The joint TerraSAR-X/TanDEM-X Mission Planning System F. Mrowka, M. P. Geyer, C. Lenzen, A. Spörl, T. Göttfert, E. Maurer,  M. Wickler, B.  Schättler I GARSS 2011, Vancouver, 29-July-2011
Overview ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Challenges: Two Satellites – Two Missions
Challenges: Two Satellites – Two Missions ,[object Object],TSX-1 CmdGen Constraint- Check, etc Order- Ingestion TSM- R2CC Order- Ingestion TSM- Order- Ingestion MPS DB
Challenges: Two Satellites – Two Missions ,[object Object],TSX-1 CmdGen TSM- R2CC TDX-1 CmdGen TSM- Order- Ingestion MPS DB Constraint- Check, etc
Challenges: Two Satellites – Two Missions
Challenges: Two Satellites – Two Missions ,[object Object],TSX-1 CmdGen TSM- R2CC TDX-1 CmdGen TSM- Order- Ingestion TDM- Order- Ingestion TDM- R2CC TAP MPS DB
Challenges:  Mutual Illumination Risks ,[object Object],[object Object],[object Object],[object Object],[object Object],0° 30° 50° 65° “ TDX may  not transmit in desc. orbit” exclusion zones (example) TSX-1 TDX-1 “ TSX may not transmit in asc. orbit” TSX-1 TDX-1
Challenges:  Sync-Warnings – The course timing Sync-Warning-Opportunity 1 Sync-Warning-Opportunity 2 TSX-DT t SWOC- Result SW max. 53min SW TDX TSX
Challenges:  Sync-Warnings – The precise timing TDM DT t SW SW TDM DT TDX TSX DataTake- StartTime- Correction Disabled Disabled Disabled Disabled TSM DT Enabled
Challenges:  Sync-Warnings - Example
Challenges ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
MPS-tsx  to  MPS-tsm-tdm : Before TDX-1Launch ,[object Object],TSX-1 CmdGen Constraint- Check, etc Order- Ingestion TSM- R2CC Order- Ingestion TSM- Order- Ingestion MPS-tsx MPS DB TSX-1 CmdGen TSM- R2CC TDX-1 CmdGen TSM- Order- Ingestion TDM- Order- Ingestion TDM- R2CC TAP MPS DB Space-Craft- Simulator On-ground After TDX-1 Launch ? TSX-1 TDX-1
MPS-tsx to MPS-tsm-tdm: Commisioning Phase June‘10 July‘10 Aug‘10 Sep‘10 Oct‘10 Nov‘10 Dec‘10 Early Orbit Phase Grg Segment Checkout Bi-static Commissioning Phase 20 km Formation TDX Orbit Drift 16.000 km    20 km Close Helix-Formation 300-400 m Launch 21 June First SAR Image  24 June (MET +3.6) First DEM  16 July (MET +25) TDX Monostatic Comm. Phase 6 Months Commissioning Phase First close formation DEM  19 October (MET +124) First bi-static SAR image  8 August (MET +48) 20 km Formation TDX Orbit Drift 16.000 km    20 km
MPS-tsx  to  MPS-tsm-tdm : Commissioning Phase ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
MPS-tsx to MPS-tsm-tdm: Commisioning Phase June‘10 July‘10 Aug‘10 Sep‘10 Oct‘10 Nov‘10 Dec‘10 Early Orbit Phase Grg Segment Checkout Bi-static Commissioning Phase 20 km Formation TDX Orbit Drift 16.000 km    20 km Close Helix-Formation 300-400 m Launch 21 June First SAR Image  24 June (MET +3.6) First DEM  16 July (MET +25) TDX Monostatic Comm. Phase 6 Months Commissioning Phase First close formation DEM  19 October (MET +124) First bi-static SAR image  8 August (MET +48)
MPS-tsx  to  MPS-tsm-tdm : Commissioning Phase ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
MPS-tsm-tdm:  Operationalization  / Close Formation Change 07.10.2010 Forma-tion change  2 3 4 5 6 7 8 9 10 11 1 2 3 4 MPS-tsm-tdm Operation-alisation 5 6 7 8 9 10 11 18.10.2010 W W W W ,[object Object],W W Kiruna Sync Warn, ISL 05.10.2010 Cycle  8 Cycle  6 TSX:  extend. timeline First timelines with updated Ground Segment Cycle  7 1 2 3 4 5 6 7 8 9 10 11 29.10.2010 W W NSG Inuvik Statisitical DTs TSXX DAS TSXX DAS Statistical DTs TSXX DAS ,[object Object],TSX ASM Test Bi- CP TDX:  operational DTs W TSX Excl. Zone   Test 04.10.2010 26.09.2010 First bi-static image
MPS-tsm-tdm: Bistatic Commisioning Phase June‘10 July‘10 Aug‘10 Sep‘10 Oct‘10 Nov‘10 Dec‘10 Early Orbit Phase Grg Segment Checkout Bi-static Commissioning Phase 20 km Formation TDX Orbit Drift 16.000 km    20 km Close Helix-Formation 300-400 m Launch 21 June First SAR Image  24 June (MET +3.6) First DEM  16 July (MET +25) TDX Monostatic Comm. Phase 6 Months Commissioning Phase First close formation DEM  19 October (MET +124) First bi-static SAR image  8 August (MET +48)
MPS-tsm-tdm:  Full automatic operations ,[object Object],[object Object],[object Object],[object Object],Often more then 100 000 Usually less then 10 000 Internal Profile-Pieces Around 200 Around 100 Constraints Often more then 3000 Usually less then 1000 Commands per day Often more then 4000 Usually less then 500 Datatakes (candidates) per day MPS-tsm-tdm MPS-tsx Number of ..
MPS-tsm-tdm:  Operations ,[object Object],[object Object],[object Object],[object Object]
TanDEM-X Ground Station Network Inuvik O‘Higgins Kiruna Chetumal DLR Neustrelitz for TerraSAR-X
MPS-tsm-tdm:  Operations
Outlook ,[object Object],[object Object],[object Object],[object Object],[object Object]
Outlook ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Mt. St. Helens, USA 2010-08-13T01:54:09
 
Power  Modeling I Energy conflict Lost Values  (unused energy) Fill Level (state of charge) Upper Limit (battery capacity) Lower Bound Conflict on fill level Solar panels charging the battery Battery full Energy consumption greater than supply Solar panels charging the battery Battery discharging
Power Modeling II Charge level without warm-up Charge level with warm-up Warm-up of RS1 instrument  Consumption profile Charge level
SSMM-Modelling DL1 TDX-1 DL1 TSX-2 Datatake 1 Datatake 2 Datatake 3 Datatake 4 Datatake 5 Datatake 6 DL1 TSX-1 DL1 TDX-2 DL1 TSX-3 DL1 TDX-3 Groundstation GS Groundstation DL1 TSX-4 DL1 TDX-4 DL1 TDX-1 DL1 TDX-2 DL1 TSX-5 DL1 TDX-5 DL1 TDX-3 DL1 TSX-6 DL1 TDX-6 DL1 TDX-4 DL1 TDX-5 DL1 TDX-6 TDX-1 memory TSX-1 memory

Mais conteúdo relacionado

Mais procurados

Grlweap frank rausche
Grlweap  frank rauscheGrlweap  frank rausche
Grlweap frank rauschecfpbolivia
 
Mathematics Colloquium, UCSC
Mathematics Colloquium, UCSCMathematics Colloquium, UCSC
Mathematics Colloquium, UCSCdongwook159
 
AMS 250 - High-Performance, Massively Parallel Computing with FLASH
AMS 250 - High-Performance, Massively Parallel Computing with FLASH AMS 250 - High-Performance, Massively Parallel Computing with FLASH
AMS 250 - High-Performance, Massively Parallel Computing with FLASH dongwook159
 
Spaceborne Imagery For Environmental & Disaster Monitoring
Spaceborne Imagery For Environmental & Disaster MonitoringSpaceborne Imagery For Environmental & Disaster Monitoring
Spaceborne Imagery For Environmental & Disaster Monitoringgpetrie
 
Extraction of Ephemeris file from Matlab SDR
Extraction of Ephemeris file from Matlab SDRExtraction of Ephemeris file from Matlab SDR
Extraction of Ephemeris file from Matlab SDRAsimKhan367
 
Orbit determination of a non transmitting satellite
Orbit determination of a non transmitting satelliteOrbit determination of a non transmitting satellite
Orbit determination of a non transmitting satelliteClifford Stone
 
presentationsample_KAKE_cosmicraytelescope_final-presentation_REVISED_3D_26JU...
presentationsample_KAKE_cosmicraytelescope_final-presentation_REVISED_3D_26JU...presentationsample_KAKE_cosmicraytelescope_final-presentation_REVISED_3D_26JU...
presentationsample_KAKE_cosmicraytelescope_final-presentation_REVISED_3D_26JU...C. David Kearsley
 
Seismic cpt (scpt) peter robertson
Seismic cpt (scpt)   peter robertsonSeismic cpt (scpt)   peter robertson
Seismic cpt (scpt) peter robertsoncfpbolivia
 
2 aircraft flight instruments
2 aircraft flight instruments2 aircraft flight instruments
2 aircraft flight instrumentsSolo Hermelin
 
French standard for deep foundations roger frank
French standard for deep foundations   roger frankFrench standard for deep foundations   roger frank
French standard for deep foundations roger frankcfpbolivia
 
FIRST BISTATIC SPACEBORNE SAR EXPERIMENTS WITH TANDEM-X.ppt
FIRST BISTATIC SPACEBORNE SAR EXPERIMENTS WITH TANDEM-X.pptFIRST BISTATIC SPACEBORNE SAR EXPERIMENTS WITH TANDEM-X.ppt
FIRST BISTATIC SPACEBORNE SAR EXPERIMENTS WITH TANDEM-X.pptgrssieee
 
TGS NSA- Loyal 3D
TGS NSA- Loyal 3D TGS NSA- Loyal 3D
TGS NSA- Loyal 3D TGS
 
Short introduction to CLIC and CTF3
Short introduction to CLIC and CTF3Short introduction to CLIC and CTF3
Short introduction to CLIC and CTF3asafrona
 
Iea59 optimiz tobita aaa
Iea59 optimiz tobita aaaIea59 optimiz tobita aaa
Iea59 optimiz tobita aaawixapps
 
MO3.L09.2 - BISTATIC SAR BASED ON TERRASAR-X AND GROUND BASED RECEIVERS
MO3.L09.2 - BISTATIC SAR BASED ON TERRASAR-X AND GROUND BASED RECEIVERSMO3.L09.2 - BISTATIC SAR BASED ON TERRASAR-X AND GROUND BASED RECEIVERS
MO3.L09.2 - BISTATIC SAR BASED ON TERRASAR-X AND GROUND BASED RECEIVERSgrssieee
 
14 fixed wing fighter aircraft- flight performance - ii
14 fixed wing fighter aircraft- flight performance - ii14 fixed wing fighter aircraft- flight performance - ii
14 fixed wing fighter aircraft- flight performance - iiSolo Hermelin
 
Noise from stray light in interferometric GWs detectors
Noise from stray light in interferometric GWs detectorsNoise from stray light in interferometric GWs detectors
Noise from stray light in interferometric GWs detectorsJose Gonzalez
 

Mais procurados (19)

Grlweap frank rausche
Grlweap  frank rauscheGrlweap  frank rausche
Grlweap frank rausche
 
Mathematics Colloquium, UCSC
Mathematics Colloquium, UCSCMathematics Colloquium, UCSC
Mathematics Colloquium, UCSC
 
AMS 250 - High-Performance, Massively Parallel Computing with FLASH
AMS 250 - High-Performance, Massively Parallel Computing with FLASH AMS 250 - High-Performance, Massively Parallel Computing with FLASH
AMS 250 - High-Performance, Massively Parallel Computing with FLASH
 
Spaceborne Imagery For Environmental & Disaster Monitoring
Spaceborne Imagery For Environmental & Disaster MonitoringSpaceborne Imagery For Environmental & Disaster Monitoring
Spaceborne Imagery For Environmental & Disaster Monitoring
 
Extraction of Ephemeris file from Matlab SDR
Extraction of Ephemeris file from Matlab SDRExtraction of Ephemeris file from Matlab SDR
Extraction of Ephemeris file from Matlab SDR
 
Orbit determination of a non transmitting satellite
Orbit determination of a non transmitting satelliteOrbit determination of a non transmitting satellite
Orbit determination of a non transmitting satellite
 
presentationsample_KAKE_cosmicraytelescope_final-presentation_REVISED_3D_26JU...
presentationsample_KAKE_cosmicraytelescope_final-presentation_REVISED_3D_26JU...presentationsample_KAKE_cosmicraytelescope_final-presentation_REVISED_3D_26JU...
presentationsample_KAKE_cosmicraytelescope_final-presentation_REVISED_3D_26JU...
 
Seismic cpt (scpt) peter robertson
Seismic cpt (scpt)   peter robertsonSeismic cpt (scpt)   peter robertson
Seismic cpt (scpt) peter robertson
 
2 aircraft flight instruments
2 aircraft flight instruments2 aircraft flight instruments
2 aircraft flight instruments
 
French standard for deep foundations roger frank
French standard for deep foundations   roger frankFrench standard for deep foundations   roger frank
French standard for deep foundations roger frank
 
FIRST BISTATIC SPACEBORNE SAR EXPERIMENTS WITH TANDEM-X.ppt
FIRST BISTATIC SPACEBORNE SAR EXPERIMENTS WITH TANDEM-X.pptFIRST BISTATIC SPACEBORNE SAR EXPERIMENTS WITH TANDEM-X.ppt
FIRST BISTATIC SPACEBORNE SAR EXPERIMENTS WITH TANDEM-X.ppt
 
Orbital Debris Mapping
Orbital Debris MappingOrbital Debris Mapping
Orbital Debris Mapping
 
TGS NSA- Loyal 3D
TGS NSA- Loyal 3D TGS NSA- Loyal 3D
TGS NSA- Loyal 3D
 
Short introduction to CLIC and CTF3
Short introduction to CLIC and CTF3Short introduction to CLIC and CTF3
Short introduction to CLIC and CTF3
 
Iea59 optimiz tobita aaa
Iea59 optimiz tobita aaaIea59 optimiz tobita aaa
Iea59 optimiz tobita aaa
 
MO3.L09.2 - BISTATIC SAR BASED ON TERRASAR-X AND GROUND BASED RECEIVERS
MO3.L09.2 - BISTATIC SAR BASED ON TERRASAR-X AND GROUND BASED RECEIVERSMO3.L09.2 - BISTATIC SAR BASED ON TERRASAR-X AND GROUND BASED RECEIVERS
MO3.L09.2 - BISTATIC SAR BASED ON TERRASAR-X AND GROUND BASED RECEIVERS
 
residual-spectra
residual-spectraresidual-spectra
residual-spectra
 
14 fixed wing fighter aircraft- flight performance - ii
14 fixed wing fighter aircraft- flight performance - ii14 fixed wing fighter aircraft- flight performance - ii
14 fixed wing fighter aircraft- flight performance - ii
 
Noise from stray light in interferometric GWs detectors
Noise from stray light in interferometric GWs detectorsNoise from stray light in interferometric GWs detectors
Noise from stray light in interferometric GWs detectors
 

Semelhante a 5_IGARSS-2011-Joint-TSM-TDM-Mission-Planning-System_final.ppt

TH1.L10.2: TANDEM-X COMMISSIONING PHASE STATUS
TH1.L10.2: TANDEM-X COMMISSIONING PHASE STATUSTH1.L10.2: TANDEM-X COMMISSIONING PHASE STATUS
TH1.L10.2: TANDEM-X COMMISSIONING PHASE STATUSgrssieee
 
TH1.L10.1: TANDEM-X: SCIENTIFIC CONTRIBUTIONS
TH1.L10.1: TANDEM-X: SCIENTIFIC CONTRIBUTIONSTH1.L10.1: TANDEM-X: SCIENTIFIC CONTRIBUTIONS
TH1.L10.1: TANDEM-X: SCIENTIFIC CONTRIBUTIONSgrssieee
 
Mission Concept Presentation for Project A.D.I.O.S.
Mission Concept Presentation for Project A.D.I.O.S.Mission Concept Presentation for Project A.D.I.O.S.
Mission Concept Presentation for Project A.D.I.O.S.Sung (Stephen) Kim
 
IGARSS 2011 - RCM, The Making of (AC) (Short).ppt
IGARSS 2011 - RCM, The Making of (AC) (Short).pptIGARSS 2011 - RCM, The Making of (AC) (Short).ppt
IGARSS 2011 - RCM, The Making of (AC) (Short).pptgrssieee
 
DEVELOPMENT OF HIGH TEMPERATURE NOISE SOURCE (HTS) FOR ADVANCED MICROWAVE SCA...
DEVELOPMENT OF HIGH TEMPERATURE NOISE SOURCE (HTS) FOR ADVANCED MICROWAVE SCA...DEVELOPMENT OF HIGH TEMPERATURE NOISE SOURCE (HTS) FOR ADVANCED MICROWAVE SCA...
DEVELOPMENT OF HIGH TEMPERATURE NOISE SOURCE (HTS) FOR ADVANCED MICROWAVE SCA...grssieee
 
Mars CubeSat Telecom Relay Constellation_JPL Final
Mars CubeSat Telecom Relay Constellation_JPL FinalMars CubeSat Telecom Relay Constellation_JPL Final
Mars CubeSat Telecom Relay Constellation_JPL FinalRohan Deshmukh
 
Télémesure-Télécommande [Mode de compatibilité].pdf
Télémesure-Télécommande [Mode de compatibilité].pdfTélémesure-Télécommande [Mode de compatibilité].pdf
Télémesure-Télécommande [Mode de compatibilité].pdfzakariyaeelmourabit
 
Introduction to gps and gnss
Introduction to gps and gnssIntroduction to gps and gnss
Introduction to gps and gnssVivek Srivastava
 
Interstellar explorerjun01
Interstellar explorerjun01Interstellar explorerjun01
Interstellar explorerjun01Clifford Stone
 
Team ESAT Preliminary Design Review
Team ESAT Preliminary Design ReviewTeam ESAT Preliminary Design Review
Team ESAT Preliminary Design Reviewmarc_cattrell
 
NatSat INSPIRE Presenation
NatSat INSPIRE Presenation NatSat INSPIRE Presenation
NatSat INSPIRE Presenation Linda Schmidt
 
ZTE (3GPP Specification Evolution).ppt
ZTE (3GPP Specification Evolution).pptZTE (3GPP Specification Evolution).ppt
ZTE (3GPP Specification Evolution).pptabasabdallha
 
3_Xorbits_InSAR_IGARSS2011.ppt
3_Xorbits_InSAR_IGARSS2011.ppt3_Xorbits_InSAR_IGARSS2011.ppt
3_Xorbits_InSAR_IGARSS2011.pptgrssieee
 
Miniaturizing Space: Small-satellites
Miniaturizing Space: Small-satellitesMiniaturizing Space: Small-satellites
Miniaturizing Space: Small-satellitesX. Breogan COSTA
 
ISU storage First Draft 1
ISU storage First Draft 1ISU storage First Draft 1
ISU storage First Draft 1isutp2
 
Williams_FR1_TO4_5_2011_07_29v1.ppt
Williams_FR1_TO4_5_2011_07_29v1.pptWilliams_FR1_TO4_5_2011_07_29v1.ppt
Williams_FR1_TO4_5_2011_07_29v1.pptgrssieee
 

Semelhante a 5_IGARSS-2011-Joint-TSM-TDM-Mission-Planning-System_final.ppt (20)

TH1.L10.2: TANDEM-X COMMISSIONING PHASE STATUS
TH1.L10.2: TANDEM-X COMMISSIONING PHASE STATUSTH1.L10.2: TANDEM-X COMMISSIONING PHASE STATUS
TH1.L10.2: TANDEM-X COMMISSIONING PHASE STATUS
 
TH1.L10.1: TANDEM-X: SCIENTIFIC CONTRIBUTIONS
TH1.L10.1: TANDEM-X: SCIENTIFIC CONTRIBUTIONSTH1.L10.1: TANDEM-X: SCIENTIFIC CONTRIBUTIONS
TH1.L10.1: TANDEM-X: SCIENTIFIC CONTRIBUTIONS
 
Mission Concept Presentation for Project A.D.I.O.S.
Mission Concept Presentation for Project A.D.I.O.S.Mission Concept Presentation for Project A.D.I.O.S.
Mission Concept Presentation for Project A.D.I.O.S.
 
IGARSS 2011 - RCM, The Making of (AC) (Short).ppt
IGARSS 2011 - RCM, The Making of (AC) (Short).pptIGARSS 2011 - RCM, The Making of (AC) (Short).ppt
IGARSS 2011 - RCM, The Making of (AC) (Short).ppt
 
DEVELOPMENT OF HIGH TEMPERATURE NOISE SOURCE (HTS) FOR ADVANCED MICROWAVE SCA...
DEVELOPMENT OF HIGH TEMPERATURE NOISE SOURCE (HTS) FOR ADVANCED MICROWAVE SCA...DEVELOPMENT OF HIGH TEMPERATURE NOISE SOURCE (HTS) FOR ADVANCED MICROWAVE SCA...
DEVELOPMENT OF HIGH TEMPERATURE NOISE SOURCE (HTS) FOR ADVANCED MICROWAVE SCA...
 
Mars CubeSat Telecom Relay Constellation_JPL Final
Mars CubeSat Telecom Relay Constellation_JPL FinalMars CubeSat Telecom Relay Constellation_JPL Final
Mars CubeSat Telecom Relay Constellation_JPL Final
 
Télémesure-Télécommande [Mode de compatibilité].pdf
Télémesure-Télécommande [Mode de compatibilité].pdfTélémesure-Télécommande [Mode de compatibilité].pdf
Télémesure-Télécommande [Mode de compatibilité].pdf
 
Introduction to gps and gnss
Introduction to gps and gnssIntroduction to gps and gnss
Introduction to gps and gnss
 
Interstellar explorerjun01
Interstellar explorerjun01Interstellar explorerjun01
Interstellar explorerjun01
 
Team ESAT Preliminary Design Review
Team ESAT Preliminary Design ReviewTeam ESAT Preliminary Design Review
Team ESAT Preliminary Design Review
 
NatSat INSPIRE Presenation
NatSat INSPIRE Presenation NatSat INSPIRE Presenation
NatSat INSPIRE Presenation
 
ZTE (3GPP Specification Evolution).ppt
ZTE (3GPP Specification Evolution).pptZTE (3GPP Specification Evolution).ppt
ZTE (3GPP Specification Evolution).ppt
 
3_Xorbits_InSAR_IGARSS2011.ppt
3_Xorbits_InSAR_IGARSS2011.ppt3_Xorbits_InSAR_IGARSS2011.ppt
3_Xorbits_InSAR_IGARSS2011.ppt
 
Chap2 ofdm basics
Chap2 ofdm basicsChap2 ofdm basics
Chap2 ofdm basics
 
Miniaturizing Space: Small-satellites
Miniaturizing Space: Small-satellitesMiniaturizing Space: Small-satellites
Miniaturizing Space: Small-satellites
 
Dsbr
DsbrDsbr
Dsbr
 
sync sources - overview
 sync sources - overview sync sources - overview
sync sources - overview
 
general overview
 general overview general overview
general overview
 
ISU storage First Draft 1
ISU storage First Draft 1ISU storage First Draft 1
ISU storage First Draft 1
 
Williams_FR1_TO4_5_2011_07_29v1.ppt
Williams_FR1_TO4_5_2011_07_29v1.pptWilliams_FR1_TO4_5_2011_07_29v1.ppt
Williams_FR1_TO4_5_2011_07_29v1.ppt
 

Mais de grssieee

Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...
Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...
Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...grssieee
 
SEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODEL
SEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODELSEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODEL
SEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODELgrssieee
 
TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...
TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...
TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...grssieee
 
THE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIES
THE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIESTHE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIES
THE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIESgrssieee
 
GMES SPACE COMPONENT:PROGRAMMATIC STATUS
GMES SPACE COMPONENT:PROGRAMMATIC STATUSGMES SPACE COMPONENT:PROGRAMMATIC STATUS
GMES SPACE COMPONENT:PROGRAMMATIC STATUSgrssieee
 
PROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETER
PROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETERPROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETER
PROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETERgrssieee
 
DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...
DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...
DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...grssieee
 
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...grssieee
 
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...grssieee
 
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...grssieee
 
test 34mb wo animations
test  34mb wo animationstest  34mb wo animations
test 34mb wo animationsgrssieee
 
2011_Fox_Tax_Worksheets.pdf
2011_Fox_Tax_Worksheets.pdf2011_Fox_Tax_Worksheets.pdf
2011_Fox_Tax_Worksheets.pdfgrssieee
 
DLR open house
DLR open houseDLR open house
DLR open housegrssieee
 
DLR open house
DLR open houseDLR open house
DLR open housegrssieee
 
DLR open house
DLR open houseDLR open house
DLR open housegrssieee
 
Tana_IGARSS2011.ppt
Tana_IGARSS2011.pptTana_IGARSS2011.ppt
Tana_IGARSS2011.pptgrssieee
 
Solaro_IGARSS_2011.ppt
Solaro_IGARSS_2011.pptSolaro_IGARSS_2011.ppt
Solaro_IGARSS_2011.pptgrssieee
 

Mais de grssieee (20)

Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...
Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...
Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...
 
SEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODEL
SEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODELSEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODEL
SEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODEL
 
TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...
TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...
TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...
 
THE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIES
THE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIESTHE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIES
THE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIES
 
GMES SPACE COMPONENT:PROGRAMMATIC STATUS
GMES SPACE COMPONENT:PROGRAMMATIC STATUSGMES SPACE COMPONENT:PROGRAMMATIC STATUS
GMES SPACE COMPONENT:PROGRAMMATIC STATUS
 
PROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETER
PROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETERPROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETER
PROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETER
 
DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...
DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...
DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...
 
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
 
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
 
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
 
Test
TestTest
Test
 
test 34mb wo animations
test  34mb wo animationstest  34mb wo animations
test 34mb wo animations
 
Test 70MB
Test 70MBTest 70MB
Test 70MB
 
Test 70MB
Test 70MBTest 70MB
Test 70MB
 
2011_Fox_Tax_Worksheets.pdf
2011_Fox_Tax_Worksheets.pdf2011_Fox_Tax_Worksheets.pdf
2011_Fox_Tax_Worksheets.pdf
 
DLR open house
DLR open houseDLR open house
DLR open house
 
DLR open house
DLR open houseDLR open house
DLR open house
 
DLR open house
DLR open houseDLR open house
DLR open house
 
Tana_IGARSS2011.ppt
Tana_IGARSS2011.pptTana_IGARSS2011.ppt
Tana_IGARSS2011.ppt
 
Solaro_IGARSS_2011.ppt
Solaro_IGARSS_2011.pptSolaro_IGARSS_2011.ppt
Solaro_IGARSS_2011.ppt
 

5_IGARSS-2011-Joint-TSM-TDM-Mission-Planning-System_final.ppt

  • 1. The joint TerraSAR-X/TanDEM-X Mission Planning System F. Mrowka, M. P. Geyer, C. Lenzen, A. Spörl, T. Göttfert, E. Maurer, M. Wickler, B. Schättler I GARSS 2011, Vancouver, 29-July-2011
  • 2.
  • 3. Challenges: Two Satellites – Two Missions
  • 4.
  • 5.
  • 6. Challenges: Two Satellites – Two Missions
  • 7.
  • 8.
  • 9. Challenges: Sync-Warnings – The course timing Sync-Warning-Opportunity 1 Sync-Warning-Opportunity 2 TSX-DT t SWOC- Result SW max. 53min SW TDX TSX
  • 10. Challenges: Sync-Warnings – The precise timing TDM DT t SW SW TDM DT TDX TSX DataTake- StartTime- Correction Disabled Disabled Disabled Disabled TSM DT Enabled
  • 12.
  • 13.
  • 14. MPS-tsx to MPS-tsm-tdm: Commisioning Phase June‘10 July‘10 Aug‘10 Sep‘10 Oct‘10 Nov‘10 Dec‘10 Early Orbit Phase Grg Segment Checkout Bi-static Commissioning Phase 20 km Formation TDX Orbit Drift 16.000 km  20 km Close Helix-Formation 300-400 m Launch 21 June First SAR Image 24 June (MET +3.6) First DEM 16 July (MET +25) TDX Monostatic Comm. Phase 6 Months Commissioning Phase First close formation DEM 19 October (MET +124) First bi-static SAR image 8 August (MET +48) 20 km Formation TDX Orbit Drift 16.000 km  20 km
  • 15.
  • 16. MPS-tsx to MPS-tsm-tdm: Commisioning Phase June‘10 July‘10 Aug‘10 Sep‘10 Oct‘10 Nov‘10 Dec‘10 Early Orbit Phase Grg Segment Checkout Bi-static Commissioning Phase 20 km Formation TDX Orbit Drift 16.000 km  20 km Close Helix-Formation 300-400 m Launch 21 June First SAR Image 24 June (MET +3.6) First DEM 16 July (MET +25) TDX Monostatic Comm. Phase 6 Months Commissioning Phase First close formation DEM 19 October (MET +124) First bi-static SAR image 8 August (MET +48)
  • 17.
  • 18.
  • 19. MPS-tsm-tdm: Bistatic Commisioning Phase June‘10 July‘10 Aug‘10 Sep‘10 Oct‘10 Nov‘10 Dec‘10 Early Orbit Phase Grg Segment Checkout Bi-static Commissioning Phase 20 km Formation TDX Orbit Drift 16.000 km  20 km Close Helix-Formation 300-400 m Launch 21 June First SAR Image 24 June (MET +3.6) First DEM 16 July (MET +25) TDX Monostatic Comm. Phase 6 Months Commissioning Phase First close formation DEM 19 October (MET +124) First bi-static SAR image 8 August (MET +48)
  • 20.
  • 21.
  • 22. TanDEM-X Ground Station Network Inuvik O‘Higgins Kiruna Chetumal DLR Neustrelitz for TerraSAR-X
  • 24.
  • 25.
  • 26. Mt. St. Helens, USA 2010-08-13T01:54:09
  • 27.  
  • 28. Power Modeling I Energy conflict Lost Values (unused energy) Fill Level (state of charge) Upper Limit (battery capacity) Lower Bound Conflict on fill level Solar panels charging the battery Battery full Energy consumption greater than supply Solar panels charging the battery Battery discharging
  • 29. Power Modeling II Charge level without warm-up Charge level with warm-up Warm-up of RS1 instrument Consumption profile Charge level
  • 30. SSMM-Modelling DL1 TDX-1 DL1 TSX-2 Datatake 1 Datatake 2 Datatake 3 Datatake 4 Datatake 5 Datatake 6 DL1 TSX-1 DL1 TDX-2 DL1 TSX-3 DL1 TDX-3 Groundstation GS Groundstation DL1 TSX-4 DL1 TDX-4 DL1 TDX-1 DL1 TDX-2 DL1 TSX-5 DL1 TDX-5 DL1 TDX-3 DL1 TSX-6 DL1 TDX-6 DL1 TDX-4 DL1 TDX-5 DL1 TDX-6 TDX-1 memory TSX-1 memory