Greg Babinski, MA, GISP
Finance & Marketing Manager
King County GIS Center
Seattle, WA
URISA Past-President
URISA GMI Committee Chair
Summit Chief Editor
URISA Develops the Geospatial Management
Competency Model (GMCM) for USDOLETA
November 14, 2012
Agenda
 Precursors: USM/NASA
 URISA’s GISCMM
 USDOLETA Geospatial Technology Competency Model
 GTCM and the Missing Tier 9 – Management Competency
 URISA Commits to Develop the GMCM:
 Washington URISA – 2011 GMCM Strawman Draft
 GIS-Pro 2011- GMCM Task Force & Work Session
 The URISA GMCM:
 4 Domains, 17 Cluster Areas
 74 Competencies
 Public Review & Comment
 Final Revisions
 Publication
 What to do with the GMCM?
 Questions & Discussion
Why Develop a Geospatial Competency Model?
For Business and Industry
For Workforce Investment Boards
For One-Stop Career Centers
For Economic Developers
For Educators and Training Providers
For Students
For Practitioners
To Establish the Geospatial Professional Domain,
separate from all other domains
Precursor: USM/NASA Geospatial Competency Model
Precursor:
USM/NASA
Geospatial
Competency
Model
Precursor: USM/NASA
Geospatial Competency
Model
Municipal GIS Capability
Maturity Model
The Ubiquitous Municipal GIS
 GIS has become a common component of city &
county government
 All large and most medium sized cities & counties
have established GIS operations
 Many small sized jurisdictions have a GIS
 31 of 39 Washington Counties have public web
mapping capability implying GIS operations of some
sort
 Dozens of Washington cities are known to have GIS
operations
Municipal GIS Capability
Maturity Model
Variations in Municipal GIS Operations
What causes variation in municipal GIS Operations?
 Each municipality is unique
 City and county business focus often varies
 Population
 Nature and level of economic development
Municipal GIS Capability
Maturity Model
Variations in Municipal GIS Operations
What causes variation in municipal GIS Operations?
 GIS development history and funding
 GIS operational budget and staffing
 GIS strategic plan
 Municipality’s institutional expectations
 GIS operational vision – or lack of vision?
Municipal GIS Capability
Maturity Model
When is GIS Development ‘Done’?
There are many ways to answer:
 With an external focus?
 Best practices
 Benchmarking
 With a theoretical focus?
 Ideal design
 Academic state of the art
 With a capability focus?
 With a maturity level focus?
Municipal GIS Capability
Maturity Model
What is a Capability Maturity Model?
 A tool to assess an organization’s ability to accomplish a
defined task or set of tasks
 Originated with the Software Engineering Institute
 Objective evaluation of software contractors
 SEI published Managing the Software Process 1989
 SEI CMM is process focused
 Other applications of the capability maturity model concept:
 System engineering
 Project management
 Risk management
 Information technology service providers
Municipal GIS Capability
Maturity Model
Why Develop a GIS Maturity Model?
To provide a means for any municipal GIS operation to gauge its
maturity against a variety of standards and/or measures,
including:
 A theoretical ideal end state of GIS organizational development
 The maturity level of other peer GIS organizations , either
individually or in aggregate
 The maturity level of the subject organization over time
 The maturity level of the organization against an agreed target
state (perhaps set by organizational policy, budget limitations,
etc.)
Municipal GIS Capability
Maturity Model
URISA’s Municipal GIS Capability
Maturity Model
 Maturity for the proposed model indicates progression of an
organization towards GIS capability that maximizes:
 Potential for the use of state of the art GIS technology
 Commonly recognized quality data
 Organizational best practices appropriate for municipal business
use
 The Municipal GIS Capability Maturity Model assumes two
broad areas of GIS operational development:
 Enabling capability
 Execution ability
Municipal GIS Capability
Maturity Model
 Enabling Capability:
 Technology
 Data
 Resources
 Infrastructure
 GIS professional staff
 Execution Ability:
 Ability of the staff to maximize use of available
capability
 Ability to execute relative to normative ideal
URISA’s Municipal GIS Capability
Maturity Model
Municipal GIS Capability
Maturity Model
Enabling Capability
Components:
URISA’s Municipal GIS Capability Maturity Model
Municipal GIS Capability
Maturity Model
Enabling Capability Assessment Scale:
URISA’s Municipal GIS Capability Maturity Model
Municipal GIS Capability
Maturity Model
Execution Ability
Components:
URISA’s Municipal GIS Capability Maturity Model
Municipal GIS Capability
Maturity Model
Execution Ability Assessment Scale:
URISA’s Municipal GIS Capability Maturity Model
2010 -URISA Commits to Develop Tier 9: The
Geospatial Management Competency Model
The GTCM is an element of the U.S. Department of Labor
Employment and Training Administration’s (DOLETA’s)
Competency Modeling Initiative
(http://www.careeronestop.org/competencymodel/).
For DOLETA, a “competency” is the capability to apply or use
a set of related knowledge, skills, and abilities required to
successfully perform “critical work functions” or tasks.
A “competency model” is a collection of competencies that
together define successful performance (Ennis 2008).
The Competency Modeling Initiative promotes the
development of industry-driven competency models in high-
growth, high-demand industries.
DOLETA identified “geospatial technology” as a high-growth
industry in 2003.
GTCM and the Missing Tier 9 –
Management Competency
In 2010, DOLETA issued a Geospatial
Technology Competency Model (GTCM) that
specifies the foundational (Tiers 1-3),
industry-wide (Tier 4), and industry sector-
specific (Tier 5) expertise characteristic of the
various occupations that comprise the
geospatial industry
(http://www.careeronestop.org/Competency
Model/pyramid.aspx?GEO=Y) . Descriptions
of individual geospatial occupations,
including occupation-specific competencies
and job requirements (Tiers 6-8), are
published in DOLETA’s O*NET occupation
database (http://www.onetonline.org/). The
GMCM corresponds to Tier 9 of the GTCM.
2010 -URISA Commits to Develop Tier 9: The
Geospatial Management Competency Model
URISA GMCM Core Team:
 David DiBiase
 Patrick Kennelly
 Greg Babinski
 Coordination with USDOLETA
Developing The
Geospatial
Management
Competency Model
Developing The Geospatial Management
Competency Model
2011 Washington GIS Conference:
GISCMM Review - GMCM Strawman Task Force (May 2011)
Greg Babinski, GISP, King County (WA) GIS Center
Steve Beimburn, City of Seattle (WA) GIS
Don Burdick, GISP, City of Bellingham (WA) GIS
Amy Esnard, GISP, Multnomah County (OR) GIS
George Horning, King County (WA) GIS Center
Tami Griffin, Thurston County (WA) GIS
Ian Von Essen, Spokane County (WA) GIS
Developing The Geospatial Management Competency
Model: Strawman Draft
Developing The Geospatial Management Competency
Model: Strawman Draft
Developing The Geospatial Management Competency Model:
2011 GIS-Pro GMCM Task Force
GMCM Task Force (November 2011 – June 2012)
David DiBiase (facilitator), GISP, CMS, Director of Education, Esri
Greg Babinski, GISP, Finance & Marketing Manager, King County GIS Center
Thomas Conry, GIS Manager, Fairfax County VA
Peter Croswell, PMP, GISP, President, Croswell-Schulte IT Consultants
Dianne Haley, DMH GIS Consulting
Patrick Kennelly, Associate Professor of Geography, Long Island University
and Penn State University
Twyla McDermott, Corporate Strategic Technology Planning Manager, City of
Charlotte NC
Robert Ryan, CP, PLS, URS Corporation
Rebecca Somers, President, Somers-St. Claire GIS Management Consultants
Bruce Stauffer, Vice President, geographIT
Dr. Chin-hong Sun, Professor of Geography, National Taiwan University
The Geospatial Management Competency Model
A Challenge:
 Competency Domains n=4
 Competency Clusters n=17
 Competencies: n=74
The Geospatial Management Competency Model
Competency Domains n=4
Based on Hays Group
Management Model
 Manage yourself
 Manage your team
 Manage collaborations
 Manage the work
Competency Clusters n=17
A. Self-Management
B. Human Resource Management
C. Performance management
D. Legal Affairs Management
E. Communication
F. Team Management
G. Relationship Management
H. Business Development
I. Leadership
J. Professional Development
K. Strategic Planning and Action
L. Work Management
M. Geospatial Project Management
N. Political Skills
O. Contract Management
P. Financial Management
Q. Asset Management
The Geospatial Management Competency Model
Competencies n=74
Competencies The following list represents the GMCM Task Force’s consensus (i.e., 80 percent
agreement) about the minimum number of critical work functions that most geospatial
managers need to be able to perform. The sequence corresponds roughly to the order of
competency areas expect that recurring competencies are listed only once.
1. Keep up with technology trends
2. Keep abreast of developments that affect your organization
3. Apply sound decision making practices
4. Assess and improve your skills and performance regularly
5. Develop a geospatial staffing plan to meet business needs
6. Recruit and hire competent geospatial and support staff
7. Define geospatial work functions and assign appropriate staff
8. Establish clear performance expectations
9. Emphasize accountability
10. Acknowledge and encourage exceptional achievement
11. Remediate performance shortfalls effectively
12. Avoid conflicts of interest—actual and apparent
The Geospatial Management Competency Model
13. Comply with all relevant laws and regulations
14. Follow relevant professional codes of ethics
15. Communicate effectively in all forms, formats, and media
16. Communicate effectively to all sizes and types of audiences
17. Communicate the value of geospatial technology to decision makers and
stakeholders
18. Foster an environment conducive to teamwork
19. Assemble, charge, and enable effective work teams
20. Help resolve conflicts among team members
21. Develop and maintain long-term client relationships
22. Develop collaborative relationships within the organization
23. Build relationships with other organizations to promote mutually
advantageous partnerships and best practices
24. Maintain productive relationships with vendors
25. Identify business opportunities
26. Evaluate risk of new ventures
27. Assess competition
28. Conduct client-focused needs evaluation
29. Develop business case and plan for developing and marketing new
ventures
30. Develop and maintain strategic partnerships
31. Develop, promote, and protect the organization’s brand
32. Lead creative thinking about geospatial technology opportunities
33. Articulate a geospatial technology vision for the organization
34. Communicate geospatial program goals to stakeholders
35. Build consensus
36. Foster a culture of employee-driven process improvement
37. Mentor staff and colleagues
38. Prepare and implement a geospatial staff competency plan
39. Provide opportunities for continuing professional development
40. Encourage contributions to the profession
41. Develop a strategic plan with measureable goals and specific actions
42. Implement a strategic planning cycle
43. Align geospatial activities to support the organization’s strategic plan
44. Adjust the plan in response to changing environment
45. Apply QA/QC best practices
46. Monitor stakeholder satisfaction
47. Improve efficiency
48. Adopt a customer service orientation
49. Apply project management knowledge and best practices
50. Understand and apply the geospatial technology components of projects
(as outlined in the Department of Labor’s Geospatial Technology Competency
Model) to accurately establish scope, resources, schedule and quality
requirements for project success
51. Identify collaborative opportunities to achieve project goals
52. Manage a portfolio of projects effectively
53. Cooperate within political and professional organizations
54. Pursue goals tactfully in context of particular organizational cultures and
governance structures
55. Identify potential political champions and engage their support
56. Honor jurisdictional responsibilities
57. Implement policies that respect the purpose and role of public, private,
nonprofit, and academic organizations in the marketplace
58. Prepare, negotiate, monitor, administer, and remediate contracts
59. Prepare Statements of Work (SOW) defining project objectives and
requirements
60. Prepare competitive solicitations including project rationale and
objectives, existing geospatial technology assets, desired services, and final
deliverables
61. Prepare proposals including understanding of need, technical approach
and proposed technology, final deliverables, schedule, budget, and relevant
qualifications
62. Prepare objective selection criteria and scoring mechanism to fairly
evaluate proposals
63. Develop service level agreements
64. Prepare and document budgets
65. Manage expenditures and income
66. Identify funding sources and obtain funding, including collaborative
opportunities
67. Develop and manage a long term financial plan
The Geospatial Management Competency Model
68. Conduct regular financial analyses
69. Implement standard financial accounting procedures and controls
70. Assure accountability by periodic independent audits
71. Understand enterprise geospatial architecture
72. Ensure that geospatial technology infrastructure meets organization
needs
73. Recognize geospatial data as a capital asset
74. Manage the asset lifecycle:
a. Establish and maintain an up-to-date asset inventory
b. Procure and upgrade assets
c. Implement and periodically audit security procedures for assets such
as work spaces, equipment, computer networks, data, and software
d. Implement computer system back-ups and periodically test reliability
of backup procedures
e. Implement sound data management procedures
The Geospatial Management Competency Model
URISA GMCM Task Force applied 74 competencies to
17 competency clusters
The Geospatial Management Competency Model
Public Review and Comment Period ended 31 March 2012
URISA GMCM Task Force reviewed all comments:
 Very few negative comments (<5%)
 Broad consensus agreement
 Use a matrix
 Identify geospatial competencies
GMCM Task Force agreed changes to the GMCM and
submitted to USDOLETA 8 June 2012
USDOLETA approved the GMCM 20 August 2012
URISA now going back to the GISCMM and consider changes
to align with the GMCM
The Geospatial Management Competency Model
and the URISA GIS Management Institute
GMBOK:
GIS Management
Body of Knowledge
Municipal
GIS
Operations
GCMM
Accreditation
GCMM: GIS
Capability
Maturity
Model
URISA
Education
ULA & UMA
GIS
Management
Educational
Program
Accreditation
GISCI
GIS Managers
Certification
Component
GMCM:
Geospatial
Management
Competency
Model
Municipal GIS Capability
Maturity Model
References and Additional Reading
Capability Maturity Model, Wikepedia Article:
http://en.wikipedia.org/wiki/Capability_Maturity_Model Accessed 8/3/2009).
Selena Rezvani, M.S.W., An Introduction to Organizational Maturity Assessment: Measuring
Organizational Capabilities, International Public Management Association Assessment
Council, ND.
Jerry Simonoff, Director, IT Investment & Enterprise Solutions, Improving IT investment
Management in the Commonwealth, Virginia Information Technology Agency, 2008.
Curtis, B., Hefley, W. E., and Miller, S. A.; People Capability Maturity Model (P-CMM),
Software Engineering Institute, 2001.
Niessink, F., Clerca, V., Tijdinka, T., and van Vlietb, H., The IT Service Capability Maturity
Model, CIBIT Consultants | Educators, 2005
Ford-Bey, M., PA Consulting Group, Proving the Business Benefits of GeoWeb Initiatives: An
ROI-Driven Approach, GeoWeb Conference, 2008.
Niessink, F. and van Vliet, H., Towards Mature IT Services, Faculty of Mathematics and
Computer Science, Vrije Universiteit Amsterdam, ND.
Gaudet, C., Annulis, H., and Carr, J., Workforce Development Models for Geospatial
Technology, University of Southern Mississippi, 2001.
Municipal GIS Capability
Maturity Model
Additional Resources
Babinski, G. (2010-11). URISA GIS Management Institute. ArcNews, Fall, 2012.
http://www.esri.com/news/arcnews/fall12articles/geospatial-society-the-gis-profession-and-
urisas-gis-management-institute.html
Babinski, G. (2010-11). URISA Proposes GIS Capability Maturity Model. ArcNews, Winter 2010/11.
http://www.esri.com/news/arcnews/winter1011articles/urisa-proposes.html
Croswell, P. (2009). The GIS Management Handbook: Concepts, Practices, and Tools for Planning,
Implementing, and Managing Geographic Information System Projects and Programs. Kessey
Dweitt Publications.
DiBiase, D., T. Corbin, T. Fox, J. Francica, K. Green, J. Jackson, G. Jeffress, B. Jones, B. Jones, J.
Mennis, K. Schuckman, C. Smith, and J. Van Sickle (2010). The New Geospatial Technology
Competency Model: Bringing Workforce Needs into Focus. URISA Journal 22:2, 55-72.
psu.edu/files/sites/file/DiBiase_etal_2010_GTCM_URISA_Journal.pdf
Ennis, M. R. (2008). Competency Models: A Review of the Literature and the Role of the
Employment and Training Administration (ETA).
http://www.careeronestop.org/COMPETENCYMODEL/info_documents/OPDRLiteratureReview.pd
f.
HayGroup (2001). The Manager Competency Model. http://www.professionallearning.
com/MCPBriefGuide.pdf
PDRI, Inc., and Aguirre International (2005). Technical Assistance Guide for Development and
Using Competency Models—One Solution for a Demand-Driven Workforce System.
http://www.careeronestop.org/competencymodel/Info_Documents/TAG.pdf.
U.S. Office of Personnel Management (2011). Competency Model for IT Program Management.
http://www.chcoc.gov/transmittals/TransmittalDetails.aspx?TransmittalID=4058
Greg Babinski, MA, GISP
URISA Past-President
URISA GIS Management Institute Committee Chair
SUMMIT Chief Editor
Finance & Marketing Manager
King County GIS Center
201 South Jackson Street, Suite 706
Seattle, WA 98104
206-263-3753
greg.babinski@kingcounty.gov
www.kingcounty.gov/gis
URISA Press Releases:
• Geospatial Management Competency Model: http://www.urisa.org/gmcm_press
• GIS Management Institute: http://www.urisa.org/gmi_pr

More Related Content

Similar to URISA Develops the Geospatial Management Competency Model (GMCM) for USDOLETA

URISA Geospatial Management Competency Model - Strawman Draft
URISA Geospatial Management Competency Model - Strawman DraftURISA Geospatial Management Competency Model - Strawman Draft
URISA Geospatial Management Competency Model - Strawman DraftGreg Babinski
 
A Proposed Municipal GIS Capability Maturity Model
A Proposed Municipal GIS Capability Maturity ModelA Proposed Municipal GIS Capability Maturity Model
A Proposed Municipal GIS Capability Maturity ModelGreg Babinski
 
URISA’s Local Government GIS Capability Maturity Model
URISA’s Local Government GIS Capability Maturity ModelURISA’s Local Government GIS Capability Maturity Model
URISA’s Local Government GIS Capability Maturity ModelGreg Babinski
 
The GIS Management Institute® and the GIS Capability Maturity Model Update, ...
The GIS Management Institute® and the  GIS Capability Maturity ModelUpdate, ...The GIS Management Institute® and the  GIS Capability Maturity ModelUpdate, ...
The GIS Management Institute® and the GIS Capability Maturity Model Update, ...Greg Babinski
 
Managing a County GIS for Results
Managing a County GIS for ResultsManaging a County GIS for Results
Managing a County GIS for ResultsGreg Babinski
 
URISA’s GIS Management Institute
URISA’s GIS Management InstituteURISA’s GIS Management Institute
URISA’s GIS Management InstituteGreg Babinski
 
GIS Capability Maturity Model - Final Version
GIS Capability Maturity Model - Final VersionGIS Capability Maturity Model - Final Version
GIS Capability Maturity Model - Final VersionGregBabinski
 
The GIS Capability Maturity Model (2013)
The GIS Capability Maturity Model (2013)The GIS Capability Maturity Model (2013)
The GIS Capability Maturity Model (2013)GregBabinski
 
URISA GISCMM May 2011 Draft
URISA GISCMM May 2011 DraftURISA GISCMM May 2011 Draft
URISA GISCMM May 2011 DraftGreg Babinski
 
URISA’s GIS Management Institute® Updates the GIS Capability Maturity Model
URISA’s GIS Management Institute® Updates the GIS Capability Maturity ModelURISA’s GIS Management Institute® Updates the GIS Capability Maturity Model
URISA’s GIS Management Institute® Updates the GIS Capability Maturity ModelGreg Babinski
 
URISA, the Geospatial Revolution, and the GIS Management Institute
URISA, the Geospatial Revolution, and the GIS Management InstituteURISA, the Geospatial Revolution, and the GIS Management Institute
URISA, the Geospatial Revolution, and the GIS Management InstituteGreg Babinski
 
URISA GIS Management Institute® The GIS Capability Maturity Model and the GMI...
URISA GIS Management Institute® The GIS Capability Maturity Model and the GMI...URISA GIS Management Institute® The GIS Capability Maturity Model and the GMI...
URISA GIS Management Institute® The GIS Capability Maturity Model and the GMI...Greg Babinski
 
URISA Draft Municipal GIS Capability Maturity Model
URISA Draft Municipal GIS Capability Maturity ModelURISA Draft Municipal GIS Capability Maturity Model
URISA Draft Municipal GIS Capability Maturity ModelGreg Babinski
 
Urisa muni giscmm-draft-questionairre
Urisa muni giscmm-draft-questionairreUrisa muni giscmm-draft-questionairre
Urisa muni giscmm-draft-questionairreGreg Babinski
 
No GIS is an Island How (and why) we should compare ourselves and share our s...
No GIS is an Island How (and why) we should compare ourselves and share our s...No GIS is an Island How (and why) we should compare ourselves and share our s...
No GIS is an Island How (and why) we should compare ourselves and share our s...Greg Babinski
 
The Geospatial Management Competency Model
The Geospatial Management Competency ModelThe Geospatial Management Competency Model
The Geospatial Management Competency ModelGregBabinski
 
Draft Municipal GIS Capability Maturity Model
Draft Municipal GIS Capability Maturity ModelDraft Municipal GIS Capability Maturity Model
Draft Municipal GIS Capability Maturity ModelGreg Babinski
 
Best Practices for Financial Management of GIS Operations
Best Practices for Financial Management of GIS OperationsBest Practices for Financial Management of GIS Operations
Best Practices for Financial Management of GIS OperationsGreg Babinski
 
Municipal GIS Capability Maturity Model Questionnaire
Municipal GIS Capability Maturity Model QuestionnaireMunicipal GIS Capability Maturity Model Questionnaire
Municipal GIS Capability Maturity Model QuestionnaireGreg Babinski
 

Similar to URISA Develops the Geospatial Management Competency Model (GMCM) for USDOLETA (20)

URISA Geospatial Management Competency Model - Strawman Draft
URISA Geospatial Management Competency Model - Strawman DraftURISA Geospatial Management Competency Model - Strawman Draft
URISA Geospatial Management Competency Model - Strawman Draft
 
A Proposed Municipal GIS Capability Maturity Model
A Proposed Municipal GIS Capability Maturity ModelA Proposed Municipal GIS Capability Maturity Model
A Proposed Municipal GIS Capability Maturity Model
 
URISA’s Local Government GIS Capability Maturity Model
URISA’s Local Government GIS Capability Maturity ModelURISA’s Local Government GIS Capability Maturity Model
URISA’s Local Government GIS Capability Maturity Model
 
The GIS Management Institute® and the GIS Capability Maturity Model Update, ...
The GIS Management Institute® and the  GIS Capability Maturity ModelUpdate, ...The GIS Management Institute® and the  GIS Capability Maturity ModelUpdate, ...
The GIS Management Institute® and the GIS Capability Maturity Model Update, ...
 
Managing a County GIS for Results
Managing a County GIS for ResultsManaging a County GIS for Results
Managing a County GIS for Results
 
URISA’s GIS Management Institute
URISA’s GIS Management InstituteURISA’s GIS Management Institute
URISA’s GIS Management Institute
 
GIS Capability Maturity Model - Final Version
GIS Capability Maturity Model - Final VersionGIS Capability Maturity Model - Final Version
GIS Capability Maturity Model - Final Version
 
The GIS Capability Maturity Model (2013)
The GIS Capability Maturity Model (2013)The GIS Capability Maturity Model (2013)
The GIS Capability Maturity Model (2013)
 
URISA GISCMM May 2011 Draft
URISA GISCMM May 2011 DraftURISA GISCMM May 2011 Draft
URISA GISCMM May 2011 Draft
 
URISA’s GIS Management Institute® Updates the GIS Capability Maturity Model
URISA’s GIS Management Institute® Updates the GIS Capability Maturity ModelURISA’s GIS Management Institute® Updates the GIS Capability Maturity Model
URISA’s GIS Management Institute® Updates the GIS Capability Maturity Model
 
URISA, the Geospatial Revolution, and the GIS Management Institute
URISA, the Geospatial Revolution, and the GIS Management InstituteURISA, the Geospatial Revolution, and the GIS Management Institute
URISA, the Geospatial Revolution, and the GIS Management Institute
 
URISA GIS Management Institute® The GIS Capability Maturity Model and the GMI...
URISA GIS Management Institute® The GIS Capability Maturity Model and the GMI...URISA GIS Management Institute® The GIS Capability Maturity Model and the GMI...
URISA GIS Management Institute® The GIS Capability Maturity Model and the GMI...
 
URISA Draft Municipal GIS Capability Maturity Model
URISA Draft Municipal GIS Capability Maturity ModelURISA Draft Municipal GIS Capability Maturity Model
URISA Draft Municipal GIS Capability Maturity Model
 
Urisa muni giscmm-draft-questionairre
Urisa muni giscmm-draft-questionairreUrisa muni giscmm-draft-questionairre
Urisa muni giscmm-draft-questionairre
 
No GIS is an Island How (and why) we should compare ourselves and share our s...
No GIS is an Island How (and why) we should compare ourselves and share our s...No GIS is an Island How (and why) we should compare ourselves and share our s...
No GIS is an Island How (and why) we should compare ourselves and share our s...
 
The Geospatial Management Competency Model
The Geospatial Management Competency ModelThe Geospatial Management Competency Model
The Geospatial Management Competency Model
 
Draft Municipal GIS Capability Maturity Model
Draft Municipal GIS Capability Maturity ModelDraft Municipal GIS Capability Maturity Model
Draft Municipal GIS Capability Maturity Model
 
Best Practices for Financial Management of GIS Operations
Best Practices for Financial Management of GIS OperationsBest Practices for Financial Management of GIS Operations
Best Practices for Financial Management of GIS Operations
 
Municipal GIS Capability Maturity Model Questionnaire
Municipal GIS Capability Maturity Model QuestionnaireMunicipal GIS Capability Maturity Model Questionnaire
Municipal GIS Capability Maturity Model Questionnaire
 
GCC Notes
GCC NotesGCC Notes
GCC Notes
 

More from Greg Babinski

GMA GIS Return on Investment (ROI) Template
GMA GIS Return on Investment (ROI) TemplateGMA GIS Return on Investment (ROI) Template
GMA GIS Return on Investment (ROI) TemplateGreg Babinski
 
GMI-GMCM Assessment Scale.pdf
GMI-GMCM Assessment Scale.pdfGMI-GMCM Assessment Scale.pdf
GMI-GMCM Assessment Scale.pdfGreg Babinski
 
IMPROVING ENTERPRISE GIS OPERATIONS VIA STAFF USAGE ANALYSIS AND SURVEYS
IMPROVING ENTERPRISE GIS OPERATIONS VIA STAFF USAGE ANALYSIS AND SURVEYSIMPROVING ENTERPRISE GIS OPERATIONS VIA STAFF USAGE ANALYSIS AND SURVEYS
IMPROVING ENTERPRISE GIS OPERATIONS VIA STAFF USAGE ANALYSIS AND SURVEYSGreg Babinski
 
BURISA News Issue 192
BURISA News Issue 192BURISA News Issue 192
BURISA News Issue 192Greg Babinski
 
URISA Newsletter Issue 193
URISA Newsletter Issue 193URISA Newsletter Issue 193
URISA Newsletter Issue 193Greg Babinski
 
BURISA Newsletter Issue 194 (Final Issue)
BURISA Newsletter Issue 194 (Final Issue)BURISA Newsletter Issue 194 (Final Issue)
BURISA Newsletter Issue 194 (Final Issue)Greg Babinski
 
King County GIS Funding and Billing Procedures 2015-2016
King County GIS Funding and Billing Procedures 2015-2016King County GIS Funding and Billing Procedures 2015-2016
King County GIS Funding and Billing Procedures 2015-2016Greg Babinski
 
GIS for Equity & Social Justice Best Practices
GIS for Equity & Social Justice Best PracticesGIS for Equity & Social Justice Best Practices
GIS for Equity & Social Justice Best PracticesGreg Babinski
 
GIS v. IT - One of these things is not like the other
GIS v. IT - One of these things is not like the otherGIS v. IT - One of these things is not like the other
GIS v. IT - One of these things is not like the otherGreg Babinski
 
Babinski geography as human ecology wsu19720614
Babinski geography as human ecology wsu19720614Babinski geography as human ecology wsu19720614
Babinski geography as human ecology wsu19720614Greg Babinski
 
Examining the meaning of confederate civil war monuments
Examining the meaning of confederate civil war monumentsExamining the meaning of confederate civil war monuments
Examining the meaning of confederate civil war monumentsGreg Babinski
 
Martin Luther King, William Bunge, URISA, and GIS for Equity and Social Justi...
Martin Luther King, William Bunge, URISA, and GIS for Equity and Social Justi...Martin Luther King, William Bunge, URISA, and GIS for Equity and Social Justi...
Martin Luther King, William Bunge, URISA, and GIS for Equity and Social Justi...Greg Babinski
 
The future of urisa as an international organization
The future of urisa as an international organizationThe future of urisa as an international organization
The future of urisa as an international organizationGreg Babinski
 
URISA’s GIS Management Institute
URISA’s GIS Management InstituteURISA’s GIS Management Institute
URISA’s GIS Management InstituteGreg Babinski
 
2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...
2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...
2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...Greg Babinski
 
A Day in the Life of King County GIS
A Day in the Life of King County GISA Day in the Life of King County GIS
A Day in the Life of King County GISGreg Babinski
 
Flight of the Malfunction: My 2013 Trip to Morotai & WWII 13th AAF Sites
Flight of the Malfunction: My 2013 Trip to Morotai & WWII 13th AAF SitesFlight of the Malfunction: My 2013 Trip to Morotai & WWII 13th AAF Sites
Flight of the Malfunction: My 2013 Trip to Morotai & WWII 13th AAF SitesGreg Babinski
 
A Survey and Analysis of GIS Web Mapping Applications in Washington State
A Survey and Analysis of GIS Web Mapping Applications in Washington StateA Survey and Analysis of GIS Web Mapping Applications in Washington State
A Survey and Analysis of GIS Web Mapping Applications in Washington StateGreg Babinski
 
Law and the Geoweb’ Panel Discussion. 2011 AAG Conference
Law and the Geoweb’ Panel Discussion. 2011 AAG ConferenceLaw and the Geoweb’ Panel Discussion. 2011 AAG Conference
Law and the Geoweb’ Panel Discussion. 2011 AAG ConferenceGreg Babinski
 
Measuring Enterprise GIS Performance For the King County GIS Center
Measuring Enterprise GIS Performance For the King County GIS CenterMeasuring Enterprise GIS Performance For the King County GIS Center
Measuring Enterprise GIS Performance For the King County GIS CenterGreg Babinski
 

More from Greg Babinski (20)

GMA GIS Return on Investment (ROI) Template
GMA GIS Return on Investment (ROI) TemplateGMA GIS Return on Investment (ROI) Template
GMA GIS Return on Investment (ROI) Template
 
GMI-GMCM Assessment Scale.pdf
GMI-GMCM Assessment Scale.pdfGMI-GMCM Assessment Scale.pdf
GMI-GMCM Assessment Scale.pdf
 
IMPROVING ENTERPRISE GIS OPERATIONS VIA STAFF USAGE ANALYSIS AND SURVEYS
IMPROVING ENTERPRISE GIS OPERATIONS VIA STAFF USAGE ANALYSIS AND SURVEYSIMPROVING ENTERPRISE GIS OPERATIONS VIA STAFF USAGE ANALYSIS AND SURVEYS
IMPROVING ENTERPRISE GIS OPERATIONS VIA STAFF USAGE ANALYSIS AND SURVEYS
 
BURISA News Issue 192
BURISA News Issue 192BURISA News Issue 192
BURISA News Issue 192
 
URISA Newsletter Issue 193
URISA Newsletter Issue 193URISA Newsletter Issue 193
URISA Newsletter Issue 193
 
BURISA Newsletter Issue 194 (Final Issue)
BURISA Newsletter Issue 194 (Final Issue)BURISA Newsletter Issue 194 (Final Issue)
BURISA Newsletter Issue 194 (Final Issue)
 
King County GIS Funding and Billing Procedures 2015-2016
King County GIS Funding and Billing Procedures 2015-2016King County GIS Funding and Billing Procedures 2015-2016
King County GIS Funding and Billing Procedures 2015-2016
 
GIS for Equity & Social Justice Best Practices
GIS for Equity & Social Justice Best PracticesGIS for Equity & Social Justice Best Practices
GIS for Equity & Social Justice Best Practices
 
GIS v. IT - One of these things is not like the other
GIS v. IT - One of these things is not like the otherGIS v. IT - One of these things is not like the other
GIS v. IT - One of these things is not like the other
 
Babinski geography as human ecology wsu19720614
Babinski geography as human ecology wsu19720614Babinski geography as human ecology wsu19720614
Babinski geography as human ecology wsu19720614
 
Examining the meaning of confederate civil war monuments
Examining the meaning of confederate civil war monumentsExamining the meaning of confederate civil war monuments
Examining the meaning of confederate civil war monuments
 
Martin Luther King, William Bunge, URISA, and GIS for Equity and Social Justi...
Martin Luther King, William Bunge, URISA, and GIS for Equity and Social Justi...Martin Luther King, William Bunge, URISA, and GIS for Equity and Social Justi...
Martin Luther King, William Bunge, URISA, and GIS for Equity and Social Justi...
 
The future of urisa as an international organization
The future of urisa as an international organizationThe future of urisa as an international organization
The future of urisa as an international organization
 
URISA’s GIS Management Institute
URISA’s GIS Management InstituteURISA’s GIS Management Institute
URISA’s GIS Management Institute
 
2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...
2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...
2002 KCGIS O&M Issue Status Report #4: Status of Original GIS Capital Project...
 
A Day in the Life of King County GIS
A Day in the Life of King County GISA Day in the Life of King County GIS
A Day in the Life of King County GIS
 
Flight of the Malfunction: My 2013 Trip to Morotai & WWII 13th AAF Sites
Flight of the Malfunction: My 2013 Trip to Morotai & WWII 13th AAF SitesFlight of the Malfunction: My 2013 Trip to Morotai & WWII 13th AAF Sites
Flight of the Malfunction: My 2013 Trip to Morotai & WWII 13th AAF Sites
 
A Survey and Analysis of GIS Web Mapping Applications in Washington State
A Survey and Analysis of GIS Web Mapping Applications in Washington StateA Survey and Analysis of GIS Web Mapping Applications in Washington State
A Survey and Analysis of GIS Web Mapping Applications in Washington State
 
Law and the Geoweb’ Panel Discussion. 2011 AAG Conference
Law and the Geoweb’ Panel Discussion. 2011 AAG ConferenceLaw and the Geoweb’ Panel Discussion. 2011 AAG Conference
Law and the Geoweb’ Panel Discussion. 2011 AAG Conference
 
Measuring Enterprise GIS Performance For the King County GIS Center
Measuring Enterprise GIS Performance For the King County GIS CenterMeasuring Enterprise GIS Performance For the King County GIS Center
Measuring Enterprise GIS Performance For the King County GIS Center
 

Recently uploaded

Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdffillmonipdc
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skillskristinalimarenko7
 

Recently uploaded (20)

Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdf
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skills
 

URISA Develops the Geospatial Management Competency Model (GMCM) for USDOLETA

  • 1. Greg Babinski, MA, GISP Finance & Marketing Manager King County GIS Center Seattle, WA URISA Past-President URISA GMI Committee Chair Summit Chief Editor URISA Develops the Geospatial Management Competency Model (GMCM) for USDOLETA November 14, 2012
  • 2. Agenda  Precursors: USM/NASA  URISA’s GISCMM  USDOLETA Geospatial Technology Competency Model  GTCM and the Missing Tier 9 – Management Competency  URISA Commits to Develop the GMCM:  Washington URISA – 2011 GMCM Strawman Draft  GIS-Pro 2011- GMCM Task Force & Work Session  The URISA GMCM:  4 Domains, 17 Cluster Areas  74 Competencies  Public Review & Comment  Final Revisions  Publication  What to do with the GMCM?  Questions & Discussion
  • 3. Why Develop a Geospatial Competency Model? For Business and Industry For Workforce Investment Boards For One-Stop Career Centers For Economic Developers For Educators and Training Providers For Students For Practitioners To Establish the Geospatial Professional Domain, separate from all other domains
  • 7. Municipal GIS Capability Maturity Model The Ubiquitous Municipal GIS  GIS has become a common component of city & county government  All large and most medium sized cities & counties have established GIS operations  Many small sized jurisdictions have a GIS  31 of 39 Washington Counties have public web mapping capability implying GIS operations of some sort  Dozens of Washington cities are known to have GIS operations
  • 8. Municipal GIS Capability Maturity Model Variations in Municipal GIS Operations What causes variation in municipal GIS Operations?  Each municipality is unique  City and county business focus often varies  Population  Nature and level of economic development
  • 9. Municipal GIS Capability Maturity Model Variations in Municipal GIS Operations What causes variation in municipal GIS Operations?  GIS development history and funding  GIS operational budget and staffing  GIS strategic plan  Municipality’s institutional expectations  GIS operational vision – or lack of vision?
  • 10. Municipal GIS Capability Maturity Model When is GIS Development ‘Done’? There are many ways to answer:  With an external focus?  Best practices  Benchmarking  With a theoretical focus?  Ideal design  Academic state of the art  With a capability focus?  With a maturity level focus?
  • 11. Municipal GIS Capability Maturity Model What is a Capability Maturity Model?  A tool to assess an organization’s ability to accomplish a defined task or set of tasks  Originated with the Software Engineering Institute  Objective evaluation of software contractors  SEI published Managing the Software Process 1989  SEI CMM is process focused  Other applications of the capability maturity model concept:  System engineering  Project management  Risk management  Information technology service providers
  • 12. Municipal GIS Capability Maturity Model Why Develop a GIS Maturity Model? To provide a means for any municipal GIS operation to gauge its maturity against a variety of standards and/or measures, including:  A theoretical ideal end state of GIS organizational development  The maturity level of other peer GIS organizations , either individually or in aggregate  The maturity level of the subject organization over time  The maturity level of the organization against an agreed target state (perhaps set by organizational policy, budget limitations, etc.)
  • 13. Municipal GIS Capability Maturity Model URISA’s Municipal GIS Capability Maturity Model  Maturity for the proposed model indicates progression of an organization towards GIS capability that maximizes:  Potential for the use of state of the art GIS technology  Commonly recognized quality data  Organizational best practices appropriate for municipal business use  The Municipal GIS Capability Maturity Model assumes two broad areas of GIS operational development:  Enabling capability  Execution ability
  • 14. Municipal GIS Capability Maturity Model  Enabling Capability:  Technology  Data  Resources  Infrastructure  GIS professional staff  Execution Ability:  Ability of the staff to maximize use of available capability  Ability to execute relative to normative ideal URISA’s Municipal GIS Capability Maturity Model
  • 15. Municipal GIS Capability Maturity Model Enabling Capability Components: URISA’s Municipal GIS Capability Maturity Model
  • 16. Municipal GIS Capability Maturity Model Enabling Capability Assessment Scale: URISA’s Municipal GIS Capability Maturity Model
  • 17. Municipal GIS Capability Maturity Model Execution Ability Components: URISA’s Municipal GIS Capability Maturity Model
  • 18. Municipal GIS Capability Maturity Model Execution Ability Assessment Scale: URISA’s Municipal GIS Capability Maturity Model
  • 19. 2010 -URISA Commits to Develop Tier 9: The Geospatial Management Competency Model The GTCM is an element of the U.S. Department of Labor Employment and Training Administration’s (DOLETA’s) Competency Modeling Initiative (http://www.careeronestop.org/competencymodel/). For DOLETA, a “competency” is the capability to apply or use a set of related knowledge, skills, and abilities required to successfully perform “critical work functions” or tasks. A “competency model” is a collection of competencies that together define successful performance (Ennis 2008). The Competency Modeling Initiative promotes the development of industry-driven competency models in high- growth, high-demand industries. DOLETA identified “geospatial technology” as a high-growth industry in 2003.
  • 20. GTCM and the Missing Tier 9 – Management Competency In 2010, DOLETA issued a Geospatial Technology Competency Model (GTCM) that specifies the foundational (Tiers 1-3), industry-wide (Tier 4), and industry sector- specific (Tier 5) expertise characteristic of the various occupations that comprise the geospatial industry (http://www.careeronestop.org/Competency Model/pyramid.aspx?GEO=Y) . Descriptions of individual geospatial occupations, including occupation-specific competencies and job requirements (Tiers 6-8), are published in DOLETA’s O*NET occupation database (http://www.onetonline.org/). The GMCM corresponds to Tier 9 of the GTCM.
  • 21. 2010 -URISA Commits to Develop Tier 9: The Geospatial Management Competency Model URISA GMCM Core Team:  David DiBiase  Patrick Kennelly  Greg Babinski  Coordination with USDOLETA
  • 23. Developing The Geospatial Management Competency Model 2011 Washington GIS Conference: GISCMM Review - GMCM Strawman Task Force (May 2011) Greg Babinski, GISP, King County (WA) GIS Center Steve Beimburn, City of Seattle (WA) GIS Don Burdick, GISP, City of Bellingham (WA) GIS Amy Esnard, GISP, Multnomah County (OR) GIS George Horning, King County (WA) GIS Center Tami Griffin, Thurston County (WA) GIS Ian Von Essen, Spokane County (WA) GIS
  • 24. Developing The Geospatial Management Competency Model: Strawman Draft
  • 25. Developing The Geospatial Management Competency Model: Strawman Draft
  • 26. Developing The Geospatial Management Competency Model: 2011 GIS-Pro GMCM Task Force GMCM Task Force (November 2011 – June 2012) David DiBiase (facilitator), GISP, CMS, Director of Education, Esri Greg Babinski, GISP, Finance & Marketing Manager, King County GIS Center Thomas Conry, GIS Manager, Fairfax County VA Peter Croswell, PMP, GISP, President, Croswell-Schulte IT Consultants Dianne Haley, DMH GIS Consulting Patrick Kennelly, Associate Professor of Geography, Long Island University and Penn State University Twyla McDermott, Corporate Strategic Technology Planning Manager, City of Charlotte NC Robert Ryan, CP, PLS, URS Corporation Rebecca Somers, President, Somers-St. Claire GIS Management Consultants Bruce Stauffer, Vice President, geographIT Dr. Chin-hong Sun, Professor of Geography, National Taiwan University
  • 27. The Geospatial Management Competency Model A Challenge:  Competency Domains n=4  Competency Clusters n=17  Competencies: n=74
  • 28. The Geospatial Management Competency Model Competency Domains n=4 Based on Hays Group Management Model  Manage yourself  Manage your team  Manage collaborations  Manage the work Competency Clusters n=17 A. Self-Management B. Human Resource Management C. Performance management D. Legal Affairs Management E. Communication F. Team Management G. Relationship Management H. Business Development I. Leadership J. Professional Development K. Strategic Planning and Action L. Work Management M. Geospatial Project Management N. Political Skills O. Contract Management P. Financial Management Q. Asset Management
  • 29. The Geospatial Management Competency Model Competencies n=74 Competencies The following list represents the GMCM Task Force’s consensus (i.e., 80 percent agreement) about the minimum number of critical work functions that most geospatial managers need to be able to perform. The sequence corresponds roughly to the order of competency areas expect that recurring competencies are listed only once. 1. Keep up with technology trends 2. Keep abreast of developments that affect your organization 3. Apply sound decision making practices 4. Assess and improve your skills and performance regularly 5. Develop a geospatial staffing plan to meet business needs 6. Recruit and hire competent geospatial and support staff 7. Define geospatial work functions and assign appropriate staff 8. Establish clear performance expectations 9. Emphasize accountability 10. Acknowledge and encourage exceptional achievement 11. Remediate performance shortfalls effectively 12. Avoid conflicts of interest—actual and apparent
  • 30. The Geospatial Management Competency Model 13. Comply with all relevant laws and regulations 14. Follow relevant professional codes of ethics 15. Communicate effectively in all forms, formats, and media 16. Communicate effectively to all sizes and types of audiences 17. Communicate the value of geospatial technology to decision makers and stakeholders 18. Foster an environment conducive to teamwork 19. Assemble, charge, and enable effective work teams 20. Help resolve conflicts among team members 21. Develop and maintain long-term client relationships 22. Develop collaborative relationships within the organization 23. Build relationships with other organizations to promote mutually advantageous partnerships and best practices 24. Maintain productive relationships with vendors 25. Identify business opportunities 26. Evaluate risk of new ventures
  • 31. 27. Assess competition 28. Conduct client-focused needs evaluation 29. Develop business case and plan for developing and marketing new ventures 30. Develop and maintain strategic partnerships 31. Develop, promote, and protect the organization’s brand 32. Lead creative thinking about geospatial technology opportunities 33. Articulate a geospatial technology vision for the organization 34. Communicate geospatial program goals to stakeholders 35. Build consensus 36. Foster a culture of employee-driven process improvement 37. Mentor staff and colleagues 38. Prepare and implement a geospatial staff competency plan 39. Provide opportunities for continuing professional development 40. Encourage contributions to the profession 41. Develop a strategic plan with measureable goals and specific actions 42. Implement a strategic planning cycle 43. Align geospatial activities to support the organization’s strategic plan
  • 32. 44. Adjust the plan in response to changing environment 45. Apply QA/QC best practices 46. Monitor stakeholder satisfaction 47. Improve efficiency 48. Adopt a customer service orientation 49. Apply project management knowledge and best practices 50. Understand and apply the geospatial technology components of projects (as outlined in the Department of Labor’s Geospatial Technology Competency Model) to accurately establish scope, resources, schedule and quality requirements for project success 51. Identify collaborative opportunities to achieve project goals 52. Manage a portfolio of projects effectively 53. Cooperate within political and professional organizations 54. Pursue goals tactfully in context of particular organizational cultures and governance structures 55. Identify potential political champions and engage their support 56. Honor jurisdictional responsibilities
  • 33. 57. Implement policies that respect the purpose and role of public, private, nonprofit, and academic organizations in the marketplace 58. Prepare, negotiate, monitor, administer, and remediate contracts 59. Prepare Statements of Work (SOW) defining project objectives and requirements 60. Prepare competitive solicitations including project rationale and objectives, existing geospatial technology assets, desired services, and final deliverables 61. Prepare proposals including understanding of need, technical approach and proposed technology, final deliverables, schedule, budget, and relevant qualifications 62. Prepare objective selection criteria and scoring mechanism to fairly evaluate proposals 63. Develop service level agreements 64. Prepare and document budgets 65. Manage expenditures and income 66. Identify funding sources and obtain funding, including collaborative opportunities 67. Develop and manage a long term financial plan
  • 34. The Geospatial Management Competency Model 68. Conduct regular financial analyses 69. Implement standard financial accounting procedures and controls 70. Assure accountability by periodic independent audits 71. Understand enterprise geospatial architecture 72. Ensure that geospatial technology infrastructure meets organization needs 73. Recognize geospatial data as a capital asset 74. Manage the asset lifecycle: a. Establish and maintain an up-to-date asset inventory b. Procure and upgrade assets c. Implement and periodically audit security procedures for assets such as work spaces, equipment, computer networks, data, and software d. Implement computer system back-ups and periodically test reliability of backup procedures e. Implement sound data management procedures
  • 35. The Geospatial Management Competency Model URISA GMCM Task Force applied 74 competencies to 17 competency clusters
  • 36. The Geospatial Management Competency Model Public Review and Comment Period ended 31 March 2012 URISA GMCM Task Force reviewed all comments:  Very few negative comments (<5%)  Broad consensus agreement  Use a matrix  Identify geospatial competencies GMCM Task Force agreed changes to the GMCM and submitted to USDOLETA 8 June 2012 USDOLETA approved the GMCM 20 August 2012 URISA now going back to the GISCMM and consider changes to align with the GMCM
  • 37. The Geospatial Management Competency Model and the URISA GIS Management Institute GMBOK: GIS Management Body of Knowledge Municipal GIS Operations GCMM Accreditation GCMM: GIS Capability Maturity Model URISA Education ULA & UMA GIS Management Educational Program Accreditation GISCI GIS Managers Certification Component GMCM: Geospatial Management Competency Model
  • 38. Municipal GIS Capability Maturity Model References and Additional Reading Capability Maturity Model, Wikepedia Article: http://en.wikipedia.org/wiki/Capability_Maturity_Model Accessed 8/3/2009). Selena Rezvani, M.S.W., An Introduction to Organizational Maturity Assessment: Measuring Organizational Capabilities, International Public Management Association Assessment Council, ND. Jerry Simonoff, Director, IT Investment & Enterprise Solutions, Improving IT investment Management in the Commonwealth, Virginia Information Technology Agency, 2008. Curtis, B., Hefley, W. E., and Miller, S. A.; People Capability Maturity Model (P-CMM), Software Engineering Institute, 2001. Niessink, F., Clerca, V., Tijdinka, T., and van Vlietb, H., The IT Service Capability Maturity Model, CIBIT Consultants | Educators, 2005 Ford-Bey, M., PA Consulting Group, Proving the Business Benefits of GeoWeb Initiatives: An ROI-Driven Approach, GeoWeb Conference, 2008. Niessink, F. and van Vliet, H., Towards Mature IT Services, Faculty of Mathematics and Computer Science, Vrije Universiteit Amsterdam, ND. Gaudet, C., Annulis, H., and Carr, J., Workforce Development Models for Geospatial Technology, University of Southern Mississippi, 2001.
  • 39. Municipal GIS Capability Maturity Model Additional Resources Babinski, G. (2010-11). URISA GIS Management Institute. ArcNews, Fall, 2012. http://www.esri.com/news/arcnews/fall12articles/geospatial-society-the-gis-profession-and- urisas-gis-management-institute.html Babinski, G. (2010-11). URISA Proposes GIS Capability Maturity Model. ArcNews, Winter 2010/11. http://www.esri.com/news/arcnews/winter1011articles/urisa-proposes.html Croswell, P. (2009). The GIS Management Handbook: Concepts, Practices, and Tools for Planning, Implementing, and Managing Geographic Information System Projects and Programs. Kessey Dweitt Publications. DiBiase, D., T. Corbin, T. Fox, J. Francica, K. Green, J. Jackson, G. Jeffress, B. Jones, B. Jones, J. Mennis, K. Schuckman, C. Smith, and J. Van Sickle (2010). The New Geospatial Technology Competency Model: Bringing Workforce Needs into Focus. URISA Journal 22:2, 55-72. psu.edu/files/sites/file/DiBiase_etal_2010_GTCM_URISA_Journal.pdf Ennis, M. R. (2008). Competency Models: A Review of the Literature and the Role of the Employment and Training Administration (ETA). http://www.careeronestop.org/COMPETENCYMODEL/info_documents/OPDRLiteratureReview.pd f. HayGroup (2001). The Manager Competency Model. http://www.professionallearning. com/MCPBriefGuide.pdf PDRI, Inc., and Aguirre International (2005). Technical Assistance Guide for Development and Using Competency Models—One Solution for a Demand-Driven Workforce System. http://www.careeronestop.org/competencymodel/Info_Documents/TAG.pdf. U.S. Office of Personnel Management (2011). Competency Model for IT Program Management. http://www.chcoc.gov/transmittals/TransmittalDetails.aspx?TransmittalID=4058
  • 40. Greg Babinski, MA, GISP URISA Past-President URISA GIS Management Institute Committee Chair SUMMIT Chief Editor Finance & Marketing Manager King County GIS Center 201 South Jackson Street, Suite 706 Seattle, WA 98104 206-263-3753 greg.babinski@kingcounty.gov www.kingcounty.gov/gis URISA Press Releases: • Geospatial Management Competency Model: http://www.urisa.org/gmcm_press • GIS Management Institute: http://www.urisa.org/gmi_pr