Project Governance
Project Management is a well defined concept found in many
guidebooks and Bodies of Knowledge. Putting these guides
and BOK’s to work for the benefit of the enterprise is the role
of Project Governance
+
IPT
Management
Program
Management
Project
Management
Project	
  Driven	
  Requirements	
  
Project	
  Delivery	
  Performance	
  
The Elements of Project
Governance
2
+
A Big problem in any discussion of
Governance
3
+
What do we mean when we say
“governance?”
!  gov⋅ern⋅ance [guhv-er-nuh ns] – noun
!  government; exercise of authority; control.
!  a method or system of government or management
!  gov⋅ern [guhv-ern] – verb
!  to rule over by right of authority: to govern a nation.
!  to exercise a directing or restraining influence over; guide: the
motives governing a decision.
!  to hold in check; control: to govern one’s temper.
!  to serve as or constitute a law for: the principles governing a case.
4
+
What is Business Governance?
Governance is the set of decisions that defines
expectations, grants power, or verifies
performance.
It consists either of a separate process or of a
specific part of management or leadership
processes.
5
+
Project Governance
6
Project governance is the framework which ensures the project has been
correctly conceived and is being executed in accordance with best project
management practice within the wider framework of the firms of
organizations governance processes.
Effective project governance ensures projects deliver the value expected of
them. An appropriate governance framework ensures that all expenditure is
appropriate for the risks being tackled.
Project governance is not about micro–management, it is about setting the
terms of reference and operating framework, defining the boundaries and
ensuring that planning and execution are carried out in a way which ensures
that the project delivers benefits.
+
Five Core Outcomes of Project
Governance
!  Strategic alignment of projects within the portfolio with business
strategy to support organizational objectives
!  Risk management by executing appropriate measures to
manage and mitigate risks and reduce potential impacts
on projects and programs to an acceptable level
!  Resource management by utilizing available resources and
skills efficiently and effectively
!  Performance measurement by measuring, monitoring and
reporting on project governance metrics to ensure that
organizational objectives are achieved
!  Value delivery by optimizing the project portfolio in support of
organizational objectives
7
+
Five Core Outcomes of Project
Governance – Applicable to GPMO
!  Strategic alignment of projects within the portfolio with business
strategy to support organizational objectives
!  Risk management by executing appropriate measures to
manage and mitigate risks and reduce potential impacts
on projects and programs to an acceptable level
!  Resource management by utilizing available resources and
skills efficiently and effectively
!  Performance measurement by measuring, monitoring and
reporting on project governance metrics to ensure that
organizational objectives are achieved
!  Value delivery by optimizing the project portfolio in support of
organizational objectives
8
+ Three Elements of Project
Governance
Project	
  Governance	
  
3.	
  How	
  do	
  we	
  know	
  we	
  are	
  being	
  successful	
  at	
  what	
  we’re	
  supposed	
  to	
  be	
  doing?	
  
2.	
  How	
  are	
  we	
  going	
  to	
  do	
  what	
  we	
  said	
  we	
  would	
  do?	
  
1.	
  What	
  do	
  we	
  want	
  to	
  do?	
  
" Business	
  and	
  Technical	
  
Strategy	
  
" Deliverables	
  Based	
  
Planning	
  
" Measures	
  of	
  Performance	
  
(MoP)	
  
" CapaciCes	
  Based	
  Planning	
   " Assessment	
  of	
  increasing	
  
maturity	
  
" Measures	
  of	
  EffecCveness	
  
(MoE)	
  
" ConnecCons	
  to	
  the	
  
delivery	
  of	
  business	
  value	
  
" DefiniCons	
  of	
  physical	
  
progress	
  of	
  plans	
  
" Measures	
  of	
  Physical	
  
Percent	
  Complete	
  
Project Governance is the Primary Role of the Program Management Office
(PMO)
9
+ What’s the difference between
Business Governance & Project
Governance?
!  Business Governance is the organizational control of the
business’s ability to deliver value
!  Project Governance is the centralized control of the projects
that produce this value
Governance reduces the asymmetric information exchange
between the providers and consumers of project
information.
Governance assures the providers of products or services
have the full consent of the consumers that continuously
increases visibility, maturity, and value of these products and
services.
10
+
What’s the Real Problem Here?
!  Corporate Governance is well defined
!  Project Management methodologies are mature and
generally applicable to a wide variety of business domain
!  There are gaps in the “governance” of projects through …
!  Applying Project Management methods is not governance, it is
project execution controls
!  Having document artifacts is necessary but not sufficient for
successful project work
!  Consumption of time and budget is never a measure of progress
11
+
What are the activities of Project
Governance?
!  Establishing the basis for project
governance, approval, and
measurement with roles,
accountabilities, policies, standards,
and associated processes
!  Evaluating project proposals to
select those that are the best
investment of funds and scarce
resources and are within the firm’s
capability and capacity to deliver
!  Enabling resourcing of projects with
staff and consultants, harness and
manage of business support and the
provision of the governance
resources
!  Defining the “desired business
outcomes”, benefits, and value —
the business measures of success
and overall value proposition
!  Controlling the scope, contingency
funds, overall project value, and
other project performance attributes
!  Monitoring the project’s progress,
stakeholder’s commitment, results
achieved and the leading indicators
of failure
!  Measuring of outputs, outcomes,
benefits and value — against both
the plan and measurable
expectations
!  “Steering” the project into the
organization, remove obstacles,
manage the critical success factors
and remediate project or benefit-
realization shortfalls
!  Developing the organization’s
project delivery capability —
continually building and enhancing
its ability to deliver more complex
and challenging projects in less time
and for less cost while generating
the maximum value.
12
+
Good Project Governance
Elements
Elements Project Governance Physical Artifact
A compelling business case, stating the objectives of the project and specifying the
in-scope and out-of-scope elements
Risk Adjusted Business Case
A mechanism to assess the compliance of the completed project to its original
objectives identifying all stakeholders with an interest in the project
Deliverables Plan connected to
business case
A defined method of communication to each stakeholder Communications Plan
A set of business-level requirements as agreed by all stakeholders Master deliverables
An agreed specification for the project deliverables and their measures of
effectiveness and measures of performance
Capabilities, features, functions,
and testable requirements
Clear assignment of project roles and responsibilities
Responsibility Assignment
Matrix
A current, published project plan that spans all project stages from project
initiation through development to the transition to operations
Integrated Master Plan
Integrated Master Schedule
A system of accurate upward promoting status and progress-reporting including
connections between cost, schedule, and technical performance
Measures of physical percent
complete and delivered
business value
A central information repository for the project Enterprise PM System
A process for the management and resolution of issues that arise during the project Issue tracking system
A process for the recording and communication of risks identified during the
project
Risk management system
13
+
3 Simple Steps to Governing the
Project Management Processes
!  Define what Project Governance means for the enterprise in
terms of its artifacts
!  Understand “governance” does not replace actionable
beneficial outcomes of a Project Management method
!  Initiate the cultural introduction of “governing” as well as
“managing”
14
+
A Project Governance Framework
!  OGC P3M3
!  Maturity model for Project, Program, Portfolio
Management Maturity Model
!  This framework is simple, well formed and in
use in the UK for council, township, county and
regional governments for IT management
!  It is a maturity model in the same way CMMI is
a maturity model
www.ogc.gov.uk
The OGC P3M3
V2.0 defines 5
levels of maturity
for project,
program, and
portfolio
management
processes.
P3M3 is “owned”
by the same
organization that
“owns” ITIL
15
+
Universal Process Maturity Levels
16
Process characterized for projects
and is often reactive
Process characterized for the organization and
is proactive
Process measured and controlled through formal data
gathering and assessment processes
Focus is on continuous process improvement through
assessment, feedback and preemptive corrective actions
Level 4:
Quantitatively
Managed
Level 1: Performed
Level 2: Managed
Level 5:
Optimizing
Level 3: Defined
Each maturity level is a layer in the foundation
for continuous process improvement
Process unpredictable, poorly
controlled and reactive
+
Characteristics of Each Maturity
Model Level
17
Maturity Level Attributes found in the organization
Level 5
Optimized
"  Project, Program, Portfolio management improvement environment is actively encouraged
"  Built on a flexible PMO centered organizational structure
"  Career path for project and program managers
"  Project, program, and portfolio management training is a component in staff development
Level 4
Managed
"  Active senior management support for integration of business planning and execution
"  Organization efficiently plans, manages, integrates and controls multiple projects
"  Database of previous project data maintained and utilized
Level 3
Defined
"  Senior management support for project, program, and portfolio management
"  Organization efficiently plans, manages, integrates, and controls single projects
"  Repository of previous project experience maintained and utilized
"  Team members and project managers trained in project management
"  Consistent use of tools and techniques for project management processes
Level 2
Repeatable
"  Managed support for project management
"  Repeatable processes are applied to basic project management steps
"  Project and program outcomes are more predictable
"  Use of common tools and techniques for key project management processes
Level 1
Initial
"  Many, incomplete, informal approaches – each project handled differently
"  Highly dependent on Project Manager
"  Project and program outcomes unpredictable
"  Little organizational support for project management
"  Lesson learned are not gathered and passed on to other projects
+
What sets high maturity
organizations apart from the rest?
!  High performing organizations are significantly more mature
in their project management practices than organizations in
general
!  The most significant difference between high and low
performing organizations is in allocating resources optimally
and in estimating accurately
!  High-performing organizations are very good at satisfying
project customers and in completing projects on schedule,
on budget
!  A significant percentage (23%) of high-performing
organizations are at Level 5 maturity in quality management
18
Project Management Maturity: A Benchmark of Current Best Practices, CBP
+
Governing Projects by
Getting to Level 3 of the
OGC P3M3
A mature organization has the ability to
manage portfolios, programs, and projects
based on standard, defined processes.
+ Project, Program, and Portfolio
Management Maturity Model
Level 1 – Initial
Recognize projects and run them differently from the ongoing business
Level 2 – Repeatable
Ensure that each project is run on its own processes and procedures to a
minimum specified standard
Level 3 – Defined
Each organizational element has a centrally controlled project processes.
Individual projects flex within these processes to suit a particular project
Level 4 – Managed
Each organizational element obtains and retains specific measures on its
project performance. These measures used to improve the quality of projects
Level 5 – Optimizing
The entire organization runs a continuous process improvement process with
proactive problem and technology management
20
+
The Program Management Office
Governance Structure using the
OGC P3M3 Framework
21
Management
Control
Benefits
Management
Financial
Management
Stakeholder
Management
Risk
Management
Organizational
Governance
Resource
Management
Portfolio
Management
Program
Management
Project
Management
Program Office Governance
+
Key Performance Improvements
!  Understand the key practices that are part of effective
portfolio, program, and project management processes
!  Identify the key practices that must be embedded within the
organization to achieve the next maturity level
!  Understand and improve the capability to manage programs
and projects more effectively in the future
22
+
P3M3
The 25 (2+11+12)
Process areas of
OGC P3M3 include
all core Knowledge
Areas of PMBOK
23
+
Assessment of the Path to OGC
P3M3 Level 3
!  Where are we today?
!  Where do we want to be?
!  How can we get there?
24
+
Benefits to reaching Level 3
!  Improved budget and schedule predictability
!  Reduced cycle time
!  Increased productivity
!  Improved quality
!  Increased customer satisfaction
!  Increased return on investment
!  Decreased cost of quality
TeraQuest / Gartner 2006 Maturity ROI
25
+
Measureable Improvements by
moving between the Maturity
Model Levels
26
Moving from One Level to the Next
L1 to L2 L2 to L3 L3 to L4
Reduced SW Defects 12% 40% 85%
Reduced Cycle Time 10% 38% 63%
Reduced Costs 8% 35% 75%
Schedule Variance 145% 24% 15%
Data presented at 5th Annual CMMI technology Conference & User Group,
Denver Colorado, November 2005
+
Benefits to Deploying a Project
Governance Process at Level 3
!  Substantial ROI improvements (from historical SEI data)
!  Identified strengths and weakness by Key Process Area (KPA)
with improvement plans for weaknesses
!  Prioritized roadmap to Level 3 with actionable outcomes
connected to business strategies
27
+
Steps to get to OGC P3M3 Level 3
!  Competency Assessment of Project Managers
!  OGC P3M3 assessment criteria
!  PMI – PMBOK process areas for project execution details
!  OGC P3M3 Deployment
!  Level 3 process areas
!  Deployment of PPM Business processes against Level 3
Process Areas
28
+
Failure Modes along the way to
Process Maturity
Failure Mode Failure Description Mitigation
Design and
Definition
Scope and outcomes not
clearly defined
Deliverables Based Planning (DBP)
with physical % complete measures
of progress
Decision
making
Inadequate levels of
sponsorship
Scorecard based mission and vision
defined up front with maturity
assessment units of measure
Risk Discipline Weak arrangements for risk
management
Embedded risk management,
retirement and mitigation in the
Master Plan
Supplier
management
Lack of shared
understanding between
suppliers
Deliverables based plan with risk
adjusted measures of performance
People Disconnects between
program and stakeholders
Deliverables focus with
measureable value to stakeholders
29
+
Beneficial Outcomes using a
Project Governance Approach
!  Change initiatives address and achieve strategic objectives
!  Business value realized earlier
!  Risks retired or managed
!  Total change investment is coherent, prioritized, and visible
!  Allocation of resources optimized
!  New initiatives evaluated for operational effectiveness
30
+
Characteristics that must be in place
for successful Project Governance
!  Focus on leadership and alignment with strategy
!  Vision covers entire organization
!  Risk visible from a strategic perspective
!  Integrity of business transformation managed through
programs in a Project Portfolio Management system
!  Benefits oriented to organization not just technology
31
+
What’s the 1st Step to Level 3?
!  Perform a gap analysis between “As Is” and “To Be” at
Level 3
!  With these gaps, build the gap closure plan
!  Execute the closure plan with measurable beneficial
outcomes to the organization
32
Project governance

Mais conteúdo relacionado

Mais procurados

PMO Presentation
PMO PresentationPMO Presentation
PMO PresentationTURKI , PMP
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasMazen Zbib
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)Anand Subramaniam
 
PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickJim Kendrick
 
PMO View Interactive Dashboard
PMO View Interactive DashboardPMO View Interactive Dashboard
PMO View Interactive DashboardMatt Angerer
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsMaria Erland, PMP
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessRuffin Veal and Associates, Inc.
 
Project management
Project managementProject management
Project managementJay Raval
 
Project Governance Framework PowerPoint Presentation Slides
Project Governance Framework PowerPoint Presentation SlidesProject Governance Framework PowerPoint Presentation Slides
Project Governance Framework PowerPoint Presentation SlidesSlideTeam
 
Project Management Best Practices - Tips and Techniques
Project Management Best Practices  - Tips and TechniquesProject Management Best Practices  - Tips and Techniques
Project Management Best Practices - Tips and TechniquesInvensis Learning
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio ManagementAnand Subramaniam
 

Mais procurados (20)

PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
Project management
Project managementProject management
Project management
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
PMO as a service
PMO as a servicePMO as a service
PMO as a service
 
PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - Kendrick
 
PMO View Interactive Dashboard
PMO View Interactive DashboardPMO View Interactive Dashboard
PMO View Interactive Dashboard
 
The PMO journey
The PMO journeyThe PMO journey
The PMO journey
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
 
Project management
Project managementProject management
Project management
 
Project Governance Framework PowerPoint Presentation Slides
Project Governance Framework PowerPoint Presentation SlidesProject Governance Framework PowerPoint Presentation Slides
Project Governance Framework PowerPoint Presentation Slides
 
Program Management Deployment Concept Consulting
Program Management Deployment Concept ConsultingProgram Management Deployment Concept Consulting
Program Management Deployment Concept Consulting
 
Project Management Best Practices - Tips and Techniques
Project Management Best Practices  - Tips and TechniquesProject Management Best Practices  - Tips and Techniques
Project Management Best Practices - Tips and Techniques
 
PMO - Delivering Business Results
PMO - Delivering Business ResultsPMO - Delivering Business Results
PMO - Delivering Business Results
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 
PMO 101
PMO 101PMO 101
PMO 101
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio Management
 

Semelhante a Project governance

Project Governance
Project Governance Project Governance
Project Governance Ziyad Zaidi
 
North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"Association for Project Management
 
Efficacy of Project Management,
Efficacy of Project Management, Efficacy of Project Management,
Efficacy of Project Management, Assignment Studio
 
EFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTEFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTAssignment Studio
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Managementchaitanyakrsk
 
25 11-big 5- critical success factors for applying (OPM)governance in MENA re...
25 11-big 5- critical success factors for applying (OPM)governance in MENA re...25 11-big 5- critical success factors for applying (OPM)governance in MENA re...
25 11-big 5- critical success factors for applying (OPM)governance in MENA re...Ahmed Al-Senosy Ph.D(cand),MSc,PMP,RMP
 
Project Management Office Vol. 1 - One Page Gold Vol. 1
Project Management Office Vol. 1  - One Page Gold Vol. 1Project Management Office Vol. 1  - One Page Gold Vol. 1
Project Management Office Vol. 1 - One Page Gold Vol. 1ken martin
 
Introduction to pmp
Introduction to pmpIntroduction to pmp
Introduction to pmpshkadry
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxwrite30
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxwrite22
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdfJamieDornan2
 
Big5 Saudi (7-3-2018)- Critical Success Factors for Applying (Organizational ...
Big5 Saudi (7-3-2018)- Critical Success Factors for Applying (Organizational ...Big5 Saudi (7-3-2018)- Critical Success Factors for Applying (Organizational ...
Big5 Saudi (7-3-2018)- Critical Success Factors for Applying (Organizational ...Ahmed Al-Senosy Ph.D(cand),MSc,PMP,RMP
 
Project management playbook innovate vancouver (2019)
Project management playbook   innovate vancouver (2019)Project management playbook   innovate vancouver (2019)
Project management playbook innovate vancouver (2019)Innovate Vancouver
 
Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
  Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...  Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...Wellingtone
 
Performing Proficient Portfolio Management Against All Odds
Performing Proficient Portfolio Management Against All OddsPerforming Proficient Portfolio Management Against All Odds
Performing Proficient Portfolio Management Against All OddsAggregage
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)Dilawar Abbas
 
L Holution Srochure B Pervices V1
L Holution Srochure B Pervices V1L Holution Srochure B Pervices V1
L Holution Srochure B Pervices V1James McDermott
 

Semelhante a Project governance (20)

Governance
GovernanceGovernance
Governance
 
Project Governance
Project Governance Project Governance
Project Governance
 
North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"
 
Efficacy of Project Management,
Efficacy of Project Management, Efficacy of Project Management,
Efficacy of Project Management,
 
CCP_SEC5_ Project Management
CCP_SEC5_ Project ManagementCCP_SEC5_ Project Management
CCP_SEC5_ Project Management
 
EFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTEFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENT
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Management
 
25 11-big 5- critical success factors for applying (OPM)governance in MENA re...
25 11-big 5- critical success factors for applying (OPM)governance in MENA re...25 11-big 5- critical success factors for applying (OPM)governance in MENA re...
25 11-big 5- critical success factors for applying (OPM)governance in MENA re...
 
Project Management Office Vol. 1 - One Page Gold Vol. 1
Project Management Office Vol. 1  - One Page Gold Vol. 1Project Management Office Vol. 1  - One Page Gold Vol. 1
Project Management Office Vol. 1 - One Page Gold Vol. 1
 
Introduction to pmp
Introduction to pmpIntroduction to pmp
Introduction to pmp
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docx
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docx
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdf
 
Big5 Saudi (7-3-2018)- Critical Success Factors for Applying (Organizational ...
Big5 Saudi (7-3-2018)- Critical Success Factors for Applying (Organizational ...Big5 Saudi (7-3-2018)- Critical Success Factors for Applying (Organizational ...
Big5 Saudi (7-3-2018)- Critical Success Factors for Applying (Organizational ...
 
Project management playbook innovate vancouver (2019)
Project management playbook   innovate vancouver (2019)Project management playbook   innovate vancouver (2019)
Project management playbook innovate vancouver (2019)
 
Project Management V1
Project Management V1Project Management V1
Project Management V1
 
Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
  Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...  Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
Expanding PMO service- The ultimate Tetris challenge - Wellingtone | Future...
 
Performing Proficient Portfolio Management Against All Odds
Performing Proficient Portfolio Management Against All OddsPerforming Proficient Portfolio Management Against All Odds
Performing Proficient Portfolio Management Against All Odds
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)
 
L Holution Srochure B Pervices V1
L Holution Srochure B Pervices V1L Holution Srochure B Pervices V1
L Holution Srochure B Pervices V1
 

Mais de Glen Alleman

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planningGlen Alleman
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSGlen Alleman
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project SuccessGlen Alleman
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMGlen Alleman
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk managementGlen Alleman
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk ManagementGlen Alleman
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Glen Alleman
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringGlen Alleman
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideGlen Alleman
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineGlen Alleman
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Glen Alleman
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by StepGlen Alleman
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)Glen Alleman
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possibleGlen Alleman
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic AbundanceGlen Alleman
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planningGlen Alleman
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for AgileGlen Alleman
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement BaselineGlen Alleman
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaGlen Alleman
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure RolloutGlen Alleman
 

Mais de Glen Alleman (20)

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPM
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk management
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk Management
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guide
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planning
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement Baseline
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six Sigma
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure Rollout
 

Último

React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...Karmanjay Verma
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...Wes McKinney
 
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...itnewsafrica
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxfnnc6jmgwh
 
Accelerating Enterprise Software Engineering with Platformless
Accelerating Enterprise Software Engineering with PlatformlessAccelerating Enterprise Software Engineering with Platformless
Accelerating Enterprise Software Engineering with PlatformlessWSO2
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical InfrastructureVarsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructureitnewsafrica
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Mark Simos
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observabilityitnewsafrica
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Jeffrey Haguewood
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Nikki Chapple
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialJoão Esperancinha
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Digital Tools & AI in Career Development
Digital Tools & AI in Career DevelopmentDigital Tools & AI in Career Development
Digital Tools & AI in Career DevelopmentMahmoud Rabie
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 

Último (20)

React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
 
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
 
Accelerating Enterprise Software Engineering with Platformless
Accelerating Enterprise Software Engineering with PlatformlessAccelerating Enterprise Software Engineering with Platformless
Accelerating Enterprise Software Engineering with Platformless
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical InfrastructureVarsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorial
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Digital Tools & AI in Career Development
Digital Tools & AI in Career DevelopmentDigital Tools & AI in Career Development
Digital Tools & AI in Career Development
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 

Project governance

  • 1. + Project Governance Project Management is a well defined concept found in many guidebooks and Bodies of Knowledge. Putting these guides and BOK’s to work for the benefit of the enterprise is the role of Project Governance
  • 2. + IPT Management Program Management Project Management Project  Driven  Requirements   Project  Delivery  Performance   The Elements of Project Governance 2
  • 3. + A Big problem in any discussion of Governance 3
  • 4. + What do we mean when we say “governance?” !  gov⋅ern⋅ance [guhv-er-nuh ns] – noun !  government; exercise of authority; control. !  a method or system of government or management !  gov⋅ern [guhv-ern] – verb !  to rule over by right of authority: to govern a nation. !  to exercise a directing or restraining influence over; guide: the motives governing a decision. !  to hold in check; control: to govern one’s temper. !  to serve as or constitute a law for: the principles governing a case. 4
  • 5. + What is Business Governance? Governance is the set of decisions that defines expectations, grants power, or verifies performance. It consists either of a separate process or of a specific part of management or leadership processes. 5
  • 6. + Project Governance 6 Project governance is the framework which ensures the project has been correctly conceived and is being executed in accordance with best project management practice within the wider framework of the firms of organizations governance processes. Effective project governance ensures projects deliver the value expected of them. An appropriate governance framework ensures that all expenditure is appropriate for the risks being tackled. Project governance is not about micro–management, it is about setting the terms of reference and operating framework, defining the boundaries and ensuring that planning and execution are carried out in a way which ensures that the project delivers benefits.
  • 7. + Five Core Outcomes of Project Governance !  Strategic alignment of projects within the portfolio with business strategy to support organizational objectives !  Risk management by executing appropriate measures to manage and mitigate risks and reduce potential impacts on projects and programs to an acceptable level !  Resource management by utilizing available resources and skills efficiently and effectively !  Performance measurement by measuring, monitoring and reporting on project governance metrics to ensure that organizational objectives are achieved !  Value delivery by optimizing the project portfolio in support of organizational objectives 7
  • 8. + Five Core Outcomes of Project Governance – Applicable to GPMO !  Strategic alignment of projects within the portfolio with business strategy to support organizational objectives !  Risk management by executing appropriate measures to manage and mitigate risks and reduce potential impacts on projects and programs to an acceptable level !  Resource management by utilizing available resources and skills efficiently and effectively !  Performance measurement by measuring, monitoring and reporting on project governance metrics to ensure that organizational objectives are achieved !  Value delivery by optimizing the project portfolio in support of organizational objectives 8
  • 9. + Three Elements of Project Governance Project  Governance   3.  How  do  we  know  we  are  being  successful  at  what  we’re  supposed  to  be  doing?   2.  How  are  we  going  to  do  what  we  said  we  would  do?   1.  What  do  we  want  to  do?   " Business  and  Technical   Strategy   " Deliverables  Based   Planning   " Measures  of  Performance   (MoP)   " CapaciCes  Based  Planning   " Assessment  of  increasing   maturity   " Measures  of  EffecCveness   (MoE)   " ConnecCons  to  the   delivery  of  business  value   " DefiniCons  of  physical   progress  of  plans   " Measures  of  Physical   Percent  Complete   Project Governance is the Primary Role of the Program Management Office (PMO) 9
  • 10. + What’s the difference between Business Governance & Project Governance? !  Business Governance is the organizational control of the business’s ability to deliver value !  Project Governance is the centralized control of the projects that produce this value Governance reduces the asymmetric information exchange between the providers and consumers of project information. Governance assures the providers of products or services have the full consent of the consumers that continuously increases visibility, maturity, and value of these products and services. 10
  • 11. + What’s the Real Problem Here? !  Corporate Governance is well defined !  Project Management methodologies are mature and generally applicable to a wide variety of business domain !  There are gaps in the “governance” of projects through … !  Applying Project Management methods is not governance, it is project execution controls !  Having document artifacts is necessary but not sufficient for successful project work !  Consumption of time and budget is never a measure of progress 11
  • 12. + What are the activities of Project Governance? !  Establishing the basis for project governance, approval, and measurement with roles, accountabilities, policies, standards, and associated processes !  Evaluating project proposals to select those that are the best investment of funds and scarce resources and are within the firm’s capability and capacity to deliver !  Enabling resourcing of projects with staff and consultants, harness and manage of business support and the provision of the governance resources !  Defining the “desired business outcomes”, benefits, and value — the business measures of success and overall value proposition !  Controlling the scope, contingency funds, overall project value, and other project performance attributes !  Monitoring the project’s progress, stakeholder’s commitment, results achieved and the leading indicators of failure !  Measuring of outputs, outcomes, benefits and value — against both the plan and measurable expectations !  “Steering” the project into the organization, remove obstacles, manage the critical success factors and remediate project or benefit- realization shortfalls !  Developing the organization’s project delivery capability — continually building and enhancing its ability to deliver more complex and challenging projects in less time and for less cost while generating the maximum value. 12
  • 13. + Good Project Governance Elements Elements Project Governance Physical Artifact A compelling business case, stating the objectives of the project and specifying the in-scope and out-of-scope elements Risk Adjusted Business Case A mechanism to assess the compliance of the completed project to its original objectives identifying all stakeholders with an interest in the project Deliverables Plan connected to business case A defined method of communication to each stakeholder Communications Plan A set of business-level requirements as agreed by all stakeholders Master deliverables An agreed specification for the project deliverables and their measures of effectiveness and measures of performance Capabilities, features, functions, and testable requirements Clear assignment of project roles and responsibilities Responsibility Assignment Matrix A current, published project plan that spans all project stages from project initiation through development to the transition to operations Integrated Master Plan Integrated Master Schedule A system of accurate upward promoting status and progress-reporting including connections between cost, schedule, and technical performance Measures of physical percent complete and delivered business value A central information repository for the project Enterprise PM System A process for the management and resolution of issues that arise during the project Issue tracking system A process for the recording and communication of risks identified during the project Risk management system 13
  • 14. + 3 Simple Steps to Governing the Project Management Processes !  Define what Project Governance means for the enterprise in terms of its artifacts !  Understand “governance” does not replace actionable beneficial outcomes of a Project Management method !  Initiate the cultural introduction of “governing” as well as “managing” 14
  • 15. + A Project Governance Framework !  OGC P3M3 !  Maturity model for Project, Program, Portfolio Management Maturity Model !  This framework is simple, well formed and in use in the UK for council, township, county and regional governments for IT management !  It is a maturity model in the same way CMMI is a maturity model www.ogc.gov.uk The OGC P3M3 V2.0 defines 5 levels of maturity for project, program, and portfolio management processes. P3M3 is “owned” by the same organization that “owns” ITIL 15
  • 16. + Universal Process Maturity Levels 16 Process characterized for projects and is often reactive Process characterized for the organization and is proactive Process measured and controlled through formal data gathering and assessment processes Focus is on continuous process improvement through assessment, feedback and preemptive corrective actions Level 4: Quantitatively Managed Level 1: Performed Level 2: Managed Level 5: Optimizing Level 3: Defined Each maturity level is a layer in the foundation for continuous process improvement Process unpredictable, poorly controlled and reactive
  • 17. + Characteristics of Each Maturity Model Level 17 Maturity Level Attributes found in the organization Level 5 Optimized "  Project, Program, Portfolio management improvement environment is actively encouraged "  Built on a flexible PMO centered organizational structure "  Career path for project and program managers "  Project, program, and portfolio management training is a component in staff development Level 4 Managed "  Active senior management support for integration of business planning and execution "  Organization efficiently plans, manages, integrates and controls multiple projects "  Database of previous project data maintained and utilized Level 3 Defined "  Senior management support for project, program, and portfolio management "  Organization efficiently plans, manages, integrates, and controls single projects "  Repository of previous project experience maintained and utilized "  Team members and project managers trained in project management "  Consistent use of tools and techniques for project management processes Level 2 Repeatable "  Managed support for project management "  Repeatable processes are applied to basic project management steps "  Project and program outcomes are more predictable "  Use of common tools and techniques for key project management processes Level 1 Initial "  Many, incomplete, informal approaches – each project handled differently "  Highly dependent on Project Manager "  Project and program outcomes unpredictable "  Little organizational support for project management "  Lesson learned are not gathered and passed on to other projects
  • 18. + What sets high maturity organizations apart from the rest? !  High performing organizations are significantly more mature in their project management practices than organizations in general !  The most significant difference between high and low performing organizations is in allocating resources optimally and in estimating accurately !  High-performing organizations are very good at satisfying project customers and in completing projects on schedule, on budget !  A significant percentage (23%) of high-performing organizations are at Level 5 maturity in quality management 18 Project Management Maturity: A Benchmark of Current Best Practices, CBP
  • 19. + Governing Projects by Getting to Level 3 of the OGC P3M3 A mature organization has the ability to manage portfolios, programs, and projects based on standard, defined processes.
  • 20. + Project, Program, and Portfolio Management Maturity Model Level 1 – Initial Recognize projects and run them differently from the ongoing business Level 2 – Repeatable Ensure that each project is run on its own processes and procedures to a minimum specified standard Level 3 – Defined Each organizational element has a centrally controlled project processes. Individual projects flex within these processes to suit a particular project Level 4 – Managed Each organizational element obtains and retains specific measures on its project performance. These measures used to improve the quality of projects Level 5 – Optimizing The entire organization runs a continuous process improvement process with proactive problem and technology management 20
  • 21. + The Program Management Office Governance Structure using the OGC P3M3 Framework 21 Management Control Benefits Management Financial Management Stakeholder Management Risk Management Organizational Governance Resource Management Portfolio Management Program Management Project Management Program Office Governance
  • 22. + Key Performance Improvements !  Understand the key practices that are part of effective portfolio, program, and project management processes !  Identify the key practices that must be embedded within the organization to achieve the next maturity level !  Understand and improve the capability to manage programs and projects more effectively in the future 22
  • 23. + P3M3 The 25 (2+11+12) Process areas of OGC P3M3 include all core Knowledge Areas of PMBOK 23
  • 24. + Assessment of the Path to OGC P3M3 Level 3 !  Where are we today? !  Where do we want to be? !  How can we get there? 24
  • 25. + Benefits to reaching Level 3 !  Improved budget and schedule predictability !  Reduced cycle time !  Increased productivity !  Improved quality !  Increased customer satisfaction !  Increased return on investment !  Decreased cost of quality TeraQuest / Gartner 2006 Maturity ROI 25
  • 26. + Measureable Improvements by moving between the Maturity Model Levels 26 Moving from One Level to the Next L1 to L2 L2 to L3 L3 to L4 Reduced SW Defects 12% 40% 85% Reduced Cycle Time 10% 38% 63% Reduced Costs 8% 35% 75% Schedule Variance 145% 24% 15% Data presented at 5th Annual CMMI technology Conference & User Group, Denver Colorado, November 2005
  • 27. + Benefits to Deploying a Project Governance Process at Level 3 !  Substantial ROI improvements (from historical SEI data) !  Identified strengths and weakness by Key Process Area (KPA) with improvement plans for weaknesses !  Prioritized roadmap to Level 3 with actionable outcomes connected to business strategies 27
  • 28. + Steps to get to OGC P3M3 Level 3 !  Competency Assessment of Project Managers !  OGC P3M3 assessment criteria !  PMI – PMBOK process areas for project execution details !  OGC P3M3 Deployment !  Level 3 process areas !  Deployment of PPM Business processes against Level 3 Process Areas 28
  • 29. + Failure Modes along the way to Process Maturity Failure Mode Failure Description Mitigation Design and Definition Scope and outcomes not clearly defined Deliverables Based Planning (DBP) with physical % complete measures of progress Decision making Inadequate levels of sponsorship Scorecard based mission and vision defined up front with maturity assessment units of measure Risk Discipline Weak arrangements for risk management Embedded risk management, retirement and mitigation in the Master Plan Supplier management Lack of shared understanding between suppliers Deliverables based plan with risk adjusted measures of performance People Disconnects between program and stakeholders Deliverables focus with measureable value to stakeholders 29
  • 30. + Beneficial Outcomes using a Project Governance Approach !  Change initiatives address and achieve strategic objectives !  Business value realized earlier !  Risks retired or managed !  Total change investment is coherent, prioritized, and visible !  Allocation of resources optimized !  New initiatives evaluated for operational effectiveness 30
  • 31. + Characteristics that must be in place for successful Project Governance !  Focus on leadership and alignment with strategy !  Vision covers entire organization !  Risk visible from a strategic perspective !  Integrity of business transformation managed through programs in a Project Portfolio Management system !  Benefits oriented to organization not just technology 31
  • 32. + What’s the 1st Step to Level 3? !  Perform a gap analysis between “As Is” and “To Be” at Level 3 !  With these gaps, build the gap closure plan !  Execute the closure plan with measurable beneficial outcomes to the organization 32