The  pursuit  of  operational  effectiveness  is  seductive  
because  it  is  concrete  and  actionable.  
Caught  up  in  the  race  for  operational  effectiveness,  many  
managers  simply  do  not  understand  the  need  to  have  a  
strategy.
– Dr.  Michael  E.  Porter  – Professor  of  Business  
Administration,  Harvard  Business  School
In  our  balanced  scorecard-­based  approach  to  planning  and  performance  
management,  we  always  start  with  strategy.  
We  are  not  innovating  in  the  ITD  for  the  sake  of  innovating.  
Rather  we  are  building  a  core  capability  that  allows  us  to  provide  
measureable  value  to  the  districts  clients  and  stakeholders  defined  through  
our  Value  Proposition.  
2
Vision
IT  Tech  Plan
ITD  Balanced  
Scorecard
Technical  
Measures
5  Goals  of  the  Tech  Plan  and  6  CIO  Goals  
connected  to  the  Master  Plan
Strategic  Initiatives defined  in  a  Strategy  
Map  with  cause  and  effect  connections.
Numeric  measures  for  each  KPI  with  
baseline  value  with  variance  values.
ü Why  We  Exist
ü What  We  Do  To  
Deliver  Value  To  Our  
Stakeholders
ü What  We  Strive  To  
Be  For  Our  
Stakeholders
ü What  Our  
Stakeholders  Want  
Us  To  Be
ü Implementation  
Framework  For  
Turning  Strategy  Into  
Execution.
Mission
Vision
GQ(I)M
Master  Plan
Mission  and  Vision  of  as  the  starting  point  
for  IT  Initiatives  and  their  connections  to  
the  Master  Plan
IT  Operating  Plan
IT  operational  activities  based  on  BSC  for  
each  operational  outcome  using  ITIL  V3.
GQ(I)M
Goal,  Question,  (Indicator),  Measure,  to  
capture  CSFs,  KPIs,  and  connections  to  
projects  through  a  Strategy  Map.
Elements of the Balanced Scorecard
Strategy  Map,  with  four  perspectives.
§ Stakeholder  perspective  – describes  the  initiatives  that  directly  
impact  the  stakeholders  of  the  IT  Department  in  pursuit  of  their  
mission  and  vision.
§ Internal  Process  Perspective  – describes  the  activities  undertaken  
by  ITD  to  deliver  the  stakeholder  initiatives.
§ Learning  and  Growth  Perspective  – the  activities  if  ITD  develop  and  
maintain  the  skills,  knowledge,  and  experience  needed  to  implement  
the  Strategic  Initiatives.
§ Budget  Perspective  – the  management  initiatives  needed  to  operate  
the  ITD  in  a  responsible  manner  while  delivering  value  to  the  BCSP  
Stakeholders.  
Score  Card
§ Vision  – what  the  future  should  look  like  for  ITD
§ Narrative  – an  elevator  pitch for  this  Strategic  Initiative  telling  what  
the  desired  outcome  will  be  in  the  future  (the  Vision).
§ Strategic  Initiative  – a  statement  of  the  work  to  be  undertaken  to  
fulfill  the  Vision
§ Performance  Goals  – a  stated  measureable  goal  from  the  work  
effort  to  deliver  the  Strategic  Initiative  that  fulfills  the  Vision
§ Critical  Success  Factors  – for  each  goal,  what  are  the  Critical  
Success  Factors  that  must  be  in  place  for  completion  of  the  
Performance  Goal
§ Key  Performance  Indicators  – the  units  of  measure  and  the  upper  
and  lower  limits  of  these  measures  to  satisfy  the  Critical  Success  
Factor
4
Cascading  The  Balanced  Scorecard
§ Cascading  the  scorecard  means  translating  the  
“corporate”  (ITD  – Tier  1)  scorecard  down  to  the  
“business  units”  (ITD  Departments  – Tier  2),  and  then  to  
a  team  of  individuals  (Department  individuals  – Tier  3).
§ The  current  BSC  is  cascaded  to  Tier  2.
§ The  result  is  “line  of  sight”  visibility  from  top  to  bottom  
and  back  again  for  each  top  level  strategic  initiative.
§ With  the  strategy  map,  goals,  performance  measures  
and  targets  are  connected  to  the  top  level  Mission  and  
Vision  of  ITD.
5
Benefits  of  Cascading  the  Scorecard
§ Top  level  Goals  -­ Master  Plan  and  ITD  Tech  Plan  –
remain  focused  on  the  Race  to  the  Top  initiatives  at  the  
strategy  level.
§ Individual  department  managers  can  connect  these  
strategies  to  their  individual  technical  and  operational  
performance  goals.
§ The  department  scorecards  can  then  be  used  to  
connect  ITD  CIO  goals  with  Critical  Success  Factors  
and  Key  Performance  Indicators  in  the  vernacular  of  
Balanced  Scorecard.
6
Connecting the Dots From Tier 1 to Tier 2
7
The scorecard initiative
is expanded in the
performance description
“card”
The “theme,” and the Initiative are flowed down the
Tier 2 scorecard to establish the basis for the
performance of the ITD department.
This answers the question - “what is the
department doing to support the top level ITD
strategy?”
The Tier 2 Goals, CSF’s, and KPI’s answer the
question “what does the department do in support
of the ITD Master Initiatives. This connects the
dots between department level strategic activities,
and the top level ITD strategic activities.
ITD Balanced Scorecard
§ The  Strategy  Map  and  performance  scorecards  show  
how  ITD  directly  enables  the  initiatives  of  the  Master  
Plan
§ The  Master  ITD  scorecard  is  augmented  with  individual  
department  scorecards  for  the  8  ITD  department  
leaders
8
Office  of  the CIO  
(PMO)
Human  Resource  
Management  
Systems
Business  
Support  Systems
Call  Center  
Services
Technical  
Support  Services
Teacher  Support  
Services (TSS)
Student  
Information  
Systems  (SIS)
Security  and  
Data  Center
Budget  Perspective
B2:  Budget
Management
B3:  Resource
Management
Internal  Processes  Perspective
Stakeholder  Perspective
S1:  Be  the  
Preferred  
Provider
S2:  Use  ITIL  
to  Manage  
Services
S3:  Provide  
Needed  
Systems  and  
Applications
S5:  Manage  
Stakeholder
Relations
S4:  Ensure  
Recognition  
of  Value
Service  Attributes Relationships
P1:  Use  ITIL  
for  Op  
Excellence
P2:  Manage  
Stakeholder
Relations
P3:  Develop  
Continuous  
Improvement  
Processes
P4:  Assure  
Security  and  
Privacy
Organizational  Capabilities  and  Capacities
Learnings  &  Growth  Perspective
Image
B1:  Project
Performance
L1:  Culture L2:  Leadership L3:  Alignment L4:  Teamwork
ITD  Strategy  Map  For  
L5:  Resource  Capacity  for  
Work
L6:  Resource  Capabilities  
for  Work
StakeholderIT  Department  Operations
9
CIO  ITD  Goals IT  Tech  Plan
IT  Department  
Balanced  Scorecard
Perspective
1:  Align  And  Execute
2:  Operational  
Execution
3:  Design  And  Develop  
Systems
4:  PMO,  PPM,  And  ITIL  
Improve  Quality
5:  Process  Design  To  
Support  G&O’s
6:  IT  Governance  And  
Risk  Management
1:  Improve  Learning
2:  Professional  Dev
3:  Technical  Efficiency
4:  Equitable  Access
5:  Improved  
Infrastructure
S1:  Preferred  Provider
S2:  ITIL  Service  Management
S3:  Needed  Applications
S4:  Ensure  Value  Recognition
S5:  Stakeholder  Relations  (External)
P1:  Operational  Excellence
P2:  Stakeholder  Relations  (Internal)
P3:  Develop  Continuous  Improvement  Process
P4:  Security  and  Privacy
L1:  Culture
L2:  Leadership
L3:  Alignment
L4:  Teamwork
L5:  Capacity  for  Work
L6:  Capability  for  Work
B1:  Project  Performance
B2:  Budget  Management
B3:  Resource Management
10
Person
Balanced Score Initiative
Stakeholder Internal Learnings & Growth Budget
James
ü Server operations
ü Network
ü Telecom
ü Security
ü Business Continuity
ü CISSP
ü Cisco VOIP
ü Basic Routing and Switching
ü VM
ü Linux
ü Connect systems with budget
Chuck
ü SMS Operations
ü Tier 3 Help Desk
ü SMS operations ü Connect systems with budget
Shashi
ü Oracle Learning Management
(S3)
ü Oracle R12 Upgrade
ü Oracle performance
Management
ü Connect systems with budget
Jessica
ü Provide services for IT Mgmt
and CIO
ü Improve PM Methods ü ProjectRisk ü AlignIT budgets
David
ü O1: P3
ü O2: P3, P1
ü O3: P3
ü O4: P3
ü O5: P1
ü O6: P3
ü O7: P3
ü Connect systems with budget
Bert
ü Provide supportfor instructional
technology
ü Provide supportfor
administrative application
ü Provide requirements for
administrative and instructional
applications
ü Understand applications to
deliver training to stakeholders
ü Use budgetfor PDC facility
ü Field supportstaff equipped
with tools and expenses
ü Consultant budgetfor changes
and improvements
Ann
ü Use technology to improve
managementand operations
(3)(P1)
ü Ensure access to equitable
access (4)(S2)
ü ITIL training and certification
(L3)
ü (B1), (B2), (B3) Connect budget
with activities FTE and some
capital equipment
Tyrone
ü Empower the stakeholder to be
self sufficientas much as
possible onthe student
technical.
ü Processes and procedures
applied to all devices –
computers, peripherals, AV
(projectors, smart)– 47 types
ü Rights based training and
supportthrough the PDC
activities
ü Identify trainthe trainer
opportunity
ü Connect systems with budget
11
12
Stakeholder  Perspective
To  reach  our  objectives,  how  do  we  create  value  for  our  stakeholders?
ITD  stakeholders  are  the  “customers”  of  the  services  provided  by  ITD.  These  are  all  the  people  who  have  an  
interest  in  the  ITD  Organization,  projects  managed   by  ITD,  the  activities  of  ITD,  the  resources,  and  deliverables  
produced  by  the  resources.
The  forms  a  complex  network  of  impacted  clients  and  stakeholders  who  exercise  influence  on  ITD’s  funding,  
direction,  and  ability  to  fulfill  its  mission.
The  strategic  initiatives  in  this  perspective  address  how  ITD  will  satisfy  the  needs  of  these  stakeholders  and  
clients,  while  maintaining   the  operational,   security,  privacy  obligations   to  Master  Plan  and  other  governance  
processes   13
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Have  a  measurable  
contribution  to  all  IT  
supported  initiatives  in  the  
using  the  6  CIO  Goals  and  
the  ITD  Tech-­Plan  5  Goals.  
Provide  proactive  two  way  
communication  of  
stakeholder  needs  and  
prompt  response  and  
resolution  of  customer  
concerns  for  all  supported  
systems  and  requests  for  IT  
services.
Implement  service  
improvement  plan  per  ITIL  
[4]
Involve  and  develop  ITD  
staff  to  implement  service  
improvement  plans
To  be  the  preferred  technology  partner  in  the  achievement  of  the  Master  Plan  and  other  
mandated  initiatives using  Information  Technology.
These  actions  are  defined  in  the  Information  Technology  Department  (ITD)  Technology  Plan  
(Tech  Plan)  through  5  Goals  and  the  ITD  CIO’s  six  (6)  goals.
Provide  IT  products  and  
services  traceable  to  each  
Initiative  as  defined  in  a  
variety  of  documents,  from  
the  Master  Plan  to  the  
Race  To  The  Top  (RTTT).
When  there  is  a  choice,  be  
the  preferred  technology  
partner  to  BCPSs.  
When  systems  are  
mandated,  assure  
customer  satisfaction  
exceeds  expectations  to  
maintain  preference  
S1:  Be  The  Preferred  
Provider  of  IT  Services
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Select  from  the  5  ITIL  
components,  which  are  
applicable  for  the  current  
strategy  deployment
Develop  operational  
performance  measures  for  
each  of  the  ITD  
departments  at  the  
execution  level  guided  by  
the  selected  ITIL  Service  
Management  Framework  
elements
The  ITIL  Service  Management  Framework  V3  defines  the  attributes  and  measures  of  the  Fit  
Purpose (Utility)  and  Fit  for  Use (Warranty).
Utility  is  the  increase  for  the  possible  “benefit”  to  the  BCPS.
Warranty  is  the  availability  and  reliability  in  continuity  and  security  of  the  services  provided  by  
ITD.  There  are  five  (5)  components:  (1)  Service,  (2)  Design,  (3)  Transition,  (4)  Operations,  and  
(5)  Continuous  Improvement  as  applied  to  the  Stakeholder.
ITD  will  select  which  of  these  to  implement  over  what  periods  of  time  to  support  the  
improvement  processes.
Implement  selected  
components  of  ITIL  
Service  Foundation  V3.  (1)  
Service,  (2)  Design,  (3)  
Transition,  (4)  Operations,  
and  (5)  Continuous  
Improvement  as  applied  to  
the  Stakeholder.
Deploy  IT  Service  
Management  best  
practices  guided  by  ITIL  
Foundations  V3.
S2:  Use  ITIL  To  Manage  
Services
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Identify,  implement,  and  
operate  the  applications  and  
systems  of  ITD  to  ensure  
the  Mission  and  Vision  of  
the  is  being  met.
For  each  goal  of  the  ITD  
Technical  Plan  define  an  
operational  plan  to  maintain  
or  increase  the  performance  
of  each  critical  application  
and  system.
Deliberate  design  of  
processes  to  support  BCPS
Understand  existing  
services  and  the  needs  of  
the  stakeholders
Define  technical  capabilities  
inventory  and  rank  those  
against  Mstr Plan
Model  the  capabilities  and  
capacities  of  critical  systems
Model  the  infrastructure  
needs  to  meet  stakeholder  
demand
Customer  survey  of  needs  
and  satisfaction  
assessment
Gap  analysis  of  current  
systems  against  critical  
stakeholder  needs
Skills,  capabilities,  and  
capacity  for  work  
assessment
Measureable  contributed  
value  to  Mstr Plan  and  IT  
Technical  Plan
Capacity,  and  “..ilities”  
model  for  all  infrastructure  
with  monetized  value.
Capacity  of  services  in  
users,  throughput  or  
volume.
Application  and  system  strategy  is  about  planning  deliberate  acts  that  increase  shareholder  
value.  IT  is  run  as  an  independent  business  and  is  therefore  regarded  as  a  supplier/outsourcer.  
This  mindset  allows  for  provisioning  services  internally  or  externally,  depending  upon  business  
conditions  and  opportunities.
IT  services  are  viewed  as  strategic  business  assets  critical  to  an  organization’s  survival  and  
success.  A  formal  business  planning  process  must  be  designed  to  complement  the  strategic  
planning  process.  The  planning  process  includes  a  market  definition  step  — determining  need  
and  estimating  revenue.
Take  actions  to  identify  
critical  assets  and  increase  
the  measurable  value  of  
ITD’s  offerings  to  and  
assure  ITD  is  the  provider  
of  choice  for  these  IT  
Services  by  operating  and  
providing  applications  that  
meet  the  needs  of  schools  
and  administration.
Assure  the  ITD  critical  
assets  directly  contribute  
to  the  success  of  and  its  
Mission  and  Vision  in  units  
of  measure  meaningful  to  
the  decision  makers.
S3:  Provide  Needed  Systems  
and  Applications
Assess  ITD  staff’s  ability  to  
deliver  value  to  
stakeholders
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Define  and  implement  the  
feedback  processes  and  
their  execution  that  will  
connect  the  offerings  of  ITD  
with  the  needs  of  the  
stakeholders  in  units  of  
measure  meaningful  to  
those  stakeholders
Define  and  implement  the  
work  processes  needed  to  
close  any  gaps  from  
feedback  from  clients  and  
stakeholders  to  increase  the  
delivered  value  and  the  
recognition  of  this  value.
Use  business  process  
measures  for  meaningful  
units
Periodic  feedback  capture  
processes  based  in  ITIL  
Service  measures
The  value  of  the  products  and  services  produced  by  ITD  must  be  recognized  as  having  value.  
ITD  cannot  declare  there  is  value  in  the  absence  of  consensus  with  the  clients  and  stakeholders.
This  recognized  value  comes  from  the  measurable  benefits  to  the  stakeholders  in  units  
meaningful  to  them.
Define  the  service  catalog,  
the  service  performance,  
and  connect  this  
performance  to  the  
measures  of  value  agreed  
to  by  the  stakeholders.
Have  ITD  stakeholders  
acknowledge  the  value  of  
the  products  and  services  
provided  to  the  consumers
S4:  Recognized  Value
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
For  the  external  
stakeholders,  define  the  
processes  needed  to  asses  
the  needs  of  the  
Stakeholder  to  determine  
what  should  be  in  the  
Service  Portfolio  and  the  
Stakeholder  Portfolio.
For  the  Internal  
Stakeholders,  define  the  
organizational  maturity  of  
ITD  and  the  processes  used  
to  manage  those  
stakeholders  and  their  
project  and  programs  using  
the  OGC  P3M3  Framework  
[3]
Increase  the  service  
potential  of  capabilities  and  
resources
Increase  the  performance  
potential  that  creates  value  
for  the  stakeholders
Identifying  stakeholders  – using  a  matrix  of  stakeholders  and  their  affinity  to  projects,  
processes  or  domain  areas.
Understanding  their  expectations  – by  interviewing,  surveys  (least  preferred)  and  face  to  face  
interactions  asking  direct  questions.
Managing  those  expectations  – in  the  same  way  as  managing  projects  or  processes,  through  
defined  outcomes.
Monitoring  the  effectiveness  of  stakeholder  engagement  activities  – by  defining  units  of  
measure  for  this  management.
Continuous  review  of  the  stakeholder  community  – through  frequent  and  periodic  meetings  
through  the  Stakeholder  Circle®  (http://www.stakeholder-­management.com/)
Install  a  relationship  
management  process  and  
identify  staff  needed  to  
ensure  stakeholders  are  
satisfied  with  ITD  products  
and  services.  
Relations  with  the  
Stakeholders  are  defined  
and  measurable  to  ensure  
continued  success  of  ITD  
through  a  Value  Network
of  tangible  and  intangible  
value  producing  
exchanges.  
S5:  Stakeholder  Relations
Internal  Process  Perspective
What  processes  must  we  excel  at  to  satisfy  our  stakeholders  and  clients?
Processes  are  structured  activities,  designed  to  accomplish  a  defined  objective.  Processes  result  in  a  goal-­
oriented  change,  utilizing  feedback  for  self-­enhancing   and  self-­corrective  actions.  Processes  are:
ü Measureable  because  they  are  performance  oriented
ü Have  specific  results
ü Provide  these  results  to  stakeholders
ü Respond  to  a  specific  event  – either  continually  or  iteratively  – originating   from  that  event. 19
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Measure  alignment  with  
schools  using  traceability  to  
paragraphs  and  sections  in  
the  Master  Plan  to  the  
portfolio  of  projects  
managed  in  ITD.
Organize  ITD  around  the  
management  of  Projects,  
Programs,  and  Portfolio  of  
projects  with  units  of  
measure  meaningful  to  the  
decision  makers.
Line  of  sight  traceability  of  
projects  to  the  Master  Plan
Monetized  investment  
analysis  of  this  work
Develop  a  portfolio  
management  process  using  
P3M3  guidance
Use  PPM  to  select  and  
prioritize  projects  in  the  
portfolio
Select  project  based  on  
“real  options”  decision  
making
Operational  excellence  
metrics  met
Monetized  performance  
metrics  met  within  
variance  bands
Performance  measures  for  
the  7  P3M3  perspectives.
To  be  operationally  excellent  requires  leadership,  teamwork  and  problem  solving  resulting  in  
continuous  improvement  throughout  the  IT  Department  by  focusing  on  the  needs  of  the  
customer,  empowering  employees,  and  optimizing  existing  activities  in  the  process.
Once  aligned  with  the  Master  Plan  and  IT  Plan,  the  execution  activities  must  be  performed  in  the  
context  of  operational  excellence.
Operational  aspects  of  ITD  will  be  guided  by  the  ITIL  Foundations  of  IT  Service  Management  
V3.  Seven  activities  from  the  P3M3  provided  during  the  delivery  of  this  Operational  Excellence  
are:  (1)  Management  Control;;  (2)  Benefits  Management;;  (3)  Budget  Management;;  (4)  
Stakeholder  Management;;  (5)  Risk  Management;;  (6)  Organizational  Governance;;  and  (7)  
Resource  Management.
Focus  IT  activities  on  
systems  and  application  
integration  to  enable  
people,  processes,  and  
technology  to  be  traceable  
to  IT  Tech  Plan  and  
Master  Plan,  guided  by  
ITIL  Foundations  V3  and  
OGC  P3M3  processes.
Develop,  align  and  
execute  ITD  initiatives  with  
the  IT  Technology  Plan  
and  Master  Plan
P1:  Use  ITIL  for  Operational  
Excellence
Provide  Operational  
Excellence  ITIL  V3  
guidance
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Define  and  oversee  
measures  connected  to  
customer  facing  
performance  of  all  
initiatives.  
Define  and  oversee  
measures  connected  to  all  
internal  operations  in  
support  of  external  
initiatives.
Identify  stakeholders  and  
their  specific  needs
Use  Stakeholder  
Typography  to  classify  and  
engage  stakeholders  [1]
Identify  stakeholders  and  
their  specific  needs
Define  risk,  value,  and  
relationship  
interactions
Stakeholder  management  is  the  process  of  managing  the  expectations  of  anyone  that  has  an  
interest  in  a  project  or  will  be  effected  by  its  deliverables  or  outputs.
Managing  stakeholders  means  knowing  what  stakeholders  want,  defining  what  products  and  
services  ITD  is  capable  of  providing,  and  confirming  that  the  Stakeholders  agree  with  and  
acknowledge  that  ITD  has  the  capabilities  to  provide  those  products  and  services.
This  starts  with  identifying  the  Stakeholders  and  their  attributes.  Stakeholder  management  is  
embedded  in  the  overall  risk  management  of  projects  and  portfolios  of  projects  managed  by  ITD.  
Starting  with  the  Race  To  
The  Top  (RTTT)  initiative  
and  others,  provide  
measureable  operational  
excellence  for  all  activities  
performance  by  ITD  
around  stakeholder  
management.
Define  and  deploy  
management  process  to  
provide  operational  
excellence  for  the  Race  to  
the  Top  Initiative  to  the  
external  and  internal  
stakeholders.
P2:  Stakeholder  Management
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Create  a  service  
improvement  plan  based  on  
the  seven  step  improvement  
process  defined  by  ITIL.
Create  an  organization  that  
includes  a  CSI  Management  
and  Service  Management  
role  in  ITD
Perform  CSI  audits  and  take  
corrective  actions
Processes  are  the  internal  affairs  of  the  ITD  as  a  service  provider.  The  first  step  is  the  activities  
that  focus  on  gaining  control  of  the  systems  that  provide  internally  focused  services.  Until  this  
control  is  established,  external  focus  will  be  difficult.  
Create  a  Continual  Service  
Improvement  (CSI)  
process  to  support  the  
needs  of  the  Stakeholder.
Apply  a  repeating  pattern  
of  improvement  efforts  that  
allow  ITD  to  better  meet  
internal  and  external  
stakeholder  needs.
P3:  Continual  Improvement
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Develop  of  an  Information  
Security  policy  and  
governance  (Controls)  
process.
Develop  an  Information  
Security  Management  
Systems  (ISMS)  to  plan,  
implement,  evaluate  and  
maintain  the  information  
management  policy  and  
governance  processes
Information  security  is  aligned  with  IT  and  business  security  is  managed  effectively  in  all  
services  and  service  management  operations  .  This  includes:
Information  is  available  and  useable  when  necessary  (availability)
Information  is  available  exclusively  to  authorized  persons  (confidentially)
The  information  is  complete,  accurate,  and  programs  against  unauthorized  changes  (integrity)
Information  and  information  exchanges  between  other  systems  re  reliable  (authenticity)
Develop  a  security  
management  framework  in  
alignment  with  the  ITD  
governance  process.
Align  IT  and  business  
security  to  ensure  effective  
management  of  services.
P4:  Security  and  Privacy
24
Learning  &  Growth  Perspective
How  do  we  align  our  intangible  assets  – people,  systems,  and  culture  – to  improve  critical  processes?
Learning-­and-­growth   metrics  is  a  framework  for  quantitatively  assessing  stakeholder  satisfaction,  productivity,  and  
retention  in  the  framework  of  the  balanced  scorecard  (BSC).  These  Goals,  Critical  Success  Factors,  and  Key  
Performance  Indicators  of  the  learning-­and-­growth   perspective  is  “the  foundation   for  all  strategy”  (Kaplan  &  
Norton,  2001,  p.  93).  These  metrics  are  not  just  behavioral  and  statistical  but  “developmental.”
25
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Define  the  End  Values  to  be  
delivered  through  the  
culture  in  terms  of  quality,  
excellence,  reliability,  
innovation,  and  budget  
management  success.
Define  the  Instrumental  
Values  to  be  the  desired  
behaviors  in  terms  of  
standards,  respect  for  
tradition  and  authority.
Identify  team  building  
opportunities,  e.g.  Strength  
Finder  2.0
Aligning  ITD  culture  with  the  Balanced  Scorecard  strategy  defines  who  we  get  things  done  
around  here.  Defining  the  Cultural  Web  consists  of  Stories,  Rituals  and  Routines,  Symbols,  
Organizational  Structure,  Control  Systems,  and  Power  Structures.
This  approach  provides  a  “ways  of  being”  to  define  the  attitudinal  aspects  of  how  ITD  operates  
on  a  daily,  including  personal  interactions,  problem  solving  approaches,  and  the  situational  
analysis  needed  improve  the  performance  of  the  organization,  using  the  Katzenbach  and  Gallup  
frameworks  for  Teams  and  Employee  Engagement  Activities.  (in  the  Backup  Materials)
Identify  the  existing  
cultural  aspects  and  
behaviors,  gaps  in  these  
behaviors,  and  take  
specific  action  to  address  
gaps  and  develop  a  
measurable  response.
Create  and  maintain  a  
culture  of  mutual  support,  
accountability  and  shared  
outcomes  for  all  ITD  
personnel.
L1:  Culture
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Select  a  strategic  theme  or  
project  that  will  enhance  the  
ITD  and  take  steps  toward  
to  achieving  its  overall  
strategic  goal through  hands  
on  leadership  of  the  work  
activities.
Define  the  work  processes  
of  a  “project  leader”  to  focus  
on  the  delivery  of  beneficial  
outcomes  that  meet  
stakeholder  needs.
Track  the  few  critical  
elements  of  strategy  for  
three  major  projects
Focus  on  short-­term  view  of  
leadership  to  critical  areas  
that  impact  stakeholders
Ensure  key  resources  are  
deployed  to  support  critical  
projects.
The  leaders  of  an  organization  have  the  prime  responsibility  for  the  quality  produced  by  the
organization,  i.e.,  the  success  of  the  mission.  The  commitment  and  participation  of  leaders
have  long  been  recognized  as  critical  factors  in  successful  organizations  (Tichy  &  Devanna,
1990).  [2]
Only  leaders  have  the  sufficient  authority,  influence,  and  access  to  information  to
begin  and  maintain  major  organizational  change.
Define  and  deploy  a  
leadership  training,  
mentoring,  and  coaching  
process  for  all  members  of  
the  IT  Department.
Train,  coach,  mentor,  and  
develop  leaders  in  the  ITD  
department  capable  of  
delivering  on  the  Tech  
Plan,  Operations  Plan  and  
Master  Plan
L2:  Leadership
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Align  internal  support  and  
service  units  with  the  IT  
Tech  Plan,  6  ITD  Goals,  
and  cross  referenced  items  
in  the  Master  Plan.
Define  how  leaders  become  
accountable  to  the  
governance  processes,  
actions,  and  performance  
through  their  personal  
involvement  in  planning,  
communications,  coaching,  
vision,  actions,  and  
performance  of  ITD.
The  Balanced  Scorecard,  when  developed  as  a  strategic  planning  and  management  system,  
helps  align  an  organization  behind  a  shared  vision  of  success,  and  gets  the  ITD  working  on  the  
right  things  and  focusing  on  results.  
A  scorecard  is  more  than  a  way  of  keeping  score,  it  is  a  system,  consisting  of  people,  strategy,  
processes,  and  technology.  The  responsibility  for  this  critical  alignment  lies  with  the  ITD  
leadership.  
Define  the  processes  
needed  to  be  aware  of  why  
I  am  here and  what  am  I  
doing  to  support  the  
Strategic  Initiatives  of  the  
ITD.
Align  ITD  organization  with  
the  needs  of  the  
stakeholders  to  assure  
delivery  of  each  strategic  
initiative  on-­time,  on-­
budget,  and  compliant  with  
the  stakeholder  needs
L3:  Alignment
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Provide  a  leadership  that  
unifies  all  parts  of  the  ITD’s  
staff  through  a  methodology  
that  turns  the  eyes  of  all  ITD  
members  to  a  single  
direction  – toward  the  
stakeholder.
Develop  an  ongoing  team  
work  engagement  process  
that  provides  the  
mechanism  for  Jon  
Katzenbach  [5]  definition  of  
a  team  – a  group  of  
individuals  who  hold  each  
other  mutually  accountable  
for  a  shared  outcome.
Define  the  organizational  
structure  and  make  that  
visible  to  all  ITD  members
Define  the  channels  of  
communication  and  ensure  
all  participants  are  informed
Deploy  Katzenbach’s  
principles  across  ITD  
It  is  often  difficult  to  improve  overall  organizational  performance  because  the  collective  goals  are  
unclear.  Employees  are  often  only  aware  of  the  aims  of  their  own  "team  island",  and  regard  
other  team  islands  as  having  a  different  job.  Individuals  are  often  motivated  to  "do  their  bit",  but  
they  lack  the  overall  understanding  of  where  the  organization  is  going  or  how  the  various  team  
islands  are  supposed  to  work  together  for  collective  good.  Whereas  a  sports  team  is  often  
characterized  by  a  focus  on  goals,  results  and  league  tables,  businesses  are  often  characterized  
by  an  absence  of  such  a  unifying  force.
Establish  “teams”  that  are  
the  first  point  of  contact  for  
stakeholders.  This  
includes,  call  center  
support,  deep  technical  
support,  and  client  and  
stakeholder  requirements  
and  satisfaction  
processes.
Create  an  organization  
that  fosters  teamwork  and  
cooperation  to  improve  the  
performance  of  the  work  of  
ITD.
L4:  Teamwork
Create  a  culture  of  “shared  
outcomes,”  for  all  ITD  work.
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Create  and  maintain  an  up-­
to-­date  resource  capacity  
plan  with  defined  objectives  
reflecting  current  and  future  
needs  of  stakeholders.
Use  this  plan  to  forecast  
performance  of  service  
requests.
Align  resource  capacity  
management  and  the  
Service  Portfolio  and  
communicate  this  alignment  
to  the  stakeholders  to  
confirm  their  understanding  
of  what  can  be  
accomplished  with  the  
resource’s  capacity.
It  is  essential  to  have  an  analytical  understanding  of  ITD  resource’s  Capacity  for  Work.  The  
capacity  must  coincide  with  the  current  and  future  needs  of  the  clients  and  stakeholders  of  the  
BCPS.  Any  capacity  gaps  must  be  understood  and  communicated  to  these  stakeholders  in  units  
of  measure  meaningful  to  the  decision  making  processes.
Provide  IT  resource  
capacity  coinciding  with  
the  current  and  future  
needs  of  stakeholders  
against  the  justifiable  costs  
of  this  capacity.
Inform  stakeholder  of  ITD’s
ability  to  respond  to  all  
non-­discretionary  demand  
for  service  with  predictable  
durations  and  quality  of  
performance.
L5:  Resource  Capacity  for  
Work
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Using  the  Gallup  12  
assessment  of  business  
capabilities  survey  and  
define  gaps  and  closure  
strategies  for  each  of  the  
G12 elements  as  shown  in  
the  BSC  supporting  
materials  pages.
Discern  alignment  to  the  
professional  development  
initiatives.
Assess  capability  and  
capacity  for  work  using  the  
G12 profile
Establish  a  Professional  
Development  Center  for  ITD  
staff
When  there  is  need  for  resources  to  be  available  to  meet  strategic  objectives,  we  need  to  
understand  current  and  future  work  capability.  
The  current  capability  includes  an  assessment  of  task  focus,  self  conduct,  and  interpersonal  
perspectives  of  the  performed  activities.
The  future  capability  includes  an  assessment  of  the  needed  development  levels  and  
developmental  potentials  and  the  risk  associated  with  regressing  to  lower  levels  of  capability  
based  on  a  systems  thinking approach  to  capacity  planning.  
Identify  the  capabilities  for  
the  needed  services  of  
Clients  and  Stakeholders  
through  an  assessment  of  
these  needs  in  a  survey  
instrument  and  direct  
“customer  contact.”
Provide  the  needed  
technical,  operational,  and  
interpersonal  capabilities  
to  meet  the  needed  
demands  of  clients  and  
stakeholders
L6:  Resource  Capability  for  
Work
32
Budget  Process  Perspective
What  are  our  stakeholder  and  client  expectations  of  our  budget  management  performance?
The  budget  perspective  activities  are  those  necessary  to  ensure  the  execution  of  the  ITD  strategy  in  support  of  the  
Mission  and  Vision.
This  activity  assigns  budget  to  projects  and  controls  the  consumption  of  that  budget  in  exchange  for  measurable  
value  – both  tangible   and  intangible.
33
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Project  execution  
performance  parameters  
meaningful  to  internal  
decision  making  of  the  ITD
Project  business  
performance  parameters  
defined  in  units  meaningful  
to  the  Clients  and  
Stakeholders  for  IT  
services.
Cost  performance
Schedule  performance
Project  business  
performance  measures
Customer  satisfaction  
measures
Technical  performance
Project  performance  management  starts  with  repeatable  processes.  The  “baseline”  of  a  project  
includes,  cost,  schedule,  and  the  measures  of  physical  percent  complete.  These  measures  are  
defined  in  units  meaningful  to  the  decision  makers.
Successful  management  of  projects  and  the  portfolio  of  projects  starts  with  the  Integrated  
Master  Plan  showing  what  capabilities  will  be  produced  for  the  stakeholders,  what  significant  
accomplishments  must  be  completed,  the  success  criteria  for  those  accomplishments,  and  the  
work  efforts  (in  the  form  a  work  package)  are  needed  for  complete  the  Accomplishment  Criteria.
These  activities  are  arranged  in  the  Integrated  Master  Schedule  (IMS)  and  placed  on  baseline.  
The  IMS  is  a  resource  loaded  activity  network  include  schedule  and  cost  margins.
Establish  a  project  
performance  management  
system  using  cost,  
schedule,  and  technical  
performance  measures  to  
increase  the  probability  of  
success  for  each  ITD  
project.
Install  and  operate  a  
project,  program,  and  
portfolio  governance  
process  to  increase  the  
probability  of  success  of  
each  project  produced  by  
ITD
B1:  Project  Performance
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Defines  budget  
management  and  submittal,  
authorization processes  to  
maintain  the  integrity  of  the  
Integrated  Master  Schedule.
Define  and  deploy  a  
Change  Management  
Process  guided  by  PMBOK  
and  ITIL  processes  to  
ensure  the  integrity  of  the  
Integrated  Master  Schedule.
Financial  assets  are  necessary  to  support  the  ownership  or  use  of  all  assets.
Resources  and  capabilities  form  the  basis  for  the  value  of  a  service.
Financial  management  is  an  integrated  element  of  service  management.  Budget  management  
provides  vital  information  needed  to  ensure  effective  and  efficient  service  delivery,  allowing  the  
ITD  to  justify  expenditures  and  allocate  funding  directly  to  the  services.
Establish  budget  
management,  forecasting,  
and  performance  
management  services  for  
all  projects  in  the  ITD  
portfolio.
Assure  the  management  of  
ITD  budget  and  the  assets  
are  guided  by  the  IT  
Governance  processes.
B2:  Budget  Management
Narrative  Of  The  Contents  Of  This  BSC  “Card”
Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators
Strategic  Theme
Master  ITD  Balanced  Scorecard
Create  a  resource  pool  
management  system  
starting  with  the  measurable  
“capacity  for  work”  that  
ensures  over  commitments  
are  not  made  without  
explicit  approval  and  the  
resulting  accountability  of  
senior  management
Provide  forecasts  of  needed  
resources  using  the  
Integrated  Master  Schedule  
as  the  “approved”  demand  
for  work.
Resources  and  capabilities  are  types  of  assets.  The  management  of  the  ITD  resources  creates  
value  in  the  form  of  services  and  IT  applications.  Management,  organization,  people,  and  
knowledge  convert  these  resources  into  value.
The  ITD  capacity  for  work  is  the  starting  point  for  resource  management.  The  capacity  for  work  
of  a  mix  of  people,  processes,  tools,  systems,  and  organizational  structures  along  with  intangible  
assets  of  ideas  and  culture.  
The  latter  – “intangible  assets”  – is  the  Critical  Success  Factor  for  ITD’s success.  
Provide  tools,  processes,  
and  leadership  needed  to  
manage  resources  for  all  
ITD  activities.
Provide  tools  and  
processes  needed  to  
manage  ITD  resources  to  
meet  the  demand  of  the  
Stakeholders
B3:  Resource  Management
Backup  Materials
37
Gallup Q12 elements
G12 Critical Employee Engagement Activities Outcomes for the BSC Leadings and Growth Perspective
I know what is expected of me at work. We have a shared outcome for all work activities
I have the materials and equipment I need to do my work right. In the Master Schedule all needed resources are defined
and available on the planned date
At work, I have the opportunity to do what I do best every day. Work activities are agreed to by the performing element
In the last seven days, I have received recognition or praise for good
work.
Katzenbach’s “teaming” processes are in place and
operational.
My supervisor or the person I report seems to care about me as a
person.
There is someone at work who encourages my development.
In the last six months, someone at work has talked with me about my
progress.
At work, my opinions seem to count.
The mission/purpose of my company makes me feel my job is important. Using the BSC, trace all activities to a strategic initiative
My associates (fellow employees) are committed to doing quality work. Measures of success include measures of effectiveness for
the clients and stakeholders and measures of performance
for the products and services
I have a best friend at work.
The last year, I have had opportunities at work to learn and grow. Provide needed technical, operational, and managerial
mentoring, coaching, and training through senior leaders
38
10 Ways to Build Capability
1. Create a leadership/coaching system that links all business functions.
2. Right Action=Reward the right: people, things, ways, time and reasons.
3. Create the feeling in your organization that people can fail to succeed.
4. Create the necessary infrastructure to connect people with metrics.
5. Become a teaching organization and teach at every level continuously.
6. Enable people with development opportunities to higher levels of function.
7. Understand appreciative coaching and how to build a culture around it.
8. Make it fun to work in your company.
9. Make perfectly clear what should be perfectly clear.
10. Get out of people’s way.
39
References
[1] A Typology of Operational Approaches for Stakeholder Analysis and
Engagement, Dr. Jing (Rebecca) Yang. Deakin University Prof. Ping Qi
(Geoffrey) Shen, Hong Kong Polytechnic University, Dr. Lynda Bourne,
Stakeholder Management Pty Ltd Christabel MF Ho & Dr. Xiaolong Xue.
http://www.stakeholdermapping.com/
[2] Transformational Leader, Tichy and Devanna, 1997
[3] OGC P3M3 (Project, Program, Portfolio Management Maturity Model)
[4] ITIL Foundations V3
[5] Jon Katezenbach, “Unleashing the Power of Teams: From Theory to
Execution, Booz and Company. The Wisdom of Teams: Creating the High-
Performance Organization.
40
41
Chapter  042 Performance-­Based   Project   Management   ®  is   a  registered   trademark   of   Niwot   Ridge   L.L.C.

Mais conteúdo relacionado

Mais procurados

Application Portfolio Rationalization
Application Portfolio RationalizationApplication Portfolio Rationalization
Application Portfolio RationalizationBob Rhubart
 
Enterprise Risk Management and Sustainability
Enterprise Risk Management and SustainabilityEnterprise Risk Management and Sustainability
Enterprise Risk Management and SustainabilityJeff B
 
Operating Model Powerpoint Presentation Slides
Operating Model Powerpoint Presentation SlidesOperating Model Powerpoint Presentation Slides
Operating Model Powerpoint Presentation SlidesSlideTeam
 
A tailored enterprise architecture maturity model
A tailored enterprise architecture maturity modelA tailored enterprise architecture maturity model
A tailored enterprise architecture maturity modelPaul Sullivan
 
Automotive IT Strategy: IT Sourcing
Automotive IT Strategy: IT SourcingAutomotive IT Strategy: IT Sourcing
Automotive IT Strategy: IT SourcingDeloitte Deutschland
 
Operating Model PowerPoint Presentation Slides
Operating Model PowerPoint Presentation Slides Operating Model PowerPoint Presentation Slides
Operating Model PowerPoint Presentation Slides SlideTeam
 
Gartner's IT Score Wallchart
Gartner's IT Score WallchartGartner's IT Score Wallchart
Gartner's IT Score WallchartPaul Sullivan
 
IT Strategy & Planning
IT Strategy & PlanningIT Strategy & Planning
IT Strategy & Planningchakraj
 
Principles of IT Governance
Principles of IT GovernancePrinciples of IT Governance
Principles of IT GovernanceGlen Alleman
 
How Gartner Helps Across the Entire IT Cost Optimization Life Cycle
How Gartner Helps Across the Entire IT Cost Optimization Life CycleHow Gartner Helps Across the Entire IT Cost Optimization Life Cycle
How Gartner Helps Across the Entire IT Cost Optimization Life CycleChris Grow
 
C-Suite’s Guide to Enterprise Risk Management and Emerging Risks
C-Suite’s Guide to Enterprise Risk Management and Emerging RisksC-Suite’s Guide to Enterprise Risk Management and Emerging Risks
C-Suite’s Guide to Enterprise Risk Management and Emerging RisksAronson LLC
 
GRC Governance, Risk mgmt. & Compliance Executive
GRC Governance, Risk mgmt. & Compliance ExecutiveGRC Governance, Risk mgmt. & Compliance Executive
GRC Governance, Risk mgmt. & Compliance ExecutiveMax Neira Schliemann
 
What’s Chipping Away at Automotive Production
What’s Chipping Away at Automotive ProductionWhat’s Chipping Away at Automotive Production
What’s Chipping Away at Automotive ProductionBoston Consulting Group
 
Application Portfolio Rationalization - Whitepaper
Application Portfolio Rationalization - WhitepaperApplication Portfolio Rationalization - Whitepaper
Application Portfolio Rationalization - WhitepaperNIIT Technologies
 
An Introduction to IT Management with COBIT 2019
An Introduction to IT Management with COBIT 2019An Introduction to IT Management with COBIT 2019
An Introduction to IT Management with COBIT 2019Gregor Polančič
 
Creating A Business Focussed Information Technology Strategy
Creating A Business Focussed Information Technology StrategyCreating A Business Focussed Information Technology Strategy
Creating A Business Focussed Information Technology StrategyAlan McSweeney
 

Mais procurados (20)

Application Portfolio Rationalization
Application Portfolio RationalizationApplication Portfolio Rationalization
Application Portfolio Rationalization
 
Enterprise Risk Management and Sustainability
Enterprise Risk Management and SustainabilityEnterprise Risk Management and Sustainability
Enterprise Risk Management and Sustainability
 
Operating Model Powerpoint Presentation Slides
Operating Model Powerpoint Presentation SlidesOperating Model Powerpoint Presentation Slides
Operating Model Powerpoint Presentation Slides
 
DEVELOPING AN ICT RISK REGISTER
DEVELOPING AN ICT RISK REGISTERDEVELOPING AN ICT RISK REGISTER
DEVELOPING AN ICT RISK REGISTER
 
A tailored enterprise architecture maturity model
A tailored enterprise architecture maturity modelA tailored enterprise architecture maturity model
A tailored enterprise architecture maturity model
 
Automotive IT Strategy: IT Sourcing
Automotive IT Strategy: IT SourcingAutomotive IT Strategy: IT Sourcing
Automotive IT Strategy: IT Sourcing
 
Operating Model PowerPoint Presentation Slides
Operating Model PowerPoint Presentation Slides Operating Model PowerPoint Presentation Slides
Operating Model PowerPoint Presentation Slides
 
Gartner's IT Score Wallchart
Gartner's IT Score WallchartGartner's IT Score Wallchart
Gartner's IT Score Wallchart
 
Optimize the IT Operating Model
Optimize the IT Operating ModelOptimize the IT Operating Model
Optimize the IT Operating Model
 
IT Strategy & Planning
IT Strategy & PlanningIT Strategy & Planning
IT Strategy & Planning
 
Principles of IT Governance
Principles of IT GovernancePrinciples of IT Governance
Principles of IT Governance
 
How Gartner Helps Across the Entire IT Cost Optimization Life Cycle
How Gartner Helps Across the Entire IT Cost Optimization Life CycleHow Gartner Helps Across the Entire IT Cost Optimization Life Cycle
How Gartner Helps Across the Entire IT Cost Optimization Life Cycle
 
C-Suite’s Guide to Enterprise Risk Management and Emerging Risks
C-Suite’s Guide to Enterprise Risk Management and Emerging RisksC-Suite’s Guide to Enterprise Risk Management and Emerging Risks
C-Suite’s Guide to Enterprise Risk Management and Emerging Risks
 
GRC Governance, Risk mgmt. & Compliance Executive
GRC Governance, Risk mgmt. & Compliance ExecutiveGRC Governance, Risk mgmt. & Compliance Executive
GRC Governance, Risk mgmt. & Compliance Executive
 
IT Strategy Tools
IT Strategy ToolsIT Strategy Tools
IT Strategy Tools
 
Strategic Operating Model
Strategic Operating Model Strategic Operating Model
Strategic Operating Model
 
What’s Chipping Away at Automotive Production
What’s Chipping Away at Automotive ProductionWhat’s Chipping Away at Automotive Production
What’s Chipping Away at Automotive Production
 
Application Portfolio Rationalization - Whitepaper
Application Portfolio Rationalization - WhitepaperApplication Portfolio Rationalization - Whitepaper
Application Portfolio Rationalization - Whitepaper
 
An Introduction to IT Management with COBIT 2019
An Introduction to IT Management with COBIT 2019An Introduction to IT Management with COBIT 2019
An Introduction to IT Management with COBIT 2019
 
Creating A Business Focussed Information Technology Strategy
Creating A Business Focussed Information Technology StrategyCreating A Business Focussed Information Technology Strategy
Creating A Business Focussed Information Technology Strategy
 

Semelhante a Master IT balanced scorecard (final).pptx

Master it balanced scorecard (final)
Master it balanced scorecard (final)Master it balanced scorecard (final)
Master it balanced scorecard (final)Glen Alleman
 
Master IT Balanced Scorecard
Master IT Balanced ScorecardMaster IT Balanced Scorecard
Master IT Balanced ScorecardGlen Alleman
 
BI Presentation Nashville CIO Council
BI Presentation Nashville CIO CouncilBI Presentation Nashville CIO Council
BI Presentation Nashville CIO CouncilThomas Danford
 
IT Performance Measurement using IT Governance Metric
IT Performance Measurement using IT Governance MetricIT Performance Measurement using IT Governance Metric
IT Performance Measurement using IT Governance MetricPECB
 
jbptunikompp-gdl-sintyasuka-19565-8-pert8.ppt
jbptunikompp-gdl-sintyasuka-19565-8-pert8.pptjbptunikompp-gdl-sintyasuka-19565-8-pert8.ppt
jbptunikompp-gdl-sintyasuka-19565-8-pert8.pptLunaAnindyaHerlinaPu
 
Organizational Performance framework-
Organizational Performance framework-Organizational Performance framework-
Organizational Performance framework-Dr. Johan Louw
 
SNW Spring 10 Presentation General
SNW Spring 10 Presentation GeneralSNW Spring 10 Presentation General
SNW Spring 10 Presentation GeneralJeff Kubacki
 
Strategic IT Planning - S42IL 110714
Strategic IT Planning - S42IL 110714Strategic IT Planning - S42IL 110714
Strategic IT Planning - S42IL 110714strategicforty2
 
Crafting a winning ICT Strategy .pptx
Crafting a winning ICT Strategy .pptxCrafting a winning ICT Strategy .pptx
Crafting a winning ICT Strategy .pptxPeterOwenje1
 
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...UMT
 
Developing an IT Scorecard Using the Balanced Scorecard Approach
Developing an IT Scorecard  Using the Balanced Scorecard ApproachDeveloping an IT Scorecard  Using the Balanced Scorecard Approach
Developing an IT Scorecard Using the Balanced Scorecard ApproachSenaka Ariyasinghe
 
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...OnePlan Solutions
 
Framing the business case service provider v1 2
Framing the business case    service provider  v1 2Framing the business case    service provider  v1 2
Framing the business case service provider v1 2pskoularikos
 
Frameworks to drive value from your investment in Information Technology
Frameworks to drive value from your investment in Information TechnologyFrameworks to drive value from your investment in Information Technology
Frameworks to drive value from your investment in Information TechnologyJohn Halliday
 
Understanding IT Governance and Risk Management
Understanding IT Governance and Risk ManagementUnderstanding IT Governance and Risk Management
Understanding IT Governance and Risk Managementjiricejka
 
Enterprise Architecture: Part II - Actualizing the Practice
Enterprise Architecture: Part II - Actualizing the PracticeEnterprise Architecture: Part II - Actualizing the Practice
Enterprise Architecture: Part II - Actualizing the PracticeFru Louis
 
Resume Eileen Jankord - Jan 2016 - BPA
Resume Eileen Jankord - Jan 2016 - BPA Resume Eileen Jankord - Jan 2016 - BPA
Resume Eileen Jankord - Jan 2016 - BPA Eileen Jankord
 

Semelhante a Master IT balanced scorecard (final).pptx (20)

Master it balanced scorecard (final)
Master it balanced scorecard (final)Master it balanced scorecard (final)
Master it balanced scorecard (final)
 
Master IT Balanced Scorecard
Master IT Balanced ScorecardMaster IT Balanced Scorecard
Master IT Balanced Scorecard
 
BI Presentation Nashville CIO Council
BI Presentation Nashville CIO CouncilBI Presentation Nashville CIO Council
BI Presentation Nashville CIO Council
 
IT Performance Measurement using IT Governance Metric
IT Performance Measurement using IT Governance MetricIT Performance Measurement using IT Governance Metric
IT Performance Measurement using IT Governance Metric
 
Practical experiences of portfolio management
Practical experiences of portfolio managementPractical experiences of portfolio management
Practical experiences of portfolio management
 
jbptunikompp-gdl-sintyasuka-19565-8-pert8.ppt
jbptunikompp-gdl-sintyasuka-19565-8-pert8.pptjbptunikompp-gdl-sintyasuka-19565-8-pert8.ppt
jbptunikompp-gdl-sintyasuka-19565-8-pert8.ppt
 
Organizational Performance framework-
Organizational Performance framework-Organizational Performance framework-
Organizational Performance framework-
 
SNW Spring 10 Presentation General
SNW Spring 10 Presentation GeneralSNW Spring 10 Presentation General
SNW Spring 10 Presentation General
 
Strategic IT Planning - S42IL 110714
Strategic IT Planning - S42IL 110714Strategic IT Planning - S42IL 110714
Strategic IT Planning - S42IL 110714
 
Crafting a winning ICT Strategy .pptx
Crafting a winning ICT Strategy .pptxCrafting a winning ICT Strategy .pptx
Crafting a winning ICT Strategy .pptx
 
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
IT Financial Management Series - Part 1: Defining a Model to Effectively Run ...
 
Developing an IT Scorecard Using the Balanced Scorecard Approach
Developing an IT Scorecard  Using the Balanced Scorecard ApproachDeveloping an IT Scorecard  Using the Balanced Scorecard Approach
Developing an IT Scorecard Using the Balanced Scorecard Approach
 
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
 
Framing the business case service provider v1 2
Framing the business case    service provider  v1 2Framing the business case    service provider  v1 2
Framing the business case service provider v1 2
 
Frameworks to drive value from your investment in Information Technology
Frameworks to drive value from your investment in Information TechnologyFrameworks to drive value from your investment in Information Technology
Frameworks to drive value from your investment in Information Technology
 
It governance & cobit 5
It governance & cobit 5It governance & cobit 5
It governance & cobit 5
 
Understanding IT Governance and Risk Management
Understanding IT Governance and Risk ManagementUnderstanding IT Governance and Risk Management
Understanding IT Governance and Risk Management
 
Satheesh_PMO
Satheesh_PMOSatheesh_PMO
Satheesh_PMO
 
Enterprise Architecture: Part II - Actualizing the Practice
Enterprise Architecture: Part II - Actualizing the PracticeEnterprise Architecture: Part II - Actualizing the Practice
Enterprise Architecture: Part II - Actualizing the Practice
 
Resume Eileen Jankord - Jan 2016 - BPA
Resume Eileen Jankord - Jan 2016 - BPA Resume Eileen Jankord - Jan 2016 - BPA
Resume Eileen Jankord - Jan 2016 - BPA
 

Mais de Glen Alleman

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planningGlen Alleman
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSGlen Alleman
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project SuccessGlen Alleman
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMGlen Alleman
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk managementGlen Alleman
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk ManagementGlen Alleman
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Glen Alleman
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringGlen Alleman
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideGlen Alleman
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineGlen Alleman
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Glen Alleman
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by StepGlen Alleman
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)Glen Alleman
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possibleGlen Alleman
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic AbundanceGlen Alleman
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planningGlen Alleman
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for AgileGlen Alleman
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement BaselineGlen Alleman
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaGlen Alleman
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure RolloutGlen Alleman
 

Mais de Glen Alleman (20)

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPM
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk management
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk Management
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guide
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planning
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement Baseline
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six Sigma
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure Rollout
 

Último

Ryan Mahoney - Will Artificial Intelligence Replace Real Estate Agents
Ryan Mahoney - Will Artificial Intelligence Replace Real Estate AgentsRyan Mahoney - Will Artificial Intelligence Replace Real Estate Agents
Ryan Mahoney - Will Artificial Intelligence Replace Real Estate AgentsRyan Mahoney
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...AliaaTarek5
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 

Último (20)

Ryan Mahoney - Will Artificial Intelligence Replace Real Estate Agents
Ryan Mahoney - Will Artificial Intelligence Replace Real Estate AgentsRyan Mahoney - Will Artificial Intelligence Replace Real Estate Agents
Ryan Mahoney - Will Artificial Intelligence Replace Real Estate Agents
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 

Master IT balanced scorecard (final).pptx

  • 2. The  pursuit  of  operational  effectiveness  is  seductive   because  it  is  concrete  and  actionable.   Caught  up  in  the  race  for  operational  effectiveness,  many   managers  simply  do  not  understand  the  need  to  have  a   strategy. – Dr.  Michael  E.  Porter  – Professor  of  Business   Administration,  Harvard  Business  School In  our  balanced  scorecard-­based  approach  to  planning  and  performance   management,  we  always  start  with  strategy.   We  are  not  innovating  in  the  ITD  for  the  sake  of  innovating.   Rather  we  are  building  a  core  capability  that  allows  us  to  provide   measureable  value  to  the  districts  clients  and  stakeholders  defined  through   our  Value  Proposition.   2
  • 3. Vision IT  Tech  Plan ITD  Balanced   Scorecard Technical   Measures 5  Goals  of  the  Tech  Plan  and  6  CIO  Goals   connected  to  the  Master  Plan Strategic  Initiatives defined  in  a  Strategy   Map  with  cause  and  effect  connections. Numeric  measures  for  each  KPI  with   baseline  value  with  variance  values. ü Why  We  Exist ü What  We  Do  To   Deliver  Value  To  Our   Stakeholders ü What  We  Strive  To   Be  For  Our   Stakeholders ü What  Our   Stakeholders  Want   Us  To  Be ü Implementation   Framework  For   Turning  Strategy  Into   Execution. Mission Vision GQ(I)M Master  Plan Mission  and  Vision  of  as  the  starting  point   for  IT  Initiatives  and  their  connections  to   the  Master  Plan IT  Operating  Plan IT  operational  activities  based  on  BSC  for   each  operational  outcome  using  ITIL  V3. GQ(I)M Goal,  Question,  (Indicator),  Measure,  to   capture  CSFs,  KPIs,  and  connections  to   projects  through  a  Strategy  Map.
  • 4. Elements of the Balanced Scorecard Strategy  Map,  with  four  perspectives. § Stakeholder  perspective  – describes  the  initiatives  that  directly   impact  the  stakeholders  of  the  IT  Department  in  pursuit  of  their   mission  and  vision. § Internal  Process  Perspective  – describes  the  activities  undertaken   by  ITD  to  deliver  the  stakeholder  initiatives. § Learning  and  Growth  Perspective  – the  activities  if  ITD  develop  and   maintain  the  skills,  knowledge,  and  experience  needed  to  implement   the  Strategic  Initiatives. § Budget  Perspective  – the  management  initiatives  needed  to  operate   the  ITD  in  a  responsible  manner  while  delivering  value  to  the  BCSP   Stakeholders.   Score  Card § Vision  – what  the  future  should  look  like  for  ITD § Narrative  – an  elevator  pitch for  this  Strategic  Initiative  telling  what   the  desired  outcome  will  be  in  the  future  (the  Vision). § Strategic  Initiative  – a  statement  of  the  work  to  be  undertaken  to   fulfill  the  Vision § Performance  Goals  – a  stated  measureable  goal  from  the  work   effort  to  deliver  the  Strategic  Initiative  that  fulfills  the  Vision § Critical  Success  Factors  – for  each  goal,  what  are  the  Critical   Success  Factors  that  must  be  in  place  for  completion  of  the   Performance  Goal § Key  Performance  Indicators  – the  units  of  measure  and  the  upper   and  lower  limits  of  these  measures  to  satisfy  the  Critical  Success   Factor 4
  • 5. Cascading  The  Balanced  Scorecard § Cascading  the  scorecard  means  translating  the   “corporate”  (ITD  – Tier  1)  scorecard  down  to  the   “business  units”  (ITD  Departments  – Tier  2),  and  then  to   a  team  of  individuals  (Department  individuals  – Tier  3). § The  current  BSC  is  cascaded  to  Tier  2. § The  result  is  “line  of  sight”  visibility  from  top  to  bottom   and  back  again  for  each  top  level  strategic  initiative. § With  the  strategy  map,  goals,  performance  measures   and  targets  are  connected  to  the  top  level  Mission  and   Vision  of  ITD. 5
  • 6. Benefits  of  Cascading  the  Scorecard § Top  level  Goals  -­ Master  Plan  and  ITD  Tech  Plan  – remain  focused  on  the  Race  to  the  Top  initiatives  at  the   strategy  level. § Individual  department  managers  can  connect  these   strategies  to  their  individual  technical  and  operational   performance  goals. § The  department  scorecards  can  then  be  used  to   connect  ITD  CIO  goals  with  Critical  Success  Factors   and  Key  Performance  Indicators  in  the  vernacular  of   Balanced  Scorecard. 6
  • 7. Connecting the Dots From Tier 1 to Tier 2 7 The scorecard initiative is expanded in the performance description “card” The “theme,” and the Initiative are flowed down the Tier 2 scorecard to establish the basis for the performance of the ITD department. This answers the question - “what is the department doing to support the top level ITD strategy?” The Tier 2 Goals, CSF’s, and KPI’s answer the question “what does the department do in support of the ITD Master Initiatives. This connects the dots between department level strategic activities, and the top level ITD strategic activities.
  • 8. ITD Balanced Scorecard § The  Strategy  Map  and  performance  scorecards  show   how  ITD  directly  enables  the  initiatives  of  the  Master   Plan § The  Master  ITD  scorecard  is  augmented  with  individual   department  scorecards  for  the  8  ITD  department   leaders 8 Office  of  the CIO   (PMO) Human  Resource   Management   Systems Business   Support  Systems Call  Center   Services Technical   Support  Services Teacher  Support   Services (TSS) Student   Information   Systems  (SIS) Security  and   Data  Center
  • 9. Budget  Perspective B2:  Budget Management B3:  Resource Management Internal  Processes  Perspective Stakeholder  Perspective S1:  Be  the   Preferred   Provider S2:  Use  ITIL   to  Manage   Services S3:  Provide   Needed   Systems  and   Applications S5:  Manage   Stakeholder Relations S4:  Ensure   Recognition   of  Value Service  Attributes Relationships P1:  Use  ITIL   for  Op   Excellence P2:  Manage   Stakeholder Relations P3:  Develop   Continuous   Improvement   Processes P4:  Assure   Security  and   Privacy Organizational  Capabilities  and  Capacities Learnings  &  Growth  Perspective Image B1:  Project Performance L1:  Culture L2:  Leadership L3:  Alignment L4:  Teamwork ITD  Strategy  Map  For   L5:  Resource  Capacity  for   Work L6:  Resource  Capabilities   for  Work StakeholderIT  Department  Operations 9
  • 10. CIO  ITD  Goals IT  Tech  Plan IT  Department   Balanced  Scorecard Perspective 1:  Align  And  Execute 2:  Operational   Execution 3:  Design  And  Develop   Systems 4:  PMO,  PPM,  And  ITIL   Improve  Quality 5:  Process  Design  To   Support  G&O’s 6:  IT  Governance  And   Risk  Management 1:  Improve  Learning 2:  Professional  Dev 3:  Technical  Efficiency 4:  Equitable  Access 5:  Improved   Infrastructure S1:  Preferred  Provider S2:  ITIL  Service  Management S3:  Needed  Applications S4:  Ensure  Value  Recognition S5:  Stakeholder  Relations  (External) P1:  Operational  Excellence P2:  Stakeholder  Relations  (Internal) P3:  Develop  Continuous  Improvement  Process P4:  Security  and  Privacy L1:  Culture L2:  Leadership L3:  Alignment L4:  Teamwork L5:  Capacity  for  Work L6:  Capability  for  Work B1:  Project  Performance B2:  Budget  Management B3:  Resource Management 10
  • 11. Person Balanced Score Initiative Stakeholder Internal Learnings & Growth Budget James ü Server operations ü Network ü Telecom ü Security ü Business Continuity ü CISSP ü Cisco VOIP ü Basic Routing and Switching ü VM ü Linux ü Connect systems with budget Chuck ü SMS Operations ü Tier 3 Help Desk ü SMS operations ü Connect systems with budget Shashi ü Oracle Learning Management (S3) ü Oracle R12 Upgrade ü Oracle performance Management ü Connect systems with budget Jessica ü Provide services for IT Mgmt and CIO ü Improve PM Methods ü ProjectRisk ü AlignIT budgets David ü O1: P3 ü O2: P3, P1 ü O3: P3 ü O4: P3 ü O5: P1 ü O6: P3 ü O7: P3 ü Connect systems with budget Bert ü Provide supportfor instructional technology ü Provide supportfor administrative application ü Provide requirements for administrative and instructional applications ü Understand applications to deliver training to stakeholders ü Use budgetfor PDC facility ü Field supportstaff equipped with tools and expenses ü Consultant budgetfor changes and improvements Ann ü Use technology to improve managementand operations (3)(P1) ü Ensure access to equitable access (4)(S2) ü ITIL training and certification (L3) ü (B1), (B2), (B3) Connect budget with activities FTE and some capital equipment Tyrone ü Empower the stakeholder to be self sufficientas much as possible onthe student technical. ü Processes and procedures applied to all devices – computers, peripherals, AV (projectors, smart)– 47 types ü Rights based training and supportthrough the PDC activities ü Identify trainthe trainer opportunity ü Connect systems with budget 11
  • 12. 12
  • 13. Stakeholder  Perspective To  reach  our  objectives,  how  do  we  create  value  for  our  stakeholders? ITD  stakeholders  are  the  “customers”  of  the  services  provided  by  ITD.  These  are  all  the  people  who  have  an   interest  in  the  ITD  Organization,  projects  managed   by  ITD,  the  activities  of  ITD,  the  resources,  and  deliverables   produced  by  the  resources. The  forms  a  complex  network  of  impacted  clients  and  stakeholders  who  exercise  influence  on  ITD’s  funding,   direction,  and  ability  to  fulfill  its  mission. The  strategic  initiatives  in  this  perspective  address  how  ITD  will  satisfy  the  needs  of  these  stakeholders  and   clients,  while  maintaining   the  operational,   security,  privacy  obligations   to  Master  Plan  and  other  governance   processes   13
  • 14. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Have  a  measurable   contribution  to  all  IT   supported  initiatives  in  the   using  the  6  CIO  Goals  and   the  ITD  Tech-­Plan  5  Goals.   Provide  proactive  two  way   communication  of   stakeholder  needs  and   prompt  response  and   resolution  of  customer   concerns  for  all  supported   systems  and  requests  for  IT   services. Implement  service   improvement  plan  per  ITIL   [4] Involve  and  develop  ITD   staff  to  implement  service   improvement  plans To  be  the  preferred  technology  partner  in  the  achievement  of  the  Master  Plan  and  other   mandated  initiatives using  Information  Technology. These  actions  are  defined  in  the  Information  Technology  Department  (ITD)  Technology  Plan   (Tech  Plan)  through  5  Goals  and  the  ITD  CIO’s  six  (6)  goals. Provide  IT  products  and   services  traceable  to  each   Initiative  as  defined  in  a   variety  of  documents,  from   the  Master  Plan  to  the   Race  To  The  Top  (RTTT). When  there  is  a  choice,  be   the  preferred  technology   partner  to  BCPSs.   When  systems  are   mandated,  assure   customer  satisfaction   exceeds  expectations  to   maintain  preference   S1:  Be  The  Preferred   Provider  of  IT  Services
  • 15. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Select  from  the  5  ITIL   components,  which  are   applicable  for  the  current   strategy  deployment Develop  operational   performance  measures  for   each  of  the  ITD   departments  at  the   execution  level  guided  by   the  selected  ITIL  Service   Management  Framework   elements The  ITIL  Service  Management  Framework  V3  defines  the  attributes  and  measures  of  the  Fit   Purpose (Utility)  and  Fit  for  Use (Warranty). Utility  is  the  increase  for  the  possible  “benefit”  to  the  BCPS. Warranty  is  the  availability  and  reliability  in  continuity  and  security  of  the  services  provided  by   ITD.  There  are  five  (5)  components:  (1)  Service,  (2)  Design,  (3)  Transition,  (4)  Operations,  and   (5)  Continuous  Improvement  as  applied  to  the  Stakeholder. ITD  will  select  which  of  these  to  implement  over  what  periods  of  time  to  support  the   improvement  processes. Implement  selected   components  of  ITIL   Service  Foundation  V3.  (1)   Service,  (2)  Design,  (3)   Transition,  (4)  Operations,   and  (5)  Continuous   Improvement  as  applied  to   the  Stakeholder. Deploy  IT  Service   Management  best   practices  guided  by  ITIL   Foundations  V3. S2:  Use  ITIL  To  Manage   Services
  • 16. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Identify,  implement,  and   operate  the  applications  and   systems  of  ITD  to  ensure   the  Mission  and  Vision  of   the  is  being  met. For  each  goal  of  the  ITD   Technical  Plan  define  an   operational  plan  to  maintain   or  increase  the  performance   of  each  critical  application   and  system. Deliberate  design  of   processes  to  support  BCPS Understand  existing   services  and  the  needs  of   the  stakeholders Define  technical  capabilities   inventory  and  rank  those   against  Mstr Plan Model  the  capabilities  and   capacities  of  critical  systems Model  the  infrastructure   needs  to  meet  stakeholder   demand Customer  survey  of  needs   and  satisfaction   assessment Gap  analysis  of  current   systems  against  critical   stakeholder  needs Skills,  capabilities,  and   capacity  for  work   assessment Measureable  contributed   value  to  Mstr Plan  and  IT   Technical  Plan Capacity,  and  “..ilities”   model  for  all  infrastructure   with  monetized  value. Capacity  of  services  in   users,  throughput  or   volume. Application  and  system  strategy  is  about  planning  deliberate  acts  that  increase  shareholder   value.  IT  is  run  as  an  independent  business  and  is  therefore  regarded  as  a  supplier/outsourcer.   This  mindset  allows  for  provisioning  services  internally  or  externally,  depending  upon  business   conditions  and  opportunities. IT  services  are  viewed  as  strategic  business  assets  critical  to  an  organization’s  survival  and   success.  A  formal  business  planning  process  must  be  designed  to  complement  the  strategic   planning  process.  The  planning  process  includes  a  market  definition  step  — determining  need   and  estimating  revenue. Take  actions  to  identify   critical  assets  and  increase   the  measurable  value  of   ITD’s  offerings  to  and   assure  ITD  is  the  provider   of  choice  for  these  IT   Services  by  operating  and   providing  applications  that   meet  the  needs  of  schools   and  administration. Assure  the  ITD  critical   assets  directly  contribute   to  the  success  of  and  its   Mission  and  Vision  in  units   of  measure  meaningful  to   the  decision  makers. S3:  Provide  Needed  Systems   and  Applications Assess  ITD  staff’s  ability  to   deliver  value  to   stakeholders
  • 17. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Define  and  implement  the   feedback  processes  and   their  execution  that  will   connect  the  offerings  of  ITD   with  the  needs  of  the   stakeholders  in  units  of   measure  meaningful  to   those  stakeholders Define  and  implement  the   work  processes  needed  to   close  any  gaps  from   feedback  from  clients  and   stakeholders  to  increase  the   delivered  value  and  the   recognition  of  this  value. Use  business  process   measures  for  meaningful   units Periodic  feedback  capture   processes  based  in  ITIL   Service  measures The  value  of  the  products  and  services  produced  by  ITD  must  be  recognized  as  having  value.   ITD  cannot  declare  there  is  value  in  the  absence  of  consensus  with  the  clients  and  stakeholders. This  recognized  value  comes  from  the  measurable  benefits  to  the  stakeholders  in  units   meaningful  to  them. Define  the  service  catalog,   the  service  performance,   and  connect  this   performance  to  the   measures  of  value  agreed   to  by  the  stakeholders. Have  ITD  stakeholders   acknowledge  the  value  of   the  products  and  services   provided  to  the  consumers S4:  Recognized  Value
  • 18. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard For  the  external   stakeholders,  define  the   processes  needed  to  asses   the  needs  of  the   Stakeholder  to  determine   what  should  be  in  the   Service  Portfolio  and  the   Stakeholder  Portfolio. For  the  Internal   Stakeholders,  define  the   organizational  maturity  of   ITD  and  the  processes  used   to  manage  those   stakeholders  and  their   project  and  programs  using   the  OGC  P3M3  Framework   [3] Increase  the  service   potential  of  capabilities  and   resources Increase  the  performance   potential  that  creates  value   for  the  stakeholders Identifying  stakeholders  – using  a  matrix  of  stakeholders  and  their  affinity  to  projects,   processes  or  domain  areas. Understanding  their  expectations  – by  interviewing,  surveys  (least  preferred)  and  face  to  face   interactions  asking  direct  questions. Managing  those  expectations  – in  the  same  way  as  managing  projects  or  processes,  through   defined  outcomes. Monitoring  the  effectiveness  of  stakeholder  engagement  activities  – by  defining  units  of   measure  for  this  management. Continuous  review  of  the  stakeholder  community  – through  frequent  and  periodic  meetings   through  the  Stakeholder  Circle®  (http://www.stakeholder-­management.com/) Install  a  relationship   management  process  and   identify  staff  needed  to   ensure  stakeholders  are   satisfied  with  ITD  products   and  services.   Relations  with  the   Stakeholders  are  defined   and  measurable  to  ensure   continued  success  of  ITD   through  a  Value  Network of  tangible  and  intangible   value  producing   exchanges.   S5:  Stakeholder  Relations
  • 19. Internal  Process  Perspective What  processes  must  we  excel  at  to  satisfy  our  stakeholders  and  clients? Processes  are  structured  activities,  designed  to  accomplish  a  defined  objective.  Processes  result  in  a  goal-­ oriented  change,  utilizing  feedback  for  self-­enhancing   and  self-­corrective  actions.  Processes  are: ü Measureable  because  they  are  performance  oriented ü Have  specific  results ü Provide  these  results  to  stakeholders ü Respond  to  a  specific  event  – either  continually  or  iteratively  – originating   from  that  event. 19
  • 20. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Measure  alignment  with   schools  using  traceability  to   paragraphs  and  sections  in   the  Master  Plan  to  the   portfolio  of  projects   managed  in  ITD. Organize  ITD  around  the   management  of  Projects,   Programs,  and  Portfolio  of   projects  with  units  of   measure  meaningful  to  the   decision  makers. Line  of  sight  traceability  of   projects  to  the  Master  Plan Monetized  investment   analysis  of  this  work Develop  a  portfolio   management  process  using   P3M3  guidance Use  PPM  to  select  and   prioritize  projects  in  the   portfolio Select  project  based  on   “real  options”  decision   making Operational  excellence   metrics  met Monetized  performance   metrics  met  within   variance  bands Performance  measures  for   the  7  P3M3  perspectives. To  be  operationally  excellent  requires  leadership,  teamwork  and  problem  solving  resulting  in   continuous  improvement  throughout  the  IT  Department  by  focusing  on  the  needs  of  the   customer,  empowering  employees,  and  optimizing  existing  activities  in  the  process. Once  aligned  with  the  Master  Plan  and  IT  Plan,  the  execution  activities  must  be  performed  in  the   context  of  operational  excellence. Operational  aspects  of  ITD  will  be  guided  by  the  ITIL  Foundations  of  IT  Service  Management   V3.  Seven  activities  from  the  P3M3  provided  during  the  delivery  of  this  Operational  Excellence   are:  (1)  Management  Control;;  (2)  Benefits  Management;;  (3)  Budget  Management;;  (4)   Stakeholder  Management;;  (5)  Risk  Management;;  (6)  Organizational  Governance;;  and  (7)   Resource  Management. Focus  IT  activities  on   systems  and  application   integration  to  enable   people,  processes,  and   technology  to  be  traceable   to  IT  Tech  Plan  and   Master  Plan,  guided  by   ITIL  Foundations  V3  and   OGC  P3M3  processes. Develop,  align  and   execute  ITD  initiatives  with   the  IT  Technology  Plan   and  Master  Plan P1:  Use  ITIL  for  Operational   Excellence Provide  Operational   Excellence  ITIL  V3   guidance
  • 21. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Define  and  oversee   measures  connected  to   customer  facing   performance  of  all   initiatives.   Define  and  oversee   measures  connected  to  all   internal  operations  in   support  of  external   initiatives. Identify  stakeholders  and   their  specific  needs Use  Stakeholder   Typography  to  classify  and   engage  stakeholders  [1] Identify  stakeholders  and   their  specific  needs Define  risk,  value,  and   relationship   interactions Stakeholder  management  is  the  process  of  managing  the  expectations  of  anyone  that  has  an   interest  in  a  project  or  will  be  effected  by  its  deliverables  or  outputs. Managing  stakeholders  means  knowing  what  stakeholders  want,  defining  what  products  and   services  ITD  is  capable  of  providing,  and  confirming  that  the  Stakeholders  agree  with  and   acknowledge  that  ITD  has  the  capabilities  to  provide  those  products  and  services. This  starts  with  identifying  the  Stakeholders  and  their  attributes.  Stakeholder  management  is   embedded  in  the  overall  risk  management  of  projects  and  portfolios  of  projects  managed  by  ITD.   Starting  with  the  Race  To   The  Top  (RTTT)  initiative   and  others,  provide   measureable  operational   excellence  for  all  activities   performance  by  ITD   around  stakeholder   management. Define  and  deploy   management  process  to   provide  operational   excellence  for  the  Race  to   the  Top  Initiative  to  the   external  and  internal   stakeholders. P2:  Stakeholder  Management
  • 22. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Create  a  service   improvement  plan  based  on   the  seven  step  improvement   process  defined  by  ITIL. Create  an  organization  that   includes  a  CSI  Management   and  Service  Management   role  in  ITD Perform  CSI  audits  and  take   corrective  actions Processes  are  the  internal  affairs  of  the  ITD  as  a  service  provider.  The  first  step  is  the  activities   that  focus  on  gaining  control  of  the  systems  that  provide  internally  focused  services.  Until  this   control  is  established,  external  focus  will  be  difficult.   Create  a  Continual  Service   Improvement  (CSI)   process  to  support  the   needs  of  the  Stakeholder. Apply  a  repeating  pattern   of  improvement  efforts  that   allow  ITD  to  better  meet   internal  and  external   stakeholder  needs. P3:  Continual  Improvement
  • 23. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Develop  of  an  Information   Security  policy  and   governance  (Controls)   process. Develop  an  Information   Security  Management   Systems  (ISMS)  to  plan,   implement,  evaluate  and   maintain  the  information   management  policy  and   governance  processes Information  security  is  aligned  with  IT  and  business  security  is  managed  effectively  in  all   services  and  service  management  operations  .  This  includes: Information  is  available  and  useable  when  necessary  (availability) Information  is  available  exclusively  to  authorized  persons  (confidentially) The  information  is  complete,  accurate,  and  programs  against  unauthorized  changes  (integrity) Information  and  information  exchanges  between  other  systems  re  reliable  (authenticity) Develop  a  security   management  framework  in   alignment  with  the  ITD   governance  process. Align  IT  and  business   security  to  ensure  effective   management  of  services. P4:  Security  and  Privacy
  • 24. 24
  • 25. Learning  &  Growth  Perspective How  do  we  align  our  intangible  assets  – people,  systems,  and  culture  – to  improve  critical  processes? Learning-­and-­growth   metrics  is  a  framework  for  quantitatively  assessing  stakeholder  satisfaction,  productivity,  and   retention  in  the  framework  of  the  balanced  scorecard  (BSC).  These  Goals,  Critical  Success  Factors,  and  Key   Performance  Indicators  of  the  learning-­and-­growth   perspective  is  “the  foundation   for  all  strategy”  (Kaplan  &   Norton,  2001,  p.  93).  These  metrics  are  not  just  behavioral  and  statistical  but  “developmental.” 25
  • 26. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Define  the  End  Values  to  be   delivered  through  the   culture  in  terms  of  quality,   excellence,  reliability,   innovation,  and  budget   management  success. Define  the  Instrumental   Values  to  be  the  desired   behaviors  in  terms  of   standards,  respect  for   tradition  and  authority. Identify  team  building   opportunities,  e.g.  Strength   Finder  2.0 Aligning  ITD  culture  with  the  Balanced  Scorecard  strategy  defines  who  we  get  things  done   around  here.  Defining  the  Cultural  Web  consists  of  Stories,  Rituals  and  Routines,  Symbols,   Organizational  Structure,  Control  Systems,  and  Power  Structures. This  approach  provides  a  “ways  of  being”  to  define  the  attitudinal  aspects  of  how  ITD  operates   on  a  daily,  including  personal  interactions,  problem  solving  approaches,  and  the  situational   analysis  needed  improve  the  performance  of  the  organization,  using  the  Katzenbach  and  Gallup   frameworks  for  Teams  and  Employee  Engagement  Activities.  (in  the  Backup  Materials) Identify  the  existing   cultural  aspects  and   behaviors,  gaps  in  these   behaviors,  and  take   specific  action  to  address   gaps  and  develop  a   measurable  response. Create  and  maintain  a   culture  of  mutual  support,   accountability  and  shared   outcomes  for  all  ITD   personnel. L1:  Culture
  • 27. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Select  a  strategic  theme  or   project  that  will  enhance  the   ITD  and  take  steps  toward   to  achieving  its  overall   strategic  goal through  hands   on  leadership  of  the  work   activities. Define  the  work  processes   of  a  “project  leader”  to  focus   on  the  delivery  of  beneficial   outcomes  that  meet   stakeholder  needs. Track  the  few  critical   elements  of  strategy  for   three  major  projects Focus  on  short-­term  view  of   leadership  to  critical  areas   that  impact  stakeholders Ensure  key  resources  are   deployed  to  support  critical   projects. The  leaders  of  an  organization  have  the  prime  responsibility  for  the  quality  produced  by  the organization,  i.e.,  the  success  of  the  mission.  The  commitment  and  participation  of  leaders have  long  been  recognized  as  critical  factors  in  successful  organizations  (Tichy  &  Devanna, 1990).  [2] Only  leaders  have  the  sufficient  authority,  influence,  and  access  to  information  to begin  and  maintain  major  organizational  change. Define  and  deploy  a   leadership  training,   mentoring,  and  coaching   process  for  all  members  of   the  IT  Department. Train,  coach,  mentor,  and   develop  leaders  in  the  ITD   department  capable  of   delivering  on  the  Tech   Plan,  Operations  Plan  and   Master  Plan L2:  Leadership
  • 28. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Align  internal  support  and   service  units  with  the  IT   Tech  Plan,  6  ITD  Goals,   and  cross  referenced  items   in  the  Master  Plan. Define  how  leaders  become   accountable  to  the   governance  processes,   actions,  and  performance   through  their  personal   involvement  in  planning,   communications,  coaching,   vision,  actions,  and   performance  of  ITD. The  Balanced  Scorecard,  when  developed  as  a  strategic  planning  and  management  system,   helps  align  an  organization  behind  a  shared  vision  of  success,  and  gets  the  ITD  working  on  the   right  things  and  focusing  on  results.   A  scorecard  is  more  than  a  way  of  keeping  score,  it  is  a  system,  consisting  of  people,  strategy,   processes,  and  technology.  The  responsibility  for  this  critical  alignment  lies  with  the  ITD   leadership.   Define  the  processes   needed  to  be  aware  of  why   I  am  here and  what  am  I   doing  to  support  the   Strategic  Initiatives  of  the   ITD. Align  ITD  organization  with   the  needs  of  the   stakeholders  to  assure   delivery  of  each  strategic   initiative  on-­time,  on-­ budget,  and  compliant  with   the  stakeholder  needs L3:  Alignment
  • 29. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Provide  a  leadership  that   unifies  all  parts  of  the  ITD’s   staff  through  a  methodology   that  turns  the  eyes  of  all  ITD   members  to  a  single   direction  – toward  the   stakeholder. Develop  an  ongoing  team   work  engagement  process   that  provides  the   mechanism  for  Jon   Katzenbach  [5]  definition  of   a  team  – a  group  of   individuals  who  hold  each   other  mutually  accountable   for  a  shared  outcome. Define  the  organizational   structure  and  make  that   visible  to  all  ITD  members Define  the  channels  of   communication  and  ensure   all  participants  are  informed Deploy  Katzenbach’s   principles  across  ITD   It  is  often  difficult  to  improve  overall  organizational  performance  because  the  collective  goals  are   unclear.  Employees  are  often  only  aware  of  the  aims  of  their  own  "team  island",  and  regard   other  team  islands  as  having  a  different  job.  Individuals  are  often  motivated  to  "do  their  bit",  but   they  lack  the  overall  understanding  of  where  the  organization  is  going  or  how  the  various  team   islands  are  supposed  to  work  together  for  collective  good.  Whereas  a  sports  team  is  often   characterized  by  a  focus  on  goals,  results  and  league  tables,  businesses  are  often  characterized   by  an  absence  of  such  a  unifying  force. Establish  “teams”  that  are   the  first  point  of  contact  for   stakeholders.  This   includes,  call  center   support,  deep  technical   support,  and  client  and   stakeholder  requirements   and  satisfaction   processes. Create  an  organization   that  fosters  teamwork  and   cooperation  to  improve  the   performance  of  the  work  of   ITD. L4:  Teamwork Create  a  culture  of  “shared   outcomes,”  for  all  ITD  work.
  • 30. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Create  and  maintain  an  up-­ to-­date  resource  capacity   plan  with  defined  objectives   reflecting  current  and  future   needs  of  stakeholders. Use  this  plan  to  forecast   performance  of  service   requests. Align  resource  capacity   management  and  the   Service  Portfolio  and   communicate  this  alignment   to  the  stakeholders  to   confirm  their  understanding   of  what  can  be   accomplished  with  the   resource’s  capacity. It  is  essential  to  have  an  analytical  understanding  of  ITD  resource’s  Capacity  for  Work.  The   capacity  must  coincide  with  the  current  and  future  needs  of  the  clients  and  stakeholders  of  the   BCPS.  Any  capacity  gaps  must  be  understood  and  communicated  to  these  stakeholders  in  units   of  measure  meaningful  to  the  decision  making  processes. Provide  IT  resource   capacity  coinciding  with   the  current  and  future   needs  of  stakeholders   against  the  justifiable  costs   of  this  capacity. Inform  stakeholder  of  ITD’s ability  to  respond  to  all   non-­discretionary  demand   for  service  with  predictable   durations  and  quality  of   performance. L5:  Resource  Capacity  for   Work
  • 31. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Using  the  Gallup  12   assessment  of  business   capabilities  survey  and   define  gaps  and  closure   strategies  for  each  of  the   G12 elements  as  shown  in   the  BSC  supporting   materials  pages. Discern  alignment  to  the   professional  development   initiatives. Assess  capability  and   capacity  for  work  using  the   G12 profile Establish  a  Professional   Development  Center  for  ITD   staff When  there  is  need  for  resources  to  be  available  to  meet  strategic  objectives,  we  need  to   understand  current  and  future  work  capability.   The  current  capability  includes  an  assessment  of  task  focus,  self  conduct,  and  interpersonal   perspectives  of  the  performed  activities. The  future  capability  includes  an  assessment  of  the  needed  development  levels  and   developmental  potentials  and  the  risk  associated  with  regressing  to  lower  levels  of  capability   based  on  a  systems  thinking approach  to  capacity  planning.   Identify  the  capabilities  for   the  needed  services  of   Clients  and  Stakeholders   through  an  assessment  of   these  needs  in  a  survey   instrument  and  direct   “customer  contact.” Provide  the  needed   technical,  operational,  and   interpersonal  capabilities   to  meet  the  needed   demands  of  clients  and   stakeholders L6:  Resource  Capability  for   Work
  • 32. 32
  • 33. Budget  Process  Perspective What  are  our  stakeholder  and  client  expectations  of  our  budget  management  performance? The  budget  perspective  activities  are  those  necessary  to  ensure  the  execution  of  the  ITD  strategy  in  support  of  the   Mission  and  Vision. This  activity  assigns  budget  to  projects  and  controls  the  consumption  of  that  budget  in  exchange  for  measurable   value  – both  tangible   and  intangible. 33
  • 34. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Project  execution   performance  parameters   meaningful  to  internal   decision  making  of  the  ITD Project  business   performance  parameters   defined  in  units  meaningful   to  the  Clients  and   Stakeholders  for  IT   services. Cost  performance Schedule  performance Project  business   performance  measures Customer  satisfaction   measures Technical  performance Project  performance  management  starts  with  repeatable  processes.  The  “baseline”  of  a  project   includes,  cost,  schedule,  and  the  measures  of  physical  percent  complete.  These  measures  are   defined  in  units  meaningful  to  the  decision  makers. Successful  management  of  projects  and  the  portfolio  of  projects  starts  with  the  Integrated   Master  Plan  showing  what  capabilities  will  be  produced  for  the  stakeholders,  what  significant   accomplishments  must  be  completed,  the  success  criteria  for  those  accomplishments,  and  the   work  efforts  (in  the  form  a  work  package)  are  needed  for  complete  the  Accomplishment  Criteria. These  activities  are  arranged  in  the  Integrated  Master  Schedule  (IMS)  and  placed  on  baseline.   The  IMS  is  a  resource  loaded  activity  network  include  schedule  and  cost  margins. Establish  a  project   performance  management   system  using  cost,   schedule,  and  technical   performance  measures  to   increase  the  probability  of   success  for  each  ITD   project. Install  and  operate  a   project,  program,  and   portfolio  governance   process  to  increase  the   probability  of  success  of   each  project  produced  by   ITD B1:  Project  Performance
  • 35. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Defines  budget   management  and  submittal,   authorization processes  to   maintain  the  integrity  of  the   Integrated  Master  Schedule. Define  and  deploy  a   Change  Management   Process  guided  by  PMBOK   and  ITIL  processes  to   ensure  the  integrity  of  the   Integrated  Master  Schedule. Financial  assets  are  necessary  to  support  the  ownership  or  use  of  all  assets. Resources  and  capabilities  form  the  basis  for  the  value  of  a  service. Financial  management  is  an  integrated  element  of  service  management.  Budget  management   provides  vital  information  needed  to  ensure  effective  and  efficient  service  delivery,  allowing  the   ITD  to  justify  expenditures  and  allocate  funding  directly  to  the  services. Establish  budget   management,  forecasting,   and  performance   management  services  for   all  projects  in  the  ITD   portfolio. Assure  the  management  of   ITD  budget  and  the  assets   are  guided  by  the  IT   Governance  processes. B2:  Budget  Management
  • 36. Narrative  Of  The  Contents  Of  This  BSC  “Card” Strategic                Initiative Performance  Goal Critical  Success  Factor Key  Performance  Indicators Strategic  Theme Master  ITD  Balanced  Scorecard Create  a  resource  pool   management  system   starting  with  the  measurable   “capacity  for  work”  that   ensures  over  commitments   are  not  made  without   explicit  approval  and  the   resulting  accountability  of   senior  management Provide  forecasts  of  needed   resources  using  the   Integrated  Master  Schedule   as  the  “approved”  demand   for  work. Resources  and  capabilities  are  types  of  assets.  The  management  of  the  ITD  resources  creates   value  in  the  form  of  services  and  IT  applications.  Management,  organization,  people,  and   knowledge  convert  these  resources  into  value. The  ITD  capacity  for  work  is  the  starting  point  for  resource  management.  The  capacity  for  work   of  a  mix  of  people,  processes,  tools,  systems,  and  organizational  structures  along  with  intangible   assets  of  ideas  and  culture.   The  latter  – “intangible  assets”  – is  the  Critical  Success  Factor  for  ITD’s success.   Provide  tools,  processes,   and  leadership  needed  to   manage  resources  for  all   ITD  activities. Provide  tools  and   processes  needed  to   manage  ITD  resources  to   meet  the  demand  of  the   Stakeholders B3:  Resource  Management
  • 38. Gallup Q12 elements G12 Critical Employee Engagement Activities Outcomes for the BSC Leadings and Growth Perspective I know what is expected of me at work. We have a shared outcome for all work activities I have the materials and equipment I need to do my work right. In the Master Schedule all needed resources are defined and available on the planned date At work, I have the opportunity to do what I do best every day. Work activities are agreed to by the performing element In the last seven days, I have received recognition or praise for good work. Katzenbach’s “teaming” processes are in place and operational. My supervisor or the person I report seems to care about me as a person. There is someone at work who encourages my development. In the last six months, someone at work has talked with me about my progress. At work, my opinions seem to count. The mission/purpose of my company makes me feel my job is important. Using the BSC, trace all activities to a strategic initiative My associates (fellow employees) are committed to doing quality work. Measures of success include measures of effectiveness for the clients and stakeholders and measures of performance for the products and services I have a best friend at work. The last year, I have had opportunities at work to learn and grow. Provide needed technical, operational, and managerial mentoring, coaching, and training through senior leaders 38
  • 39. 10 Ways to Build Capability 1. Create a leadership/coaching system that links all business functions. 2. Right Action=Reward the right: people, things, ways, time and reasons. 3. Create the feeling in your organization that people can fail to succeed. 4. Create the necessary infrastructure to connect people with metrics. 5. Become a teaching organization and teach at every level continuously. 6. Enable people with development opportunities to higher levels of function. 7. Understand appreciative coaching and how to build a culture around it. 8. Make it fun to work in your company. 9. Make perfectly clear what should be perfectly clear. 10. Get out of people’s way. 39
  • 40. References [1] A Typology of Operational Approaches for Stakeholder Analysis and Engagement, Dr. Jing (Rebecca) Yang. Deakin University Prof. Ping Qi (Geoffrey) Shen, Hong Kong Polytechnic University, Dr. Lynda Bourne, Stakeholder Management Pty Ltd Christabel MF Ho & Dr. Xiaolong Xue. http://www.stakeholdermapping.com/ [2] Transformational Leader, Tichy and Devanna, 1997 [3] OGC P3M3 (Project, Program, Portfolio Management Maturity Model) [4] ITIL Foundations V3 [5] Jon Katezenbach, “Unleashing the Power of Teams: From Theory to Execution, Booz and Company. The Wisdom of Teams: Creating the High- Performance Organization. 40
  • 41. 41
  • 42. Chapter  042 Performance-­Based   Project   Management   ®  is   a  registered   trademark   of   Niwot   Ridge   L.L.C.