Technology Services Division (TSD)
Balanced Scorecard
1
The pursuit of operational effectiveness is seductive
because it is concrete and actionable.
Caught up in the race for operational effectiveness, many
managers simply do not understand the need to have a
strategy.
– Dr. Michael E. Porter – Professor of Business
Administration, Harvard Business School
A Motivation for Change
2
Vision
Business
Strategy
TSD Balanced
Scorecard
Technical
Measures
«the business strategy documents are
needed here to drive the IT strategy»
Strategic Initiatives defined in a Strategy
Map with cause and effect connections.
Numeric measures for each KPI with
baseline value with variance values.
 Why We Exist
 What We Do To
Deliver Value To Our
Stakeholders
 What We Strive To
Be For Our
Stakeholders
 What Our
Stakeholders Want
Us To Be
 Implementation
Framework For
Turning Strategy Into
Execution.
Mission
Vision
GQ(I)M [6]
City of London
Strategy Plan
Mission and Vision of City of London as
the starting point for IT Strategic Initiatives
and their connections to the Master Plan
IT Operating Plan
IT operational activities based on City of
London for each operational outcome
using ITIL V3.
GQ(I)M
Goal, Question, (Indicator), Measure, to
capture CSFs, KPIs, and connections to
projects through a Strategy Map.
Elements of the Balanced Scorecard
Strategy Map, with four perspectives.
 Stakeholder perspective – describes the initiatives that directly
impact the stakeholders of the City of London IT Department in
pursuit of their mission and vision.
 Internal Process Perspective – describes the activities undertaken
by City of London TSD to deliver the stakeholder initiatives.
 Learning and Growth Perspective – the activities if City of London
TSD develop and maintain the skills, knowledge, and experience
needed to implement the Strategic Initiatives.
 Budget Perspective – the management initiatives needed to operate
the TSD in a responsible manner while delivering value to the BCSP
Stakeholders.
Score Card
 Vision – what the future should look like for City of London TSD
 Narrative – an elevator pitch for this Strategic Initiative telling what
the desired outcome will be in the future (the Vision).
 Strategic Initiative – a statement of the work to be undertaken to
fulfill the Vision
 Performance Goals – a stated measureable goal from the work
effort to deliver the Strategic Initiative that fulfills the Vision
 Critical Success Factors – for each goal, what are the Critical
Success Factors that must be in place for completion of the
Performance Goal
 Key Performance Indicators – the units of measure and the upper
and lower limits of these measures to satisfy the Critical Success
Factor
Cascading The Balanced Scorecard
 Cascading the scorecard means translating the TSD–
Tier 1 (This Scorecard) down to the TSD Departments –
Tier 2, and then to a team of individuals, the TSD
Department individuals – Tier 3.
 The current City of London is cascaded to Tier 2.
 The result is “line of sight” visibility from top to bottom
and back again for each top level strategic initiative.
 With the strategy map, goals, performance measures
and targets are connected to the top level Mission and
Vision of TSD.
5
Benefits of Cascading the Scorecard
 Top level Goals – City of London Strategic Plan focus
on the corporate goals and objectives connected to the
TSD strategic initiatives defined in the Information
Technology Strategy (1/16/2012).
 Individual department managers can connect these
strategies to their individual technical and operational
performance goals.
 The department scorecards can then be used to
connect TSD goals with Critical Success Factors and
Key Performance Indicators in the vernacular of
Balanced Scorecard.
6
Connecting the Dots From Tier 1 to Tier 2
7
The scorecard initiative is
expanded in the
performance description
“card” for each department
The “theme,” and the Initiative are flowed down the
Tier 2 scorecard to establish the basis for the
performance of the TSD department.
This answers the question - “what is the
department doing to support the top level TSD
strategy?”
The Tier 2 Goals, CSF’s, and KPI’s answer the
question “what does the department do in support
of the TSD Master Initiatives. This connects the
dots between department level strategic activities,
and the top level TSD strategic activities.
City of London TSD Balanced Scorecard
 The Strategy Map and department performance
scorecards show how TSD directly enables the
initiatives of the City of London Master Plan.
 The Master TSD scorecard is augmented with
individual department scorecards for the 8 TSD
department leaders.
8
Chief Technology
Officer
Customer
Relations
Management
Customer
Support
Applications
Information and
Information
Security
Business
Enabling
Program
Management
Office
Enterprise
Architect
Budget Perspective
B2: Budget
Management
B3: Resource
Management
Internal Processes Perspective
Stakeholder Perspective
S1: Be the
Preferred
Provider
S2: Use ITIL
to Manage
Services
S3: Provide
Needed
Systems and
Applications
S5: Manage
Stakeholder
Relations
S4: Ensure
Recognition
of Value
Service Attributes Relationships
P1: Use ITIL
for Op
Excellence
P2: Manage
Stakeholder
Relations
P3: Develop
Continuous
Improvement
Processes
P4: Assure
Security and
Privacy
Organizational Capabilities and Capacities
Learnings & Growth Perspective
Image
B1: Project
Performance
L1: Culture L2: Leadership L3: Alignment L4: Teamwork
City of London TSD Strategy Map
L5: Resource Capacity for
Work
L6: Resource Capabilities
for Work
StakeholderITDepartmentOperations
Four City of London IT Department (ITD)
Strategic elements mapped to the four BSC
perspectives.
When IT governance initiatives are defined
they are guided by the 5 framework
elements of ITIL V3
Organizational Strategy Service Strategy
Information Data
Strategy
Technology
Strategy
Improve
Organizational
Structure
Buildskillsand
improveresources
flexibility
ImplementIT
guidance
Improvesecurity
ExpandShared
Services
Improveoperational
processes
Reducecostof
service
Implementmanaged
services
ImproveWeband
contentcapability
Improvedecision
support
EnableCityof
Londoncollaboration
Deliverbusiness
applications
Rationalize
applicationsuite
Expandmobile
capability
Four Perspectives of the Balanced Scorecard
of Stakeholder, Internal, Learning's and
Growth and Budget Adherence
S1: Be the Preferred Provider of IT Services
S2: ITIL Service Management
S3: Needed Applications
S4: Ensure Value Recognition
S5: Stakeholder Relations (External)
P1: Operational Excellence
P2: Stakeholder Relations (Internal)
P3: Develop Continuous Improvement Process
P4: Security and Privacy
L1: Culture
L2: Leadership
L3: Alignment
L4: Teamwork
L5: Capacity for Work
L6: Capability for Work
B1: Project Performance
B2: Budget Management
B3: Resource Management
11
ITIL Paradigm for Balanced Scorecard
ITIL V3 Framework
1. Service Strategy – how to design, develop, and implement service
management not only as an organizational capability but also as a
strategic asset.
2. Service Design – design principles and methods for converting
strategic objectives into portfolios of services and service assets.
3. Service Transition – development and improvement of
capabilities for transitioning new and changed services into
operations.
4. Service Operation – achieving effectiveness and efficiency in the
delivery and support of services so as to ensure value for the
customer and the service provider.
5. Continual Service Improvement – creating and maintaining
value for customers through better design, introduction and
operation of services.
12
Connecting ITIL with IT Strategy
 The strategy map connects the IT strategy with four
perspectives of the balanced scorecard.
 The ITIL service areas establish the basis of all service
delivery strategies.
 The remaining CoL IT Strategy elements also have
connections to ITIL V3 and will be mapped during the
CSF and KPI phases.
13
14
Stakeholder Perspective
To reach our objectives, how do we create value for our stakeholders?
City of London TSD stakeholders are the “customers” of the services provided by TSD. These are all the people
who have an interest in the TSD Organization, projects managed by TSD, the activities of TSD, the resources, and
deliverables produced by the resources.
The City of London forms a complex network of impacted clients and stakeholders who exercise influence on
TSD’s funding, direction, and ability to fulfill its mission.
The strategic initiatives in this perspective address how TSD will satisfy the needs of these stakeholders and
clients, while maintaining the operational, security, privacy obligations to City of London Strategy and other
governance processes
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Improve technology and
governance on sites and
content to replace old and
unstable technologies.
Improve content delivery by
increasing web based
capabilities guided by
strategic needs of the
stakeholders
Implement service
improvement plan per ITIL
[4]
Involve and develop TSD
staff to implement service
improvement plans
Install web streaming to
improve customer
satisfaction
Improve web organization
and searching
Improve work flow
processes
ITIL V3 Event, incident,
Request, Access, and
Operational Mgmnt KPI
ITIL V3 Event, incident,
Request, Access, and
Operational Mgmnt KPI
Percent of documents
under control
All committee rooms and
Council Chambers web
streaming capable
Value stream maps w/
monetized savings &
improvements
Comparable value and
performance to Google
To be the preferred technology partner in the achievement of the City of London Strategic Plan
and other mandated initiatives using Information Technology ITD must provide not only
desirable products and services, they must sustain the expected performance from those
products and services in the presence in increasing demand, evolving technology and maturing
stakeholder, asking tougher questions.
Provide IT products and
services traceable to each
City of London Initiative as
defined in a variety of
documents, from the
Strategic Plan.
When there is a choice, be
the preferred technology
partner to City of London.
When systems are
mandated, assure
customer satisfaction
exceeds expectations to
maintain preference
S1: Be The Preferred
Provider of IT Services
Implement SharePoint as
basis of all document
management services
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Select from the 5 ITIL
components, which are
applicable for the current
strategy deployment
Develop operational
performance measures for
each of the TSD
departments at the
execution level guided by
the selected ITIL Service
Management Framework
elements
Deliver business apps to
meet customer needs
identified in strategy
Rationalize application suite
using ITIL portfolio
management
Determine resource needs
for fulfill IT service
management
Leverage Enterprise
Architecture
Expand mobile capability
and infrastructure flexibility
# current applications vs.
original # of applications
# of current platforms vs.
original # of platforms
% of new projects
approved by EA traced to
strategy
The ITIL Service Management Framework V3 defines the attributes and measures of the Fit for
Purpose (Utility) and Fit for Use (Warranty).
Utility is the increase for the possible “benefit” to the City of London.
Warranty is the availability and reliability in continuity and security of the services provided by
City of London TSD.
There are five (5) components: (1) Service, (2) Design, (3) Transition, (4) Operations, and (5)
Continuous Improvement as applied to the Stakeholder.
TSD will select which of these to implement over what periods of time to support the
improvement processes.
Implement selected
components of ITIL
Service Foundation V3. (1)
Service, (2) Design, (3)
Transition, (4) Operations,
and (5) Continuous
Improvement as applied to
the Stakeholder.
Deploy IT Service
Management best
practices guided by ITIL
Foundations V3.
S2: Use ITIL To Manage
Services
Standardize on fewer
platforms
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Identify, implement, and
operate the applications and
systems of TSD to ensure
the Mission and Vision of
the City of London is being
met.
For each goal in the TSD
Strategic Plan define an
operational plan to maintain
or increase the performance
of each critical application
and system.
Deliberate design of
processes to support City of
London
Understand existing
services and the needs of
the stakeholders
Define technical capabilities
inventory and rank those
against CoL Mstr Plan
Model the capabilities and
capacities of critical systems
Model the infrastructure
needs to meet stakeholder
demand
Customer survey of needs
and satisfaction
assessment
Gap analysis of current
systems against critical
stakeholder needs
Skills, capabilities, and
capacity for work
assessment
Measureable contributed
value to CoL Mstr Plan
and IT Strategic Plan
Capacity, and “..ilities”
model for all infrastructure
with monetized value.
Capacity of services in
users, throughput or
volume.
Application and system strategy is about planning deliberate acts that increase stakeholder
value. IT is run as an independent business and is therefore regarded as a supplier/outsourcer.
This mindset allows for provisioning services internally or externally, depending upon business
conditions and opportunities.
IT services are viewed as strategic business assets critical to an organization’s survival and
success. A formal business planning process must be designed to complement the City of
London strategic planning process. The planning process includes a market definition step —
determining need and estimating revenue.
Take actions to identify
critical assets and increase
the measurable value of
TSD’s offerings to City of
London and assure TSD is
the provider of choice for
these IT Services by
operating and providing
applications that meet the
needs of the City of
London services provided
in section 3.2 of the
Information Technology
Strategy.
Assure the TSD critical
assets directly contribute
to the success of City of
London and its Mission
and Vision in units of
measure meaningful to the
decision makers.
S3: Provide Needed Systems
and Applications
Assess TSD staff’s ability to
deliver value to
stakeholders
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Define and implement the
feedback processes and
their execution that will
connect the offerings of
TSD with the needs of the
stakeholders in units of
measure meaningful to
those stakeholders
Define and implement the
work processes needed to
close any gaps from
feedback from clients and
stakeholders to increase the
delivered value and the
recognition of this value.
Use business process
measures for meaningful
units
Periodic feedback capture
processes based in ITIL
Service measures
Customer feedback
received and gaps identified
and closure plans in place
Business models for
services
Feedback period and
corrective action fulfillment
Monetized value of
services, reduced risks
and business costs
Wishbone diagram for
cause, effect, and closure
in place and in use
The value of the products and services produced by City of London TSD must be recognized as
having tangible measureable value. TSD cannot declare there is value in the absence of
consensus with the clients and stakeholders.
This recognized value comes from the measurable benefits to the stakeholders in units
meaningful to them. These units can be hard dollars or monetized soft benefits.
But these benefits must be tangible and have a conversion rate to dollars for them to be useful
for the Balanced Scorecard efforts.
Define the service catalog,
the service performance,
and connect this
performance to the
measures of value agreed
to by the stakeholders.
Have TSD stakeholders
acknowledge the value of
the products and services
provided to the City of
London consumers
S4: Recognized Value
Define asset value for IT
system in monetized units of
measures
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
For the external
stakeholders, define the
processes needed to asses
the needs of the
Stakeholder to determine
what should be in the
Service Portfolio and the
Stakeholder Portfolio.
For the Internal
Stakeholders, define the
organizational maturity of
TSD and the processes
used to manage those
stakeholders and their
project and programs using
the OGC P3M3 Framework
[3]
Increase the service
potential of capabilities and
resources to meet demand
Increase the performance
potential that creates value
for the stakeholders
Improve project
management processes
Improve business
engagement processes
Improve design and
development processes
«define capability
measures»
«define performance
measures»
CRMs and customers
engaged in providing and
recording feedback
Use P3M3 model for
increasing maturity
Use P3M3 model for
increasing maturity
Use P3M3 model for
increasing maturity
Identifying stakeholders – using a matrix of stakeholders and their affinity to projects,
processes or domain areas.
Understanding their expectations – by interviewing, surveys (least preferred) and face to face
interactions asking direct questions.
Managing those expectations – in the same way as managing projects or processes, through
defined outcomes.
Monitoring the effectiveness of stakeholder engagement activities – by defining units of
measure for this management.
Continuous review of the stakeholder community – through frequent and periodic meetings
through the Stakeholder Circle® (http://www.stakeholder-management.com/)
Install a relationship
management process and
identify staff needed to
ensure stakeholders are
satisfied with TSD
products and services.
Relations with the
Stakeholders are defined
and measurable to ensure
continued success of City
of London TSD through a
Value Network of tangible
and intangible value
producing exchanges.
S5: Stakeholder Relations
Involve stakeholders with
communication processes
to capture needs
Internal Process Perspective
What processes must we excel at to satisfy our stakeholders and clients?
Processes are structured activities, designed to accomplish a defined objective. Processes result in a goal-
oriented change, utilizing feedback for self-enhancing and self-corrective actions.
Processes are:
 Measureable because they are performance oriented
 Have specific results
 Provide these results to stakeholders
 Respond to a specific event – either continually or iteratively – originating from that event.
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Measure alignment with City
of London public services
using traceability to
paragraphs and sections in
the Master Plan to the
portfolio of projects
managed in TSD.
Organize TSD around the
management of Projects,
Programs, and Portfolio of
projects with units of
measure meaningful to the
decision makers.
Line of sight traceability of
projects to the CoL Strategic
Plan to portfolio of projects
Monetized investment
analysis of all TSD work in
the portfolio
Develop a portfolio
management process using
P3M3 guidance
Use PPM to select and
prioritize projects in the
portfolio
Select project based on
“real options” decision
making
Operational excellence
metrics met
Monetized performance
metrics met within
variance bands
Performance
communicated to IT staff
and others
Performance measures for
the 7 P3M3 perspectives.
Criteria defined for
selecting projects
To be operationally excellent requires leadership, teamwork and problem solving resulting in
continuous improvement throughout the City of London IT Department by focusing on the needs
of the customer, empowering employees, and optimizing existing activities in the process.
Once aligned with the Master Plan and IT Plan, the execution activities must be performed in the
context of operational excellence.
Operational aspects of City of London TSD will be guided by the ITIL Foundations of IT Service
Management V3. Seven activities from the P3M3 provided during the delivery of this Operational
Excellence are: (1) Management Control; (2) Benefits Management; (3) Budget Management;
(4) Stakeholder Management; (5) Risk Management; (6) Organizational Governance; and (7)
Resource Management.
Focus IT activities on
systems and application
integration to enable
people, processes, and
technology to be traceable
to IT Tech Plan and City of
London Master Plan,
guided by ITIL
Foundations V3 and OGC
P3M3 processes.
Develop, align and
execute TSD initiatives
with the IT Technology
Plan and City of London
Master Plan
P1: Use ITIL for Operational
Excellence
Provide Operational
Excellence ITIL V3
guidance
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Define and oversee
measures connected to
customer facing
performance of all
initiatives.
Define and oversee
measures connected to all
internal operations in
support of external
initiatives.
Identify stakeholders and
their specific needs
Use Stakeholder
Typography to classify and
engage stakeholders [1]
Identify stakeholders and
their specific needs
Define risk, value, and
relationship
interactions
Business Rqmnts and
Value Prop documents
created for all initiatives
% of Service Requests
that provide risk and value
criteria
Stakeholder management is the process of managing the expectations of anyone that has an
interest in a project or will be effected by its deliverables or outputs.
Managing stakeholders means knowing what stakeholders want, defining what products and
services TSD is capable of providing, and confirming that the Stakeholders agree with and
acknowledge that TSD has the capabilities to provide those products and services.
This starts with identifying the Stakeholders and their attributes. Stakeholder management is
embedded in the overall risk management of projects and portfolios of projects managed by
TSD.
Provide measureable
operational excellence for
all activities performance
by TSD around
stakeholder management.
Define and deploy
management process to
provide operational
excellence for the Race to
the Top Initiative to the
external and internal
stakeholders.
P2: Stakeholder Management
Customer Satisfaction
Surveys with at least 70%
satisfaction
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Create a service
improvement plan based on
the seven step improvement
process defined by ITIL.
Create an organization that
includes a CSI Management
and Service Management
role in City of London TSD
Processes are the internal affairs of the City of London TSD as a service provider. The first step
is the activities that focus on gaining control of the systems that provide internally focused
services. Until this control is established, external focus will be difficult.
Create a Continual Service
Improvement (CSI)
process to support the
needs of the Stakeholder.
Apply a repeating pattern
of improvement efforts that
allow City of London TSD
to better meet internal and
external stakeholder
needs.
P3: Continual Improvement
Perform CSI audits and take
corrective actions
Establish CSI baselines and
criteria for improvement
Create Service
Management Office
Establish SMO mandate
and objectives
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Develop of an Information
Security policy and
governance (Controls)
process.
Develop an Information
Security Management
System (ISMS) to plan,
implement, evaluate and
maintain the information
management policy and
governance processes
Information security is aligned with IT and business security is managed effectively in all
services and service management operations . This includes:
Information is available and useable when necessary (availability)
Information is available exclusively to authorized persons (confidentially)
The information is complete, accurate, and programs against unauthorized changes (integrity)
Information and information exchanges between other systems re reliable (authenticity)
Develop a security
management framework in
alignment with the TSD
governance process.
Align IT and business
process security to ensure
effective management of
services.
P4: Security and Privacy
Information Security policies
in place
Plan in place for regular
review of policies
IS Strategy developed,
approved and
communicated
IS Plan for 1 Year tactical
and 3 year strategic in
place
Compliance monitored and
non-compliance
escalated
Acceptable Use policy,
PCI policy, TSD policy
Monitoring and escalation
procedures in place
Compliance monitored and
non-compliance escalated
Learning & Growth Perspective
How do we align our intangible assets – people, systems, and culture – to improve critical processes?
The Learning-and-growth metrics is a framework for quantitatively assessing stakeholder satisfaction, productivity,
and retention in the framework of the balanced scorecard (City of London). These Goals, Critical Success Factors,
and Key Performance Indicators of the learning-and-growth perspective is “the foundation for all strategy” (Kaplan
& Norton, 2001, p. 93). These metrics are not just behavioral and statistical but “developmental.”
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Define the End Values to be
delivered through the
culture in terms of quality,
excellence, reliability,
innovation, and budget
management success.
Define the Instrumental
Values to be the desired
behaviors in terms of
standards, respect for
tradition and authority.
Aligning City of London TSD culture with the Balanced Scorecard strategy defines how we get
things done around here. Defining the Cultural Web consists of Stories, Rituals and Routines,
Symbols, Organizational Structure, Control Systems, and Power Structures.
This approach provides a “ways of being” to define the attitudinal aspects of how TSD operates
on a daily, including personal interactions, problem solving approaches, and the situational
analysis needed improve the performance of the organization, using the Katzenbach and Gallup
frameworks for Teams and Employee Engagement Activities. (in the Backup Materials)
Identify the existing
cultural aspects and
behaviors, gaps in these
behaviors, and take
specific action to address
gaps and develop a
measurable response.
Create and maintain a
culture of mutual support,
accountability and shared
outcomes for all TSD
personnel.
L1: Culture
Identify team building
opportunities, e.g. Strength
Finder 2.0
Assess cultural impacts for
each element of the BSC
and corrective actions
Corporate values aligned
and adhered to
Leadership Team sets the
example
Deploy development
processes to implement
corrective actions
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Select a strategic theme or
project that will enhance the
TSD and take steps toward
to achieving its overall
strategic goal through hands
on leadership of the work
activities.
Define the work processes
of a “project leader” to focus
on the delivery of beneficial
outcomes that meet
stakeholder needs.
The leaders of an organization have the prime responsibility for the quality produced by the
organization, i.e., the success of the mission. The commitment and participation of leaders
have long been recognized as critical factors in successful organizations (Tichy & Devanna,
1990). [2]
Only leaders have the sufficient authority, influence, and access to information to
begin and maintain major organizational change.
Define and deploy a
leadership training,
mentoring, and coaching
process for all members of
the City of London IT
Department.
Train, coach, mentor, and
develop leaders in the City
of London TSD
department capable of
delivering on the Tech
Plan, Operations Plan and
Master Plan
L2: Leadership
Mentoring and skills
upgrading program
Track the few critical
elements of strategy for
three major projects
Focus on short-term view of
leadership to critical areas
that impact stakeholders
Ensure key resources are
deployed to support critical
projects.
# of mentoring/skills
upgrading sessions
Value of mentoring/skills
upgrading
Dedicated project
resources
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Align internal support and
service units with the 4
strategic focus areas in IT
Strategy 2012–2014 and
cross referenced items in
the City of London Master
Plan.
Define how leaders become
accountable to the
governance processes,
actions, and performance
through their personal
involvement in planning,
communications, coaching,
vision, actions, and
performance of TSD.
The Balanced Scorecard, when developed as a strategic planning and management system,
helps align an organization behind a shared vision of success, and gets the City of London TSD
working on the right things and focusing on results.
A scorecard is more than a way of keeping score, it is a system, consisting of people, strategy,
processes, and technology. The responsibility for this critical alignment lies with the TSD
leadership.
Define the processes
needed to be aware of why
I am here and what am I
doing to support the
Strategic Initiatives of the
City of London TSD.
Align City of London TSD
organization with the
needs of the stakeholders
to assure delivery of each
strategic initiative on-time,
on-budget, and compliant
with the stakeholder needs
L3: Alignment
Leadership Team objectives
aligned with IT Strategy
Initiatives aligned with 4
strategic focus areas
Leadership Team goals and
objectives monitored,
reported and acted upon
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Provide a leadership that
unifies all parts of the TSD’s
staff through a methodology
that turns the eyes of all
TSD members to a single
direction – toward the
stakeholder.
Develop an ongoing team
work engagement process
that provides the
mechanism for Jon
Katzenbach [5] definition of
a team – a group of
individuals who hold each
other mutually accountable
for a shared outcome.
It is often difficult to improve overall organizational performance because the City of London
collective goals are unclear. Employees are often only aware of the aims of their own "team
island", and regard other team islands as having a different job. Individuals are often motivated
to "do their bit", but they lack the overall understanding of where the organization is going or how
the various team islands are supposed to work together for City of London collective good.
Whereas a sports team is often characterized by a focus on goals, results and league tables,
businesses are often characterized by an absence of such a unifying force.
Establish “teams” that are
the first point of contact for
stakeholders. This
includes, call center
support, deep technical
support, and client and
stakeholder requirements
and satisfaction
processes.
Create an organization
that fosters teamwork and
cooperation to improve the
performance of the work of
TSD.
L4: Teamwork
Define the organizational
structure and make that
visible to all TSD members
Define the channels of
communication and ensure
all participants are informed
Deploy Katzenbach’s
principles across City of
London TSD
Leadership Team held
accountable
TSD
teams/groups/individuals
held accountable
TSD ‘Restructuring plan’
complete and implemented
Create a culture of “shared
outcomes,” for all TSD
work.
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Create and maintain an up-
to-date resource capacity
plan with defined objectives
reflecting current and future
needs of City of London
stakeholders.
Use this plan to forecast
performance of service
requests.
Align resource capacity
management and the
Service Portfolio and
communicate this alignment
to the stakeholders to
confirm their understanding
of what can be
accomplished with the
resource’s capacity.
It is essential to have an analytical understanding of City of London TSD resource’s Capacity for
Work. The capacity must coincide with the current and future needs of the clients and
stakeholders of the City of London. Any capacity gaps must be understood and communicated
to these stakeholders in units of measure meaningful to the decision making processes.
Provide IT resource
capacity coinciding with
the current and future
needs of City of London
stakeholders against the
justifiable costs of this
capacity.
Inform stakeholder of City
of London TSD’s ability to
respond to all non-
discretionary demand for
service with predictable
durations and quality of
performance.
L5: Resource Capacity for
Work
Current and future capacity
requirements determined
Resources in place to
determine and deliver
requirements
Corporate and
Departmental Steering
Committees
CRM delivery of
expectations
Capacity Management
process
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Using the Gallup 12
assessment of business
capabilities survey and
define gaps and closure
strategies for each of the
G12 elements as shown in
the City of London
supporting materials pages.
Discern alignment to the
professional development
initiatives.
Assess capability and
capacity for work using the
G12 profile
Establish a Professional
Development Center for
TSD staff
When there is need for resources to be available to meet strategic objectives, we need to
understand current and future work capability.
The current capability includes an assessment of task focus, self conduct, and interpersonal
perspectives of the performed activities.
The future capability includes an assessment of the needed development levels and
developmental potentials and the risk associated with regressing to lower levels of capability
based on a systems thinking approach to capacity planning.
Identify the capabilities for
the needed services of
City of London Clients and
Stakeholders through an
assessment of these
needs in a survey
instrument and direct
“customer contact.”
Provide the needed
technical, operational, and
interpersonal capabilities
to meet the needed
demands of City of London
clients and stakeholders
L6: Resource Capability for
Work
Budget Process Perspective
What are our stakeholder and client expectations of our budget management performance?
The budget perspective activities are those necessary to ensure the execution of the City of London TSD strategy
in support of the Mission and Vision.
This activity assigns budget to projects and controls the consumption of that budget in exchange for measurable
value – both tangible and intangible.
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Project execution
performance parameters
meaningful to internal
decision making of the City
of London TSD
Project business
performance parameters
defined in units meaningful
to the City of London Clients
and Stakeholders for IT
services.
Project performance management starts with repeatable processes. The “baseline” of a project
includes, cost, schedule, and the measures of physical percent complete. These measures are
defined in units meaningful to the decision makers.
Successful management of projects and the portfolio of projects starts with the Integrated
Master Plan showing what capabilities will be produced for the stakeholders, what significant
accomplishments must be completed, the success criteria for those accomplishments, and the
work efforts (in the form a work package) are needed for complete the Accomplishment Criteria.
These activities are arranged in the Integrated Master Schedule (IMS) and placed on baseline.
The IMS is a resource loaded activity network include schedule and cost margins.
Establish a project
performance management
system using cost,
schedule, and technical
performance measures to
increase the probability of
success for each City of
London TSD project.
Install and operate a
project, program, and
portfolio governance
process to increase the
probability of success of
each project produced by
City of London TSD
B1: Project Performance
Cost performance
Schedule performance
Project business
performance measures
Customer satisfaction
measures
Technical performance
Integrated Master Plan in
place
Performance metrics
defined
% of non-compliance
Survey results
Non-compliance defined
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Defines budget
management and submittal,
authorization processes to
maintain the integrity of the
Integrated Master Schedule.
Define and deploy a
Change Management
Process guided by PMBOK
and ITIL processes to
ensure the integrity of the
Integrated Master Schedule.
Financial assets are necessary to support the ownership or use of all assets.
Resources and capabilities form the basis for the value of a service.
Financial management is an integrated element of service management. Budget management
provides vital information needed to ensure effective and efficient service delivery, allowing the
TSD to justify expenditures and allocate funding directly to the services.
Establish budget
management, forecasting,
and performance
management services for
all projects in the City of
London TSD portfolio.
Assure the management of
City of London TSD
budget and the assets are
guided by the IT
Governance processes.
B2: Budget Management
Costs are optimized
Waste eliminated
ITSM Change Management
(?)
Investment Management
Board
$$$ saved and re-
purposed
Contracts cancelled or
renegotiated
Controls in place
Narrative Of The Contents Of This City of London “Card”
Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators
Strategic Theme
TSD Balanced Scorecard
Create a resource pool
management system
starting with the measurable
“capacity for work” that
ensures over commitments
are not made without
explicit approval and the
resulting accountability of
senior management
Provide forecasts of needed
resources using the
Integrated Master Schedule
as the “approved” demand
for work.
Resources and capabilities are types of assets. The management of the City of London TSD
resources creates value in the form of services and IT applications. Management, organization,
people, and knowledge convert these resources into value.
The TSD capacity for work is the starting point for resource management. The capacity for work
of a mix of people, processes, tools, systems, and organizational structures along with intangible
assets of ideas and culture.
The latter – “intangible assets” – is the Critical Success Factor for City of London TSD’s
success.
Provide tools, processes,
and leadership needed to
manage resources for all
TSD activities.
Provide tools and
processes needed to
manage City of London
TSD resources to meet the
demand of the
Stakeholders
B3: Resource Management
Resource Allocation
Program/Plan
Resource Allocation tools
and reporting
Master Schedule
Committed resources
Controls for over-resourcing
in place
Backup Materials
Gallup Q12 elements
G12 Critical Employee Engagement Activities
Outcomes for the City of London Leadings and
Growth Perspective
I know what is expected of me at work. We have a shared outcome for all work activities
I have the materials and equipment I need to do my work right. In the Master Schedule all needed resources are
defined and available on the planned date
At work, I have the opportunity to do what I do best every day. Work activities are agreed to by the performing
element
In the last seven days, I have received recognition or praise for
good work.
Katzenbach’s “teaming” processes are in place and
operational.
My supervisor or the person I report seems to care about me as
a person.
There is someone at work who encourages my development.
In the last six months, someone at work has talked with me
about my progress.
At work, my opinions seem to count.
The mission/purpose of my company makes me feel my job is
important.
Using the City of London, trace all activities to a
strategic initiative
My associates (fellow employees) are committed to doing quality
work.
Measures of success include measures of
effectiveness for the clients and stakeholders and
measures of performance for the products and
services
I have a best friend at work.
10 Ways to Build Capability
1. Create a leadership/coaching system that links all business
functions.
2. Right Action=Reward the right: people, things, ways, time and
reasons.
3. Create the feeling in your organization that people can fail to
succeed.
4. Create the necessary infrastructure to connect people with
metrics.
5. Become a teaching organization and teach at every level
continuously.
6. Enable people with development opportunities to higher levels of
function.
7. Understand appreciative coaching and how to build a culture
around it.
8. Make it fun to work in your company.
References
[1] A Typology of Operational Approaches for Stakeholder Analysis and
Engagement, Dr. Jing (Rebecca) Yang. Deakin University Prof. Ping
Qi (Geoffrey) Shen, Hong Kong Polytechnic University, Dr. Lynda
Bourne, Stakeholder Management Pty Ltd Christabel MF Ho & Dr.
Xiaolong Xue.
http://www.stakeholdermapping.com/
[2] Transformational Leader, Tichy and Devanna, 1997
[3] OGC P3M3 (Project, Program, Portfolio Management Maturity
Model) http://www.p3m3-officialsite.com/
[4] ITIL Foundations V3
[5] Jon Katezenbach, “Unleashing the Power of Teams: From Theory
to Execution, Booz and Company. The Wisdom of Teams: Creating
the High-Performance Organization.
[6] Deriving Enterprise-Based Measures Using the Balanced
Scorecard and Goal-Driven Measurement Techniques, Wolfhart
Goethert Matt Fisher October 2003, Software Engineering
Measurement and Analysis Initiative, Technical Note, CMU/SEI-
A Final Thought – It’s All About Execution
44
Next Steps
 Complete the CSF review
 Define KPIs for each CSF and confirm they
produce measurable outcomes
 Syndicate the CSFs and KPIs with those
accountable for the performance outcomes
 Rebuild the scorecard and connect the dots
between the Initiatives (contents of the
perspectives)
 Reconfirm that all participants have sufficient
understanding to move to the implementation
step
 Pick the first department or function for
45

More Related Content

What's hot

PMO and Value Conference - Matt Williams and Merv Wyeth, London, 25 October 2016
PMO and Value Conference - Matt Williams and Merv Wyeth, London, 25 October 2016PMO and Value Conference - Matt Williams and Merv Wyeth, London, 25 October 2016
PMO and Value Conference - Matt Williams and Merv Wyeth, London, 25 October 2016
Association for Project Management
 
Operating model design v1
Operating model design v1Operating model design v1
Operating model design v1
Richard Tilley
 
Business Architecture - Paul Turner
Business Architecture - Paul TurnerBusiness Architecture - Paul Turner
Business Architecture - Paul Turner
IIBA UK Chapter
 
Business Architecture Foundations
Business Architecture FoundationsBusiness Architecture Foundations
Business Architecture Foundations
Mohamed Zakarya Abdelgawad
 
Using Business Architecture to Facilitate a North American Business Model at ...
Using Business Architecture to Facilitate a North American Business Model at ...Using Business Architecture to Facilitate a North American Business Model at ...
Using Business Architecture to Facilitate a North American Business Model at ...
Daniel Lambert, M. Sc.
 
PMO and Value Conference - Ray Mead, London, 25 October 2016
PMO and Value Conference - Ray Mead, London, 25 October 2016PMO and Value Conference - Ray Mead, London, 25 October 2016
PMO and Value Conference - Ray Mead, London, 25 October 2016
Association for Project Management
 
CobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced ScorecardsCobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced ScorecardsMichael Sim
 
T2 - T2S Consolidation | How to be compliant in time?
T2 - T2S Consolidation | How to be compliant in time?T2 - T2S Consolidation | How to be compliant in time?
T2 - T2S Consolidation | How to be compliant in time?
PwC Italy
 
Aligning business and tech thru capabilities - A capstera thought paper
Aligning business and tech thru capabilities  - A capstera thought paperAligning business and tech thru capabilities  - A capstera thought paper
Aligning business and tech thru capabilities - A capstera thought paper
SatyaIluri
 
Competency Modeling for Business Process Review
Competency Modeling for Business Process ReviewCompetency Modeling for Business Process Review
Competency Modeling for Business Process Review
John Macasio
 
PMs Role supporting Cloud Acquisition and associated Challenges
PMs Role supporting Cloud Acquisition and associated ChallengesPMs Role supporting Cloud Acquisition and associated Challenges
PMs Role supporting Cloud Acquisition and associated Challenges
Michael Torres
 
Operating Model and Organization Design Toolkit
Operating Model and Organization Design Toolkit Operating Model and Organization Design Toolkit
Operating Model and Organization Design Toolkit
Aurelien Domont, MBA
 
Collaborative Service Overview
Collaborative Service OverviewCollaborative Service Overview
Collaborative Service Overview
rebekaclifton
 

What's hot (13)

PMO and Value Conference - Matt Williams and Merv Wyeth, London, 25 October 2016
PMO and Value Conference - Matt Williams and Merv Wyeth, London, 25 October 2016PMO and Value Conference - Matt Williams and Merv Wyeth, London, 25 October 2016
PMO and Value Conference - Matt Williams and Merv Wyeth, London, 25 October 2016
 
Operating model design v1
Operating model design v1Operating model design v1
Operating model design v1
 
Business Architecture - Paul Turner
Business Architecture - Paul TurnerBusiness Architecture - Paul Turner
Business Architecture - Paul Turner
 
Business Architecture Foundations
Business Architecture FoundationsBusiness Architecture Foundations
Business Architecture Foundations
 
Using Business Architecture to Facilitate a North American Business Model at ...
Using Business Architecture to Facilitate a North American Business Model at ...Using Business Architecture to Facilitate a North American Business Model at ...
Using Business Architecture to Facilitate a North American Business Model at ...
 
PMO and Value Conference - Ray Mead, London, 25 October 2016
PMO and Value Conference - Ray Mead, London, 25 October 2016PMO and Value Conference - Ray Mead, London, 25 October 2016
PMO and Value Conference - Ray Mead, London, 25 October 2016
 
CobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced ScorecardsCobiT, Val IT & Balanced Scorecards
CobiT, Val IT & Balanced Scorecards
 
T2 - T2S Consolidation | How to be compliant in time?
T2 - T2S Consolidation | How to be compliant in time?T2 - T2S Consolidation | How to be compliant in time?
T2 - T2S Consolidation | How to be compliant in time?
 
Aligning business and tech thru capabilities - A capstera thought paper
Aligning business and tech thru capabilities  - A capstera thought paperAligning business and tech thru capabilities  - A capstera thought paper
Aligning business and tech thru capabilities - A capstera thought paper
 
Competency Modeling for Business Process Review
Competency Modeling for Business Process ReviewCompetency Modeling for Business Process Review
Competency Modeling for Business Process Review
 
PMs Role supporting Cloud Acquisition and associated Challenges
PMs Role supporting Cloud Acquisition and associated ChallengesPMs Role supporting Cloud Acquisition and associated Challenges
PMs Role supporting Cloud Acquisition and associated Challenges
 
Operating Model and Organization Design Toolkit
Operating Model and Organization Design Toolkit Operating Model and Organization Design Toolkit
Operating Model and Organization Design Toolkit
 
Collaborative Service Overview
Collaborative Service OverviewCollaborative Service Overview
Collaborative Service Overview
 

Similar to Master IT Balanced Scorecard

Master it balanced scorecard (final)
Master it balanced scorecard (final)Master it balanced scorecard (final)
Master it balanced scorecard (final)
Glen Alleman
 
Master IT balanced scorecard (final).pptx
Master IT balanced scorecard (final).pptxMaster IT balanced scorecard (final).pptx
Master IT balanced scorecard (final).pptx
Glen Alleman
 
BI Presentation Nashville CIO Council
BI Presentation Nashville CIO CouncilBI Presentation Nashville CIO Council
BI Presentation Nashville CIO Council
Thomas Danford
 
Organizational Performance framework-
Organizational Performance framework-Organizational Performance framework-
Organizational Performance framework-Dr. Johan Louw
 
Strategic IT Planning - S42IL 110714
Strategic IT Planning - S42IL 110714Strategic IT Planning - S42IL 110714
Strategic IT Planning - S42IL 110714strategicforty2
 
IT Performance Measurement using IT Governance Metric
IT Performance Measurement using IT Governance MetricIT Performance Measurement using IT Governance Metric
IT Performance Measurement using IT Governance Metric
PECB
 
Digital Transformation Toolkit - Overview and Approach
Digital Transformation Toolkit - Overview and ApproachDigital Transformation Toolkit - Overview and Approach
Digital Transformation Toolkit - Overview and Approach
PeterFranz6
 
Information and communication technology consultancy
Information and communication technology consultancyInformation and communication technology consultancy
Information and communication technology consultancyBrijesh Rawat
 
1365320.pdf
1365320.pdf1365320.pdf
1365320.pdf
AbdetaImi
 
DIGIT North 2022
DIGIT North 2022DIGIT North 2022
DIGIT North 2022
Ray Bugg
 
The Path to CIO
The Path to CIOThe Path to CIO
The Path to CIO
CAST
 
E-Service Planning and Enterprise Architecture
E-Service Planning and Enterprise ArchitectureE-Service Planning and Enterprise Architecture
E-Service Planning and Enterprise Architecture
John Macasio
 
Al Mateus Oct2010 2
Al Mateus Oct2010 2Al Mateus Oct2010 2
Al Mateus Oct2010 2
nycitstrategist1
 
Session3 introduction to e governance project lifecycle
Session3 introduction to e governance project lifecycleSession3 introduction to e governance project lifecycle
Session3 introduction to e governance project lifecycle
Bantu Sai Ramesh
 
Ict4gov eservices strategic_planning
Ict4gov eservices strategic_planningIct4gov eservices strategic_planning
Ict4gov eservices strategic_planning
nitotalib
 
Executive Resume & CV - Joey Blondin
Executive Resume & CV - Joey BlondinExecutive Resume & CV - Joey Blondin
Executive Resume & CV - Joey Blondin
Joey Blondin, PMP, ITIL
 
Management summary presentation
Management summary presentationManagement summary presentation
Management summary presentation
IT Strategy Group
 
Digital Transformation Toolkit - Framework, Best Practices and Templates
Digital Transformation Toolkit - Framework, Best Practices and TemplatesDigital Transformation Toolkit - Framework, Best Practices and Templates
Digital Transformation Toolkit - Framework, Best Practices and Templates
Aurelien Domont, MBA
 

Similar to Master IT Balanced Scorecard (20)

Master it balanced scorecard (final)
Master it balanced scorecard (final)Master it balanced scorecard (final)
Master it balanced scorecard (final)
 
Master IT balanced scorecard (final).pptx
Master IT balanced scorecard (final).pptxMaster IT balanced scorecard (final).pptx
Master IT balanced scorecard (final).pptx
 
BI Presentation Nashville CIO Council
BI Presentation Nashville CIO CouncilBI Presentation Nashville CIO Council
BI Presentation Nashville CIO Council
 
Organizational Performance framework-
Organizational Performance framework-Organizational Performance framework-
Organizational Performance framework-
 
Strategic IT Planning - S42IL 110714
Strategic IT Planning - S42IL 110714Strategic IT Planning - S42IL 110714
Strategic IT Planning - S42IL 110714
 
IT Performance Measurement using IT Governance Metric
IT Performance Measurement using IT Governance MetricIT Performance Measurement using IT Governance Metric
IT Performance Measurement using IT Governance Metric
 
Digital Transformation Toolkit - Overview and Approach
Digital Transformation Toolkit - Overview and ApproachDigital Transformation Toolkit - Overview and Approach
Digital Transformation Toolkit - Overview and Approach
 
Information and communication technology consultancy
Information and communication technology consultancyInformation and communication technology consultancy
Information and communication technology consultancy
 
1 itil v3 overview ver1.8
1 itil v3 overview ver1.81 itil v3 overview ver1.8
1 itil v3 overview ver1.8
 
1365320.pdf
1365320.pdf1365320.pdf
1365320.pdf
 
DIGIT North 2022
DIGIT North 2022DIGIT North 2022
DIGIT North 2022
 
The Path to CIO
The Path to CIOThe Path to CIO
The Path to CIO
 
E-Service Planning and Enterprise Architecture
E-Service Planning and Enterprise ArchitectureE-Service Planning and Enterprise Architecture
E-Service Planning and Enterprise Architecture
 
Al Mateus Oct2010 2
Al Mateus Oct2010 2Al Mateus Oct2010 2
Al Mateus Oct2010 2
 
Session3 introduction to e governance project lifecycle
Session3 introduction to e governance project lifecycleSession3 introduction to e governance project lifecycle
Session3 introduction to e governance project lifecycle
 
Ict4gov eservices strategic_planning
Ict4gov eservices strategic_planningIct4gov eservices strategic_planning
Ict4gov eservices strategic_planning
 
Executive Resume & CV - Joey Blondin
Executive Resume & CV - Joey BlondinExecutive Resume & CV - Joey Blondin
Executive Resume & CV - Joey Blondin
 
Management summary presentation
Management summary presentationManagement summary presentation
Management summary presentation
 
Digital Transformation Toolkit - Framework, Best Practices and Templates
Digital Transformation Toolkit - Framework, Best Practices and TemplatesDigital Transformation Toolkit - Framework, Best Practices and Templates
Digital Transformation Toolkit - Framework, Best Practices and Templates
 
From Strategy to Operations ProjectWorld 2013
From Strategy to Operations ProjectWorld 2013From Strategy to Operations ProjectWorld 2013
From Strategy to Operations ProjectWorld 2013
 

More from Glen Alleman

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
Glen Alleman
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
Glen Alleman
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
Glen Alleman
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPM
Glen Alleman
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk management
Glen Alleman
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk Management
Glen Alleman
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Glen Alleman
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
Glen Alleman
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guide
Glen Alleman
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
Glen Alleman
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
Glen Alleman
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
Glen Alleman
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
Glen Alleman
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
Glen Alleman
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
Glen Alleman
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planning
Glen Alleman
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
Glen Alleman
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement Baseline
Glen Alleman
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six Sigma
Glen Alleman
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure Rollout
Glen Alleman
 

More from Glen Alleman (20)

Managing risk with deliverables planning
Managing risk with deliverables planningManaging risk with deliverables planning
Managing risk with deliverables planning
 
A Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMSA Gentle Introduction to the IMP/IMS
A Gentle Introduction to the IMP/IMS
 
Increasing the Probability of Project Success
Increasing the Probability of Project SuccessIncreasing the Probability of Project Success
Increasing the Probability of Project Success
 
Process Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPMProcess Flow and Narrative for Agile+PPM
Process Flow and Narrative for Agile+PPM
 
Practices of risk management
Practices of risk managementPractices of risk management
Practices of risk management
 
Principles of Risk Management
Principles of Risk ManagementPrinciples of Risk Management
Principles of Risk Management
 
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
 
NAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guideNAVAIR Integrated Master Schedule Guide guide
NAVAIR Integrated Master Schedule Guide guide
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
 
Integrated master plan methodology (v2)
Integrated master plan methodology (v2)Integrated master plan methodology (v2)
Integrated master plan methodology (v2)
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
 
Making the impossible possible
Making the impossible possibleMaking the impossible possible
Making the impossible possible
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
Capabilities based planning
Capabilities based planningCapabilities based planning
Capabilities based planning
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
 
Building the Performance Measurement Baseline
Building the Performance Measurement BaselineBuilding the Performance Measurement Baseline
Building the Performance Measurement Baseline
 
Program Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six SigmaProgram Management Office Lean Software Development and Six Sigma
Program Management Office Lean Software Development and Six Sigma
 
Policy and Procedure Rollout
Policy and Procedure RolloutPolicy and Procedure Rollout
Policy and Procedure Rollout
 

Recently uploaded

GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
Octavian Nadolu
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
sonjaschweigert1
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
Matthew Sinclair
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
Kumud Singh
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
DianaGray10
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex ProofszkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
Alex Pruden
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
Neo4j
 
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptxSecstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
nkrafacyberclub
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
James Anderson
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 

Recently uploaded (20)

GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex ProofszkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
zkStudyClub - Reef: Fast Succinct Non-Interactive Zero-Knowledge Regex Proofs
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
 
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptxSecstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 

Master IT Balanced Scorecard

  • 1. Technology Services Division (TSD) Balanced Scorecard 1
  • 2. The pursuit of operational effectiveness is seductive because it is concrete and actionable. Caught up in the race for operational effectiveness, many managers simply do not understand the need to have a strategy. – Dr. Michael E. Porter – Professor of Business Administration, Harvard Business School A Motivation for Change 2
  • 3. Vision Business Strategy TSD Balanced Scorecard Technical Measures «the business strategy documents are needed here to drive the IT strategy» Strategic Initiatives defined in a Strategy Map with cause and effect connections. Numeric measures for each KPI with baseline value with variance values.  Why We Exist  What We Do To Deliver Value To Our Stakeholders  What We Strive To Be For Our Stakeholders  What Our Stakeholders Want Us To Be  Implementation Framework For Turning Strategy Into Execution. Mission Vision GQ(I)M [6] City of London Strategy Plan Mission and Vision of City of London as the starting point for IT Strategic Initiatives and their connections to the Master Plan IT Operating Plan IT operational activities based on City of London for each operational outcome using ITIL V3. GQ(I)M Goal, Question, (Indicator), Measure, to capture CSFs, KPIs, and connections to projects through a Strategy Map.
  • 4. Elements of the Balanced Scorecard Strategy Map, with four perspectives.  Stakeholder perspective – describes the initiatives that directly impact the stakeholders of the City of London IT Department in pursuit of their mission and vision.  Internal Process Perspective – describes the activities undertaken by City of London TSD to deliver the stakeholder initiatives.  Learning and Growth Perspective – the activities if City of London TSD develop and maintain the skills, knowledge, and experience needed to implement the Strategic Initiatives.  Budget Perspective – the management initiatives needed to operate the TSD in a responsible manner while delivering value to the BCSP Stakeholders. Score Card  Vision – what the future should look like for City of London TSD  Narrative – an elevator pitch for this Strategic Initiative telling what the desired outcome will be in the future (the Vision).  Strategic Initiative – a statement of the work to be undertaken to fulfill the Vision  Performance Goals – a stated measureable goal from the work effort to deliver the Strategic Initiative that fulfills the Vision  Critical Success Factors – for each goal, what are the Critical Success Factors that must be in place for completion of the Performance Goal  Key Performance Indicators – the units of measure and the upper and lower limits of these measures to satisfy the Critical Success Factor
  • 5. Cascading The Balanced Scorecard  Cascading the scorecard means translating the TSD– Tier 1 (This Scorecard) down to the TSD Departments – Tier 2, and then to a team of individuals, the TSD Department individuals – Tier 3.  The current City of London is cascaded to Tier 2.  The result is “line of sight” visibility from top to bottom and back again for each top level strategic initiative.  With the strategy map, goals, performance measures and targets are connected to the top level Mission and Vision of TSD. 5
  • 6. Benefits of Cascading the Scorecard  Top level Goals – City of London Strategic Plan focus on the corporate goals and objectives connected to the TSD strategic initiatives defined in the Information Technology Strategy (1/16/2012).  Individual department managers can connect these strategies to their individual technical and operational performance goals.  The department scorecards can then be used to connect TSD goals with Critical Success Factors and Key Performance Indicators in the vernacular of Balanced Scorecard. 6
  • 7. Connecting the Dots From Tier 1 to Tier 2 7 The scorecard initiative is expanded in the performance description “card” for each department The “theme,” and the Initiative are flowed down the Tier 2 scorecard to establish the basis for the performance of the TSD department. This answers the question - “what is the department doing to support the top level TSD strategy?” The Tier 2 Goals, CSF’s, and KPI’s answer the question “what does the department do in support of the TSD Master Initiatives. This connects the dots between department level strategic activities, and the top level TSD strategic activities.
  • 8. City of London TSD Balanced Scorecard  The Strategy Map and department performance scorecards show how TSD directly enables the initiatives of the City of London Master Plan.  The Master TSD scorecard is augmented with individual department scorecards for the 8 TSD department leaders. 8 Chief Technology Officer Customer Relations Management Customer Support Applications Information and Information Security Business Enabling Program Management Office Enterprise Architect
  • 9. Budget Perspective B2: Budget Management B3: Resource Management Internal Processes Perspective Stakeholder Perspective S1: Be the Preferred Provider S2: Use ITIL to Manage Services S3: Provide Needed Systems and Applications S5: Manage Stakeholder Relations S4: Ensure Recognition of Value Service Attributes Relationships P1: Use ITIL for Op Excellence P2: Manage Stakeholder Relations P3: Develop Continuous Improvement Processes P4: Assure Security and Privacy Organizational Capabilities and Capacities Learnings & Growth Perspective Image B1: Project Performance L1: Culture L2: Leadership L3: Alignment L4: Teamwork City of London TSD Strategy Map L5: Resource Capacity for Work L6: Resource Capabilities for Work StakeholderITDepartmentOperations
  • 10. Four City of London IT Department (ITD) Strategic elements mapped to the four BSC perspectives. When IT governance initiatives are defined they are guided by the 5 framework elements of ITIL V3 Organizational Strategy Service Strategy Information Data Strategy Technology Strategy Improve Organizational Structure Buildskillsand improveresources flexibility ImplementIT guidance Improvesecurity ExpandShared Services Improveoperational processes Reducecostof service Implementmanaged services ImproveWeband contentcapability Improvedecision support EnableCityof Londoncollaboration Deliverbusiness applications Rationalize applicationsuite Expandmobile capability Four Perspectives of the Balanced Scorecard of Stakeholder, Internal, Learning's and Growth and Budget Adherence S1: Be the Preferred Provider of IT Services S2: ITIL Service Management S3: Needed Applications S4: Ensure Value Recognition S5: Stakeholder Relations (External) P1: Operational Excellence P2: Stakeholder Relations (Internal) P3: Develop Continuous Improvement Process P4: Security and Privacy L1: Culture L2: Leadership L3: Alignment L4: Teamwork L5: Capacity for Work L6: Capability for Work B1: Project Performance B2: Budget Management B3: Resource Management
  • 11. 11 ITIL Paradigm for Balanced Scorecard
  • 12. ITIL V3 Framework 1. Service Strategy – how to design, develop, and implement service management not only as an organizational capability but also as a strategic asset. 2. Service Design – design principles and methods for converting strategic objectives into portfolios of services and service assets. 3. Service Transition – development and improvement of capabilities for transitioning new and changed services into operations. 4. Service Operation – achieving effectiveness and efficiency in the delivery and support of services so as to ensure value for the customer and the service provider. 5. Continual Service Improvement – creating and maintaining value for customers through better design, introduction and operation of services. 12
  • 13. Connecting ITIL with IT Strategy  The strategy map connects the IT strategy with four perspectives of the balanced scorecard.  The ITIL service areas establish the basis of all service delivery strategies.  The remaining CoL IT Strategy elements also have connections to ITIL V3 and will be mapped during the CSF and KPI phases. 13
  • 14. 14
  • 15. Stakeholder Perspective To reach our objectives, how do we create value for our stakeholders? City of London TSD stakeholders are the “customers” of the services provided by TSD. These are all the people who have an interest in the TSD Organization, projects managed by TSD, the activities of TSD, the resources, and deliverables produced by the resources. The City of London forms a complex network of impacted clients and stakeholders who exercise influence on TSD’s funding, direction, and ability to fulfill its mission. The strategic initiatives in this perspective address how TSD will satisfy the needs of these stakeholders and clients, while maintaining the operational, security, privacy obligations to City of London Strategy and other governance processes
  • 16. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Improve technology and governance on sites and content to replace old and unstable technologies. Improve content delivery by increasing web based capabilities guided by strategic needs of the stakeholders Implement service improvement plan per ITIL [4] Involve and develop TSD staff to implement service improvement plans Install web streaming to improve customer satisfaction Improve web organization and searching Improve work flow processes ITIL V3 Event, incident, Request, Access, and Operational Mgmnt KPI ITIL V3 Event, incident, Request, Access, and Operational Mgmnt KPI Percent of documents under control All committee rooms and Council Chambers web streaming capable Value stream maps w/ monetized savings & improvements Comparable value and performance to Google To be the preferred technology partner in the achievement of the City of London Strategic Plan and other mandated initiatives using Information Technology ITD must provide not only desirable products and services, they must sustain the expected performance from those products and services in the presence in increasing demand, evolving technology and maturing stakeholder, asking tougher questions. Provide IT products and services traceable to each City of London Initiative as defined in a variety of documents, from the Strategic Plan. When there is a choice, be the preferred technology partner to City of London. When systems are mandated, assure customer satisfaction exceeds expectations to maintain preference S1: Be The Preferred Provider of IT Services Implement SharePoint as basis of all document management services
  • 17. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Select from the 5 ITIL components, which are applicable for the current strategy deployment Develop operational performance measures for each of the TSD departments at the execution level guided by the selected ITIL Service Management Framework elements Deliver business apps to meet customer needs identified in strategy Rationalize application suite using ITIL portfolio management Determine resource needs for fulfill IT service management Leverage Enterprise Architecture Expand mobile capability and infrastructure flexibility # current applications vs. original # of applications # of current platforms vs. original # of platforms % of new projects approved by EA traced to strategy The ITIL Service Management Framework V3 defines the attributes and measures of the Fit for Purpose (Utility) and Fit for Use (Warranty). Utility is the increase for the possible “benefit” to the City of London. Warranty is the availability and reliability in continuity and security of the services provided by City of London TSD. There are five (5) components: (1) Service, (2) Design, (3) Transition, (4) Operations, and (5) Continuous Improvement as applied to the Stakeholder. TSD will select which of these to implement over what periods of time to support the improvement processes. Implement selected components of ITIL Service Foundation V3. (1) Service, (2) Design, (3) Transition, (4) Operations, and (5) Continuous Improvement as applied to the Stakeholder. Deploy IT Service Management best practices guided by ITIL Foundations V3. S2: Use ITIL To Manage Services Standardize on fewer platforms
  • 18. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Identify, implement, and operate the applications and systems of TSD to ensure the Mission and Vision of the City of London is being met. For each goal in the TSD Strategic Plan define an operational plan to maintain or increase the performance of each critical application and system. Deliberate design of processes to support City of London Understand existing services and the needs of the stakeholders Define technical capabilities inventory and rank those against CoL Mstr Plan Model the capabilities and capacities of critical systems Model the infrastructure needs to meet stakeholder demand Customer survey of needs and satisfaction assessment Gap analysis of current systems against critical stakeholder needs Skills, capabilities, and capacity for work assessment Measureable contributed value to CoL Mstr Plan and IT Strategic Plan Capacity, and “..ilities” model for all infrastructure with monetized value. Capacity of services in users, throughput or volume. Application and system strategy is about planning deliberate acts that increase stakeholder value. IT is run as an independent business and is therefore regarded as a supplier/outsourcer. This mindset allows for provisioning services internally or externally, depending upon business conditions and opportunities. IT services are viewed as strategic business assets critical to an organization’s survival and success. A formal business planning process must be designed to complement the City of London strategic planning process. The planning process includes a market definition step — determining need and estimating revenue. Take actions to identify critical assets and increase the measurable value of TSD’s offerings to City of London and assure TSD is the provider of choice for these IT Services by operating and providing applications that meet the needs of the City of London services provided in section 3.2 of the Information Technology Strategy. Assure the TSD critical assets directly contribute to the success of City of London and its Mission and Vision in units of measure meaningful to the decision makers. S3: Provide Needed Systems and Applications Assess TSD staff’s ability to deliver value to stakeholders
  • 19. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Define and implement the feedback processes and their execution that will connect the offerings of TSD with the needs of the stakeholders in units of measure meaningful to those stakeholders Define and implement the work processes needed to close any gaps from feedback from clients and stakeholders to increase the delivered value and the recognition of this value. Use business process measures for meaningful units Periodic feedback capture processes based in ITIL Service measures Customer feedback received and gaps identified and closure plans in place Business models for services Feedback period and corrective action fulfillment Monetized value of services, reduced risks and business costs Wishbone diagram for cause, effect, and closure in place and in use The value of the products and services produced by City of London TSD must be recognized as having tangible measureable value. TSD cannot declare there is value in the absence of consensus with the clients and stakeholders. This recognized value comes from the measurable benefits to the stakeholders in units meaningful to them. These units can be hard dollars or monetized soft benefits. But these benefits must be tangible and have a conversion rate to dollars for them to be useful for the Balanced Scorecard efforts. Define the service catalog, the service performance, and connect this performance to the measures of value agreed to by the stakeholders. Have TSD stakeholders acknowledge the value of the products and services provided to the City of London consumers S4: Recognized Value Define asset value for IT system in monetized units of measures
  • 20. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard For the external stakeholders, define the processes needed to asses the needs of the Stakeholder to determine what should be in the Service Portfolio and the Stakeholder Portfolio. For the Internal Stakeholders, define the organizational maturity of TSD and the processes used to manage those stakeholders and their project and programs using the OGC P3M3 Framework [3] Increase the service potential of capabilities and resources to meet demand Increase the performance potential that creates value for the stakeholders Improve project management processes Improve business engagement processes Improve design and development processes «define capability measures» «define performance measures» CRMs and customers engaged in providing and recording feedback Use P3M3 model for increasing maturity Use P3M3 model for increasing maturity Use P3M3 model for increasing maturity Identifying stakeholders – using a matrix of stakeholders and their affinity to projects, processes or domain areas. Understanding their expectations – by interviewing, surveys (least preferred) and face to face interactions asking direct questions. Managing those expectations – in the same way as managing projects or processes, through defined outcomes. Monitoring the effectiveness of stakeholder engagement activities – by defining units of measure for this management. Continuous review of the stakeholder community – through frequent and periodic meetings through the Stakeholder Circle® (http://www.stakeholder-management.com/) Install a relationship management process and identify staff needed to ensure stakeholders are satisfied with TSD products and services. Relations with the Stakeholders are defined and measurable to ensure continued success of City of London TSD through a Value Network of tangible and intangible value producing exchanges. S5: Stakeholder Relations Involve stakeholders with communication processes to capture needs
  • 21. Internal Process Perspective What processes must we excel at to satisfy our stakeholders and clients? Processes are structured activities, designed to accomplish a defined objective. Processes result in a goal- oriented change, utilizing feedback for self-enhancing and self-corrective actions. Processes are:  Measureable because they are performance oriented  Have specific results  Provide these results to stakeholders  Respond to a specific event – either continually or iteratively – originating from that event.
  • 22. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Measure alignment with City of London public services using traceability to paragraphs and sections in the Master Plan to the portfolio of projects managed in TSD. Organize TSD around the management of Projects, Programs, and Portfolio of projects with units of measure meaningful to the decision makers. Line of sight traceability of projects to the CoL Strategic Plan to portfolio of projects Monetized investment analysis of all TSD work in the portfolio Develop a portfolio management process using P3M3 guidance Use PPM to select and prioritize projects in the portfolio Select project based on “real options” decision making Operational excellence metrics met Monetized performance metrics met within variance bands Performance communicated to IT staff and others Performance measures for the 7 P3M3 perspectives. Criteria defined for selecting projects To be operationally excellent requires leadership, teamwork and problem solving resulting in continuous improvement throughout the City of London IT Department by focusing on the needs of the customer, empowering employees, and optimizing existing activities in the process. Once aligned with the Master Plan and IT Plan, the execution activities must be performed in the context of operational excellence. Operational aspects of City of London TSD will be guided by the ITIL Foundations of IT Service Management V3. Seven activities from the P3M3 provided during the delivery of this Operational Excellence are: (1) Management Control; (2) Benefits Management; (3) Budget Management; (4) Stakeholder Management; (5) Risk Management; (6) Organizational Governance; and (7) Resource Management. Focus IT activities on systems and application integration to enable people, processes, and technology to be traceable to IT Tech Plan and City of London Master Plan, guided by ITIL Foundations V3 and OGC P3M3 processes. Develop, align and execute TSD initiatives with the IT Technology Plan and City of London Master Plan P1: Use ITIL for Operational Excellence Provide Operational Excellence ITIL V3 guidance
  • 23. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Define and oversee measures connected to customer facing performance of all initiatives. Define and oversee measures connected to all internal operations in support of external initiatives. Identify stakeholders and their specific needs Use Stakeholder Typography to classify and engage stakeholders [1] Identify stakeholders and their specific needs Define risk, value, and relationship interactions Business Rqmnts and Value Prop documents created for all initiatives % of Service Requests that provide risk and value criteria Stakeholder management is the process of managing the expectations of anyone that has an interest in a project or will be effected by its deliverables or outputs. Managing stakeholders means knowing what stakeholders want, defining what products and services TSD is capable of providing, and confirming that the Stakeholders agree with and acknowledge that TSD has the capabilities to provide those products and services. This starts with identifying the Stakeholders and their attributes. Stakeholder management is embedded in the overall risk management of projects and portfolios of projects managed by TSD. Provide measureable operational excellence for all activities performance by TSD around stakeholder management. Define and deploy management process to provide operational excellence for the Race to the Top Initiative to the external and internal stakeholders. P2: Stakeholder Management Customer Satisfaction Surveys with at least 70% satisfaction
  • 24. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Create a service improvement plan based on the seven step improvement process defined by ITIL. Create an organization that includes a CSI Management and Service Management role in City of London TSD Processes are the internal affairs of the City of London TSD as a service provider. The first step is the activities that focus on gaining control of the systems that provide internally focused services. Until this control is established, external focus will be difficult. Create a Continual Service Improvement (CSI) process to support the needs of the Stakeholder. Apply a repeating pattern of improvement efforts that allow City of London TSD to better meet internal and external stakeholder needs. P3: Continual Improvement Perform CSI audits and take corrective actions Establish CSI baselines and criteria for improvement Create Service Management Office Establish SMO mandate and objectives
  • 25. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Develop of an Information Security policy and governance (Controls) process. Develop an Information Security Management System (ISMS) to plan, implement, evaluate and maintain the information management policy and governance processes Information security is aligned with IT and business security is managed effectively in all services and service management operations . This includes: Information is available and useable when necessary (availability) Information is available exclusively to authorized persons (confidentially) The information is complete, accurate, and programs against unauthorized changes (integrity) Information and information exchanges between other systems re reliable (authenticity) Develop a security management framework in alignment with the TSD governance process. Align IT and business process security to ensure effective management of services. P4: Security and Privacy Information Security policies in place Plan in place for regular review of policies IS Strategy developed, approved and communicated IS Plan for 1 Year tactical and 3 year strategic in place Compliance monitored and non-compliance escalated Acceptable Use policy, PCI policy, TSD policy Monitoring and escalation procedures in place Compliance monitored and non-compliance escalated
  • 26.
  • 27. Learning & Growth Perspective How do we align our intangible assets – people, systems, and culture – to improve critical processes? The Learning-and-growth metrics is a framework for quantitatively assessing stakeholder satisfaction, productivity, and retention in the framework of the balanced scorecard (City of London). These Goals, Critical Success Factors, and Key Performance Indicators of the learning-and-growth perspective is “the foundation for all strategy” (Kaplan & Norton, 2001, p. 93). These metrics are not just behavioral and statistical but “developmental.”
  • 28. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Define the End Values to be delivered through the culture in terms of quality, excellence, reliability, innovation, and budget management success. Define the Instrumental Values to be the desired behaviors in terms of standards, respect for tradition and authority. Aligning City of London TSD culture with the Balanced Scorecard strategy defines how we get things done around here. Defining the Cultural Web consists of Stories, Rituals and Routines, Symbols, Organizational Structure, Control Systems, and Power Structures. This approach provides a “ways of being” to define the attitudinal aspects of how TSD operates on a daily, including personal interactions, problem solving approaches, and the situational analysis needed improve the performance of the organization, using the Katzenbach and Gallup frameworks for Teams and Employee Engagement Activities. (in the Backup Materials) Identify the existing cultural aspects and behaviors, gaps in these behaviors, and take specific action to address gaps and develop a measurable response. Create and maintain a culture of mutual support, accountability and shared outcomes for all TSD personnel. L1: Culture Identify team building opportunities, e.g. Strength Finder 2.0 Assess cultural impacts for each element of the BSC and corrective actions Corporate values aligned and adhered to Leadership Team sets the example Deploy development processes to implement corrective actions
  • 29. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Select a strategic theme or project that will enhance the TSD and take steps toward to achieving its overall strategic goal through hands on leadership of the work activities. Define the work processes of a “project leader” to focus on the delivery of beneficial outcomes that meet stakeholder needs. The leaders of an organization have the prime responsibility for the quality produced by the organization, i.e., the success of the mission. The commitment and participation of leaders have long been recognized as critical factors in successful organizations (Tichy & Devanna, 1990). [2] Only leaders have the sufficient authority, influence, and access to information to begin and maintain major organizational change. Define and deploy a leadership training, mentoring, and coaching process for all members of the City of London IT Department. Train, coach, mentor, and develop leaders in the City of London TSD department capable of delivering on the Tech Plan, Operations Plan and Master Plan L2: Leadership Mentoring and skills upgrading program Track the few critical elements of strategy for three major projects Focus on short-term view of leadership to critical areas that impact stakeholders Ensure key resources are deployed to support critical projects. # of mentoring/skills upgrading sessions Value of mentoring/skills upgrading Dedicated project resources
  • 30. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Align internal support and service units with the 4 strategic focus areas in IT Strategy 2012–2014 and cross referenced items in the City of London Master Plan. Define how leaders become accountable to the governance processes, actions, and performance through their personal involvement in planning, communications, coaching, vision, actions, and performance of TSD. The Balanced Scorecard, when developed as a strategic planning and management system, helps align an organization behind a shared vision of success, and gets the City of London TSD working on the right things and focusing on results. A scorecard is more than a way of keeping score, it is a system, consisting of people, strategy, processes, and technology. The responsibility for this critical alignment lies with the TSD leadership. Define the processes needed to be aware of why I am here and what am I doing to support the Strategic Initiatives of the City of London TSD. Align City of London TSD organization with the needs of the stakeholders to assure delivery of each strategic initiative on-time, on-budget, and compliant with the stakeholder needs L3: Alignment Leadership Team objectives aligned with IT Strategy Initiatives aligned with 4 strategic focus areas Leadership Team goals and objectives monitored, reported and acted upon
  • 31. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Provide a leadership that unifies all parts of the TSD’s staff through a methodology that turns the eyes of all TSD members to a single direction – toward the stakeholder. Develop an ongoing team work engagement process that provides the mechanism for Jon Katzenbach [5] definition of a team – a group of individuals who hold each other mutually accountable for a shared outcome. It is often difficult to improve overall organizational performance because the City of London collective goals are unclear. Employees are often only aware of the aims of their own "team island", and regard other team islands as having a different job. Individuals are often motivated to "do their bit", but they lack the overall understanding of where the organization is going or how the various team islands are supposed to work together for City of London collective good. Whereas a sports team is often characterized by a focus on goals, results and league tables, businesses are often characterized by an absence of such a unifying force. Establish “teams” that are the first point of contact for stakeholders. This includes, call center support, deep technical support, and client and stakeholder requirements and satisfaction processes. Create an organization that fosters teamwork and cooperation to improve the performance of the work of TSD. L4: Teamwork Define the organizational structure and make that visible to all TSD members Define the channels of communication and ensure all participants are informed Deploy Katzenbach’s principles across City of London TSD Leadership Team held accountable TSD teams/groups/individuals held accountable TSD ‘Restructuring plan’ complete and implemented Create a culture of “shared outcomes,” for all TSD work.
  • 32. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Create and maintain an up- to-date resource capacity plan with defined objectives reflecting current and future needs of City of London stakeholders. Use this plan to forecast performance of service requests. Align resource capacity management and the Service Portfolio and communicate this alignment to the stakeholders to confirm their understanding of what can be accomplished with the resource’s capacity. It is essential to have an analytical understanding of City of London TSD resource’s Capacity for Work. The capacity must coincide with the current and future needs of the clients and stakeholders of the City of London. Any capacity gaps must be understood and communicated to these stakeholders in units of measure meaningful to the decision making processes. Provide IT resource capacity coinciding with the current and future needs of City of London stakeholders against the justifiable costs of this capacity. Inform stakeholder of City of London TSD’s ability to respond to all non- discretionary demand for service with predictable durations and quality of performance. L5: Resource Capacity for Work Current and future capacity requirements determined Resources in place to determine and deliver requirements Corporate and Departmental Steering Committees CRM delivery of expectations Capacity Management process
  • 33. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Using the Gallup 12 assessment of business capabilities survey and define gaps and closure strategies for each of the G12 elements as shown in the City of London supporting materials pages. Discern alignment to the professional development initiatives. Assess capability and capacity for work using the G12 profile Establish a Professional Development Center for TSD staff When there is need for resources to be available to meet strategic objectives, we need to understand current and future work capability. The current capability includes an assessment of task focus, self conduct, and interpersonal perspectives of the performed activities. The future capability includes an assessment of the needed development levels and developmental potentials and the risk associated with regressing to lower levels of capability based on a systems thinking approach to capacity planning. Identify the capabilities for the needed services of City of London Clients and Stakeholders through an assessment of these needs in a survey instrument and direct “customer contact.” Provide the needed technical, operational, and interpersonal capabilities to meet the needed demands of City of London clients and stakeholders L6: Resource Capability for Work
  • 34.
  • 35. Budget Process Perspective What are our stakeholder and client expectations of our budget management performance? The budget perspective activities are those necessary to ensure the execution of the City of London TSD strategy in support of the Mission and Vision. This activity assigns budget to projects and controls the consumption of that budget in exchange for measurable value – both tangible and intangible.
  • 36. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Project execution performance parameters meaningful to internal decision making of the City of London TSD Project business performance parameters defined in units meaningful to the City of London Clients and Stakeholders for IT services. Project performance management starts with repeatable processes. The “baseline” of a project includes, cost, schedule, and the measures of physical percent complete. These measures are defined in units meaningful to the decision makers. Successful management of projects and the portfolio of projects starts with the Integrated Master Plan showing what capabilities will be produced for the stakeholders, what significant accomplishments must be completed, the success criteria for those accomplishments, and the work efforts (in the form a work package) are needed for complete the Accomplishment Criteria. These activities are arranged in the Integrated Master Schedule (IMS) and placed on baseline. The IMS is a resource loaded activity network include schedule and cost margins. Establish a project performance management system using cost, schedule, and technical performance measures to increase the probability of success for each City of London TSD project. Install and operate a project, program, and portfolio governance process to increase the probability of success of each project produced by City of London TSD B1: Project Performance Cost performance Schedule performance Project business performance measures Customer satisfaction measures Technical performance Integrated Master Plan in place Performance metrics defined % of non-compliance Survey results Non-compliance defined
  • 37. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Defines budget management and submittal, authorization processes to maintain the integrity of the Integrated Master Schedule. Define and deploy a Change Management Process guided by PMBOK and ITIL processes to ensure the integrity of the Integrated Master Schedule. Financial assets are necessary to support the ownership or use of all assets. Resources and capabilities form the basis for the value of a service. Financial management is an integrated element of service management. Budget management provides vital information needed to ensure effective and efficient service delivery, allowing the TSD to justify expenditures and allocate funding directly to the services. Establish budget management, forecasting, and performance management services for all projects in the City of London TSD portfolio. Assure the management of City of London TSD budget and the assets are guided by the IT Governance processes. B2: Budget Management Costs are optimized Waste eliminated ITSM Change Management (?) Investment Management Board $$$ saved and re- purposed Contracts cancelled or renegotiated Controls in place
  • 38. Narrative Of The Contents Of This City of London “Card” Strategic Initiative Performance Goal Critical Success Factor Key Performance Indicators Strategic Theme TSD Balanced Scorecard Create a resource pool management system starting with the measurable “capacity for work” that ensures over commitments are not made without explicit approval and the resulting accountability of senior management Provide forecasts of needed resources using the Integrated Master Schedule as the “approved” demand for work. Resources and capabilities are types of assets. The management of the City of London TSD resources creates value in the form of services and IT applications. Management, organization, people, and knowledge convert these resources into value. The TSD capacity for work is the starting point for resource management. The capacity for work of a mix of people, processes, tools, systems, and organizational structures along with intangible assets of ideas and culture. The latter – “intangible assets” – is the Critical Success Factor for City of London TSD’s success. Provide tools, processes, and leadership needed to manage resources for all TSD activities. Provide tools and processes needed to manage City of London TSD resources to meet the demand of the Stakeholders B3: Resource Management Resource Allocation Program/Plan Resource Allocation tools and reporting Master Schedule Committed resources Controls for over-resourcing in place
  • 40. Gallup Q12 elements G12 Critical Employee Engagement Activities Outcomes for the City of London Leadings and Growth Perspective I know what is expected of me at work. We have a shared outcome for all work activities I have the materials and equipment I need to do my work right. In the Master Schedule all needed resources are defined and available on the planned date At work, I have the opportunity to do what I do best every day. Work activities are agreed to by the performing element In the last seven days, I have received recognition or praise for good work. Katzenbach’s “teaming” processes are in place and operational. My supervisor or the person I report seems to care about me as a person. There is someone at work who encourages my development. In the last six months, someone at work has talked with me about my progress. At work, my opinions seem to count. The mission/purpose of my company makes me feel my job is important. Using the City of London, trace all activities to a strategic initiative My associates (fellow employees) are committed to doing quality work. Measures of success include measures of effectiveness for the clients and stakeholders and measures of performance for the products and services I have a best friend at work.
  • 41. 10 Ways to Build Capability 1. Create a leadership/coaching system that links all business functions. 2. Right Action=Reward the right: people, things, ways, time and reasons. 3. Create the feeling in your organization that people can fail to succeed. 4. Create the necessary infrastructure to connect people with metrics. 5. Become a teaching organization and teach at every level continuously. 6. Enable people with development opportunities to higher levels of function. 7. Understand appreciative coaching and how to build a culture around it. 8. Make it fun to work in your company.
  • 42. References [1] A Typology of Operational Approaches for Stakeholder Analysis and Engagement, Dr. Jing (Rebecca) Yang. Deakin University Prof. Ping Qi (Geoffrey) Shen, Hong Kong Polytechnic University, Dr. Lynda Bourne, Stakeholder Management Pty Ltd Christabel MF Ho & Dr. Xiaolong Xue. http://www.stakeholdermapping.com/ [2] Transformational Leader, Tichy and Devanna, 1997 [3] OGC P3M3 (Project, Program, Portfolio Management Maturity Model) http://www.p3m3-officialsite.com/ [4] ITIL Foundations V3 [5] Jon Katezenbach, “Unleashing the Power of Teams: From Theory to Execution, Booz and Company. The Wisdom of Teams: Creating the High-Performance Organization. [6] Deriving Enterprise-Based Measures Using the Balanced Scorecard and Goal-Driven Measurement Techniques, Wolfhart Goethert Matt Fisher October 2003, Software Engineering Measurement and Analysis Initiative, Technical Note, CMU/SEI-
  • 43. A Final Thought – It’s All About Execution
  • 44. 44
  • 45. Next Steps  Complete the CSF review  Define KPIs for each CSF and confirm they produce measurable outcomes  Syndicate the CSFs and KPIs with those accountable for the performance outcomes  Rebuild the scorecard and connect the dots between the Initiatives (contents of the perspectives)  Reconfirm that all participants have sufficient understanding to move to the implementation step  Pick the first department or function for 45