Investment in reliability program versus return – how to decide
Fred Schenkelberg, Ops A La Carte, LLC

Key Words: Reliability, program, planning, investment, ROI

                SUMMARY & CONCLUSIONS                                 cost in resources, time, or materials. Focusing on tasks that
                                                                      effectively and efficiently move the design toward a market
     Selecting the right tool, or the right investment for a
                                                                      acceptable product drives the overall program’s success. One
specific reliability task is often left to the judgment of the
                                                                      aspect is the product’s reliability. Engineer and program
reliability professional. With experience these choices become
                                                                      managers can quickly estimate the cost of specific tasks, like
simpler, yet in many cases the task can be daunting. By
                                                                      Highly Accelerated Life Test (HALT) or Accelerated Life
examining the decision process we explore a means to
                                                                      Test (ALT). Yet, the value returned to the program is not as
determine the most cost effective reliability activities for
                                                                      clear.
specific situations.
                                                                           This paper explores a few examples and situations to
     Not all reliability tools provide useful information or
                                                                      illustrate how to determine the Return On Investment (ROI).
timely results in every situation, yet how does one choose the
                                                                      Your actual situation is different and the resulting ROI will
best activities for a given situation. After conducting over 100
                                                                      also be different. It is the assessment of which tasks add the
reliability program assessments and working with dozens of
                                                                      most value provides a guide to building an overall reliability
design teams to build effective reliability programs, the author
                                                                      plan.
lays out an means to trade-off the cost and benefits for the
                                                                           In each of three examples explored there are numerous
appropriate selections of reliability activities.
                                                                      ‘facts’ stated that would be known by the design team. These
     Considering the constraints and the objectives - there is a
                                                                      are simply stated as facts to build information about the
best set of tools to employ during the development process to
                                                                      situation. Each case is built from an actual situation
produce a reliable product. This paper explore the cost/benefit
                                                                      experienced in my work. Also, there are many assumptions
equation in three different cases: High cost low volume, low
                                                                      made and stated as assumptions. In practice we do not have all
cost high volume and brand new technology product
                                                                      the information or facts, assumptions permit the calculation to
development situations. Considerations include risk, models,
                                                                      continue, and by stating them clearly permit the team to
processes, and technology along with customer or market
                                                                      challenge, understand and improve the calculations.
expectations. Another significant consideration is the
reliability maturity of the organization.                                           2 HALT AND TIME TO MARKET
     There isn't a single set of tools or activities that will
                                                                           Consider the development of a new game controller. High
always produce a reliable product in a cost effective manner.
                                                                      volume with the majority of sales expected immediately after
Carefully, considering the current situation and capabilities
                                                                      product launch during the holiday sales period. New design,
permit the team to select the right tools to make significant
                                                                      time to market emphasis, majority of product manufactured
progress toward a reliable product.
                                                                      prior to the start of sales, no repairs and the controller is an
                      1 INTRODUCTION                                  enabling part of a larger system. The controller’s reliability
                                                                      goal is 98% reliable over the first year of ownership when
     Many reliability activities are naturally part of design
                                                                      used as part of the game system.
engineering. Adding the weight of a radio to an aircraft is a
tradeoff between the value of the communication function and          2.1 HALT vs ALT Discussion
the cost of lifting the additional weight. Another tradeoff
                                                                           One of the basic questions facing the team is, “Will the
considered is between the value of the communication
                                                                      product meet the 98% reliability goal?” An ALT may help
function and cost of maintenance or repair. The repair cost is
                                                                      answer this question if we know which failure mechanism(s)
in part related to the reliability of the equipment.
                                                                      will lead to failure during the first year [1]. This is a new
     Seasonal consumer products may have an emphasis on
                                                                      product without any field history. Other controllers designed
time to market and the cost of lost sales. Medical products
                                                                      for this environment have experienced a range of failure
may have an emphasis on product safety and cost of potential
                                                                      causes and are often dominated by shock and vibration
product liability. For each product development team the
                                                                      damage from dropping.
ability to quantify the cost of unreliability is important in order
                                                                           The risk analysis done by the design team fully suspects
to balance the appropriate investment into achieving reliability
                                                                      that drop damage would be the most significant contributor to
objectives.
                                                                      product failures. The new controller is different enough that
     Each task related to the development of a product has a
© IEEE 2012 – Annual Reliability and Maintainability Symposium
using the field data is likely to not apply. Also, it is unknown     first year. 25% of the time, the underlying design has at least
which specific element of the design would experience failure        one major failure mechanism that may be detected and
first or at all over one year of use. Therefore, understanding       resolved prior to the start of sales.
the most likely failure mechanisms that are to occur is                    Also, consider that no testing program will uncover all
important to discover.                                               faults, yet let’s assume that only 10% of the time will HALT
      The initial project plan did not include HALT testing on       and DVT not find a major (>10% failure rate) issue. Also,
the first set of prototypes, rather it would sample from the         HALT may not find the issue while DVT does detect the fault,
second set of prototypes, 8 weeks later, just before the transfer    let’s say 50% of the time. And, let’s assume HALT finds the
of the design to manufacturing to conduct design verification        fault only 40% of the time. Note: this low rate is pessimistic
testing (DVT), including life testing. The drop testing portion      for an estimate of the ability of a well executed HALT and in
of the DVT is expected to take a week to accomplish.                 my experience HALT is much more effective.
      The reliability engineer on this program recommends                  For the value calculation, 25% chance of an unacceptable
performing HALT on the first available prototypes. Using             failure rate exists in the design, times a 40% chance of HALT
high loads of random vibration and high shock loads in the           finding the issue, times the cost avoided by having time to
HALT plan to quickly assess the design weakness related to           solve the issue without a 30 day program delay, results in an
product drop damage. The project manager requests more               expected savings of 0.25 x 0.40 x $15m = $1.5 million.
information on timing, cost and benefits (value).
2.2 HALT Cost
     There isn’t time to procure a HALT chamber within the
development schedule; therefore we let’s collect quotes from
HALT labs to conduct the testing. Let’s assume a quote of
$10k for one round of testing [2]. Of course, if there were
HALT facilities internally available this cost would be less.
     Also consider the cost of the prototypes are about 5 times
more expensive then second round prototype units. The first
round of prototypes are a small run, specialized tooling, quick                   Figure 1 HALT Value Calculation
turn production, costing approximately $1k for each unit. We
are requesting five units at an increased cost of 5 times over
later prototypes at an $800 price increase, or $4k.                  2.4 HALT ROI
     Rounding out the expected costs of engineering support,             The ROI is the ratio of the expected return over the cost.
testing equipment support, and failure analysis support, we          $1.5 million divided by $24k, which results in an ROI of over
estimate an additional cost of approximately $10k. Therefore,        60.
the total cost to the program to add HALT testing is                     This is only part of the value, as it only considered the
approximately $24k.                                                  detection of major issues thus avoiding a schedule slip. The
2.3 HALT Value                                                       HALT will also find less significant issues that wouldn’t have
                                                                     resulted in a schedule slip, yet the earlier detection would
     One of the primary benefits of HALT is the potential            reduce the cost of implementing design changes. Plus, HALT
uncovering of new failure mechanisms in the design [3]. By           may have found unique failure mechanisms beyond what the
conducting the HALT on the first available prototypes the            DVT would find, than leading to an incremental reduction in
design team increases the time available to resolve design           achieved field failure rate.
errors or make design improvements. Designers tend to design
away from failures; HALT is a tool to discover previously                            3 ALT AND MARKET SHARE
unknown (or unsuspected) failure mechanisms.                              A design team working on a medical device understands
     Let’s assume (for purpose of this example) the design           that the market share is related to the product reliability. The
prior to any testing has a 25% chance of a failure mechanism         current product performs adequately yet has the highest field
that will lead to an unacceptably high first year failure rate. In   failure rate of similar products. Customers complain about the
discussions with the program manager we learn that they              poor reliability and the market share reflects their comparative
would delay the start of production if there were a 10% or           reliability ranking. The product with the highest market share
higher expected field failure rate. And, the cost of the delay       is also the most reliable.
was estimated at $500k per day in lost sales. With an assumed             The design challenge is to create a product that is more
30 days to design and implement an improvement to resolve a          reliable than the competition at about the same price point and
major reliability issue, that would cost the program $500k/day       if possible with improved functionality. The early concepts all
for 30 days, or $15 million.                                         include a novel design using an unproven (reliability) sealing
     There is a good chance the design is fine and will meet         material. The uncertainty suggests the implementation of an
the reliability objectives. Let’s assume 75% of the time the         accelerated life test to estimate the expected product
design has an overall failure rate of less than 10% over the
© IEEE 2012 – Annual Reliability and Maintainability Symposium
reliability.                                                       the testing complexity and result in lower overall costs.
     Achieving the higher reliability is expected to result in          The cost of the subsystem that holds the seal is $200 each.
more than tripling the market share in the first year. This        230 x $200 estimates the cost for samples of $46k. Therefore,
would result is sales of the $3k/unit priced product to jump       the total cost of the ALT is approximately $96k.
from 10k per year now to approximately 30k per year. This
                                                                   3.3 ALT Value
would be an additional $60m in revenue. Furthermore, the
increase in sales would require more than doubling the                  In this situation the test results provide a binary result.
manufacturing capacity at a cost of $5 million. The decision to    The population either does or does not achieve at least 99%
increase the manufacturing capacity is dependent on the            reliability. Keeping in mind the ALT is run with a sample to
estimated product reliability. In order to have the capacity       represent the population there is some uncertainty about the
available to meet the expected demand the decision has be          results. Statistical error may lead to four outcomes as shown in
made and the $5 million committed prior to the start of            table 1 [6]. Assuming the test design used 90% confidence and
production.                                                        has a 90% power, we have a 10% chance of thinking the
                                                                   reliability is less than it actually is, and not invest in added
                                                                   manufacturing capacity (lost opportunity for increased sales).
3.1 Reliability Goal and ALT Discussion
                                                                   And, we have a 10% chance of thinking the reliability is better
     The current product achieves 90% reliability over two         than 99% when it is not, thus investing in added capacity
years. The best competitive product is estimated to achieve        when demand will not materialize.
98% reliability over the same period. The goal for the new
design is 99% reliable over two years or better. This is a major
goal and simply conducting an ALT is not going to achieve                                    The unknown actual Reliability
the result. Yet, a key element is the understanding if the goal                                       is less then 99%
has been achieved or not. The $5 million investment in             Test Result              Is TRUE                 Is FALSE
manufacturing depends on knowing if the design will or will        R >= 99%               Type I error               Correct
not meet the goal.                                                 R < 99%                   Correct               Type II error
     ALT in this case can answer the question as it’s focused                         Table 1 Statistical Errors
on the expected dominant failure mechanism [4]. The failure
mechanism and the stresses are all known. The new design               Going in to the ALT we have a 50/50 chance that the new
using novel material does leave the uncertainty around how         material and design will meet the 99% reliability goal.
the design will actually perform. A well designed ALT has the      Combining that with the uncertainty of statistical error and a
capability to ascertain the expected reliability performance.      $5m decision, we can calculate the value of the test.
3.2 ALT Cost
     ALT is often an expensive test to conduct. The test
design, samples, product operation jigs (robots, actuators,
software, etc.), monitoring equipment and failure analysis all
add to the cost. Let’s assume the total test planning and setup
cost is $50k.
     The high reliability to demonstrate will require a
significant number of samples. The following formula [5]
provides a rough estimate of the number of samples needed
for a test to demonstrate 99% reliability with 90% confidence
assuming no failures of any tested samples.                                      Figure 2 ALT Value Calculations

                 ln(1−C) ln(1− 0.9)
           n=            =          ≅ 230                    (1)
                   ln(R)   ln(0.99)                                3.4 ALT ROI
                                                                        The ROI is the ratio of the expected return over the cost.
    Where,                                                         $4m over $96k results in an ROI of over 41.
    n is the sample size                                                Of course, the $5m decision isn’t the only factor in the
    C is the statistical confidence                                value of the ALT. It also provides a base line for further
    R is the reliability                                           testing (test cost savings), it may provide information on the
                                                                   amount of margin the design has over the goal and permit
     The 230 sample number is based on a success testing           further design enhancements. It also confirms the change in
approach assuming the failure mechanism and associated             reliability permitting a proactive changes in warranty accruals
stress is well understood. Reducing the sample size with the       and service and repair operations.
use of degradation testing, or some other method may increase
© IEEE 2012 – Annual Reliability and Maintainability Symposium
program.
         4 DERATING AND FIELD FAILURE RATE                          4.3 Derating Value
     The specialized test and measurement industry creates               The primary value of component derating is the increase
very complex electronic equipment, which are expensive tools        circuit robustness of the product leads to fewer field failures
with total production of maybe 50 per year over a four year         [7]. The cost of a field failure is expensive, due to the
period. And, like other high cost/low volume products the cost      replacement cost, failure analysis, and possible redesign and
of failure is very high.                                            qualification costs. Let’s assume that each field failure has an
     Because the unit costs are very high, the ability to test      average cost $2m or four times the sales price.
sufficient numbers of units to failure or at all, is severely            Reducing a 10% annual failure rate (a low estimate for
limited. It is not uncommon to have only one or two units for       such complex products) to 5% would results in 2.5 fewer $2m
all qualification testing. Furthermore, the complexity of the       failures per year for an annual savings of $5m.
units provide multiple possible failure mechanisms and only
rarely does the design provide a clear dominate failure
                                                                    4.4 Derating ROI
mechanism to focus reliability evaluations.
     Given the barriers to conducting physical testing, the              The ROI is the ratio of the expected return over the cost.
reliability team recommends implementing detailed derating          With a cost of $6 million and return of only $5m, the ROI is
analysis for the selection of every electronic component.           less than one at 0.83.
     The design team does use some derating concepts, yet                If the starting failure rate or cost of failure is low then this
only based on a 50% guideline and without detailed analysis.        ROI may not exceed the breakeven point. Also, consider the
Therefore, the project manager has requested more                   market and competition impact. If the high failure rate caused
information about the process, costs, and value.                    a loss of market share, that may further increase the cost of
                                                                    failure. Currently, implementing derating does not make sense
                                                                    in this situation.
4.1 Derating and Field Failures Discussion
     Derating is the selection of components that have ratings
                                                                          5 RELIABILITY MATURITY CONSIDERATIONS
(power, voltage, etc) above the expected stress [. Selecting a
capacitor that bridges a 5 volt potential that has a voltage             Organizations have different capabilities and approaches
rating of 10 volts would be considered a 50% derating.              to reliability. In some, product reliability is not considered and
Selecting components that match the expected stress and             the product performance is fairly random and unpredictable.
rating generally lead to premature failure of the components.       Other organizations do considerable testing and use a wide
The ratings vendors provide only imply the component can            range of tools to improve reliability, yet the testing and tools
experience the stress at the rated value for a very short time.     are generally done in response to customer complaints and
Derating provides a margin to minimize the accumulation of          field failures. And a few organizations are proactive in the
damage or the chance exposure of high enough stress to cause        selection of high value reliability design activities [8].
a failure. The same concept applied for mechanical designs               The base culture of reactive or proactive with respect to
using a safety margins.                                             reliability suggests different routes to making reliability
     At Hewlett-Packard, a study of the effects of various          improvements. Less mature organizations may require training
design for reliability tools found a very high correlation          and maybe a pilot program to build acceptance of the
between well executed derating programs and low field failure       proposed changes. More mature organizations my not find
rates. This contributed to the 50% fewer field failures             additional tools with significant ROI’s, yet may understand
experienced [9]. In one particular division where the design        and be able to calculate the impact of reliability improvements
team embarked on a full implementation of derating on all           on market share or customer satisfaction.
products, realized a 50% reduction in field failures in the first        In less mature organizations the calculations for cost and
year, and continued to realized reduced failure rates over          benefit may more difficult and rely on more assumptions. That
subsequent years as more fully derated product designs              is not a reason for not doing the calculations. State the
shipped.                                                            assumptions and start the discussion to find better information
                                                                    for the assessment.
4.2 Derating Cost
                                                                         In more mature organizations, while the calculations may
     Higher rated components cost more and are generally            be easier to accomplish given the better understanding of costs
larger in size. Assuming the current bill of material cost is       and benefits, the ROI’s are likely to be smaller in a direct
$100k and with the implementation of detailed and thorough          manner. These organization also understand the value of
derating the bill of material costs rise to $200,000, or doubles.   customer satisfaction and avoiding the costs associated with
For a production run of 50 units, the cost increases to $5m.        the reactive engineering to field problems. Mature
     The additional engineering time for training, circuit          organizations do not have 25% of their design engineering
analysis, and procurement may add an additional $1m to the          resources responding to field failures.
project cost. The total cost is an additional $6m to the
© IEEE 2012 – Annual Reliability and Maintainability Symposium
6 CONCLUSIONS                                     Test Plans, and Data Analysis. Edited by S S Wilks
                                                                       Samuel. Wiley Series in Probability and Mathematical
     The decision to add a reliability specific task generally
                                                                       Statistics. New York: John Wiley & Sons, 1990, pg. 3.
adds cost to the development program. The costs are typically
                                                                  5.   Wasserman, Gary S. Reliability Verification, Testing and
easily calculated by summing engineering time, material costs,
                                                                       Analysis in Engineering Design. New York: Marcel
added samples, added time, and other direct costs. On the
                                                                       Dekker, 2003, pg. 209.
other hand, the benefit is more difficult to calculate. The
                                                                  6.   Ott, Lyman. An Introduction to Statistical Methods and
benefits may included estimated reduction of field failure
                                                                       Data Analysis. Belmont, Calif.: Duxbury Press, 1993, pg.
rates, or estimated reduction in risks, or expected discovery
                                                                       216.
rates of serious field failure issue during the early design
                                                                  7.   Ireson, William Grant, Clyde F Coombs, and Richard Y
phase.
                                                                       Moss. Handbook of Reliability Engineering and
     The calculation of value before the value is realized is
                                                                       Management. New York: McGraw Hill, 1995., pg. 16.9.
difficult and often based on a series of assumptions. Stating
                                                                  8.   Crosby, Philip B. Quality Is Free: The Art of Making
the assumptions and showing the calculations permits the team
                                                                       Quality Certain. New York: Signet, 1979.
to understand the calculations and check the assumptions.
                                                                  9.   Ireson, William Grant, Clyde F Coombs, and Richard Y
Having an estimated value provides a quantitative means to
                                                                       Moss. Handbook of Reliability Engineering and
determine the return on investment. The ROI value provides a
                                                                       Management. New York: McGraw Hill, 1995, pg. 5.4.
means to determine the relative value of any investment, thus
permitting the comparison of all the investment decisions
made during a development project.                                                       BIOGRAPHIES
     Without the quantitative value calculation the team relies
                                                                  Fred Schenkelberg
on the antidotal belief that the tools will provide value. In
                                                                  Ops A La Carte, LLC
some cases this will be obvious or not a question, yet in those
                                                                  990 Richard Avenue, Suite 101
cases where there is any doubt, the examples in this paper
                                                                  Santa Clara, CA 95050, USA
provide guidance for the ROI calculation of reliability tasks.
     Every product development team faces different criteria      e-mail: fms@opsalacarte.com
for value (time, cost, etc.) and different sets of constraints
                                                                  Fred Schenkelberg is a reliability engineering and
(time, samples, test capabilities, etc.). Just like creating a
                                                                  management consultant with Ops A La Carte, with areas of
specific test plan, the ROI calculation is tailored to fit the
                                                                  focus including reliability engineering management training
situation.
                                                                  and accelerated life testing. Previously, he co-founded and
     Not every tool is appropriate to use and through the
                                                                  built the HP corporate reliability program, including
analysis of the ROI, even with estimates and assumptions,
                                                                  consulting on a broad range of HP products. He is a lecturer
provides an organization the ability to select the tools that
                                                                  with the University of Maryland teaching a graduate level
provide the best value.
                                                                  course on reliability engineering management. He earned a
                                                                  Master of Science degree in statistics at Stanford University in
                       REFERENCES
                                                                  1996. He earned his bachelors degrees in Physics at the
                                                                  United State Military Academy in 1983. Fred is an active
1.   Silverman, Mike. How Reliable Is Your Product?
                                                                  volunteer with the management committee of RAMS,
     Cupertino, CA: Super Star Press, December, 2010, pg.
                                                                  currently the Chair of the American Society of Quality
     193.
                                                                  Reliability Division, active at the local level with the Society
2.   Personal Communication with Mike Silverman, June 18th,
                                                                  of Reliability Engineers and IEEE’s Reliability Society, IEEE
     2011.
                                                                  reliability standards development teams and recently joined
3.   Hobbs, Gregg K. Accelerated Reliability Engineering :
                                                                  the US delegation as a voting member of the IEC TAG 56 -
     HALT and HASS. Chichester ; New York: Wiley, 2000,
                                                                  Durability. He is a Senior Member of ASQ and IEEE. He is
     pg. 43.
                                                                  an ASQ Certified Quality and Reliability Engineer.
4.   Nelson, Wayne. Accelerated Testing: Statistical Models,




© IEEE 2012 – Annual Reliability and Maintainability Symposium

Mais conteúdo relacionado

Mais de Accendo Reliability

09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdfAccendo Reliability
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdfAccendo Reliability
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdfAccendo Reliability
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdfAccendo Reliability
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdfAccendo Reliability
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdfAccendo Reliability
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdfAccendo Reliability
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyerAccendo Reliability
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life TestAccendo Reliability
 
Getting Started with Reliability Engineering
Getting Started with Reliability EngineeringGetting Started with Reliability Engineering
Getting Started with Reliability EngineeringAccendo Reliability
 

Mais de Accendo Reliability (20)

09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdf
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf
 
03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf
 
02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf
 
01-5 CBM Facts.pdf
01-5 CBM Facts.pdf01-5 CBM Facts.pdf
01-5 CBM Facts.pdf
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyer
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life Test
 
Reliability Programs
Reliability ProgramsReliability Programs
Reliability Programs
 
Reliability Distributions
Reliability DistributionsReliability Distributions
Reliability Distributions
 
R Software and Reliability
R Software and ReliabilityR Software and Reliability
R Software and Reliability
 
Getting Started with Reliability Engineering
Getting Started with Reliability EngineeringGetting Started with Reliability Engineering
Getting Started with Reliability Engineering
 
ALT Approaches for Reliability
ALT Approaches for ReliabilityALT Approaches for Reliability
ALT Approaches for Reliability
 
Environmental Testing
Environmental TestingEnvironmental Testing
Environmental Testing
 
Break the Always Cycle
Break the Always CycleBreak the Always Cycle
Break the Always Cycle
 

Último

The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 

Último (20)

The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 

2012 RAMS Investment in Reliability Program versus Return – How to Decide

  • 1. Investment in reliability program versus return – how to decide Fred Schenkelberg, Ops A La Carte, LLC Key Words: Reliability, program, planning, investment, ROI SUMMARY & CONCLUSIONS cost in resources, time, or materials. Focusing on tasks that effectively and efficiently move the design toward a market Selecting the right tool, or the right investment for a acceptable product drives the overall program’s success. One specific reliability task is often left to the judgment of the aspect is the product’s reliability. Engineer and program reliability professional. With experience these choices become managers can quickly estimate the cost of specific tasks, like simpler, yet in many cases the task can be daunting. By Highly Accelerated Life Test (HALT) or Accelerated Life examining the decision process we explore a means to Test (ALT). Yet, the value returned to the program is not as determine the most cost effective reliability activities for clear. specific situations. This paper explores a few examples and situations to Not all reliability tools provide useful information or illustrate how to determine the Return On Investment (ROI). timely results in every situation, yet how does one choose the Your actual situation is different and the resulting ROI will best activities for a given situation. After conducting over 100 also be different. It is the assessment of which tasks add the reliability program assessments and working with dozens of most value provides a guide to building an overall reliability design teams to build effective reliability programs, the author plan. lays out an means to trade-off the cost and benefits for the In each of three examples explored there are numerous appropriate selections of reliability activities. ‘facts’ stated that would be known by the design team. These Considering the constraints and the objectives - there is a are simply stated as facts to build information about the best set of tools to employ during the development process to situation. Each case is built from an actual situation produce a reliable product. This paper explore the cost/benefit experienced in my work. Also, there are many assumptions equation in three different cases: High cost low volume, low made and stated as assumptions. In practice we do not have all cost high volume and brand new technology product the information or facts, assumptions permit the calculation to development situations. Considerations include risk, models, continue, and by stating them clearly permit the team to processes, and technology along with customer or market challenge, understand and improve the calculations. expectations. Another significant consideration is the reliability maturity of the organization. 2 HALT AND TIME TO MARKET There isn't a single set of tools or activities that will Consider the development of a new game controller. High always produce a reliable product in a cost effective manner. volume with the majority of sales expected immediately after Carefully, considering the current situation and capabilities product launch during the holiday sales period. New design, permit the team to select the right tools to make significant time to market emphasis, majority of product manufactured progress toward a reliable product. prior to the start of sales, no repairs and the controller is an 1 INTRODUCTION enabling part of a larger system. The controller’s reliability goal is 98% reliable over the first year of ownership when Many reliability activities are naturally part of design used as part of the game system. engineering. Adding the weight of a radio to an aircraft is a tradeoff between the value of the communication function and 2.1 HALT vs ALT Discussion the cost of lifting the additional weight. Another tradeoff One of the basic questions facing the team is, “Will the considered is between the value of the communication product meet the 98% reliability goal?” An ALT may help function and cost of maintenance or repair. The repair cost is answer this question if we know which failure mechanism(s) in part related to the reliability of the equipment. will lead to failure during the first year [1]. This is a new Seasonal consumer products may have an emphasis on product without any field history. Other controllers designed time to market and the cost of lost sales. Medical products for this environment have experienced a range of failure may have an emphasis on product safety and cost of potential causes and are often dominated by shock and vibration product liability. For each product development team the damage from dropping. ability to quantify the cost of unreliability is important in order The risk analysis done by the design team fully suspects to balance the appropriate investment into achieving reliability that drop damage would be the most significant contributor to objectives. product failures. The new controller is different enough that Each task related to the development of a product has a © IEEE 2012 – Annual Reliability and Maintainability Symposium
  • 2. using the field data is likely to not apply. Also, it is unknown first year. 25% of the time, the underlying design has at least which specific element of the design would experience failure one major failure mechanism that may be detected and first or at all over one year of use. Therefore, understanding resolved prior to the start of sales. the most likely failure mechanisms that are to occur is Also, consider that no testing program will uncover all important to discover. faults, yet let’s assume that only 10% of the time will HALT The initial project plan did not include HALT testing on and DVT not find a major (>10% failure rate) issue. Also, the first set of prototypes, rather it would sample from the HALT may not find the issue while DVT does detect the fault, second set of prototypes, 8 weeks later, just before the transfer let’s say 50% of the time. And, let’s assume HALT finds the of the design to manufacturing to conduct design verification fault only 40% of the time. Note: this low rate is pessimistic testing (DVT), including life testing. The drop testing portion for an estimate of the ability of a well executed HALT and in of the DVT is expected to take a week to accomplish. my experience HALT is much more effective. The reliability engineer on this program recommends For the value calculation, 25% chance of an unacceptable performing HALT on the first available prototypes. Using failure rate exists in the design, times a 40% chance of HALT high loads of random vibration and high shock loads in the finding the issue, times the cost avoided by having time to HALT plan to quickly assess the design weakness related to solve the issue without a 30 day program delay, results in an product drop damage. The project manager requests more expected savings of 0.25 x 0.40 x $15m = $1.5 million. information on timing, cost and benefits (value). 2.2 HALT Cost There isn’t time to procure a HALT chamber within the development schedule; therefore we let’s collect quotes from HALT labs to conduct the testing. Let’s assume a quote of $10k for one round of testing [2]. Of course, if there were HALT facilities internally available this cost would be less. Also consider the cost of the prototypes are about 5 times more expensive then second round prototype units. The first round of prototypes are a small run, specialized tooling, quick Figure 1 HALT Value Calculation turn production, costing approximately $1k for each unit. We are requesting five units at an increased cost of 5 times over later prototypes at an $800 price increase, or $4k. 2.4 HALT ROI Rounding out the expected costs of engineering support, The ROI is the ratio of the expected return over the cost. testing equipment support, and failure analysis support, we $1.5 million divided by $24k, which results in an ROI of over estimate an additional cost of approximately $10k. Therefore, 60. the total cost to the program to add HALT testing is This is only part of the value, as it only considered the approximately $24k. detection of major issues thus avoiding a schedule slip. The 2.3 HALT Value HALT will also find less significant issues that wouldn’t have resulted in a schedule slip, yet the earlier detection would One of the primary benefits of HALT is the potential reduce the cost of implementing design changes. Plus, HALT uncovering of new failure mechanisms in the design [3]. By may have found unique failure mechanisms beyond what the conducting the HALT on the first available prototypes the DVT would find, than leading to an incremental reduction in design team increases the time available to resolve design achieved field failure rate. errors or make design improvements. Designers tend to design away from failures; HALT is a tool to discover previously 3 ALT AND MARKET SHARE unknown (or unsuspected) failure mechanisms. A design team working on a medical device understands Let’s assume (for purpose of this example) the design that the market share is related to the product reliability. The prior to any testing has a 25% chance of a failure mechanism current product performs adequately yet has the highest field that will lead to an unacceptably high first year failure rate. In failure rate of similar products. Customers complain about the discussions with the program manager we learn that they poor reliability and the market share reflects their comparative would delay the start of production if there were a 10% or reliability ranking. The product with the highest market share higher expected field failure rate. And, the cost of the delay is also the most reliable. was estimated at $500k per day in lost sales. With an assumed The design challenge is to create a product that is more 30 days to design and implement an improvement to resolve a reliable than the competition at about the same price point and major reliability issue, that would cost the program $500k/day if possible with improved functionality. The early concepts all for 30 days, or $15 million. include a novel design using an unproven (reliability) sealing There is a good chance the design is fine and will meet material. The uncertainty suggests the implementation of an the reliability objectives. Let’s assume 75% of the time the accelerated life test to estimate the expected product design has an overall failure rate of less than 10% over the © IEEE 2012 – Annual Reliability and Maintainability Symposium
  • 3. reliability. the testing complexity and result in lower overall costs. Achieving the higher reliability is expected to result in The cost of the subsystem that holds the seal is $200 each. more than tripling the market share in the first year. This 230 x $200 estimates the cost for samples of $46k. Therefore, would result is sales of the $3k/unit priced product to jump the total cost of the ALT is approximately $96k. from 10k per year now to approximately 30k per year. This 3.3 ALT Value would be an additional $60m in revenue. Furthermore, the increase in sales would require more than doubling the In this situation the test results provide a binary result. manufacturing capacity at a cost of $5 million. The decision to The population either does or does not achieve at least 99% increase the manufacturing capacity is dependent on the reliability. Keeping in mind the ALT is run with a sample to estimated product reliability. In order to have the capacity represent the population there is some uncertainty about the available to meet the expected demand the decision has be results. Statistical error may lead to four outcomes as shown in made and the $5 million committed prior to the start of table 1 [6]. Assuming the test design used 90% confidence and production. has a 90% power, we have a 10% chance of thinking the reliability is less than it actually is, and not invest in added manufacturing capacity (lost opportunity for increased sales). 3.1 Reliability Goal and ALT Discussion And, we have a 10% chance of thinking the reliability is better The current product achieves 90% reliability over two than 99% when it is not, thus investing in added capacity years. The best competitive product is estimated to achieve when demand will not materialize. 98% reliability over the same period. The goal for the new design is 99% reliable over two years or better. This is a major goal and simply conducting an ALT is not going to achieve The unknown actual Reliability the result. Yet, a key element is the understanding if the goal is less then 99% has been achieved or not. The $5 million investment in Test Result Is TRUE Is FALSE manufacturing depends on knowing if the design will or will R >= 99% Type I error Correct not meet the goal. R < 99% Correct Type II error ALT in this case can answer the question as it’s focused Table 1 Statistical Errors on the expected dominant failure mechanism [4]. The failure mechanism and the stresses are all known. The new design Going in to the ALT we have a 50/50 chance that the new using novel material does leave the uncertainty around how material and design will meet the 99% reliability goal. the design will actually perform. A well designed ALT has the Combining that with the uncertainty of statistical error and a capability to ascertain the expected reliability performance. $5m decision, we can calculate the value of the test. 3.2 ALT Cost ALT is often an expensive test to conduct. The test design, samples, product operation jigs (robots, actuators, software, etc.), monitoring equipment and failure analysis all add to the cost. Let’s assume the total test planning and setup cost is $50k. The high reliability to demonstrate will require a significant number of samples. The following formula [5] provides a rough estimate of the number of samples needed for a test to demonstrate 99% reliability with 90% confidence assuming no failures of any tested samples. Figure 2 ALT Value Calculations ln(1−C) ln(1− 0.9) n= = ≅ 230 (1) ln(R) ln(0.99) 3.4 ALT ROI The ROI is the ratio of the expected return over the cost. Where, $4m over $96k results in an ROI of over 41. n is the sample size Of course, the $5m decision isn’t the only factor in the C is the statistical confidence value of the ALT. It also provides a base line for further R is the reliability testing (test cost savings), it may provide information on the amount of margin the design has over the goal and permit The 230 sample number is based on a success testing further design enhancements. It also confirms the change in approach assuming the failure mechanism and associated reliability permitting a proactive changes in warranty accruals stress is well understood. Reducing the sample size with the and service and repair operations. use of degradation testing, or some other method may increase © IEEE 2012 – Annual Reliability and Maintainability Symposium
  • 4. program. 4 DERATING AND FIELD FAILURE RATE 4.3 Derating Value The specialized test and measurement industry creates The primary value of component derating is the increase very complex electronic equipment, which are expensive tools circuit robustness of the product leads to fewer field failures with total production of maybe 50 per year over a four year [7]. The cost of a field failure is expensive, due to the period. And, like other high cost/low volume products the cost replacement cost, failure analysis, and possible redesign and of failure is very high. qualification costs. Let’s assume that each field failure has an Because the unit costs are very high, the ability to test average cost $2m or four times the sales price. sufficient numbers of units to failure or at all, is severely Reducing a 10% annual failure rate (a low estimate for limited. It is not uncommon to have only one or two units for such complex products) to 5% would results in 2.5 fewer $2m all qualification testing. Furthermore, the complexity of the failures per year for an annual savings of $5m. units provide multiple possible failure mechanisms and only rarely does the design provide a clear dominate failure 4.4 Derating ROI mechanism to focus reliability evaluations. Given the barriers to conducting physical testing, the The ROI is the ratio of the expected return over the cost. reliability team recommends implementing detailed derating With a cost of $6 million and return of only $5m, the ROI is analysis for the selection of every electronic component. less than one at 0.83. The design team does use some derating concepts, yet If the starting failure rate or cost of failure is low then this only based on a 50% guideline and without detailed analysis. ROI may not exceed the breakeven point. Also, consider the Therefore, the project manager has requested more market and competition impact. If the high failure rate caused information about the process, costs, and value. a loss of market share, that may further increase the cost of failure. Currently, implementing derating does not make sense in this situation. 4.1 Derating and Field Failures Discussion Derating is the selection of components that have ratings 5 RELIABILITY MATURITY CONSIDERATIONS (power, voltage, etc) above the expected stress [. Selecting a capacitor that bridges a 5 volt potential that has a voltage Organizations have different capabilities and approaches rating of 10 volts would be considered a 50% derating. to reliability. In some, product reliability is not considered and Selecting components that match the expected stress and the product performance is fairly random and unpredictable. rating generally lead to premature failure of the components. Other organizations do considerable testing and use a wide The ratings vendors provide only imply the component can range of tools to improve reliability, yet the testing and tools experience the stress at the rated value for a very short time. are generally done in response to customer complaints and Derating provides a margin to minimize the accumulation of field failures. And a few organizations are proactive in the damage or the chance exposure of high enough stress to cause selection of high value reliability design activities [8]. a failure. The same concept applied for mechanical designs The base culture of reactive or proactive with respect to using a safety margins. reliability suggests different routes to making reliability At Hewlett-Packard, a study of the effects of various improvements. Less mature organizations may require training design for reliability tools found a very high correlation and maybe a pilot program to build acceptance of the between well executed derating programs and low field failure proposed changes. More mature organizations my not find rates. This contributed to the 50% fewer field failures additional tools with significant ROI’s, yet may understand experienced [9]. In one particular division where the design and be able to calculate the impact of reliability improvements team embarked on a full implementation of derating on all on market share or customer satisfaction. products, realized a 50% reduction in field failures in the first In less mature organizations the calculations for cost and year, and continued to realized reduced failure rates over benefit may more difficult and rely on more assumptions. That subsequent years as more fully derated product designs is not a reason for not doing the calculations. State the shipped. assumptions and start the discussion to find better information for the assessment. 4.2 Derating Cost In more mature organizations, while the calculations may Higher rated components cost more and are generally be easier to accomplish given the better understanding of costs larger in size. Assuming the current bill of material cost is and benefits, the ROI’s are likely to be smaller in a direct $100k and with the implementation of detailed and thorough manner. These organization also understand the value of derating the bill of material costs rise to $200,000, or doubles. customer satisfaction and avoiding the costs associated with For a production run of 50 units, the cost increases to $5m. the reactive engineering to field problems. Mature The additional engineering time for training, circuit organizations do not have 25% of their design engineering analysis, and procurement may add an additional $1m to the resources responding to field failures. project cost. The total cost is an additional $6m to the © IEEE 2012 – Annual Reliability and Maintainability Symposium
  • 5. 6 CONCLUSIONS Test Plans, and Data Analysis. Edited by S S Wilks Samuel. Wiley Series in Probability and Mathematical The decision to add a reliability specific task generally Statistics. New York: John Wiley & Sons, 1990, pg. 3. adds cost to the development program. The costs are typically 5. Wasserman, Gary S. Reliability Verification, Testing and easily calculated by summing engineering time, material costs, Analysis in Engineering Design. New York: Marcel added samples, added time, and other direct costs. On the Dekker, 2003, pg. 209. other hand, the benefit is more difficult to calculate. The 6. Ott, Lyman. An Introduction to Statistical Methods and benefits may included estimated reduction of field failure Data Analysis. Belmont, Calif.: Duxbury Press, 1993, pg. rates, or estimated reduction in risks, or expected discovery 216. rates of serious field failure issue during the early design 7. Ireson, William Grant, Clyde F Coombs, and Richard Y phase. Moss. Handbook of Reliability Engineering and The calculation of value before the value is realized is Management. New York: McGraw Hill, 1995., pg. 16.9. difficult and often based on a series of assumptions. Stating 8. Crosby, Philip B. Quality Is Free: The Art of Making the assumptions and showing the calculations permits the team Quality Certain. New York: Signet, 1979. to understand the calculations and check the assumptions. 9. Ireson, William Grant, Clyde F Coombs, and Richard Y Having an estimated value provides a quantitative means to Moss. Handbook of Reliability Engineering and determine the return on investment. The ROI value provides a Management. New York: McGraw Hill, 1995, pg. 5.4. means to determine the relative value of any investment, thus permitting the comparison of all the investment decisions made during a development project. BIOGRAPHIES Without the quantitative value calculation the team relies Fred Schenkelberg on the antidotal belief that the tools will provide value. In Ops A La Carte, LLC some cases this will be obvious or not a question, yet in those 990 Richard Avenue, Suite 101 cases where there is any doubt, the examples in this paper Santa Clara, CA 95050, USA provide guidance for the ROI calculation of reliability tasks. Every product development team faces different criteria e-mail: fms@opsalacarte.com for value (time, cost, etc.) and different sets of constraints Fred Schenkelberg is a reliability engineering and (time, samples, test capabilities, etc.). Just like creating a management consultant with Ops A La Carte, with areas of specific test plan, the ROI calculation is tailored to fit the focus including reliability engineering management training situation. and accelerated life testing. Previously, he co-founded and Not every tool is appropriate to use and through the built the HP corporate reliability program, including analysis of the ROI, even with estimates and assumptions, consulting on a broad range of HP products. He is a lecturer provides an organization the ability to select the tools that with the University of Maryland teaching a graduate level provide the best value. course on reliability engineering management. He earned a Master of Science degree in statistics at Stanford University in REFERENCES 1996. He earned his bachelors degrees in Physics at the United State Military Academy in 1983. Fred is an active 1. Silverman, Mike. How Reliable Is Your Product? volunteer with the management committee of RAMS, Cupertino, CA: Super Star Press, December, 2010, pg. currently the Chair of the American Society of Quality 193. Reliability Division, active at the local level with the Society 2. Personal Communication with Mike Silverman, June 18th, of Reliability Engineers and IEEE’s Reliability Society, IEEE 2011. reliability standards development teams and recently joined 3. Hobbs, Gregg K. Accelerated Reliability Engineering : the US delegation as a voting member of the IEC TAG 56 - HALT and HASS. Chichester ; New York: Wiley, 2000, Durability. He is a Senior Member of ASQ and IEEE. He is pg. 43. an ASQ Certified Quality and Reliability Engineer. 4. Nelson, Wayne. Accelerated Testing: Statistical Models, © IEEE 2012 – Annual Reliability and Maintainability Symposium