SlideShare a Scribd company logo
1 of 4
Download to read offline
1 
 
Name: Mohammad A. Alfaraj
Mobile: +966551036099
Email: farajma2020@gmail.com 
Profile
A highly motivated and enthusiastic project engineer professional specialize in
instrumentation and control system. Operating in the project management department for
one of the leading oil and gas company (Saudi Aramco). Has the flair and talent in
managing projects throughout the life cycle, achieving a quality delivery where stringent
deadlines and budget constraints are present. Thinks in a strategic manner and possesses
strong interpersonal, strategic planning, communication, negotiation, and problem
solving skills. Has an academic qualification of a Master of Business, Administration and
Engineering MBA&E from German University.
Career and Experience
Project Engineer 2003-2009
Had the responsibility within team work in managing successful program mainly control
system and control room replacement for Aramco to its Gas Oil Separation Plants
(GOSPs). Actively and self-motivation within the team to achieve the projects goals from
defining the scope to installing the new control systems in the new control building.
The goal of the control system upgrade program are to have the GOSPs working
more efficient and safer.
Main Achievements
 Work on control system upgrade program
 BI-08260 Ain Dar GOSPS 4, 6 Control Systems upgrade to Ykogawa
DCS, Invesys ESD and SKF VMS .
 BI-08261 Uthmaniah GOSPS 8,9,10 Control Systems upgrade to
Ykogawa DCS, Invesys ESD and SKF VMS .
 BI-0370 Hawiayh 2 Gas compressor replacement and control system
installation.
 The project divided into three phases; project proposal PP, details design DD,
and construction in each of these stages my jobs were.
 Project proposal phase:
 The estimate of the projects the materiel and manpower needed.
 As Saudi Aramco rep, I am responsible to have the projects are
well defined and cover all Saudi Aramco standards and
procedure.
2 
 
 Number of ESD, DCS, VMS, and FF points has to be agreed
between verse departments as project rep coordination between
them is essential.
 Project schedule.
 Support lead Project proposal 30%, 60% and 100% meeting
review.
 Details design phase:
 Make the package be ready mainly for the Aramco operation and
construction contractor.
 Review and approve critical documents and drawings such as:
 Project Scope of work,
 MTOs,
 P&IDs,
 ILDs,
 Logic Drawings,
 ISS,
 And many other related to control System upgrade.
 I/Os points such as DCS , ESD, VMS, and FF are completed.
 The control room construction details structure and furniture.
 All materials are defined and agreed between Aramco
departments and within budget.
 Support the details design review meeting.
 Aramco‘s PMT rep to have most of the departments agreed in
DD, was a challenge because of the time limit and cost of the
project at the end all of them understand the projects has budget.
 Construction phase:
 This phase was the most challenging one.
 Selecting and evaluating the construction contractor based on:
 The manpower qualification and skills spicily in control
system.
 The tools and equipment it has.
 Awareness of Aramco Standard, quality level and safety.
 Building the control room based on Aramco’s standard.
 Factory acceptance test and site acceptance test for the control
systems.
 Commissioning the systems
 Totally involve in 3000 I/Os (AI, AO, DI, DO) successful
loop checks.
 Any filled loop to be traced and rechecked.
 Sign the pass loops.
 Aramco’s PMT, Aramco’s operation, Aramco’s
inspection, construction contractor, and design contactor
were involved.
 PMT job is to have the execution of projects within:
o budget,
o safely,
3 
 
o Aramco standard and quality,
o Operation agreement.
 Coordination between Aramco ‘s operation, inspection, construction
contractor and control system provider:
 Support in leading weekly meeting
 Control the spending hours verses accomplish activities within
schedule.
 Solve technical issues and clarify Aramco standard
 Solve outstanding items after startup the GOSP
Instrumentation Engineer 2000-2002
Working as instrument engineer for lead consultant office (Alhijelan) which provide
consultation to big companies such as SABIC and Saudi Aramco.
Main Achievements
 Involve in Over 500 drawings of As-built projects for Aramco in Bari Gas Plant.
 Within a team successfully complete instrumentation’s drawings and
specifications complying with the client’s standard.
 Accomplish projects e.g. as-built, H2S detector specification in Apqaiq plant.
 Tank level control instrumentation requirements in Aramco plant in Ras Tanurah
 Self training Microstation and CADD.
 Take the initiative to understand the client’s requirements and standards.
Skills and Abilities
 Able to use MS office word, excel, access, and power point
 Self-motivator and like to learn.
 Willing to deal with and bring new tech to support the company goal.
 Able to communicate and understand other ideas and reflect them into reality
 Willing to motivate other to serve the team success.
 Excellent in creating presentations in PowerPoint and presenting them to client.
 Able to build working process for the company
 Committed to add value within a team work to maximize the company strengths
and reduce weaknesses via applying different modern and innovative models e.g.
competitive advantages.
Education, Qualifications & Personal Development 2011-2014
University of Applied Science in Berlin, Germany
 Master of Business, Administration and Engineering MBA&E in English from the
University of Applied Science in Berlin, Germany.
 Interact with effective and professional courses.
 Gain both hard and soft leadership skills.
 Match between management and engineering to have innovative product.
4 
 
 Apply many tools and technique to achieve quality e.g. inspection
checklist, Kaizen, or TQM.
 Create completive advantages model to gain high market share.
 Learn Deutsch in Gothe-Institut B1 Level (2010-2011)
 Bachelor in Electrical Engineering from KFUPM in Dhahran, Saudi
Arabia 1994-2000.
Hobbies and Interest
Swimming and reading.

More Related Content

What's hot

MOHAMED KORASHY CV 2016 new
MOHAMED KORASHY CV 2016 newMOHAMED KORASHY CV 2016 new
MOHAMED KORASHY CV 2016 newMohamed korashy
 
Iad Zalaf C.V
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.Viad zalaf
 
Jameel ahmed cv - Cost Control Manger
Jameel ahmed cv - Cost Control MangerJameel ahmed cv - Cost Control Manger
Jameel ahmed cv - Cost Control MangerJAMEELAHMED117
 
CV - Emad Fathi CM
CV - Emad Fathi CMCV - Emad Fathi CM
CV - Emad Fathi CMemad salim
 
Front End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control TrainingFront End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control TrainingDEVELOP
 
Mohamed El Sayed - Updated CV Nov. 2015
Mohamed El Sayed - Updated CV Nov. 2015Mohamed El Sayed - Updated CV Nov. 2015
Mohamed El Sayed - Updated CV Nov. 2015Mohamed Elsayed
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi
 
Christopher Palmer - Quality Inspection 2015
Christopher Palmer - Quality Inspection 2015Christopher Palmer - Quality Inspection 2015
Christopher Palmer - Quality Inspection 2015Chris Palmer
 

What's hot (18)

Mars
Mars Mars
Mars
 
Certified Planning Engineer CPE
Certified Planning Engineer CPECertified Planning Engineer CPE
Certified Planning Engineer CPE
 
Update CV
Update CVUpdate CV
Update CV
 
Gopi 221116
Gopi 221116 Gopi 221116
Gopi 221116
 
MOHAMED KORASHY CV 2016 new
MOHAMED KORASHY CV 2016 newMOHAMED KORASHY CV 2016 new
MOHAMED KORASHY CV 2016 new
 
Brief_CV_Nahedh
Brief_CV_NahedhBrief_CV_Nahedh
Brief_CV_Nahedh
 
Mahmood_CV
Mahmood_CVMahmood_CV
Mahmood_CV
 
Iad Zalaf C.V
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.V
 
my cv
my cv my cv
my cv
 
Jameel ahmed cv - Cost Control Manger
Jameel ahmed cv - Cost Control MangerJameel ahmed cv - Cost Control Manger
Jameel ahmed cv - Cost Control Manger
 
CV - Emad Fathi CM
CV - Emad Fathi CMCV - Emad Fathi CM
CV - Emad Fathi CM
 
Ash CV NOV 2016
Ash CV NOV 2016 Ash CV NOV 2016
Ash CV NOV 2016
 
Front End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control TrainingFront End Engineering Design (FEED) Project Control Training
Front End Engineering Design (FEED) Project Control Training
 
John Scrowston CV v11
John Scrowston CV v11John Scrowston CV v11
John Scrowston CV v11
 
Mohamed El Sayed - Updated CV Nov. 2015
Mohamed El Sayed - Updated CV Nov. 2015Mohamed El Sayed - Updated CV Nov. 2015
Mohamed El Sayed - Updated CV Nov. 2015
 
Orville Whitlock Resume 2
Orville Whitlock Resume 2Orville Whitlock Resume 2
Orville Whitlock Resume 2
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
 
Christopher Palmer - Quality Inspection 2015
Christopher Palmer - Quality Inspection 2015Christopher Palmer - Quality Inspection 2015
Christopher Palmer - Quality Inspection 2015
 

Similar to Mohammad Alfaraj CV 2015

PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-Adel Alqontar
 
neil_mckie_cv_17_05_2015
neil_mckie_cv_17_05_2015neil_mckie_cv_17_05_2015
neil_mckie_cv_17_05_2015Neil Mckie
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers
 
Dlw resume march 2016 p
Dlw  resume march 2016 pDlw  resume march 2016 p
Dlw resume march 2016 pDavid Wahl
 
Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Dr Sabih Laham
 
SQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar GhoshSQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar GhoshSuman Ghosh
 
Dlw resume july 2016
Dlw  resume july 2016Dlw  resume july 2016
Dlw resume july 2016David Wahl
 
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad Samir
 
Balaji_Kumaran_Updated.doc
Balaji_Kumaran_Updated.docBalaji_Kumaran_Updated.doc
Balaji_Kumaran_Updated.docBalaji Kumaran
 
Resume - Farhan Ahmed Memon - June 20, 2015
Resume - Farhan Ahmed Memon - June 20, 2015Resume - Farhan Ahmed Memon - June 20, 2015
Resume - Farhan Ahmed Memon - June 20, 2015Engr. Farhan Ahmed Memon
 

Similar to Mohammad Alfaraj CV 2015 (20)

Rahimulla CV
Rahimulla CVRahimulla CV
Rahimulla CV
 
CV ABHI 06-09 - Copy
CV ABHI 06-09 - CopyCV ABHI 06-09 - Copy
CV ABHI 06-09 - Copy
 
CV ABHIJIT 04-03-2015
CV ABHIJIT 04-03-2015CV ABHIJIT 04-03-2015
CV ABHIJIT 04-03-2015
 
CV-Ganeshkumar D
CV-Ganeshkumar DCV-Ganeshkumar D
CV-Ganeshkumar D
 
PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-
 
neil_mckie_cv_17_05_2015
neil_mckie_cv_17_05_2015neil_mckie_cv_17_05_2015
neil_mckie_cv_17_05_2015
 
MARTY_PATE
MARTY_PATEMARTY_PATE
MARTY_PATE
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
 
NPS_L
NPS_LNPS_L
NPS_L
 
NPS_L
NPS_LNPS_L
NPS_L
 
Dlw resume march 2016 p
Dlw  resume march 2016 pDlw  resume march 2016 p
Dlw resume march 2016 p
 
Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015
 
SQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar GhoshSQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar Ghosh
 
Dlw resume july 2016
Dlw  resume july 2016Dlw  resume july 2016
Dlw resume july 2016
 
Ahmed Badr CV
Ahmed Badr CVAhmed Badr CV
Ahmed Badr CV
 
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
 
Balaji_Kumaran_Updated.doc
Balaji_Kumaran_Updated.docBalaji_Kumaran_Updated.doc
Balaji_Kumaran_Updated.doc
 
Certified Planning Engineer CPE
Certified Planning Engineer CPE Certified Planning Engineer CPE
Certified Planning Engineer CPE
 
Resume - Farhan Ahmed Memon - June 20, 2015
Resume - Farhan Ahmed Memon - June 20, 2015Resume - Farhan Ahmed Memon - June 20, 2015
Resume - Farhan Ahmed Memon - June 20, 2015
 
Mayank Mathur- New
Mayank Mathur- NewMayank Mathur- New
Mayank Mathur- New
 

Mohammad Alfaraj CV 2015

  • 1. 1    Name: Mohammad A. Alfaraj Mobile: +966551036099 Email: farajma2020@gmail.com  Profile A highly motivated and enthusiastic project engineer professional specialize in instrumentation and control system. Operating in the project management department for one of the leading oil and gas company (Saudi Aramco). Has the flair and talent in managing projects throughout the life cycle, achieving a quality delivery where stringent deadlines and budget constraints are present. Thinks in a strategic manner and possesses strong interpersonal, strategic planning, communication, negotiation, and problem solving skills. Has an academic qualification of a Master of Business, Administration and Engineering MBA&E from German University. Career and Experience Project Engineer 2003-2009 Had the responsibility within team work in managing successful program mainly control system and control room replacement for Aramco to its Gas Oil Separation Plants (GOSPs). Actively and self-motivation within the team to achieve the projects goals from defining the scope to installing the new control systems in the new control building. The goal of the control system upgrade program are to have the GOSPs working more efficient and safer. Main Achievements  Work on control system upgrade program  BI-08260 Ain Dar GOSPS 4, 6 Control Systems upgrade to Ykogawa DCS, Invesys ESD and SKF VMS .  BI-08261 Uthmaniah GOSPS 8,9,10 Control Systems upgrade to Ykogawa DCS, Invesys ESD and SKF VMS .  BI-0370 Hawiayh 2 Gas compressor replacement and control system installation.  The project divided into three phases; project proposal PP, details design DD, and construction in each of these stages my jobs were.  Project proposal phase:  The estimate of the projects the materiel and manpower needed.  As Saudi Aramco rep, I am responsible to have the projects are well defined and cover all Saudi Aramco standards and procedure.
  • 2. 2     Number of ESD, DCS, VMS, and FF points has to be agreed between verse departments as project rep coordination between them is essential.  Project schedule.  Support lead Project proposal 30%, 60% and 100% meeting review.  Details design phase:  Make the package be ready mainly for the Aramco operation and construction contractor.  Review and approve critical documents and drawings such as:  Project Scope of work,  MTOs,  P&IDs,  ILDs,  Logic Drawings,  ISS,  And many other related to control System upgrade.  I/Os points such as DCS , ESD, VMS, and FF are completed.  The control room construction details structure and furniture.  All materials are defined and agreed between Aramco departments and within budget.  Support the details design review meeting.  Aramco‘s PMT rep to have most of the departments agreed in DD, was a challenge because of the time limit and cost of the project at the end all of them understand the projects has budget.  Construction phase:  This phase was the most challenging one.  Selecting and evaluating the construction contractor based on:  The manpower qualification and skills spicily in control system.  The tools and equipment it has.  Awareness of Aramco Standard, quality level and safety.  Building the control room based on Aramco’s standard.  Factory acceptance test and site acceptance test for the control systems.  Commissioning the systems  Totally involve in 3000 I/Os (AI, AO, DI, DO) successful loop checks.  Any filled loop to be traced and rechecked.  Sign the pass loops.  Aramco’s PMT, Aramco’s operation, Aramco’s inspection, construction contractor, and design contactor were involved.  PMT job is to have the execution of projects within: o budget, o safely,
  • 3. 3    o Aramco standard and quality, o Operation agreement.  Coordination between Aramco ‘s operation, inspection, construction contractor and control system provider:  Support in leading weekly meeting  Control the spending hours verses accomplish activities within schedule.  Solve technical issues and clarify Aramco standard  Solve outstanding items after startup the GOSP Instrumentation Engineer 2000-2002 Working as instrument engineer for lead consultant office (Alhijelan) which provide consultation to big companies such as SABIC and Saudi Aramco. Main Achievements  Involve in Over 500 drawings of As-built projects for Aramco in Bari Gas Plant.  Within a team successfully complete instrumentation’s drawings and specifications complying with the client’s standard.  Accomplish projects e.g. as-built, H2S detector specification in Apqaiq plant.  Tank level control instrumentation requirements in Aramco plant in Ras Tanurah  Self training Microstation and CADD.  Take the initiative to understand the client’s requirements and standards. Skills and Abilities  Able to use MS office word, excel, access, and power point  Self-motivator and like to learn.  Willing to deal with and bring new tech to support the company goal.  Able to communicate and understand other ideas and reflect them into reality  Willing to motivate other to serve the team success.  Excellent in creating presentations in PowerPoint and presenting them to client.  Able to build working process for the company  Committed to add value within a team work to maximize the company strengths and reduce weaknesses via applying different modern and innovative models e.g. competitive advantages. Education, Qualifications & Personal Development 2011-2014 University of Applied Science in Berlin, Germany  Master of Business, Administration and Engineering MBA&E in English from the University of Applied Science in Berlin, Germany.  Interact with effective and professional courses.  Gain both hard and soft leadership skills.  Match between management and engineering to have innovative product.
  • 4. 4     Apply many tools and technique to achieve quality e.g. inspection checklist, Kaizen, or TQM.  Create completive advantages model to gain high market share.  Learn Deutsch in Gothe-Institut B1 Level (2010-2011)  Bachelor in Electrical Engineering from KFUPM in Dhahran, Saudi Arabia 1994-2000. Hobbies and Interest Swimming and reading.