NORTH WEST STREET SIDEWALK IMPROVEMENTS
FROM GREAT FALLS STREET TO BRILYN PLACE
Contract No. CN 19304154
Project No. ST-000036-003
Dranesville District/City of Falls Church
Tax Map No. 40-4
March 4, 2021
NORTH WEST STREET SIDEWALK IMPROVEMENTS
FROM GREAT FALLS STREET TO BRILYN PLACE
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Project Details
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Description:
North West Street Sidewalk Improvements project was substantially completed on February 10, 2021.
The project consisted of the construction of new concrete sidewalk, curb and gutter, curb ramps and
reconstruction of driveways along the north side of North West Street between Great Falls Street and
Brilyn Place. As part of this project, the North West Street - Great Falls Street intersection was
reconstructed, and the traffic signal was replaced. The construction also included drainage
improvements, installation of decorative streetlights, watermain relocation and betterments, paving,
pavement marking and signage.
The North West St. Sidewalk project is located in both Fairfax County and the City of Falls Church. The
City and the County have agreed to bid and construct the project jointly with the City reimbursing the
County for the City’s share of construction and administration costs.
Project Overview:
• Project Delivery: Design-Bid-Build
• Contract: Unit Price
NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
Project Details
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Project Team:
• Contractor
• A&M Concrete Corporation
• City of Falls Church
• Department of Public Works – Zachary Bradley , Tara Puzin
• Fairfax County
• Department of Transportation – James Beall, Gibran Abifadel , Michael Maisel
• Construction Manager, UDCD – Samuel Engida
• Project Inspector, UDCD – Abbas Eram, Joseph Adzovie
• Land Survey Branch, UDCD – Cody Harp-Taylor, Chris Jensen
• Right of Way Agent, Land Acquisition Division – Lisa Glass
NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Dranesville District, Tax Map No. 40-4 & City of Falls Church
NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Water Main and Storm Sewer Installation
NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Installation of Asphalt Paving
NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Installation of Pavement Marking
NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Signal Work and Streetlights Installation
NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Traffic Signal Work
NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
NORTH WEST STREET SIDEWALK IMPROVEMENTS
FROM GREAT FALLS STREET TO BRILYN PLACE
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
NORTH WEST STREET SIDEWALK IMPROVEMENTS
FROM GREAT FALLS STREET TO BRILYN PLACE
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Before After
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
NORTH WEST STREET SIDEWALK IMPROVEMENTS
FROM GREAT FALLS STREET TO BRILYN PLACE
Before After
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
NORTH WEST STREET SIDEWALK IMPROVEMENTS
FROM GREAT FALLS STREET TO BRILYN PLACE
Before After
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
NORTH WEST STREET SIDEWALK IMPROVEMENTS
FROM GREAT FALLS STREET TO BRILYN PLACE
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/publicworks
NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Sharon North or Irene Haske in the
DPWES Public Information Office
703-324-5500, TTY 711
Sharon.North@fairfaxcounty.gov
Irene.Haske@fairfaxcounty.gov

More Related Content

What's hot

Nancy Springer 2015 Resume
Nancy Springer  2015 ResumeNancy Springer  2015 Resume
Nancy Springer 2015 Resume
Nancy Springer
 

What's hot (20)

Workhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County TrailWorkhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County Trail
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
 
Center Road sidewalk
Center Road sidewalkCenter Road sidewalk
Center Road sidewalk
 
West Ox Road Walkway
West Ox Road WalkwayWest Ox Road Walkway
West Ox Road Walkway
 
Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020
 
Lukens Lane Intersection Improvements Phase II
Lukens Lane Intersection Improvements Phase IILukens Lane Intersection Improvements Phase II
Lukens Lane Intersection Improvements Phase II
 
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampReston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
 
Richmond Highway Bus Stop Safety and Accessibility Improvement at Six Bus Sto...
Richmond Highway Bus Stop Safety and Accessibility Improvement at Six Bus Sto...Richmond Highway Bus Stop Safety and Accessibility Improvement at Six Bus Sto...
Richmond Highway Bus Stop Safety and Accessibility Improvement at Six Bus Sto...
 
Fairfax County Old Courthouse Road Walkway Improvements August 2020
Fairfax County Old Courthouse Road Walkway Improvements August 2020Fairfax County Old Courthouse Road Walkway Improvements August 2020
Fairfax County Old Courthouse Road Walkway Improvements August 2020
 
Old Mount Vernon Road Walkway
Old Mount Vernon Road WalkwayOld Mount Vernon Road Walkway
Old Mount Vernon Road Walkway
 
Nancy Springer 2015 Resume
Nancy Springer  2015 ResumeNancy Springer  2015 Resume
Nancy Springer 2015 Resume
 
Dolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly Road
Dolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly RoadDolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly Road
Dolley Madison Boulevard Sidewalk - Old Dominion Road to Beverly Road
 
Route 50 Sidewalk from Cherry Street to Linden Lane
Route 50 Sidewalk from Cherry Street to Linden LaneRoute 50 Sidewalk from Cherry Street to Linden Lane
Route 50 Sidewalk from Cherry Street to Linden Lane
 
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy CircleSunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
 
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk ImprovementsBraddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
 
Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020
Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020
Tysons Blvd.Temporary NB Single Lane Closure June 8, 2020
 
Bus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsBus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility Improvements
 
San Bernardino County Transportation Funding Update
San Bernardino County Transportation Funding UpdateSan Bernardino County Transportation Funding Update
San Bernardino County Transportation Funding Update
 
Route 50 Sidewalk - Patrick Henry to Olin Dr.
Route 50 Sidewalk - Patrick Henry to Olin Dr.Route 50 Sidewalk - Patrick Henry to Olin Dr.
Route 50 Sidewalk - Patrick Henry to Olin Dr.
 
Fairfax County Route 50 Walkway Improvements Sept 2020
Fairfax County Route 50 Walkway Improvements Sept 2020Fairfax County Route 50 Walkway Improvements Sept 2020
Fairfax County Route 50 Walkway Improvements Sept 2020
 

Similar to Substantial Completion - North West Street Sidewalk Improvements

Similar to Substantial Completion - North West Street Sidewalk Improvements (20)

Great Falls St. Sidewalk Improvements December 2020
Great Falls St. Sidewalk Improvements December 2020Great Falls St. Sidewalk Improvements December 2020
Great Falls St. Sidewalk Improvements December 2020
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
 
North Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot ImprovementNorth Beauregard Street at North Chambliss Street Spot Improvement
North Beauregard Street at North Chambliss Street Spot Improvement
 
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
 
Silverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway ProjectSilverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway Project
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Fairfax County Sunrise Valley Drive Sidewalk North and South July 2020
Fairfax County Sunrise Valley Drive Sidewalk North and South July 2020Fairfax County Sunrise Valley Drive Sidewalk North and South July 2020
Fairfax County Sunrise Valley Drive Sidewalk North and South July 2020
 
Pohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian ImprovementsPohick Road - South Run Road Walkway Pedestrian Improvements
Pohick Road - South Run Road Walkway Pedestrian Improvements
 
Hunter Village Drive Walkway from Wentworth Place to Flax Street
Hunter Village Drive Walkway from Wentworth Place to Flax StreetHunter Village Drive Walkway from Wentworth Place to Flax Street
Hunter Village Drive Walkway from Wentworth Place to Flax Street
 
Bus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsBus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility Improvements
 
Quander Road Walkway
Quander Road WalkwayQuander Road Walkway
Quander Road Walkway
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
 
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview RoadIntersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
 
Kirby Road Sidewalk Improvements
Kirby Road Sidewalk ImprovementsKirby Road Sidewalk Improvements
Kirby Road Sidewalk Improvements
 
Sunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
Sunrise Valley Drive from Hitchcock Drive to Colts Neck DriveSunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
Sunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
 
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
 
Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020
 
Cinder Bed Road Realignment
Cinder Bed Road RealignmentCinder Bed Road Realignment
Cinder Bed Road Realignment
 
Vesper St. Shared Use Path
Vesper St. Shared Use PathVesper St. Shared Use Path
Vesper St. Shared Use Path
 
Braddock Road Walkway - Carlbern Drive to Clubside Lane
Braddock Road Walkway - Carlbern Drive to Clubside LaneBraddock Road Walkway - Carlbern Drive to Clubside Lane
Braddock Road Walkway - Carlbern Drive to Clubside Lane
 

More from Fairfax County

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 

Recently uploaded (20)

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Substantial Completion - North West Street Sidewalk Improvements

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! NORTH WEST STREET SIDEWALK IMPROVEMENTS FROM GREAT FALLS STREET TO BRILYN PLACE Contract No. CN 19304154 Project No. ST-000036-003 Dranesville District/City of Falls Church Tax Map No. 40-4 March 4, 2021
  • 2. NORTH WEST STREET SIDEWALK IMPROVEMENTS FROM GREAT FALLS STREET TO BRILYN PLACE Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  • 3. Project Details Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Description: North West Street Sidewalk Improvements project was substantially completed on February 10, 2021. The project consisted of the construction of new concrete sidewalk, curb and gutter, curb ramps and reconstruction of driveways along the north side of North West Street between Great Falls Street and Brilyn Place. As part of this project, the North West Street - Great Falls Street intersection was reconstructed, and the traffic signal was replaced. The construction also included drainage improvements, installation of decorative streetlights, watermain relocation and betterments, paving, pavement marking and signage. The North West St. Sidewalk project is located in both Fairfax County and the City of Falls Church. The City and the County have agreed to bid and construct the project jointly with the City reimbursing the County for the City’s share of construction and administration costs. Project Overview: • Project Delivery: Design-Bid-Build • Contract: Unit Price NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
  • 4. Project Details Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Project Team: • Contractor • A&M Concrete Corporation • City of Falls Church • Department of Public Works – Zachary Bradley , Tara Puzin • Fairfax County • Department of Transportation – James Beall, Gibran Abifadel , Michael Maisel • Construction Manager, UDCD – Samuel Engida • Project Inspector, UDCD – Abbas Eram, Joseph Adzovie • Land Survey Branch, UDCD – Cody Harp-Taylor, Chris Jensen • Right of Way Agent, Land Acquisition Division – Lisa Glass NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
  • 5. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Dranesville District, Tax Map No. 40-4 & City of Falls Church NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
  • 6. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Water Main and Storm Sewer Installation NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
  • 7. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Installation of Asphalt Paving NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
  • 8. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Installation of Pavement Marking NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
  • 9. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Signal Work and Streetlights Installation NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
  • 10. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Traffic Signal Work NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL.
  • 11. NORTH WEST STREET SIDEWALK IMPROVEMENTS FROM GREAT FALLS STREET TO BRILYN PLACE Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  • 12. NORTH WEST STREET SIDEWALK IMPROVEMENTS FROM GREAT FALLS STREET TO BRILYN PLACE Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  • 13. Before After Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch NORTH WEST STREET SIDEWALK IMPROVEMENTS FROM GREAT FALLS STREET TO BRILYN PLACE
  • 14. Before After Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch NORTH WEST STREET SIDEWALK IMPROVEMENTS FROM GREAT FALLS STREET TO BRILYN PLACE
  • 15. Before After Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch NORTH WEST STREET SIDEWALK IMPROVEMENTS FROM GREAT FALLS STREET TO BRILYN PLACE
  • 16. Additional Information For additional Information, please call www.fairfaxcounty.gov/publicworks NORTH WEST ST. SIDEWALK IMPROVEMENTS FROM GREAT FALLS ST. TO BRILYN PL. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Sharon North or Irene Haske in the DPWES Public Information Office 703-324-5500, TTY 711 Sharon.North@fairfaxcounty.gov Irene.Haske@fairfaxcounty.gov