Herndon Station Metro Garage

113 visualizações

Publicada em

The Herndon Station Metro Garage project provides a new six-level pre-cast parking structure with seven tiers of parking to accommodate over 2,000 added parking spaces. This project addresses the increased parking demand associated with the coming arrival of the Silver Line Metro, and supports the expanded use of public, mass transportation in the area. The project also provides secure bicycle storage for 130 bikes, energy efficient LED lighting fixtures throughout the garage, and vehicular and pedestrian bridge connections to the existing garage. Infrastructure and site improvements include utilities and road widening coordinated with the Silver Line Phase 2 project, direct vehicular garage egress to the Dulles Toll Road to reduce traffic impact on local roads, and enhanced stormwater management serving the site.

Publicada em: Governo e ONGs
  • Seja o primeiro a comentar

  • Seja a primeira pessoa a gostar disto

Herndon Station Metro Garage

  1. 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! HERNDON STATION METRO GARAGE Project Number: TF-000020-001 Hunter Mill District April 2019
  2. 2. HERNDON STATION METRO GARAGE Department of Public Works and Environmental Services | Building Design and Construction Division
  3. 3. HERNDON STATION METRO GARAGE Department of Public Works and Environmental Services | Building Design and Construction Division Project Description The project site, located at 12530 Sunrise Valley Drive, Herndon, is designated as the location of the Herndon Metro Station in Silver Line Phase 2. The new Herndon Station Metro Garage addresses the increased parking demand associated with the arrival of the Silver Line Metro, and supports the expanded use of public, mass transportation. The project site is 5.3 acres as part of the overall 28.2 acres site that also houses an existing garage, a bus loop and connections to the Dulles Toll Road, all of which remained operational during the construction of the new garage. The project provides: • A new 6 level pre-cast parking structure with 7 tiers of parking to accommodate 2,006 parking spaces, • Secure bicycles storage area for 130 bikes, • Energy Efficient LED lighting fixtures throughout the garage, • Vehicular and pedestrian connections to the existing garage by a new steel truss bridge, • Infrastructure and site improvements, including utilities and road widening as coordinated with the Silver Line Phase 2 project, • Enhanced stormwater management serving the site • Direct vehicular egress to Dulles Toll Road to reduce traffic impact on local roads. Substantial Completion: April 4, 2019 Total Project Cost: $44,900,000
  4. 4. HERNDON STATION METRO GARAGE DPWES- Building Design and Construction Division: • Gasim Elfaki, Project Coordinator, Public Private Partnerships Branch • Mohammed Abdel-Kariem, Construction Manager, Building Construction Branch • Geoffrey Kimmel, Senior Construction Manager, Building Construction Branch • Peter Duryea, Building QC Inspector, Building Construction Branch • Don Buckbee, Building QC Inspector, Building Construction Branch DPWES- Land Acquisition Division: • John Zeigler, Land Acquisition Agent Fairfax County Department of Transportation: • Mark Canale, Dulles Rail Project Manager, Fairfax County • Martha Coello, Senior Transportation Planner • Nathan Wilkinson, Transportation Planner • Pamela Rittenhouse, Transportation Planner • Kris Miller, Transportation Planner Architect: Hammel Green and Abrahamson General Contractor: Manhattan Construction Company Department of Public Works and Environmental Services | Building Design and Construction Division Project Team
  5. 5. HERNDON STATION METRO GARAGE Department of Public Works and Environmental Services | Building Design and Construction Division 12530 SUNRISE VALLEY DRIVE, HERNDON, VA 20191 New Garage Stormwater Management Project Location
  6. 6. HERNDON STATION METRO GARAGE Department of Public Works and Environmental Services | Building Design and Construction Division Pedestrian and Vehicular Bridge
  7. 7. HERNDON STATION METRO GARAGE Department of Public Works and Environmental Services | Building Design and Construction Division Garage Exterior Views EAST AND NORTH SOUTH WEST ELEVATORS AND STAIR TOWER
  8. 8. HERNDON STATION METRO GARAGE Department of Public Works and Environmental Services | Building Design and Construction Division Garage Interior Views 4th Level Elevators West Entrance Stair Tower 7th Level Elevators
  9. 9. HERNDON STATION METRO GARAGE Department of Public Works and Environmental Services | Building Design and Construction Division Garage Interior Views
  10. 10. HERNDON STATION METRO GARAGE Department of Public Works and Environmental Services | Building Design and Construction Division Secure Bicycle Storage
  11. 11. Before After Department of Public Works and Environmental Services | Building Design and Construction Division HERNDON STATION METRO GARAGE
  12. 12. Additional Information For additional Information, please call www.fairfaxcounty.gov/dpwes HERNDON STATION METRO GARAGE Matt Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.Kaiser@fairfaxcounty.gov Department of Public Works and Environmental Services | Building Design and Construction Division

×