This project included repair and replacement of 84 linear feet of 8-inch gravity sewer and approximately 100 linear feet of stream restoration.

Publicada em: Meio ambiente
  • Seja o primeiro a comentar

  • Seja a primeira pessoa a gostar disto

Gadsen Drive Emergency Gravity Sewer Repairs

  1. 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Project No. WW-000028-008 Braddock District November 2019 GADSEN DRIVE EMERGENCY GRAVITY SEWER REPAIR
  2. 2. Project Details GADSEN DRIVE EMERGENCY GRAVITY SEWER REPAIR Capital Facilities/Wastewater Design and Construction Division Description: The Gadsen Drive Emergency Gravity Sewer Repair project was substantially completed on November 8, 2019. This project included repair and replacement of 84 linear feet of 8-inch gravity sewer and approximately 100 linear feet of stream restoration. Project Overview: • Removal and proper disposal of 84 feet of asbestos pipe • Installation of 84 linear feet of gravity sewer with new ductile iron pipe • Roughly 100 linear feet of stream restoration • Site restoration Project Team: • Darwin Proano Instrumentation Technician I, Wastewater Collection Division • Atilio Urbina Instrumentation Technician II, Wastewater Collection Division • Evan Silverthorn, CCTV Supervisor, Wastewater Collection Division • Robert Hoover, PWES Specialist, Wastewater Collection Division • Robert White, Construction/Project Manager I, Wastewater Collection Division • Richard Finnell, Land Acquisition Division • Tom Grala, Wastewater Design and Construction Division • Matthew Doyle, Wastewater Design and Construction Division • Contractor: Patriot Development Corporation
  3. 3. GADSEN DRIVE EMERGENCY GRAVITY SEWER REPAIR Capital Facilities/Wastewater Design and Construction Division Gadsen Drive Roughly 84 LF of new ductile iron pipe
  4. 4. GADSEN DRIVE EMERGENCY GRAVITY SEWER REPAIR Capital Facilities/Wastewater Design and Construction Division Pre-Existing Conditions Existing stormwater drainage Broken 8” gravity sewer
  5. 5. GADSEN DRIVE EMERGENCY GRAVITY SEWER REPAIR Capital Facilities/Wastewater Design and Construction Division By-Pass Pump and Haul 24-hour pump and haul operation provided by Wastewater Collection Division, DPWES By-pass pipe
  6. 6. GADSEN DRIVE EMERGENCY GRAVITY SEWER REPAIR Capital Facilities/Wastewater Design and Construction Division During Repair Installation of access road Deck matting to protect and preserve the property
  7. 7. GADSEN DRIVE EMERGENCY GRAVITY SEWER REPAIR Capital Facilities/Wastewater Design and Construction Division During Repair Removal of existing pipe Old broken pipe
  8. 8. GADSEN DRIVE EMERGENCY GRAVITY SEWER REPAIR Capital Facilities/Wastewater Design and Construction Division During Repair Installation of new piping Installation of bedding for new piping (Checking for the required slope)
  9. 9. GADSEN DRIVE EMERGENCY GRAVITY SEWER REPAIR Capital Facilities/Wastewater Design and Construction Division Quality Control Final connection of new pipe Internal inspection and quality control provided by DPWES, Wastewater Collection Division Final Connection
  10. 10. GADSEN DRIVE EMERGENCY GRAVITY SEWER REPAIR Capital Facilities/Wastewater Design and Construction Division Before and After BEFORE AFTER Same tree in both photos Same tree In both photos
  11. 11. Additional Information For additional Information, please call www.fairfaxcounty.gov/publicworks GADSEN DRIVE EMERGENCY GRAVITY SEWER REPAIR Capital Facilities/Wastewater Design and Construction Division Matthew Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.Kaiser@fairfaxcounty.gov

×