IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 167
LIFE CYCLE COST ANALYSIS OF OVERLAY FOR AN URBAN ROAD IN
BANGALORE
Preethi.S1
, Radhakrishna2
, Raghavendra Prasad3
1
PG Student, 2
Associate Professor, 3
Research Scholar, Department of Civil Engineering, R. V. College of Engineering,
R. V. Vidyaniketan Post, Mysore Road, Bangalore 560059, India
Abstract
Pavements are subjected to severe condition of stresses and weathering effects from the day they are constructed and opened to traffic
mainly due to its fatigue behavior and environmental effects. Therefore, pavement rehabilitation is one of the most important
components of entire road systems. This paper highlights the design of concrete pavement with added mono fibers like polypropylene,
steel and hybrid fibres for a widened portion of existing concrete pavement and various overlay alternatives for an existing
bituminous pavement in an urban road in Bangalore. Along with this, Life cycle cost analyses at these sections are done by Net
Present Value (NPV) method to identify the most feasible option. The results show that though the initial cost of construction of
concrete overlay is high, over a period of time it prove to be better than the bituminous overlay considering the whole life cycle cost.
The economic analysis also indicates that, out of the three fibre options, hybrid reinforced concrete would be economical without
compromising the performance of the pavement.
Keywords: - Fatigue, Life cycle cost analysis, Net Present Value method, Overlay, Rehabilitation
--------------------------------------------------------------------***----------------------------------------------------------------------
1. INTRODUCTION
Road network in India has grown exponentially from 0.4
million km in 1951 to 3.32 million km presently with increase
in motor vehicles from 0.3 million in 1951 to 108 million in
2008 [1]. Due to this gigantic increase in traffic load, its
intensity, tire pressure, inadequate design of pavement
thickness and ill-drained effects, highway engineers are
finding themselves at a great disadvantage in keeping
pavements in a traffic- worthy state. The scarcity of resources
for the road sector in the past has lead to the adoption of stage
wise construction strategies with a short design period [2].
Therefore road construction in our country will be a never
ending process, with pavement strengthening to be a major
activity for many years to come. An overlay is a layer of
suitable thickness provided on top of an existing pavement to
improve its structural adequacy and riding quality. The two
principal options for overlay in terms of specification of
binder are [3]:
• Flexible overlay, consisting of granular layers and
bituminous layers
• Cement concrete overlay
Cement concrete overlay on top of an existing bituminous
surface is commonly known as white-topping. White-topping
based on thickness and bonding conditions are again classified
as: Conventional white-topping : thickness range : 200-300
mm, Thin white-topping : thickness range : 100-200 mm and
Ultra thin white-topping : thickness range : 50-100 mm.
Overlay practice in India: In India, the most common
strategy for pavement maintenance and rehabilitation was to
provide bituminous overlays on existing black topped surface.
This was mainly due to abundant supply of bitumen, in
addition to the comfort levels of construction methods among
engineers. In recent times all these advantages are reversed
and petroleum industry is using refined processing technology
leading to reduction in the production of bitumen thereby
increasing imports [4, 5]. The rapid developments in concrete
material technology and mechanization are favoring concrete
overlays as a sustainable option. A typical mix proportion of
concrete overlays by taking into consideration polypropylene
fiber, mineral admixtures like fly-ash, granulated blast furnace
slag, silica fume have shown increase in density of concrete
due to particle packing theory [6].
2. OBJECTIVES & SCOPE OF THE STUDY
The main objective of the research is to study the structural
adequacy of existing pavement and to design the overlay
alternatives along with cost evaluation of each alternative.
3. DATA ACQUISITION
3.1 Stretch Selected
The stretch selected is located in eastern part of Bangalore city
and acts as a link between NH-4 (Old Madras road) on north
western side and Old Airport road on south western side as
shown in Figure 1. This is one of the busiest stretches in the
city. The traffic in the area chosen was moderately dispersed
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 168
at all times of the day, since the either side of corridor is
populated with establishments like HAL, BEML limited,
Bagmane Tech park, HAL engine division etc. The road is 2
lane with a total length of about 3.8 km in which 2.7 km is
rigid pavement and the remaining 1.1 km is flexible pavement
as shown in Figure 2.
3.2 Benkelman Beam Deflection Study
Surface deflections of existing flexible pavements are usually
measured by Falling Weight Deflectometer (FWD) and
Benkelman Beam Deflection test (BBD). A good correlation
strength was obtained between FWD and BBD values in a
study done by Jundhare.D.R [9] on conventional white-
topping of 320 mm thickness. Benkelman beam deflection
study was done on the stretch, and the characteristic deflection
obtained was 1.67 mm.
3.3 Traffic Data
For the design purpose, analysis is being made on the number
of commercial vehicles of laden weight having 3 Tons or
more. From traffic analysis, the commercial vehicles per day
obtained for section 1 and section 2 was 1146 cvpd and 982
cpvd respectively.
Fig 1: Map showing the selected stretch
Fig2: Different pavement sections in the selected stretch
4. DESIGN OF SECTIONS
Design of flexible overlay has been done as per IRC:81-1997
using Benkelman Beam Deflection value and traffic in msa
[6]. Rigid overlay design has been done as the same
procedure for new pavement given in IRC: 58-2002 [7].
White-topping design is done as per IRC: SP: 76-2008 [8].
4.1. Section 1: Widening of Concrete Road
Existing single lane concrete road was to be widened on either
side. Concrete pavement combined with fibres where used for
this. Fiber reinforced concrete (FRC) is mixtures of cement
concrete containing short discrete, uniformly dispersed and
randomly oriented suitable fibrous material which increases its
structural integrity. The amount of fibers added to concrete
mix is measured as percentage of the total volume of
composites. Aspect ratio (l/d) is calculated by dividing fiber
length (l) by its diameter (d).The types of fibres used for the
design along with the flexural strength and obtained thickness
is given in Table 1.
Table 1: Thickness of concrete with different fibers
Concrete Flexural strength
,MPa
Thickness
obtained, mm
Plain 4.62 290
Polyproplyene 4.762 280
Steel 5.129 270
Hybrid 5.54 250
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 169
4.2 Section 2: Flexible Pavement
The existing flexible pavement has developed distresses like
rutting. So overlay has to be provided as a rehabilitation
strategy. Flexible or concrete overlay can be provided over the
bituminous surface.
4.2.1 Design of Flexible Overlay
Based on Benkelman Beam deflection data and commercial
vehicles per day using IRC-81, the thickness of flexible
overlay has been found out to as 150 mm BM. The thickness
deduced is the overlay thickness in terms of BM construction.
The equivalent overlay thickness to be provided can b
determined using equivalency factors. So the total individual
thicknesses obtained are: BC thickness: 40 mm and DBM
thickness: 65 mm
4.2.2 Design of Thin White-Topping
Thin white-topping design is carried as per IRC; SP: 76-2008
and IRC: 58-2002. The thickness obtained was about 200 mm.
The cumulative fatigue life consumed is less than 1. Hence
design life is safe from fatigue consideration. Total of
temperature warping stress and highest axle load stress =
21.98 kg/cm2, which is less than 45kg/cm2, the flexural
strength.
5. ECONOMIC EVALUATION
The alternative methods of strengthening or repairing of roads
should be based on their durability rather purely by initial cost.
The cost comparison for such alternative strengthening/repair
methods should be based on the concept of life-cycle cost
analysis
5.1 Life Cycle Cost Analysis between Different Types
of Fibres in Concrete for Section 1
In Section 1 the existing concrete pavement has to be widened
with addition of fibres to enhance its performance. The
quantity of work item involved in section 1 per km length is
given in Table 2.
Table 2: Quantities of work item involved per km length
In the present analysis the rates considered are Rs. 5191/ Cum
for control concrete, Rs. 376/kg for polypropylene fibre, Rs.
140/kg for concrete with steel fibre. Inorder to obtain flexural
strength of 4.762 MPa for polypropylene fibre reinforced
concrete, the percentage of recron 3s fibre used was 0.036%
(900g/cum of concrete). Therefore its cost will be Rs. 5529/
Cum. Similarly cost of steel and hybrid fibre concrete was
found out to be Rs. 8691/ Cum and Rs. 9029.4/ Cum
respectively. Traffic volume survey was conducted at stretch 1
and the volume of commercial vehicles obtained is given in
Table 3.
Table 3: Traffic volume obtained from traffic survey
A study made by CRRI, New Delhi on Delhi-Agra (NH-2)
found that there will be saving of 14% in fuel on concrete road
as compared to bituminous road for commercial vehicles [9].
The parameters considered for life cycle cost analysis by Net
Present Value method is given in Table 4.
Control concrete
(cum)
Concrete with
polypropylene
fibre (cum)
Concrete
with steel
fibre (cum)
Concrete with hybrid fibre (cum)
Heavy traffic 1160 1120 1080 1000
Type Count
Bus 166
HCV 570
MAV 44
LCV 332
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 170
Table 4: Parameters considered for analysis of section 1
Commercial Vehicles Per
Day 1146
Traffic growth rate 7.50%
Inflation 5.00%
Diesel Cost Rs.54.21/l
Fuel Savings 14.00%
Mileage 4kmpl
Annual Fuel Savings (Rs) CVPD*365*FuelSavings*Mileage*DieselCost
5.2 Economic Comparison between Flexible and
Concrete Overlay for Section 2:
It will be assumed that bituminous overlays need following
interventions during the analysis period: 10th, 20th years : 50
mm BC + 75 mm DBM for heavy traffic , 40 mm BC + 75
mm DBM for medium traffic [10]. Surface renewals are
provided as per MORTH as 25 mm BC once in 5 years. The
cost of ordinary repairs as per 2011 price is 2,10,000 Rs/ Km.
Quantity of work item involved per km length of road is given
in Table 5.
Road User Cost:
The user cost comprises of vehicle operating costs (VOC),
time cost of passengers and commodities in transit and
accident costs. In present analysis, only VOC is considered, it
being assumed that time costs and accident costs on both types
of surfaces are the same [11]. The parameters considered for
the analysis is given in Table 6.
Table 5: Quantities of work item involved per km length
Periodic renewal once in 5 years
Heavy traffic 7000 - 175 - -
Overlay once in 10 years
Heavy traffic 7000 455 280 - -
Table 6: Parameters considered for analysis
Parameter Value
CVPD 982
Traffic growth rate 7.5%
Inflation 5.00%
Diesel cost Rs.54.21/liter
Fuel savings 14.00%
Mileage 4 kmpl
Annual fuel savings (Rs) (cvpd x 365 x fuel savings x mileage x diesel cost)
Analysis period 30 years
Flexible overlay Tack Coat (sqm) DBM (cum) BC (cum) Concrete M-40 (cum)
Thin white topping
Heavy traffic 7000 455 280 1400
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 171
The rates for calculation of initial cost of flexible and white
topping are taken from schedule of rates Bangalore 2011-
2012. In the present analysis the rates considered are Rs. 6975/
Cum for DBM, Rs. 8632/Cum for BC, Rs.12/Sqm for tack
coat and Rs. 5,191/Cum for M-40 cement concrete. From
traffic volume survey the count obtained was as given in Table
7.
Table 7: Traffic count at section 2
6. RESULTS AND DISCUSSION
From the analysis for section 1, the thickness of widened
portion of concrete was less when hybrid fibres are used. The
initial cost of hybrid fibres when used in concrete pavement
was less compared to steel fibres. In case of section 2, the
initial cost of concrete overlay is more compared to flexible
overlay. But in view of availability of cement in plenty within
the country and scarcity and rising prices of bitumen, as crude
oil prices in the International market are rising and bulk of
crude oil has to be imported from other countries it will be
prudent to consider rigid pavements. Initial cost of concrete
after addition of fibers at section 1 and cost of flexible and
rigid overlay at section 2 is given in Table 8 and 9
respectively. Life cycle cost analysis by net present value
method for two sections are given in Table 10 and 11.
Table 8: Initial cost of concrete at section 1per km length
Control concrete PFRC(recron-3s) SFRC HFRC
60.22 lakhs 61.92 lakhs 93.86 lakhs 90.29 lakhs
Table 9: Intial cost of overlay for section 2 per km length
Table 10: Net present analysis of concrete with different type of fibre for section 1
Roug
hness 2000 mm/km 2000 mm/km 2000 mm/km 2000 mm/km
Concrete Overlay Rs-
Lakhs
Concrete Overlay with
Polyproplyene fiber Rs-
Lakhs
Concrete Overlay with
steel fiber Rs-Lakhs
Concrete Overlay with
hybrid fiberRs-Lakhs
Years
CVP
D
Constru
ction/M
aintena
nce VOC
Total
Cost
Constru
ction/M
aintena
nce VOC
Total
Cost
Constru
ction/M
aintena
nce VOC
Total
Cost
Constru
ction/M
aintena
nce VOC
Total
Cost
0 1146 60.220 0.000 60.220 61.920 0.000 61.920 93.860 0.000 93.860 90.290 0.000 90.290
1 1232 0.776 0.065 0.840 0.776 0.065 0.840 0.776 0.065 0.840 0.776 0.065 0.840
2 1324 0.814 0.070 0.884 0.814 0.070 0.884 0.814 0.070 0.884 0.814 0.070 0.884
3 1424 0.855 0.075 0.930 0.855 0.075 0.930 0.855 0.075 0.930 0.855 0.075 0.930
4 1530 0.898 0.080 0.978 0.898 0.080 0.978 0.898 0.080 0.978 0.898 0.080 0.978
5 1645 0.943 0.086 1.029 0.943 0.086 1.029 0.943 0.086 1.029 0.943 0.086 1.029
6 1769 0.990 0.093 1.083 0.990 0.093 1.083 0.990 0.093 1.083 0.990 0.093 1.083
7 1901 1.039 0.100 1.139 1.039 0.100 1.139 1.039 0.100 1.139 1.039 0.100 1.139
8 2044 1.091 0.107 1.199 1.091 0.107 1.199 1.091 0.107 1.199 1.091 0.107 1.199
9 2197 1.146 0.115 1.261 1.146 0.115 1.261 1.146 0.115 1.261 1.146 0.115 1.261
10 2362 1.203 0.124 1.327 1.203 0.124 1.327 1.203 0.124 1.327 1.203 0.124 1.327
Type Count
Bus 154
HCV 416
MAV 38
LCV 374
Flexible overlay Concrete overlay
56.74 Lakhs 72.67 Lakhs
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 172
11 2539 1.263 0.133 1.397 1.263 0.133 1.397 1.263 0.133 1.397 1.263 0.133 1.397
12 2730 1.327 0.143 1.470 1.327 0.143 1.470 1.327 0.143 1.470 1.327 0.143 1.470
13 2934 1.393 0.154 1.547 1.393 0.154 1.547 1.393 0.154 1.547 1.393 0.154 1.547
14 3154 1.463 0.166 1.628 1.463 0.166 1.628 1.463 0.166 1.628 1.463 0.166 1.628
15 3391 1.536 0.178 1.714 1.536 0.178 1.714 1.536 0.178 1.714 1.536 0.178 1.714
16 3645 1.613 0.192 1.804 1.613 0.192 1.804 1.613 0.192 1.804 1.613 0.192 1.804
17 3919 1.693 0.206 1.899 1.693 0.206 1.899 1.693 0.206 1.899 1.693 0.206 1.899
18 4212 1.778 0.221 1.999 1.778 0.221 1.999 1.778 0.221 1.999 1.778 0.221 1.999
19 4528 1.867 0.238 2.105 1.867 0.238 2.105 1.867 0.238 2.105 1.867 0.238 2.105
20 4868 1.960 0.256 2.216 1.960 0.256 2.216 1.960 0.256 2.216 1.960 0.256 2.216
21 5233 2.058 0.275 2.333 2.058 0.275 2.333 2.058 0.275 2.333 2.058 0.275 2.333
22 5626 2.161 0.296 2.457 2.161 0.296 2.457 2.161 0.296 2.457 2.161 0.296 2.457
23 6048 2.269 0.318 2.587 2.269 0.318 2.587 2.269 0.318 2.587 2.269 0.318 2.587
24 6501 2.382 0.342 2.724 2.382 0.342 2.724 2.382 0.342 2.724 2.382 0.342 2.724
25 6989 2.502 0.367 2.869 2.502 0.367 2.869 2.502 0.367 2.869 2.502 0.367 2.869
26 7513 2.627 0.395 3.022 2.627 0.395 3.022 2.627 0.395 3.022 2.627 0.395 3.022
27 8076 2.758 0.425 3.183 2.758 0.425 3.183 2.758 0.425 3.183 2.758 0.425 3.183
28 8682 2.896 0.456 3.352 2.896 0.456 3.352 2.896 0.456 3.352 2.896 0.456 3.352
29 9333 3.041 0.491 3.531 3.041 0.491 3.531 3.041 0.491 3.531 3.041 0.491 3.531
30
1003
3 3.193 0.527 3.720 3.193 0.527 3.720 3.193 0.527 3.720 3.193 0.527 3.720
NPV
@
12.00
% 62.234 0.909 63.144 63.752 0.909 64.662 92.270 0.909 93.179 89.083 0.909 89.992
Table 11: Life cycle cost analysis of section 2
Roughness 3000 mm/km 2000 mm/km
Flexible Overlay Rs-Lakhs Concrete Overlay Rs-Lakhs
Years CVPD
Construction
/Maintenanc
e VOC
Extra Fuel
Cost (Rs)
Lakhs Total Cost
Constructi
on/Mainte
nance VOC
Total
Cost
0 982 56.740 0.000 5.27 62.009 72.670 0.000 72.670
1 1056 3.103 0.059 5.66 8.825 0.776 0.057 0.833
2 1135 3.258 0.063 6.09 9.410 0.814 0.061 0.876
3 1220 3.421 0.068 6.55 10.034 0.855 0.066 0.921
4 1311 3.592 0.073 7.04 10.701 0.898 0.071 0.969
5 1410 21.247 0.078 7.56 28.890 0.943 0.076 1.019
6 1516 3.960 0.084 8.13 12.176 0.990 0.082 1.072
7 1629 4.158 0.091 8.74 12.990 1.039 0.088 1.127
8 1751 4.366 0.097 9.40 13.860 1.091 0.094 1.186
9 1883 4.584 0.105 10.10 14.790 1.146 0.102 1.248
10 2024 85.538 0.113 10.86 96.510 1.203 0.109 1.312
11 2176 5.054 0.121 11.67 16.849 1.263 0.117 1.381
12 2339 5.307 0.130 12.55 17.986 1.327 0.126 1.453
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 173
13 2514 5.572 0.140 13.49 19.202 1.393 0.136 1.529
14 2703 5.851 0.150 14.50 20.503 1.463 0.146 1.608
15 2906 34.609 0.162 15.59 50.361 1.536 0.157 1.692
16 3124 6.450 0.174 16.76 23.383 1.613 0.168 1.781
17 3358 6.773 0.187 18.02 24.976 1.693 0.181 1.874
18 3610 7.111 0.201 19.37 26.680 1.778 0.195 1.972
19 3880 7.467 0.216 20.82 28.503 1.867 0.209 2.076
20 4171 139.332 0.232 22.38 161.945 1.960 0.225 2.185
21 4484 8.232 0.249 24.06 32.542 2.058 0.242 2.300
22 4821 8.644 0.268 25.86 34.777 2.161 0.260 2.421
23 5182 9.076 0.288 27.80 37.169 2.269 0.279 2.548
24 5571 9.530 0.310 29.89 39.730 2.382 0.300 2.683
25 5989 56.375 0.333 32.13 88.840 2.502 0.323 2.825
26 6438 10.507 0.358 34.54 45.406 2.627 0.347 2.974
27 6921 11.032 0.385 37.13 48.549 2.758 0.373 3.131
28 7440 11.584 0.414 39.92 51.914 2.896 0.401 3.297
29 7998 12.163 0.445 42.91 55.518 3.041 0.431 3.472
30 8597 226.957 0.478 46.13 273.564 3.193 0.464 3.656
NPV @ 12.00% 142.219 0.824 84.246 227.290 73.350 0.799 74.150
CONCLUSIONS
The following broad conclusions can be drawn from the
present investigation on mono steel, mono polypropelene and
hybrid fibres in concrete pavements:
• The thickness of pavement slab with hybrid fibres is
less by 40 mm compared to mono steel and
polypropylene fibres separately.
• From NPV method, the life cycle cost of
polypropylene fibres was less than hybrid fiber and
steel fibers.
• When mono steel and hybrid fibres are considered
separately, hybrid fibers are cost effective and
perform better than other mono fibers.
• The life cycle cost analysis for 12 percent discount
rate and 5 percent inflation rate suggests that flexible
overlay becomes expensive than rigid overlay due to
its heavy maintenance inflow over the life period.
REFERENCES
[1] Jundhare. D.R, Khare. K. C & R. K. Jain ,
“Development correlation between BBD and FWD for
conventional white-topping overlay” journal of basic
and applied scientific research, pg: 8725-8731, 2012
[2] “White-topping of roads- concrete overlay technology”,
cement manufactures association, November 2011
[3] Vandana tare, “ Overlay alternatives on flexible
pavement- a case study”, Indian highway, December
2006.
[4] Sinha. V.K, Satander Kumar and Jain. R.K,
“WHITETOPPING - A Cost Effective Rehabiltation
Alternative for Preserving Bituminous Pavements on
Long term basis, IRC Journal, December, 2007, pp: 538
[5] Mitesh. D.Patel, “ White-topping as a rehabilitation
method : A case study of Budhel- Ghogha road”,
international journal of Advanced engineering research
and studies, vol 1, july-september – 2012, pg: 31-35
[6] Ankit Sharma, “Guidelines for the design and
construction of Ultra thin whitetopping”, International
Journal of Engineering and Science, vol 2,2013, pp:
269-274
[7] “Guidelines for Strengthening of Flexible Road
Pavements using Benkelman Beam Deflection
Technique”, IRC: 81-1997, Indian Roads Congress,
New Delhi, 1997.
[8] Guidelines for the Design of Plain Jointed Rigid
Pavements for Highways, IRC: 58-2002, Indian Roads
Congress, New Delhi, 2002.
[9] “Tentative Guidelines for Conventional, Thin and
Ultra-Thin White-Topping”, IRC: SP: 76-2008, Indian
Roads Congress, New Delhi, 2008.
[10] Bageshwar Prasad, “ life cycle cost analysis of cement
concrete roads vs bituminous roads”, Indian highway,
september 2007
[11] Manual on economic evaluation of highway projects in
India, IRC:SP:30-1993, Indian Roads Congress, New
Delhi, 1993
[12] Kadiyali, L. R., “Traffic Engineering & Transport
Planning”, 7th
Edition, Khanna Publishers, 2009.

More Related Content

What's hot

Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenanceMohd Bakhsh
 
Sachin gupta summer training in pwd
Sachin gupta summer training in pwdSachin gupta summer training in pwd
Sachin gupta summer training in pwdSachin gupta
 
Capacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghwaysCapacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghwaysRaghupathi Kandiboina
 
Training report - RCC Bridge
Training report - RCC BridgeTraining report - RCC Bridge
Training report - RCC BridgePRASUNMANI
 
Bituminous mix design.pptx
Bituminous mix design.pptxBituminous mix design.pptx
Bituminous mix design.pptxASHIKBELLARY
 
Highway Engineering topics
Highway Engineering topicsHighway Engineering topics
Highway Engineering topicsShubham Sadh
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementNIWASHISH VISWAS
 
Fundamentals of traffic Engg
Fundamentals of traffic EnggFundamentals of traffic Engg
Fundamentals of traffic Enggkiransomase1
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTSatyam Anand
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the trackT.Naga Anusha
 
Geometric design of railway track
Geometric design of railway  trackGeometric design of railway  track
Geometric design of railway trackMOHIT DUREJA
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge ConstructionSukhdeep Jat
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: TurnoutsVijai Krishnan V
 

What's hot (20)

Road construction
Road constructionRoad construction
Road construction
 
Vissim
VissimVissim
Vissim
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenance
 
Sachin gupta summer training in pwd
Sachin gupta summer training in pwdSachin gupta summer training in pwd
Sachin gupta summer training in pwd
 
Capacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghwaysCapacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghways
 
Training report - RCC Bridge
Training report - RCC BridgeTraining report - RCC Bridge
Training report - RCC Bridge
 
Bituminous mix design.pptx
Bituminous mix design.pptxBituminous mix design.pptx
Bituminous mix design.pptx
 
PWD, national highway
PWD, national highwayPWD, national highway
PWD, national highway
 
Highway Engineering topics
Highway Engineering topicsHighway Engineering topics
Highway Engineering topics
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavement
 
Fundamentals of traffic Engg
Fundamentals of traffic EnggFundamentals of traffic Engg
Fundamentals of traffic Engg
 
Training report 2
Training report 2Training report 2
Training report 2
 
Irc 37-2018
Irc 37-2018Irc 37-2018
Irc 37-2018
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
Road construction ppt
Road construction pptRoad construction ppt
Road construction ppt
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
 
Geometric design of railway track
Geometric design of railway  trackGeometric design of railway  track
Geometric design of railway track
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 
Sight Distance
Sight DistanceSight Distance
Sight Distance
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: Turnouts
 

Similar to Life cycle cost analysis of overlay for an urban road in bangalore

Study on rutting and surface behaviour of urban flexible pavement
Study on rutting and surface behaviour of urban flexible pavementStudy on rutting and surface behaviour of urban flexible pavement
Study on rutting and surface behaviour of urban flexible pavementeSAT Publishing House
 
Logical assessment of hooked end steel fibre reinforced concrete in m 40 grad...
Logical assessment of hooked end steel fibre reinforced concrete in m 40 grad...Logical assessment of hooked end steel fibre reinforced concrete in m 40 grad...
Logical assessment of hooked end steel fibre reinforced concrete in m 40 grad...eSAT Journals
 
Study of bituminous concrete under different mix conditions
Study of bituminous concrete under different mix conditionsStudy of bituminous concrete under different mix conditions
Study of bituminous concrete under different mix conditionseSAT Journals
 
IRJET- Study of Static Analysis on Conventional and Oblique Prestressed C...
IRJET-  	  Study of Static Analysis on Conventional and Oblique Prestressed C...IRJET-  	  Study of Static Analysis on Conventional and Oblique Prestressed C...
IRJET- Study of Static Analysis on Conventional and Oblique Prestressed C...IRJET Journal
 
IRJET- Study of Square Concrete Column Behavior Confined with CFRP Sheets
IRJET-  	  Study of Square Concrete Column Behavior Confined with CFRP SheetsIRJET-  	  Study of Square Concrete Column Behavior Confined with CFRP Sheets
IRJET- Study of Square Concrete Column Behavior Confined with CFRP SheetsIRJET Journal
 
DESIGN OF RIGID PAVEMENT AND ITS COST-BENEFIT ANALYSIS BY USAGE OF VITRIFIED ...
DESIGN OF RIGID PAVEMENT AND ITS COST-BENEFIT ANALYSIS BY USAGE OF VITRIFIED ...DESIGN OF RIGID PAVEMENT AND ITS COST-BENEFIT ANALYSIS BY USAGE OF VITRIFIED ...
DESIGN OF RIGID PAVEMENT AND ITS COST-BENEFIT ANALYSIS BY USAGE OF VITRIFIED ...IAEME Publication
 
Experimental study on strength characteristics of concrete with recycled aggr...
Experimental study on strength characteristics of concrete with recycled aggr...Experimental study on strength characteristics of concrete with recycled aggr...
Experimental study on strength characteristics of concrete with recycled aggr...eSAT Journals
 
Performance evaluation on thin whitetopping
Performance evaluation on thin whitetoppingPerformance evaluation on thin whitetopping
Performance evaluation on thin whitetoppingeSAT Publishing House
 
Comparative study of polymer fibre reinforced concrete with conventional conc...
Comparative study of polymer fibre reinforced concrete with conventional conc...Comparative study of polymer fibre reinforced concrete with conventional conc...
Comparative study of polymer fibre reinforced concrete with conventional conc...eSAT Journals
 
Comparative study of polymer fibre reinforced
Comparative study of polymer fibre reinforcedComparative study of polymer fibre reinforced
Comparative study of polymer fibre reinforcedeSAT Publishing House
 
Ultra-Thin Whitetopping in India: State-of- Practice
Ultra-Thin Whitetopping in India: State-of- Practice Ultra-Thin Whitetopping in India: State-of- Practice
Ultra-Thin Whitetopping in India: State-of- Practice IDES Editor
 
IRJET-Experimental Study on Strength of Fiber Reinforced Concrete for Rigid P...
IRJET-Experimental Study on Strength of Fiber Reinforced Concrete for Rigid P...IRJET-Experimental Study on Strength of Fiber Reinforced Concrete for Rigid P...
IRJET-Experimental Study on Strength of Fiber Reinforced Concrete for Rigid P...IRJET Journal
 
Utilization of industrial waste materials in the construction of interlocking...
Utilization of industrial waste materials in the construction of interlocking...Utilization of industrial waste materials in the construction of interlocking...
Utilization of industrial waste materials in the construction of interlocking...IRJET Journal
 
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible PavementIRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET- A Study of Cement Treated Base and Sub Base in Flexible PavementIRJET Journal
 
EXPERIMENTAL INVESTIGATION ON PERFORMANCE OF WHITE TOPPING OVER FLEXIBLE PAVE...
EXPERIMENTAL INVESTIGATION ON PERFORMANCE OF WHITE TOPPING OVER FLEXIBLE PAVE...EXPERIMENTAL INVESTIGATION ON PERFORMANCE OF WHITE TOPPING OVER FLEXIBLE PAVE...
EXPERIMENTAL INVESTIGATION ON PERFORMANCE OF WHITE TOPPING OVER FLEXIBLE PAVE...IRJET Journal
 
Application of Geosynthetics in Pavement Design
Application of Geosynthetics in Pavement DesignApplication of Geosynthetics in Pavement Design
Application of Geosynthetics in Pavement DesignIRJET Journal
 
Experimental studies on performance of steel fiber and polymer modified recyc...
Experimental studies on performance of steel fiber and polymer modified recyc...Experimental studies on performance of steel fiber and polymer modified recyc...
Experimental studies on performance of steel fiber and polymer modified recyc...eSAT Journals
 
IRJET- Laboratory Studies on Geotextile Reinforced Soil for Pavement
IRJET- Laboratory Studies on Geotextile Reinforced Soil for PavementIRJET- Laboratory Studies on Geotextile Reinforced Soil for Pavement
IRJET- Laboratory Studies on Geotextile Reinforced Soil for PavementIRJET Journal
 
IRJET-Investigation and Analysis of Effect of Admixtures over the Strength of...
IRJET-Investigation and Analysis of Effect of Admixtures over the Strength of...IRJET-Investigation and Analysis of Effect of Admixtures over the Strength of...
IRJET-Investigation and Analysis of Effect of Admixtures over the Strength of...IRJET Journal
 

Similar to Life cycle cost analysis of overlay for an urban road in bangalore (20)

Study on rutting and surface behaviour of urban flexible pavement
Study on rutting and surface behaviour of urban flexible pavementStudy on rutting and surface behaviour of urban flexible pavement
Study on rutting and surface behaviour of urban flexible pavement
 
Logical assessment of hooked end steel fibre reinforced concrete in m 40 grad...
Logical assessment of hooked end steel fibre reinforced concrete in m 40 grad...Logical assessment of hooked end steel fibre reinforced concrete in m 40 grad...
Logical assessment of hooked end steel fibre reinforced concrete in m 40 grad...
 
Study of bituminous concrete under different mix conditions
Study of bituminous concrete under different mix conditionsStudy of bituminous concrete under different mix conditions
Study of bituminous concrete under different mix conditions
 
IRJET- Study of Static Analysis on Conventional and Oblique Prestressed C...
IRJET-  	  Study of Static Analysis on Conventional and Oblique Prestressed C...IRJET-  	  Study of Static Analysis on Conventional and Oblique Prestressed C...
IRJET- Study of Static Analysis on Conventional and Oblique Prestressed C...
 
IRJET- Study of Square Concrete Column Behavior Confined with CFRP Sheets
IRJET-  	  Study of Square Concrete Column Behavior Confined with CFRP SheetsIRJET-  	  Study of Square Concrete Column Behavior Confined with CFRP Sheets
IRJET- Study of Square Concrete Column Behavior Confined with CFRP Sheets
 
DESIGN OF RIGID PAVEMENT AND ITS COST-BENEFIT ANALYSIS BY USAGE OF VITRIFIED ...
DESIGN OF RIGID PAVEMENT AND ITS COST-BENEFIT ANALYSIS BY USAGE OF VITRIFIED ...DESIGN OF RIGID PAVEMENT AND ITS COST-BENEFIT ANALYSIS BY USAGE OF VITRIFIED ...
DESIGN OF RIGID PAVEMENT AND ITS COST-BENEFIT ANALYSIS BY USAGE OF VITRIFIED ...
 
Experimental study on strength characteristics of concrete with recycled aggr...
Experimental study on strength characteristics of concrete with recycled aggr...Experimental study on strength characteristics of concrete with recycled aggr...
Experimental study on strength characteristics of concrete with recycled aggr...
 
Performance evaluation on thin whitetopping
Performance evaluation on thin whitetoppingPerformance evaluation on thin whitetopping
Performance evaluation on thin whitetopping
 
Comparative study of polymer fibre reinforced concrete with conventional conc...
Comparative study of polymer fibre reinforced concrete with conventional conc...Comparative study of polymer fibre reinforced concrete with conventional conc...
Comparative study of polymer fibre reinforced concrete with conventional conc...
 
Comparative study of polymer fibre reinforced
Comparative study of polymer fibre reinforcedComparative study of polymer fibre reinforced
Comparative study of polymer fibre reinforced
 
Ultra-Thin Whitetopping in India: State-of- Practice
Ultra-Thin Whitetopping in India: State-of- Practice Ultra-Thin Whitetopping in India: State-of- Practice
Ultra-Thin Whitetopping in India: State-of- Practice
 
IRJET-Experimental Study on Strength of Fiber Reinforced Concrete for Rigid P...
IRJET-Experimental Study on Strength of Fiber Reinforced Concrete for Rigid P...IRJET-Experimental Study on Strength of Fiber Reinforced Concrete for Rigid P...
IRJET-Experimental Study on Strength of Fiber Reinforced Concrete for Rigid P...
 
Utilization of industrial waste materials in the construction of interlocking...
Utilization of industrial waste materials in the construction of interlocking...Utilization of industrial waste materials in the construction of interlocking...
Utilization of industrial waste materials in the construction of interlocking...
 
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible PavementIRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
 
EXPERIMENTAL INVESTIGATION ON PERFORMANCE OF WHITE TOPPING OVER FLEXIBLE PAVE...
EXPERIMENTAL INVESTIGATION ON PERFORMANCE OF WHITE TOPPING OVER FLEXIBLE PAVE...EXPERIMENTAL INVESTIGATION ON PERFORMANCE OF WHITE TOPPING OVER FLEXIBLE PAVE...
EXPERIMENTAL INVESTIGATION ON PERFORMANCE OF WHITE TOPPING OVER FLEXIBLE PAVE...
 
Application of Geosynthetics in Pavement Design
Application of Geosynthetics in Pavement DesignApplication of Geosynthetics in Pavement Design
Application of Geosynthetics in Pavement Design
 
Experimental studies on performance of steel fiber and polymer modified recyc...
Experimental studies on performance of steel fiber and polymer modified recyc...Experimental studies on performance of steel fiber and polymer modified recyc...
Experimental studies on performance of steel fiber and polymer modified recyc...
 
IRJET- Laboratory Studies on Geotextile Reinforced Soil for Pavement
IRJET- Laboratory Studies on Geotextile Reinforced Soil for PavementIRJET- Laboratory Studies on Geotextile Reinforced Soil for Pavement
IRJET- Laboratory Studies on Geotextile Reinforced Soil for Pavement
 
IRJET-Investigation and Analysis of Effect of Admixtures over the Strength of...
IRJET-Investigation and Analysis of Effect of Admixtures over the Strength of...IRJET-Investigation and Analysis of Effect of Admixtures over the Strength of...
IRJET-Investigation and Analysis of Effect of Admixtures over the Strength of...
 
V35119123
V35119123V35119123
V35119123
 

More from eSAT Journals

Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementseSAT Journals
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case studyeSAT Journals
 
Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case studyeSAT Journals
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialseSAT Journals
 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...eSAT Journals
 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...eSAT Journals
 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizereSAT Journals
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementeSAT Journals
 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...eSAT Journals
 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteeSAT Journals
 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...eSAT Journals
 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...eSAT Journals
 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabseSAT Journals
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaeSAT Journals
 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...eSAT Journals
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodeSAT Journals
 
Estimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniquesEstimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniqueseSAT Journals
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...eSAT Journals
 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...eSAT Journals
 
Effect of skew angle on static behaviour of reinforced concrete slab bridge d...
Effect of skew angle on static behaviour of reinforced concrete slab bridge d...Effect of skew angle on static behaviour of reinforced concrete slab bridge d...
Effect of skew angle on static behaviour of reinforced concrete slab bridge d...eSAT Journals
 

More from eSAT Journals (20)

Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavements
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
 
Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case study
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...
 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...
 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizer
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concrete
 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...
 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabs
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in india
 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn method
 
Estimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniquesEstimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniques
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...
 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...
 
Effect of skew angle on static behaviour of reinforced concrete slab bridge d...
Effect of skew angle on static behaviour of reinforced concrete slab bridge d...Effect of skew angle on static behaviour of reinforced concrete slab bridge d...
Effect of skew angle on static behaviour of reinforced concrete slab bridge d...
 

Recently uploaded

+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Recently uploaded (20)

+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

Life cycle cost analysis of overlay for an urban road in bangalore

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 167 LIFE CYCLE COST ANALYSIS OF OVERLAY FOR AN URBAN ROAD IN BANGALORE Preethi.S1 , Radhakrishna2 , Raghavendra Prasad3 1 PG Student, 2 Associate Professor, 3 Research Scholar, Department of Civil Engineering, R. V. College of Engineering, R. V. Vidyaniketan Post, Mysore Road, Bangalore 560059, India Abstract Pavements are subjected to severe condition of stresses and weathering effects from the day they are constructed and opened to traffic mainly due to its fatigue behavior and environmental effects. Therefore, pavement rehabilitation is one of the most important components of entire road systems. This paper highlights the design of concrete pavement with added mono fibers like polypropylene, steel and hybrid fibres for a widened portion of existing concrete pavement and various overlay alternatives for an existing bituminous pavement in an urban road in Bangalore. Along with this, Life cycle cost analyses at these sections are done by Net Present Value (NPV) method to identify the most feasible option. The results show that though the initial cost of construction of concrete overlay is high, over a period of time it prove to be better than the bituminous overlay considering the whole life cycle cost. The economic analysis also indicates that, out of the three fibre options, hybrid reinforced concrete would be economical without compromising the performance of the pavement. Keywords: - Fatigue, Life cycle cost analysis, Net Present Value method, Overlay, Rehabilitation --------------------------------------------------------------------***---------------------------------------------------------------------- 1. INTRODUCTION Road network in India has grown exponentially from 0.4 million km in 1951 to 3.32 million km presently with increase in motor vehicles from 0.3 million in 1951 to 108 million in 2008 [1]. Due to this gigantic increase in traffic load, its intensity, tire pressure, inadequate design of pavement thickness and ill-drained effects, highway engineers are finding themselves at a great disadvantage in keeping pavements in a traffic- worthy state. The scarcity of resources for the road sector in the past has lead to the adoption of stage wise construction strategies with a short design period [2]. Therefore road construction in our country will be a never ending process, with pavement strengthening to be a major activity for many years to come. An overlay is a layer of suitable thickness provided on top of an existing pavement to improve its structural adequacy and riding quality. The two principal options for overlay in terms of specification of binder are [3]: • Flexible overlay, consisting of granular layers and bituminous layers • Cement concrete overlay Cement concrete overlay on top of an existing bituminous surface is commonly known as white-topping. White-topping based on thickness and bonding conditions are again classified as: Conventional white-topping : thickness range : 200-300 mm, Thin white-topping : thickness range : 100-200 mm and Ultra thin white-topping : thickness range : 50-100 mm. Overlay practice in India: In India, the most common strategy for pavement maintenance and rehabilitation was to provide bituminous overlays on existing black topped surface. This was mainly due to abundant supply of bitumen, in addition to the comfort levels of construction methods among engineers. In recent times all these advantages are reversed and petroleum industry is using refined processing technology leading to reduction in the production of bitumen thereby increasing imports [4, 5]. The rapid developments in concrete material technology and mechanization are favoring concrete overlays as a sustainable option. A typical mix proportion of concrete overlays by taking into consideration polypropylene fiber, mineral admixtures like fly-ash, granulated blast furnace slag, silica fume have shown increase in density of concrete due to particle packing theory [6]. 2. OBJECTIVES & SCOPE OF THE STUDY The main objective of the research is to study the structural adequacy of existing pavement and to design the overlay alternatives along with cost evaluation of each alternative. 3. DATA ACQUISITION 3.1 Stretch Selected The stretch selected is located in eastern part of Bangalore city and acts as a link between NH-4 (Old Madras road) on north western side and Old Airport road on south western side as shown in Figure 1. This is one of the busiest stretches in the city. The traffic in the area chosen was moderately dispersed
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 168 at all times of the day, since the either side of corridor is populated with establishments like HAL, BEML limited, Bagmane Tech park, HAL engine division etc. The road is 2 lane with a total length of about 3.8 km in which 2.7 km is rigid pavement and the remaining 1.1 km is flexible pavement as shown in Figure 2. 3.2 Benkelman Beam Deflection Study Surface deflections of existing flexible pavements are usually measured by Falling Weight Deflectometer (FWD) and Benkelman Beam Deflection test (BBD). A good correlation strength was obtained between FWD and BBD values in a study done by Jundhare.D.R [9] on conventional white- topping of 320 mm thickness. Benkelman beam deflection study was done on the stretch, and the characteristic deflection obtained was 1.67 mm. 3.3 Traffic Data For the design purpose, analysis is being made on the number of commercial vehicles of laden weight having 3 Tons or more. From traffic analysis, the commercial vehicles per day obtained for section 1 and section 2 was 1146 cvpd and 982 cpvd respectively. Fig 1: Map showing the selected stretch Fig2: Different pavement sections in the selected stretch 4. DESIGN OF SECTIONS Design of flexible overlay has been done as per IRC:81-1997 using Benkelman Beam Deflection value and traffic in msa [6]. Rigid overlay design has been done as the same procedure for new pavement given in IRC: 58-2002 [7]. White-topping design is done as per IRC: SP: 76-2008 [8]. 4.1. Section 1: Widening of Concrete Road Existing single lane concrete road was to be widened on either side. Concrete pavement combined with fibres where used for this. Fiber reinforced concrete (FRC) is mixtures of cement concrete containing short discrete, uniformly dispersed and randomly oriented suitable fibrous material which increases its structural integrity. The amount of fibers added to concrete mix is measured as percentage of the total volume of composites. Aspect ratio (l/d) is calculated by dividing fiber length (l) by its diameter (d).The types of fibres used for the design along with the flexural strength and obtained thickness is given in Table 1. Table 1: Thickness of concrete with different fibers Concrete Flexural strength ,MPa Thickness obtained, mm Plain 4.62 290 Polyproplyene 4.762 280 Steel 5.129 270 Hybrid 5.54 250
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 169 4.2 Section 2: Flexible Pavement The existing flexible pavement has developed distresses like rutting. So overlay has to be provided as a rehabilitation strategy. Flexible or concrete overlay can be provided over the bituminous surface. 4.2.1 Design of Flexible Overlay Based on Benkelman Beam deflection data and commercial vehicles per day using IRC-81, the thickness of flexible overlay has been found out to as 150 mm BM. The thickness deduced is the overlay thickness in terms of BM construction. The equivalent overlay thickness to be provided can b determined using equivalency factors. So the total individual thicknesses obtained are: BC thickness: 40 mm and DBM thickness: 65 mm 4.2.2 Design of Thin White-Topping Thin white-topping design is carried as per IRC; SP: 76-2008 and IRC: 58-2002. The thickness obtained was about 200 mm. The cumulative fatigue life consumed is less than 1. Hence design life is safe from fatigue consideration. Total of temperature warping stress and highest axle load stress = 21.98 kg/cm2, which is less than 45kg/cm2, the flexural strength. 5. ECONOMIC EVALUATION The alternative methods of strengthening or repairing of roads should be based on their durability rather purely by initial cost. The cost comparison for such alternative strengthening/repair methods should be based on the concept of life-cycle cost analysis 5.1 Life Cycle Cost Analysis between Different Types of Fibres in Concrete for Section 1 In Section 1 the existing concrete pavement has to be widened with addition of fibres to enhance its performance. The quantity of work item involved in section 1 per km length is given in Table 2. Table 2: Quantities of work item involved per km length In the present analysis the rates considered are Rs. 5191/ Cum for control concrete, Rs. 376/kg for polypropylene fibre, Rs. 140/kg for concrete with steel fibre. Inorder to obtain flexural strength of 4.762 MPa for polypropylene fibre reinforced concrete, the percentage of recron 3s fibre used was 0.036% (900g/cum of concrete). Therefore its cost will be Rs. 5529/ Cum. Similarly cost of steel and hybrid fibre concrete was found out to be Rs. 8691/ Cum and Rs. 9029.4/ Cum respectively. Traffic volume survey was conducted at stretch 1 and the volume of commercial vehicles obtained is given in Table 3. Table 3: Traffic volume obtained from traffic survey A study made by CRRI, New Delhi on Delhi-Agra (NH-2) found that there will be saving of 14% in fuel on concrete road as compared to bituminous road for commercial vehicles [9]. The parameters considered for life cycle cost analysis by Net Present Value method is given in Table 4. Control concrete (cum) Concrete with polypropylene fibre (cum) Concrete with steel fibre (cum) Concrete with hybrid fibre (cum) Heavy traffic 1160 1120 1080 1000 Type Count Bus 166 HCV 570 MAV 44 LCV 332
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 170 Table 4: Parameters considered for analysis of section 1 Commercial Vehicles Per Day 1146 Traffic growth rate 7.50% Inflation 5.00% Diesel Cost Rs.54.21/l Fuel Savings 14.00% Mileage 4kmpl Annual Fuel Savings (Rs) CVPD*365*FuelSavings*Mileage*DieselCost 5.2 Economic Comparison between Flexible and Concrete Overlay for Section 2: It will be assumed that bituminous overlays need following interventions during the analysis period: 10th, 20th years : 50 mm BC + 75 mm DBM for heavy traffic , 40 mm BC + 75 mm DBM for medium traffic [10]. Surface renewals are provided as per MORTH as 25 mm BC once in 5 years. The cost of ordinary repairs as per 2011 price is 2,10,000 Rs/ Km. Quantity of work item involved per km length of road is given in Table 5. Road User Cost: The user cost comprises of vehicle operating costs (VOC), time cost of passengers and commodities in transit and accident costs. In present analysis, only VOC is considered, it being assumed that time costs and accident costs on both types of surfaces are the same [11]. The parameters considered for the analysis is given in Table 6. Table 5: Quantities of work item involved per km length Periodic renewal once in 5 years Heavy traffic 7000 - 175 - - Overlay once in 10 years Heavy traffic 7000 455 280 - - Table 6: Parameters considered for analysis Parameter Value CVPD 982 Traffic growth rate 7.5% Inflation 5.00% Diesel cost Rs.54.21/liter Fuel savings 14.00% Mileage 4 kmpl Annual fuel savings (Rs) (cvpd x 365 x fuel savings x mileage x diesel cost) Analysis period 30 years Flexible overlay Tack Coat (sqm) DBM (cum) BC (cum) Concrete M-40 (cum) Thin white topping Heavy traffic 7000 455 280 1400
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 171 The rates for calculation of initial cost of flexible and white topping are taken from schedule of rates Bangalore 2011- 2012. In the present analysis the rates considered are Rs. 6975/ Cum for DBM, Rs. 8632/Cum for BC, Rs.12/Sqm for tack coat and Rs. 5,191/Cum for M-40 cement concrete. From traffic volume survey the count obtained was as given in Table 7. Table 7: Traffic count at section 2 6. RESULTS AND DISCUSSION From the analysis for section 1, the thickness of widened portion of concrete was less when hybrid fibres are used. The initial cost of hybrid fibres when used in concrete pavement was less compared to steel fibres. In case of section 2, the initial cost of concrete overlay is more compared to flexible overlay. But in view of availability of cement in plenty within the country and scarcity and rising prices of bitumen, as crude oil prices in the International market are rising and bulk of crude oil has to be imported from other countries it will be prudent to consider rigid pavements. Initial cost of concrete after addition of fibers at section 1 and cost of flexible and rigid overlay at section 2 is given in Table 8 and 9 respectively. Life cycle cost analysis by net present value method for two sections are given in Table 10 and 11. Table 8: Initial cost of concrete at section 1per km length Control concrete PFRC(recron-3s) SFRC HFRC 60.22 lakhs 61.92 lakhs 93.86 lakhs 90.29 lakhs Table 9: Intial cost of overlay for section 2 per km length Table 10: Net present analysis of concrete with different type of fibre for section 1 Roug hness 2000 mm/km 2000 mm/km 2000 mm/km 2000 mm/km Concrete Overlay Rs- Lakhs Concrete Overlay with Polyproplyene fiber Rs- Lakhs Concrete Overlay with steel fiber Rs-Lakhs Concrete Overlay with hybrid fiberRs-Lakhs Years CVP D Constru ction/M aintena nce VOC Total Cost Constru ction/M aintena nce VOC Total Cost Constru ction/M aintena nce VOC Total Cost Constru ction/M aintena nce VOC Total Cost 0 1146 60.220 0.000 60.220 61.920 0.000 61.920 93.860 0.000 93.860 90.290 0.000 90.290 1 1232 0.776 0.065 0.840 0.776 0.065 0.840 0.776 0.065 0.840 0.776 0.065 0.840 2 1324 0.814 0.070 0.884 0.814 0.070 0.884 0.814 0.070 0.884 0.814 0.070 0.884 3 1424 0.855 0.075 0.930 0.855 0.075 0.930 0.855 0.075 0.930 0.855 0.075 0.930 4 1530 0.898 0.080 0.978 0.898 0.080 0.978 0.898 0.080 0.978 0.898 0.080 0.978 5 1645 0.943 0.086 1.029 0.943 0.086 1.029 0.943 0.086 1.029 0.943 0.086 1.029 6 1769 0.990 0.093 1.083 0.990 0.093 1.083 0.990 0.093 1.083 0.990 0.093 1.083 7 1901 1.039 0.100 1.139 1.039 0.100 1.139 1.039 0.100 1.139 1.039 0.100 1.139 8 2044 1.091 0.107 1.199 1.091 0.107 1.199 1.091 0.107 1.199 1.091 0.107 1.199 9 2197 1.146 0.115 1.261 1.146 0.115 1.261 1.146 0.115 1.261 1.146 0.115 1.261 10 2362 1.203 0.124 1.327 1.203 0.124 1.327 1.203 0.124 1.327 1.203 0.124 1.327 Type Count Bus 154 HCV 416 MAV 38 LCV 374 Flexible overlay Concrete overlay 56.74 Lakhs 72.67 Lakhs
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 172 11 2539 1.263 0.133 1.397 1.263 0.133 1.397 1.263 0.133 1.397 1.263 0.133 1.397 12 2730 1.327 0.143 1.470 1.327 0.143 1.470 1.327 0.143 1.470 1.327 0.143 1.470 13 2934 1.393 0.154 1.547 1.393 0.154 1.547 1.393 0.154 1.547 1.393 0.154 1.547 14 3154 1.463 0.166 1.628 1.463 0.166 1.628 1.463 0.166 1.628 1.463 0.166 1.628 15 3391 1.536 0.178 1.714 1.536 0.178 1.714 1.536 0.178 1.714 1.536 0.178 1.714 16 3645 1.613 0.192 1.804 1.613 0.192 1.804 1.613 0.192 1.804 1.613 0.192 1.804 17 3919 1.693 0.206 1.899 1.693 0.206 1.899 1.693 0.206 1.899 1.693 0.206 1.899 18 4212 1.778 0.221 1.999 1.778 0.221 1.999 1.778 0.221 1.999 1.778 0.221 1.999 19 4528 1.867 0.238 2.105 1.867 0.238 2.105 1.867 0.238 2.105 1.867 0.238 2.105 20 4868 1.960 0.256 2.216 1.960 0.256 2.216 1.960 0.256 2.216 1.960 0.256 2.216 21 5233 2.058 0.275 2.333 2.058 0.275 2.333 2.058 0.275 2.333 2.058 0.275 2.333 22 5626 2.161 0.296 2.457 2.161 0.296 2.457 2.161 0.296 2.457 2.161 0.296 2.457 23 6048 2.269 0.318 2.587 2.269 0.318 2.587 2.269 0.318 2.587 2.269 0.318 2.587 24 6501 2.382 0.342 2.724 2.382 0.342 2.724 2.382 0.342 2.724 2.382 0.342 2.724 25 6989 2.502 0.367 2.869 2.502 0.367 2.869 2.502 0.367 2.869 2.502 0.367 2.869 26 7513 2.627 0.395 3.022 2.627 0.395 3.022 2.627 0.395 3.022 2.627 0.395 3.022 27 8076 2.758 0.425 3.183 2.758 0.425 3.183 2.758 0.425 3.183 2.758 0.425 3.183 28 8682 2.896 0.456 3.352 2.896 0.456 3.352 2.896 0.456 3.352 2.896 0.456 3.352 29 9333 3.041 0.491 3.531 3.041 0.491 3.531 3.041 0.491 3.531 3.041 0.491 3.531 30 1003 3 3.193 0.527 3.720 3.193 0.527 3.720 3.193 0.527 3.720 3.193 0.527 3.720 NPV @ 12.00 % 62.234 0.909 63.144 63.752 0.909 64.662 92.270 0.909 93.179 89.083 0.909 89.992 Table 11: Life cycle cost analysis of section 2 Roughness 3000 mm/km 2000 mm/km Flexible Overlay Rs-Lakhs Concrete Overlay Rs-Lakhs Years CVPD Construction /Maintenanc e VOC Extra Fuel Cost (Rs) Lakhs Total Cost Constructi on/Mainte nance VOC Total Cost 0 982 56.740 0.000 5.27 62.009 72.670 0.000 72.670 1 1056 3.103 0.059 5.66 8.825 0.776 0.057 0.833 2 1135 3.258 0.063 6.09 9.410 0.814 0.061 0.876 3 1220 3.421 0.068 6.55 10.034 0.855 0.066 0.921 4 1311 3.592 0.073 7.04 10.701 0.898 0.071 0.969 5 1410 21.247 0.078 7.56 28.890 0.943 0.076 1.019 6 1516 3.960 0.084 8.13 12.176 0.990 0.082 1.072 7 1629 4.158 0.091 8.74 12.990 1.039 0.088 1.127 8 1751 4.366 0.097 9.40 13.860 1.091 0.094 1.186 9 1883 4.584 0.105 10.10 14.790 1.146 0.102 1.248 10 2024 85.538 0.113 10.86 96.510 1.203 0.109 1.312 11 2176 5.054 0.121 11.67 16.849 1.263 0.117 1.381 12 2339 5.307 0.130 12.55 17.986 1.327 0.126 1.453
  • 7. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 173 13 2514 5.572 0.140 13.49 19.202 1.393 0.136 1.529 14 2703 5.851 0.150 14.50 20.503 1.463 0.146 1.608 15 2906 34.609 0.162 15.59 50.361 1.536 0.157 1.692 16 3124 6.450 0.174 16.76 23.383 1.613 0.168 1.781 17 3358 6.773 0.187 18.02 24.976 1.693 0.181 1.874 18 3610 7.111 0.201 19.37 26.680 1.778 0.195 1.972 19 3880 7.467 0.216 20.82 28.503 1.867 0.209 2.076 20 4171 139.332 0.232 22.38 161.945 1.960 0.225 2.185 21 4484 8.232 0.249 24.06 32.542 2.058 0.242 2.300 22 4821 8.644 0.268 25.86 34.777 2.161 0.260 2.421 23 5182 9.076 0.288 27.80 37.169 2.269 0.279 2.548 24 5571 9.530 0.310 29.89 39.730 2.382 0.300 2.683 25 5989 56.375 0.333 32.13 88.840 2.502 0.323 2.825 26 6438 10.507 0.358 34.54 45.406 2.627 0.347 2.974 27 6921 11.032 0.385 37.13 48.549 2.758 0.373 3.131 28 7440 11.584 0.414 39.92 51.914 2.896 0.401 3.297 29 7998 12.163 0.445 42.91 55.518 3.041 0.431 3.472 30 8597 226.957 0.478 46.13 273.564 3.193 0.464 3.656 NPV @ 12.00% 142.219 0.824 84.246 227.290 73.350 0.799 74.150 CONCLUSIONS The following broad conclusions can be drawn from the present investigation on mono steel, mono polypropelene and hybrid fibres in concrete pavements: • The thickness of pavement slab with hybrid fibres is less by 40 mm compared to mono steel and polypropylene fibres separately. • From NPV method, the life cycle cost of polypropylene fibres was less than hybrid fiber and steel fibers. • When mono steel and hybrid fibres are considered separately, hybrid fibers are cost effective and perform better than other mono fibers. • The life cycle cost analysis for 12 percent discount rate and 5 percent inflation rate suggests that flexible overlay becomes expensive than rigid overlay due to its heavy maintenance inflow over the life period. REFERENCES [1] Jundhare. D.R, Khare. K. C & R. K. Jain , “Development correlation between BBD and FWD for conventional white-topping overlay” journal of basic and applied scientific research, pg: 8725-8731, 2012 [2] “White-topping of roads- concrete overlay technology”, cement manufactures association, November 2011 [3] Vandana tare, “ Overlay alternatives on flexible pavement- a case study”, Indian highway, December 2006. [4] Sinha. V.K, Satander Kumar and Jain. R.K, “WHITETOPPING - A Cost Effective Rehabiltation Alternative for Preserving Bituminous Pavements on Long term basis, IRC Journal, December, 2007, pp: 538 [5] Mitesh. D.Patel, “ White-topping as a rehabilitation method : A case study of Budhel- Ghogha road”, international journal of Advanced engineering research and studies, vol 1, july-september – 2012, pg: 31-35 [6] Ankit Sharma, “Guidelines for the design and construction of Ultra thin whitetopping”, International Journal of Engineering and Science, vol 2,2013, pp: 269-274 [7] “Guidelines for Strengthening of Flexible Road Pavements using Benkelman Beam Deflection Technique”, IRC: 81-1997, Indian Roads Congress, New Delhi, 1997. [8] Guidelines for the Design of Plain Jointed Rigid Pavements for Highways, IRC: 58-2002, Indian Roads Congress, New Delhi, 2002. [9] “Tentative Guidelines for Conventional, Thin and Ultra-Thin White-Topping”, IRC: SP: 76-2008, Indian Roads Congress, New Delhi, 2008. [10] Bageshwar Prasad, “ life cycle cost analysis of cement concrete roads vs bituminous roads”, Indian highway, september 2007 [11] Manual on economic evaluation of highway projects in India, IRC:SP:30-1993, Indian Roads Congress, New Delhi, 1993 [12] Kadiyali, L. R., “Traffic Engineering & Transport Planning”, 7th Edition, Khanna Publishers, 2009.