Other benefits of launching:
• Safer
• Faster
• Cheaper
• Easier to inspect
Other bridge components can be
constructed at the same time
Incremental Launching Method
Los Pajaros Bridge Construction
Field Test vs. Computer Model Predictions
Los Pajaros Bridge – Diagnostic Load Testing
Load Case 3 Load Case 4
- Analytical predictions ~ measured responses
- Bridge behaves as designed
- Ready for opening to traffic
- Diagnostic load testing: new bridges = design verification
- Deflections
- Different load cases
- Test load ~ 60% the design vehicular load
- Disagreement between field and model => further studies
- Presented cases: close correspondence
Conclusions