My Background
    +  15 years experience in software product management, sales
       engineering, technology evangelism, training, support
    +  Director of Product Management, Broadband Content Services at
       VeriSign, Inc.
    +  Previously:
        ▪  Director of Product Management (Kontiki) for 4.0x, 4.1, 4.2, 5.0 ...
        ▪  Senior Sales Engineer (Kontiki) for E&Y, Verizon
        ▪  Group Product Manager (Kontiki) for 1.0, 1.1, 1.2, 2.0
        ▪  Group Product Manager (Netscape) for Gecko Browser Engine
        ▪  Senior Technology Evangelist (Netscape) for JavaScript
        ▪  Technology Evangelist (Interleaf Japan)
        ▪  B.S. in Computer Science & B.A. in Japanese from Stanford




2
About VeriSign and Kontiki
    +  Kontiki Inc.
        ▪  Founded November 2000
        ▪  Developed secure commercial peer-to-peer (P2P) content delivery
           solution used by both enterprises for internal communication and media
           companies for B2C content delivery
        ▪  Acquired March 2006 by VeriSign for $63M

    +  VeriSign Inc.
        ▪  Mission: to enable and protect all the world’s network interactions
        ▪  Supports secure content distribution to both mobile and broadband
           consumers
        ▪  Launched VeriSign Intelligent CDN December 2006 based on Kontiki
           technology & VeriSign Constellation infrastructure
            –  Next-generation content delivery network (CDN) that enables delivery of
               higher quality rich media at lower cost by use of VeriSign Kontiki P2P
               technology




3
What We’re Going to Cover
    +  Common problems in software development
    +  How process can improve product definition and development and
       company performance
    +  A product definition/development, feature drop, and change control
       process that worked for Kontiki Inc. for two years and 13 releases
    +  Results of following those processes




4
You Know Your Process Has Problems When …
     (all real problems seen various places)
    +  No one in eng believes schedule can be met.
       ▪  Company commits to schedule anyway.

    +  “Wait, shouldn’t the schedule have accounted for QAing
       the product on Windows?”
    +  Major destabilizing “skunk works” architectural changes
       introduced well into development without adjusting
       schedule.
       ▪  ANY new features are introduced after PRD (Product
         Requirements Document) complete, design complete, and/or
         schedule commit without adjusting the schedule.

    +  Company has no definition of “PRD complete,” “design
       complete,” “feature complete,” and “code complete.”
5
You Know Your Process Has Problems When …
    (all real problems seen various places)
    +  6 weeks before scheduled Release To Manufacturing
       (RTM), 250 bugs & enhancements are untriaged
    +  Company has committed to ship a product with a fatal
       flaw that will cause it to fail customer security reviews
       ▪  “It would have taken too long to fix it”

    +  Call from legal counsel: “Hey, you’d better file for export
       approval … the last PM never did …”
    +  Customer beta feedback: “Hey, why’d you take that
       feature out … we depend on it!” (Sales Engineer was
       sure no one used it … no one checked with the customer
       …)
    +  No one can figure out what certain lines in the PRD were
       supposed to mean


6
You Know Your Process Has Problems When …
    (all real problems seen various places)
    +  There’s no specification for the product user interface
    +  “Can anyone tell me how this feature is supposed to
       work?”
    +  Company has deemed unimportant known issues that
       key customers consider unacceptable.
    +  “We’ve never seen an email like that from product
       management before.” (sales rep, upon receiving a
       request for input)
    +  “Wait, customer X HAS to have feature Y … why isn’t
       that in the plan?”


7
You Know Your Process Has Problems When …
    (all real problems seen various places)
    +  Customer: “We feel like you stopped talking to us.”
    +  Sales: “We decided we weren’t even going to mention
       that to [customer name] for now …”
    +  You have impressively detailed 24 month product
       roadmaps that have no relation to reality.
    +  Numerous stop-ship bugs are found just before RTM
    +  One day before the beta date, an executive review
       determines the beta will actually have to slip by six
       months
    +  You slip 6 month server/client dev plans by 4 and 6
       months, 2 months before planned RTM
    +  You never hit your release dates


8
Myth
    +  “Engineers will take as much time to ship products as you give
       them.”
        ▪    Consequences:
              1.  Company imposes unrealistic/unbuffered schedules thinking this will speed
                  delivery.
              2.  Eng/QA becomes frustrated and demoralized.
              3.  Eng won’t make maximum efforts to hit a schedule they never believed in.
              4.  Frustrated engineers leave company.
              5.  Releases miss announced dates.
              6.  Return to step 1 and repeat until fired or bankrupt …
    +  Antidote:
        ▪    Make detailed, rigorous, complete PRDs reviewed by sales, executives,
             and engineering.
        ▪    Have engineering do thorough bottoms-up level of effort estimates on
             all features and “major bugs.”
        ▪    Iteratively negotiate work/schedule tradeoff until optimal tradeoff is
             identified.



9
“Roadmap” -- the root of all confusion?
     +  Executives, Customers: “I want to see the roadmap.”
     +  Sales: “But I saw it on the roadmap … it was committed!”
     +  PM: “That was only a roadmap.”

     +  The problem:
         ▪  Some consider “roadmap” an illustration of possibilities, subject to
            change (e.g. marketing & PM, selling the dream)
         ▪  Others consider “roadmap” hard and fast commitments that can be
            promised to customers (e.g. sales)

     +  A solution:
         ▪  Have a clear, written Plan of Record that shows only firm commitments
         ▪  Rather than a “roadmap,” show “what is committed” and “what is under
           consideration”




10
The Iron Triangle of Sales Needs

     +  Sales primarily wants three things from product
        management:
        ▪  Deliver the features and benefits customers/prospects are asking
           for within the timeframes they want it.
        ▪  Never miss a commitment to anyone.
        ▪  Flexibility to add new deliverables and/or change the plan at any
           time.

     +  These goals are each good, legitimate, and
        understandable, but are fundamentally in conflict and
        irreconcilable.
     +  Each account team sells to different customers, leading to
        additional conflict among requests.
11
The Iron Triangle of Sales Needs: The Solution
     +    Define a solid product definition and delivery process.
     +    Educate company about process and why it’s important.
     +    Get process approved and made official.
     +    Follow the process.
     +    Use the process to develop the best possible plan with the time,
          resources, and information available.
           ▪  Spend more time on due diligence. If you don’t get every decision right
              (enough), you can’t defend plan later.
           ▪  Incorporate adequate buffer to cover the unexpected & unknown.
     +    Get everyone’s buy-in to the plan before company commits.
     +    Communicate the outcome and commitment to all concerned.
     +    Fight like hell to stick to plan once committed.
     +    Insist on schedule adjustments where needed if plan must be
          changed.



12
Problems That Good Process Can Help Prevent
     +  Committing way too much work in a given time period and planning
        to cut features later “if we run out of time.”
     +  Opportunity of the Day Syndrome
     +  Shiny Object Syndrome
     +  Pursuing off-strategy opportunities
     +  Sales or executives going directly to engineering
         ▪  Process gives eng a way to say no, force an exec meeting

     +  Engineering building what it wants instead of what the customers
        want
     +  Product management guessing what market needs
     +  Company building what it THINKS customers want instead of what
        they DO want

13
Commitment Techniques in Product Management

     +  Lessons from social psychology research
        studies:
       ▪  People are happier and more likely to comply if they
         feel VALIDATED.
          –  You listened.
          –  You understood.
          –  You repeated what you heard with empathy to prove it.
       ▪  People are more likely to comply if they say they will.
          –  … especially if they say so in front of other people.




14
Key Processes Used by Kontiki Inc.

     +  Feature Drop Process
     +  Product Definition & Development Process
     +  Change Control Process




15
A Feature Drop Process that Worked for Kontiki
     +  Confirm with core product team (PM, eng, QA) you really want to
        drop feature
     +  Document in writing everything you are proposing to drop, including:
         ▪    Product UI (fields, controls)
         ▪    API calls
         ▪    Preferences or configuration settings
         ▪    Data (schema fields, etc.)
         ▪    Capabilities & benefits (e.g. ability to centrally manage X, support for
              platform Y, etc.)
     +  Update PRD and (if needed) road map to note that the proposed
        change is pending
     +  Email proposal to sales, support, PM, eng
         ▪  Specify deadline for objections

     +  Restate proposal at next sales meeting
     +  Identify any customers currently using feature

16
A Feature Drop Process that Worked for Kontiki
     (cont’d)
     +  Work with account teams to communicate change to relevant
        customers
     +  At some point, email proposal to customers
     +  Include proposal in overall “road map update” presentation emailed
        and/or presented to each customer
         ▪  Archive presentations you give/send to each customer!

     +  Get confirmation from responsible party at each affected customer
        that they accept feature drop proposal
         ▪  Permanently document confirmer name & date received

     +  After verifying change won’t hurt existing customers or block sales at
        prospects, do change control process to ratify decision at executive
        staff



17
A Feature Drop Process that Worked for Kontiki
     (cont’d)
     +  Notify sales, support, PM, eng of ratification; list customer approvals
     +  ONLY THEN: file bug reports to start removing the feature!




18
Results of Following Feature Drop Process
     +  63 features (including support for obsolete browser, mail
        client, OS, media player versions) successfully
        permanently dropped over two years
     +  10 more features removed at client architectural
        transition with possibility of future restoration
     +  Zero customer escalations
     +  Zero emergency restorations or respins
     +  Major savings of engineering & QA effort
     +  Only two customer representatives later expressed
        surprise
        ▪  One had not been informed by co-worker who approved removal
        ▪  One had forgotten they approved feature drop
        ▪  Both accepted change when shown presentation we’d given and
          that their company had accepted

19
A Product Definition and Development Process that
     Worked for Kontiki for Two Years & 13 Releases
     +  Release Definition / Requirements Gathering
        ▪  Define high-level objectives, target audience/customer(s), and
             scope of release (major, minor, or maintenance) [PM]
        ▪    Define codename [PM]
        ▪    Create bug database keywords for nomination, approval, and
             rejection of changes for the release [QA]
        ▪    Solicit input from sales, eng, QA, support, operations of
             proposed work [PM]
        ▪    Inform customers "release planning window" has opened [PM]
        ▪    Meet with each key customer and solicit input [PM]




20
A Product Definition and Development Process
     that Worked for Kontiki (cont’d)
     +  Product Work Definition:
         ▪  Create first draft PRD(s) for release. [PM] Cover:
            –  Target market
            –  Features & benefits
            –  Quality target
            –  Security
            –  Performance targets including quantitative metrics
            –  Language support
            –  Supported OS & 3rd party component versions including
               browsers, players, helper apps, virus checkers, etc. New
               versions? Add/drop?




21
A Product Definition and Development Process
     that Worked for Kontiki (cont’d)
       ▪  Create first draft PRD(s) (cont’d)
          –  Necessary and desirable timeframe for release
          –  Quantifiable success criteria for release including per-
             customer revenue enablement goals (if any)
          –  Assumptions
          –  Open issues and any risk areas




22
A Product Definition and Development Process
     that Worked for Kontiki (cont’d)
     +  Product Work Definition:
       ▪  Define bug triage criteria [PM]
       ▪  Review bugs & enhancements: [PM]
          –  Definite or possible sales blockers for prospects
          –  Known enhancement requests from customers
          –  All bugs doable for this kind of release (maintenance, minor,
             or major)
          –  Any possible security issues
          –  Bugs rejected for previous release & not already assigned to
             maintenance, minor, major, future buckets
          –  Nominate/approve bugs/enhancements




23
A Product Definition and Development Process
     that Worked for Kontiki (cont’d)
     +  Product Work Definition
        ▪  Kick off Feature Drop Process where necessary [PM]
        ▪  Kick off eng/QA Level of Effort estimates: major features, then
           minor features, then “big bugs”
        ▪  Write presentation describing proposed release, with tentative
           dates, for customer review meetings [PM]
        ▪  Review presentation with each customer [PM]
            –  Archive what you showed each customer!
        ▪  Iteratively review PRDs with sales / eng / qa / ops [PM]
        ▪  Hold "cross-PRD customer requirements review meeting” [PM]
        ▪  Finalize PRDs = “PRD Complete” milestone
        ▪  Official hand-off of PRD




24
A Product Definition and Development Process
     that Worked for Kontiki (cont’d)
     +  Product Work Definition
        ▪  Kick off engineering design effort
        ▪  Do pre-design sanity check security review discussion [eng, PM]
        ▪  Ensure adequate spec of UI and functionality requirements
             exists [PM, eng]
        ▪    As appropriate, review design with SEs, client services,
             customers [PM, eng]
        ▪    As time/resources allow, do usability testing [PM]
        ▪    Complete Level of Effort estimates for all items [eng, QA, PM]
        ▪    Do bottoms-up schedule, timeline for all items [eng]
        ▪    Determine amount of buffer for release date [eng, PM, QA]




25
A Product Definition and Development Process
     that Worked for Kontiki (cont’d)
     +  Product Work Definition
        ▪  Review eng spec to confirm it satisfies PRD requirements [PM,
             eng]
        ▪    Conduct security review [PM, eng, QA, SE]
        ▪    Get executive staff approval of final schedule Communicate
             approved final release plan & external schedule to customers
             [PM]
        ▪    Archive the presentation!
        ▪    Document QA test plan [QA]
        ▪    Review QA test plan with sales to ensure understand of what is/
             isn’t tested and how deeply [PM, QA]
        ▪    Gather documentation requirements [doc lead]
        ▪    Define proposed doc plan for release [doc lead]
        ▪    Iteratively review doc plan with customers, sales, eng, QA ops
             until finalized [doc lead]
26
A Product Definition and Development Process
     that Worked for Kontiki (cont’d)
     +  Legal Compliance
        ▪  If creating new product with strong cryptography or increasing
           strength of existing cryptography, work with legal to determine if
           export certification is needed. If needed, start early: 30-45 day
           lead time!
        ▪  If more open source software is to be used with product, update
           list of o.s. software and work with legal to verify license
           acceptability and compliance
            –  Ditto for any o.s. software distribution
        ▪  Evaluate any changes to legal privacy requirements
        ▪  If new product/product area, do general review with legal (End
          User Licensing Agreement, etc.)




27
A Product Definition and Development Process
     that Worked for Kontiki (cont’d)
     +  Development Process Management
        ▪  Schedule & attend team meetings as needed [PM]
        ▪  Keep “for PM review” bugs list at zero [PM]
        ▪  Triage new bugs and keep nominees list at zero [program
           manager, QA, with PM help as needed]
        ▪  Flag bugs for release notes as needed [all]

     +  Beta program
        ▪  Define goals [PM]
        ▪  Identify target customer(s) [PM]
        ▪  Get agreement to participate from customer(s) [PM]
        ▪  Ensue doc created to support beta [PM]
        ▪  Provide customers beta software, doc [support, ops]
        ▪  Gather feedback from customers & support [PM]


28
A Product Definition and Development Process
     that Worked for Kontiki (cont’d)
     +  Shipping Process
        ▪  Identify issues that will affect deployment process (e.g.
             migration) & communicate to support, SEs, client services, as
             appropriate [PM]
        ▪    Keep “for PM review” bug tally at zero! [PM]
        ▪    Ensure all needed release notes get written [PM, support]
        ▪    Copy draft release notes from bug reports into actual release
             notes document [support]
        ▪    Review WONTFIX bugs and mark CLOSED to approve [PM]

     +  Launch
        ▪  Finalize name/number of release [PM]
        ▪  Work with outbound marketing as needed to support product
             launch [PM]

     +  Deployment
        ▪  Support sales & support in customer communication [PM]

29
A Product Definition and Development Process
     that Worked for Kontiki (cont’d)
     +  Post-Release
        ▪  Schedule and hold post-mortem review
            –  Identify action items for future process improvement.
        ▪  Permanently archive all release-related documents




30
Change Control Process
     +  When used:
        ▪  New feature request that isn’t included in the current product
           plan as specified by the written Plan of Record (POR) and PRDs
        ▪  Any feature or implementation change that impacts schedule on
           POR
        ▪  When action will take more than an hour of time from a
           developer, QA tester, or UI designer

     +  Steps:
        ▪  Define work
        ▪  Estimate level of effort, get PM/Eng/QA approval
        ▪  Review at executive staff meeting, get approval

     +  Benefits:
        ▪  Gives eng, QA a way to say “no” to execs, sales, PMs, others
        ▪  Provides a structured way to change plans when needed


31
Iterative Refinement: A Hybrid Between Waterfall
     and Extreme Programming
     +  Define the big “must do, will do, universally agreed” chunks first and
        get engineering to start work on them right away
     +  Continue evaluating “may do” features and iteratively refining the list
        based on customer/prospect/sales/support/executive input and
        engineering/QA level of effort estimates
     +  Postpone finalizing decisions where you need to and can afford to
     +  Iteratively develop and communicate tentative top-down, tentative
        bottoms-up, and final bottoms-up schedules
     +  Kontiki CEO on largest release company ever did: “I’ve never seen a
        release definition finalized as late in the process as we did …” yet
        the release shipped 6 weeks ahead of schedule after an 18 month
        development cycle


32
Results of Following This Process*
     +  13 consecutive releases shipped on or ahead of schedule (on a
        resource-constant basis)
         ▪  In every case that release was necessary to get customer business,
            release met deadline, passed customer acceptance, and deal closed
     +  Record number of new customers for company on both enterprise
        and media sides
     +  Profitability achieved for first time
     +  Company valuation greatly increased over 16 months after third
        round of financing
     +  $62 million acquisition by VeriSign 16 months after third round of
        financing
     +  Company products and technology used as a foundation for
        VeriSign Intelligent CDN, major new managed serving offering
        launched 9 months after acquisition closed

     * and an improving market, new company leadership, etc. …

33
Results: Annual Employee Survey Results (Dec
     ’04 – Dec ’05)
     Biggest deviations from last employee survey:
     Teamwork
     +  After the debate, we move forward and support decisions made. (95%)
     +  Everyone has the opportunity to express their opinions (95%)
     +  We challenge each other's thinking to get the best idea/solution (90%)
     +  We are driven by facts, not opinions. (74%)
     +  We foster open debate (84%)
     Management
     +  We focus on the critical few vs. the trivial many (69%)
     +  We get results by focusing motivated capable people on a shared objective
        (95%)
     Communication
     +  We focus on listening and understanding. (90%)
     +  We foster open and direct communication. (95%)
     +  Overall, I have a good understanding of the company's focus and efforts
        (95%)
     +  We communicate early and often. (90%)

34
Best Practice: Record Everything On the Intranet
     +  What if you or a co-worker leave or go on vacation?
     +  What if someone needs information you know and doesn’t know you
        know it?
     +  What if a new employee needs to get up to speed and review an
        account’s history?
     +  What if you forget the status of something?




35
Best Practice: Use a Wiki for Your Intranet
     +  “I can never find anything on our intranet and it’s all out of date
        anyway.” (Sound familiar?)
     +  If you want people to keep intranet pages up to date, how do you
        get them to do that? MAKE IT EASY!
     +  If you want people to collaborate, how do you get them to do that?
        MAKE IT EASY!
     +  If you want a culture in which everyone feels free to contribute, how
        do you achieve that? MAKE IT EASY!
     +  Wikis address all of these needs.
         ▪  To update a page, you just click Edit, type, and Save. It’s too easy NOT
            to correct something that’s wrong or out of date!
         ▪  To add a new page, you click Edit, type something like [Page Pretty
            Name|Internal Name], hit Save, click the new link, type, and Save
         ▪  Don’t need to know HTML. ANYONE CAN DO THIS!




36
Great Uses for Wiki Pages
     +  “To Do” lists                       +  Archiving all “FYI” emails sent
     +  “Open Issues” lists                    out by product management,
     +  Individual status page for every       especially to sales force
        open issue
         ▪  Known problems                  +  Archiving customer meeting
         ▪  New features                       notes
         ▪  Page for each release
                                            +  Individual status page for every
     +  Maintaining FAQs
                                               customer
     +  Lists of links to other resources       ▪  Summarize deployment, use
        (documents, videos, FAQs,                 cases, known issues,
        repositories)                             platforms, application,
     +  List of contacts by function for          requirements, account history,
        a project                                 etc.
     +  Training steps for new hires
     +  History of decisions on project


37
Disclaimers: Your Mileage May Vary
     +  For this to work:
         ▪  Company culture must follow Jim Barksdale’s rule: “The product
            manager is the CEO of the product.”
         ▪  Company executives must agree to follow the process.
         ▪  As a product manager you must execute the process faithfully,
            thoroughly, and successfully or management will not let you continue to
            follow it.

     +  We were working with finite number of large accounts
     +  Much easier to do at a small company than at a large one.
     +  Employees I was working with during this better were way better
        than average quality.
         ▪  Most team members had been working together for 2-3 years, knew
           each other’s strengths and weaknesses




38
Summary

     +  Good process:
        ▪  Saves more effort than it consumes
        ▪  Prevents more conflict than it creates
        ▪  Surfaces issues sooner, enabling easier/better resolution
        ▪  Enables increased sales
        ▪  Improves customer satisfaction
        ▪  Improves employee satisfaction & retention
        ▪  Increases odds of company success (and survival!)
        ▪  Is totally, totally worth it




39
Q&A




40
Deadly Sins of Product Management
     +  Sloth: Failing to do sufficient due diligence
     +  Vagueness: writing doc that could be misunderstood
     +  Undercommunication: could anyone not know?
     +  Pride:
         ▪  thinking you know the answer instead of asking
         ▪  ignoring eng, QA, sales, customer, exec input

     +  Wishful thinking
     +  “Inside the Beltway Thinking:” adhering to beliefs inside the building
        that don’t apply outside the building
         ▪  “This issue isn’t a big deal because it doesn’t happen often”




41
Principles to Live By
     +    Humility: “I am a fool” -- Socrates
     +    Listen: to customers, sales, engineering
     +    Write it down: take and archive notes
     +    Tell the truth: to yourself, customers, executives, sales, engineering
           ▪  If you don’t know, say so!
           ▪  Bad news doesn’t improve with age
     +    Get buy-in: from executives, eng, sales, customers
     +    Communicate in writing: especially to sales and customers
     +    Document customer agreement
     +    Archive what you communicated
     +    Expect the unexpected
           ▪  Practice realistic scheduling
           ▪  Include adequate schedule buffer: 30%




42

Mais conteúdo relacionado

Mais procurados

Entrepreneurial product development
Entrepreneurial product developmentEntrepreneurial product development
Entrepreneurial product developmentElaine Chen
 
Product Development Using Agile and Lean Principles
Product Development Using Agile and Lean PrinciplesProduct Development Using Agile and Lean Principles
Product Development Using Agile and Lean PrinciplesTathagat Varma
 
The Creative Product Owner
The Creative Product OwnerThe Creative Product Owner
The Creative Product OwnerAl Bennett
 
Contract Manufacturing - CMD Prototyping
Contract Manufacturing - CMD PrototypingContract Manufacturing - CMD Prototyping
Contract Manufacturing - CMD PrototypingNORCAT
 
Ent101 - Product Development (by Minalytix)
Ent101 - Product Development (by Minalytix)Ent101 - Product Development (by Minalytix)
Ent101 - Product Development (by Minalytix)NORCAT
 
Agile ALM Virtual Study Group Session 2 - Backlog management
Agile ALM Virtual Study Group Session 2 - Backlog managementAgile ALM Virtual Study Group Session 2 - Backlog management
Agile ALM Virtual Study Group Session 2 - Backlog managementIBM Rational software
 
Product Owner Super Powers
Product Owner Super PowersProduct Owner Super Powers
Product Owner Super PowersStefan Haas
 
Collaboration Les Cles Pour Lever Les Freins A L Innovation
Collaboration Les Cles Pour Lever Les Freins A L InnovationCollaboration Les Cles Pour Lever Les Freins A L Innovation
Collaboration Les Cles Pour Lever Les Freins A L InnovationValtech
 
Practical-Agile Product owner workshop
Practical-Agile Product owner workshopPractical-Agile Product owner workshop
Practical-Agile Product owner workshopElad Sofer
 
What is Customer Validation
What is Customer ValidationWhat is Customer Validation
What is Customer ValidationCentercode
 
Eric Ries Lean Startup Presentation For Web 2.0 Expo April 1 2009 A Disciplin...
Eric Ries Lean Startup Presentation For Web 2.0 Expo April 1 2009 A Disciplin...Eric Ries Lean Startup Presentation For Web 2.0 Expo April 1 2009 A Disciplin...
Eric Ries Lean Startup Presentation For Web 2.0 Expo April 1 2009 A Disciplin...Eric Ries
 
Product Discovery At Google
Product Discovery At GoogleProduct Discovery At Google
Product Discovery At GoogleJohn Gibbon
 
Lean New Product Introduction
Lean New Product IntroductionLean New Product Introduction
Lean New Product Introductionguest0631f5e
 
Scrum - Product Owner
Scrum - Product OwnerScrum - Product Owner
Scrum - Product OwnerMárcio Oya
 
Product development methods agile, scrum and lean startup
Product development methods  agile, scrum and lean startupProduct development methods  agile, scrum and lean startup
Product development methods agile, scrum and lean startupKrunal Naik, MBA, PMP, CSM
 
Eric Ries Lean Startup Schematic View Of Agile Development And Customer Devel...
Eric Ries Lean Startup Schematic View Of Agile Development And Customer Devel...Eric Ries Lean Startup Schematic View Of Agile Development And Customer Devel...
Eric Ries Lean Startup Schematic View Of Agile Development And Customer Devel...Eric Ries
 
2009_06_08 The Lean Startup Tokyo edition
2009_06_08 The Lean Startup Tokyo edition2009_06_08 The Lean Startup Tokyo edition
2009_06_08 The Lean Startup Tokyo editionEric Ries
 
The ROI of Beta Testing
The ROI of Beta TestingThe ROI of Beta Testing
The ROI of Beta TestingCentercode
 

Mais procurados (20)

Introducing Agile
Introducing AgileIntroducing Agile
Introducing Agile
 
Entrepreneurial product development
Entrepreneurial product developmentEntrepreneurial product development
Entrepreneurial product development
 
Product Development Using Agile and Lean Principles
Product Development Using Agile and Lean PrinciplesProduct Development Using Agile and Lean Principles
Product Development Using Agile and Lean Principles
 
The Creative Product Owner
The Creative Product OwnerThe Creative Product Owner
The Creative Product Owner
 
Contract Manufacturing - CMD Prototyping
Contract Manufacturing - CMD PrototypingContract Manufacturing - CMD Prototyping
Contract Manufacturing - CMD Prototyping
 
Ent101 - Product Development (by Minalytix)
Ent101 - Product Development (by Minalytix)Ent101 - Product Development (by Minalytix)
Ent101 - Product Development (by Minalytix)
 
Agile ALM Virtual Study Group Session 2 - Backlog management
Agile ALM Virtual Study Group Session 2 - Backlog managementAgile ALM Virtual Study Group Session 2 - Backlog management
Agile ALM Virtual Study Group Session 2 - Backlog management
 
Product Owner Super Powers
Product Owner Super PowersProduct Owner Super Powers
Product Owner Super Powers
 
Martijn Beijk & Charles Goodall
Martijn Beijk & Charles GoodallMartijn Beijk & Charles Goodall
Martijn Beijk & Charles Goodall
 
Collaboration Les Cles Pour Lever Les Freins A L Innovation
Collaboration Les Cles Pour Lever Les Freins A L InnovationCollaboration Les Cles Pour Lever Les Freins A L Innovation
Collaboration Les Cles Pour Lever Les Freins A L Innovation
 
Practical-Agile Product owner workshop
Practical-Agile Product owner workshopPractical-Agile Product owner workshop
Practical-Agile Product owner workshop
 
What is Customer Validation
What is Customer ValidationWhat is Customer Validation
What is Customer Validation
 
Eric Ries Lean Startup Presentation For Web 2.0 Expo April 1 2009 A Disciplin...
Eric Ries Lean Startup Presentation For Web 2.0 Expo April 1 2009 A Disciplin...Eric Ries Lean Startup Presentation For Web 2.0 Expo April 1 2009 A Disciplin...
Eric Ries Lean Startup Presentation For Web 2.0 Expo April 1 2009 A Disciplin...
 
Product Discovery At Google
Product Discovery At GoogleProduct Discovery At Google
Product Discovery At Google
 
Lean New Product Introduction
Lean New Product IntroductionLean New Product Introduction
Lean New Product Introduction
 
Scrum - Product Owner
Scrum - Product OwnerScrum - Product Owner
Scrum - Product Owner
 
Product development methods agile, scrum and lean startup
Product development methods  agile, scrum and lean startupProduct development methods  agile, scrum and lean startup
Product development methods agile, scrum and lean startup
 
Eric Ries Lean Startup Schematic View Of Agile Development And Customer Devel...
Eric Ries Lean Startup Schematic View Of Agile Development And Customer Devel...Eric Ries Lean Startup Schematic View Of Agile Development And Customer Devel...
Eric Ries Lean Startup Schematic View Of Agile Development And Customer Devel...
 
2009_06_08 The Lean Startup Tokyo edition
2009_06_08 The Lean Startup Tokyo edition2009_06_08 The Lean Startup Tokyo edition
2009_06_08 The Lean Startup Tokyo edition
 
The ROI of Beta Testing
The ROI of Beta TestingThe ROI of Beta Testing
The ROI of Beta Testing
 

Destaque

Managing Remote Product Managers
Managing Remote Product ManagersManaging Remote Product Managers
Managing Remote Product ManagersPinkesh Shah
 
Evolving the Product Management Process to Match Company Growth
Evolving the Product Management Process to Match Company GrowthEvolving the Product Management Process to Match Company Growth
Evolving the Product Management Process to Match Company GrowthSVPMA
 
Product management vs. product leadership
Product management vs. product leadershipProduct management vs. product leadership
Product management vs. product leadershipAnthony Broad-Crawford
 
Como Criar, Estimar, Priorizar e Manter o Product Backlog
Como Criar, Estimar, Priorizar e Manter o Product BacklogComo Criar, Estimar, Priorizar e Manter o Product Backlog
Como Criar, Estimar, Priorizar e Manter o Product BacklogRildo (@rildosan) Santos
 
2014 future of product management
2014 future of product management2014 future of product management
2014 future of product managementJanice Fraser
 
How to Create a Product Management Process That Doesn't Suck
How to Create a Product Management Process That Doesn't SuckHow to Create a Product Management Process That Doesn't Suck
How to Create a Product Management Process That Doesn't SuckIntelligent_ly
 
A Product Manager's Job
A Product Manager's JobA Product Manager's Job
A Product Manager's Jobjoshelman
 

Destaque (9)

Managing Remote Product Managers
Managing Remote Product ManagersManaging Remote Product Managers
Managing Remote Product Managers
 
Evolving the Product Management Process to Match Company Growth
Evolving the Product Management Process to Match Company GrowthEvolving the Product Management Process to Match Company Growth
Evolving the Product Management Process to Match Company Growth
 
Product management vs. product leadership
Product management vs. product leadershipProduct management vs. product leadership
Product management vs. product leadership
 
Product management
Product managementProduct management
Product management
 
Como Criar, Estimar, Priorizar e Manter o Product Backlog
Como Criar, Estimar, Priorizar e Manter o Product BacklogComo Criar, Estimar, Priorizar e Manter o Product Backlog
Como Criar, Estimar, Priorizar e Manter o Product Backlog
 
2014 future of product management
2014 future of product management2014 future of product management
2014 future of product management
 
How to Create a Product Management Process That Doesn't Suck
How to Create a Product Management Process That Doesn't SuckHow to Create a Product Management Process That Doesn't Suck
How to Create a Product Management Process That Doesn't Suck
 
Lean Startup for Agile Product Management
Lean Startup for Agile Product ManagementLean Startup for Agile Product Management
Lean Startup for Agile Product Management
 
A Product Manager's Job
A Product Manager's JobA Product Manager's Job
A Product Manager's Job
 

Semelhante a Using Great Product Management Process for Great Results

From Project to Product - 'Big Rock' Constraints & How to Overcome Them
From Project to Product - 'Big Rock' Constraints & How to Overcome ThemFrom Project to Product - 'Big Rock' Constraints & How to Overcome Them
From Project to Product - 'Big Rock' Constraints & How to Overcome ThemCprime
 
From Project to Product: “Big Rock” Constraints and How to Overcome Them
From Project to Product: “Big Rock” Constraints and How to Overcome ThemFrom Project to Product: “Big Rock” Constraints and How to Overcome Them
From Project to Product: “Big Rock” Constraints and How to Overcome ThemCprime
 
Liberating your Teams from Rigid Scope and Date Agreements.pdf
Liberating your Teams from Rigid Scope and Date Agreements.pdfLiberating your Teams from Rigid Scope and Date Agreements.pdf
Liberating your Teams from Rigid Scope and Date Agreements.pdfRowan Bunning
 
3wks Introduction Pack
3wks Introduction Pack3wks Introduction Pack
3wks Introduction PackAlex Freeman
 
Scaling Your Service-Based Business with Software
Scaling Your Service-Based Business with SoftwareScaling Your Service-Based Business with Software
Scaling Your Service-Based Business with SoftwareElyse Ash
 
From Project to Product - The Need for Speed
From Project to Product - The Need for SpeedFrom Project to Product - The Need for Speed
From Project to Product - The Need for SpeedCprime
 
Doing agile with an ISO-20000 Telco (AgilePT 2015)
Doing agile with an ISO-20000 Telco (AgilePT 2015)Doing agile with an ISO-20000 Telco (AgilePT 2015)
Doing agile with an ISO-20000 Telco (AgilePT 2015)Manuel Padilha
 
Rich Mironov - Product Management Auckland Talk Slides
Rich Mironov - Product Management Auckland Talk SlidesRich Mironov - Product Management Auckland Talk Slides
Rich Mironov - Product Management Auckland Talk SlidesAnthony Marter
 
Four Laws of Tech Product Economics - Rich Mironov
Four Laws of Tech Product Economics - Rich MironovFour Laws of Tech Product Economics - Rich Mironov
Four Laws of Tech Product Economics - Rich MironovProductCampPortland
 
Publishing Strategic Technology for Association of Catholic Publishers
Publishing Strategic Technology for Association of Catholic PublishersPublishing Strategic Technology for Association of Catholic Publishers
Publishing Strategic Technology for Association of Catholic PublishersCraig Miller
 
From Project to Product: Don't You Dare Mess With Planning
From Project to Product: Don't You Dare Mess With PlanningFrom Project to Product: Don't You Dare Mess With Planning
From Project to Product: Don't You Dare Mess With PlanningCprime
 
Examples of Using Heroku With Force.com to Build Apps
Examples of Using Heroku With Force.com to Build AppsExamples of Using Heroku With Force.com to Build Apps
Examples of Using Heroku With Force.com to Build AppsSalesforce Developers
 
Impactful Product Management by MessageBird and eBay, Marktplaats PMs
Impactful Product Management by MessageBird and eBay, Marktplaats PMsImpactful Product Management by MessageBird and eBay, Marktplaats PMs
Impactful Product Management by MessageBird and eBay, Marktplaats PMsProduct School
 
A Brave New World of Delivering IT
A Brave New World of Delivering ITA Brave New World of Delivering IT
A Brave New World of Delivering ITXebiaLabs
 
Why Is Managing Software So Hard?
Why Is Managing Software So Hard?Why Is Managing Software So Hard?
Why Is Managing Software So Hard?Michael Lamont
 
Acid Tango | 5 things to consider when building an in-house product team
Acid Tango | 5 things to consider when building an in-house product teamAcid Tango | 5 things to consider when building an in-house product team
Acid Tango | 5 things to consider when building an in-house product teamElena González Castillo
 
Making Your Product Manager Productive by Clinton Wolfe
Making Your Product Manager Productive by Clinton WolfeMaking Your Product Manager Productive by Clinton Wolfe
Making Your Product Manager Productive by Clinton WolfeDevOpsDays Baltimore
 
Making Your Product Manager Productive by Clinton Wolfe
Making Your Product Manager Productive by Clinton Wolfe Making Your Product Manager Productive by Clinton Wolfe
Making Your Product Manager Productive by Clinton Wolfe DevOpsDays Baltimore
 
How to Plan for Hyper Growth Success by Slack Software Engineer
How to Plan for Hyper Growth Success by Slack Software EngineerHow to Plan for Hyper Growth Success by Slack Software Engineer
How to Plan for Hyper Growth Success by Slack Software EngineerProduct School
 

Semelhante a Using Great Product Management Process for Great Results (20)

From Project to Product - 'Big Rock' Constraints & How to Overcome Them
From Project to Product - 'Big Rock' Constraints & How to Overcome ThemFrom Project to Product - 'Big Rock' Constraints & How to Overcome Them
From Project to Product - 'Big Rock' Constraints & How to Overcome Them
 
From Project to Product: “Big Rock” Constraints and How to Overcome Them
From Project to Product: “Big Rock” Constraints and How to Overcome ThemFrom Project to Product: “Big Rock” Constraints and How to Overcome Them
From Project to Product: “Big Rock” Constraints and How to Overcome Them
 
Liberating your Teams from Rigid Scope and Date Agreements.pdf
Liberating your Teams from Rigid Scope and Date Agreements.pdfLiberating your Teams from Rigid Scope and Date Agreements.pdf
Liberating your Teams from Rigid Scope and Date Agreements.pdf
 
3wks Introduction Pack
3wks Introduction Pack3wks Introduction Pack
3wks Introduction Pack
 
Scaling Your Service-Based Business with Software
Scaling Your Service-Based Business with SoftwareScaling Your Service-Based Business with Software
Scaling Your Service-Based Business with Software
 
From Project to Product - The Need for Speed
From Project to Product - The Need for SpeedFrom Project to Product - The Need for Speed
From Project to Product - The Need for Speed
 
Doing agile with an ISO-20000 Telco (AgilePT 2015)
Doing agile with an ISO-20000 Telco (AgilePT 2015)Doing agile with an ISO-20000 Telco (AgilePT 2015)
Doing agile with an ISO-20000 Telco (AgilePT 2015)
 
Rich Mironov - Product Management Auckland Talk Slides
Rich Mironov - Product Management Auckland Talk SlidesRich Mironov - Product Management Auckland Talk Slides
Rich Mironov - Product Management Auckland Talk Slides
 
Four Laws of Tech Product Economics - Rich Mironov
Four Laws of Tech Product Economics - Rich MironovFour Laws of Tech Product Economics - Rich Mironov
Four Laws of Tech Product Economics - Rich Mironov
 
Publishing Strategic Technology for Association of Catholic Publishers
Publishing Strategic Technology for Association of Catholic PublishersPublishing Strategic Technology for Association of Catholic Publishers
Publishing Strategic Technology for Association of Catholic Publishers
 
From Project to Product: Don't You Dare Mess With Planning
From Project to Product: Don't You Dare Mess With PlanningFrom Project to Product: Don't You Dare Mess With Planning
From Project to Product: Don't You Dare Mess With Planning
 
Future Wonder Offering
Future Wonder OfferingFuture Wonder Offering
Future Wonder Offering
 
Examples of Using Heroku With Force.com to Build Apps
Examples of Using Heroku With Force.com to Build AppsExamples of Using Heroku With Force.com to Build Apps
Examples of Using Heroku With Force.com to Build Apps
 
Impactful Product Management by MessageBird and eBay, Marktplaats PMs
Impactful Product Management by MessageBird and eBay, Marktplaats PMsImpactful Product Management by MessageBird and eBay, Marktplaats PMs
Impactful Product Management by MessageBird and eBay, Marktplaats PMs
 
A Brave New World of Delivering IT
A Brave New World of Delivering ITA Brave New World of Delivering IT
A Brave New World of Delivering IT
 
Why Is Managing Software So Hard?
Why Is Managing Software So Hard?Why Is Managing Software So Hard?
Why Is Managing Software So Hard?
 
Acid Tango | 5 things to consider when building an in-house product team
Acid Tango | 5 things to consider when building an in-house product teamAcid Tango | 5 things to consider when building an in-house product team
Acid Tango | 5 things to consider when building an in-house product team
 
Making Your Product Manager Productive by Clinton Wolfe
Making Your Product Manager Productive by Clinton WolfeMaking Your Product Manager Productive by Clinton Wolfe
Making Your Product Manager Productive by Clinton Wolfe
 
Making Your Product Manager Productive by Clinton Wolfe
Making Your Product Manager Productive by Clinton Wolfe Making Your Product Manager Productive by Clinton Wolfe
Making Your Product Manager Productive by Clinton Wolfe
 
How to Plan for Hyper Growth Success by Slack Software Engineer
How to Plan for Hyper Growth Success by Slack Software EngineerHow to Plan for Hyper Growth Success by Slack Software Engineer
How to Plan for Hyper Growth Success by Slack Software Engineer
 

Mais de Eric Krock

Agile Project Management and Scrum Introduction
Agile Project Management and Scrum IntroductionAgile Project Management and Scrum Introduction
Agile Project Management and Scrum IntroductionEric Krock
 
Getting Started with Social Media Marketing
Getting Started with Social Media MarketingGetting Started with Social Media Marketing
Getting Started with Social Media MarketingEric Krock
 
Getting Started with Social Media Marketing
Getting Started with Social Media MarketingGetting Started with Social Media Marketing
Getting Started with Social Media MarketingEric Krock
 
Introduction to Agile Project Management and Scrum
Introduction to Agile Project Management and ScrumIntroduction to Agile Project Management and Scrum
Introduction to Agile Project Management and ScrumEric Krock
 
Social Media Marketing for the Lean Startup
Social Media Marketing for the Lean StartupSocial Media Marketing for the Lean Startup
Social Media Marketing for the Lean StartupEric Krock
 
Money and Investing 101
Money and Investing 101Money and Investing 101
Money and Investing 101Eric Krock
 
Retirement 101
Retirement 101Retirement 101
Retirement 101Eric Krock
 

Mais de Eric Krock (8)

Agile Project Management and Scrum Introduction
Agile Project Management and Scrum IntroductionAgile Project Management and Scrum Introduction
Agile Project Management and Scrum Introduction
 
Getting Started with Social Media Marketing
Getting Started with Social Media MarketingGetting Started with Social Media Marketing
Getting Started with Social Media Marketing
 
Getting Started with Social Media Marketing
Getting Started with Social Media MarketingGetting Started with Social Media Marketing
Getting Started with Social Media Marketing
 
Introduction to Agile Project Management and Scrum
Introduction to Agile Project Management and ScrumIntroduction to Agile Project Management and Scrum
Introduction to Agile Project Management and Scrum
 
Social Media Marketing for the Lean Startup
Social Media Marketing for the Lean StartupSocial Media Marketing for the Lean Startup
Social Media Marketing for the Lean Startup
 
Money and Investing 101
Money and Investing 101Money and Investing 101
Money and Investing 101
 
Retirement 101
Retirement 101Retirement 101
Retirement 101
 
Insurance 101
Insurance 101Insurance 101
Insurance 101
 

Último

BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756
BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756
BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756dollysharma2066
 
Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝 97111⇛⇛47426
Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝  97111⇛⇛47426Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝  97111⇛⇛47426
Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝 97111⇛⇛47426jennyeacort
 
《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》
《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》
《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》rnrncn29
 
83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...
83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...
83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...dollysharma2066
 
8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway
8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway
8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar HealthywayAmit Kakkar Healthyway
 
labradorite energetic gems for well beings.pdf
labradorite energetic gems for well beings.pdflabradorite energetic gems for well beings.pdf
labradorite energetic gems for well beings.pdfAkrati jewels inc
 
'the Spring 2024- popular Fashion trends
'the Spring 2024- popular Fashion trends'the Spring 2024- popular Fashion trends
'the Spring 2024- popular Fashion trendsTangledThoughtsCO
 
Uttoxeter & Cheadle Voice, Issue 122.pdf
Uttoxeter & Cheadle Voice, Issue 122.pdfUttoxeter & Cheadle Voice, Issue 122.pdf
Uttoxeter & Cheadle Voice, Issue 122.pdfNoel Sergeant
 
Virat Kohli Centuries In Career Age Awards and Facts.pdf
Virat Kohli Centuries In Career Age Awards and Facts.pdfVirat Kohli Centuries In Career Age Awards and Facts.pdf
Virat Kohli Centuries In Career Age Awards and Facts.pdfkigaya33
 
8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr
8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr
8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncrdollysharma2066
 

Último (11)

BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756
BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756
BOOK NIGHT-Call Girls In Noida City Centre Delhi ☎️ 8377877756
 
Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝 97111⇛⇛47426
Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝  97111⇛⇛47426Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝  97111⇛⇛47426
Call In girls Delhi Safdarjung Enclave/WhatsApp 🔝 97111⇛⇛47426
 
《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》
《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》
《QUT毕业文凭网-认证昆士兰科技大学毕业证成绩单》
 
83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...
83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...
83778-876O7, Cash On Delivery Call Girls In South- EX-(Delhi) Escorts Service...
 
8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway
8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway
8 Easy Ways to Keep Your Heart Healthy this Summer | Amit Kakkar Healthyway
 
labradorite energetic gems for well beings.pdf
labradorite energetic gems for well beings.pdflabradorite energetic gems for well beings.pdf
labradorite energetic gems for well beings.pdf
 
'the Spring 2024- popular Fashion trends
'the Spring 2024- popular Fashion trends'the Spring 2024- popular Fashion trends
'the Spring 2024- popular Fashion trends
 
Uttoxeter & Cheadle Voice, Issue 122.pdf
Uttoxeter & Cheadle Voice, Issue 122.pdfUttoxeter & Cheadle Voice, Issue 122.pdf
Uttoxeter & Cheadle Voice, Issue 122.pdf
 
Virat Kohli Centuries In Career Age Awards and Facts.pdf
Virat Kohli Centuries In Career Age Awards and Facts.pdfVirat Kohli Centuries In Career Age Awards and Facts.pdf
Virat Kohli Centuries In Career Age Awards and Facts.pdf
 
8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr
8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr
8377877756 Full Enjoy @24/7 Call Girls In Mayur Vihar Delhi Ncr
 
Call Girls 9953525677 Call Girls In Delhi Call Girls 9953525677 Call Girls In...
Call Girls 9953525677 Call Girls In Delhi Call Girls 9953525677 Call Girls In...Call Girls 9953525677 Call Girls In Delhi Call Girls 9953525677 Call Girls In...
Call Girls 9953525677 Call Girls In Delhi Call Girls 9953525677 Call Girls In...
 

Using Great Product Management Process for Great Results

  • 1. Using Great Product Development Process to Achieve Great Results Eric Krock Director of Product Management for Broadband Content Services, VeriSign Inc. (formerly of Kontiki Inc.) February 7, 2007
  • 2. My Background +  15 years experience in software product management, sales engineering, technology evangelism, training, support +  Director of Product Management, Broadband Content Services at VeriSign, Inc. +  Previously: ▪  Director of Product Management (Kontiki) for 4.0x, 4.1, 4.2, 5.0 ... ▪  Senior Sales Engineer (Kontiki) for E&Y, Verizon ▪  Group Product Manager (Kontiki) for 1.0, 1.1, 1.2, 2.0 ▪  Group Product Manager (Netscape) for Gecko Browser Engine ▪  Senior Technology Evangelist (Netscape) for JavaScript ▪  Technology Evangelist (Interleaf Japan) ▪  B.S. in Computer Science & B.A. in Japanese from Stanford 2
  • 3. About VeriSign and Kontiki +  Kontiki Inc. ▪  Founded November 2000 ▪  Developed secure commercial peer-to-peer (P2P) content delivery solution used by both enterprises for internal communication and media companies for B2C content delivery ▪  Acquired March 2006 by VeriSign for $63M +  VeriSign Inc. ▪  Mission: to enable and protect all the world’s network interactions ▪  Supports secure content distribution to both mobile and broadband consumers ▪  Launched VeriSign Intelligent CDN December 2006 based on Kontiki technology & VeriSign Constellation infrastructure –  Next-generation content delivery network (CDN) that enables delivery of higher quality rich media at lower cost by use of VeriSign Kontiki P2P technology 3
  • 4. What We’re Going to Cover +  Common problems in software development +  How process can improve product definition and development and company performance +  A product definition/development, feature drop, and change control process that worked for Kontiki Inc. for two years and 13 releases +  Results of following those processes 4
  • 5. You Know Your Process Has Problems When … (all real problems seen various places) +  No one in eng believes schedule can be met. ▪  Company commits to schedule anyway. +  “Wait, shouldn’t the schedule have accounted for QAing the product on Windows?” +  Major destabilizing “skunk works” architectural changes introduced well into development without adjusting schedule. ▪  ANY new features are introduced after PRD (Product Requirements Document) complete, design complete, and/or schedule commit without adjusting the schedule. +  Company has no definition of “PRD complete,” “design complete,” “feature complete,” and “code complete.” 5
  • 6. You Know Your Process Has Problems When … (all real problems seen various places) +  6 weeks before scheduled Release To Manufacturing (RTM), 250 bugs & enhancements are untriaged +  Company has committed to ship a product with a fatal flaw that will cause it to fail customer security reviews ▪  “It would have taken too long to fix it” +  Call from legal counsel: “Hey, you’d better file for export approval … the last PM never did …” +  Customer beta feedback: “Hey, why’d you take that feature out … we depend on it!” (Sales Engineer was sure no one used it … no one checked with the customer …) +  No one can figure out what certain lines in the PRD were supposed to mean 6
  • 7. You Know Your Process Has Problems When … (all real problems seen various places) +  There’s no specification for the product user interface +  “Can anyone tell me how this feature is supposed to work?” +  Company has deemed unimportant known issues that key customers consider unacceptable. +  “We’ve never seen an email like that from product management before.” (sales rep, upon receiving a request for input) +  “Wait, customer X HAS to have feature Y … why isn’t that in the plan?” 7
  • 8. You Know Your Process Has Problems When … (all real problems seen various places) +  Customer: “We feel like you stopped talking to us.” +  Sales: “We decided we weren’t even going to mention that to [customer name] for now …” +  You have impressively detailed 24 month product roadmaps that have no relation to reality. +  Numerous stop-ship bugs are found just before RTM +  One day before the beta date, an executive review determines the beta will actually have to slip by six months +  You slip 6 month server/client dev plans by 4 and 6 months, 2 months before planned RTM +  You never hit your release dates 8
  • 9. Myth +  “Engineers will take as much time to ship products as you give them.” ▪  Consequences: 1.  Company imposes unrealistic/unbuffered schedules thinking this will speed delivery. 2.  Eng/QA becomes frustrated and demoralized. 3.  Eng won’t make maximum efforts to hit a schedule they never believed in. 4.  Frustrated engineers leave company. 5.  Releases miss announced dates. 6.  Return to step 1 and repeat until fired or bankrupt … +  Antidote: ▪  Make detailed, rigorous, complete PRDs reviewed by sales, executives, and engineering. ▪  Have engineering do thorough bottoms-up level of effort estimates on all features and “major bugs.” ▪  Iteratively negotiate work/schedule tradeoff until optimal tradeoff is identified. 9
  • 10. “Roadmap” -- the root of all confusion? +  Executives, Customers: “I want to see the roadmap.” +  Sales: “But I saw it on the roadmap … it was committed!” +  PM: “That was only a roadmap.” +  The problem: ▪  Some consider “roadmap” an illustration of possibilities, subject to change (e.g. marketing & PM, selling the dream) ▪  Others consider “roadmap” hard and fast commitments that can be promised to customers (e.g. sales) +  A solution: ▪  Have a clear, written Plan of Record that shows only firm commitments ▪  Rather than a “roadmap,” show “what is committed” and “what is under consideration” 10
  • 11. The Iron Triangle of Sales Needs +  Sales primarily wants three things from product management: ▪  Deliver the features and benefits customers/prospects are asking for within the timeframes they want it. ▪  Never miss a commitment to anyone. ▪  Flexibility to add new deliverables and/or change the plan at any time. +  These goals are each good, legitimate, and understandable, but are fundamentally in conflict and irreconcilable. +  Each account team sells to different customers, leading to additional conflict among requests. 11
  • 12. The Iron Triangle of Sales Needs: The Solution +  Define a solid product definition and delivery process. +  Educate company about process and why it’s important. +  Get process approved and made official. +  Follow the process. +  Use the process to develop the best possible plan with the time, resources, and information available. ▪  Spend more time on due diligence. If you don’t get every decision right (enough), you can’t defend plan later. ▪  Incorporate adequate buffer to cover the unexpected & unknown. +  Get everyone’s buy-in to the plan before company commits. +  Communicate the outcome and commitment to all concerned. +  Fight like hell to stick to plan once committed. +  Insist on schedule adjustments where needed if plan must be changed. 12
  • 13. Problems That Good Process Can Help Prevent +  Committing way too much work in a given time period and planning to cut features later “if we run out of time.” +  Opportunity of the Day Syndrome +  Shiny Object Syndrome +  Pursuing off-strategy opportunities +  Sales or executives going directly to engineering ▪  Process gives eng a way to say no, force an exec meeting +  Engineering building what it wants instead of what the customers want +  Product management guessing what market needs +  Company building what it THINKS customers want instead of what they DO want 13
  • 14. Commitment Techniques in Product Management +  Lessons from social psychology research studies: ▪  People are happier and more likely to comply if they feel VALIDATED. –  You listened. –  You understood. –  You repeated what you heard with empathy to prove it. ▪  People are more likely to comply if they say they will. –  … especially if they say so in front of other people. 14
  • 15. Key Processes Used by Kontiki Inc. +  Feature Drop Process +  Product Definition & Development Process +  Change Control Process 15
  • 16. A Feature Drop Process that Worked for Kontiki +  Confirm with core product team (PM, eng, QA) you really want to drop feature +  Document in writing everything you are proposing to drop, including: ▪  Product UI (fields, controls) ▪  API calls ▪  Preferences or configuration settings ▪  Data (schema fields, etc.) ▪  Capabilities & benefits (e.g. ability to centrally manage X, support for platform Y, etc.) +  Update PRD and (if needed) road map to note that the proposed change is pending +  Email proposal to sales, support, PM, eng ▪  Specify deadline for objections +  Restate proposal at next sales meeting +  Identify any customers currently using feature 16
  • 17. A Feature Drop Process that Worked for Kontiki (cont’d) +  Work with account teams to communicate change to relevant customers +  At some point, email proposal to customers +  Include proposal in overall “road map update” presentation emailed and/or presented to each customer ▪  Archive presentations you give/send to each customer! +  Get confirmation from responsible party at each affected customer that they accept feature drop proposal ▪  Permanently document confirmer name & date received +  After verifying change won’t hurt existing customers or block sales at prospects, do change control process to ratify decision at executive staff 17
  • 18. A Feature Drop Process that Worked for Kontiki (cont’d) +  Notify sales, support, PM, eng of ratification; list customer approvals +  ONLY THEN: file bug reports to start removing the feature! 18
  • 19. Results of Following Feature Drop Process +  63 features (including support for obsolete browser, mail client, OS, media player versions) successfully permanently dropped over two years +  10 more features removed at client architectural transition with possibility of future restoration +  Zero customer escalations +  Zero emergency restorations or respins +  Major savings of engineering & QA effort +  Only two customer representatives later expressed surprise ▪  One had not been informed by co-worker who approved removal ▪  One had forgotten they approved feature drop ▪  Both accepted change when shown presentation we’d given and that their company had accepted 19
  • 20. A Product Definition and Development Process that Worked for Kontiki for Two Years & 13 Releases +  Release Definition / Requirements Gathering ▪  Define high-level objectives, target audience/customer(s), and scope of release (major, minor, or maintenance) [PM] ▪  Define codename [PM] ▪  Create bug database keywords for nomination, approval, and rejection of changes for the release [QA] ▪  Solicit input from sales, eng, QA, support, operations of proposed work [PM] ▪  Inform customers "release planning window" has opened [PM] ▪  Meet with each key customer and solicit input [PM] 20
  • 21. A Product Definition and Development Process that Worked for Kontiki (cont’d) +  Product Work Definition: ▪  Create first draft PRD(s) for release. [PM] Cover: –  Target market –  Features & benefits –  Quality target –  Security –  Performance targets including quantitative metrics –  Language support –  Supported OS & 3rd party component versions including browsers, players, helper apps, virus checkers, etc. New versions? Add/drop? 21
  • 22. A Product Definition and Development Process that Worked for Kontiki (cont’d) ▪  Create first draft PRD(s) (cont’d) –  Necessary and desirable timeframe for release –  Quantifiable success criteria for release including per- customer revenue enablement goals (if any) –  Assumptions –  Open issues and any risk areas 22
  • 23. A Product Definition and Development Process that Worked for Kontiki (cont’d) +  Product Work Definition: ▪  Define bug triage criteria [PM] ▪  Review bugs & enhancements: [PM] –  Definite or possible sales blockers for prospects –  Known enhancement requests from customers –  All bugs doable for this kind of release (maintenance, minor, or major) –  Any possible security issues –  Bugs rejected for previous release & not already assigned to maintenance, minor, major, future buckets –  Nominate/approve bugs/enhancements 23
  • 24. A Product Definition and Development Process that Worked for Kontiki (cont’d) +  Product Work Definition ▪  Kick off Feature Drop Process where necessary [PM] ▪  Kick off eng/QA Level of Effort estimates: major features, then minor features, then “big bugs” ▪  Write presentation describing proposed release, with tentative dates, for customer review meetings [PM] ▪  Review presentation with each customer [PM] –  Archive what you showed each customer! ▪  Iteratively review PRDs with sales / eng / qa / ops [PM] ▪  Hold "cross-PRD customer requirements review meeting” [PM] ▪  Finalize PRDs = “PRD Complete” milestone ▪  Official hand-off of PRD 24
  • 25. A Product Definition and Development Process that Worked for Kontiki (cont’d) +  Product Work Definition ▪  Kick off engineering design effort ▪  Do pre-design sanity check security review discussion [eng, PM] ▪  Ensure adequate spec of UI and functionality requirements exists [PM, eng] ▪  As appropriate, review design with SEs, client services, customers [PM, eng] ▪  As time/resources allow, do usability testing [PM] ▪  Complete Level of Effort estimates for all items [eng, QA, PM] ▪  Do bottoms-up schedule, timeline for all items [eng] ▪  Determine amount of buffer for release date [eng, PM, QA] 25
  • 26. A Product Definition and Development Process that Worked for Kontiki (cont’d) +  Product Work Definition ▪  Review eng spec to confirm it satisfies PRD requirements [PM, eng] ▪  Conduct security review [PM, eng, QA, SE] ▪  Get executive staff approval of final schedule Communicate approved final release plan & external schedule to customers [PM] ▪  Archive the presentation! ▪  Document QA test plan [QA] ▪  Review QA test plan with sales to ensure understand of what is/ isn’t tested and how deeply [PM, QA] ▪  Gather documentation requirements [doc lead] ▪  Define proposed doc plan for release [doc lead] ▪  Iteratively review doc plan with customers, sales, eng, QA ops until finalized [doc lead] 26
  • 27. A Product Definition and Development Process that Worked for Kontiki (cont’d) +  Legal Compliance ▪  If creating new product with strong cryptography or increasing strength of existing cryptography, work with legal to determine if export certification is needed. If needed, start early: 30-45 day lead time! ▪  If more open source software is to be used with product, update list of o.s. software and work with legal to verify license acceptability and compliance –  Ditto for any o.s. software distribution ▪  Evaluate any changes to legal privacy requirements ▪  If new product/product area, do general review with legal (End User Licensing Agreement, etc.) 27
  • 28. A Product Definition and Development Process that Worked for Kontiki (cont’d) +  Development Process Management ▪  Schedule & attend team meetings as needed [PM] ▪  Keep “for PM review” bugs list at zero [PM] ▪  Triage new bugs and keep nominees list at zero [program manager, QA, with PM help as needed] ▪  Flag bugs for release notes as needed [all] +  Beta program ▪  Define goals [PM] ▪  Identify target customer(s) [PM] ▪  Get agreement to participate from customer(s) [PM] ▪  Ensue doc created to support beta [PM] ▪  Provide customers beta software, doc [support, ops] ▪  Gather feedback from customers & support [PM] 28
  • 29. A Product Definition and Development Process that Worked for Kontiki (cont’d) +  Shipping Process ▪  Identify issues that will affect deployment process (e.g. migration) & communicate to support, SEs, client services, as appropriate [PM] ▪  Keep “for PM review” bug tally at zero! [PM] ▪  Ensure all needed release notes get written [PM, support] ▪  Copy draft release notes from bug reports into actual release notes document [support] ▪  Review WONTFIX bugs and mark CLOSED to approve [PM] +  Launch ▪  Finalize name/number of release [PM] ▪  Work with outbound marketing as needed to support product launch [PM] +  Deployment ▪  Support sales & support in customer communication [PM] 29
  • 30. A Product Definition and Development Process that Worked for Kontiki (cont’d) +  Post-Release ▪  Schedule and hold post-mortem review –  Identify action items for future process improvement. ▪  Permanently archive all release-related documents 30
  • 31. Change Control Process +  When used: ▪  New feature request that isn’t included in the current product plan as specified by the written Plan of Record (POR) and PRDs ▪  Any feature or implementation change that impacts schedule on POR ▪  When action will take more than an hour of time from a developer, QA tester, or UI designer +  Steps: ▪  Define work ▪  Estimate level of effort, get PM/Eng/QA approval ▪  Review at executive staff meeting, get approval +  Benefits: ▪  Gives eng, QA a way to say “no” to execs, sales, PMs, others ▪  Provides a structured way to change plans when needed 31
  • 32. Iterative Refinement: A Hybrid Between Waterfall and Extreme Programming +  Define the big “must do, will do, universally agreed” chunks first and get engineering to start work on them right away +  Continue evaluating “may do” features and iteratively refining the list based on customer/prospect/sales/support/executive input and engineering/QA level of effort estimates +  Postpone finalizing decisions where you need to and can afford to +  Iteratively develop and communicate tentative top-down, tentative bottoms-up, and final bottoms-up schedules +  Kontiki CEO on largest release company ever did: “I’ve never seen a release definition finalized as late in the process as we did …” yet the release shipped 6 weeks ahead of schedule after an 18 month development cycle 32
  • 33. Results of Following This Process* +  13 consecutive releases shipped on or ahead of schedule (on a resource-constant basis) ▪  In every case that release was necessary to get customer business, release met deadline, passed customer acceptance, and deal closed +  Record number of new customers for company on both enterprise and media sides +  Profitability achieved for first time +  Company valuation greatly increased over 16 months after third round of financing +  $62 million acquisition by VeriSign 16 months after third round of financing +  Company products and technology used as a foundation for VeriSign Intelligent CDN, major new managed serving offering launched 9 months after acquisition closed * and an improving market, new company leadership, etc. … 33
  • 34. Results: Annual Employee Survey Results (Dec ’04 – Dec ’05) Biggest deviations from last employee survey: Teamwork +  After the debate, we move forward and support decisions made. (95%) +  Everyone has the opportunity to express their opinions (95%) +  We challenge each other's thinking to get the best idea/solution (90%) +  We are driven by facts, not opinions. (74%) +  We foster open debate (84%) Management +  We focus on the critical few vs. the trivial many (69%) +  We get results by focusing motivated capable people on a shared objective (95%) Communication +  We focus on listening and understanding. (90%) +  We foster open and direct communication. (95%) +  Overall, I have a good understanding of the company's focus and efforts (95%) +  We communicate early and often. (90%) 34
  • 35. Best Practice: Record Everything On the Intranet +  What if you or a co-worker leave or go on vacation? +  What if someone needs information you know and doesn’t know you know it? +  What if a new employee needs to get up to speed and review an account’s history? +  What if you forget the status of something? 35
  • 36. Best Practice: Use a Wiki for Your Intranet +  “I can never find anything on our intranet and it’s all out of date anyway.” (Sound familiar?) +  If you want people to keep intranet pages up to date, how do you get them to do that? MAKE IT EASY! +  If you want people to collaborate, how do you get them to do that? MAKE IT EASY! +  If you want a culture in which everyone feels free to contribute, how do you achieve that? MAKE IT EASY! +  Wikis address all of these needs. ▪  To update a page, you just click Edit, type, and Save. It’s too easy NOT to correct something that’s wrong or out of date! ▪  To add a new page, you click Edit, type something like [Page Pretty Name|Internal Name], hit Save, click the new link, type, and Save ▪  Don’t need to know HTML. ANYONE CAN DO THIS! 36
  • 37. Great Uses for Wiki Pages +  “To Do” lists +  Archiving all “FYI” emails sent +  “Open Issues” lists out by product management, +  Individual status page for every especially to sales force open issue ▪  Known problems +  Archiving customer meeting ▪  New features notes ▪  Page for each release +  Individual status page for every +  Maintaining FAQs customer +  Lists of links to other resources ▪  Summarize deployment, use (documents, videos, FAQs, cases, known issues, repositories) platforms, application, +  List of contacts by function for requirements, account history, a project etc. +  Training steps for new hires +  History of decisions on project 37
  • 38. Disclaimers: Your Mileage May Vary +  For this to work: ▪  Company culture must follow Jim Barksdale’s rule: “The product manager is the CEO of the product.” ▪  Company executives must agree to follow the process. ▪  As a product manager you must execute the process faithfully, thoroughly, and successfully or management will not let you continue to follow it. +  We were working with finite number of large accounts +  Much easier to do at a small company than at a large one. +  Employees I was working with during this better were way better than average quality. ▪  Most team members had been working together for 2-3 years, knew each other’s strengths and weaknesses 38
  • 39. Summary +  Good process: ▪  Saves more effort than it consumes ▪  Prevents more conflict than it creates ▪  Surfaces issues sooner, enabling easier/better resolution ▪  Enables increased sales ▪  Improves customer satisfaction ▪  Improves employee satisfaction & retention ▪  Increases odds of company success (and survival!) ▪  Is totally, totally worth it 39
  • 41. Deadly Sins of Product Management +  Sloth: Failing to do sufficient due diligence +  Vagueness: writing doc that could be misunderstood +  Undercommunication: could anyone not know? +  Pride: ▪  thinking you know the answer instead of asking ▪  ignoring eng, QA, sales, customer, exec input +  Wishful thinking +  “Inside the Beltway Thinking:” adhering to beliefs inside the building that don’t apply outside the building ▪  “This issue isn’t a big deal because it doesn’t happen often” 41
  • 42. Principles to Live By +  Humility: “I am a fool” -- Socrates +  Listen: to customers, sales, engineering +  Write it down: take and archive notes +  Tell the truth: to yourself, customers, executives, sales, engineering ▪  If you don’t know, say so! ▪  Bad news doesn’t improve with age +  Get buy-in: from executives, eng, sales, customers +  Communicate in writing: especially to sales and customers +  Document customer agreement +  Archive what you communicated +  Expect the unexpected ▪  Practice realistic scheduling ▪  Include adequate schedule buffer: 30% 42