Mr. Morales can offer to employer an excellent project, program and
construction management in his 34 years of construction experience in
heavy civil works like rail tunnels, underground stations, utility tunnels
(wet & dry), viaducts, roads & bridges, ports and harbors, dam,
commercial , industrial and residential buildings.
His management approach includes an emphasis on cost-effective
construction planning, flexibility, and the commitment to delivering
projects on time and within budget.
His overall strength includes careful construction planning and
personnel development. Projects are successful by developing the skills
of junior engineers, supervisors and the workforce involve in the
construction team.
Nov.11, 2014 – July 16,2016
Hill International - Qatar
Site Construction Engineer
Project
 Doha Metro Green line Project – Phase 1
Responsibilities:
 Project management consultant in the Green line Doha Metro,
approximately 18km twin bore 6.7m diameter tunnel railway
with 8 stations constructed in karst limestone conditions
approximately 25m deep. Civil works to be completed and
handed over for commissioning in 2018 for the operation of the
network commencing 2020.
 Provide construction surveillances to the overall civil
construction and TBM tunneling works for eight (8) stations
with switchbox, cross over and six (6) emergency evacuation
shafts.
 Provide supervision and implementation assistance to
Contractor’s compliance to contractual obligations and to
Qatar Construction and International Standards (QCS).
 Submit daily engineer’s report (EDR) and CSR to cover up site
work quality compliance based on Employers requirements and
contractual obligation for design and build contract.
 Frequent walk through inspections with Contractor’s lead
QA/QC engineers and project engineer staff on tunnel lining
epoxy injection sealing on wet cracks prior to 1st stage tunnel
invert concreting with embedded HDPE invert drainage
preparatory to interface with ballast less track bed
requirements.
 Check block works tool and jointing finishing including painting
EDUCATION:
Bachelor of Science in Civil
Engineering, Mindanao State
University , Southern Philippines,
1981
CONTACT NO:
Mobile: (+974) 6611 6914
Visa: Transferable with NOC
E: moralesedgar46@yahoo.com.ph
NATIONALITY:
Filipino
GEOGRAPHICAL EXPERIENCE:
Philippines, Qatar, Saudi Arabia, and
Malaysia
EDGAR MORALES
SR. SITE ENGINEER
2
primer application for MEP Piping and CCTV inspections on all
drainage at basement areas under platform.
 Strict adherence to health and safety compliance, method of
statement work procedures and employers requirements to
complete the project within budget and time frame.
May 2011 – September 2014
Parsons/AECOM JV- PM/CM
Doha - Qatar
Civil Inspector
Project:
 Lusail City LRT
April 2010 - April 2011
PBS&J PM/CM Consultancy Services
Civil Inspector
Project:
 Lusail City LRT
January 2010 – April 2010
Halcrow (Consulting Engineers & Architects)
Senior Site Inspector Reporting to the Chief Resident Engineer
Project:
 Lusail City Development Project, Contract Package – 1
September 2009 - December 2010
Wagner Biro Qatar WLL- Qatar
TSE Network Engineer- Raw and Foul Sewage Network contracted
to Ashghal (PWA)
July 2008 - February 2009
Panceltica Holdings - Qatar
Superintendent
The first fast track steel manufacturing company in Doha Qatar
Building First Class community houses (G+3) from Barwa Real Estate.
Project:
 Barwa Housing – West Sailiya
 Project value – QAR 1.2 Billion.
October 2006 – July 2008
Nesma and Partners
Al Khobar, Saudi Arabia
Structural Engineer
Projects:
 Ras Tanura Sewage Treatment Plant Expansion Project
Kingdom of Saudi Arabia, Jubail Petrochem complex,
Ras Al Zur Di-ammonium Phosphate Plant, Ras Tanura
Sulfur Recovery Unit( SRU)Aramco project.
EDGAR MORALES
SR. SITE ENGINEER
3
April 2005 - July 2005
Taisei Shimizu Joint Venture
Santa Barbara, New Iloilo City, Philippines
Senior Site Engineer
Project:
 New Iloilo – Santa Barbara City, Airport Development
Project funded under Japan Intl. Construction Aid ( JICA)
June 2004 - December 2004
Maxco Const. Corp. Phil. Inc. - Philippines
Project Manager
Project:
 Cagayan De Oro City Factory
 Nestle Fluidized Bed Boiler Building
Philippines, Costing Php 18M.
March 2003 - April 2004
New Kanlaon Construction Inc.
Baclaran - Paranaque, Manila - Philippines
Superintendent
Project:
 Asiana Pricemart Shopping Mall
June 2002 - February 2003
Philippines Sundt
Cebu City, Philippines
Superintendent
Project:
 Casino Espanol de Cebu Sports Club, Cebu City, Philippines
June 2000 - May 2002
Raytheon Ebasco Overseas Ltd:
San Manuel - Pangasinan, Philippines
Superintendent
Project:
 San Roque Dam Multipurpose Project
 Project value: Costing $1.2B (345 Megawatt Hydropower
Project)
May 1997 - September 1999
Dillingham Construction International Inc.,
Roadworks Superintendent
Project:
 Arterial Roadlink Development Project – 27Km., Western
Samar – Philippines
EDGAR MORALES
SR. SITE ENGINEER
4
Project Value: Php270M (Funded by Japan Intl. Const. Aid-
JICA)
June 1994 - October 1996
Dillingham Construction International Inc.
General Santos City, Philippines
Construction Engineer
Project:
 New General Santos City Airport ,USAID
 Project Value: $50M, United States for Intl. Development
Project(USAID)
April 1992 – May 1994
Morrison Knudsen Corporation Inc.,
General Santos City - Philippines
Construction Engineer
Responsibilities:
 Supervised Asphalt Concrete Paving job using CedarapidS
Paver Machine for 250 km. asphalting of 5 – sectors Phil. Aid
Plan (PAP), funded under USAID costing $250M.
June 1990 – July 1991
Fordeco Construction SDN BHD
Project Engineer
Project:
 Malaysia - Lahad Datu, Sabah Eastern Malaysia
Responsibilities:
 Work with Fordeco Construction Sdn. Berhad as Project
Engineer undertaking contracts with the government of
Sabah East Malaysia in Lahad Datu for all Asphalt Concrete
Pavement of 98 km. Asphalt Paving works, Lahad Datu
Kinabatangan to Sandakan Road Project.
Nov. 1987 - May 1990
Philippine Ports Authority (4th
IBRD Fourth Ports Project)
Project Engineer
Responsibilities:
 Assigned as Chief of Monitoring Section for Pulauan Port
Project funded under 4th IBRD Ports Project in Zamboanga
Del Norte, Dapitan City under PPA PMO Office undertaking
Port Rehabilitation and Reclamation Rockworks with jetty
rock protection & pier fender pile clusters.
August 1982 - October 1987
FF Cruz - Renardet - Sauti - ICE Consulting Engineers
Field Engineer
General Santos City – Davao City , Philippines
Project:
 Fourth IBRD Highway (Funded under World Bank )Contract
Packages XIII, XIV & XV, Intl. Bank for Reconstruction and
Development (IBRD).
EDGAR MORALES
SR. SITE ENGINEER
5
 Project value – Php164M.
Responsibilities:
Assigned as Field Engineer for 116km Double Bituminous
Surface Treatment (DBST) asphalt paving job comprising
three (3) packages till handover to Department of Public
Works and Highways (DPWH) with complete signage and as-
built plan.
Training and Seminars Attended:
 Supervisors Training for Accident Reduction
Techniques(START)
 Scaffolding Erection seminar - July 05, 2000
 Confined Space seminar - July 06,2000
 Job Hazards Recognition and Analysis - September 20, 2001
 Crane and Rigging Safety Seminar /Certified Rigger June 2001
 Basic First Aid Training - July 19, 2001
 Perfect Attendance Awardee(PAECOM)-May 2012
 Parsons LRT Safety Award Winner — July , 2012
 Basic Fire Fighting — January 07, 2013
 Fire Warden Marshall Training August 27 , 2014
 CIEH Level 2 Award in Health and Safety in the Workplace,
Doha Metro Green line Project, June 02, 2015
 CIEH Level 3 Award in Health and Safety in the Workplace,
Doha Metro Green line Project, May 24, 2016.
References:
Karl Muniz
Resident Engineer
Doha-Metro Green line Project
Mobile: +974 3344 6594
kmuniz_pmc@qr.com.qa
Daniel Dowling
Construction Manager
Doha-Metro Green line Project
Mobile: +974 6687 4341
Doha-metro Green line Project
ddowling_pmc@qr.com.qa

More Related Content

What's hot (20)

Ronnie CV 2015
Ronnie CV  2015Ronnie CV  2015
Ronnie CV 2015
 
hdebelenjr-latest-CV
hdebelenjr-latest-CVhdebelenjr-latest-CV
hdebelenjr-latest-CV
 
CV_ETMa
CV_ETMaCV_ETMa
CV_ETMa
 
CV
CVCV
CV
 
GERALD ROMINGER RESUME
GERALD ROMINGER RESUMEGERALD ROMINGER RESUME
GERALD ROMINGER RESUME
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
R.C.V. (1)
R.C.V. (1)R.C.V. (1)
R.C.V. (1)
 
Updated CV Aug 6 2015
Updated CV Aug 6 2015Updated CV Aug 6 2015
Updated CV Aug 6 2015
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Omar Alani CV 20160410
Omar Alani CV 20160410Omar Alani CV 20160410
Omar Alani CV 20160410
 
CV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer IICV-Danilo B. Acosta. Engineer II
CV-Danilo B. Acosta. Engineer II
 
RMJugueta Resume 01172016
RMJugueta Resume 01172016RMJugueta Resume 01172016
RMJugueta Resume 01172016
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
CV-EBSantos
CV-EBSantosCV-EBSantos
CV-EBSantos
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer
 
resume_odesio mariano
resume_odesio marianoresume_odesio mariano
resume_odesio mariano
 
cv1
cv1cv1
cv1
 
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)
 
CVHAlbertoGarcia2016English_C
CVHAlbertoGarcia2016English_CCVHAlbertoGarcia2016English_C
CVHAlbertoGarcia2016English_C
 

Similar to SR. SITE ENGINEER (20)

DCG_CV
DCG_CVDCG_CV
DCG_CV
 
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
 
subhash__cv
subhash__cvsubhash__cv
subhash__cv
 
MCV
MCVMCV
MCV
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
CV (KYUYOUNG, HAN)(DMEC)
CV (KYUYOUNG, HAN)(DMEC)CV (KYUYOUNG, HAN)(DMEC)
CV (KYUYOUNG, HAN)(DMEC)
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
HASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPHASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMP
 
JAGMOC RESUME
JAGMOC RESUMEJAGMOC RESUME
JAGMOC RESUME
 
updated CVlarrybisa
updated CVlarrybisaupdated CVlarrybisa
updated CVlarrybisa
 
CV_Hazwan Updated
CV_Hazwan UpdatedCV_Hazwan Updated
CV_Hazwan Updated
 
Resume-Cristian Alvarez
Resume-Cristian AlvarezResume-Cristian Alvarez
Resume-Cristian Alvarez
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
GIRIRAJAN
GIRIRAJANGIRIRAJAN
GIRIRAJAN
 
george nasralla CV
george nasralla CVgeorge nasralla CV
george nasralla CV
 
Sats Ganesh_
Sats Ganesh_Sats Ganesh_
Sats Ganesh_
 
ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017
 
Slk m india
Slk m indiaSlk m india
Slk m india
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 

SR. SITE ENGINEER

  • 1. EDGAR MORALES SR. SITE ENGINEER 1 Mr. Morales can offer to employer an excellent project, program and construction management in his 34 years of construction experience in heavy civil works like rail tunnels, underground stations, utility tunnels (wet & dry), viaducts, roads & bridges, ports and harbors, dam, commercial , industrial and residential buildings. His management approach includes an emphasis on cost-effective construction planning, flexibility, and the commitment to delivering projects on time and within budget. His overall strength includes careful construction planning and personnel development. Projects are successful by developing the skills of junior engineers, supervisors and the workforce involve in the construction team. Nov.11, 2014 – July 16,2016 Hill International - Qatar Site Construction Engineer Project  Doha Metro Green line Project – Phase 1 Responsibilities:  Project management consultant in the Green line Doha Metro, approximately 18km twin bore 6.7m diameter tunnel railway with 8 stations constructed in karst limestone conditions approximately 25m deep. Civil works to be completed and handed over for commissioning in 2018 for the operation of the network commencing 2020.  Provide construction surveillances to the overall civil construction and TBM tunneling works for eight (8) stations with switchbox, cross over and six (6) emergency evacuation shafts.  Provide supervision and implementation assistance to Contractor’s compliance to contractual obligations and to Qatar Construction and International Standards (QCS).  Submit daily engineer’s report (EDR) and CSR to cover up site work quality compliance based on Employers requirements and contractual obligation for design and build contract.  Frequent walk through inspections with Contractor’s lead QA/QC engineers and project engineer staff on tunnel lining epoxy injection sealing on wet cracks prior to 1st stage tunnel invert concreting with embedded HDPE invert drainage preparatory to interface with ballast less track bed requirements.  Check block works tool and jointing finishing including painting EDUCATION: Bachelor of Science in Civil Engineering, Mindanao State University , Southern Philippines, 1981 CONTACT NO: Mobile: (+974) 6611 6914 Visa: Transferable with NOC E: moralesedgar46@yahoo.com.ph NATIONALITY: Filipino GEOGRAPHICAL EXPERIENCE: Philippines, Qatar, Saudi Arabia, and Malaysia
  • 2. EDGAR MORALES SR. SITE ENGINEER 2 primer application for MEP Piping and CCTV inspections on all drainage at basement areas under platform.  Strict adherence to health and safety compliance, method of statement work procedures and employers requirements to complete the project within budget and time frame. May 2011 – September 2014 Parsons/AECOM JV- PM/CM Doha - Qatar Civil Inspector Project:  Lusail City LRT April 2010 - April 2011 PBS&J PM/CM Consultancy Services Civil Inspector Project:  Lusail City LRT January 2010 – April 2010 Halcrow (Consulting Engineers & Architects) Senior Site Inspector Reporting to the Chief Resident Engineer Project:  Lusail City Development Project, Contract Package – 1 September 2009 - December 2010 Wagner Biro Qatar WLL- Qatar TSE Network Engineer- Raw and Foul Sewage Network contracted to Ashghal (PWA) July 2008 - February 2009 Panceltica Holdings - Qatar Superintendent The first fast track steel manufacturing company in Doha Qatar Building First Class community houses (G+3) from Barwa Real Estate. Project:  Barwa Housing – West Sailiya  Project value – QAR 1.2 Billion. October 2006 – July 2008 Nesma and Partners Al Khobar, Saudi Arabia Structural Engineer Projects:  Ras Tanura Sewage Treatment Plant Expansion Project Kingdom of Saudi Arabia, Jubail Petrochem complex, Ras Al Zur Di-ammonium Phosphate Plant, Ras Tanura Sulfur Recovery Unit( SRU)Aramco project.
  • 3. EDGAR MORALES SR. SITE ENGINEER 3 April 2005 - July 2005 Taisei Shimizu Joint Venture Santa Barbara, New Iloilo City, Philippines Senior Site Engineer Project:  New Iloilo – Santa Barbara City, Airport Development Project funded under Japan Intl. Construction Aid ( JICA) June 2004 - December 2004 Maxco Const. Corp. Phil. Inc. - Philippines Project Manager Project:  Cagayan De Oro City Factory  Nestle Fluidized Bed Boiler Building Philippines, Costing Php 18M. March 2003 - April 2004 New Kanlaon Construction Inc. Baclaran - Paranaque, Manila - Philippines Superintendent Project:  Asiana Pricemart Shopping Mall June 2002 - February 2003 Philippines Sundt Cebu City, Philippines Superintendent Project:  Casino Espanol de Cebu Sports Club, Cebu City, Philippines June 2000 - May 2002 Raytheon Ebasco Overseas Ltd: San Manuel - Pangasinan, Philippines Superintendent Project:  San Roque Dam Multipurpose Project  Project value: Costing $1.2B (345 Megawatt Hydropower Project) May 1997 - September 1999 Dillingham Construction International Inc., Roadworks Superintendent Project:  Arterial Roadlink Development Project – 27Km., Western Samar – Philippines
  • 4. EDGAR MORALES SR. SITE ENGINEER 4 Project Value: Php270M (Funded by Japan Intl. Const. Aid- JICA) June 1994 - October 1996 Dillingham Construction International Inc. General Santos City, Philippines Construction Engineer Project:  New General Santos City Airport ,USAID  Project Value: $50M, United States for Intl. Development Project(USAID) April 1992 – May 1994 Morrison Knudsen Corporation Inc., General Santos City - Philippines Construction Engineer Responsibilities:  Supervised Asphalt Concrete Paving job using CedarapidS Paver Machine for 250 km. asphalting of 5 – sectors Phil. Aid Plan (PAP), funded under USAID costing $250M. June 1990 – July 1991 Fordeco Construction SDN BHD Project Engineer Project:  Malaysia - Lahad Datu, Sabah Eastern Malaysia Responsibilities:  Work with Fordeco Construction Sdn. Berhad as Project Engineer undertaking contracts with the government of Sabah East Malaysia in Lahad Datu for all Asphalt Concrete Pavement of 98 km. Asphalt Paving works, Lahad Datu Kinabatangan to Sandakan Road Project. Nov. 1987 - May 1990 Philippine Ports Authority (4th IBRD Fourth Ports Project) Project Engineer Responsibilities:  Assigned as Chief of Monitoring Section for Pulauan Port Project funded under 4th IBRD Ports Project in Zamboanga Del Norte, Dapitan City under PPA PMO Office undertaking Port Rehabilitation and Reclamation Rockworks with jetty rock protection & pier fender pile clusters. August 1982 - October 1987 FF Cruz - Renardet - Sauti - ICE Consulting Engineers Field Engineer General Santos City – Davao City , Philippines Project:  Fourth IBRD Highway (Funded under World Bank )Contract Packages XIII, XIV & XV, Intl. Bank for Reconstruction and Development (IBRD).
  • 5. EDGAR MORALES SR. SITE ENGINEER 5  Project value – Php164M. Responsibilities: Assigned as Field Engineer for 116km Double Bituminous Surface Treatment (DBST) asphalt paving job comprising three (3) packages till handover to Department of Public Works and Highways (DPWH) with complete signage and as- built plan. Training and Seminars Attended:  Supervisors Training for Accident Reduction Techniques(START)  Scaffolding Erection seminar - July 05, 2000  Confined Space seminar - July 06,2000  Job Hazards Recognition and Analysis - September 20, 2001  Crane and Rigging Safety Seminar /Certified Rigger June 2001  Basic First Aid Training - July 19, 2001  Perfect Attendance Awardee(PAECOM)-May 2012  Parsons LRT Safety Award Winner — July , 2012  Basic Fire Fighting — January 07, 2013  Fire Warden Marshall Training August 27 , 2014  CIEH Level 2 Award in Health and Safety in the Workplace, Doha Metro Green line Project, June 02, 2015  CIEH Level 3 Award in Health and Safety in the Workplace, Doha Metro Green line Project, May 24, 2016. References: Karl Muniz Resident Engineer Doha-Metro Green line Project Mobile: +974 3344 6594 kmuniz_pmc@qr.com.qa Daniel Dowling Construction Manager Doha-Metro Green line Project Mobile: +974 6687 4341 Doha-metro Green line Project ddowling_pmc@qr.com.qa