Heating media or device.
Used for heating and melting.
For providing heat to chemical reactions for
processes like cracking.
The furnace may be heated by fuel as in many
furnaces coke is used as a fuel.
some are operated by electrical energy e.g. electric
arc furnace.
What is Furnace???
Cupola was made by Rene-Antoine around 1720.
Cupola is a melting device.
Used in foundries for production of cast iron.
Used for making bronzes.
Its charge is Coke , Metal , Flux.
Scrap of blast furnace is re melted in cupola.
Large cupolas may produce up to 100 tons/hour of
hot iron.
Cupola Furnace
Cupola is a cylindrical in shape and placed vertical.
Its shell is made of steel.
Its size is expressed in diameters and can range from 0.5 to
4.0 m.
It supported by four legs.
Internal walls are lined with refectory bricks.
Its lining is temporary.
Construction
Spark arrester.
Charging door.
Air box.
Tuyeres.
Tap hole.
Slag hole.
Parts of Cupola
Well
The space between the bottom of
the Tuyeres and the sand bed.
Molten metal collected in this
portion.
Combustion zone
Also known as oxidizing zone .
Combustion take place in this
zone.
It is located between well and
melting zone.
Height of this zone is normally
15cm to 30cm.
Zones
Zones
In this zone the temperature is
1540°C to 1870°C.
The exothermic reactions takes
place in this zone these are
following .
C + O2 → CO2 + Heat
Si + O2 → SiO2 + Heat
2Mn + O2 → 2MnO + Heat
Reducing zone
Locate between upper level of
combustion zone and upper
level of coke bed.
Zones
In this zone temperature is about
1200°C.
In this zone CO2 change in to CO.
CO2 + C (coke) → 2CO
Melting zone
In this zone the melting is done.
It is located between preheating
zone and combustion zone.
The following reaction take place
in this zone.
3Fe + 2CO → Fe3C + CO2 .
Zones
Preheating zone
This zone is starts from the upper
end of the melting zone and
continues up to the bottom level of
the charging door .
Objective of this zone is preheat the
charges from room temperature to
about 1090°C before entering the
metal charge to the melting zone.
Stack
The empty portion of cupola above
the preheating zone is called as
stack. It provides the passage to hot
gases to go to atmosphere from the
cupola furnace.
Before the blower is started, the furnace is uniformly pre-
heated and the metal, flux and coke charges, lying in
alternate layers, are sufficiently heated up.
The cover plates are positioned suitably and the blower is
started.
The height of coke charge in the cupola in each layer
varies generally from 10 to 15 cm . The requirement of flux
to the metal charge depends upon the quality of the
charged metal and scarp, the composition of the coke and
the amount of ash content present in the coke.
Charging of Cupola Furnace
Its charge consist of scrap,
coke and flux.
The charge is placed layer
by layer.
The first layer is coke,
second is flux and third
metal.
Air enter through the
bottom tuyeres.
This increases the energy
efficiency of the furnace.
Coke is consumed.
Working of Cupola Furnace
Working of Cupola Furnace
The hot exhaust gases rise up
through the charge, preheating it.
The charge is melted.
As the material is consumed,
additional charges can be added to
the furnace.
A continuous flow of iron emerges
from the bottom of the furnace.
The slag is removed from slag hole.
The molten metal achieved by tap
hole.
Preparation of cupola.
Firing the cupola.
Soaking of iron.
Opening of air blast.
Pouring the molten metal.
Closing the cupola.
Operation of Cupola
Slag and metal adhere to the cupola lining from the
previous run is removed and lining of cupola is re
made.
The bottom plates are swung to closing position
supported by prob.
The sand bed is then prepared with molding sand
such that its slopes to towards the tap hole.
Preparation of cupola
The cupola is fired by kindling wood at the bottom.
This should be done 2.5 to 3 hours before the molten
metal is required.
On the top of the kindling wood a bed of coke is built.
The height of the coke bed is may be vary from 50cm
to 125cm according to the size of cupola.
Firing the Cupola
When the furnace is charged fully it is maintain for
about 45 minutes.
The charge is slowly heated.
During the stage the air blast is shut off and iron is
soaked.
Soaking of Iron
At the end of the soaking period the air blast is
opened.
The taping hole is closed by a plug when the melting
proceeds and molten metal is collect at the bottom.
Opening of blast air
When the sufficient amount of metal has collected in
the hearth the slag hole is opened and the slag is
removed.
Then taping hole is opened and molten metal is flows
out in the table.
The same procedure is repeated until the charge is
melted and the operation is over.
Pouring of molten metal
When the operation is over the air blast is shut off .
The bottom of furnace is opened by removing the
prop.
Closing the cupola
It is simple and economical to operate .
Cupolas can refine the metal charge, removing impurities
out of the slag.
High melt rates .
Ease of operation .
Adequate temperature control .
Chemical composition control .
Efficiency of cupola varies from 30 to 50%.
Less floor space requirements.
Advantages
Since molten iron and coke are in contact with each
other, certain elements like si , Mn are lost and
others like sulphur are picked up. This changes the
final analysis of molten metal.
Close temperature control is difficult to maintain
Disadvantages
Any Question?????????

Mais conteúdo relacionado

Mais procurados (20)

Heat treatment of steel
Heat treatment of steelHeat treatment of steel
Heat treatment of steel
 
6.core
6.core6.core
6.core
 
Heat Treatment Process
Heat Treatment ProcessHeat Treatment Process
Heat Treatment Process
 
Heat Treatment Process
Heat Treatment ProcessHeat Treatment Process
Heat Treatment Process
 
Continuous casting
Continuous castingContinuous casting
Continuous casting
 
LD process
LD processLD process
LD process
 
Recovery recrystallization and grain growth
Recovery recrystallization and grain growthRecovery recrystallization and grain growth
Recovery recrystallization and grain growth
 
Alloy Steel
Alloy SteelAlloy Steel
Alloy Steel
 
Classification of Steel
Classification of SteelClassification of Steel
Classification of Steel
 
Cast Iron
Cast IronCast Iron
Cast Iron
 
Casting furnaces
Casting furnacesCasting furnaces
Casting furnaces
 
Powder metallurgy
Powder metallurgyPowder metallurgy
Powder metallurgy
 
Heat treatment Process
Heat treatment ProcessHeat treatment Process
Heat treatment Process
 
Pit furnace
Pit furnacePit furnace
Pit furnace
 
Steel Making: Lecture open hearth furnace
Steel Making: Lecture open hearth furnaceSteel Making: Lecture open hearth furnace
Steel Making: Lecture open hearth furnace
 
casting ppt
casting pptcasting ppt
casting ppt
 
arc welding
arc weldingarc welding
arc welding
 
Hot and cold working
Hot and cold workingHot and cold working
Hot and cold working
 
Secondary steel making processes
Secondary steel making processesSecondary steel making processes
Secondary steel making processes
 
Ferrous and non ferrous alloys by Hari Prasad
Ferrous and non ferrous alloys by Hari PrasadFerrous and non ferrous alloys by Hari Prasad
Ferrous and non ferrous alloys by Hari Prasad
 

Semelhante a Cupola Furnace: Heating Device Used for Melting Scrap Iron

Melting furnace
Melting furnaceMelting furnace
Melting furnacesairaagav
 
Manufacturing cast iron.pptggggggvgggggy
Manufacturing cast iron.pptggggggvgggggyManufacturing cast iron.pptggggggvgggggy
Manufacturing cast iron.pptggggggvgggggyteddiyfentaw
 
Industrial melting furnaces
Industrial melting furnacesIndustrial melting furnaces
Industrial melting furnacesNear East Uni
 
Metal melting furnaces
Metal melting furnacesMetal melting furnaces
Metal melting furnacesRaj Parekh
 
Types of Casting Furnaces, Inspection and cleaning of casting
Types of Casting Furnaces, Inspection and cleaning of castingTypes of Casting Furnaces, Inspection and cleaning of casting
Types of Casting Furnaces, Inspection and cleaning of castingprashantborakhede1
 
Chapter2 150109004021-conversion-gate02
Chapter2 150109004021-conversion-gate02Chapter2 150109004021-conversion-gate02
Chapter2 150109004021-conversion-gate02Cleophas Rwemera
 
Chapter 2: Ferrous Material
Chapter 2: Ferrous MaterialChapter 2: Ferrous Material
Chapter 2: Ferrous Materialsyar 2604
 
Iron and Steel Making with allied chemical reactions .pptx
Iron and Steel Making with allied chemical reactions .pptxIron and Steel Making with allied chemical reactions .pptx
Iron and Steel Making with allied chemical reactions .pptx029DevendraKumarSing
 
blast furnace.pptx
blast furnace.pptxblast furnace.pptx
blast furnace.pptxJenithM
 
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...029DevendraKumarSing
 
modern meltig practises and metal transfer
modern meltig practises and metal transfermodern meltig practises and metal transfer
modern meltig practises and metal transferdeep shankar
 
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjj
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjjSteel manufacturing.ppthhh>jjjjjjjjjjjjjjj
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjjteddiyfentaw
 
3furnaces 120520160438-phpapp01
3furnaces 120520160438-phpapp013furnaces 120520160438-phpapp01
3furnaces 120520160438-phpapp01John Tauli
 
Blast furnace,cupola furnace
Blast furnace,cupola furnaceBlast furnace,cupola furnace
Blast furnace,cupola furnacePravinkumar
 
Steel manufacturing process
Steel manufacturing processSteel manufacturing process
Steel manufacturing processAshvani Shukla
 

Semelhante a Cupola Furnace: Heating Device Used for Melting Scrap Iron (20)

Melting furnace
Melting furnaceMelting furnace
Melting furnace
 
Manufacturing cast iron.pptggggggvgggggy
Manufacturing cast iron.pptggggggvgggggyManufacturing cast iron.pptggggggvgggggy
Manufacturing cast iron.pptggggggvgggggy
 
8.melting furnaces
8.melting furnaces8.melting furnaces
8.melting furnaces
 
Industrial melting furnaces
Industrial melting furnacesIndustrial melting furnaces
Industrial melting furnaces
 
Faisal
FaisalFaisal
Faisal
 
Cupola.ppt
Cupola.pptCupola.ppt
Cupola.ppt
 
Metal melting furnaces
Metal melting furnacesMetal melting furnaces
Metal melting furnaces
 
Types of Casting Furnaces, Inspection and cleaning of casting
Types of Casting Furnaces, Inspection and cleaning of castingTypes of Casting Furnaces, Inspection and cleaning of casting
Types of Casting Furnaces, Inspection and cleaning of casting
 
Chapter2 150109004021-conversion-gate02
Chapter2 150109004021-conversion-gate02Chapter2 150109004021-conversion-gate02
Chapter2 150109004021-conversion-gate02
 
Chapter 2: Ferrous Material
Chapter 2: Ferrous MaterialChapter 2: Ferrous Material
Chapter 2: Ferrous Material
 
Iron and Steel Making with allied chemical reactions .pptx
Iron and Steel Making with allied chemical reactions .pptxIron and Steel Making with allied chemical reactions .pptx
Iron and Steel Making with allied chemical reactions .pptx
 
blast furnace.pptx
blast furnace.pptxblast furnace.pptx
blast furnace.pptx
 
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
Blast Furnace Iron Making Process with Construction and Chemical Reactions in...
 
modern meltig practises and metal transfer
modern meltig practises and metal transfermodern meltig practises and metal transfer
modern meltig practises and metal transfer
 
Metal Casting.pptx
Metal Casting.pptxMetal Casting.pptx
Metal Casting.pptx
 
ISM.pptx
ISM.pptxISM.pptx
ISM.pptx
 
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjj
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjjSteel manufacturing.ppthhh>jjjjjjjjjjjjjjj
Steel manufacturing.ppthhh>jjjjjjjjjjjjjjj
 
3furnaces 120520160438-phpapp01
3furnaces 120520160438-phpapp013furnaces 120520160438-phpapp01
3furnaces 120520160438-phpapp01
 
Blast furnace,cupola furnace
Blast furnace,cupola furnaceBlast furnace,cupola furnace
Blast furnace,cupola furnace
 
Steel manufacturing process
Steel manufacturing processSteel manufacturing process
Steel manufacturing process
 

Mais de Gulfam Hussain

Tensile, Impact and Hardness Testing of Mild Steel
Tensile, Impact and Hardness Testing of Mild SteelTensile, Impact and Hardness Testing of Mild Steel
Tensile, Impact and Hardness Testing of Mild SteelGulfam Hussain
 
Fuel cladding materials
Fuel cladding materialsFuel cladding materials
Fuel cladding materialsGulfam Hussain
 
Properties of materials / Mechanical Properties of materials
Properties of materials / Mechanical Properties of materialsProperties of materials / Mechanical Properties of materials
Properties of materials / Mechanical Properties of materialsGulfam Hussain
 
Intergranular Corrosion
Intergranular CorrosionIntergranular Corrosion
Intergranular CorrosionGulfam Hussain
 
Hardening (Heat treatment) Quenching
Hardening (Heat treatment)  QuenchingHardening (Heat treatment)  Quenching
Hardening (Heat treatment) QuenchingGulfam Hussain
 
Cathode Ray Oscilloscope CRO
Cathode Ray Oscilloscope CROCathode Ray Oscilloscope CRO
Cathode Ray Oscilloscope CROGulfam Hussain
 
Eight forms of corrosion
Eight  forms of corrosionEight  forms of corrosion
Eight forms of corrosionGulfam Hussain
 
Non-destructive Testing
Non-destructive TestingNon-destructive Testing
Non-destructive TestingGulfam Hussain
 
Non-traditional manufacturing processes
Non-traditional manufacturing processesNon-traditional manufacturing processes
Non-traditional manufacturing processesGulfam Hussain
 
Terrorism in pakistan causes & remedies
Terrorism in pakistan causes & remediesTerrorism in pakistan causes & remedies
Terrorism in pakistan causes & remediesGulfam Hussain
 
Metallurgical properties of cast irons
Metallurgical properties of cast ironsMetallurgical properties of cast irons
Metallurgical properties of cast ironsGulfam Hussain
 

Mais de Gulfam Hussain (20)

Tensile, Impact and Hardness Testing of Mild Steel
Tensile, Impact and Hardness Testing of Mild SteelTensile, Impact and Hardness Testing of Mild Steel
Tensile, Impact and Hardness Testing of Mild Steel
 
Fuel cladding materials
Fuel cladding materialsFuel cladding materials
Fuel cladding materials
 
Definitions
Definitions Definitions
Definitions
 
Properties of materials / Mechanical Properties of materials
Properties of materials / Mechanical Properties of materialsProperties of materials / Mechanical Properties of materials
Properties of materials / Mechanical Properties of materials
 
Intergranular Corrosion
Intergranular CorrosionIntergranular Corrosion
Intergranular Corrosion
 
Hardening (Heat treatment) Quenching
Hardening (Heat treatment)  QuenchingHardening (Heat treatment)  Quenching
Hardening (Heat treatment) Quenching
 
Extrusion
ExtrusionExtrusion
Extrusion
 
Cathode Ray Oscilloscope CRO
Cathode Ray Oscilloscope CROCathode Ray Oscilloscope CRO
Cathode Ray Oscilloscope CRO
 
Eight forms of corrosion
Eight  forms of corrosionEight  forms of corrosion
Eight forms of corrosion
 
Non-destructive Testing
Non-destructive TestingNon-destructive Testing
Non-destructive Testing
 
Non-traditional manufacturing processes
Non-traditional manufacturing processesNon-traditional manufacturing processes
Non-traditional manufacturing processes
 
Pakistan
PakistanPakistan
Pakistan
 
Terrorism in pakistan causes & remedies
Terrorism in pakistan causes & remediesTerrorism in pakistan causes & remedies
Terrorism in pakistan causes & remedies
 
Heat Treatment
Heat TreatmentHeat Treatment
Heat Treatment
 
Atomic Bonding
Atomic BondingAtomic Bonding
Atomic Bonding
 
Metallurgical properties of cast irons
Metallurgical properties of cast ironsMetallurgical properties of cast irons
Metallurgical properties of cast irons
 
PYROMETER
PYROMETER PYROMETER
PYROMETER
 
Muffle furnace
Muffle furnaceMuffle furnace
Muffle furnace
 
Atmospheric Corrosion
Atmospheric CorrosionAtmospheric Corrosion
Atmospheric Corrosion
 
Erosion Corrosion
Erosion Corrosion Erosion Corrosion
Erosion Corrosion
 

Último

Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524najka9823
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 

Último (20)

Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 

Cupola Furnace: Heating Device Used for Melting Scrap Iron

  • 2. Muhammad Zubair MME-12-29 M. Faisal Maqsood MME-12-20 Gulfam Hussain MME-12-30 Arif Ali MME-12-01 Muhammad Ahmad MME-12-14 Group No 1
  • 3. Heating media or device. Used for heating and melting. For providing heat to chemical reactions for processes like cracking. The furnace may be heated by fuel as in many furnaces coke is used as a fuel. some are operated by electrical energy e.g. electric arc furnace. What is Furnace???
  • 4. Cupola was made by Rene-Antoine around 1720. Cupola is a melting device. Used in foundries for production of cast iron. Used for making bronzes. Its charge is Coke , Metal , Flux. Scrap of blast furnace is re melted in cupola. Large cupolas may produce up to 100 tons/hour of hot iron. Cupola Furnace
  • 5. Cupola is a cylindrical in shape and placed vertical. Its shell is made of steel. Its size is expressed in diameters and can range from 0.5 to 4.0 m. It supported by four legs. Internal walls are lined with refectory bricks. Its lining is temporary. Construction
  • 6. Spark arrester. Charging door. Air box. Tuyeres. Tap hole. Slag hole. Parts of Cupola
  • 7. Well The space between the bottom of the Tuyeres and the sand bed. Molten metal collected in this portion. Combustion zone Also known as oxidizing zone . Combustion take place in this zone. It is located between well and melting zone. Height of this zone is normally 15cm to 30cm. Zones
  • 8. Zones In this zone the temperature is 1540°C to 1870°C. The exothermic reactions takes place in this zone these are following . C + O2 → CO2 + Heat Si + O2 → SiO2 + Heat 2Mn + O2 → 2MnO + Heat Reducing zone Locate between upper level of combustion zone and upper level of coke bed.
  • 9. Zones In this zone temperature is about 1200°C. In this zone CO2 change in to CO. CO2 + C (coke) → 2CO Melting zone In this zone the melting is done. It is located between preheating zone and combustion zone. The following reaction take place in this zone. 3Fe + 2CO → Fe3C + CO2 .
  • 10. Zones Preheating zone This zone is starts from the upper end of the melting zone and continues up to the bottom level of the charging door . Objective of this zone is preheat the charges from room temperature to about 1090°C before entering the metal charge to the melting zone. Stack The empty portion of cupola above the preheating zone is called as stack. It provides the passage to hot gases to go to atmosphere from the cupola furnace.
  • 11. Before the blower is started, the furnace is uniformly pre- heated and the metal, flux and coke charges, lying in alternate layers, are sufficiently heated up. The cover plates are positioned suitably and the blower is started. The height of coke charge in the cupola in each layer varies generally from 10 to 15 cm . The requirement of flux to the metal charge depends upon the quality of the charged metal and scarp, the composition of the coke and the amount of ash content present in the coke. Charging of Cupola Furnace
  • 12. Its charge consist of scrap, coke and flux. The charge is placed layer by layer. The first layer is coke, second is flux and third metal. Air enter through the bottom tuyeres. This increases the energy efficiency of the furnace. Coke is consumed. Working of Cupola Furnace
  • 13. Working of Cupola Furnace The hot exhaust gases rise up through the charge, preheating it. The charge is melted. As the material is consumed, additional charges can be added to the furnace. A continuous flow of iron emerges from the bottom of the furnace. The slag is removed from slag hole. The molten metal achieved by tap hole.
  • 14. Preparation of cupola. Firing the cupola. Soaking of iron. Opening of air blast. Pouring the molten metal. Closing the cupola. Operation of Cupola
  • 15. Slag and metal adhere to the cupola lining from the previous run is removed and lining of cupola is re made. The bottom plates are swung to closing position supported by prob. The sand bed is then prepared with molding sand such that its slopes to towards the tap hole. Preparation of cupola
  • 16. The cupola is fired by kindling wood at the bottom. This should be done 2.5 to 3 hours before the molten metal is required. On the top of the kindling wood a bed of coke is built. The height of the coke bed is may be vary from 50cm to 125cm according to the size of cupola. Firing the Cupola
  • 17. When the furnace is charged fully it is maintain for about 45 minutes. The charge is slowly heated. During the stage the air blast is shut off and iron is soaked. Soaking of Iron
  • 18. At the end of the soaking period the air blast is opened. The taping hole is closed by a plug when the melting proceeds and molten metal is collect at the bottom. Opening of blast air
  • 19. When the sufficient amount of metal has collected in the hearth the slag hole is opened and the slag is removed. Then taping hole is opened and molten metal is flows out in the table. The same procedure is repeated until the charge is melted and the operation is over. Pouring of molten metal
  • 20. When the operation is over the air blast is shut off . The bottom of furnace is opened by removing the prop. Closing the cupola
  • 21. It is simple and economical to operate . Cupolas can refine the metal charge, removing impurities out of the slag. High melt rates . Ease of operation . Adequate temperature control . Chemical composition control . Efficiency of cupola varies from 30 to 50%. Less floor space requirements. Advantages