DURBAN CHAMBER OF COMMERCE AND INDUSTRY
PROJECT REPORT
C
ornubia is a 1300 hec-
tare expanse of green-
field opportunity stra-
tegically located within
the municipality’s
Northern Urban Development
Corridor (NUDC), which is central
to the province’s primary growth
and development corridor.
This area is identified in the City
of Durban’s Integrated
Development Plan (IDP) as part of
a major economic
investment node. The project is
snugly nested between Phoenix/
Ottawa and Umhlanga, bordered
by N2 freeway on the east and
the M41arterial on the south, and
the Ohlanga River to the north,
just a mere 7 km south of the
King Shaka International Airport.
The development of Cornubia
presents a significant opportunity
to attract new investment to this
area by releasing land to meet the
significant demand for
well-located industrial and
commercial land as a result of the
increased economic growth rate
of the metropolitan economy.
The proposed development is
ideally suited for infrastructure,
commercial (offices, retail, etc.),
light industry (logistics, manu-
facturing), and residential units
across the full spectrum of
housing needs.
The project has the scope and
ability to be either a wholly
private sector project or a Public
Private Partnership (PPP).
Currently, due to joint planning
and collaboration, it could be
viewed as a PPP between part-
ners Tongaat Hulett and
eThekwini Municipality.
Cornubia is a multi-phase project.
Construction has already
commenced, while in many
phases all necessary approv-
als have been obtained. On the
remaining phases, a process of
obtaining environmental approv-
als is well underway. Opportunity
exists for investors to partner with
either the developers and/or the
end users.
The project’s success will depend
on some key road infrastructure,
the provision of which is currently
being rolled out, making the de-
velopment area highly accessible.
CONTACT PERSON: MTURA
MATSHINI - 031 5601900, Mtura.
Matshini@tongaat.com
CORNUBIA
www.cornubia.co.za
2
DURBAN CHAMBER OF COMMERCE AND INDUSTRY
PROJECT REPORT
It’s an opportunity for and my family to
achieve what we’ve always dreamt of.
-Themba Mkhize, father and husband
“
“
3
DURBAN CHAMBER OF COMMERCE AND INDUSTRY
PROJECT REPORT
DUBETRADEPORT: DUBECITY
D
ube City is currently in its first phase of development. It comprises a 12-hectare site located at
King Shaka International Airport (KSIA), increasing to 24 hectares on completion. Land use has
been planned to include a mix of hotel, conference, entertainment, retail and knowledge-inten-
sive companies and company head offices. DTPC’s own headquarters, 29° South, is situated in
the heart of Dube City. Companies may either develop for themselves or link-in with a developer
looking to put a project together.
The development hub is just 900 metres from KSIA near the N2, M4 and R102, approximately 34 km from the
centre of Durban and 16 km from Umhlanga Ridge and Gateway. This northern corridor is recognised as a
pre-eminent contributor to the future growth of the provincial and city economies. This is a public sector
investment for which all zoning and other approvals have been secured. Developer-or tenant-led
development are now sought in the spheres, particularly, of large-scale office, commercial and hospitality
buildings.DTPC currently has developers looking at various sites; the first development planned after 29°
South is an office development as well as a hotel development which is under final negotiations. It is
anticipated that this will include a 200-bed hotel and large conference centre with retail space on the ground
floor and approximately 13 000m² of offices.
CONTACT PERSONS: 032 814 0000 	 TIM HUDSON (Tim.hudson@dubetradeport.co.za)
					HAMISH ERSKINE (Hamish.erskine@dubetradeport.co.za)
4
DURBAN CHAMBER OF COMMERCE AND INDUSTRY
PROJECT REPORT
www.dubetradeport.co.za
The Dube TradeZone is industrial land surrounding the Dube Cargo Terminal. Within Dube TradeZone, pref-
erence is given to businesses which are aligned to air services, i.e. companies that import or
manufacture for export, logistic and support companies.
Companies targeted are ones that would benefit from close proximity to KSIA and Dube Cargo Terminal, the
freight forwarders on site and DTPC’s trucking division Dube AirRoad. The project seeks industrial
development and tenants for industrial properties, including manufacturing, logistics and distribution in
particular.
In Dube TradeZone, a high degree of interest has been shown which has resulted in the conclusion of lease
agreements over almost all the available sites. A number of buildings are now under construction or com-
plete. DTPC is now focusing on bringing online future phases, TradeZone Phase 2 and uShukela.
CONTACT PERSONS: 032 814 0000	 TIM HUDSON (Tim.hudson@dubetradeport.co.za)
					HAMISH ERSKINE (Hamish.erskine@dubetradeport.co.za)
DUBETRADEPORT: DUBETRADEZONE
5
DURBAN CHAMBER OF COMMERCE AND INDUSTRY
PROJECT REPORT
T
he uShukela development is situated immediately adjacent to the massive Dube TradePort
infrastructural project, a multi-faceted‘greenfield’business precinct surrounding Durban’s King
Shaka International Airport (KSIA) which forms the heart of an emerging aerotropolis, 30km north
of Durban.
The rapidly developing Dube TradePort, with the international airport at its centre, provides KwaZulu-Natal
with a new, world-class trade and logistics platform, creating a globally competitive business location which
offers the business community speed, agility and connectivity. The neighbouring uShukela development
adjoins the present Dube TradeZone - an area designed to attract a range of airport-related enterprises,
warehousing, logistics and distribution, light manufacturing and the like. uShukela is 80 hectares in extent,
of which 50 hectares is developable as a business, industrial and logistics platform. Whilst capitalising on
significantly improved air connectivity, uShukela is strategically positioned between Africa’s two major
seaports, Durban and Richards Bay, serviced by world-class road and rail access.
UShukela is ideally located immediately to the north of Dube Trade Port and King Shaka International
Airport. The site is bound to the east by the N2 highway linking Durban and Richards Bay, to the south by
Dube TradePort’s TradeZone and to the north by the M43, uShukela Highway.
Tongaat Hulett is flexible in terms of the ultimate land use; however, the proposed development is well
suited for commercial, offices, hotels and conferencing, industrial, logistics and warehousing.
Due to the fact that a portion of the land belongs to Tongaat Hulett and the adjacent portion belongs to
Dube Trade Port, the opportunity exists to either collaboratively plan and develop the properties to opti-
mise use and outcomes or to develop the property as a stand-alone development. Specialist’s studies have
already been completed and it is envisaged that development rights will be received by the end of 2014.
CONTACT PERSON: GREG VEERASAMY - 031 560 1900, Greg.veerasamy@tongaat.com
USHUKELA
www.thdev.co.za
6
DURBAN CHAMBER OF COMMERCE AND INDUSTRY
PROJECT REPORT
B
ridge City was established in 2006 as a joint venture development between the eThekwini Munici-
pality and Tongaat Hulett and comprises a 47 hectare town centre and 13 hectare business node.
It is a mixed-use development and will include government/retail/commercial/offices and residen-
tial uses. To date, a 48 000m2 shopping centre and a Regional Magistrates Court have been built
and opened and a State Regional Hospital is due to start construction in June 2014.
The rail link into the station under the shopping centre was opened in March 2014 and the eThekwini Bus
Rapid Transport (BRT) system will be up and running by June 2016. Bridge City is the key destination for
three separate routes within eThekwini being the links with Pinetown, Cornubia/Umhlanga and the Durban
CBD. This has added significant impetus to Bridge City and significant interest in purchasing in Bridge City.
Part of the BRT contract, as awarded in May 2014, includes the construction of the half diamond interchange
under the M25 freeway and most importantly, this will provide access from Bridge City onto the M25 freeway
back towards the N2 freeway system within the next two years.
All bulk services are installed to Bridge City and all sites in the town centre are saleable and transferrable.
33% of the available bulk has been sold and the remainder is available for sale. Developments in the town
centre may start construction within three to four months while developments in the Business Estate may
start construction within three to six months.
Any site may be purchased and developed and services will be made available to such sites before beneficial
occupation, if not already available. All triggers for the release of the total bulk of 725 000m2 allocated to
Bridge City will be in place by mid-2016 i.e. the rail line connection (opened) and the half diamond inter-
change with the M25 (mid-2016). Bridge City is located in the Inanda, Ntuzuma and KwaMashu (INK) and
Phoenix region of eThekwini Municipality (approximately 1 million people) to the north west of the Durban
CBD. The development is a joint venture development between eThekwini Municipality and Tongaat Hulett
and is a successful example of a PPP.
CONTACT PERSON: BRIAN IVE - 031 560 1977, Brian.ive@tongaat.com
BRIDGECITY
www.bridgecity.co.za
7
DURBAN CHAMBER OF COMMERCE AND INDUSTRY
PROJECT REPORT
T
ongaat Hulett’s Sibaya development provides for the integration of urban development and the
natural environment, creating a new urban identity with significant tourism potential and way of
life for residents in and visitors to an idyllic setting some 8km north of Umhlanga and 25km from
the Durban city centre.
Sibaya, with its undulating topography, gives rise to a new coastal node which includes residential, commer-
cial and office development, together with recreational and entertainment opportunities, whilst simultane-
ously strengthening the attractiveness of the northern coastal corridor. The development sets out to provide
for a vibrant and inter-connected mixed-use - though predominantly residential and lifestyle uses, maximis-
ing the area’s unique natural conditions, while acknowledging and remaining responsive and receptive to
environmental sensitivities. Sibaya comprises five development nodes and is 750 hectares in extent, inclu-
sive of the Hawaan Forest, rich in flora and fauna and the only remaining significant pristine coastal dune
forest, outside the Isimangaliso Wetland Park, in KwaZulu-Natal. Sibaya is located immediately north of the
existing Umhlanga node and south-east of the King Shaka International Airport. It is bordered by the N2 to
the west, Umdloti and the Indian Ocean on the east and it dissected by the existing M4 highway.
Sibaya is a predominantly a residential development, with a strong emphasis on leisure-types of develop-
ment complemented by some commercial, resort and office rights.
The development is also boarded by a pristine indigenous coastal dune forest and the Umhlanga Estuary
that enhances the lifestyle factor. Development nodes 1 and 5 have approved development rights and are
“shovel ready”. Development node 4 is currently undergoing an environmental impact analysis. The full
planning process is expected to have been completed and the node will be “shovel ready”by the end of
2014.The remaining development nodes are programmed as future phases and no planning processes have
commenced as yet. The proposed development of the Sibaya node will require a significant expansion of
current infrastructure. This has been planned but not installed.
CONTACT PERSON: SITHEMBISO MTHEMBU - 031 560 1925, Sithembiso.mthembu@tongaat.com
www.thdev.co.za
SIBAYA
8
DURBAN CHAMBER OF COMMERCE AND INDUSTRY
PROJECT REPORT
T
he Wewe Driefontein Project is based on approximately 621 hectares, designed to be a fully
integrated township focusing on creating employment with inclusionary housing. The layout plan
clearly shows the components of the integrated scheme, consisting of general industry, light and
service industry, parks, commercial, retail, housing, agricultural and conservation. The market
needs assessment together with independent feasibilities, clearly highlight the need for this
development.
The development area is strategically located within the 5 to 10km radius of the new King Shaka Airport and
Dube Trade Port, situated in the main Aerotropolis and Northern Development corridor from the new King
Shaka Airport, also recognised as a Flagship Development by Provincial and Local government authorities
and the Department of Human Settlements. General industry is expected to be the main catalyst to create
employment and housing opportunities. The terrain is flat and suitable for this purpose while the existing
road network and, importantly, the new proposed Western Bypass will act as the main mobility corridor to
the north and south of the Northern Development corridor from Durban/King Shaka Airport through to
Richards Bay and Mozambique. The Western Bypass passes through the eastern boundary of the project.
This project is currently privately-owned, but engagement with the public sector is proceeding, considering
that the project will achieve the outcomes that are aligned to government policies. At present, the develop-
ers are in the zoning process and have finalised all specialist studies including handing-in the final environ-
mental impact assessment. The investment required is dependent on the phasing and current negotiations
of the partnership in the application, but an investment of approximately 155 million Rand for bulk and link
services for the initial phases is sought.
CONTACT PERSON: PAT CONWAY - 032 946 2927, 082 444 1654, pat@spdev.co.za
WEWEDRIEFONTEIN–KINGSESTATE
9
DURBAN CHAMBER OF COMMERCE AND INDUSTRY
PROJECT REPORT
F
inningley offers a unique opportunity to partner with the estate landowners of over a hundred
years, in developing their heritage, by creating a ground-breaking, self-sustaining‘city in the sun’
on the beautiful South Coast of KwaZulu Natal, South Africa. Cutting-edge innovation and sustain-
able green technology will be implemented from inception. The development spans an area of 2640
hectares.
The project includes:
•	 Infrastructure - building strong & green for the future.
•	 Industrial and commercial - bringing international expertise and technologies and providing sustain
able job opportunities.
•	 Residential - innovative urban architecture.
•	 Leisure - world-class resorts.
•	 Education - universities, research facilities, schools.
•	 Aerodrome - including a road safety centre, motocross-track, off-road driving/test track and
drifting area.
Finningley Estate is located on the Farm Clansthal 1202ET, the Farm Crosley No 14718 and Umkomanzi Drift
No 1357, KwaZulu-Natal, between Umkomaas and Scottburgh on the KwaZulu-Natal South coast, some 60
km from the city of Durban.
The environmental impact assessment has been completed and ROD issued. The amount sought in invest-
ment capital is R600 million. The project encompasses necessary infrastructure in partnership with eThek-
wini Municipality.
CONTACT PERSON: RUSSELL CHAPPE DE LEONVAL - 031 266 9525, russell@jcgroup.co.za
FINNINGLEYGROWTHSPHERE
10
DURBAN CHAMBER OF COMMERCE AND INDUSTRY
PROJECT REPORT
T
he 300 hectare site identified for the sub-regional metropolitan town centre serves a catchment of
some 200 000 people. The project has four phases:
Phase One: 	 retail and business development
Phase Two:	 public precinct with the following public investment to occur subject to completion 	
	 of business plans with respective government departments:
•	 New Metro police station
•	 Municipal Customer Care Centre which will accommodate various government service departments,
and a library
•	 Social welfare centre
•	 Public park with sport and recreational facilities
•	 New railway station integrated with nodal transport interchange
•	 Health facilities
•	 Small trader facilities
Phase Three: 	 500 low cost RDP Units
Phase Four: 	 1000 middle income gap housing
Mpumalanga Township is close to Hammarsdale situated within the outer west region of eThekwini. The
eThekwini Municipality’s private sector partner is the ERIS Property Group. The partnership between ERIS
and eThekwni Municipality only extends to Phase One of the town centre. The partnership resulted in cost-
sharing in the provision of bulk infrastructure that lead to the construction of the 18000m2 retail shopping
centre. Further partnership opportunities could be available for the residential development component.
The Town Centre Precinct Plan was adopted by the municipality in 2009. Only Phase One is zoned and ap-
proved at this stage. Construction undertaken so far includes a shopping centre with a taxi rank. Phase Two
is currently going through approval stages. All bulk infrastructure is in place for phases One, Two and Three.
CONTACT PERSON: PETER GILMORE - 031 311 4227, 083 378 8737, Peter.gilmore@durban.gov.za
MPUMALANGANEWTOWNCENTRE
11
DURBAN CHAMBER OF COMMERCE AND INDUSTRY
PROJECT REPORT
T
he project was initiated by a request from the National Department of Transport, to develop an
Inland Intermodal Terminal / Dry Port as part of the National Strategic Infrastructure Plan (SIP), and
specifically within the mandate of the SIP 2 (Durban-Gauteng Freight Corridor) Committee. Initially
it was planned as a private sector initiative, with the facility to progress to a Public-Private Partner-
ship (PPP).
At an early stage, it was recognised that significant potential existed to extend the planned project to in-
clude a number of other complementary initiatives which would elevate the project to a major integrated
development. This would include all aspects of logistics and warehousing, commercial and industrial devel-
opment, residential housing, a hospital and training centres, all sited in Cato Ridge, which lies to the south
and south west of the N3 Freeway and the Cato Ridge township, approximately 46km from Durban centre.
The following component developments are envisaged:
•	 Transport and logistics infrastructure
•	 Warehousing and distribution
•	 Industrial and manufacturing facilities
•	 Commercial and retail facilities
•	 Residential
•	 Education and health
The development is being planned by City Ventures Group, a subsidiary of City Couriers, a major logistics
provider in South Africa.A joint venture agreement with a major local concern is about to be concluded.
Details are confidential and cannot be released at this stage. Engagements with the government at national,
provincial and municipal levels with all authorities and departments with an interest and stake in the pro-
ject have been on-going for the past few years. There has been support for the project at all levels. The first
phase of the development of the dry port element requires R1.2 billion. The other elements are being quan-
tified in terms of the overall master plan.
Existing local infrastructure (as indicated in the bulk services studies which have been done, for instance)
is currently sufficient for the initiation of the project. Local road interchange upgrade is necessary, and has
been planned in engagement with SANRAL, etc. Further infrastructural upgrades will become necessary as
the development expands, and will have to be addressed in the medium term by eThekwini Municipality.
These issues are being discussed in engagements with the appropriate authorities.
CONTACT PERSON: STEVE BALDWIN - 031 580 2000, 083 700 4313, steve@cityc.co.za
CATORIDGEINLANDINTERMODALTERMINAL
12
DURBAN CHAMBER OF COMMERCE AND INDUSTRY
PROJECT REPORT

More Related Content

Similar to Durban investment & business road show

Dube trade port special economic zone investment brochure 2018
Dube trade port special economic zone   investment brochure 2018Dube trade port special economic zone   investment brochure 2018
Dube trade port special economic zone investment brochure 2018justincorbett
 
The New Port Residences.pdf
The New Port Residences.pdfThe New Port Residences.pdf
The New Port Residences.pdfVograce
 
Africa Singapore Business Forum 2018 | Ghana
Africa Singapore Business Forum 2018 | GhanaAfrica Singapore Business Forum 2018 | Ghana
Africa Singapore Business Forum 2018 | GhanaEnterprise Singapore
 
GreenZoneProject.07.10.15.
GreenZoneProject.07.10.15.GreenZoneProject.07.10.15.
GreenZoneProject.07.10.15.Martin Beale
 
Projects_Airport node town planning, Bloemfontein
Projects_Airport node town planning, BloemfonteinProjects_Airport node town planning, Bloemfontein
Projects_Airport node town planning, BloemfonteinAdéle de Jong
 
Pankaj Bajaj Eldeco | Eldeco Pankaj Bajaj
Pankaj Bajaj Eldeco | Eldeco Pankaj BajajPankaj Bajaj Eldeco | Eldeco Pankaj Bajaj
Pankaj Bajaj Eldeco | Eldeco Pankaj BajajPankaj Bajaj
 
Toi property | Pankaj Bajaj Eldeco News-Email
Toi property | Pankaj Bajaj Eldeco News-EmailToi property | Pankaj Bajaj Eldeco News-Email
Toi property | Pankaj Bajaj Eldeco News-EmailPankaj Bajaj
 
Mon Tresor Smart City
Mon Tresor Smart CityMon Tresor Smart City
Mon Tresor Smart CityMon Tresor
 
Mon Tresor Smart City
Mon Tresor Smart CityMon Tresor Smart City
Mon Tresor Smart CityMon Tresor
 
Mon Tresor smart city
Mon Tresor smart city Mon Tresor smart city
Mon Tresor smart city Mon Tresor
 
Mon tersor smart city mauritius
Mon tersor smart city mauritiusMon tersor smart city mauritius
Mon tersor smart city mauritiusMon Tresor
 
Mon Tresor Smart City
Mon Tresor Smart CityMon Tresor Smart City
Mon Tresor Smart CityMon Tresor
 
Mon Tresor Smart City
Mon Tresor Smart CityMon Tresor Smart City
Mon Tresor Smart CityMon Tresor
 
Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...
Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...
Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...Durban Chamber of Commerce and Industry
 

Similar to Durban investment & business road show (20)

Dtpc and action miit brochure
Dtpc and action miit brochureDtpc and action miit brochure
Dtpc and action miit brochure
 
2013 - Mon Tresor master plan
2013 - Mon Tresor master plan 2013 - Mon Tresor master plan
2013 - Mon Tresor master plan
 
Construction Management Presentation
Construction Management PresentationConstruction Management Presentation
Construction Management Presentation
 
Dube trade port cargo brochure 2014
Dube trade port cargo brochure 2014Dube trade port cargo brochure 2014
Dube trade port cargo brochure 2014
 
Dube trade port 360 brochure
Dube trade port 360 brochureDube trade port 360 brochure
Dube trade port 360 brochure
 
Dube trade port special economic zone investment brochure 2018
Dube trade port special economic zone   investment brochure 2018Dube trade port special economic zone   investment brochure 2018
Dube trade port special economic zone investment brochure 2018
 
The New Port Residences.pdf
The New Port Residences.pdfThe New Port Residences.pdf
The New Port Residences.pdf
 
Dube trade port fact book
Dube trade port fact bookDube trade port fact book
Dube trade port fact book
 
Africa Singapore Business Forum 2018 | Ghana
Africa Singapore Business Forum 2018 | GhanaAfrica Singapore Business Forum 2018 | Ghana
Africa Singapore Business Forum 2018 | Ghana
 
GreenZoneProject.07.10.15.
GreenZoneProject.07.10.15.GreenZoneProject.07.10.15.
GreenZoneProject.07.10.15.
 
Projects_Airport node town planning, Bloemfontein
Projects_Airport node town planning, BloemfonteinProjects_Airport node town planning, Bloemfontein
Projects_Airport node town planning, Bloemfontein
 
Pankaj Bajaj Eldeco | Eldeco Pankaj Bajaj
Pankaj Bajaj Eldeco | Eldeco Pankaj BajajPankaj Bajaj Eldeco | Eldeco Pankaj Bajaj
Pankaj Bajaj Eldeco | Eldeco Pankaj Bajaj
 
Toi property | Pankaj Bajaj Eldeco News-Email
Toi property | Pankaj Bajaj Eldeco News-EmailToi property | Pankaj Bajaj Eldeco News-Email
Toi property | Pankaj Bajaj Eldeco News-Email
 
Mon Tresor Smart City
Mon Tresor Smart CityMon Tresor Smart City
Mon Tresor Smart City
 
Mon Tresor Smart City
Mon Tresor Smart CityMon Tresor Smart City
Mon Tresor Smart City
 
Mon Tresor smart city
Mon Tresor smart city Mon Tresor smart city
Mon Tresor smart city
 
Mon tersor smart city mauritius
Mon tersor smart city mauritiusMon tersor smart city mauritius
Mon tersor smart city mauritius
 
Mon Tresor Smart City
Mon Tresor Smart CityMon Tresor Smart City
Mon Tresor Smart City
 
Mon Tresor Smart City
Mon Tresor Smart CityMon Tresor Smart City
Mon Tresor Smart City
 
Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...
Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...
Presentation: Durban Aerotropolis - Northern Area Business Forum: 18 February...
 

More from Durban Chamber of Commerce and Industry

More from Durban Chamber of Commerce and Industry (20)

SUMMARY AMENDED CCMA RULES
SUMMARY AMENDED CCMA RULESSUMMARY AMENDED CCMA RULES
SUMMARY AMENDED CCMA RULES
 
201507 caisson repair project final
201507 caisson repair project final201507 caisson repair project final
201507 caisson repair project final
 
Simply biz shift questions with allon dbn 2 v2
Simply biz shift questions with allon dbn 2 v2Simply biz shift questions with allon dbn 2 v2
Simply biz shift questions with allon dbn 2 v2
 
Speakers' profiles
Speakers' profilesSpeakers' profiles
Speakers' profiles
 
Mail shot wom. conv. a4
Mail shot   wom. conv. a4Mail shot   wom. conv. a4
Mail shot wom. conv. a4
 
Talk sign a5 flyer 2015
Talk sign a5 flyer 2015Talk sign a5 flyer 2015
Talk sign a5 flyer 2015
 
ethekwini municipality 2013 2014 annual report
ethekwini municipality 2013 2014 annual reportethekwini municipality 2013 2014 annual report
ethekwini municipality 2013 2014 annual report
 
Sefa breakfast session presentation
Sefa breakfast session presentationSefa breakfast session presentation
Sefa breakfast session presentation
 
Invitation letter to careers expo 2015
Invitation letter to careers expo 2015Invitation letter to careers expo 2015
Invitation letter to careers expo 2015
 
Invitation to submit tenders to organise the sacci annual convention
Invitation to submit tenders to organise the sacci annual conventionInvitation to submit tenders to organise the sacci annual convention
Invitation to submit tenders to organise the sacci annual convention
 
Media release phoenix ink business directory approved 13 jan2015
Media release phoenix ink business directory approved 13 jan2015Media release phoenix ink business directory approved 13 jan2015
Media release phoenix ink business directory approved 13 jan2015
 
Daily market commentary 10122014
Daily market commentary 10122014Daily market commentary 10122014
Daily market commentary 10122014
 
Invitation
InvitationInvitation
Invitation
 
Daily market commentary 11112014
Daily market commentary 11112014Daily market commentary 11112014
Daily market commentary 11112014
 
Daily market commentary 10102014
Daily market commentary  10102014Daily market commentary  10102014
Daily market commentary 10102014
 
Jirah article 2014
Jirah article 2014Jirah article 2014
Jirah article 2014
 
KZN Infrastructure Funding Fair
KZN Infrastructure Funding Fair KZN Infrastructure Funding Fair
KZN Infrastructure Funding Fair
 
Gibela supplier specs
Gibela supplier specs Gibela supplier specs
Gibela supplier specs
 
Mntc studyarea dbnchamber.mpumalanga
Mntc studyarea dbnchamber.mpumalangaMntc studyarea dbnchamber.mpumalanga
Mntc studyarea dbnchamber.mpumalanga
 
Kwamnyandu node urban design precinct plan
Kwamnyandu node urban design precinct planKwamnyandu node urban design precinct plan
Kwamnyandu node urban design precinct plan
 

Recently uploaded

Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 

Recently uploaded (20)

Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 

Durban investment & business road show

  • 1. 1 DURBAN CHAMBER OF COMMERCE AND INDUSTRY PROJECT REPORT C ornubia is a 1300 hec- tare expanse of green- field opportunity stra- tegically located within the municipality’s Northern Urban Development Corridor (NUDC), which is central to the province’s primary growth and development corridor. This area is identified in the City of Durban’s Integrated Development Plan (IDP) as part of a major economic investment node. The project is snugly nested between Phoenix/ Ottawa and Umhlanga, bordered by N2 freeway on the east and the M41arterial on the south, and the Ohlanga River to the north, just a mere 7 km south of the King Shaka International Airport. The development of Cornubia presents a significant opportunity to attract new investment to this area by releasing land to meet the significant demand for well-located industrial and commercial land as a result of the increased economic growth rate of the metropolitan economy. The proposed development is ideally suited for infrastructure, commercial (offices, retail, etc.), light industry (logistics, manu- facturing), and residential units across the full spectrum of housing needs. The project has the scope and ability to be either a wholly private sector project or a Public Private Partnership (PPP). Currently, due to joint planning and collaboration, it could be viewed as a PPP between part- ners Tongaat Hulett and eThekwini Municipality. Cornubia is a multi-phase project. Construction has already commenced, while in many phases all necessary approv- als have been obtained. On the remaining phases, a process of obtaining environmental approv- als is well underway. Opportunity exists for investors to partner with either the developers and/or the end users. The project’s success will depend on some key road infrastructure, the provision of which is currently being rolled out, making the de- velopment area highly accessible. CONTACT PERSON: MTURA MATSHINI - 031 5601900, Mtura. Matshini@tongaat.com CORNUBIA www.cornubia.co.za
  • 2. 2 DURBAN CHAMBER OF COMMERCE AND INDUSTRY PROJECT REPORT It’s an opportunity for and my family to achieve what we’ve always dreamt of. -Themba Mkhize, father and husband “ “
  • 3. 3 DURBAN CHAMBER OF COMMERCE AND INDUSTRY PROJECT REPORT DUBETRADEPORT: DUBECITY D ube City is currently in its first phase of development. It comprises a 12-hectare site located at King Shaka International Airport (KSIA), increasing to 24 hectares on completion. Land use has been planned to include a mix of hotel, conference, entertainment, retail and knowledge-inten- sive companies and company head offices. DTPC’s own headquarters, 29° South, is situated in the heart of Dube City. Companies may either develop for themselves or link-in with a developer looking to put a project together. The development hub is just 900 metres from KSIA near the N2, M4 and R102, approximately 34 km from the centre of Durban and 16 km from Umhlanga Ridge and Gateway. This northern corridor is recognised as a pre-eminent contributor to the future growth of the provincial and city economies. This is a public sector investment for which all zoning and other approvals have been secured. Developer-or tenant-led development are now sought in the spheres, particularly, of large-scale office, commercial and hospitality buildings.DTPC currently has developers looking at various sites; the first development planned after 29° South is an office development as well as a hotel development which is under final negotiations. It is anticipated that this will include a 200-bed hotel and large conference centre with retail space on the ground floor and approximately 13 000m² of offices. CONTACT PERSONS: 032 814 0000 TIM HUDSON (Tim.hudson@dubetradeport.co.za) HAMISH ERSKINE (Hamish.erskine@dubetradeport.co.za)
  • 4. 4 DURBAN CHAMBER OF COMMERCE AND INDUSTRY PROJECT REPORT www.dubetradeport.co.za The Dube TradeZone is industrial land surrounding the Dube Cargo Terminal. Within Dube TradeZone, pref- erence is given to businesses which are aligned to air services, i.e. companies that import or manufacture for export, logistic and support companies. Companies targeted are ones that would benefit from close proximity to KSIA and Dube Cargo Terminal, the freight forwarders on site and DTPC’s trucking division Dube AirRoad. The project seeks industrial development and tenants for industrial properties, including manufacturing, logistics and distribution in particular. In Dube TradeZone, a high degree of interest has been shown which has resulted in the conclusion of lease agreements over almost all the available sites. A number of buildings are now under construction or com- plete. DTPC is now focusing on bringing online future phases, TradeZone Phase 2 and uShukela. CONTACT PERSONS: 032 814 0000 TIM HUDSON (Tim.hudson@dubetradeport.co.za) HAMISH ERSKINE (Hamish.erskine@dubetradeport.co.za) DUBETRADEPORT: DUBETRADEZONE
  • 5. 5 DURBAN CHAMBER OF COMMERCE AND INDUSTRY PROJECT REPORT T he uShukela development is situated immediately adjacent to the massive Dube TradePort infrastructural project, a multi-faceted‘greenfield’business precinct surrounding Durban’s King Shaka International Airport (KSIA) which forms the heart of an emerging aerotropolis, 30km north of Durban. The rapidly developing Dube TradePort, with the international airport at its centre, provides KwaZulu-Natal with a new, world-class trade and logistics platform, creating a globally competitive business location which offers the business community speed, agility and connectivity. The neighbouring uShukela development adjoins the present Dube TradeZone - an area designed to attract a range of airport-related enterprises, warehousing, logistics and distribution, light manufacturing and the like. uShukela is 80 hectares in extent, of which 50 hectares is developable as a business, industrial and logistics platform. Whilst capitalising on significantly improved air connectivity, uShukela is strategically positioned between Africa’s two major seaports, Durban and Richards Bay, serviced by world-class road and rail access. UShukela is ideally located immediately to the north of Dube Trade Port and King Shaka International Airport. The site is bound to the east by the N2 highway linking Durban and Richards Bay, to the south by Dube TradePort’s TradeZone and to the north by the M43, uShukela Highway. Tongaat Hulett is flexible in terms of the ultimate land use; however, the proposed development is well suited for commercial, offices, hotels and conferencing, industrial, logistics and warehousing. Due to the fact that a portion of the land belongs to Tongaat Hulett and the adjacent portion belongs to Dube Trade Port, the opportunity exists to either collaboratively plan and develop the properties to opti- mise use and outcomes or to develop the property as a stand-alone development. Specialist’s studies have already been completed and it is envisaged that development rights will be received by the end of 2014. CONTACT PERSON: GREG VEERASAMY - 031 560 1900, Greg.veerasamy@tongaat.com USHUKELA www.thdev.co.za
  • 6. 6 DURBAN CHAMBER OF COMMERCE AND INDUSTRY PROJECT REPORT B ridge City was established in 2006 as a joint venture development between the eThekwini Munici- pality and Tongaat Hulett and comprises a 47 hectare town centre and 13 hectare business node. It is a mixed-use development and will include government/retail/commercial/offices and residen- tial uses. To date, a 48 000m2 shopping centre and a Regional Magistrates Court have been built and opened and a State Regional Hospital is due to start construction in June 2014. The rail link into the station under the shopping centre was opened in March 2014 and the eThekwini Bus Rapid Transport (BRT) system will be up and running by June 2016. Bridge City is the key destination for three separate routes within eThekwini being the links with Pinetown, Cornubia/Umhlanga and the Durban CBD. This has added significant impetus to Bridge City and significant interest in purchasing in Bridge City. Part of the BRT contract, as awarded in May 2014, includes the construction of the half diamond interchange under the M25 freeway and most importantly, this will provide access from Bridge City onto the M25 freeway back towards the N2 freeway system within the next two years. All bulk services are installed to Bridge City and all sites in the town centre are saleable and transferrable. 33% of the available bulk has been sold and the remainder is available for sale. Developments in the town centre may start construction within three to four months while developments in the Business Estate may start construction within three to six months. Any site may be purchased and developed and services will be made available to such sites before beneficial occupation, if not already available. All triggers for the release of the total bulk of 725 000m2 allocated to Bridge City will be in place by mid-2016 i.e. the rail line connection (opened) and the half diamond inter- change with the M25 (mid-2016). Bridge City is located in the Inanda, Ntuzuma and KwaMashu (INK) and Phoenix region of eThekwini Municipality (approximately 1 million people) to the north west of the Durban CBD. The development is a joint venture development between eThekwini Municipality and Tongaat Hulett and is a successful example of a PPP. CONTACT PERSON: BRIAN IVE - 031 560 1977, Brian.ive@tongaat.com BRIDGECITY www.bridgecity.co.za
  • 7. 7 DURBAN CHAMBER OF COMMERCE AND INDUSTRY PROJECT REPORT T ongaat Hulett’s Sibaya development provides for the integration of urban development and the natural environment, creating a new urban identity with significant tourism potential and way of life for residents in and visitors to an idyllic setting some 8km north of Umhlanga and 25km from the Durban city centre. Sibaya, with its undulating topography, gives rise to a new coastal node which includes residential, commer- cial and office development, together with recreational and entertainment opportunities, whilst simultane- ously strengthening the attractiveness of the northern coastal corridor. The development sets out to provide for a vibrant and inter-connected mixed-use - though predominantly residential and lifestyle uses, maximis- ing the area’s unique natural conditions, while acknowledging and remaining responsive and receptive to environmental sensitivities. Sibaya comprises five development nodes and is 750 hectares in extent, inclu- sive of the Hawaan Forest, rich in flora and fauna and the only remaining significant pristine coastal dune forest, outside the Isimangaliso Wetland Park, in KwaZulu-Natal. Sibaya is located immediately north of the existing Umhlanga node and south-east of the King Shaka International Airport. It is bordered by the N2 to the west, Umdloti and the Indian Ocean on the east and it dissected by the existing M4 highway. Sibaya is a predominantly a residential development, with a strong emphasis on leisure-types of develop- ment complemented by some commercial, resort and office rights. The development is also boarded by a pristine indigenous coastal dune forest and the Umhlanga Estuary that enhances the lifestyle factor. Development nodes 1 and 5 have approved development rights and are “shovel ready”. Development node 4 is currently undergoing an environmental impact analysis. The full planning process is expected to have been completed and the node will be “shovel ready”by the end of 2014.The remaining development nodes are programmed as future phases and no planning processes have commenced as yet. The proposed development of the Sibaya node will require a significant expansion of current infrastructure. This has been planned but not installed. CONTACT PERSON: SITHEMBISO MTHEMBU - 031 560 1925, Sithembiso.mthembu@tongaat.com www.thdev.co.za SIBAYA
  • 8. 8 DURBAN CHAMBER OF COMMERCE AND INDUSTRY PROJECT REPORT T he Wewe Driefontein Project is based on approximately 621 hectares, designed to be a fully integrated township focusing on creating employment with inclusionary housing. The layout plan clearly shows the components of the integrated scheme, consisting of general industry, light and service industry, parks, commercial, retail, housing, agricultural and conservation. The market needs assessment together with independent feasibilities, clearly highlight the need for this development. The development area is strategically located within the 5 to 10km radius of the new King Shaka Airport and Dube Trade Port, situated in the main Aerotropolis and Northern Development corridor from the new King Shaka Airport, also recognised as a Flagship Development by Provincial and Local government authorities and the Department of Human Settlements. General industry is expected to be the main catalyst to create employment and housing opportunities. The terrain is flat and suitable for this purpose while the existing road network and, importantly, the new proposed Western Bypass will act as the main mobility corridor to the north and south of the Northern Development corridor from Durban/King Shaka Airport through to Richards Bay and Mozambique. The Western Bypass passes through the eastern boundary of the project. This project is currently privately-owned, but engagement with the public sector is proceeding, considering that the project will achieve the outcomes that are aligned to government policies. At present, the develop- ers are in the zoning process and have finalised all specialist studies including handing-in the final environ- mental impact assessment. The investment required is dependent on the phasing and current negotiations of the partnership in the application, but an investment of approximately 155 million Rand for bulk and link services for the initial phases is sought. CONTACT PERSON: PAT CONWAY - 032 946 2927, 082 444 1654, pat@spdev.co.za WEWEDRIEFONTEIN–KINGSESTATE
  • 9. 9 DURBAN CHAMBER OF COMMERCE AND INDUSTRY PROJECT REPORT F inningley offers a unique opportunity to partner with the estate landowners of over a hundred years, in developing their heritage, by creating a ground-breaking, self-sustaining‘city in the sun’ on the beautiful South Coast of KwaZulu Natal, South Africa. Cutting-edge innovation and sustain- able green technology will be implemented from inception. The development spans an area of 2640 hectares. The project includes: • Infrastructure - building strong & green for the future. • Industrial and commercial - bringing international expertise and technologies and providing sustain able job opportunities. • Residential - innovative urban architecture. • Leisure - world-class resorts. • Education - universities, research facilities, schools. • Aerodrome - including a road safety centre, motocross-track, off-road driving/test track and drifting area. Finningley Estate is located on the Farm Clansthal 1202ET, the Farm Crosley No 14718 and Umkomanzi Drift No 1357, KwaZulu-Natal, between Umkomaas and Scottburgh on the KwaZulu-Natal South coast, some 60 km from the city of Durban. The environmental impact assessment has been completed and ROD issued. The amount sought in invest- ment capital is R600 million. The project encompasses necessary infrastructure in partnership with eThek- wini Municipality. CONTACT PERSON: RUSSELL CHAPPE DE LEONVAL - 031 266 9525, russell@jcgroup.co.za FINNINGLEYGROWTHSPHERE
  • 10. 10 DURBAN CHAMBER OF COMMERCE AND INDUSTRY PROJECT REPORT T he 300 hectare site identified for the sub-regional metropolitan town centre serves a catchment of some 200 000 people. The project has four phases: Phase One: retail and business development Phase Two: public precinct with the following public investment to occur subject to completion of business plans with respective government departments: • New Metro police station • Municipal Customer Care Centre which will accommodate various government service departments, and a library • Social welfare centre • Public park with sport and recreational facilities • New railway station integrated with nodal transport interchange • Health facilities • Small trader facilities Phase Three: 500 low cost RDP Units Phase Four: 1000 middle income gap housing Mpumalanga Township is close to Hammarsdale situated within the outer west region of eThekwini. The eThekwini Municipality’s private sector partner is the ERIS Property Group. The partnership between ERIS and eThekwni Municipality only extends to Phase One of the town centre. The partnership resulted in cost- sharing in the provision of bulk infrastructure that lead to the construction of the 18000m2 retail shopping centre. Further partnership opportunities could be available for the residential development component. The Town Centre Precinct Plan was adopted by the municipality in 2009. Only Phase One is zoned and ap- proved at this stage. Construction undertaken so far includes a shopping centre with a taxi rank. Phase Two is currently going through approval stages. All bulk infrastructure is in place for phases One, Two and Three. CONTACT PERSON: PETER GILMORE - 031 311 4227, 083 378 8737, Peter.gilmore@durban.gov.za MPUMALANGANEWTOWNCENTRE
  • 11. 11 DURBAN CHAMBER OF COMMERCE AND INDUSTRY PROJECT REPORT T he project was initiated by a request from the National Department of Transport, to develop an Inland Intermodal Terminal / Dry Port as part of the National Strategic Infrastructure Plan (SIP), and specifically within the mandate of the SIP 2 (Durban-Gauteng Freight Corridor) Committee. Initially it was planned as a private sector initiative, with the facility to progress to a Public-Private Partner- ship (PPP). At an early stage, it was recognised that significant potential existed to extend the planned project to in- clude a number of other complementary initiatives which would elevate the project to a major integrated development. This would include all aspects of logistics and warehousing, commercial and industrial devel- opment, residential housing, a hospital and training centres, all sited in Cato Ridge, which lies to the south and south west of the N3 Freeway and the Cato Ridge township, approximately 46km from Durban centre. The following component developments are envisaged: • Transport and logistics infrastructure • Warehousing and distribution • Industrial and manufacturing facilities • Commercial and retail facilities • Residential • Education and health The development is being planned by City Ventures Group, a subsidiary of City Couriers, a major logistics provider in South Africa.A joint venture agreement with a major local concern is about to be concluded. Details are confidential and cannot be released at this stage. Engagements with the government at national, provincial and municipal levels with all authorities and departments with an interest and stake in the pro- ject have been on-going for the past few years. There has been support for the project at all levels. The first phase of the development of the dry port element requires R1.2 billion. The other elements are being quan- tified in terms of the overall master plan. Existing local infrastructure (as indicated in the bulk services studies which have been done, for instance) is currently sufficient for the initiation of the project. Local road interchange upgrade is necessary, and has been planned in engagement with SANRAL, etc. Further infrastructural upgrades will become necessary as the development expands, and will have to be addressed in the medium term by eThekwini Municipality. These issues are being discussed in engagements with the appropriate authorities. CONTACT PERSON: STEVE BALDWIN - 031 580 2000, 083 700 4313, steve@cityc.co.za CATORIDGEINLANDINTERMODALTERMINAL
  • 12. 12 DURBAN CHAMBER OF COMMERCE AND INDUSTRY PROJECT REPORT