E N E R G O Brasov

  Cement Plants
   Projects Completed
The process of production for
              the cement
1.    Quarry
2.    Crushing
3.    Raw material conveyor
4.    Homogenization
5.    Raw mill
6.    Filter
7.    Preheater
8.    Kiln
9.    Cooler
10.   Clinker silo
11.   Cement mill
12.   Packaging and delivery
ENERGO on brief
Who we are

   We are "ENERGO SA" a private company, proud to be among the companies recognized
    by the quality of work done.
    The company was founded in 1985 as a company specializing in supply of parts and
    components for national power plants system. Since 1995, when it became a private
    company was diversified range of products and services covering now different market
    segments.
   With over 25 years experience in the industrial, infrastructure and civil constructions
    and with over 15 years of collaboration with major companies in the world of power
    generation, we believe that we have the necessary strengths to add value to the projects
    that you develop for your clients.
                                         ​
    The company operates in an area of 41.000 square meters of which 13,000 square
    meters are the production space, including metal construction department (cutting,
    assembling and welding), machining department and department blasting / painting.
   Capabilites includes Engineering, Fabrication, Supply and Erection of structural steel
    for civil and industrial buildings, energy, environment and renewable energy, public
    utility works (stadiums, sports arenas) and infrastructure (bridges), different metallic
    confections (ducts, hoppers, silos) and is able to assimilate new products easily.
   The company's production capacity amounts to 1000 tons / month after modernization
    and upgrading of production line.
   Employees are ENERGO characteristic: professionals, scrupulous and able to resolve
    any requirement. Professionalism is certified by various organizations such as:
    International Institute of Welding ,TÜV SÜDDEUTSCHLAND, SLV Munchen, ISCIR,
    Aeronautical Authority , Railway Authority AFER
PROJECT 1

New production line and clinker
          storage
PROJECT 1
New production line and clinker storage



                      To achieve marketing objectives, client
                       investment consisted of expanding
                       production by building a new line with a
                       capacity of 4,000 tons of clinker / day,
                       watching all processes from raw material
                       preparation to storage clinker in silos of
                       45,000 tons
                      ENERGO was appointed to execute and
                       deliver steel structures necessary for
                       several objectives of Phase I:
PROJECT 1
New production line and clinker storage
                  1.    Raw Mill Building
                  2.    Bucket Elevator Tower
                  3.    Kiln De-dusting Filter Air
                  4.    Slide Support 1Air Slide Support 2
                  5.    Cooler Building
                  6.    Air Slide Tower
                  7.    Supporting Structure Transfer Tower
                  8.    Silo Roof 1Silo Roof 2
                  9.    Control Room
                  10.   Duct Support
                  11.   Kiln Dust Bin Support
                  12.   Clinker Cooler Dedusting
                  13.   Staircase to Penthouse on Silo 2Steel Structure-Penthouse on Silo 1
                  14.   Kiln Gangway and Stairs between piers
                  15.   Steel Structure-Penthouse on Silo 2
                  16.   Cable Bridge
                  17.   Clinker Transport to Storage Conveyor between silos
                  18.   Gypsum Hall
                  19.   Beam for Correctives Hall
                  20.   Support Stair and platform at electrical room
                  21.   Airslide support between Sup tower &Preheater
                  22.   Steel structure - Off spec clinker transport
                  23.   Steel structure - Preheater reinforcement
                  24.   Gas duct support
                  25.   Support Conveyor
                  26.   Lift Preheater structure
                  27.   Filler transport

                  Total quantity executed and delivered for Phase I and II
                       was over 6,500 tons
PROJECT 1
                New production line and clinker storage




Components have been delivered simultaneously
  to several objectives following the installation
  order established by the client
PROJECT 1
                   New production line and clinker storage




Logistics of Complete delivery was
   provided by ENERGO
PROJECT 1
                    New production line and clinker storage




The accuracy of execution was essential in
   order to achieve the best conditions of
   installation
PROJECT 1
                 New production line and clinker storage




After completion of phase I,
ENERGO continued at customer
request execution and delivery for
objects belonging Phase II
PROJECT 2

Transportation and storage of
    130,000 To clinker
PROJECT 2
Transportation and storage of 130,000 To clinker




                                      
                                          Client investment purpose
                                          was to build a new deposit
                                          and transport to feed clinker
                                          silo of 130,000 tons.



                                      
                                          ENERGO was appointed to
                                          carry out the work of design
                                          - construction - installation
                                          of conveyor and supply -
                                          assembly of the roof silo .
PROJECT 2
                 Transportation and storage of 130,000 To clinker

    Cylindrical part of the silo was built from
    concrete.


                      ​
    The roof was made of:


     •   3449 metallic elements assembled with
         screws

     •   30 trusses placed radially, forming a
         truncated cone with a diameter of 80 m
         at the base and a height of 22 m above
         the 16 m of concrete cylinder.


     •   The structure was fixed in 30 mobile
         supports.
PROJECT 2
               Transportation and storage of 130,000 To clinker

For installation was designed, developed and installed in the
     center of the silo, a temporary tower that helped to fix the
     central tension ring
PROJECT 2
               Transportation and storage of 130,000 To clinker




Petals was installed, pre-assembled on the ground

Installation was done by balancing the weights on cylinder diameter and
central ring tension
PROJECT 2
                  Transportation and storage of 130,000 To clinker





    Final deviation resulting from installation on a
    circumference of about 250 m was 0.01 m
PROJECT 2
              Transportation and storage of 130,000 To clinker




Complete assembly of silo roof was done in 5 weeks
PROIECT
Transport si depozitare 130 000 To clinker




Simultaneously was installed conveyor to
    feed the silo
ENERGO
     SUCCESS KEYS
           for
CEMENT INDUSTRY PROJECTS
           Guaranteeing of technical conditions and quality requirements of projects
                                     Execution state-of-art
                                     Delivery Just-in-Time
         The promptness in identifying, analyzing and solving various situations created
                            The accuracy of of documents prepared




                           Therefore two major brands of cement:

                   "Power Passion Performance" and "For better building"

Were for ENERGO the way ahead to success and complete satisfaction of their customers
www.energobv.ro

Mais conteúdo relacionado

Destaque

Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSSin Byrne
 
Comparison of lateral analysis of reinforced concrete and steel silo
Comparison of lateral analysis of reinforced concrete and steel siloComparison of lateral analysis of reinforced concrete and steel silo
Comparison of lateral analysis of reinforced concrete and steel siloIAEME Publication
 
Vibrating machinery steel skid on piles
Vibrating machinery steel skid on pilesVibrating machinery steel skid on piles
Vibrating machinery steel skid on pilesr2d22
 
Seismic response of reinforced concrete silos
Seismic response of reinforced concrete silosSeismic response of reinforced concrete silos
Seismic response of reinforced concrete siloseSAT Journals
 
Steel silo failure case study
Steel silo failure case study  Steel silo failure case study
Steel silo failure case study Khaled Eid
 
Sap tutorial for dynamics
Sap tutorial for dynamicsSap tutorial for dynamics
Sap tutorial for dynamicscolosimoricardo
 
Post Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt LtdPost Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt LtdSathish Kumar
 
Company presentation fabricator feb20_2016
Company presentation fabricator feb20_2016Company presentation fabricator feb20_2016
Company presentation fabricator feb20_2016Pravin Patel
 
Silo at narrow space
Silo at narrow spaceSilo at narrow space
Silo at narrow spacechandra manik
 
Construction Methodology Scheduling1
Construction Methodology Scheduling1Construction Methodology Scheduling1
Construction Methodology Scheduling1Allan Leyte
 
A Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingA Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingSiddhartha Kamat
 
Structure Analysis-Deflection using SAP2000
Structure Analysis-Deflection using  SAP2000Structure Analysis-Deflection using  SAP2000
Structure Analysis-Deflection using SAP2000Batoul Alshamali
 
Tekla structure models
Tekla structure modelsTekla structure models
Tekla structure modelsJanusz Majcher
 
Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016
Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016
Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016Bimo Radifan A
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project reportShubham Parab
 
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...Duy Dang
 
The tekla training guide
The tekla training guideThe tekla training guide
The tekla training guidePhuc An
 

Destaque (20)

Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
 
Comparison of lateral analysis of reinforced concrete and steel silo
Comparison of lateral analysis of reinforced concrete and steel siloComparison of lateral analysis of reinforced concrete and steel silo
Comparison of lateral analysis of reinforced concrete and steel silo
 
Vibrating machinery steel skid on piles
Vibrating machinery steel skid on pilesVibrating machinery steel skid on piles
Vibrating machinery steel skid on piles
 
The Ins & Outs of Concrete Silo Inspection
The Ins & Outs of Concrete Silo InspectionThe Ins & Outs of Concrete Silo Inspection
The Ins & Outs of Concrete Silo Inspection
 
Seismic response of reinforced concrete silos
Seismic response of reinforced concrete silosSeismic response of reinforced concrete silos
Seismic response of reinforced concrete silos
 
Steel silo failure case study
Steel silo failure case study  Steel silo failure case study
Steel silo failure case study
 
Sap tutorial for dynamics
Sap tutorial for dynamicsSap tutorial for dynamics
Sap tutorial for dynamics
 
Post Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt LtdPost Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt Ltd
 
Company presentation fabricator feb20_2016
Company presentation fabricator feb20_2016Company presentation fabricator feb20_2016
Company presentation fabricator feb20_2016
 
Silo at narrow space
Silo at narrow spaceSilo at narrow space
Silo at narrow space
 
Analysis of warehouse in staad pro.
Analysis of warehouse in staad pro. Analysis of warehouse in staad pro.
Analysis of warehouse in staad pro.
 
Construction Methodology Scheduling1
Construction Methodology Scheduling1Construction Methodology Scheduling1
Construction Methodology Scheduling1
 
A Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingA Critical Review of Building Information Modelling
A Critical Review of Building Information Modelling
 
Storage structre
Storage structreStorage structre
Storage structre
 
Structure Analysis-Deflection using SAP2000
Structure Analysis-Deflection using  SAP2000Structure Analysis-Deflection using  SAP2000
Structure Analysis-Deflection using SAP2000
 
Tekla structure models
Tekla structure modelsTekla structure models
Tekla structure models
 
Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016
Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016
Desain Perkerasan Jalan | Program Studi D3 Teknik Sipil Transportasi UNS 2016
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project report
 
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
 
The tekla training guide
The tekla training guideThe tekla training guide
The tekla training guide
 

Semelhante a E n e r g o Cement Plant - Projects

Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate buildingNayan Rao
 
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITEDCIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITEDWater Birds (Ali)
 
Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Rohit Arora
 
Devnya plant tour
Devnya plant tourDevnya plant tour
Devnya plant tourteopetz
 
Devnya plant tour_EN
Devnya plant tour_ENDevnya plant tour_EN
Devnya plant tour_ENMarco Maccari
 
Chalcroft Special Projects
Chalcroft Special ProjectsChalcroft Special Projects
Chalcroft Special ProjectsChalcroft Ltd
 
Concrete Towers - a business case for sustained investment_Rev 5
Concrete Towers - a business case for sustained investment_Rev 5Concrete Towers - a business case for sustained investment_Rev 5
Concrete Towers - a business case for sustained investment_Rev 5Santie Gouws
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesAkshey Sharma
 
National Gallery & Science Museum - Sarnafil+
National Gallery & Science Museum - Sarnafil+National Gallery & Science Museum - Sarnafil+
National Gallery & Science Museum - Sarnafil+Vin Housley
 
Seminar presentation Burj Khalifa
Seminar presentation Burj KhalifaSeminar presentation Burj Khalifa
Seminar presentation Burj KhalifaAazam Nirban
 
Ywct Short Presentation Exe
Ywct   Short Presentation ExeYwct   Short Presentation Exe
Ywct Short Presentation Exematanp
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016Steve Edgson
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of constructionJoji Mathew
 

Semelhante a E n e r g o Cement Plant - Projects (20)

Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITEDCIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
 
Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
burjjjj new
burjjjj newburjjjj new
burjjjj new
 
Devnya plant tour
Devnya plant tourDevnya plant tour
Devnya plant tour
 
Devnya plant tour_EN
Devnya plant tour_ENDevnya plant tour_EN
Devnya plant tour_EN
 
Chalcroft Special Projects
Chalcroft Special ProjectsChalcroft Special Projects
Chalcroft Special Projects
 
Concrete Towers - a business case for sustained investment_Rev 5
Concrete Towers - a business case for sustained investment_Rev 5Concrete Towers - a business case for sustained investment_Rev 5
Concrete Towers - a business case for sustained investment_Rev 5
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologies
 
National Gallery & Science Museum - Sarnafil+
National Gallery & Science Museum - Sarnafil+National Gallery & Science Museum - Sarnafil+
National Gallery & Science Museum - Sarnafil+
 
Seminar presentation Burj Khalifa
Seminar presentation Burj KhalifaSeminar presentation Burj Khalifa
Seminar presentation Burj Khalifa
 
New PPT
New PPT New PPT
New PPT
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Ywct Short Presentation Exe
Ywct   Short Presentation ExeYwct   Short Presentation Exe
Ywct Short Presentation Exe
 
TRE July 2016 - Stirling
TRE July 2016 - StirlingTRE July 2016 - Stirling
TRE July 2016 - Stirling
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016
 
RA_CV - October 2016
RA_CV - October 2016RA_CV - October 2016
RA_CV - October 2016
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
 

Mais de Daniel DRAGOSIN

ENERGO Brasov - Renewable projects ed2015
ENERGO Brasov - Renewable projects ed2015ENERGO Brasov - Renewable projects ed2015
ENERGO Brasov - Renewable projects ed2015Daniel DRAGOSIN
 
ENERGO Brasov - new presentation 2015 May
ENERGO Brasov -  new presentation 2015  MayENERGO Brasov -  new presentation 2015  May
ENERGO Brasov - new presentation 2015 MayDaniel DRAGOSIN
 
Energo metals projects experience presentation - oct2014
Energo  metals projects experience presentation - oct2014Energo  metals projects experience presentation - oct2014
Energo metals projects experience presentation - oct2014Daniel DRAGOSIN
 
ENERGO Brasov -Energy sector projects completed
ENERGO Brasov -Energy sector projects completed ENERGO Brasov -Energy sector projects completed
ENERGO Brasov -Energy sector projects completed Daniel DRAGOSIN
 
@Energo Brasov - Steel Bridges Experience
@Energo Brasov - Steel Bridges Experience@Energo Brasov - Steel Bridges Experience
@Energo Brasov - Steel Bridges ExperienceDaniel DRAGOSIN
 
12 fastest growing economies for 2013
12 fastest growing economies for 201312 fastest growing economies for 2013
12 fastest growing economies for 2013Daniel DRAGOSIN
 
Project - Brasov Business Park
Project - Brasov Business ParkProject - Brasov Business Park
Project - Brasov Business ParkDaniel DRAGOSIN
 

Mais de Daniel DRAGOSIN (8)

ENERGO Brasov - Renewable projects ed2015
ENERGO Brasov - Renewable projects ed2015ENERGO Brasov - Renewable projects ed2015
ENERGO Brasov - Renewable projects ed2015
 
ENERGO Brasov - new presentation 2015 May
ENERGO Brasov -  new presentation 2015  MayENERGO Brasov -  new presentation 2015  May
ENERGO Brasov - new presentation 2015 May
 
Energo metals projects experience presentation - oct2014
Energo  metals projects experience presentation - oct2014Energo  metals projects experience presentation - oct2014
Energo metals projects experience presentation - oct2014
 
Maritimo Shopping Mall
Maritimo Shopping MallMaritimo Shopping Mall
Maritimo Shopping Mall
 
ENERGO Brasov -Energy sector projects completed
ENERGO Brasov -Energy sector projects completed ENERGO Brasov -Energy sector projects completed
ENERGO Brasov -Energy sector projects completed
 
@Energo Brasov - Steel Bridges Experience
@Energo Brasov - Steel Bridges Experience@Energo Brasov - Steel Bridges Experience
@Energo Brasov - Steel Bridges Experience
 
12 fastest growing economies for 2013
12 fastest growing economies for 201312 fastest growing economies for 2013
12 fastest growing economies for 2013
 
Project - Brasov Business Park
Project - Brasov Business ParkProject - Brasov Business Park
Project - Brasov Business Park
 

E n e r g o Cement Plant - Projects

  • 1. E N E R G O Brasov Cement Plants Projects Completed
  • 2. The process of production for the cement 1. Quarry 2. Crushing 3. Raw material conveyor 4. Homogenization 5. Raw mill 6. Filter 7. Preheater 8. Kiln 9. Cooler 10. Clinker silo 11. Cement mill 12. Packaging and delivery
  • 3. ENERGO on brief Who we are  We are "ENERGO SA" a private company, proud to be among the companies recognized by the quality of work done.  The company was founded in 1985 as a company specializing in supply of parts and components for national power plants system. Since 1995, when it became a private company was diversified range of products and services covering now different market segments.  With over 25 years experience in the industrial, infrastructure and civil constructions and with over 15 years of collaboration with major companies in the world of power generation, we believe that we have the necessary strengths to add value to the projects that you develop for your clients.  ​ The company operates in an area of 41.000 square meters of which 13,000 square meters are the production space, including metal construction department (cutting, assembling and welding), machining department and department blasting / painting.  Capabilites includes Engineering, Fabrication, Supply and Erection of structural steel for civil and industrial buildings, energy, environment and renewable energy, public utility works (stadiums, sports arenas) and infrastructure (bridges), different metallic confections (ducts, hoppers, silos) and is able to assimilate new products easily.  The company's production capacity amounts to 1000 tons / month after modernization and upgrading of production line.  Employees are ENERGO characteristic: professionals, scrupulous and able to resolve any requirement. Professionalism is certified by various organizations such as: International Institute of Welding ,TÜV SÜDDEUTSCHLAND, SLV Munchen, ISCIR, Aeronautical Authority , Railway Authority AFER
  • 4. PROJECT 1 New production line and clinker storage
  • 5. PROJECT 1 New production line and clinker storage  To achieve marketing objectives, client investment consisted of expanding production by building a new line with a capacity of 4,000 tons of clinker / day, watching all processes from raw material preparation to storage clinker in silos of 45,000 tons  ENERGO was appointed to execute and deliver steel structures necessary for several objectives of Phase I:
  • 6. PROJECT 1 New production line and clinker storage 1. Raw Mill Building 2. Bucket Elevator Tower 3. Kiln De-dusting Filter Air 4. Slide Support 1Air Slide Support 2 5. Cooler Building 6. Air Slide Tower 7. Supporting Structure Transfer Tower 8. Silo Roof 1Silo Roof 2 9. Control Room 10. Duct Support 11. Kiln Dust Bin Support 12. Clinker Cooler Dedusting 13. Staircase to Penthouse on Silo 2Steel Structure-Penthouse on Silo 1 14. Kiln Gangway and Stairs between piers 15. Steel Structure-Penthouse on Silo 2 16. Cable Bridge 17. Clinker Transport to Storage Conveyor between silos 18. Gypsum Hall 19. Beam for Correctives Hall 20. Support Stair and platform at electrical room 21. Airslide support between Sup tower &Preheater 22. Steel structure - Off spec clinker transport 23. Steel structure - Preheater reinforcement 24. Gas duct support 25. Support Conveyor 26. Lift Preheater structure 27. Filler transport Total quantity executed and delivered for Phase I and II was over 6,500 tons
  • 7. PROJECT 1 New production line and clinker storage Components have been delivered simultaneously to several objectives following the installation order established by the client
  • 8. PROJECT 1 New production line and clinker storage Logistics of Complete delivery was provided by ENERGO
  • 9. PROJECT 1 New production line and clinker storage The accuracy of execution was essential in order to achieve the best conditions of installation
  • 10. PROJECT 1 New production line and clinker storage After completion of phase I, ENERGO continued at customer request execution and delivery for objects belonging Phase II
  • 11. PROJECT 2 Transportation and storage of 130,000 To clinker
  • 12. PROJECT 2 Transportation and storage of 130,000 To clinker  Client investment purpose was to build a new deposit and transport to feed clinker silo of 130,000 tons.  ENERGO was appointed to carry out the work of design - construction - installation of conveyor and supply - assembly of the roof silo .
  • 13. PROJECT 2 Transportation and storage of 130,000 To clinker  Cylindrical part of the silo was built from concrete.  ​ The roof was made of: • 3449 metallic elements assembled with screws • 30 trusses placed radially, forming a truncated cone with a diameter of 80 m at the base and a height of 22 m above the 16 m of concrete cylinder. • The structure was fixed in 30 mobile supports.
  • 14. PROJECT 2 Transportation and storage of 130,000 To clinker For installation was designed, developed and installed in the center of the silo, a temporary tower that helped to fix the central tension ring
  • 15. PROJECT 2 Transportation and storage of 130,000 To clinker Petals was installed, pre-assembled on the ground Installation was done by balancing the weights on cylinder diameter and central ring tension
  • 16. PROJECT 2 Transportation and storage of 130,000 To clinker  Final deviation resulting from installation on a circumference of about 250 m was 0.01 m
  • 17. PROJECT 2 Transportation and storage of 130,000 To clinker Complete assembly of silo roof was done in 5 weeks
  • 18. PROIECT Transport si depozitare 130 000 To clinker Simultaneously was installed conveyor to feed the silo
  • 19. ENERGO SUCCESS KEYS for CEMENT INDUSTRY PROJECTS  Guaranteeing of technical conditions and quality requirements of projects  Execution state-of-art  Delivery Just-in-Time  The promptness in identifying, analyzing and solving various situations created  The accuracy of of documents prepared Therefore two major brands of cement: "Power Passion Performance" and "For better building" Were for ENERGO the way ahead to success and complete satisfaction of their customers