Infrastructure for All: Building Fulton's Future
$1 BILLION FOR FULTON’S FUTURE
$378 MILLION
INVESTMENTS IN
WATER
• Water Tank Painting and
Maintenance
• Alpharetta Water Transmission
Upgrade and Improvement
• Providence Road Water Main
Upgrade and Improvement
• Peachtree Industrial Boulevard
(Hwy 141) Water Main Expansion
• Shallowford Road & North
Coleman Water Main
Improvements
WATER & WASTEWATER INVESTMENTS
2016-2026
WATER SYSTEM
IMPROVEMENTS & EXPANSION
$42 million
• Big Creek WRF Expansion
• Little River WRF Expansion
• Johns Creek Reuse Water Main
Construction
• Sanitary Sewer Pump Station
Improvements
• Big Creek Pipeline Diversion
Improvement
• Camp Creek WRF Improvements
WASTEWATER SYSTEM
IMPROVEMENTS AND
EXPANSION
$336 million
• Currently Under
Construction
• Connects Johns Creek
Environmental Campus
to existing reuse water
main infrastructure
• Total Cost = $13 million
• Provides reuse water for
irrigation purposes to 5
golf courses, 2 churches,
and the City of Johns
Creek
Johns Creek Reuse Water Main
2017
• Currently Under Construction
• Total Cost = $39 Million
• Increases Capacity from 1.0
MGD to 2.6 MGD
• Utilizes same membrane
technology and odor control
as JCEC
• Goal to be operational by
January 2020
Little River Water Reclamation Facility
2017 - 2020
• Currently Underway in
the RFP Phase
• Progressive Design –
Build Project
• Total Cost = ????
• $100 – 250 Million
• Increases Capacity from
24 MGD to 38 MGD
• Goal to be operational
by January 2022
Big Creek Water Reclamation Facility
2017 - 2022
National Trends in Water & Sewer Rates
 Source: BLS CPI-U & CPI: Water and Sewer Maintenance Series
Fulton County
Water & Sewer Rate History
Base Rate in 2000
 $7.16 per 1,000 gallons
5% Increase in 2004
 $7.61 per 1,000 gallons
 Funded the JCEC construction
15% Increase in 2008
 $8.75 per 1,000 gallons
 Funded the 2010 Capital Improvement Program
4% Decrease in 2013
 $8.41 per 1,000 gallons
 Reduction due to Cauley Creek Decommissioning
Impact of Proposed
Increase on Typical Bills
 Fulton County remains reasonably priced compared to regional utilities, increasing
about $3/month for 6,000 gallon per month residential user
 Other utilities expected to increase rates over time
$570 MILLION
COUNTYWIDE
THROUGH TSPLOST
INVESTMENTS IN
TRANSPORTATION
$570 Million in Transportation Investments
Across North & South Fulton
Congestion Relief &
Roadway Projects
$222.4 Million
Pedestrian, Bike, Streetscape
& Landscape Projects
$75.9 Million
Operations & Safety
$145.4 Million
Maintenance & Safety
Improvements
$96.8 Million
Bridges
$11.5 Million
Quick Response
$6.6 Million
$8.8 Million - Program / Project Management
$1.1 Million - Fulton County Airport
Debt Retirement - $1 Million
TIER 1 & 2 PROJECTS
$100+ MILLION
INVESTMENTS IN
FACILITIES
Facilities Projects - Funding
 2016 Capital Funding - $20 Million
 2017 Capital Funding - $7.5 Million
 2017 Urban Redevelopment Authority Bond -
$90 Million
 Continued Annual Funding Required - $7.5
Million
$20MillionCapitalBudget
UNDER
CONSTRUCTION
COMPLETED
 Central Library/Courthouse Roof Replacement
 Justice Center Tower/Roof Replacement
 Southwest Arts Center/ HVAC Improvements
 WROC Tax Commissioner Office
 Bowden/Dogwood Senior Center Upgrades
 Government Center Elevator Modernizations
 Select Fulton/Strategic Planning Office Construction
 10 Park Place & Vital Records/Interior Construction
 North Annex/Chiller Replacement
 Countywide & Justice Center Tower/Fire Alarm
 Birdine Senior Center/Interior Construction
 WROC Driver Services/ Interior Construction
 Gov’t Ctr Tax Commissioner/Interior Construction
 College Park Health Ctr/Generator Replacement
 Gov’t Ctr/Entrance Doors Replacement
 Gov’t Ctr/Atrium Repairs
 Gov’t Ctr/Roof Replacement
 Countywide/Elevator Modernizations
PRE-
CONSTRUCTION/
BID
APPROVAL
$20 million Capital Budget
Elevators Modernization
Tax Commissioner10 Park Place Interior Construction
Atrium Repairs
UrbanRedevelopmentBond $90M Urban Redevelopment Bond*
 Government Center
• Tower
• Atrium
• Public Safety Building
• Mid-Rise Building
• Low-Rise Building
• Assembly Building
• 137 Peachtree Building
 Courts Complex
• Carnes Building
• Justice Center Tower
• Slaton Courthouse
• Medical Examiners Office
• Powell Juvenile Justice
Center
Priority Projects
o Courthouse Exterior Stonework
Repairs
o Government Center & Justice
Center Complex MEP Improvements
o Government Center & Justice
Center Complex Common Areas,
ADA, Signage & Interiors
Improvements
o Multiple Facilities Fire Alarm, Mass
Notification & Access Control
System Upgrades
o Justice Center Tower Exterior
Cleaning & Improvements
“Urban” Locations
Recommended to be Covered
*Addresses F+G Facilities Assessment Results
for Facilities Located in Urban Redevelopment
Area
Bond Application Process
o Outside Legal Counsel & Financial
Adviser Selected
o Private Placement Issue
o Closing & Funding Expected in June
o Priority Projects – Outside Project
Manager, Courthouse Exterior
Investigation, MEP Design/Build,
Interior Improvements
Programming
Urban Redevelopment Bond Projects
• Courthouse Exterior Stonework Repair
• Government Center & Justice Center Complex HVAC Improvements
• Government Center & Justice Center Common Area, ADA and Interiors
Improvements
2017$7.5MillionCapitalBudget
HVAC Improvements
Senior Centers (11)
Service Centers (2)
Health Center
Misc.
Roof Repairs & Replacements
Senior Centers (10)
Training Centers (2)
Health Center
Fire Alarm Systems
Countywide
Parking Areas
Senior Centers (13)
Health Center
Service Center
Senior Center Projects
PARKING AREAS
ROOFS
HVAC
FIRE ALARMS
$109 MILLION
INVESTMENTS IN
LIBRARIES – PHASE II
Library Capital Plan - Phase II
Renovation of 22 Libraries
– Group 1 Libraries: Roswell, Sandy Springs, Dogwood,
Kirkwood, Washington Park, West End and Southwest
• Design, scope & schedule development underway
• Preliminary Schedule: Construction Start 4th Quarter
2017
– Group 2 Libraries: Ocee, Northeast Spruill Oaks, Northside,
Mechanicsville, and Buckhead
• Design Build firm recommendation for board approval
in June 2017
– Group 3 Libraries: Adams Park, Adamsville, Cleveland Ave.,
College Park, Ponce De Leon and East Atlanta
• Advertise RFP 2nd Quarter 2017 after Group 2 is
approved by BOC
– Group 4 Libraries: East Point and Fairburn
• Design Build recommendation for board approval in
June 2017
– Hapeville
• Advertise RFP 2nd Quarter 2017 after Group 4 is
approved by BOC
Library Capital Plan - Phase II
Central Library
– Bridge Design – Firm finalist presentations
underway
– Design/Build Services for Construction –
Advertised 1st Quarter 2018
TELLING THE
STORY OF OUR
INVESTMENTS
INFRASTRUCTURE
COMMUNICATIONS
Infrastructure for All: Building Fulton's Future

Mais conteúdo relacionado

Mais procurados

Sustainable water systems--Mark Peterson (Loudoun Water) presentation
Sustainable water systems--Mark Peterson (Loudoun Water) presentationSustainable water systems--Mark Peterson (Loudoun Water) presentation
Sustainable water systems--Mark Peterson (Loudoun Water) presentationwsbrower
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
 
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfPreliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfBappy114
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationFairfax County
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectascemiami-dade
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road WalkwayFairfax County
 
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationPike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationFairfax County
 
Laurel Hill Reclaimed Water
Laurel Hill Reclaimed WaterLaurel Hill Reclaimed Water
Laurel Hill Reclaimed WaterFairfax County
 
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Fairfax County
 
Sussex sewer district presentation to city 11262018
Sussex sewer district  presentation to city   11262018Sussex sewer district  presentation to city   11262018
Sussex sewer district presentation to city 11262018rehobothbeachde
 
City of LaSalle 2008 Annual Report
City of LaSalle 2008 Annual ReportCity of LaSalle 2008 Annual Report
City of LaSalle 2008 Annual Reportcityoflasalle
 
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)Andrew Gelston
 
Colfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation ProjectColfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation ProjectFairfax County
 
Sp1 crown center redevelopment council presentation 021714 v2
Sp1 crown center redevelopment council presentation 021714 v2Sp1 crown center redevelopment council presentation 021714 v2
Sp1 crown center redevelopment council presentation 021714 v2cityofevanston
 

Mais procurados (20)

Sustainable water systems--Mark Peterson (Loudoun Water) presentation
Sustainable water systems--Mark Peterson (Loudoun Water) presentationSustainable water systems--Mark Peterson (Loudoun Water) presentation
Sustainable water systems--Mark Peterson (Loudoun Water) presentation
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
 
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdfPreliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 project
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationPike Branch at Wilton Road Presentation
Pike Branch at Wilton Road Presentation
 
Laurel Hill Reclaimed Water
Laurel Hill Reclaimed WaterLaurel Hill Reclaimed Water
Laurel Hill Reclaimed Water
 
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017Difficult Run at Brittenford Drive Information Meeting May 17, 2017
Difficult Run at Brittenford Drive Information Meeting May 17, 2017
 
Scheuer Climate Change
Scheuer Climate ChangeScheuer Climate Change
Scheuer Climate Change
 
Sussex sewer district presentation to city 11262018
Sussex sewer district  presentation to city   11262018Sussex sewer district  presentation to city   11262018
Sussex sewer district presentation to city 11262018
 
City of LaSalle 2008 Annual Report
City of LaSalle 2008 Annual ReportCity of LaSalle 2008 Annual Report
City of LaSalle 2008 Annual Report
 
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
Turkey Point-6 and Turkey Point-7 Project Overview (May 2013)
 
Master Plan EIR CAP Presentation - March 27, 2014
Master Plan EIR CAP Presentation - March 27, 2014Master Plan EIR CAP Presentation - March 27, 2014
Master Plan EIR CAP Presentation - March 27, 2014
 
Colfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation ProjectColfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation Project
 
Water Master Plan Northgate Update
Water Master Plan Northgate UpdateWater Master Plan Northgate Update
Water Master Plan Northgate Update
 
Climate Action Plan Update Sept 12 2013 Special Board Mtg
Climate Action Plan Update Sept 12 2013 Special Board MtgClimate Action Plan Update Sept 12 2013 Special Board Mtg
Climate Action Plan Update Sept 12 2013 Special Board Mtg
 
Sp1 crown center redevelopment council presentation 021714 v2
Sp1 crown center redevelopment council presentation 021714 v2Sp1 crown center redevelopment council presentation 021714 v2
Sp1 crown center redevelopment council presentation 021714 v2
 
Master Plan Public Hearing Presentation - January 9, 2014
Master Plan Public Hearing Presentation - January 9, 2014Master Plan Public Hearing Presentation - January 9, 2014
Master Plan Public Hearing Presentation - January 9, 2014
 
Interlocal Agreement with Wellborn SUD
Interlocal Agreement with Wellborn SUDInterlocal Agreement with Wellborn SUD
Interlocal Agreement with Wellborn SUD
 

Semelhante a Infrastructure for All: Building Fulton's Future

2015- 2016 Budget Workshop Presentation
2015- 2016 Budget Workshop Presentation 2015- 2016 Budget Workshop Presentation
2015- 2016 Budget Workshop Presentation City of Corona
 
City Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment PlanCity Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment PlanCity of Dayton
 
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future GrowthAPA Florida
 
CMAA Presentation Final Cook County
CMAA Presentation Final Cook CountyCMAA Presentation Final Cook County
CMAA Presentation Final Cook CountyAusrine Rakauskaite
 
2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishmentsmckay
 
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...Michael Hewitt, GISP
 
Municipal Budgets, Capital Improvements Planning & Public Funding
Municipal Budgets, Capital Improvements Planning & Public FundingMunicipal Budgets, Capital Improvements Planning & Public Funding
Municipal Budgets, Capital Improvements Planning & Public FundingShaun Wilson
 
Grant Programs & Success Stories
Grant Programs & Success StoriesGrant Programs & Success Stories
Grant Programs & Success StoriesPrein Newhof
 
VTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasVTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasSCVTA
 
Public works presentation 9 30final
Public works presentation 9 30finalPublic works presentation 9 30final
Public works presentation 9 30finalCityofEvanston2
 
Final 12 01 community mtg phase ii presentation
Final 12 01 community mtg  phase ii presentationFinal 12 01 community mtg  phase ii presentation
Final 12 01 community mtg phase ii presentationSCVTA
 
2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bond2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bondF. X. Flinn
 
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumBracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumGW Solar Institute
 
WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities us2unionsquare
 
Public meeting # 1 for website
Public meeting # 1   for websitePublic meeting # 1   for website
Public meeting # 1 for websitepixellence
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessEMRoundtable
 
Brownfields Redevelopment Case Studies
Brownfields Redevelopment Case Studies Brownfields Redevelopment Case Studies
Brownfields Redevelopment Case Studies nado-web
 

Semelhante a Infrastructure for All: Building Fulton's Future (20)

2015- 2016 Budget Workshop Presentation
2015- 2016 Budget Workshop Presentation 2015- 2016 Budget Workshop Presentation
2015- 2016 Budget Workshop Presentation
 
City Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment PlanCity Manager's Recommended 2015 Investment Plan
City Manager's Recommended 2015 Investment Plan
 
DOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant WorkshopDOPWIC Program Year 2017 Applicant Workshop
DOPWIC Program Year 2017 Applicant Workshop
 
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
 
FY18 Budget Workshop Day 2
FY18 Budget Workshop Day 2FY18 Budget Workshop Day 2
FY18 Budget Workshop Day 2
 
CMAA Presentation Final Cook County
CMAA Presentation Final Cook CountyCMAA Presentation Final Cook County
CMAA Presentation Final Cook County
 
2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments
 
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
 
FY 21 Debt Issuance
FY 21 Debt IssuanceFY 21 Debt Issuance
FY 21 Debt Issuance
 
Municipal Budgets, Capital Improvements Planning & Public Funding
Municipal Budgets, Capital Improvements Planning & Public FundingMunicipal Budgets, Capital Improvements Planning & Public Funding
Municipal Budgets, Capital Improvements Planning & Public Funding
 
Grant Programs & Success Stories
Grant Programs & Success StoriesGrant Programs & Success Stories
Grant Programs & Success Stories
 
VTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasVTA 2016 Measure B Program Areas
VTA 2016 Measure B Program Areas
 
Public works presentation 9 30final
Public works presentation 9 30finalPublic works presentation 9 30final
Public works presentation 9 30final
 
Final 12 01 community mtg phase ii presentation
Final 12 01 community mtg  phase ii presentationFinal 12 01 community mtg  phase ii presentation
Final 12 01 community mtg phase ii presentation
 
2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bond2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bond
 
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumBracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
 
WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities
 
Public meeting # 1 for website
Public meeting # 1   for websitePublic meeting # 1   for website
Public meeting # 1 for website
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site Readiness
 
Brownfields Redevelopment Case Studies
Brownfields Redevelopment Case Studies Brownfields Redevelopment Case Studies
Brownfields Redevelopment Case Studies
 

Último

2024: The FAR, Federal Acquisition Regulations - Part 17
2024: The FAR, Federal Acquisition Regulations - Part 172024: The FAR, Federal Acquisition Regulations - Part 17
2024: The FAR, Federal Acquisition Regulations - Part 17JSchaus & Associates
 
Item # 1a - March 18, 2024 Special CCM Minutes
Item # 1a - March 18, 2024 Special CCM MinutesItem # 1a - March 18, 2024 Special CCM Minutes
Item # 1a - March 18, 2024 Special CCM Minutesahcitycouncil
 
Water and peace go hand-in hand. World Water Day 2024
Water and peace go hand-in hand. World Water Day 2024Water and peace go hand-in hand. World Water Day 2024
Water and peace go hand-in hand. World Water Day 2024Christina Parmionova
 
Hub Design Inspiration Graphics for inspiration
Hub Design Inspiration Graphics for inspirationHub Design Inspiration Graphics for inspiration
Hub Design Inspiration Graphics for inspirationStephen Abram
 
Item # 5&6 - 218 Canyon Drive replat prop.
Item # 5&6 - 218 Canyon Drive replat prop.Item # 5&6 - 218 Canyon Drive replat prop.
Item # 5&6 - 218 Canyon Drive replat prop.ahcitycouncil
 
Yes!? We can end TB - World Tuberculosis Day 2024.
Yes!? We can end TB - World Tuberculosis Day 2024.Yes!? We can end TB - World Tuberculosis Day 2024.
Yes!? We can end TB - World Tuberculosis Day 2024.Christina Parmionova
 
Parents give a charity ideas for children
Parents give a charity ideas for childrenParents give a charity ideas for children
Parents give a charity ideas for childrenSERUDS INDIA
 
For World Water Day 2024, we promote the vital link between water and peace.
For World Water Day 2024, we promote the vital link between water and peace.For World Water Day 2024, we promote the vital link between water and peace.
For World Water Day 2024, we promote the vital link between water and peace.Christina Parmionova
 
What Teenagers Have to Say about the Grandparents
What Teenagers Have to Say about the GrandparentsWhat Teenagers Have to Say about the Grandparents
What Teenagers Have to Say about the GrandparentsSERUDS INDIA
 
PPT Item # 5-6 218 Canyon Drive replat prop.
PPT Item # 5-6 218 Canyon Drive replat prop.PPT Item # 5-6 218 Canyon Drive replat prop.
PPT Item # 5-6 218 Canyon Drive replat prop.ahcitycouncil
 
Passive Interactive Programming and Surveys 2.pptx
Passive Interactive Programming and Surveys 2.pptxPassive Interactive Programming and Surveys 2.pptx
Passive Interactive Programming and Surveys 2.pptxStephen Abram
 
B-SAN Annual Report July 2022 - June 2023
B-SAN Annual Report July 2022 - June 2023B-SAN Annual Report July 2022 - June 2023
B-SAN Annual Report July 2022 - June 2023B-SCAN
 
Parents can give charity ideas for kids.
Parents can give charity ideas for kids.Parents can give charity ideas for kids.
Parents can give charity ideas for kids.SERUDS INDIA
 
india sanitation coalition Swachata Abhiyan ​.pdf
india sanitation coalition Swachata Abhiyan ​.pdfindia sanitation coalition Swachata Abhiyan ​.pdf
india sanitation coalition Swachata Abhiyan ​.pdfcoalitionindiasanita
 
Leveraging Water for Peace - World Water Day 2024
Leveraging Water for Peace - World Water Day 2024Leveraging Water for Peace - World Water Day 2024
Leveraging Water for Peace - World Water Day 2024Christina Parmionova
 
2024: The FAR, Federal Acquisition Regulations - Part 16
2024: The FAR, Federal Acquisition Regulations - Part 162024: The FAR, Federal Acquisition Regulations - Part 16
2024: The FAR, Federal Acquisition Regulations - Part 16JSchaus & Associates
 
Water for Prosperity and peace - United Nations World Water Development Repo...
Water for Prosperity and peace -  United Nations World Water Development Repo...Water for Prosperity and peace -  United Nations World Water Development Repo...
Water for Prosperity and peace - United Nations World Water Development Repo...Christina Parmionova
 
O Conselho Estadual de Cultura e o Incentivo à Cultura no RS: relato de expe...
O Conselho Estadual de Cultura e o Incentivo à Cultura no RS:  relato de expe...O Conselho Estadual de Cultura e o Incentivo à Cultura no RS:  relato de expe...
O Conselho Estadual de Cultura e o Incentivo à Cultura no RS: relato de expe...Alvaro Santi
 
Project Synthesis - Markus Schneider - Humane Future Lab
Project Synthesis - Markus Schneider - Humane Future LabProject Synthesis - Markus Schneider - Humane Future Lab
Project Synthesis - Markus Schneider - Humane Future LabMarkus Schneider
 
CBO’s Work on Health Care and a Call for New Research
CBO’s Work on Health Care and a Call for New ResearchCBO’s Work on Health Care and a Call for New Research
CBO’s Work on Health Care and a Call for New ResearchCongressional Budget Office
 

Último (20)

2024: The FAR, Federal Acquisition Regulations - Part 17
2024: The FAR, Federal Acquisition Regulations - Part 172024: The FAR, Federal Acquisition Regulations - Part 17
2024: The FAR, Federal Acquisition Regulations - Part 17
 
Item # 1a - March 18, 2024 Special CCM Minutes
Item # 1a - March 18, 2024 Special CCM MinutesItem # 1a - March 18, 2024 Special CCM Minutes
Item # 1a - March 18, 2024 Special CCM Minutes
 
Water and peace go hand-in hand. World Water Day 2024
Water and peace go hand-in hand. World Water Day 2024Water and peace go hand-in hand. World Water Day 2024
Water and peace go hand-in hand. World Water Day 2024
 
Hub Design Inspiration Graphics for inspiration
Hub Design Inspiration Graphics for inspirationHub Design Inspiration Graphics for inspiration
Hub Design Inspiration Graphics for inspiration
 
Item # 5&6 - 218 Canyon Drive replat prop.
Item # 5&6 - 218 Canyon Drive replat prop.Item # 5&6 - 218 Canyon Drive replat prop.
Item # 5&6 - 218 Canyon Drive replat prop.
 
Yes!? We can end TB - World Tuberculosis Day 2024.
Yes!? We can end TB - World Tuberculosis Day 2024.Yes!? We can end TB - World Tuberculosis Day 2024.
Yes!? We can end TB - World Tuberculosis Day 2024.
 
Parents give a charity ideas for children
Parents give a charity ideas for childrenParents give a charity ideas for children
Parents give a charity ideas for children
 
For World Water Day 2024, we promote the vital link between water and peace.
For World Water Day 2024, we promote the vital link between water and peace.For World Water Day 2024, we promote the vital link between water and peace.
For World Water Day 2024, we promote the vital link between water and peace.
 
What Teenagers Have to Say about the Grandparents
What Teenagers Have to Say about the GrandparentsWhat Teenagers Have to Say about the Grandparents
What Teenagers Have to Say about the Grandparents
 
PPT Item # 5-6 218 Canyon Drive replat prop.
PPT Item # 5-6 218 Canyon Drive replat prop.PPT Item # 5-6 218 Canyon Drive replat prop.
PPT Item # 5-6 218 Canyon Drive replat prop.
 
Passive Interactive Programming and Surveys 2.pptx
Passive Interactive Programming and Surveys 2.pptxPassive Interactive Programming and Surveys 2.pptx
Passive Interactive Programming and Surveys 2.pptx
 
B-SAN Annual Report July 2022 - June 2023
B-SAN Annual Report July 2022 - June 2023B-SAN Annual Report July 2022 - June 2023
B-SAN Annual Report July 2022 - June 2023
 
Parents can give charity ideas for kids.
Parents can give charity ideas for kids.Parents can give charity ideas for kids.
Parents can give charity ideas for kids.
 
india sanitation coalition Swachata Abhiyan ​.pdf
india sanitation coalition Swachata Abhiyan ​.pdfindia sanitation coalition Swachata Abhiyan ​.pdf
india sanitation coalition Swachata Abhiyan ​.pdf
 
Leveraging Water for Peace - World Water Day 2024
Leveraging Water for Peace - World Water Day 2024Leveraging Water for Peace - World Water Day 2024
Leveraging Water for Peace - World Water Day 2024
 
2024: The FAR, Federal Acquisition Regulations - Part 16
2024: The FAR, Federal Acquisition Regulations - Part 162024: The FAR, Federal Acquisition Regulations - Part 16
2024: The FAR, Federal Acquisition Regulations - Part 16
 
Water for Prosperity and peace - United Nations World Water Development Repo...
Water for Prosperity and peace -  United Nations World Water Development Repo...Water for Prosperity and peace -  United Nations World Water Development Repo...
Water for Prosperity and peace - United Nations World Water Development Repo...
 
O Conselho Estadual de Cultura e o Incentivo à Cultura no RS: relato de expe...
O Conselho Estadual de Cultura e o Incentivo à Cultura no RS:  relato de expe...O Conselho Estadual de Cultura e o Incentivo à Cultura no RS:  relato de expe...
O Conselho Estadual de Cultura e o Incentivo à Cultura no RS: relato de expe...
 
Project Synthesis - Markus Schneider - Humane Future Lab
Project Synthesis - Markus Schneider - Humane Future LabProject Synthesis - Markus Schneider - Humane Future Lab
Project Synthesis - Markus Schneider - Humane Future Lab
 
CBO’s Work on Health Care and a Call for New Research
CBO’s Work on Health Care and a Call for New ResearchCBO’s Work on Health Care and a Call for New Research
CBO’s Work on Health Care and a Call for New Research
 

Infrastructure for All: Building Fulton's Future

  • 2. $1 BILLION FOR FULTON’S FUTURE
  • 4. • Water Tank Painting and Maintenance • Alpharetta Water Transmission Upgrade and Improvement • Providence Road Water Main Upgrade and Improvement • Peachtree Industrial Boulevard (Hwy 141) Water Main Expansion • Shallowford Road & North Coleman Water Main Improvements WATER & WASTEWATER INVESTMENTS 2016-2026 WATER SYSTEM IMPROVEMENTS & EXPANSION $42 million • Big Creek WRF Expansion • Little River WRF Expansion • Johns Creek Reuse Water Main Construction • Sanitary Sewer Pump Station Improvements • Big Creek Pipeline Diversion Improvement • Camp Creek WRF Improvements WASTEWATER SYSTEM IMPROVEMENTS AND EXPANSION $336 million
  • 5. • Currently Under Construction • Connects Johns Creek Environmental Campus to existing reuse water main infrastructure • Total Cost = $13 million • Provides reuse water for irrigation purposes to 5 golf courses, 2 churches, and the City of Johns Creek Johns Creek Reuse Water Main 2017
  • 6. • Currently Under Construction • Total Cost = $39 Million • Increases Capacity from 1.0 MGD to 2.6 MGD • Utilizes same membrane technology and odor control as JCEC • Goal to be operational by January 2020 Little River Water Reclamation Facility 2017 - 2020
  • 7. • Currently Underway in the RFP Phase • Progressive Design – Build Project • Total Cost = ???? • $100 – 250 Million • Increases Capacity from 24 MGD to 38 MGD • Goal to be operational by January 2022 Big Creek Water Reclamation Facility 2017 - 2022
  • 8. National Trends in Water & Sewer Rates  Source: BLS CPI-U & CPI: Water and Sewer Maintenance Series
  • 9. Fulton County Water & Sewer Rate History Base Rate in 2000  $7.16 per 1,000 gallons 5% Increase in 2004  $7.61 per 1,000 gallons  Funded the JCEC construction 15% Increase in 2008  $8.75 per 1,000 gallons  Funded the 2010 Capital Improvement Program 4% Decrease in 2013  $8.41 per 1,000 gallons  Reduction due to Cauley Creek Decommissioning
  • 10. Impact of Proposed Increase on Typical Bills  Fulton County remains reasonably priced compared to regional utilities, increasing about $3/month for 6,000 gallon per month residential user  Other utilities expected to increase rates over time
  • 12. $570 Million in Transportation Investments Across North & South Fulton Congestion Relief & Roadway Projects $222.4 Million Pedestrian, Bike, Streetscape & Landscape Projects $75.9 Million Operations & Safety $145.4 Million Maintenance & Safety Improvements $96.8 Million Bridges $11.5 Million Quick Response $6.6 Million $8.8 Million - Program / Project Management $1.1 Million - Fulton County Airport Debt Retirement - $1 Million TIER 1 & 2 PROJECTS
  • 14. Facilities Projects - Funding  2016 Capital Funding - $20 Million  2017 Capital Funding - $7.5 Million  2017 Urban Redevelopment Authority Bond - $90 Million  Continued Annual Funding Required - $7.5 Million
  • 15. $20MillionCapitalBudget UNDER CONSTRUCTION COMPLETED  Central Library/Courthouse Roof Replacement  Justice Center Tower/Roof Replacement  Southwest Arts Center/ HVAC Improvements  WROC Tax Commissioner Office  Bowden/Dogwood Senior Center Upgrades  Government Center Elevator Modernizations  Select Fulton/Strategic Planning Office Construction  10 Park Place & Vital Records/Interior Construction  North Annex/Chiller Replacement  Countywide & Justice Center Tower/Fire Alarm  Birdine Senior Center/Interior Construction  WROC Driver Services/ Interior Construction  Gov’t Ctr Tax Commissioner/Interior Construction  College Park Health Ctr/Generator Replacement  Gov’t Ctr/Entrance Doors Replacement  Gov’t Ctr/Atrium Repairs  Gov’t Ctr/Roof Replacement  Countywide/Elevator Modernizations PRE- CONSTRUCTION/ BID APPROVAL
  • 16. $20 million Capital Budget Elevators Modernization Tax Commissioner10 Park Place Interior Construction Atrium Repairs
  • 17. UrbanRedevelopmentBond $90M Urban Redevelopment Bond*  Government Center • Tower • Atrium • Public Safety Building • Mid-Rise Building • Low-Rise Building • Assembly Building • 137 Peachtree Building  Courts Complex • Carnes Building • Justice Center Tower • Slaton Courthouse • Medical Examiners Office • Powell Juvenile Justice Center Priority Projects o Courthouse Exterior Stonework Repairs o Government Center & Justice Center Complex MEP Improvements o Government Center & Justice Center Complex Common Areas, ADA, Signage & Interiors Improvements o Multiple Facilities Fire Alarm, Mass Notification & Access Control System Upgrades o Justice Center Tower Exterior Cleaning & Improvements “Urban” Locations Recommended to be Covered *Addresses F+G Facilities Assessment Results for Facilities Located in Urban Redevelopment Area Bond Application Process o Outside Legal Counsel & Financial Adviser Selected o Private Placement Issue o Closing & Funding Expected in June o Priority Projects – Outside Project Manager, Courthouse Exterior Investigation, MEP Design/Build, Interior Improvements Programming
  • 18. Urban Redevelopment Bond Projects • Courthouse Exterior Stonework Repair • Government Center & Justice Center Complex HVAC Improvements • Government Center & Justice Center Common Area, ADA and Interiors Improvements
  • 19. 2017$7.5MillionCapitalBudget HVAC Improvements Senior Centers (11) Service Centers (2) Health Center Misc. Roof Repairs & Replacements Senior Centers (10) Training Centers (2) Health Center Fire Alarm Systems Countywide Parking Areas Senior Centers (13) Health Center Service Center
  • 20. Senior Center Projects PARKING AREAS ROOFS HVAC FIRE ALARMS
  • 22. Library Capital Plan - Phase II Renovation of 22 Libraries – Group 1 Libraries: Roswell, Sandy Springs, Dogwood, Kirkwood, Washington Park, West End and Southwest • Design, scope & schedule development underway • Preliminary Schedule: Construction Start 4th Quarter 2017 – Group 2 Libraries: Ocee, Northeast Spruill Oaks, Northside, Mechanicsville, and Buckhead • Design Build firm recommendation for board approval in June 2017 – Group 3 Libraries: Adams Park, Adamsville, Cleveland Ave., College Park, Ponce De Leon and East Atlanta • Advertise RFP 2nd Quarter 2017 after Group 2 is approved by BOC – Group 4 Libraries: East Point and Fairburn • Design Build recommendation for board approval in June 2017 – Hapeville • Advertise RFP 2nd Quarter 2017 after Group 4 is approved by BOC
  • 23. Library Capital Plan - Phase II Central Library – Bridge Design – Firm finalist presentations underway – Design/Build Services for Construction – Advertised 1st Quarter 2018
  • 24. TELLING THE STORY OF OUR INVESTMENTS INFRASTRUCTURE COMMUNICATIONS