Introduction
 The

Theory of Constraints was developed
and popularized by Eliyahu Goldratt.
 TOC, as it is commonly called, recognizes
that organizations exist to achieve a
goal.
 A factor that limits a company's ability to
achieve more of its goal is referred to as a
"constraint."
Example






The demand for parts produced by a
computer-controlled piece of equipment
known as the NCX10 exceeded the
machine's capacity.
Since the factory could only assemble and
sell as many products as they had parts from
the machine.
The capacity of the factory to make money
was tied directly to the output of the NCX10.
The NCX10, therefore, was the constraint.
Five step process
 To

1.
2.

3.
4.
5.

manage constraints ,Goldratt proposes
a five-step Process Of On Going
Improvement. The steps in this process
are:
Identify
Exploit
Subordinate
Elevate, and
Go back to Step 1
1. Identify








In order to manage a constraint, it is first necessary
to identify it.
In the above example, the NCX10 was identified
as the constraint.
This knowledge helped the company determine
where an increase in "productivity" would lead to
increased profits.
Concentrating on a non-constraint resource
would not increase the throughput because there
would not be an increase in the number of
products assembled.
To increase throughput, flow through the
constraint must be increased.
2. Exploit
 Once

the constraint is identified, the next step is to
focus on how to get more production within the
existing capacity limitations.
 when the company and the labor union agreed to
stagger lunches, breaks, and shift changes so the
machine could produce during times it previously
sat idle.
 This added significantly to the output of the NCX10,
and therefore to the output of the entire plant.
 To manage the output of the plant, a schedule was
created for the constraint. The schedule showed
the sequence in which orders would be processed
and their approximate starting time.
3. Subordinate








Exploiting the constraint does not ensure that
the materials needed next by the constraint
will always show up on time.
The
most
important
component
of
subordination is to control the way material is
fed to the non-constraint resources.
TOC says that non-constraint resources should
only be allowed to process enough materials
to match the output of the constraint.
The release of materials is closely controlled
and synchronized to the constraint schedule
4. Elevate
The next step is to determine if the output of the
constraint is enough to supply market demand. If
not, it is necessary to find more capacity by
"elevating" the constraint.
 In the above example, schedulers were able to
remove some of the load from the constraint by
rerouting it across two other machines.
 They also outsourced some work and brought in an
older machine that could process some of the parts
made by the NCX10.
 These were all ways of adding capacity, or
elevating the constraint.

5. Go Back to Step 1
 Once

the output of the constraint is no
longer the factor that limits the rate of
fulfilling orders, it is no longer a constraint.
 Step 5 is to go back to Step 1 and identify
a new constraint -because there always is
one.
Case Study
 Analysed

enterprise is the company producing
cardboard
and
litho-laminated
packaging.
Production process was monitored without and
then with using Theory of Constraints for production
planning.
Current method of production
planning and control
 The

company schedules individual job
orders generally according to delivery
time
Production Schedule without
using TOC
Production Schedule using TOC
Some measurable benefits of using
TOC principles for production
planning
1.

Better reliability in delivery dates
2. Shortening of the production lead time


In this example, scheduling problem was solved by
using TOC principles. It was proven that TOC can
help to solve major problems with capacity
planning in discrete batch production and reduce
number of delayed orders
Thank You

More Related Content

What's hot

Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
MOHD ARISH
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
Eka Darmadi
 
Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.
Yadhu Gopinath
 

What's hot (20)

Introduction To Theory of Constraints
Introduction To Theory of ConstraintsIntroduction To Theory of Constraints
Introduction To Theory of Constraints
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
The Goal by Eliyahu M. Goldratt - A Book Review
The Goal by Eliyahu M. Goldratt - A Book ReviewThe Goal by Eliyahu M. Goldratt - A Book Review
The Goal by Eliyahu M. Goldratt - A Book Review
 
Book review the goal
Book review   the goalBook review   the goal
Book review the goal
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
 
Understanding THE GOAL: The best-seller by Eli Goldratt and Jeff Cox
Understanding THE GOAL: The best-seller by Eli Goldratt and Jeff CoxUnderstanding THE GOAL: The best-seller by Eli Goldratt and Jeff Cox
Understanding THE GOAL: The best-seller by Eli Goldratt and Jeff Cox
 
Work Study, Method Study
Work Study, Method StudyWork Study, Method Study
Work Study, Method Study
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven Wastes
 
Theory of constraints and its types
Theory of constraints and its typesTheory of constraints and its types
Theory of constraints and its types
 
Bottleneck Analysis Theory Of Constraints (TOC)
Bottleneck Analysis Theory Of Constraints (TOC)Bottleneck Analysis Theory Of Constraints (TOC)
Bottleneck Analysis Theory Of Constraints (TOC)
 
Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.
 
093 Productivity Measurement
093 Productivity Measurement093 Productivity Measurement
093 Productivity Measurement
 
Process mapping overview
Process mapping overviewProcess mapping overview
Process mapping overview
 
Line balancing
Line balancingLine balancing
Line balancing
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
 
Case Study - The Goal (E M Goldratt)
Case Study - The Goal (E M Goldratt)Case Study - The Goal (E M Goldratt)
Case Study - The Goal (E M Goldratt)
 

Viewers also liked

Theory of constraints case study webinar
Theory of constraints case study webinarTheory of constraints case study webinar
Theory of constraints case study webinar
ronakshah2000
 
Theory of constraint
Theory of constraintTheory of constraint
Theory of constraint
Rubab Shaikh
 
Arezzo brand
Arezzo brandArezzo brand
Arezzo brand
Arezzori
 

Viewers also liked (18)

Theory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case StudyTheory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case Study
 
Theory of Constraints- A Case study
Theory of Constraints- A Case studyTheory of Constraints- A Case study
Theory of Constraints- A Case study
 
Theory of constraints in banking sector
Theory of constraints in banking sectorTheory of constraints in banking sector
Theory of constraints in banking sector
 
Theory of constraints case study webinar
Theory of constraints case study webinarTheory of constraints case study webinar
Theory of constraints case study webinar
 
Theory of constraint
Theory of constraintTheory of constraint
Theory of constraint
 
Theory of Constraints Sim
Theory of Constraints SimTheory of Constraints Sim
Theory of Constraints Sim
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Understanding theory of constraints
Understanding theory of constraintsUnderstanding theory of constraints
Understanding theory of constraints
 
Theory of Constraints Handbook Co-authors Interview
Theory of Constraints Handbook Co-authors InterviewTheory of Constraints Handbook Co-authors Interview
Theory of Constraints Handbook Co-authors Interview
 
Theory of constraints -SIOM
Theory of constraints -SIOMTheory of constraints -SIOM
Theory of constraints -SIOM
 
TlS: Theory Of Cosntraints & Lean Six Sigma
TlS: Theory Of Cosntraints & Lean Six SigmaTlS: Theory Of Cosntraints & Lean Six Sigma
TlS: Theory Of Cosntraints & Lean Six Sigma
 
Rapid replenishment s&t tree
Rapid replenishment s&t treeRapid replenishment s&t tree
Rapid replenishment s&t tree
 
Improving throughput with the Theory of Constraints and Queuing Theory
Improving throughput with the Theory of Constraints and Queuing TheoryImproving throughput with the Theory of Constraints and Queuing Theory
Improving throughput with the Theory of Constraints and Queuing Theory
 
Winning in Apparel Retail: Portfolio View of Supply Chain
Winning in Apparel Retail: Portfolio View of Supply ChainWinning in Apparel Retail: Portfolio View of Supply Chain
Winning in Apparel Retail: Portfolio View of Supply Chain
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean Projects
 
Supply Chain Management of ZARA
Supply Chain Management of ZARASupply Chain Management of ZARA
Supply Chain Management of ZARA
 
Arezzo brand
Arezzo brandArezzo brand
Arezzo brand
 

Similar to Implementing the Theory of Constraints (TOC) In Production

Theory Of Constraints 2
Theory Of Constraints  2Theory Of Constraints  2
Theory Of Constraints 2
MOHD ARISH
 
A p r i l 2 0 0 5 I S T R AT E G I C F I N A N C E 5 1A.docx
A p r i l  2 0 0 5 I S T R AT E G I C  F I N A N C E 5 1A.docxA p r i l  2 0 0 5 I S T R AT E G I C  F I N A N C E 5 1A.docx
A p r i l 2 0 0 5 I S T R AT E G I C F I N A N C E 5 1A.docx
ransayo
 
Unconstrained Benefits Assignment
Unconstrained Benefits AssignmentUnconstrained Benefits Assignment
Unconstrained Benefits Assignment
James Dunford
 
A IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English Version
A IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English VersionA IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English Version
A IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English Version
Jackson Bezerra
 

Similar to Implementing the Theory of Constraints (TOC) In Production (20)

Theory Of Constraints 2
Theory Of Constraints  2Theory Of Constraints  2
Theory Of Constraints 2
 
A p r i l 2 0 0 5 I S T R AT E G I C F I N A N C E 5 1A.docx
A p r i l  2 0 0 5 I S T R AT E G I C  F I N A N C E 5 1A.docxA p r i l  2 0 0 5 I S T R AT E G I C  F I N A N C E 5 1A.docx
A p r i l 2 0 0 5 I S T R AT E G I C F I N A N C E 5 1A.docx
 
customer relation management presentation roadmap what is known and
customer relation management presentation roadmap  what is known andcustomer relation management presentation roadmap  what is known and
customer relation management presentation roadmap what is known and
 
A study on just in time logistics in erf industry at madurai
A study on just in time logistics in erf industry at maduraiA study on just in time logistics in erf industry at madurai
A study on just in time logistics in erf industry at madurai
 
Operations managementppt
Operations managementpptOperations managementppt
Operations managementppt
 
Throughput Accounting.pdf notes from accounting and finance
Throughput Accounting.pdf notes  from accounting and financeThroughput Accounting.pdf notes  from accounting and finance
Throughput Accounting.pdf notes from accounting and finance
 
Crude-Oil Blend Scheduling Optimization: An Application with Multi-Million D...
Crude-Oil Blend Scheduling Optimization:  An Application with Multi-Million D...Crude-Oil Blend Scheduling Optimization:  An Application with Multi-Million D...
Crude-Oil Blend Scheduling Optimization: An Application with Multi-Million D...
 
Unconstrained Benefits Assignment
Unconstrained Benefits AssignmentUnconstrained Benefits Assignment
Unconstrained Benefits Assignment
 
A IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English Version
A IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English VersionA IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English Version
A IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English Version
 
jit
jitjit
jit
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Drum-Buffer-Rope
Drum-Buffer-RopeDrum-Buffer-Rope
Drum-Buffer-Rope
 
Which of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelWhich of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory model
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...
 
Which of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecastingWhich of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecasting
 
Cellular Mfg
Cellular MfgCellular Mfg
Cellular Mfg
 
OPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.comOPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.com
 
Toc Sample
Toc SampleToc Sample
Toc Sample
 
Advance concepts in Operations Planning and Control.
Advance concepts in Operations Planning and Control.Advance concepts in Operations Planning and Control.
Advance concepts in Operations Planning and Control.
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...
 

More from Sai Praveen Chettupalli

Project Leadership in multi cultural context
Project Leadership in multi cultural contextProject Leadership in multi cultural context
Project Leadership in multi cultural context
Sai Praveen Chettupalli
 
Capacity Planning with reference to McDonlds
Capacity Planning with reference to McDonldsCapacity Planning with reference to McDonlds
Capacity Planning with reference to McDonlds
Sai Praveen Chettupalli
 
Blogs and discussion forum as a medium for knowledge sharing
Blogs and discussion forum as a medium for knowledge sharingBlogs and discussion forum as a medium for knowledge sharing
Blogs and discussion forum as a medium for knowledge sharing
Sai Praveen Chettupalli
 
Market Research on consumer behavior towards coffee bars
Market Research on consumer behavior towards coffee barsMarket Research on consumer behavior towards coffee bars
Market Research on consumer behavior towards coffee bars
Sai Praveen Chettupalli
 

More from Sai Praveen Chettupalli (7)

Sales Management in Dish TV
Sales Management in Dish TVSales Management in Dish TV
Sales Management in Dish TV
 
Report on Celebrity Endorsement
Report on Celebrity EndorsementReport on Celebrity Endorsement
Report on Celebrity Endorsement
 
Project Leadership in multi cultural context
Project Leadership in multi cultural contextProject Leadership in multi cultural context
Project Leadership in multi cultural context
 
Marketing mix of Aircel surf excel
Marketing mix of Aircel surf excelMarketing mix of Aircel surf excel
Marketing mix of Aircel surf excel
 
Capacity Planning with reference to McDonlds
Capacity Planning with reference to McDonldsCapacity Planning with reference to McDonlds
Capacity Planning with reference to McDonlds
 
Blogs and discussion forum as a medium for knowledge sharing
Blogs and discussion forum as a medium for knowledge sharingBlogs and discussion forum as a medium for knowledge sharing
Blogs and discussion forum as a medium for knowledge sharing
 
Market Research on consumer behavior towards coffee bars
Market Research on consumer behavior towards coffee barsMarket Research on consumer behavior towards coffee bars
Market Research on consumer behavior towards coffee bars
 

Recently uploaded

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 

Recently uploaded (20)

Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 

Implementing the Theory of Constraints (TOC) In Production

  • 1. Implementing the Theory of Constraints (TOC) In Production Sai Praveen – D 23 Sumit Nandal – D 27
  • 2. Introduction  The Theory of Constraints was developed and popularized by Eliyahu Goldratt.  TOC, as it is commonly called, recognizes that organizations exist to achieve a goal.  A factor that limits a company's ability to achieve more of its goal is referred to as a "constraint."
  • 3. Example    The demand for parts produced by a computer-controlled piece of equipment known as the NCX10 exceeded the machine's capacity. Since the factory could only assemble and sell as many products as they had parts from the machine. The capacity of the factory to make money was tied directly to the output of the NCX10. The NCX10, therefore, was the constraint.
  • 4. Five step process  To 1. 2. 3. 4. 5. manage constraints ,Goldratt proposes a five-step Process Of On Going Improvement. The steps in this process are: Identify Exploit Subordinate Elevate, and Go back to Step 1
  • 5. 1. Identify      In order to manage a constraint, it is first necessary to identify it. In the above example, the NCX10 was identified as the constraint. This knowledge helped the company determine where an increase in "productivity" would lead to increased profits. Concentrating on a non-constraint resource would not increase the throughput because there would not be an increase in the number of products assembled. To increase throughput, flow through the constraint must be increased.
  • 6. 2. Exploit  Once the constraint is identified, the next step is to focus on how to get more production within the existing capacity limitations.  when the company and the labor union agreed to stagger lunches, breaks, and shift changes so the machine could produce during times it previously sat idle.  This added significantly to the output of the NCX10, and therefore to the output of the entire plant.  To manage the output of the plant, a schedule was created for the constraint. The schedule showed the sequence in which orders would be processed and their approximate starting time.
  • 7. 3. Subordinate     Exploiting the constraint does not ensure that the materials needed next by the constraint will always show up on time. The most important component of subordination is to control the way material is fed to the non-constraint resources. TOC says that non-constraint resources should only be allowed to process enough materials to match the output of the constraint. The release of materials is closely controlled and synchronized to the constraint schedule
  • 8. 4. Elevate The next step is to determine if the output of the constraint is enough to supply market demand. If not, it is necessary to find more capacity by "elevating" the constraint.  In the above example, schedulers were able to remove some of the load from the constraint by rerouting it across two other machines.  They also outsourced some work and brought in an older machine that could process some of the parts made by the NCX10.  These were all ways of adding capacity, or elevating the constraint. 
  • 9. 5. Go Back to Step 1  Once the output of the constraint is no longer the factor that limits the rate of fulfilling orders, it is no longer a constraint.  Step 5 is to go back to Step 1 and identify a new constraint -because there always is one.
  • 10. Case Study  Analysed enterprise is the company producing cardboard and litho-laminated packaging. Production process was monitored without and then with using Theory of Constraints for production planning.
  • 11.
  • 12. Current method of production planning and control  The company schedules individual job orders generally according to delivery time
  • 15. Some measurable benefits of using TOC principles for production planning 1. Better reliability in delivery dates
  • 16. 2. Shortening of the production lead time
  • 17.  In this example, scheduling problem was solved by using TOC principles. It was proven that TOC can help to solve major problems with capacity planning in discrete batch production and reduce number of delayed orders