2.
The PRINCE2® Certification Levels
There are two levels of certifications for PRINCE2:
PRINCE2 Foundation (usually taken after 3 training days)
Course
Focus on principles, processes , themes and how to apply them
Focus on learning PRINCE2
Exam
1 hour
75 multiple choice questions
50% pass rate
PRINCE2 Practitioner (usually taken after an additional 2 training days)
Course
Focus on processes & how to run a project from A to Z
Focus on practicing and tailoring PRINCE2
More techniques, add-ons, etc. Practitioner Recertification
Exam • Required after max of 5 years
2.5 hours • 1 hour exam can be taken
Case Study of approx 10 pages after 3 years-5 years
108 multiple choice questions, covering
9 out of 10 syllabus areas
55% pass rate Note
• PRINCE2 Certification is not
valid after 5 years
Project Management
training for the real world! 2
5.
The structure of PRINCE2
7 Principles, 7 Themes, 7 Processes
The 4 integrated
PROJECT ENVIRONMENT elements of
PRINCE2:
7.Progress 1.Business Case
2.Organization
6.Change PRINCE2 Processes 1. Principles
1 2 3 4 5 6 7
3.Quality
2. Themes
5.Risks 4. Plans
PRINCE2 3. Processes
Themes
4. Tailoring of
PRINCE2
4. Manage by stages 7. Tailor to project
PRINCE2 Principles environment
3. Defined roles &
responsibilities 6. Focus on products
2. Learn from experience 5. Manage by exception
1. Continued business justification
Project Management
training for the real world! 5
9.
Relating Themes to Processes (an example)
Themes provide us with “detailed guidance” on important elements of PRINCE2 that
we need to apply as we navigate through a PRINCE2 project life-cycle (processes)
For example: An important activity with the Start-up process is to “Design and Appoint
the Project Management Team”. To do this effectively, we really need to read and
understand the “Organization Theme”. We will also need the Organization Theme
when we perform other activities throughout the project life-cycle.
Appoint the Executive and
Organization
the Project Manager Theme is used
heavily in
Capture Design and appoint these
previous lessons the project
management team activities
Prepare the outline Select the project
Business Case approach & assemble
the Project Brief
Request to
Plan the initiate a
initiation stage project
Starting up a Project (SU)
Project Management
training for the real world! 9
10.
PRINCE2® Processes
The diagram on the following slide shows the typical process flow.
Note the following:
A project mandate triggers the project
We then use the SU process to ensure we have a viable project . This is
not considered part of the project, but known as “Pre-Project” work.
IP is considered the first stage. We create most of the project
documentation in IP and assemble them in a master document called the
PID (Project Initiation document).
We start to control the day-to-day running of the project in CS (Project
Manager’s responsibility) which in turn drives MP where the Team
Manager will control actual work to create our product.
Near the end of every stage (except the last stage) we will hit a Stage
Boundary (SB) where we will prepare for the next stage. In the last
stage we hit CP to start winding down.
Project Management
training for the real world! 10
11.
PRINCE2® Process Flow
1 2 3 ... n
Initiation Final
Project Pre-project Subsequent Stages
Stage Stage
Mandate
Authorize Project
DP Give ad-hoc Direction
Closure
Directing Authorize
Authorize Authorize a Stage
the
(EX, SU, SS) Initiation or Exception Plan
Project
...
SU
Managing
SB SB SB
... CP
(Project
Manager) IP CS CS ... CS
Delivering
(typyically
Team MP MP ... MP
Manager)
Project Management
training for the real world! 11
12.
Docs
Documents prepared during the Start-up Process (SU)
1 (min) 2 3 ... n
Initiation Final
Project Pre-project Subsequent Stages
Stage Stage
Mandate
Authorize Project
DP Give ad-hoc Direction
Closure
Directing Authorize
Authorize Authorize a Stage
the
(EX, SU, SS) Initiation or Exception Plan
Project
...
SU
Managing
SB SB SB
... CP
(Project Log
Daily Project
Manager) Brief IP CS CS ... CS
DeliveringLog
Lessons
Outline
Business
Case
(typyically
Team MP MP ... MP
Manager) Stage Plan
(initiation) Project
Product
Desc
Project Management
training for the real world! 12
13.
Theme #1
ORGANIZATION
TO DEFINE AND ESTABLISH THE PROJECT’S STRUCTURE OF
ACCOUNTABILITY AND RESPONSIBILITIES
Project Management
training for the real world! 13
13
15.
Organization Theme: Typical Project Management team structure
Corporate or programme management
Form a User Form a
Project Board
Group Supplier
(if too many) Group
Senior User(s) Executive Senior Supplier(s) (if too many)
Business, User and Change Authority
Supplier Project
Assurance Project Manager
Project Support
Team Manager(s)
Team members
Within the project management team Lines of authority
From the customer Project Assurance responsibility
From the supplier Lines of support/advice
(s)
Project Management
training for the real world! 15
16.
Theme #2
BUSINESS CASE
TO ESTABLISH MECHANISMS TO JUDGE WHETHER THE PROJECT IS (AND REMAINS)
DESIRABLE, VIABLE ANDACHIEVABLE AS A MEANS TO SUPPORT DECISION MAKING
IN ITS (CONTINUED) INVESTMENT.
Project Management
training for the real world! 16
16
18.
Theme #3
QUALITY
TO DEFINE AND IMPLEMENT THE MEANS BY WHICH THE PROJECT WILL CREATE AND
VERIFY PRODUCTS THAT ARE FIT FOR PURPOSE.
M - 47
Project Management
training for the real world! 18
18
19.
PRINCE2® - Quality Theme
Note the following:
Quality is closely related to the “Focus on Products” principle and is
reinforced within PRINCE2 by the creation of the Project Product
Description (PPD) document in SU
The PPD includes statements about the customer’s quality expectations
and acceptance criteria to avoid any ambiguity
When doing detailed planning (usually at Stage Boundaries – SB) we
create Product Descriptions which are really sub-components of the
Project Product or overall deliverable (see the Product Breakdown
Structure in the next Theme “PLANS”)
Project Management
training for the real world! 19
20.
The PRINCE2 ® path to quality
Pre- Initiation Subsequent Final
Project Stage Stages Stage
Directing DP
SU SB SB SB CP
Managing
IP CS CS CS
Delivering MP MP MP
Describe the Plan the Plan the Accept
Plan the
Project Product Planning Production the
Production
Project
Plan the Product
Choose the Production
approach Produce the Produce the
Produce the
Product Product Product
Quality Quality Quality
Control the Control the Control the
Product Product Product
Approve the Approve the Approve the
Product Product Product
Project Management
training for the real world! 20
21.
Theme #4
PLANS
TO FACILITATE COMMUNICATION AND CONTROL BY DEFINING THE MEANS OF
DELIVERING THE PRODUCTS (THE WHERE AND HOW, BY WHOM, AND ESTIMATING
THE WHEN AND HOW MUCH)
M - 61
Project Management
training for the real world! 21
21
23.
Product Breakdown Structure (PBS)
PRINCE2 recommends the use of a PBS as a planning pre-requisite
New Flight Booking System
(fully Operational)
Management Software Hardware
Training
products System
PID Installed Flight
User Manuals High Screen
Booking
Monitors
System
•Initiation stage End Administrator High Spec
Stage Report Manuals Server
•Stage plan [2]
Booking Front-
On-line Help End
•End Stage Report [2]
Application
•Stage plan [3]
Trained Front-
line Desk Staff Booking Back-
•End Stage Report [3] End Database
•Stage plan [4]
On-Line
Help Docs
•End Project Report
External Management Product
Gouping
product product
Project Management
training for the real world! 23
24.
Flight Booking System Example – Product Flow Diagram (PFD)
PRINCE2 recommends the use of a PFD after a PBS has been created
High Spec
Server
Booking Back- High Screen Stage 2
End Database Monitors Product
Descriptions
On-Line
Help Docs
Booking Front-End
On-line Help
Application
Stage 3
User Manuals Product
Descriptions
Trained Front- Installed Flight
line Desk Staff Booking
System Stage 4
Product
Administrator Descriptions
Manuals
New Flight Booking System
(fully Operational)
Project Management
training for the real world! 24
25.
Theme #5
PROGRESS
TO ESTABLISH MECHANISMS TO MONITOR ANDCOMPARE ACTUAL ACHIEVEMENTS
AGAINST THOSE PLANNED; PROVIDE A FORECAST FOR THE PROJECT OBJECTIVES
AND THE PROJECT;S CONTINUED VIABILITY; AND CONTROL AND UNACCEPTABLE
DEVIATIONS
M - 101
Project Management
training for the real world! 25
25
26.
PRINCE2 ® - Progress Theme
PRINCE2 recommends six areas of a project that need to be managed,
controlled & tracked to ensure the project remains on track. These are
depicted below:
Costs
Benefits Timescale
Aspects of
Project
Performance
Scope Quality
Risk
Project Management
training for the real world! 26
27.
What we wish to control & where we document it
Tolerance areas Project Stage Work Product
Package
Time +/- amounts of time on target Work
Project Plan Stage Plan NA
completion dates Package
Cost +/- amounts of planned budget Work
Project Plan Stage Plan NA
Package
Scope Permitted variation of the scope of a
project solution, e.g. MoSCoW prioritization Work
Project Plan Stage Plan NA
of requirements (Must have, Should have, Package
Could have, Won’t have’).
Risk Limit on the aggregated value of threats
(e.g. expected monetary value to remain less Risk
Work
than 10% of the plan’s budget); and Management Stage Plan NA
Package
Limit on any individual threat (e.g. any Strategy
threat to operational service)
Quality Defining quality targets in terms of ranges, Project
Product
e.g. a product that weighs 300g +/- 10g Product NA NA
Description
Description
Benefits Defining target benefits in terms of ranges,
e.g. to achieve minimum cost savings of Business
NA NA NA
5% per branch, with an average of 7% Case
across all branches
Project Management
training for the real world! 27
28.
Theme #6
RISK
TO IDENTIFY, ASSESS AND CONTROL UNCERTAINTY AN, AS A RESULT, IMPROVE THE ABILITY OF
THE PROJECT TO SUCCEED.
M - 77
Project Management
training for the real world! 28
28
29.
PRINCE2 ® - Risk Theme (Definitions)
Risk: An uncertain event or set of events that, should it occur, will have
an effect on the achievements of objectives.
PRINCE2 defines two types of risks (“bad” and “good”):
Risk “Threat”: ..can have a negative impact on objectives
Risk “Opportunity”: ..can have a favourable impact on objectives
Project Management
training for the real world! 29
31.
Theme #7
CHANGE
TO IDENTIFY, ASSESS AND CONTROL ANY POTENTIAL ANDAPPROVED CHANGES TO
THE BASELINE.
M - 91
Project Management
training for the real world! 31
31
32.
PRINCE2 ® - Change Theme
The PRINCE2 philosophy is not to prevent change (because this is unrealistic in
the real world), but to control it and put in place proper controls so we do not end
up with a run-away project.
On a day-to-day basis, the Project Manager is responsible for managing change
within the Controlling a Stage (CS) process. One of the key activities in the CS
process is “Capture & examine Issues and Risks” which forms the entry point for
managing change. Change is considered as a type of issue in PRINCE2 terms
(see next slide).
Escalate Report
issues and risks highlights
Controlling a Stage
Take corrective Review stage
action status
Capture and
examine issues
and risks
Receive
Authorize Review Work
completed
Work Packages Package status
Work Packages
Project Management
training for the real world! 32
33.
PRINCE2 ® Issue Types
Issue types Definition Project Manager Project Board
Request for change A proposal for a change • Capture • Approve
to a baseline (including • Impact analysis (examine) • Reject
baselined Product
Descriptions). • Propose action • Defer decision
• Present to the person or • Request more
group who has the information
competence to accept or • Ask for Exception Plan
refuse the request for
change
Off-specification Errors or omissions • Capture • Grant a concession
A product is, or will not • Impact analysis • Instruct that the off-
be, delivered as specification be resolved
described in the
• Propose action
Product Description. • Project Manager tries to • Defer decision
handle inside stage • Request more
tolerances information
• If impossible: Exception • Ask for Exception Plan
Report
Problem/concern Any other issues • The Project Manager • Provide guidance
resolves within • Ask for Exception Plan
tolerances
• If impossible: Exception
Report
Project Management
training for the real world! 33
Parece que tem um bloqueador de anúncios ativo. Ao listar o SlideShare no seu bloqueador de anúncios, está a apoiar a nossa comunidade de criadores de conteúdo.
Odeia anúncios?
Atualizámos a nossa política de privacidade.
Atualizámos a nossa política de privacidade de modo a estarmos em conformidade com os regulamentos de privacidade em constante mutação a nível mundial e para lhe fornecer uma visão sobre as formas limitadas de utilização dos seus dados.
Pode ler os detalhes abaixo. Ao aceitar, está a concordar com a política de privacidade atualizada.