Metri Plant With utility

Project Title: Formulation Project (Agro chemical) Location: Ankleshwar, Gujarat. Company: UPL-3 • Responsible in project all mechanical work including Strucher, piping & support fabrication and erection. • Review of all Equipment specification and erection. • Coordinating with Engineering and Construction and liaise with the detail engineering requirements. • Existing Equipment, pipeline & structure dismantling and new pipeline equipment erection as per requirement. • Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site. • Preparing Daily & Weekly Project Monitoring Report to the Management. • Certifying sub-contractors bills and coordinating for preparing the client bills. • Ensure that hydro test reinstatement is to be done as per procedure. • Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project. • Preparation of resources schedule for proper utilization of equipment’s & Preparing Lifting Plan for Heavy Package erections / Installations. • Manpower handling and stage inspection of mechanical works at site. • Responsible for the implementation of safety standards at the project site by ensuring that all relevant norms are employed effectively. • Ensure commissioning work with Production lots.

CHIRAG A PATEL
CONTACT
MOBILE : +919998665932
+919726013632
PROJECT ENGINEER
EMAIL : chirag_patel3233@yahoo.com
ADDRESS:
2, RajVihar Row House, Palanpur
Jakatnaka,Surat, Gujarat, India-395009
OBJECTIVE
To associate as a Mechanical engineer with an organization which raises a new challenging opportunity,
and excellent cooperative working environment, enabling me to improve my abilities, development my
functionality and improve organization plan and work procedures.
KEY STREGNTHS
 Construction Management
 Inspections and Testing
 Vendor Qualification
 Cost Reduction Strategies
 Procedures and Specifications
 Fabrication and Installation of Structure and Piping Works.
ACADEMIA
 2009-2012 - Mechanical engineering (Pacific University, Delhi) - First Class.
 2006-2009 – Diploma in Mechanical Engineering (Govt. Polytechnic, Valsad.) – First Class.
 2005-2006 – SSC (University of Gujarat) – Passed with Distinction.
IT CREDENTIALS
 Possess good knowledge of Windows, MSOffice, Oracle, Java, power point and Internet
Applications.
ORGANISATIONAL
GROW PATH
PRESENT PROJECT (Oil & Gas - Onshore)
Project Title: Formulation Project
Client: United phosphorus Ltd. (UPL-3)
Location: Ankleshwar, Gujarat.
Company: UPL-3(uniphos.com)
PERIOD ORGANISATION POSITION
December’14 to till United Phosphorus Ltd. Mechanical Engineer
August’ 2014 to December 14’ IETS India Pvt. Ltd. Mechanical Engineer
June’ 2013 to July 14’ Leighton Contractors Pvt. Ltd. Piping & Structural Engineer
Sept’09 to May 13’ Cummins Exhaust India Ltd. Junior Manager
Date of Joining: 15th December 2014.
Key Accountabilities:
 Responsible in project all mechanical work including Strucher, piping & support fabrication and
erection.
 Review of all Equipment specification and erection.
 Coordinating with Engineering and Construction and liaise with the detail engineering
requirements.
 Existing Equipment, pipeline & structure dismantling and new pipeline equipment erection as
per requirement.
 Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other
Disciplines in site.
 Preparing Daily & Weekly Project Monitoring Report to the Management.
 Certifying sub-contractors bills and coordinating for preparing the client bills.
 Ensure that hydro test reinstatement is to be done as per procedure.
 Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that
there is no continuation of project.
Project Title: EPC Project (Central polymer facility)
Client: Cairn Energy India Ltd.
Location: Barmer, Rajasthan.
Company: Dafeng-IETS India Pvt. Ltd
Date of Joining: 12th August 2014 to 12th December.
Key Accountabilities:
 Responsible in pipeline project planning, screening of pipeline project opportunities, route
selection, feasibility assessments and concept selections.
 Review of Project specification and P&ID s.
 Handling all piping technical queries and investigating all field pipe work related problems,
including the drawing of field sketches when necessary.
 Develop Construction Engineering Technology in line with Company Policy and Procedures.
 Elaborates construction feasibility analysis evaluating the available materials & drawings.
 Responsible for Piping erection operations and pipe support installation in accordance with
schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings.
 Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other
Disciplines in site.
 Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress
Reports.
 Assist Design Department in solving Piping Modification and Technical Problems in the Field.
 Provide technical answers to Engineering Queries raised up by the sub-contractor confirming
design drawings and standard requirements.
 Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct
location, orientation, alignment.
 Preparation of field piping system test packages, including system limit on P&ID and piping
Isometrics.
 Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests,
fulfilling commissioning and Pre-Commissioning requirements for the project.
 Responsible for line checking after hydro test to complete the post punch list prior to sign-off
the test packages before signing the completion of piping / mechanical.
Project Title: EPC-2 (Power Generation and Distribution System) & EPC-3 Integrated
Balance Works
Client: Cairn Energy India Ltd.
Location: Barmer, Rajasthan
Previous Key Accountabilities:
 Providing technical leadership on all erection/installation related activities for the project and
maintain mechanical standard specifications.
 Proposed innovative solutions and cost saving alternatives to meet clients’ objectives and
expectations and to set up win-win relationships.
 Ensure the delivery of Construction of the project fulfil the Tender Specifications, quality and
schedule
 Liaise between clients, vendors, contractors and various Engineering to resolve any Interface.
 Responsible for the Fabrication & Erection of Piping & Structural, Installation of project
mechanical packages.
 Ensure the Progress of the Pipeline Installation is on schedule & within Given Timeframe
 Preparing Daily & Weekly Project Monitoring Report to the Management / Client
 Preparation of fabrication, erection schedule to meet the target within the planned time frame.
 Co-ordination with interface departments, preparing DPR, and protocols for fabrication,
Installation and erection works.
 Maintain continuous inspections of works @ site and issue the necessary remedial notes (NCR)
for defected works observed @ site.
 Verification and maintain of records of materials supply by vendor prior execution.
 Attend meeting with contractor to achieve target completion of project in all aspect of quality
and safety.
 Preparation of resources schedule for proper utilization of equipment’s & Preparing Lifting Plan
for Heavy Package erections / Installations.
 Manpower handling and stage inspection of mechanical works at site.
 Certifying sub-contractors bills and coordinating for preparing the client bills.
 Responsible for the implementation of safety standards at the project site by ensuring that all
relevant norms are employed effectively.
Previous Key Accountabilities:
 MIS (management information system) Reporting, monitoring, Setting of Goals and Targets for
the Function and actions to improve on them continuously.
 Member of Team for Manufacturing Expense analysis.
 Improve Productivity, quality and line efficiency by implementing Cycle time reduction,
Pokayoke techniques, Single Line Flow.
 Identifying and implementing Projects for Process Improvements and
cost Reduction.
 Working as Value stream Leader for Paint line.
 Production Planning.
 MIG, MAG and TIG Welding Inspection.
 Carry out 5-S activities
 Monitoring and improving of Multi Skill Matrix.
 Method and Time study for new and existing products.
 Line balancing for Product Mix.
 Monitoring of Changeover activities.
 Develops new painter and welders.
 Co-ordination with other department.
TRAINING UNDERGONE
 Visual Inspection and testing in welding (AWS).
 Geometric dimensions and tolerance.
 FMEA (Failure mode and effect analysis).
 Fire Fighter training.
 Painting process training.
 5S training.
 Two weeks training in NARANLALA PVT LTD, NAVSARI during my diploma study in
2009.
EXTRA CURRICULAR ACTIVITIES
 Represented school in sports game at State Level in Nonstop 6 hours&4 hours skating.
 Active Member of Corporate responsibility team at CEIL Daman.
PERSONAL DETAILS
 Date of Birth : 30th Jan, 1990.
 Nationality : Indian.
 Gender : Male
 Marital Status : Single.
 Hobbies : Cricket, biking, skating.
 Language Known : English, Hindi, Gujarati.
 Passport no : L2436236 , Date of Expiry: 07/07/2023
DECLARATION
I declare that the above mentioned information is true to the best of my knowledge.
Date: 31/3/2015
Place: Ankleshwar, Gujarat CHIRAG PATEL

Recomendados

Resume_Laxmikant por
Resume_LaxmikantResume_Laxmikant
Resume_LaxmikantLaxmikant Gajinkar
239 visualizações4 slides
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM por
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMMuhammad Awais
254 visualizações5 slides
Rohan Gupta Resume por
Rohan Gupta ResumeRohan Gupta Resume
Rohan Gupta ResumeRohan Gupta
46 visualizações2 slides
Piping Engineer CV -Sandip Karmakar por
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarSandip Karmakar
3.5K visualizações4 slides
JAYANT KUMAR por
JAYANT KUMARJAYANT KUMAR
JAYANT KUMARJayant Kumar
399 visualizações4 slides
Mohammed Naveed uddin CV por
Mohammed Naveed uddin CVMohammed Naveed uddin CV
Mohammed Naveed uddin CVmohammed naveed uddin
299 visualizações4 slides

Mais conteúdo relacionado

Mais procurados

DEEPU CV por
DEEPU CVDEEPU CV
DEEPU CVDeepu Francis
126 visualizações2 slides
LEAD MECHANICAL CONSTRUCTION ENGINEER 1 por
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1John Raj BE, MBA
619 visualizações6 slides
Mechanical Engineer-Juffrie por
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-JuffrieJuffrie Cuevas
341 visualizações3 slides
11 year Exp in Instrumentation Field. por
11 year Exp in Instrumentation Field.11 year Exp in Instrumentation Field.
11 year Exp in Instrumentation Field.Bharath Viswanathan ABB/KEMCO-E&I
300 visualizações6 slides
Wpf resume-formal-eng-current-design-5 por
Wpf resume-formal-eng-current-design-5Wpf resume-formal-eng-current-design-5
Wpf resume-formal-eng-current-design-5WarrenFaeth
817 visualizações3 slides
new CV Rehan por
new CV Rehannew CV Rehan
new CV RehanAnsari mohammad Rehan
175 visualizações3 slides

Mais procurados(20)

DEEPU CV por Deepu Francis
DEEPU CVDEEPU CV
DEEPU CV
Deepu Francis126 visualizações
LEAD MECHANICAL CONSTRUCTION ENGINEER 1 por John Raj BE, MBA
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
John Raj BE, MBA619 visualizações
Mechanical Engineer-Juffrie por Juffrie Cuevas
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
Juffrie Cuevas341 visualizações
Wpf resume-formal-eng-current-design-5 por WarrenFaeth
Wpf resume-formal-eng-current-design-5Wpf resume-formal-eng-current-design-5
Wpf resume-formal-eng-current-design-5
WarrenFaeth817 visualizações
Karthik S - 5.5 Years of Experience por Karthick Sekar
Karthik S - 5.5 Years of ExperienceKarthik S - 5.5 Years of Experience
Karthik S - 5.5 Years of Experience
Karthick Sekar54 visualizações
CV por Mariam Waris
CVCV
CV
Mariam Waris322 visualizações
Instrumentation Engineer Resume por Suresh Selvaraju
Instrumentation Engineer ResumeInstrumentation Engineer Resume
Instrumentation Engineer Resume
Suresh Selvaraju399 visualizações
Wpf Resume Formal Eng Current Design 5 por WarrenFaeth
Wpf Resume Formal Eng Current Design 5Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5
WarrenFaeth657 visualizações
S.U.Madusanka CV por upul madusanka
S.U.Madusanka CVS.U.Madusanka CV
S.U.Madusanka CV
upul madusanka89 visualizações
joseph_resume UPDATED 08192015 por Joseph. Gaon
joseph_resume UPDATED 08192015joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015
Joseph. Gaon498 visualizações
Resume of SSK por Saravana Kumar
Resume of SSKResume of SSK
Resume of SSK
Saravana Kumar471 visualizações
Sushil Kumar Jain resume (National) mod 3 (2) por Sushil Kumar Jain
Sushil Kumar Jain resume (National) mod 3 (2)Sushil Kumar Jain resume (National) mod 3 (2)
Sushil Kumar Jain resume (National) mod 3 (2)
Sushil Kumar Jain195 visualizações

Destaque

Osnovi d n_Tkachev_o_v_6_mf por
Osnovi d n_Tkachev_o_v_6_mfOsnovi d n_Tkachev_o_v_6_mf
Osnovi d n_Tkachev_o_v_6_mfdimka1994
174 visualizações9 slides
Introduction of PSIVER (Japanese ) por
Introduction of PSIVER (Japanese )Introduction of PSIVER (Japanese )
Introduction of PSIVER (Japanese )Mizuguchi Laboratory
1K visualizações5 slides
greasing wheels of mobility por
greasing wheels of mobilitygreasing wheels of mobility
greasing wheels of mobilityJon J. Johnson
122 visualizações59 slides
Huong dan thiet ke mo phong por
Huong dan thiet ke mo phongHuong dan thiet ke mo phong
Huong dan thiet ke mo phongMai Thanh
256 visualizações6 slides
SK TECHNOLOGIES por
SK TECHNOLOGIESSK TECHNOLOGIES
SK TECHNOLOGIESkrishna murthy sharma
593 visualizações8 slides
Auto & Design Dec 2014.3 por
Auto & Design Dec 2014.3Auto & Design Dec 2014.3
Auto & Design Dec 2014.3Helen Lee
234 visualizações3 slides

Destaque(16)

Osnovi d n_Tkachev_o_v_6_mf por dimka1994
Osnovi d n_Tkachev_o_v_6_mfOsnovi d n_Tkachev_o_v_6_mf
Osnovi d n_Tkachev_o_v_6_mf
dimka1994174 visualizações
Introduction of PSIVER (Japanese ) por Mizuguchi Laboratory
Introduction of PSIVER (Japanese )Introduction of PSIVER (Japanese )
Introduction of PSIVER (Japanese )
Mizuguchi Laboratory1K visualizações
greasing wheels of mobility por Jon J. Johnson
greasing wheels of mobilitygreasing wheels of mobility
greasing wheels of mobility
Jon J. Johnson122 visualizações
Huong dan thiet ke mo phong por Mai Thanh
Huong dan thiet ke mo phongHuong dan thiet ke mo phong
Huong dan thiet ke mo phong
Mai Thanh256 visualizações
Auto & Design Dec 2014.3 por Helen Lee
Auto & Design Dec 2014.3Auto & Design Dec 2014.3
Auto & Design Dec 2014.3
Helen Lee234 visualizações
CA Aging transpo specialist full job descrip por Jon J. Johnson
CA Aging transpo specialist full job descripCA Aging transpo specialist full job descrip
CA Aging transpo specialist full job descrip
Jon J. Johnson85 visualizações
результати анкетування por a. Kovpas
результати анкетуваннярезультати анкетування
результати анкетування
a. Kovpas280 visualizações
Catlogue por PRANAVIND
CatlogueCatlogue
Catlogue
PRANAVIND173 visualizações
Genoeg van overtypen? Document Capture por IT Solutions
Genoeg van overtypen? Document CaptureGenoeg van overtypen? Document Capture
Genoeg van overtypen? Document Capture
IT Solutions418 visualizações
ενέργεια por roumkosalex
ενέργειαενέργεια
ενέργεια
roumkosalex389 visualizações
London por nuzuraya
London   London
London
nuzuraya195 visualizações
Mira amirah por panglimaagus
Mira amirahMira amirah
Mira amirah
panglimaagus299 visualizações
Printing_BrandonFrisco por Brandon Frisco
Printing_BrandonFriscoPrinting_BrandonFrisco
Printing_BrandonFrisco
Brandon Frisco277 visualizações
HUMAN WASTE HAIR PRODUCTS por HUMANHAIRSUPERMARKET
HUMAN WASTE HAIR PRODUCTSHUMAN WASTE HAIR PRODUCTS
HUMAN WASTE HAIR PRODUCTS
HUMANHAIRSUPERMARKET184 visualizações

Similar a Metri Plant With utility

cv piping(1) por
cv piping(1)cv piping(1)
cv piping(1)Equbal Ahmad
1.8K visualizações4 slides
Project Engineer- (Design, Engineering, Planning & Coordination - Projects) por
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Aniket Dalvi
1K visualizações6 slides
Piping Engineer por
Piping EngineerPiping Engineer
Piping Engineerervinay singh
620 visualizações5 slides
Saif cv(1) por
Saif cv(1)Saif cv(1)
Saif cv(1)Saifur Rahman
57 visualizações3 slides
Sayantan resume por
Sayantan resumeSayantan resume
Sayantan resumeSayantan Dhar
41 visualizações3 slides
Manish kumar project planning & control with 3.7 years of experience por
Manish kumar project planning & control with 3.7 years of experienceManish kumar project planning & control with 3.7 years of experience
Manish kumar project planning & control with 3.7 years of experienceManish Kumar PGP - NICMAR Pune
276 visualizações4 slides

Similar a Metri Plant With utility(20)

cv piping(1) por Equbal Ahmad
cv piping(1)cv piping(1)
cv piping(1)
Equbal Ahmad1.8K visualizações
Project Engineer- (Design, Engineering, Planning & Coordination - Projects) por Aniket Dalvi
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Aniket Dalvi1K visualizações
Piping Engineer por ervinay singh
Piping EngineerPiping Engineer
Piping Engineer
ervinay singh620 visualizações
Saif cv(1) por Saifur Rahman
Saif cv(1)Saif cv(1)
Saif cv(1)
Saifur Rahman57 visualizações
Sayantan resume por Sayantan Dhar
Sayantan resumeSayantan resume
Sayantan resume
Sayantan Dhar41 visualizações
Manish kumar project planning & control with 3.7 years of experience por Manish Kumar PGP - NICMAR Pune
Manish kumar project planning & control with 3.7 years of experienceManish kumar project planning & control with 3.7 years of experience
Manish kumar project planning & control with 3.7 years of experience
Manish Kumar PGP - NICMAR Pune276 visualizações
KINGSLY M PIPING-PROJECT CV ABD por KINGSLY AROKIAM
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY AROKIAM120 visualizações
Muralidhar por Muralidhar J K
MuralidharMuralidhar
Muralidhar
Muralidhar J K107 visualizações
Ghafran-Electrical Engineer final por Ghafran Tariq
Ghafran-Electrical Engineer finalGhafran-Electrical Engineer final
Ghafran-Electrical Engineer final
Ghafran Tariq97 visualizações
NEW RESUME AUG-16 por Tushar Patel
NEW RESUME AUG-16NEW RESUME AUG-16
NEW RESUME AUG-16
Tushar Patel92 visualizações
syed Raza _CV por Syed Raza
syed Raza _CVsyed Raza _CV
syed Raza _CV
Syed Raza246 visualizações
SushantCV por Sushant Saxena
SushantCVSushantCV
SushantCV
Sushant Saxena156 visualizações
CV for civil engineer (Updated)--- Alpesh Parmar por ALPESH CONTRACTOR
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
ALPESH CONTRACTOR412 visualizações
Resume Expediting & Inspection Engineer (Oil & Gas) por Sarim Mujtaba
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
Sarim Mujtaba3.5K visualizações
Mantena Neeladri varma_original por Neeladri varma
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
Neeladri varma223 visualizações
Vijai CV por Vijai Ram •
Vijai CVVijai CV
Vijai CV
Vijai Ram •54 visualizações
Cv melwin samuel w lt 2 por Melwin Samuel
Cv melwin samuel w lt 2Cv melwin samuel w lt 2
Cv melwin samuel w lt 2
Melwin Samuel380 visualizações
updated cv of indrasen por indrasen kushwaha
updated cv of indrasenupdated cv of indrasen
updated cv of indrasen
indrasen kushwaha126 visualizações
JAY RESUME por Jay Mistri
JAY RESUMEJAY RESUME
JAY RESUME
Jay Mistri78 visualizações

Último

Automated Remote sensing GPS satellite system for managing resources and moni... por
Automated Remote sensing GPS satellite system for managing resources and moni...Automated Remote sensing GPS satellite system for managing resources and moni...
Automated Remote sensing GPS satellite system for managing resources and moni...Khalid Abdel Naser Abdel Rahim
7 visualizações1 slide
02. COLEGIO - KIT SANITARIO .pdf por
02. COLEGIO - KIT SANITARIO .pdf02. COLEGIO - KIT SANITARIO .pdf
02. COLEGIO - KIT SANITARIO .pdfRAULALEJANDROMALDONA
5 visualizações7 slides
Unlocking Research Visibility.pdf por
Unlocking Research Visibility.pdfUnlocking Research Visibility.pdf
Unlocking Research Visibility.pdfKhatirNaima
11 visualizações19 slides
GDSC Mikroskil Members Onboarding 2023.pdf por
GDSC Mikroskil Members Onboarding 2023.pdfGDSC Mikroskil Members Onboarding 2023.pdf
GDSC Mikroskil Members Onboarding 2023.pdfgdscmikroskil
75 visualizações62 slides
Different type of computer networks .pptx por
Different  type of computer networks .pptxDifferent  type of computer networks .pptx
Different type of computer networks .pptxnazmul1514788
20 visualizações22 slides
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf por
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdfASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdfAlhamduKure
11 visualizações11 slides

Último(20)

Automated Remote sensing GPS satellite system for managing resources and moni... por Khalid Abdel Naser Abdel Rahim
Automated Remote sensing GPS satellite system for managing resources and moni...Automated Remote sensing GPS satellite system for managing resources and moni...
Automated Remote sensing GPS satellite system for managing resources and moni...
Khalid Abdel Naser Abdel Rahim7 visualizações
02. COLEGIO - KIT SANITARIO .pdf por RAULALEJANDROMALDONA
02. COLEGIO - KIT SANITARIO .pdf02. COLEGIO - KIT SANITARIO .pdf
02. COLEGIO - KIT SANITARIO .pdf
RAULALEJANDROMALDONA5 visualizações
Unlocking Research Visibility.pdf por KhatirNaima
Unlocking Research Visibility.pdfUnlocking Research Visibility.pdf
Unlocking Research Visibility.pdf
KhatirNaima11 visualizações
GDSC Mikroskil Members Onboarding 2023.pdf por gdscmikroskil
GDSC Mikroskil Members Onboarding 2023.pdfGDSC Mikroskil Members Onboarding 2023.pdf
GDSC Mikroskil Members Onboarding 2023.pdf
gdscmikroskil75 visualizações
Different type of computer networks .pptx por nazmul1514788
Different  type of computer networks .pptxDifferent  type of computer networks .pptx
Different type of computer networks .pptx
nazmul151478820 visualizações
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf por AlhamduKure
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdfASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
AlhamduKure11 visualizações
Programmable Logic Devices : SPLD and CPLD por Usha Mehta
Programmable Logic Devices : SPLD and CPLDProgrammable Logic Devices : SPLD and CPLD
Programmable Logic Devices : SPLD and CPLD
Usha Mehta44 visualizações
Web Dev Session 1.pptx por VedVekhande
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptx
VedVekhande23 visualizações
MODULE-1 CHAPTER 3- Operators - Object Oriented Programming with JAVA por Demian Antony D'Mello
MODULE-1 CHAPTER 3- Operators - Object Oriented Programming with JAVAMODULE-1 CHAPTER 3- Operators - Object Oriented Programming with JAVA
MODULE-1 CHAPTER 3- Operators - Object Oriented Programming with JAVA
Demian Antony D'Mello8 visualizações
Module-1, Chapter-2 Data Types, Variables, and Arrays por Demian Antony D'Mello
Module-1, Chapter-2 Data Types, Variables, and ArraysModule-1, Chapter-2 Data Types, Variables, and Arrays
Module-1, Chapter-2 Data Types, Variables, and Arrays
Demian Antony D'Mello19 visualizações
CPM Schedule Float.pptx por Mathew Joseph
CPM Schedule Float.pptxCPM Schedule Float.pptx
CPM Schedule Float.pptx
Mathew Joseph9 visualizações
REACTJS.pdf por ArthyR3
REACTJS.pdfREACTJS.pdf
REACTJS.pdf
ArthyR339 visualizações
2023-12 Emarei MRI Tool Set E2I0501ST (TQ).pdf por Philipp Daum
2023-12 Emarei MRI Tool Set E2I0501ST (TQ).pdf2023-12 Emarei MRI Tool Set E2I0501ST (TQ).pdf
2023-12 Emarei MRI Tool Set E2I0501ST (TQ).pdf
Philipp Daum6 visualizações
IRJET-Productivity Enhancement Using Method Study.pdf por SahilBavdhankar
IRJET-Productivity Enhancement Using Method Study.pdfIRJET-Productivity Enhancement Using Method Study.pdf
IRJET-Productivity Enhancement Using Method Study.pdf
SahilBavdhankar11 visualizações
Solution Challenge Introduction.pptx por GDSCCEC
Solution Challenge Introduction.pptxSolution Challenge Introduction.pptx
Solution Challenge Introduction.pptx
GDSCCEC13 visualizações
Here comes the Loom - Ya!vaConf.pdf por Krystian Zybała
Here comes the Loom - Ya!vaConf.pdfHere comes the Loom - Ya!vaConf.pdf
Here comes the Loom - Ya!vaConf.pdf
Krystian Zybała7 visualizações
MongoDB.pdf por ArthyR3
MongoDB.pdfMongoDB.pdf
MongoDB.pdf
ArthyR353 visualizações
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... por csegroupvn
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
csegroupvn17 visualizações
dummy.pptx por JamesLamp
dummy.pptxdummy.pptx
dummy.pptx
JamesLamp7 visualizações

Metri Plant With utility

  • 1. CHIRAG A PATEL CONTACT MOBILE : +919998665932 +919726013632 PROJECT ENGINEER EMAIL : chirag_patel3233@yahoo.com ADDRESS: 2, RajVihar Row House, Palanpur Jakatnaka,Surat, Gujarat, India-395009 OBJECTIVE To associate as a Mechanical engineer with an organization which raises a new challenging opportunity, and excellent cooperative working environment, enabling me to improve my abilities, development my functionality and improve organization plan and work procedures. KEY STREGNTHS  Construction Management  Inspections and Testing  Vendor Qualification  Cost Reduction Strategies  Procedures and Specifications  Fabrication and Installation of Structure and Piping Works. ACADEMIA  2009-2012 - Mechanical engineering (Pacific University, Delhi) - First Class.  2006-2009 – Diploma in Mechanical Engineering (Govt. Polytechnic, Valsad.) – First Class.  2005-2006 – SSC (University of Gujarat) – Passed with Distinction. IT CREDENTIALS  Possess good knowledge of Windows, MSOffice, Oracle, Java, power point and Internet Applications. ORGANISATIONAL GROW PATH PRESENT PROJECT (Oil & Gas - Onshore) Project Title: Formulation Project Client: United phosphorus Ltd. (UPL-3) Location: Ankleshwar, Gujarat. Company: UPL-3(uniphos.com) PERIOD ORGANISATION POSITION December’14 to till United Phosphorus Ltd. Mechanical Engineer August’ 2014 to December 14’ IETS India Pvt. Ltd. Mechanical Engineer June’ 2013 to July 14’ Leighton Contractors Pvt. Ltd. Piping & Structural Engineer Sept’09 to May 13’ Cummins Exhaust India Ltd. Junior Manager
  • 2. Date of Joining: 15th December 2014. Key Accountabilities:  Responsible in project all mechanical work including Strucher, piping & support fabrication and erection.  Review of all Equipment specification and erection.  Coordinating with Engineering and Construction and liaise with the detail engineering requirements.  Existing Equipment, pipeline & structure dismantling and new pipeline equipment erection as per requirement.  Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.  Preparing Daily & Weekly Project Monitoring Report to the Management.  Certifying sub-contractors bills and coordinating for preparing the client bills.  Ensure that hydro test reinstatement is to be done as per procedure.  Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no continuation of project. Project Title: EPC Project (Central polymer facility) Client: Cairn Energy India Ltd. Location: Barmer, Rajasthan. Company: Dafeng-IETS India Pvt. Ltd Date of Joining: 12th August 2014 to 12th December. Key Accountabilities:  Responsible in pipeline project planning, screening of pipeline project opportunities, route selection, feasibility assessments and concept selections.  Review of Project specification and P&ID s.  Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.  Develop Construction Engineering Technology in line with Company Policy and Procedures.  Elaborates construction feasibility analysis evaluating the available materials & drawings.  Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings.  Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.  Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports.  Assist Design Department in solving Piping Modification and Technical Problems in the Field.  Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements.  Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment.  Preparation of field piping system test packages, including system limit on P&ID and piping Isometrics.  Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.  Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical. Project Title: EPC-2 (Power Generation and Distribution System) & EPC-3 Integrated Balance Works Client: Cairn Energy India Ltd. Location: Barmer, Rajasthan Previous Key Accountabilities:  Providing technical leadership on all erection/installation related activities for the project and maintain mechanical standard specifications.
  • 3.  Proposed innovative solutions and cost saving alternatives to meet clients’ objectives and expectations and to set up win-win relationships.  Ensure the delivery of Construction of the project fulfil the Tender Specifications, quality and schedule  Liaise between clients, vendors, contractors and various Engineering to resolve any Interface.  Responsible for the Fabrication & Erection of Piping & Structural, Installation of project mechanical packages.  Ensure the Progress of the Pipeline Installation is on schedule & within Given Timeframe  Preparing Daily & Weekly Project Monitoring Report to the Management / Client  Preparation of fabrication, erection schedule to meet the target within the planned time frame.  Co-ordination with interface departments, preparing DPR, and protocols for fabrication, Installation and erection works.  Maintain continuous inspections of works @ site and issue the necessary remedial notes (NCR) for defected works observed @ site.  Verification and maintain of records of materials supply by vendor prior execution.  Attend meeting with contractor to achieve target completion of project in all aspect of quality and safety.  Preparation of resources schedule for proper utilization of equipment’s & Preparing Lifting Plan for Heavy Package erections / Installations.  Manpower handling and stage inspection of mechanical works at site.  Certifying sub-contractors bills and coordinating for preparing the client bills.  Responsible for the implementation of safety standards at the project site by ensuring that all relevant norms are employed effectively. Previous Key Accountabilities:  MIS (management information system) Reporting, monitoring, Setting of Goals and Targets for the Function and actions to improve on them continuously.  Member of Team for Manufacturing Expense analysis.  Improve Productivity, quality and line efficiency by implementing Cycle time reduction, Pokayoke techniques, Single Line Flow.  Identifying and implementing Projects for Process Improvements and cost Reduction.  Working as Value stream Leader for Paint line.  Production Planning.  MIG, MAG and TIG Welding Inspection.  Carry out 5-S activities  Monitoring and improving of Multi Skill Matrix.  Method and Time study for new and existing products.  Line balancing for Product Mix.  Monitoring of Changeover activities.  Develops new painter and welders.  Co-ordination with other department. TRAINING UNDERGONE  Visual Inspection and testing in welding (AWS).  Geometric dimensions and tolerance.  FMEA (Failure mode and effect analysis).  Fire Fighter training.  Painting process training.  5S training.  Two weeks training in NARANLALA PVT LTD, NAVSARI during my diploma study in 2009.
  • 4. EXTRA CURRICULAR ACTIVITIES  Represented school in sports game at State Level in Nonstop 6 hours&4 hours skating.  Active Member of Corporate responsibility team at CEIL Daman. PERSONAL DETAILS  Date of Birth : 30th Jan, 1990.  Nationality : Indian.  Gender : Male  Marital Status : Single.  Hobbies : Cricket, biking, skating.  Language Known : English, Hindi, Gujarati.  Passport no : L2436236 , Date of Expiry: 07/07/2023 DECLARATION I declare that the above mentioned information is true to the best of my knowledge. Date: 31/3/2015 Place: Ankleshwar, Gujarat CHIRAG PATEL