RECOMMENDED SCOPE OF GEOTECHNICAL WORK AND FEES FOR DESIGN OF INGROUND SWIMMING POOLS.pdf

RECOMMENDED SCOPE OF GEOTECHNICAL WORK AND FEES FOR DESIGN OF INGROUND SWIMMING POOLS.pdf
CHALLENGING SUBSOIL
CONDITIONS
Due to the treacherous subsoil conditions in the
Gulf Coast area, characterized by loose sands and
expansive clays, it is essential to conduct a
thorough geotechnical investigation before
designing and constructing inground swimming
pools.
SHALLOW GROUNDWATER
ASSESSMENT
Given the presence of shallow groundwater in the
region, assessing groundwater levels is crucial
during the geotechnical exploration to understand
its impact on pool construction.
STRUCTURAL
CONSIDERATIONS
The geotechnical investigation should encompass
an evaluation of structural considerations, as pools
built in expansive clays can experience substantial
movement problems and structural distress if not
properly designed.
DRAINAGE AND SLOPE
ANALYSIS
Comprehensive pool design should take into
account factors such as drainage, the presence of
trees, and slope conditions on the site to mitigate
potential issues.
HOUSTON AREA POOLS
Recognizing the prevalence of inground swimming
pools in the Houston area, it's imperative to address
the issues of movement and cracking that some
pools in the region have experienced. The study
aims to establish best practices for the design and
construction of pools to safeguard public safety
and the interests of pool contractors.
GEOTECHNICAL
EXPLORATION AND SOIL
BORINGS
The geotechnical engineer licensed in the State of
Texas should conduct a geotechnical exploration.
This exploration will involve drilling soil borings at
the pool's intended location. The depth of these
borings should be at least twice the depth of the
pool, with a minimum depth of 20 feet.
BORING REQUIREMENTS
Depending on the pool's size, the number of
borings required should be determined. For pools
under 3000 sq. ft., a minimum of two borings is
recommended. For larger pools exceeding 3000
sq. ft., additional borings should be performed,
with at least one boring for every additional 1500
sq. ft. of pool area. These borings are critical for
assessing the subsurface conditions and ensuring
safe and reliable pool construction.
Phone Number
713.699.4000
Email Address
ron@geotecheng.com
Website
www.geotecheng.com
CONTACT US
1 de 9

Recomendados

Planning of reservoir por
Planning of reservoirPlanning of reservoir
Planning of reservoirnumber113
115 visualizações8 slides
Swimming Pool Package por
Swimming Pool PackageSwimming Pool Package
Swimming Pool PackageGeotech Engineering and Testing
3 visualizações7 slides
Bahrain - Half Moon Bay Project - Project Manager por
Bahrain - Half Moon Bay Project - Project ManagerBahrain - Half Moon Bay Project - Project Manager
Bahrain - Half Moon Bay Project - Project ManagerNiels Asjee
143 visualizações2 slides
Reservoir sedimentation causes and mitigation por
Reservoir sedimentation causes and mitigationReservoir sedimentation causes and mitigation
Reservoir sedimentation causes and mitigationPramoda Raj
2.7K visualizações21 slides
Reservoir sedimentation causes sedimentation por
Reservoir sedimentation causes sedimentationReservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentationPramoda Raj
6K visualizações21 slides
Eg unit v por
Eg unit vEg unit v
Eg unit vshaymaa17
93 visualizações44 slides

Mais conteúdo relacionado

Similar a RECOMMENDED SCOPE OF GEOTECHNICAL WORK AND FEES FOR DESIGN OF INGROUND SWIMMING POOLS.pdf

Water dam versus Tailing Dam por
Water dam versus Tailing DamWater dam versus Tailing Dam
Water dam versus Tailing Damfrank huangfu
673 visualizações12 slides
Important of soil survey and selection of suitable dam site-topography/geolog... por
Important of soil survey and selection of suitable dam site-topography/geolog...Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...GauravGautam344043
207 visualizações24 slides
International Journal of Engineering Research and Development por
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
625 visualizações10 slides
Note 01 soil mechanics NCT por
Note 01 soil mechanics NCTNote 01 soil mechanics NCT
Note 01 soil mechanics NCTSanath Balasuriya
586 visualizações3 slides
Group a workshop on c h por
Group a workshop on c hGroup a workshop on c h
Group a workshop on c hALI HYDER GADHI
449 visualizações49 slides
Design of diversion dam in tarbela dam pakistan por
Design of diversion dam in tarbela dam pakistanDesign of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanShoaib Madridista
2.5K visualizações26 slides

Similar a RECOMMENDED SCOPE OF GEOTECHNICAL WORK AND FEES FOR DESIGN OF INGROUND SWIMMING POOLS.pdf(20)

Water dam versus Tailing Dam por frank huangfu
Water dam versus Tailing DamWater dam versus Tailing Dam
Water dam versus Tailing Dam
frank huangfu673 visualizações
Important of soil survey and selection of suitable dam site-topography/geolog... por GauravGautam344043
Important of soil survey and selection of suitable dam site-topography/geolog...Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...
GauravGautam344043207 visualizações
International Journal of Engineering Research and Development por IJERD Editor
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
IJERD Editor625 visualizações
Note 01 soil mechanics NCT por Sanath Balasuriya
Note 01 soil mechanics NCTNote 01 soil mechanics NCT
Note 01 soil mechanics NCT
Sanath Balasuriya586 visualizações
Group a workshop on c h por ALI HYDER GADHI
Group a workshop on c hGroup a workshop on c h
Group a workshop on c h
ALI HYDER GADHI449 visualizações
Design of diversion dam in tarbela dam pakistan por Shoaib Madridista
Design of diversion dam in tarbela dam pakistanDesign of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistan
Shoaib Madridista2.5K visualizações
Design-of-diversion-dam-in-tarbela-dam-pakistan.pptx por LeenaMujahed
Design-of-diversion-dam-in-tarbela-dam-pakistan.pptxDesign-of-diversion-dam-in-tarbela-dam-pakistan.pptx
Design-of-diversion-dam-in-tarbela-dam-pakistan.pptx
LeenaMujahed5 visualizações
Poope and dean 1986 por Edgar Bernabe
Poope and dean 1986Poope and dean 1986
Poope and dean 1986
Edgar Bernabe125 visualizações
Raising, widening & strengthening with protection to scoured bank of Bedpur-K... por Satyajit Behera
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...Raising, widening & strengthening with protection to scoured bank of Bedpur-K...
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...
Satyajit Behera905 visualizações
Factors to considered in foundation design and numerical based on bis method por ErankajKumar
Factors to considered in foundation design and numerical based on bis methodFactors to considered in foundation design and numerical based on bis method
Factors to considered in foundation design and numerical based on bis method
ErankajKumar111 visualizações
Engineering Geology for Civil Engineering por RajkumarGhosh14
Engineering Geology for Civil EngineeringEngineering Geology for Civil Engineering
Engineering Geology for Civil Engineering
RajkumarGhosh1446 visualizações
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro... por Mohit Shukla
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Mohit Shukla1.8K visualizações
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012 por Erin Vieira
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
Erin Vieira213 visualizações
Design_and_Construction_of_Embankment_Da (2).pdf por YeshiharegAlemu
Design_and_Construction_of_Embankment_Da (2).pdfDesign_and_Construction_of_Embankment_Da (2).pdf
Design_and_Construction_of_Embankment_Da (2).pdf
YeshiharegAlemu11 visualizações
Design_and_Construction_of_Embankment_Da (1).pdf por YeshiharegAlemu
Design_and_Construction_of_Embankment_Da (1).pdfDesign_and_Construction_of_Embankment_Da (1).pdf
Design_and_Construction_of_Embankment_Da (1).pdf
YeshiharegAlemu5 visualizações
Geotechnical investigations for tunnelling por Prof. A.Balasubramanian
Geotechnical  investigations for tunnellingGeotechnical  investigations for tunnelling
Geotechnical investigations for tunnelling
Prof. A.Balasubramanian 14K visualizações
OK por cikisay
OKOK
OK
cikisay41 visualizações
basic-geology-unit 1.pptx por PandieswariM2
basic-geology-unit 1.pptxbasic-geology-unit 1.pptx
basic-geology-unit 1.pptx
PandieswariM225 visualizações
damandtypesofdamwithsiteselection-170403160723 (1) (1).pptx por abhijitsaha99
damandtypesofdamwithsiteselection-170403160723 (1) (1).pptxdamandtypesofdamwithsiteselection-170403160723 (1) (1).pptx
damandtypesofdamwithsiteselection-170403160723 (1) (1).pptx
abhijitsaha999 visualizações

Mais de bethchanning

Essential elements of hospitality photography.pdf por
Essential elements of hospitality photography.pdfEssential elements of hospitality photography.pdf
Essential elements of hospitality photography.pdfbethchanning
4 visualizações14 slides
Xodusadventures.pdf por
Xodusadventures.pdfXodusadventures.pdf
Xodusadventures.pdfbethchanning
5 visualizações10 slides
4 ways product sampling helps your brand win over shoppers.pdf por
4 ways product sampling helps your brand win over shoppers.pdf4 ways product sampling helps your brand win over shoppers.pdf
4 ways product sampling helps your brand win over shoppers.pdfbethchanning
2 visualizações8 slides
How To Effectively Display Your Cosmetic Products To Attract More Customers.pdf por
How To Effectively Display Your Cosmetic Products To Attract More Customers.pdfHow To Effectively Display Your Cosmetic Products To Attract More Customers.pdf
How To Effectively Display Your Cosmetic Products To Attract More Customers.pdfbethchanning
4 visualizações7 slides
Resort Photography por
Resort PhotographyResort Photography
Resort Photographybethchanning
3 visualizações7 slides
Virtual Bookkeeper por
Virtual BookkeeperVirtual Bookkeeper
Virtual Bookkeeperbethchanning
6 visualizações5 slides

Mais de bethchanning(20)

Essential elements of hospitality photography.pdf por bethchanning
Essential elements of hospitality photography.pdfEssential elements of hospitality photography.pdf
Essential elements of hospitality photography.pdf
bethchanning4 visualizações
Xodusadventures.pdf por bethchanning
Xodusadventures.pdfXodusadventures.pdf
Xodusadventures.pdf
bethchanning5 visualizações
4 ways product sampling helps your brand win over shoppers.pdf por bethchanning
4 ways product sampling helps your brand win over shoppers.pdf4 ways product sampling helps your brand win over shoppers.pdf
4 ways product sampling helps your brand win over shoppers.pdf
bethchanning2 visualizações
How To Effectively Display Your Cosmetic Products To Attract More Customers.pdf por bethchanning
How To Effectively Display Your Cosmetic Products To Attract More Customers.pdfHow To Effectively Display Your Cosmetic Products To Attract More Customers.pdf
How To Effectively Display Your Cosmetic Products To Attract More Customers.pdf
bethchanning4 visualizações
Resort Photography por bethchanning
Resort PhotographyResort Photography
Resort Photography
bethchanning3 visualizações
Virtual Bookkeeper por bethchanning
Virtual BookkeeperVirtual Bookkeeper
Virtual Bookkeeper
bethchanning6 visualizações
Rngbankruptcy.pdf por bethchanning
Rngbankruptcy.pdfRngbankruptcy.pdf
Rngbankruptcy.pdf
bethchanning6 visualizações
Birdeyesurveillance.pdf por bethchanning
Birdeyesurveillance.pdfBirdeyesurveillance.pdf
Birdeyesurveillance.pdf
bethchanning2 visualizações
Purecreative.pdf por bethchanning
Purecreative.pdfPurecreative.pdf
Purecreative.pdf
bethchanning2 visualizações
Samand.pdf por bethchanning
Samand.pdfSamand.pdf
Samand.pdf
bethchanning7 visualizações
Samand.pdf por bethchanning
Samand.pdfSamand.pdf
Samand.pdf
bethchanning2 visualizações
Lonestarparties.pdf por bethchanning
Lonestarparties.pdfLonestarparties.pdf
Lonestarparties.pdf
bethchanning4 visualizações
Birdeyesurveillance por bethchanning
BirdeyesurveillanceBirdeyesurveillance
Birdeyesurveillance
bethchanning2 visualizações
Purecreative solutions por bethchanning
Purecreative solutionsPurecreative solutions
Purecreative solutions
bethchanning3 visualizações
Web Designing por bethchanning
Web DesigningWeb Designing
Web Designing
bethchanning3 visualizações
First97days por bethchanning
First97daysFirst97days
First97days
bethchanning2 visualizações
Product Sampling por bethchanning
Product SamplingProduct Sampling
Product Sampling
bethchanning12 visualizações
Construction Project por bethchanning
Construction ProjectConstruction Project
Construction Project
bethchanning10 visualizações
construction jobsites' security por bethchanning
construction jobsites' security construction jobsites' security
construction jobsites' security
bethchanning340 visualizações

Último

StratPlanning Manual 220713.pdf por
StratPlanning Manual 220713.pdfStratPlanning Manual 220713.pdf
StratPlanning Manual 220713.pdfLakewalk Media
15 visualizações43 slides
Antimalarial agents-Medicinal Chemistry por
Antimalarial agents-Medicinal ChemistryAntimalarial agents-Medicinal Chemistry
Antimalarial agents-Medicinal ChemistryNarminHamaaminHussen
6 visualizações27 slides
Antifungal agents-Medicinal Chemistry por
Antifungal agents-Medicinal Chemistry Antifungal agents-Medicinal Chemistry
Antifungal agents-Medicinal Chemistry NarminHamaaminHussen
7 visualizações27 slides
FIESTAS DE QUITO.pdf por
FIESTAS DE QUITO.pdfFIESTAS DE QUITO.pdf
FIESTAS DE QUITO.pdfeluniversocom
15 visualizações8 slides
Sudden Deafness Design Document por
Sudden Deafness Design DocumentSudden Deafness Design Document
Sudden Deafness Design Documentwyfangherman
48 visualizações19 slides
Doing Footwear - Footwear Factory por
Doing Footwear - Footwear FactoryDoing Footwear - Footwear Factory
Doing Footwear - Footwear FactoryDoing Footwear
11 visualizações15 slides

Último(20)

StratPlanning Manual 220713.pdf por Lakewalk Media
StratPlanning Manual 220713.pdfStratPlanning Manual 220713.pdf
StratPlanning Manual 220713.pdf
Lakewalk Media15 visualizações
Antimalarial agents-Medicinal Chemistry por NarminHamaaminHussen
Antimalarial agents-Medicinal ChemistryAntimalarial agents-Medicinal Chemistry
Antimalarial agents-Medicinal Chemistry
NarminHamaaminHussen6 visualizações
Antifungal agents-Medicinal Chemistry por NarminHamaaminHussen
Antifungal agents-Medicinal Chemistry Antifungal agents-Medicinal Chemistry
Antifungal agents-Medicinal Chemistry
NarminHamaaminHussen7 visualizações
FIESTAS DE QUITO.pdf por eluniversocom
FIESTAS DE QUITO.pdfFIESTAS DE QUITO.pdf
FIESTAS DE QUITO.pdf
eluniversocom15 visualizações
Sudden Deafness Design Document por wyfangherman
Sudden Deafness Design DocumentSudden Deafness Design Document
Sudden Deafness Design Document
wyfangherman48 visualizações
Doing Footwear - Footwear Factory por Doing Footwear
Doing Footwear - Footwear FactoryDoing Footwear - Footwear Factory
Doing Footwear - Footwear Factory
Doing Footwear11 visualizações
Designing Effective AR Experiences por Kumar Ahir
Designing Effective AR ExperiencesDesigning Effective AR Experiences
Designing Effective AR Experiences
Kumar Ahir5 visualizações
Big Deal Curmel Moton Shirt por brandshop1
Big Deal Curmel Moton ShirtBig Deal Curmel Moton Shirt
Big Deal Curmel Moton Shirt
brandshop19 visualizações
SS25 Fashion Key Items trend book por Peclers Paris
SS25 Fashion Key Items trend bookSS25 Fashion Key Items trend book
SS25 Fashion Key Items trend book
Peclers Paris148 visualizações
Figma Prototype A to Z.pdf por Atiqur Rahaman
Figma Prototype A to Z.pdfFigma Prototype A to Z.pdf
Figma Prototype A to Z.pdf
Atiqur Rahaman18 visualizações
Here_Process book por nykimstudio
Here_Process bookHere_Process book
Here_Process book
nykimstudio16 visualizações
evidence .pptx por npgkddpbpd
evidence .pptxevidence .pptx
evidence .pptx
npgkddpbpd10 visualizações
TISFLEET WEB DESIGN PROJECT por Rabius Sany
TISFLEET WEB DESIGN PROJECTTISFLEET WEB DESIGN PROJECT
TISFLEET WEB DESIGN PROJECT
Rabius Sany39 visualizações
Anti-Cancer Drugs-Medicinal Chemistry por NarminHamaaminHussen
Anti-Cancer Drugs-Medicinal ChemistryAnti-Cancer Drugs-Medicinal Chemistry
Anti-Cancer Drugs-Medicinal Chemistry
NarminHamaaminHussen9 visualizações
Design System in Figma A to Z.pdf por Atiqur Rahaman
Design System in Figma A to Z.pdfDesign System in Figma A to Z.pdf
Design System in Figma A to Z.pdf
Atiqur Rahaman22 visualizações
Scopic UX Design Test Task.pdf por Atiqur Rahaman
Scopic UX Design Test Task.pdfScopic UX Design Test Task.pdf
Scopic UX Design Test Task.pdf
Atiqur Rahaman302 visualizações
Benzodiazepines--Medicinal Chemistry por NarminHamaaminHussen
Benzodiazepines--Medicinal ChemistryBenzodiazepines--Medicinal Chemistry
Benzodiazepines--Medicinal Chemistry
NarminHamaaminHussen7 visualizações
My Creative Resume DIAPOS.pptx por BrayanQuispe23
My Creative Resume DIAPOS.pptxMy Creative Resume DIAPOS.pptx
My Creative Resume DIAPOS.pptx
BrayanQuispe2318 visualizações
IEC 600068-2-39 ENVIROMENT TESTING COMBINED TEMPERATURE LOW HUMIDTY.pdf por NirmalanGanapathy1
IEC 600068-2-39 ENVIROMENT TESTING COMBINED TEMPERATURE LOW HUMIDTY.pdfIEC 600068-2-39 ENVIROMENT TESTING COMBINED TEMPERATURE LOW HUMIDTY.pdf
IEC 600068-2-39 ENVIROMENT TESTING COMBINED TEMPERATURE LOW HUMIDTY.pdf
NirmalanGanapathy19 visualizações

RECOMMENDED SCOPE OF GEOTECHNICAL WORK AND FEES FOR DESIGN OF INGROUND SWIMMING POOLS.pdf

  • 2. CHALLENGING SUBSOIL CONDITIONS Due to the treacherous subsoil conditions in the Gulf Coast area, characterized by loose sands and expansive clays, it is essential to conduct a thorough geotechnical investigation before designing and constructing inground swimming pools.
  • 3. SHALLOW GROUNDWATER ASSESSMENT Given the presence of shallow groundwater in the region, assessing groundwater levels is crucial during the geotechnical exploration to understand its impact on pool construction.
  • 4. STRUCTURAL CONSIDERATIONS The geotechnical investigation should encompass an evaluation of structural considerations, as pools built in expansive clays can experience substantial movement problems and structural distress if not properly designed.
  • 5. DRAINAGE AND SLOPE ANALYSIS Comprehensive pool design should take into account factors such as drainage, the presence of trees, and slope conditions on the site to mitigate potential issues.
  • 6. HOUSTON AREA POOLS Recognizing the prevalence of inground swimming pools in the Houston area, it's imperative to address the issues of movement and cracking that some pools in the region have experienced. The study aims to establish best practices for the design and construction of pools to safeguard public safety and the interests of pool contractors.
  • 7. GEOTECHNICAL EXPLORATION AND SOIL BORINGS The geotechnical engineer licensed in the State of Texas should conduct a geotechnical exploration. This exploration will involve drilling soil borings at the pool's intended location. The depth of these borings should be at least twice the depth of the pool, with a minimum depth of 20 feet.
  • 8. BORING REQUIREMENTS Depending on the pool's size, the number of borings required should be determined. For pools under 3000 sq. ft., a minimum of two borings is recommended. For larger pools exceeding 3000 sq. ft., additional borings should be performed, with at least one boring for every additional 1500 sq. ft. of pool area. These borings are critical for assessing the subsurface conditions and ensuring safe and reliable pool construction.