SlideShare a Scribd company logo
1 of 39
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy




        Environmental Consideration



                               27th July, 2007


                     Kenichi KURAMOTO
                       Environment Assessment
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
          Intensive Learning Session on Urban Planning under Market Economy




                Contents of This Session


• Part I           :Environmental Impact Assessment



• Part II          :Environmental City Planning




                                                                                            2
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy




                  Part I :
      Environmental Impact Assessment




                                                                                          3
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy


            What is Environmental Impact
                Assessment (EIA)?
• Purpose of EIA is:
    – To mitigate negative impact and to strengthen
      positive impact caused by project.

                                                 n      t
                                            e me
         Project Purpose                 rov
                                      Im
                                        p                   Human Life
                                                            Economy
                                                            Transportation
                                                            Natural Resource
         Project Activity             Ag                    Ecology
                                        gra
                                           va
                                              ti   on



                                                                                          4
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
            Intensive Learning Session on Urban Planning under Market Economy



                                General EIA
Generally, EIA is executed related to a certain project during feasibility
study or design stage. It is for environmental permission. → Project-
Level Assessment
Time Schedule
 Planning Stage                                 Feasibility Study        Design Stage

   Policy         Planning        Master Plan
                                   Program

                                                 Project A
                                                                   EIA

                                                             Project B
                                                                             EIA
                                                 Project C
                                                                   EIA
                                                                                             5
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
          Intensive Learning Session on Urban Planning under Market Economy


What is Weakness of Project-Level Assessment?
1. Limited feedback and modification to planning
   (Limited within project design)
         Changing installed Facility        :Possible
                    construction method     :Possible
                    project location        :Difficult
          Cancelling project                :Difficult
 Policy        Planning        Master Plan
                                Program


  X                 X                         Project A

                                                  O
                                                                EIA

                                                          Project B

                                                                          EIA
                                              Project C
                                                                EIA
                                                                                           6
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
         Intensive Learning Session on Urban Planning under Market Economy


What is Weakness of Project-Level Assessment?
2. Limited assessment against accumulative impact caused by multiple
    activity.

Project B : Bridge Construction
Small Water Impact                                          Project A : Power Plant
                                                            Medium Water Impact




                                                       River




                                                        Project C : Complex Building
      Small Water Impact?                               Small Water Impact

                                                                                           7
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
          Intensive Learning Session on Urban Planning under Market Economy

What is Weakness of Project-Level Assessment?
 3. Limited Consensus Building because EIA is executed for each project

Project B : Bridge Construction
                                                            Project A : Power Plant




                                             We agree


                      We agree                         River


                                             We agree


                                                        Project C : Complex Building
           We agree?



                                                                                            8
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy


   Strategic Environmental Assessment
                   (SEA)
• SEA aims at strengthening environmental
  impact assessment system.
• Key Points of SEA
    – Planned-Level Assessment : Recommendation
      can be reflected to planning.
    – Public Disclose and Involvement : Securing
      Transparency and Fairness.
    – Comprehensive Assessment : Applicable
      evaluation for multiple project.



                                                                                          9
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy




                             EIA vs SEA
                            EIA                                SEA
                    (Project-Level EIA)                 (Planned-Level EIA)
Weakness •Limited feedback and                       •Non-detailed evaluation
                 recommendation to                   •Complicated procedure
                 planning                            •Affect to (private)
                •Limited accumulative                 business activities
                 evaluation
                •Limited consensus
                 building
Advantag        •Technically detailed                •Transparency and
e                evaluation                          fairness
                •Easy establishing                   •Accumulative evaluation
                 mitigation program                  •Easy feedback to
                                                      planning

                                                                                          10
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy



                          Points of SEA
• Comprehensive Impact Assessment
   – Overall evaluation for multiple project
   – Aiming at accumulating impact, not detailed
     evaluation for individual project.
• Public Involvement for Consensus Building
   – Partnership with residents, NGOs, Academics, e.g.
• Feedback to Planning
   – Evaluation of alternatives, with/without project
• Feedback to project-level assessment
   – Scoping for EIA for environmental permission

                                                                                          11
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy


          Strategic Environmental Assessment
Time Schedule

    Planning Stage                             Feasibility Study        Design Stage

              FRAMEWORK
        Policy, Plan and Program
                  Government
                  Developer
                                                             Project A
                                                                 EIA

          Citizens              NGOs                                 Project B
        Stakeholder           Academics
                                                                            EIA
                                                              Project C
                                                                  EIA
      Strategic Environmental Assessment
                                                                                          12
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
            Intensive Learning Session on Urban Planning under Market Economy


                       Structure of SEA (1)
                                      Screening
                            Necessary of SEA?



  Consultation                                                         Integration with
                                        Scoping
Public Involvement                                                       Policy, Plan
                             What is Purpose of policy and
                             plan?
                             What issues shall be assessed?
                             What method is suitable for
                             evaluation?


                               Impact Forecast and
                                   Evaluation
                             What is significant impact?
                             How can be mitigated?
                             How to monitor after decision
                             making?


                                                                                              13
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
           Intensive Learning Session on Urban Planning under Market Economy


                      Structure of SEA (2)
                                           Review
                              Alternative plans are evaluated?
                              Impact forecast and its method
                              are clearly presented?


  Consultation                                                           Integration with
                                  Decision making                          Policy & Plan
Public Involvement
                              Is the SEA integrated with
                              policy/planning process?
                              Is the SEA related to EIA process?
                              Is the SEA appropriately
                              considered with decision making?

                                Implementation and
                                    Monitoring
                              Is it clear how the policy/plan shall be
                              implemented ?
                              Is recommendation on monitoring
                              appropriately addressed?
                              Is there mechanism to correct serious
                              problems?
                                                                                             14
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy



           Case Study of SEA (Japan)
• Approach on Innovation of SEA System in
  Japan
    – Local governments have led to innovating SEA
      system prior to national government.
    – EIA procedures are different from each local
      government (type/scale of project, e.g.)
    – National government (Ministry of Environment)
      established guideline for SEA in 2007.
    – Previously, Ministry of Land, Infrastructure and
      Transport has established Procedural Guideline
      for Public Involvement from Planning Stage.


                                                                                          15
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy



 Case Study on Waste Dumping Site
Purpose of Planning
To establish basic program on Facility Improvement for Urban
waste
Investigative Commission among stakeholders has been
established.
In the commission, Possibility of renovation of existing sites and
3R (Reuse, Recycle and Reduction) was investigated. Then
Necessary capacity of dumping site are estimated based on
above approach. → Assessment of without case

Outcome of Planning (expected project)
Construction of dumping site for domestic waste (Capacity :
3,000,000 m3)




                                                                                          16
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy



          Location Map of Case Study
                                Road


         Alternative A
                                                                             Forest

                                                                        Agricultural Area
                                       Alternative B            Road
                                                                        Residential Area

                                                                        Commercial Zone
                                                             River
                                                                        Reclaimed Area




                         Road
                                        Alternative C


                                                Existing
                                              Dumping Site   Mountain
                                                                                            17
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy



   Case Study on Waste Dumping Site(2)
Natural and Social Condition in the Area
Large traffic volume generates noise disturbance and serious
traffic congestion.
There are wide reclaimed sites existing in coastal area.
There are various endangered insects, amphibians living.
There is good spring water area registered as the best spring
water
There are various visually significant areas, also nature park, also
some area is categorized as traditional residential area,
forest/agricultural land, e.g.
The location is reside commutable area of inner city, so that
population is on the increase.

Major Environmental Issues
 Improvement of living environment (air pollution, noise/vibration
disturbance) along roads.
Conservation of natural environment (nature park, forest,
landscape)
                                                                                          18
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy



   Case Study on Waste Dumping Site(3)

Recommendation and Requirement from Residents
Vehicles to dumping site shall avoid from driving inner city road.
Dumping site shall not be constructed beside our area.
Location shall avoid beside environmentally rich site where is
used for extra education program.
Acceleration of traffic congestion shall strictly be prohibited.




                                                                                          19
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
          Intensive Learning Session on Urban Planning under Market Economy


     Case Study on Waste Sumping Site(4)
               Alternative Plan
                     Location           Point
Plan A               Coastal area Avoiding of residential zone.
                                   Conserving of natural environment in
                                   mountain area.
Plan B               Alluvial area Minimizing traffic disturbance.


Plan C               Mountain           Saving project cost
                     area

Without Project According to investigation under Commission, it was
                resulted that existing dumping site will not meet
                demand on waste dumping.



                                                                                            20
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy


 Case Study on Waste Repository Site(5)
            Alternative Plan
Evaluation Item                   Plan A             Plan B               Plan C

Air Condition                        N                  SI                    I

Water Condition
        Surface                       I                  I                   I
        Underground                                                          SI
Soil Condition,                                          I
Geography
Ecosystem                                               N                    SI

Landscape                             I                 N

Amenity                                                  I                   N
SI: Significant Impact, I: Impact, N: No or Little Impact

                                                                                          21
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
          Intensive Learning Session on Urban Planning under Market Economy


   Case Study on Waste Repository Site(6)
              Alternative Plan
Evaluation Item                            Plan A            Plan B            Plan C
Environmental Impact to be            Coastal Water       Air Condition    Air Condition
Considered                            Landscape           River Water      River/Undergro
                                                          Topography       und Water
                                                          Geography        Ecosystem
                                                          Amenity
Consistency between
Environmental Conservation Policy
Living Environment along Road                 =                  0                 0
Conservation of natural                       0                  0                ==
Environment
in Mountain Area
0: No Change, =: Predicted Aggravation, ==: Predicted Serious Aggravation




                                                                                            22
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy



Environmental Consideration under Japan
        Assistance (JICA/JBIC)
• Relationship between JICA and JBIC
    – IEE level preliminary study is conducted under JICA Master
      Plan Study
    – Public consultation is supported by JICA study.
    – Scoping process of EIA conducted by recipient government
      is executed for developing JBIC project
• Points of Environmental Consideration
    – Planned-level assessment from policy/planning stage (JICA
      Master Plan Study)
    – Public involvement and disclose aiming consensus building,
      transparency and fairness.
    – Obligation of Approval on EIA preceding project
      implementation
    – Special attention on social environment (Involuntary
      resettlement, Gender, Infectious disease, e.g.)

                                                                                          23
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
           Intensive Learning Session on Urban Planning under Market Economy



                Procedure under JBIC Project
                       Recipient Government                    JBIC
       Disclosure of       Preparation of
           EIA                Project
Supported                                                   Examination of
under JICA Project        Request of Loan
                                                               Project

                            Submission of                                                Disclosure
                                                           Screening,                    Screening
                           Screening Form              Categorizing Project                Result
                                               Category C               Category A, B
                                                                        Category FI

                             Submission                       Implementation            Provision of
                                                                                        information
                               of EIA                           of Review

                                                                                        Disclosure of
                           Implementation              Decision of Finance,               Review
                            of the Project              Loan Agreement
                                                                                                        24
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy



          Procedure after Commencement

                  Recipient Government                    JBIC

                                                                                Disclosure of
                                                   Decision of Finance,           Review
                       Implementation               Loan Agreement                process
                        of the Project
                                                        Monitoring


                                                     Post Evaluation
                         Completion
                                                       Follow Up


                                                        Feed Back



                                                                                                25
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy




                       Part II :
               Environment City Planning




                                                                                          26
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
                  Intensive Learning Session on Urban Planning under Market Economy




                      Environment City Planning
         • Environmental Consideration based on EIA
           System
                – Mitigating negative impact caused by city planning
                  (passive consideration)
                                        Reduction of green/water zone




                                                                                           under the Project
                    Project
                                        Air Pollution
City Planning




                                                                                              Mitigation
                    Project             Traffic disturbance

                    Project             Noise/Vibration disturbance
                                        Solid Waste
                    Project
                                        Micro/Global Climate

                                                                                                               27
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
             Intensive Learning Session on Urban Planning under Market Economy




             Environment City Planning (2)
• What is Environment City Planning?
   – City Planning considering with economy, ecology and
     community development (active consideration)
   – Environmentally sustainability and symbiosis – Eco City
   – Public Involvement




                                                                                     Environmental Problem
                                     Greening, creating environment




                                                                                        on City Planning
   City Planning                     Natural resource conservation
                                     Urban transportation system
   Project

             Project

                       Project




                                     Energy conservation, 3R
                                     Zoning considering natural
                                     resources


                                                                                                             28
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy




Case Study of Environment City Planning


• Concept of Eco-City
    – Zoning based on land use and natural
      environment condition




                                                                                          29
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
          Intensive Learning Session on Urban Planning under Market Economy



                                    Zoning
                          Urban Center                Area A: New urban center and
       Build-up Area
                                                      large scale development area
                                                      Area B: Complex area of high
                                                      density urban area and build-up
Suburbs                                               area
                                                      Area C: Suburbs, outskirts

       Area
       C




                                  Area
                                  B




                                      Area
                                      A                                                    30
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy




     Concept of Area A Development

• Accumulation of high-level city function
  including government-related
  organization.
• Improvement of transportation network
  crossing urban area.
• Beneficial use of open space
• Energy saving system
• Environmentally friendly development

                                                                                          31
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy




 Concept of Area A Development (2)



                          Private Space

                               Semi-public Space


                                Public Space



 Road
                                                                         Road



                                      Parking


                                                                                          32
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy




     Concept of Area B Development

• Landscape consideration between
  traditional heritage and urbanized
  business area.
• Improvement of living environment on
  air and water conditions.
• Road management improvement.



                                                                                          33
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
                   Intensive Learning Session on Urban Planning under Market Economy




      Concept of Area B Development (2)
Tree-line
Street
                                                                 Breeze


                                    e   ze
                                Bre
                                             B
                                                                     D
                                                     C                   C




                                                             B
      B re e z e




                                                                                   Breez
                                                                                   e
                                                                     D
                            B
                                                 D
                                                                         C

                                                         C




                                                                             Pocket Park


                                                                                               34
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy




     Concept of Area C Development

• Land readjustment concentrating on
  residential area.
• Development harmonized with natural
  environment.
• Conservation of natural resources.




                                                                                          35
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy




 Concept of Area C Development (2)


       Residential
       Area
                                   Slope Green            Water Amenity Area
                                   Area



                Rainfall
               Infiltration
                                                                    Rive
                                                                    r




                                                                                          36
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy




                              Conclusion
• Strategic Assessment for Policy/Planning
  Stage
     – Feedback to policy/planning, and project-level EIA
• Passive Consideration to Active
  Consideration
  – Environmentally friendly and sustainable
    development
  – Environmental creation
• Public Involvement
  – Transparency and Fairness
  – Use various resource/knowledge from
    stakeholders
  – Share responsibility and obligation

                                                                                          37
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy


Environmental Points on City Planning in
          Urlaanbaatar City
• Air pollution: especially in winter season
  caused by activity in Ger Area.
• Water shortage: water resource will not meet
  water demand in 2015.
• Water pollution in Tuul River: especially west
  side (down stream).
• Lack of sewage management
• Spring Water Pollution caused by sewage
  facility.
• Soil contamination, e.g.

                                                                                          38
The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS)
        Intensive Learning Session on Urban Planning under Market Economy




           Thank you for Attention




                                                                                          39

More Related Content

What's hot

Intensive learning session hosomi
Intensive learning session hosomiIntensive learning session hosomi
Intensive learning session hosomi
Bayar Tsend
 
Urban planning in japan (nagayama)ubmps
Urban planning in japan (nagayama)ubmpsUrban planning in japan (nagayama)ubmps
Urban planning in japan (nagayama)ubmps
Bayar Tsend
 
Presentation0724
Presentation0724Presentation0724
Presentation0724
Bayar Tsend
 
Bus procurement
Bus procurement Bus procurement
Bus procurement
AMIT BHARTI
 
High Rise Towers Detailed Plans | Amman Institute
High Rise Towers Detailed Plans | Amman InstituteHigh Rise Towers Detailed Plans | Amman Institute
High Rise Towers Detailed Plans | Amman Institute
Amman Institute
 
Shi Nan. Central government's role in planning
Shi Nan. Central government's role in planning Shi Nan. Central government's role in planning
Shi Nan. Central government's role in planning
moscowuforum
 
A City with a Soul... growing smartly (CIS) | Amman Institute
A City with a Soul... growing smartly (CIS) | Amman InstituteA City with a Soul... growing smartly (CIS) | Amman Institute
A City with a Soul... growing smartly (CIS) | Amman Institute
Amman Institute
 
Connect PB Summary Report
Connect PB Summary ReportConnect PB Summary Report
Connect PB Summary Report
Crowdbrite
 
Amman 2025 From Master Plan to Strategic Initiative | Amman Institute
Amman 2025 From Master Plan to Strategic Initiative | Amman Institute Amman 2025 From Master Plan to Strategic Initiative | Amman Institute
Amman 2025 From Master Plan to Strategic Initiative | Amman Institute
Amman Institute
 
June 28, 2012 Transportation Advisory Group Presentation
June 28, 2012 Transportation Advisory Group PresentationJune 28, 2012 Transportation Advisory Group Presentation
June 28, 2012 Transportation Advisory Group Presentation
Jing Zhang, AICP
 
Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...
Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...
Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...
journal ijrtem
 
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman InstituteDevelopment manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
Amman Institute
 

What's hot (20)

Intensive learning session hosomi
Intensive learning session hosomiIntensive learning session hosomi
Intensive learning session hosomi
 
Urban planning in japan (nagayama)ubmps
Urban planning in japan (nagayama)ubmpsUrban planning in japan (nagayama)ubmps
Urban planning in japan (nagayama)ubmps
 
Presentation0724
Presentation0724Presentation0724
Presentation0724
 
Bus procurement
Bus procurement Bus procurement
Bus procurement
 
Cdp imphal
Cdp imphalCdp imphal
Cdp imphal
 
Cradle City Master Plan 30 June 08 Phase 1
Cradle City Master Plan 30 June 08   Phase 1Cradle City Master Plan 30 June 08   Phase 1
Cradle City Master Plan 30 June 08 Phase 1
 
High Rise Towers Detailed Plans | Amman Institute
High Rise Towers Detailed Plans | Amman InstituteHigh Rise Towers Detailed Plans | Amman Institute
High Rise Towers Detailed Plans | Amman Institute
 
Shi Nan. Central government's role in planning
Shi Nan. Central government's role in planning Shi Nan. Central government's role in planning
Shi Nan. Central government's role in planning
 
Elaboration of integrated cultural heritage management plans (conference in G...
Elaboration of integrated cultural heritage management plans (conference in G...Elaboration of integrated cultural heritage management plans (conference in G...
Elaboration of integrated cultural heritage management plans (conference in G...
 
A City with a Soul... growing smartly (CIS) | Amman Institute
A City with a Soul... growing smartly (CIS) | Amman InstituteA City with a Soul... growing smartly (CIS) | Amman Institute
A City with a Soul... growing smartly (CIS) | Amman Institute
 
Connect PB Summary Report
Connect PB Summary ReportConnect PB Summary Report
Connect PB Summary Report
 
Amman 2025 From Master Plan to Strategic Initiative | Amman Institute
Amman 2025 From Master Plan to Strategic Initiative | Amman Institute Amman 2025 From Master Plan to Strategic Initiative | Amman Institute
Amman 2025 From Master Plan to Strategic Initiative | Amman Institute
 
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
 
June 28, 2012 Transportation Advisory Group Presentation
June 28, 2012 Transportation Advisory Group PresentationJune 28, 2012 Transportation Advisory Group Presentation
June 28, 2012 Transportation Advisory Group Presentation
 
Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...
Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...
Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...
 
Development manual for HDMU | Amman Institute
Development manual for HDMU | Amman InstituteDevelopment manual for HDMU | Amman Institute
Development manual for HDMU | Amman Institute
 
Session 46 Helena Kyster-Hansen
Session 46 Helena Kyster-HansenSession 46 Helena Kyster-Hansen
Session 46 Helena Kyster-Hansen
 
Urban Density Analysis wrt Roads using GIS & Imagery
Urban Density Analysis wrt Roads using GIS & ImageryUrban Density Analysis wrt Roads using GIS & Imagery
Urban Density Analysis wrt Roads using GIS & Imagery
 
Portfolio 2009
Portfolio 2009Portfolio 2009
Portfolio 2009
 
dr. yap
 dr. yap dr. yap
dr. yap
 

Viewers also liked

Taniltsuulga mongol 26 feb 2013.new era of public transportation.
Taniltsuulga mongol 26 feb 2013.new era of public transportation.Taniltsuulga mongol 26 feb 2013.new era of public transportation.
Taniltsuulga mongol 26 feb 2013.new era of public transportation.
Bayar Tsend
 
презентаци 10162013
презентаци 10162013презентаци 10162013
презентаци 10162013
Bayar Tsend
 
1[1].land readjustment mongolia
1[1].land readjustment mongolia1[1].land readjustment mongolia
1[1].land readjustment mongolia
Bayar Tsend
 
Adb 28.06.13 mongol
Adb 28.06.13 mongolAdb 28.06.13 mongol
Adb 28.06.13 mongol
Bayar Tsend
 
Land use plan and land management eng
Land use plan and land management engLand use plan and land management eng
Land use plan and land management eng
Bayar Tsend
 
Architecture and Planning of jaipur
Architecture and Planning of jaipurArchitecture and Planning of jaipur
Architecture and Planning of jaipur
saumyakohli
 

Viewers also liked (7)

Taniltsuulga mongol 26 feb 2013.new era of public transportation.
Taniltsuulga mongol 26 feb 2013.new era of public transportation.Taniltsuulga mongol 26 feb 2013.new era of public transportation.
Taniltsuulga mongol 26 feb 2013.new era of public transportation.
 
презентаци 10162013
презентаци 10162013презентаци 10162013
презентаци 10162013
 
1[1].land readjustment mongolia
1[1].land readjustment mongolia1[1].land readjustment mongolia
1[1].land readjustment mongolia
 
Adb 28.06.13 mongol
Adb 28.06.13 mongolAdb 28.06.13 mongol
Adb 28.06.13 mongol
 
Land use plan and land management eng
Land use plan and land management engLand use plan and land management eng
Land use plan and land management eng
 
Architecture and Planning of jaipur
Architecture and Planning of jaipurArchitecture and Planning of jaipur
Architecture and Planning of jaipur
 
Jaipur master plan review
Jaipur master plan reviewJaipur master plan review
Jaipur master plan review
 

Similar to Environment eng

TA-7779 Inception Workshop
TA-7779 Inception WorkshopTA-7779 Inception Workshop
TA-7779 Inception Workshop
Son Ha-Dang
 
Colombo port expansion project (2)
Colombo port expansion project (2)Colombo port expansion project (2)
Colombo port expansion project (2)
D.S. Chandrasiri
 
Urban CDM Challenges & Opportunities-Kim
Urban CDM Challenges & Opportunities-KimUrban CDM Challenges & Opportunities-Kim
Urban CDM Challenges & Opportunities-Kim
ICLEI
 
Launch Presentation Eng
Launch Presentation EngLaunch Presentation Eng
Launch Presentation Eng
slpmn
 
Theoretical Risk Identification within the Nigeria East- West Coastal Highway...
Theoretical Risk Identification within the Nigeria East- West Coastal Highway...Theoretical Risk Identification within the Nigeria East- West Coastal Highway...
Theoretical Risk Identification within the Nigeria East- West Coastal Highway...
civejjour
 

Similar to Environment eng (20)

Erakv news2
Erakv news2Erakv news2
Erakv news2
 
NPTEL SWM course Week 2 Q Bank part (3) of 7.pdf
NPTEL SWM course Week 2 Q Bank part (3) of 7.pdfNPTEL SWM course Week 2 Q Bank part (3) of 7.pdf
NPTEL SWM course Week 2 Q Bank part (3) of 7.pdf
 
1. Erakv 2nd seminar: Introduction of the project and its overall progress
1. Erakv 2nd seminar: Introduction of the project and its overall progress1. Erakv 2nd seminar: Introduction of the project and its overall progress
1. Erakv 2nd seminar: Introduction of the project and its overall progress
 
NPTEL SWM course Week 2 Q Bank part (4) of 7.pdf
NPTEL SWM course Week 2 Q Bank part (4) of 7.pdfNPTEL SWM course Week 2 Q Bank part (4) of 7.pdf
NPTEL SWM course Week 2 Q Bank part (4) of 7.pdf
 
Introduction and overall progress
Introduction and overall progressIntroduction and overall progress
Introduction and overall progress
 
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNGBIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
 
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
 
TA-7779 Inception Workshop
TA-7779 Inception WorkshopTA-7779 Inception Workshop
TA-7779 Inception Workshop
 
Colombo port expansion project (2)
Colombo port expansion project (2)Colombo port expansion project (2)
Colombo port expansion project (2)
 
Evaluating Urban Renewal in India: What questions to ask of the JNNURM
Evaluating Urban Renewal in India: What questions to ask of the JNNURMEvaluating Urban Renewal in India: What questions to ask of the JNNURM
Evaluating Urban Renewal in India: What questions to ask of the JNNURM
 
Urban CDM Challenges & Opportunities-Kim
Urban CDM Challenges & Opportunities-KimUrban CDM Challenges & Opportunities-Kim
Urban CDM Challenges & Opportunities-Kim
 
Pezzagno & Bulferetti - input2012
Pezzagno & Bulferetti - input2012Pezzagno & Bulferetti - input2012
Pezzagno & Bulferetti - input2012
 
1 erakv 3nd seminar_outline and results of the project
1 erakv 3nd seminar_outline and results of the project1 erakv 3nd seminar_outline and results of the project
1 erakv 3nd seminar_outline and results of the project
 
Launch Presentation Eng
Launch Presentation EngLaunch Presentation Eng
Launch Presentation Eng
 
What we can do - Seongbak Wi
What we can do - Seongbak WiWhat we can do - Seongbak Wi
What we can do - Seongbak Wi
 
[JICA ERAKV] 4th Newletter (Final)
[JICA ERAKV] 4th Newletter (Final)[JICA ERAKV] 4th Newletter (Final)
[JICA ERAKV] 4th Newletter (Final)
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...
 
Full Eecs Report Draft 11 05 2009
Full Eecs Report Draft 11 05 2009Full Eecs Report Draft 11 05 2009
Full Eecs Report Draft 11 05 2009
 
Theoretical Risk Identification within the Nigeria East- West Coastal Highway...
Theoretical Risk Identification within the Nigeria East- West Coastal Highway...Theoretical Risk Identification within the Nigeria East- West Coastal Highway...
Theoretical Risk Identification within the Nigeria East- West Coastal Highway...
 
Theoretical risk identification within
Theoretical risk identification withinTheoretical risk identification within
Theoretical risk identification within
 

More from Bayar Tsend

матрын ордны ерөнхий шинж
матрын ордны ерөнхий шинжматрын ордны ерөнхий шинж
матрын ордны ерөнхий шинж
Bayar Tsend
 
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
Bayar Tsend
 
ТУСГАЙ ЗАМЫН АВТОБУС 20150904
ТУСГАЙ ЗАМЫН АВТОБУС 20150904 ТУСГАЙ ЗАМЫН АВТОБУС 20150904
ТУСГАЙ ЗАМЫН АВТОБУС 20150904
Bayar Tsend
 
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛАЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ
Bayar Tsend
 
БАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ
БАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛБАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ
БАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ
Bayar Tsend
 
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
Bayar Tsend
 
УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...
УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...
УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...
Bayar Tsend
 
газар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулга
газар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулгагазар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулга
газар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулга
Bayar Tsend
 
ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...
ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...
ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...
Bayar Tsend
 

More from Bayar Tsend (20)

матрын ордны ерөнхий шинж
матрын ордны ерөнхий шинжматрын ордны ерөнхий шинж
матрын ордны ерөнхий шинж
 
2015 хагас жилийн тайлан
2015 хагас жилийн тайлан2015 хагас жилийн тайлан
2015 хагас жилийн тайлан
 
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
 
ТУСГАЙ ЗАМЫН АВТОБУС 20150904
ТУСГАЙ ЗАМЫН АВТОБУС 20150904 ТУСГАЙ ЗАМЫН АВТОБУС 20150904
ТУСГАЙ ЗАМЫН АВТОБУС 20150904
 
Гэр хорооллын дахин төлөвлөлтийн хувилбарууд
Гэр хорооллын дахин төлөвлөлтийн хувилбаруудГэр хорооллын дахин төлөвлөлтийн хувилбарууд
Гэр хорооллын дахин төлөвлөлтийн хувилбарууд
 
битумын контейнер
битумын контейнер битумын контейнер
битумын контейнер
 
Сайжруулсан асфальтыг авто замд ашиглах боломжууд
Сайжруулсан асфальтыг авто замд ашиглах боломжуудСайжруулсан асфальтыг авто замд ашиглах боломжууд
Сайжруулсан асфальтыг авто замд ашиглах боломжууд
 
Битумын контейнер/ Bitumen container
Битумын контейнер/ Bitumen containerБитумын контейнер/ Bitumen container
Битумын контейнер/ Bitumen container
 
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ 01
 
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛАЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ
АЗИЙН ХӨГЖЛИЙН БАНКТАЙ ХАМТРАН ХЭРЭГЖҮҮЛЖ БУЙ ТӨСӨЛ
 
БАЯНХОШУУ БА СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ ТАНИЛЦУУЛГА
БАЯНХОШУУ БА СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ ТАНИЛЦУУЛГАБАЯНХОШУУ БА СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ ТАНИЛЦУУЛГА
БАЯНХОШУУ БА СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ ТАНИЛЦУУЛГА
 
БАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ
БАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛБАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ
БАЯНХОШУУ СЭЛБЭ ДЭД ТӨВИЙГ ХӨГЖҮҮЛЭХ ТӨСӨЛ
 
УЛААНБААТАР НИЙТИЙН ТЭЭВЭР 2014
УЛААНБААТАР НИЙТИЙН ТЭЭВЭР 2014 УЛААНБААТАР НИЙТИЙН ТЭЭВЭР 2014
УЛААНБААТАР НИЙТИЙН ТЭЭВЭР 2014
 
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...Asphalt Binders Used  in Mongolia in the view of  Superpave Specification,jul...
Asphalt Binders Used in Mongolia in the view of Superpave Specification,jul...
 
УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...
УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...
УЛААНБААТАР ХОТЫН ГЭР ХОРООЛЛЫГ ХӨГЖҮҮЛЭХ, ХӨРӨНГӨ ОРУУЛАЛТЫГ ДЭМЖИХ ХӨТӨЛБӨР...
 
газар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулга
газар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулгагазар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулга
газар чөлөөлөлт ба нүүлгэн суурьшуулалтын танилцуулга
 
АВТО ЗАМЫН ЗАСВАР АРЧЛАЛТЫН СТРАТЕГИ Орчуулсан Ц.Баярсайхан 88115842
АВТО ЗАМЫН ЗАСВАР АРЧЛАЛТЫН СТРАТЕГИ Орчуулсан Ц.Баярсайхан 88115842АВТО ЗАМЫН ЗАСВАР АРЧЛАЛТЫН СТРАТЕГИ Орчуулсан Ц.Баярсайхан 88115842
АВТО ЗАМЫН ЗАСВАР АРЧЛАЛТЫН СТРАТЕГИ Орчуулсан Ц.Баярсайхан 88115842
 
ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...
ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...
ХҮЙТЭН ЦАГ АГААРЫН НӨХЦӨЛД ЦЕМЕНТ БЕТОН АВТО ЗАМ БАРИХ Орчуулсан Ц.Баярсайхан...
 
Accountability mechanism 06112012 mon
Accountability mechanism 06112012 monAccountability mechanism 06112012 mon
Accountability mechanism 06112012 mon
 
АВТО ЗАМЫН ЭЭЛЖИТ ЗАСВАР АРЧЛАЛТ Орчуулсан Ц.Баярсайхан 88115842
АВТО ЗАМЫН ЭЭЛЖИТ ЗАСВАР АРЧЛАЛТ Орчуулсан Ц.Баярсайхан 88115842АВТО ЗАМЫН ЭЭЛЖИТ ЗАСВАР АРЧЛАЛТ Орчуулсан Ц.Баярсайхан 88115842
АВТО ЗАМЫН ЭЭЛЖИТ ЗАСВАР АРЧЛАЛТ Орчуулсан Ц.Баярсайхан 88115842
 

Environment eng

  • 1. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Environmental Consideration 27th July, 2007 Kenichi KURAMOTO Environment Assessment
  • 2. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Contents of This Session • Part I :Environmental Impact Assessment • Part II :Environmental City Planning 2
  • 3. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Part I : Environmental Impact Assessment 3
  • 4. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy What is Environmental Impact Assessment (EIA)? • Purpose of EIA is: – To mitigate negative impact and to strengthen positive impact caused by project. n t e me Project Purpose rov Im p Human Life Economy Transportation Natural Resource Project Activity Ag Ecology gra va ti on 4
  • 5. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy General EIA Generally, EIA is executed related to a certain project during feasibility study or design stage. It is for environmental permission. → Project- Level Assessment Time Schedule Planning Stage Feasibility Study Design Stage Policy Planning Master Plan Program Project A EIA Project B EIA Project C EIA 5
  • 6. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy What is Weakness of Project-Level Assessment? 1. Limited feedback and modification to planning (Limited within project design) Changing installed Facility :Possible construction method :Possible project location :Difficult Cancelling project :Difficult Policy Planning Master Plan Program X X Project A O EIA Project B EIA Project C EIA 6
  • 7. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy What is Weakness of Project-Level Assessment? 2. Limited assessment against accumulative impact caused by multiple activity. Project B : Bridge Construction Small Water Impact Project A : Power Plant Medium Water Impact River Project C : Complex Building Small Water Impact? Small Water Impact 7
  • 8. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy What is Weakness of Project-Level Assessment? 3. Limited Consensus Building because EIA is executed for each project Project B : Bridge Construction Project A : Power Plant We agree We agree River We agree Project C : Complex Building We agree? 8
  • 9. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Strategic Environmental Assessment (SEA) • SEA aims at strengthening environmental impact assessment system. • Key Points of SEA – Planned-Level Assessment : Recommendation can be reflected to planning. – Public Disclose and Involvement : Securing Transparency and Fairness. – Comprehensive Assessment : Applicable evaluation for multiple project. 9
  • 10. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy EIA vs SEA EIA SEA (Project-Level EIA) (Planned-Level EIA) Weakness •Limited feedback and •Non-detailed evaluation recommendation to •Complicated procedure planning •Affect to (private) •Limited accumulative business activities evaluation •Limited consensus building Advantag •Technically detailed •Transparency and e evaluation fairness •Easy establishing •Accumulative evaluation mitigation program •Easy feedback to planning 10
  • 11. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Points of SEA • Comprehensive Impact Assessment – Overall evaluation for multiple project – Aiming at accumulating impact, not detailed evaluation for individual project. • Public Involvement for Consensus Building – Partnership with residents, NGOs, Academics, e.g. • Feedback to Planning – Evaluation of alternatives, with/without project • Feedback to project-level assessment – Scoping for EIA for environmental permission 11
  • 12. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Strategic Environmental Assessment Time Schedule Planning Stage Feasibility Study Design Stage FRAMEWORK Policy, Plan and Program Government Developer Project A EIA Citizens NGOs Project B Stakeholder Academics EIA Project C EIA Strategic Environmental Assessment 12
  • 13. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Structure of SEA (1) Screening Necessary of SEA? Consultation Integration with Scoping Public Involvement Policy, Plan What is Purpose of policy and plan? What issues shall be assessed? What method is suitable for evaluation? Impact Forecast and Evaluation What is significant impact? How can be mitigated? How to monitor after decision making? 13
  • 14. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Structure of SEA (2) Review Alternative plans are evaluated? Impact forecast and its method are clearly presented? Consultation Integration with Decision making Policy & Plan Public Involvement Is the SEA integrated with policy/planning process? Is the SEA related to EIA process? Is the SEA appropriately considered with decision making? Implementation and Monitoring Is it clear how the policy/plan shall be implemented ? Is recommendation on monitoring appropriately addressed? Is there mechanism to correct serious problems? 14
  • 15. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Case Study of SEA (Japan) • Approach on Innovation of SEA System in Japan – Local governments have led to innovating SEA system prior to national government. – EIA procedures are different from each local government (type/scale of project, e.g.) – National government (Ministry of Environment) established guideline for SEA in 2007. – Previously, Ministry of Land, Infrastructure and Transport has established Procedural Guideline for Public Involvement from Planning Stage. 15
  • 16. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Case Study on Waste Dumping Site Purpose of Planning To establish basic program on Facility Improvement for Urban waste Investigative Commission among stakeholders has been established. In the commission, Possibility of renovation of existing sites and 3R (Reuse, Recycle and Reduction) was investigated. Then Necessary capacity of dumping site are estimated based on above approach. → Assessment of without case Outcome of Planning (expected project) Construction of dumping site for domestic waste (Capacity : 3,000,000 m3) 16
  • 17. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Location Map of Case Study Road Alternative A Forest Agricultural Area Alternative B Road Residential Area Commercial Zone River Reclaimed Area Road Alternative C Existing Dumping Site Mountain 17
  • 18. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Case Study on Waste Dumping Site(2) Natural and Social Condition in the Area Large traffic volume generates noise disturbance and serious traffic congestion. There are wide reclaimed sites existing in coastal area. There are various endangered insects, amphibians living. There is good spring water area registered as the best spring water There are various visually significant areas, also nature park, also some area is categorized as traditional residential area, forest/agricultural land, e.g. The location is reside commutable area of inner city, so that population is on the increase. Major Environmental Issues Improvement of living environment (air pollution, noise/vibration disturbance) along roads. Conservation of natural environment (nature park, forest, landscape) 18
  • 19. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Case Study on Waste Dumping Site(3) Recommendation and Requirement from Residents Vehicles to dumping site shall avoid from driving inner city road. Dumping site shall not be constructed beside our area. Location shall avoid beside environmentally rich site where is used for extra education program. Acceleration of traffic congestion shall strictly be prohibited. 19
  • 20. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Case Study on Waste Sumping Site(4) Alternative Plan Location Point Plan A Coastal area Avoiding of residential zone. Conserving of natural environment in mountain area. Plan B Alluvial area Minimizing traffic disturbance. Plan C Mountain Saving project cost area Without Project According to investigation under Commission, it was resulted that existing dumping site will not meet demand on waste dumping. 20
  • 21. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Case Study on Waste Repository Site(5) Alternative Plan Evaluation Item Plan A Plan B Plan C Air Condition N SI I Water Condition Surface I I I Underground SI Soil Condition, I Geography Ecosystem N SI Landscape I N Amenity I N SI: Significant Impact, I: Impact, N: No or Little Impact 21
  • 22. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Case Study on Waste Repository Site(6) Alternative Plan Evaluation Item Plan A Plan B Plan C Environmental Impact to be Coastal Water Air Condition Air Condition Considered Landscape River Water River/Undergro Topography und Water Geography Ecosystem Amenity Consistency between Environmental Conservation Policy Living Environment along Road = 0 0 Conservation of natural 0 0 == Environment in Mountain Area 0: No Change, =: Predicted Aggravation, ==: Predicted Serious Aggravation 22
  • 23. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Environmental Consideration under Japan Assistance (JICA/JBIC) • Relationship between JICA and JBIC – IEE level preliminary study is conducted under JICA Master Plan Study – Public consultation is supported by JICA study. – Scoping process of EIA conducted by recipient government is executed for developing JBIC project • Points of Environmental Consideration – Planned-level assessment from policy/planning stage (JICA Master Plan Study) – Public involvement and disclose aiming consensus building, transparency and fairness. – Obligation of Approval on EIA preceding project implementation – Special attention on social environment (Involuntary resettlement, Gender, Infectious disease, e.g.) 23
  • 24. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Procedure under JBIC Project Recipient Government JBIC Disclosure of Preparation of EIA Project Supported Examination of under JICA Project Request of Loan Project Submission of Disclosure Screening, Screening Screening Form Categorizing Project Result Category C Category A, B Category FI Submission Implementation Provision of information of EIA of Review Disclosure of Implementation Decision of Finance, Review of the Project Loan Agreement 24
  • 25. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Procedure after Commencement Recipient Government JBIC Disclosure of Decision of Finance, Review Implementation Loan Agreement process of the Project Monitoring Post Evaluation Completion Follow Up Feed Back 25
  • 26. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Part II : Environment City Planning 26
  • 27. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Environment City Planning • Environmental Consideration based on EIA System – Mitigating negative impact caused by city planning (passive consideration) Reduction of green/water zone under the Project Project Air Pollution City Planning Mitigation Project Traffic disturbance Project Noise/Vibration disturbance Solid Waste Project Micro/Global Climate 27
  • 28. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Environment City Planning (2) • What is Environment City Planning? – City Planning considering with economy, ecology and community development (active consideration) – Environmentally sustainability and symbiosis – Eco City – Public Involvement Environmental Problem Greening, creating environment on City Planning City Planning Natural resource conservation Urban transportation system Project Project Project Energy conservation, 3R Zoning considering natural resources 28
  • 29. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Case Study of Environment City Planning • Concept of Eco-City – Zoning based on land use and natural environment condition 29
  • 30. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Zoning Urban Center Area A: New urban center and Build-up Area large scale development area Area B: Complex area of high density urban area and build-up Suburbs area Area C: Suburbs, outskirts Area C Area B Area A 30
  • 31. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Concept of Area A Development • Accumulation of high-level city function including government-related organization. • Improvement of transportation network crossing urban area. • Beneficial use of open space • Energy saving system • Environmentally friendly development 31
  • 32. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Concept of Area A Development (2) Private Space Semi-public Space Public Space Road Road Parking 32
  • 33. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Concept of Area B Development • Landscape consideration between traditional heritage and urbanized business area. • Improvement of living environment on air and water conditions. • Road management improvement. 33
  • 34. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Concept of Area B Development (2) Tree-line Street Breeze e ze Bre B D C C B B re e z e Breez e D B D C C Pocket Park 34
  • 35. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Concept of Area C Development • Land readjustment concentrating on residential area. • Development harmonized with natural environment. • Conservation of natural resources. 35
  • 36. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Concept of Area C Development (2) Residential Area Slope Green Water Amenity Area Area Rainfall Infiltration Rive r 36
  • 37. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Conclusion • Strategic Assessment for Policy/Planning Stage – Feedback to policy/planning, and project-level EIA • Passive Consideration to Active Consideration – Environmentally friendly and sustainable development – Environmental creation • Public Involvement – Transparency and Fairness – Use various resource/knowledge from stakeholders – Share responsibility and obligation 37
  • 38. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Environmental Points on City Planning in Urlaanbaatar City • Air pollution: especially in winter season caused by activity in Ger Area. • Water shortage: water resource will not meet water demand in 2015. • Water pollution in Tuul River: especially west side (down stream). • Lack of sewage management • Spring Water Pollution caused by sewage facility. • Soil contamination, e.g. 38
  • 39. The Study on City Master Plan and Urban Development Program of Ulaanbaatar City (UBMPS) Intensive Learning Session on Urban Planning under Market Economy Thank you for Attention 39