SlideShare a Scribd company logo
1 of 28
Download to read offline
Exceptional Dispatch Trends for
April – June 2009




Douglas Bergman, Ph.D.
Lead Market Monitoring Analyst,
ISO Department of Market Monitoring

MSC Meeting – General Session
July 16, 2009
Overview of Presentation


 The purpose of this analysis is to provide a
    Detailed review of trends in Exceptional Dispatch (ED) over the
     first three months of market operation;
    Detailed description of some of the primary reasons for ED; and
    Assessment of the hourly energy volumes of ED – as an
     indication of relative market impact.
 Presentation will cover
    Data limitations and interpretation
    Summary of Exceptional Dispatch by reason
    Detail on most prevalent Exceptional Dispatch reasons



                                California ISO PUBLIC             Slide 2
Data Limitations and Assumptions

 Data used in analysis are from ISO logging application
    Provides information about reason for ED and whether ED was “manual
     dispatch”, “Pre-IFM day-ahead”, “Post-IFM day-ahead”, or “real time”.
    Data are manually entered and not settlement quality
    Some assumptions were required in cases where data were not
     complete
 Analysis focuses on internal resources
    Dispatch of RMR resources via ED not considered
    Dispatch of intertie resources not considered
 Charts capture gross energy from ED and do not distinguish
  between “in-market” and “Out-of-Sequence”
 Analysis does not address instruction codes or settlement issues

                                   California ISO PUBLIC               Slide 3
Transmission outages, modeling gaps, and market
software issues are primary drivers of ED
                     Frequency (# of Unit Days) of ED by Reason for
                                          DA and RT (Apr - Jun 2009)
                Day Ahead                                                                             Real Time
                                     G-206 (San Diego
                                          Local)                                                                G-217 (South of
                                                                                                    Unit Testing    Lugo)
                                            G-217 (South of
                                                Lugo)
                                                                                     Transmission
                                                G-219 (SCE Orange                      Outages                                    Other
                                                  County Local)
Transmission
  Outages                                          G-233 (PG&E Bay
                                                     Area Local)
                                                                           T-165 (PG&E Rio
                                                                             Oso-Palermo
                                                                                 Area)
                                                                                T-138 (PG&E
                                               Other
                                                                               Humboldt Area)
                                                                                                                                  Ramp Rate
                                                                                      T-103 (SCIT)
           T-103 (SCIT)
                          SP26 Capacity                                                                  Software
                                                                                                         Limitation




                                                                     California ISO PUBLIC                                                Slide 4
Overall downward trend in frequency of day-ahead
ED since May.
          Weekly Frequency (Unit Days) by Reason – ED Day Ahead Unit Commitment

                100

                90

                80
                                                                                                        Transmission Outages
                70                                                                                      T-103 (SCIT)
                60                                                                                      SP26 Capacity
    Unit-Days




                                                                                                        G-233 (PG&E Bay Area Local)
                50
                                                                                                        G-219 (SCE Orange County Local)
                40                                                                                      G-217 (South of Lugo)
                30                                                                                      G-206 (San Diego Local)
                                                                                                        Other
                20

                10

                 0
                      3/29   4/5   4/12 4/19 4/26   5/3   5/10 5/17 5/24 5/31   6/7    6/14 6/21 6/28
                                                     Week Beginning



         Palo Verde-Devers and SWPL transmission outages was primary driver in May.
         Late June heat wave resulted in increased ED (“Other” category includes system capacity).



                                                                       California ISO PUBLIC                                          Slide 5
Overall downward trend in frequency of real-time
ED since May.
              Weekly Frequency (Unit Days) by Reason – Real-Time ED energy dispatch

              140


              120
                                                                                                       Unit Testing

              100                                                                                      Transmission Outages
                                                                                                       T-165 (PG&E Rio Oso - Palermo)
  Unit-Days




              80                                                                                       T-138 (PG&E Humboldt)
                                                                                                       T-103 (SCIT)
              60                                                                                       Software Limitation
                                                                                                       Ramp Rate
              40                                                                                       G-217 (South of Lugo)
                                                                                                       Other
              20

               0
                    3/29   4/5   4/12 4/19 4/26   5/3   5/10 5/17 5/24 5/31     6/7   6/14 6/21 6/28
                                                    Week Beginning




                                                                     California ISO PUBLIC                                        Slide 6
Hourly Profile of Energy from ED - April 2009
         800

                   Real Time Dispatch
         700
                   Day-Ahead Post-IFM
         600       Day-Ahead Pre-IFM

         500
    MW




         400

         300

         200

         100

           0
               1   2   3    4   5   6   7   8   9   10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
                                                       Hour Ending




 Average ED energy evenly split between minimum load and energy
  above minimum load.
 Pre-IFM ED commitment began April 20

                                                         California ISO PUBLIC                     Slide 7
Hourly Profile of Energy from ED -May 2009

         800
                   Real Time Dispatch
         700       Day-Ahead Post-IFM
                   Day-Ahead Pre-IFM
         600

         500
    MW




         400

         300

         200

         100

           0
               1     2   3   4   5      6   7   8   9   10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
                                                           Hour Ending




 Average hourly energy peaked in May - primarily from minimum load.
 Week of May 10 – most of ED commitment (PV-Devers and SWPL
   transmission outages).


                                                              California ISO PUBLIC                    Slide 8
Hourly Profile of Energy from ED - June 2009

     800

               Real Time Dispatch
     700
               Day-Ahead Post-IFM
     600       Day-Ahead Pre-IFM

     500
MW




     400

     300

     200

     100

       0
           1   2   3    4   5   6   7   8   9   10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
                                                   Hour Ending




  Energy from ED in June was half of May volume.
  Minimal energy over minimum load.

                                                       California ISO PUBLIC                   Slide 9
Monthly Duration Curves of Real-Time ED energy
instructions above Minimum Load
        1200
                                                                                 April
                                                                                 May
                                                                                 June
        1000




         800
                         Dispatch above minimum load
                              decreased through the quarter
                         Most high-MW hours in April
   MW




         600

                              limited to 3 days - due to ED for
         400
                              ramp rate

         200




           0
           100%   90%   80%    70%   60%     50%         40%             30%           20%       10%   0%
                                                                   Percentile Ranking of Hours




                                           California ISO PUBLIC                                            Slide 10
Exceptional Dispatch




       Profiles of Select Dispatch Reasons




                       California ISO PUBLIC   Slide 11
Exceptional Dispatch for Transmission Outages –
Frequency and Reasons
              Reasons                                                          Weekly Frequency
 Devers-Valley 500kv
                                                        100
     out April 6-29
                                                                                     RT
     up to 8 commitments/day                           90
                                                                                     Pre-IFM
 Devers-Palo Verde 500kv                               80                           Post-IFM
     out May 2-6
                                                        70
     up to 12 commitments/day
 SWPL                                                  60




                                            Unit-Days
     out May 8-18                                      50
     up to 11 commitments/day                          40
 Pittsburg 230kv bus                                   30
     out May 18-21
     1 commitment/day                                  20

 Contra Costa-Lone Tree (East Bay)                     10

     out May 23-June 10                                 0
     up to 3 commitments/day                                 3/29/2009

                                                                          4/5/2009

                                                                                       4/12/2009

                                                                                                   4/19/2009

                                                                                                               4/26/2009

                                                                                                                           5/3/2009

                                                                                                                                      5/10/2009

                                                                                                                                                  5/17/2009

                                                                                                                                                              5/24/2009

                                                                                                                                                                          5/31/2009

                                                                                                                                                                                      6/7/2009

                                                                                                                                                                                                 6/14/2009

                                                                                                                                                                                                             6/21/2009

                                                                                                                                                                                                                         6/28/2009
 Ignacio-Sobrante 230kv (East Bay)
     out May 30-June 6                                                                                                    Week Beginning
     up to 2 commitments/day



                                      California ISO PUBLIC                                                                                                                                                  Slide 12
Exceptional Dispatch for Transmission Outages –
Energy Volumes
                                           Weekly Energy (Gross MWh)
             6000
                                           RT
                                           Pre-IFM
             5000
                                           Post-IFM


             4000
       MWh




             3000



             2000



             1000



               0
                    3/29/2009

                                4/5/2009

                                            4/12/2009

                                                        4/19/2009

                                                                    4/26/2009

                                                                                5/3/2009

                                                                                           5/10/2009

                                                                                                       5/17/2009

                                                                                                                   5/24/2009

                                                                                                                               5/31/2009

                                                                                                                                           6/7/2009

                                                                                                                                                      6/14/2009

                                                                                                                                                                  6/21/2009

                                                                                                                                                                              6/28/2009
                                                                                 We ek Be ginning




                                                                                                California ISO PUBLIC                                                                     Slide 13
Exceptional Dispatch for Software Limitations –
Frequency & Reasons
          Reasons                                                            Weekly Frequency
                                                                                                                        RT

 Real-time reason only                     35

 Used to override erroneous                30                           RT

  software-generated startup                25
  and shutdown instructions.



                                Unit-Days
                                            20

 NOT due to failures in                    15

  automated dispatch system                 10
  communicating instructions.               5


                                            0    3/29/2009

                                                             4/5/2009

                                                                        4/12/2009

                                                                                    4/19/2009

                                                                                                4/26/2009

                                                                                                            5/3/2009

                                                                                                                       5/10/2009

                                                                                                                                   5/17/2009

                                                                                                                                               5/24/2009

                                                                                                                                                           5/31/2009

                                                                                                                                                                       6/7/2009

                                                                                                                                                                                  6/14/2009

                                                                                                                                                                                              6/21/2009

                                                                                                                                                                                                           6/28/2009
                                                                                                            Week Beginning




                                California ISO PUBLIC                                                                                                                                                     Slide 14
Exceptional Dispatch for Software Limitations –
Energy Volume
                               Weekly Energy (Gross MWh)

                                                                                             RT


                1400


                1200                            RT


                1000


                800
          MWh




                600


                400


                200


                  0
                       3/29/2009

                                   4/5/2009

                                              4/12/2009

                                                          4/19/2009

                                                                      4/26/2009

                                                                                  5/3/2009

                                                                                             5/10/2009

                                                                                                         5/17/2009

                                                                                                                     5/24/2009

                                                                                                                                 5/31/2009

                                                                                                                                             6/7/2009

                                                                                                                                                        6/14/2009

                                                                                                                                                                    6/21/2009

                                                                                                                                                                                6/28/2009
                                                                                   Week Beginning




                                                                                             California ISO PUBLIC                                                                          Slide 15
Exceptional Dispatch for G-206 (San Diego Local)
- Frequency & Reasons
           Reasons                                                            Weekly Frequency
                                                 12


 Unit commitment based on                       10
                                                                             Pre-IFM
                                                                             Post-IFM
   Operations Engineers’ daily
   transmission network                          8

   analysis



                                     Unit-Days
                                                 6

 Primarily for voltage support
                                                 4
   and contingencies
 Ongoing clearances in San                      2


   Diego area required support                   0
   through much of April and                                      4/5/2009




                                                                                                                   5/3/2009




                                                                                                                                                                              6/7/2009
                                                      3/29/2009



                                                                               4/12/2009

                                                                                           4/19/2009

                                                                                                       4/26/2009



                                                                                                                              5/10/2009

                                                                                                                                          5/17/2009

                                                                                                                                                      5/24/2009

                                                                                                                                                                  5/31/2009



                                                                                                                                                                                         6/14/2009

                                                                                                                                                                                                     6/21/2009

                                                                                                                                                                                                                  6/28/2009
   May
                                                                                                                   Week Beginning




                                  California ISO PUBLIC                                                                                                                                                          Slide 16
Exceptional Dispatch for G-206 (San Diego Local)
- Energy Volume
                                Weekly Energy (Gross MWh)
            1000

            900                           Pre-IFM
                                          Post-IFM
            800

            700

            600
      MWh




            500

            400

            300

            200

            100

              0
                   3/29/2009

                               4/5/2009

                                           4/12/2009

                                                       4/19/2009

                                                                   4/26/2009

                                                                               5/3/2009

                                                                                           5/10/2009

                                                                                                       5/17/2009

                                                                                                                   5/24/2009

                                                                                                                               5/31/2009

                                                                                                                                           6/7/2009

                                                                                                                                                      6/14/2009

                                                                                                                                                                  6/21/2009

                                                                                                                                                                              6/28/2009
                                                                                 We e k Be ginning




                                                                                          California ISO PUBLIC                                                                           Slide 17
Exceptional Dispatch for G-219 (SCE Orange
County Local) – Frequency and Reasons
          Reasons                                                           Weekly Frequency

                                              14

 Commitments issued prior to                                             Pre-IFM
                                              12
  G-217                                                                   Post-IFM

                                              10
 Local area voltage and
  capacity requirements


                                  Unit-Days
                                              8



 Approximately 1 to 2 units
                                              6



  committed per day                           4


                                              2


                                              0    3/29/2009

                                                               4/5/2009

                                                                            4/12/2009

                                                                                        4/19/2009

                                                                                                    4/26/2009

                                                                                                                5/3/2009

                                                                                                                           5/10/2009

                                                                                                                                       5/17/2009

                                                                                                                                                   5/24/2009

                                                                                                                                                               5/31/2009

                                                                                                                                                                           6/7/2009

                                                                                                                                                                                      6/14/2009

                                                                                                                                                                                                  6/21/2009

                                                                                                                                                                                                              6/28/2009
                                                                                                                Week Beginning




                                California ISO PUBLIC                                                                                                                                                     Slide 18
Exceptional Dispatch for G-219 (SCE Orange
County Local) – Energy Volume
                         Weekly Energy (Gross MWh)
                 350

                                              Pre-IFM
                 300                          Post-IFM


                 250


                 200
           MWh




                 150


                 100


                  50


                  0
                       3/29/2009

                                   4/5/2009

                                                4/12/2009

                                                            4/19/2009

                                                                        4/26/2009

                                                                                    5/3/2009

                                                                                               5/10/2009

                                                                                                           5/17/2009

                                                                                                                       5/24/2009

                                                                                                                                   5/31/2009

                                                                                                                                               6/7/2009

                                                                                                                                                          6/14/2009

                                                                                                                                                                      6/21/2009

                                                                                                                                                                                  6/28/2009
                                                                                    Week Beginning




                                                                                       California ISO PUBLIC                                                                                  Slide 19
Exceptional Dispatch for Ramp Rate –
Frequency and Reasons
           Reasons                                                             Weekly Frequency

 RT instruction only                                                                                                       RT


                                               35
 Brings units that are                                                      RT
                                               30
   committed at minimum load
   to a higher output level that               25


   has greater ramping


                                   Unit-Days
                                               20


   capability                                  15



 ED in April and May
                                               10



   particularly to units
                                               5


   committed for transmission                  0    3/29/2009

                                                                4/5/2009

                                                                           4/12/2009

                                                                                       4/19/2009

                                                                                                   4/26/2009

                                                                                                               5/3/2009

                                                                                                                          5/10/2009

                                                                                                                                      5/17/2009

                                                                                                                                                  5/24/2009

                                                                                                                                                              5/31/2009

                                                                                                                                                                          6/7/2009

                                                                                                                                                                                     6/14/2009

                                                                                                                                                                                                 6/21/2009

                                                                                                                                                                                                               6/28/2009
   outages
                                                                                                                Week Beginning




                                   California ISO PUBLIC                                                                                                                                                     Slide 20
Exceptional Dispatch for Ramp Rate –
Energy Volume
                           Weekly Energy (Gross MWh)

                                                                                               RT


                4000

                3500                            RT

                3000

                2500
          MWh




                2000

                1500

                1000

                 500

                  0
                       3/29/2009

                                   4/5/2009

                                              4/12/2009

                                                          4/19/2009

                                                                      4/26/2009

                                                                                  5/3/2009

                                                                                               5/10/2009

                                                                                                           5/17/2009

                                                                                                                       5/24/2009

                                                                                                                                   5/31/2009

                                                                                                                                               6/7/2009

                                                                                                                                                          6/14/2009

                                                                                                                                                                      6/21/2009

                                                                                                                                                                                  6/28/2009
                                                                                  Week Beginning




                                                                                             California ISO PUBLIC                                                                            Slide 21
Exceptional Dispatch for SP26 Capacity –
Frequency and Reasons
          Reasons                                                            Weekly Frequency

 SP26 capacity requirement                    30
                                                                Pre-IFM
                                                                Post-IFM
 Long-start unit held on for                  25


  multiple days in May                         20




                                   Unit-Days
                                               15



                                               10



                                               5



                                               0
                                                    3/29/2009

                                                                  4/5/2009

                                                                             4/12/2009

                                                                                         4/19/2009

                                                                                                     4/26/2009

                                                                                                                 5/3/2009

                                                                                                                            5/10/2009

                                                                                                                                        5/17/2009

                                                                                                                                                    5/24/2009

                                                                                                                                                                5/31/2009

                                                                                                                                                                            6/7/2009

                                                                                                                                                                                       6/14/2009

                                                                                                                                                                                                   6/21/2009

                                                                                                                                                                                                                6/28/2009
                                                                                                                 Week Beginning




                                California ISO PUBLIC                                                                                                                                                          Slide 22
Exceptional Dispatch for SP26 Capacity –
Energy Volume
                        Weekly Energy (Gross MWh)
                 1400

                                               Pre-IFM
                 1200                          Post-IFM


                 1000


                 800
           MWh




                 600


                 400


                 200


                   0
                        3/29/2009

                                    4/5/2009

                                                 4/12/2009

                                                             4/19/2009

                                                                         4/26/2009

                                                                                      5/3/2009

                                                                                                 5/10/2009

                                                                                                             5/17/2009

                                                                                                                         5/24/2009

                                                                                                                                     5/31/2009

                                                                                                                                                 6/7/2009

                                                                                                                                                            6/14/2009

                                                                                                                                                                        6/21/2009

                                                                                                                                                                                    6/28/2009
                                                                                      Week Beginning




                                                                                     California ISO PUBLIC                                                                                      Slide 23
Exceptional Dispatch for T-138 (Humboldt Area) –
Frequency & Reasons
         Reasons                                                         Weekly Frequency
                                                                                                                         RT
 Modeling issues in
  Humboldt usually due to                    30


  inaccurate modeling of QF                  25
                                                                          RT


  resources and frequent                     20
  deviations from schedules



                                 Unit-Days
                                             15
 Many dispatches of
                                             10
  Humboldt resources are
  small movements of 0 to                    5

  20 MW                                      0
                                                  3/29/2009

                                                              4/5/2009

                                                                         4/12/2009

                                                                                     4/19/2009

                                                                                                 4/26/2009

                                                                                                             5/3/2009

                                                                                                                        5/10/2009

                                                                                                                                    5/17/2009

                                                                                                                                                5/24/2009

                                                                                                                                                            5/31/2009

                                                                                                                                                                        6/7/2009

                                                                                                                                                                                   6/14/2009

                                                                                                                                                                                               6/21/2009

                                                                                                                                                                                                           6/28/2009
 Some resources require
  nightly ED shutdown                                                                                        Week Beginning




                              California ISO PUBLIC                                                                                                                                                   Slide 24
Exceptional Dispatch for T-138 (Humboldt Area) –
Energy Volume
                              Weekly Energy (Gross MWh)
                                                                                            RT


                300

                                               RT
                250


                200
          MWh




                150


                100


                50


                 0
                      3/29/2009

                                  4/5/2009

                                             4/12/2009

                                                         4/19/2009

                                                                     4/26/2009

                                                                                 5/3/2009

                                                                                            5/10/2009

                                                                                                        5/17/2009

                                                                                                                    5/24/2009

                                                                                                                                5/31/2009

                                                                                                                                            6/7/2009

                                                                                                                                                       6/14/2009

                                                                                                                                                                   6/21/2009

                                                                                                                                                                               6/28/2009
                                                                                 Week Beginning




                                                                                    California ISO PUBLIC                                                                                  Slide 25
Recommendations – Reducing Reliance on
Exceptional Dispatch

 Test day-ahead pre-IFM unit commitment to determine
  whether pre-committed resources could be committed by
  the market
    Ongoing transmission outages in particular may not require ED
     commitment
    Validate / confirm assumptions about unit commitment for
     voltage support.
 Develop methods for including more generation
  requirements in market constraints



                                California ISO PUBLIC           Slide 26
Recommendations – Reporting and Monitoring


 Improve logging and recording of ED so that dispatch
  time, market interval, specific reason, and information
  about competitive constraints is clear
 ISO ED Project Team is developing integrated full-
  featured IFM/RTN ED interface
 Will include SLIC data integrated with market data and
  competitive path information (for mitigation)
 Facilitates logging and reporting best practices for ED



                             California ISO PUBLIC          Slide 27
References


 CAISO Tariff Section 34.9 – general
    http://www.caiso.com/23b2/23b2c9d974c00.pdf
 ED Technical Bulletin – more specific
    Provides overview of categories and settlement rules
    http://www.caiso.com/23ab/23abf0ae703d0.pdf
 Operating Procedures M-402, M-402a, M-402b, S-318
    Currently being updated with additional information on instruction type
     codes: undergoing review by ED project
    M-402 series at
     http://www.caiso.com/thegrid/operations/opsdoc/marketops/index.html
    S-318 at
     http://www.caiso.com/thegrid/operations/opsdoc/sched/index.html


                                    California ISO PUBLIC                 Slide 28

More Related Content

Recently uploaded

2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 

Recently uploaded (20)

2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 

Featured

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 

Featured (20)

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 

Exceptional Dispatch Trends Analysis for Q2 2009

  • 1. Exceptional Dispatch Trends for April – June 2009 Douglas Bergman, Ph.D. Lead Market Monitoring Analyst, ISO Department of Market Monitoring MSC Meeting – General Session July 16, 2009
  • 2. Overview of Presentation  The purpose of this analysis is to provide a  Detailed review of trends in Exceptional Dispatch (ED) over the first three months of market operation;  Detailed description of some of the primary reasons for ED; and  Assessment of the hourly energy volumes of ED – as an indication of relative market impact.  Presentation will cover  Data limitations and interpretation  Summary of Exceptional Dispatch by reason  Detail on most prevalent Exceptional Dispatch reasons California ISO PUBLIC Slide 2
  • 3. Data Limitations and Assumptions  Data used in analysis are from ISO logging application  Provides information about reason for ED and whether ED was “manual dispatch”, “Pre-IFM day-ahead”, “Post-IFM day-ahead”, or “real time”.  Data are manually entered and not settlement quality  Some assumptions were required in cases where data were not complete  Analysis focuses on internal resources  Dispatch of RMR resources via ED not considered  Dispatch of intertie resources not considered  Charts capture gross energy from ED and do not distinguish between “in-market” and “Out-of-Sequence”  Analysis does not address instruction codes or settlement issues California ISO PUBLIC Slide 3
  • 4. Transmission outages, modeling gaps, and market software issues are primary drivers of ED Frequency (# of Unit Days) of ED by Reason for DA and RT (Apr - Jun 2009) Day Ahead Real Time G-206 (San Diego Local) G-217 (South of Unit Testing Lugo) G-217 (South of Lugo) Transmission G-219 (SCE Orange Outages Other County Local) Transmission Outages G-233 (PG&E Bay Area Local) T-165 (PG&E Rio Oso-Palermo Area) T-138 (PG&E Other Humboldt Area) Ramp Rate T-103 (SCIT) T-103 (SCIT) SP26 Capacity Software Limitation California ISO PUBLIC Slide 4
  • 5. Overall downward trend in frequency of day-ahead ED since May. Weekly Frequency (Unit Days) by Reason – ED Day Ahead Unit Commitment 100 90 80 Transmission Outages 70 T-103 (SCIT) 60 SP26 Capacity Unit-Days G-233 (PG&E Bay Area Local) 50 G-219 (SCE Orange County Local) 40 G-217 (South of Lugo) 30 G-206 (San Diego Local) Other 20 10 0 3/29 4/5 4/12 4/19 4/26 5/3 5/10 5/17 5/24 5/31 6/7 6/14 6/21 6/28 Week Beginning  Palo Verde-Devers and SWPL transmission outages was primary driver in May.  Late June heat wave resulted in increased ED (“Other” category includes system capacity). California ISO PUBLIC Slide 5
  • 6. Overall downward trend in frequency of real-time ED since May. Weekly Frequency (Unit Days) by Reason – Real-Time ED energy dispatch 140 120 Unit Testing 100 Transmission Outages T-165 (PG&E Rio Oso - Palermo) Unit-Days 80 T-138 (PG&E Humboldt) T-103 (SCIT) 60 Software Limitation Ramp Rate 40 G-217 (South of Lugo) Other 20 0 3/29 4/5 4/12 4/19 4/26 5/3 5/10 5/17 5/24 5/31 6/7 6/14 6/21 6/28 Week Beginning California ISO PUBLIC Slide 6
  • 7. Hourly Profile of Energy from ED - April 2009 800 Real Time Dispatch 700 Day-Ahead Post-IFM 600 Day-Ahead Pre-IFM 500 MW 400 300 200 100 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hour Ending  Average ED energy evenly split between minimum load and energy above minimum load.  Pre-IFM ED commitment began April 20 California ISO PUBLIC Slide 7
  • 8. Hourly Profile of Energy from ED -May 2009 800 Real Time Dispatch 700 Day-Ahead Post-IFM Day-Ahead Pre-IFM 600 500 MW 400 300 200 100 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hour Ending  Average hourly energy peaked in May - primarily from minimum load.  Week of May 10 – most of ED commitment (PV-Devers and SWPL transmission outages). California ISO PUBLIC Slide 8
  • 9. Hourly Profile of Energy from ED - June 2009 800 Real Time Dispatch 700 Day-Ahead Post-IFM 600 Day-Ahead Pre-IFM 500 MW 400 300 200 100 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hour Ending  Energy from ED in June was half of May volume.  Minimal energy over minimum load. California ISO PUBLIC Slide 9
  • 10. Monthly Duration Curves of Real-Time ED energy instructions above Minimum Load 1200 April May June 1000 800  Dispatch above minimum load decreased through the quarter  Most high-MW hours in April MW 600 limited to 3 days - due to ED for 400 ramp rate 200 0 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Percentile Ranking of Hours California ISO PUBLIC Slide 10
  • 11. Exceptional Dispatch Profiles of Select Dispatch Reasons California ISO PUBLIC Slide 11
  • 12. Exceptional Dispatch for Transmission Outages – Frequency and Reasons Reasons Weekly Frequency  Devers-Valley 500kv 100  out April 6-29 RT  up to 8 commitments/day 90 Pre-IFM  Devers-Palo Verde 500kv 80 Post-IFM  out May 2-6 70  up to 12 commitments/day  SWPL 60 Unit-Days  out May 8-18 50  up to 11 commitments/day 40  Pittsburg 230kv bus 30  out May 18-21  1 commitment/day 20  Contra Costa-Lone Tree (East Bay) 10  out May 23-June 10 0  up to 3 commitments/day 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009  Ignacio-Sobrante 230kv (East Bay)  out May 30-June 6 Week Beginning  up to 2 commitments/day California ISO PUBLIC Slide 12
  • 13. Exceptional Dispatch for Transmission Outages – Energy Volumes Weekly Energy (Gross MWh) 6000 RT Pre-IFM 5000 Post-IFM 4000 MWh 3000 2000 1000 0 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009 We ek Be ginning California ISO PUBLIC Slide 13
  • 14. Exceptional Dispatch for Software Limitations – Frequency & Reasons Reasons Weekly Frequency RT  Real-time reason only 35  Used to override erroneous 30 RT software-generated startup 25 and shutdown instructions. Unit-Days 20  NOT due to failures in 15 automated dispatch system 10 communicating instructions. 5 0 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009 Week Beginning California ISO PUBLIC Slide 14
  • 15. Exceptional Dispatch for Software Limitations – Energy Volume Weekly Energy (Gross MWh) RT 1400 1200 RT 1000 800 MWh 600 400 200 0 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009 Week Beginning California ISO PUBLIC Slide 15
  • 16. Exceptional Dispatch for G-206 (San Diego Local) - Frequency & Reasons Reasons Weekly Frequency 12  Unit commitment based on 10 Pre-IFM Post-IFM Operations Engineers’ daily transmission network 8 analysis Unit-Days 6  Primarily for voltage support 4 and contingencies  Ongoing clearances in San 2 Diego area required support 0 through much of April and 4/5/2009 5/3/2009 6/7/2009 3/29/2009 4/12/2009 4/19/2009 4/26/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/14/2009 6/21/2009 6/28/2009 May Week Beginning California ISO PUBLIC Slide 16
  • 17. Exceptional Dispatch for G-206 (San Diego Local) - Energy Volume Weekly Energy (Gross MWh) 1000 900 Pre-IFM Post-IFM 800 700 600 MWh 500 400 300 200 100 0 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009 We e k Be ginning California ISO PUBLIC Slide 17
  • 18. Exceptional Dispatch for G-219 (SCE Orange County Local) – Frequency and Reasons Reasons Weekly Frequency 14  Commitments issued prior to Pre-IFM 12 G-217 Post-IFM 10  Local area voltage and capacity requirements Unit-Days 8  Approximately 1 to 2 units 6 committed per day 4 2 0 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009 Week Beginning California ISO PUBLIC Slide 18
  • 19. Exceptional Dispatch for G-219 (SCE Orange County Local) – Energy Volume Weekly Energy (Gross MWh) 350 Pre-IFM 300 Post-IFM 250 200 MWh 150 100 50 0 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009 Week Beginning California ISO PUBLIC Slide 19
  • 20. Exceptional Dispatch for Ramp Rate – Frequency and Reasons Reasons Weekly Frequency  RT instruction only RT 35  Brings units that are RT 30 committed at minimum load to a higher output level that 25 has greater ramping Unit-Days 20 capability 15  ED in April and May 10 particularly to units 5 committed for transmission 0 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009 outages Week Beginning California ISO PUBLIC Slide 20
  • 21. Exceptional Dispatch for Ramp Rate – Energy Volume Weekly Energy (Gross MWh) RT 4000 3500 RT 3000 2500 MWh 2000 1500 1000 500 0 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009 Week Beginning California ISO PUBLIC Slide 21
  • 22. Exceptional Dispatch for SP26 Capacity – Frequency and Reasons Reasons Weekly Frequency  SP26 capacity requirement 30 Pre-IFM Post-IFM  Long-start unit held on for 25 multiple days in May 20 Unit-Days 15 10 5 0 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009 Week Beginning California ISO PUBLIC Slide 22
  • 23. Exceptional Dispatch for SP26 Capacity – Energy Volume Weekly Energy (Gross MWh) 1400 Pre-IFM 1200 Post-IFM 1000 800 MWh 600 400 200 0 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009 Week Beginning California ISO PUBLIC Slide 23
  • 24. Exceptional Dispatch for T-138 (Humboldt Area) – Frequency & Reasons Reasons Weekly Frequency RT  Modeling issues in Humboldt usually due to 30 inaccurate modeling of QF 25 RT resources and frequent 20 deviations from schedules Unit-Days 15  Many dispatches of 10 Humboldt resources are small movements of 0 to 5 20 MW 0 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009  Some resources require nightly ED shutdown Week Beginning California ISO PUBLIC Slide 24
  • 25. Exceptional Dispatch for T-138 (Humboldt Area) – Energy Volume Weekly Energy (Gross MWh) RT 300 RT 250 200 MWh 150 100 50 0 3/29/2009 4/5/2009 4/12/2009 4/19/2009 4/26/2009 5/3/2009 5/10/2009 5/17/2009 5/24/2009 5/31/2009 6/7/2009 6/14/2009 6/21/2009 6/28/2009 Week Beginning California ISO PUBLIC Slide 25
  • 26. Recommendations – Reducing Reliance on Exceptional Dispatch  Test day-ahead pre-IFM unit commitment to determine whether pre-committed resources could be committed by the market  Ongoing transmission outages in particular may not require ED commitment  Validate / confirm assumptions about unit commitment for voltage support.  Develop methods for including more generation requirements in market constraints California ISO PUBLIC Slide 26
  • 27. Recommendations – Reporting and Monitoring  Improve logging and recording of ED so that dispatch time, market interval, specific reason, and information about competitive constraints is clear  ISO ED Project Team is developing integrated full- featured IFM/RTN ED interface  Will include SLIC data integrated with market data and competitive path information (for mitigation)  Facilitates logging and reporting best practices for ED California ISO PUBLIC Slide 27
  • 28. References  CAISO Tariff Section 34.9 – general  http://www.caiso.com/23b2/23b2c9d974c00.pdf  ED Technical Bulletin – more specific  Provides overview of categories and settlement rules  http://www.caiso.com/23ab/23abf0ae703d0.pdf  Operating Procedures M-402, M-402a, M-402b, S-318  Currently being updated with additional information on instruction type codes: undergoing review by ED project  M-402 series at http://www.caiso.com/thegrid/operations/opsdoc/marketops/index.html  S-318 at http://www.caiso.com/thegrid/operations/opsdoc/sched/index.html California ISO PUBLIC Slide 28