SlideShare uma empresa Scribd logo
1 de 14
Baixar para ler offline
©
Slide 1
Overview of
P3M3 V3
2015
Rod Sowden
Aspire Europe Ltd
©
Slide 2
Aspire Europe
Formed 2004
MSP lead author 2007
P3M3 lead author 2008
MSP lead author 2011
P3M3 jt lead author 2015
BCM Survival Guide 2014
SRO Survival Guide 2015
Programme Manager Survival
Guide 2015
Easy guide to planning 2015
©
Slide 3
Maturity models – why bother?
“If anything is certain, it is that change
is certain. The world we are planning
for today will not exist in this form”
Phil Crosby
©
Slide 4
Organisational Performance Journey
• Level 1 is characterised by
heroic and ad-hoc behaviours
• Level 2 is characterised by
groups and teams setting
their own ways of working or
a central approach that is
partially adopted
• Level 3 is characterised by a
consistent approach being
used across the organisation.
• Level 4 is characterised by
continual improvement and
analysis of performance
• Level 5 organisations are
optimised for their
environment
©
Slide 5
About P3M3
2005 – P3M3
v1
2008 – P3M3
v2
2015 – P3M3
v3
• Baselining current capability (for later
comparison)
• Benchmarking capability against other
organisations (possibly to harvest best
practice from a community of organisations)
• Discovering capabilities to determine
which areas to concentrate on
• Diagnosing systemic weaknesses to
eliminate root causes and non-confirming
costs
• Prioritising improvement initiatives (based
on any of the above)
• Certifying capability through independent
assessment
©
Slide 6
P3M3 maturity model
People
ToolsProcess
Assignment
The P3M3 model looks for balance between
processes, tools and people, at level 3 these
are normally in balance and at level 4 they are
becoming optimised and efficient.
©
Slide 7
Using P3M3 to optimise
£
Money
Spent
Degree of Process / Formality
Point of
Optimum
Balance
“Cost of Winging it!”“Cost of Prevention”
£
Money
Spent
©
Slide 8
What did we learn from P3M3 Version 2
People found the style
endearing, but not easy to
assess
Assessments offered too
much flexibility
Designed for self delivery
organisations
Self assessments were
misleading and needed to
be improved
Needed to be widened and
deepened for accuracy
©
Slide 9
What did we achieve with P3M3 Version 2
Transport for London
Main UK public sector
Transport sector
NDA and Sellafield Ltd
Australian government
FIFA
Gatwick Airport
London Olympics
Queensland Government
New Zealand government
Measurement of
Suppliers
Partner
We got it
right !
©
Slide 10
P3M3 has provided evidence of the cost of low maturity
Slow or random decision
making
Poor requirements
Duplication and overlap
Poor knowledge management
Poor team performance
Excessive meetings
Using poor frameworks and
process
Hidden operational costs
Excessive reporting and
documentation
Transport for London - £1bn saving
moving from level 1 to 4 in 5 years
PMI - High maturity organisations
within 2% of budget, low maturity
normally 30%+
UKBA saved 40% of training budget as
a result of a survey
Estimated 500 assessment of 200
organisations, we have done over half
Mandated in Australia and New
Zealand. All UK central government and
the core cities
©
Slide 11
Whats new in P3M3 Version 3
2 years of design, development and
testing
Increased alignment with industry
bodies of knowledge, notably PMI,
IPMA, ISO21500 and APM
More breadth – e.g. commercial
management
More depth – e.g. behaviours,
model integration
Easier to use – simple on-line self-
assessment
Better diagnostics – identification
of common weaknesses
©
Slide 12
P3M3 Cube
Threads
Common assessment areas across each perspective
Tools and techniques
Standards and processes
Information and knowledge
Organisation
Assurance
Behaviours
PlansOrganisationalGovernance
ManagementControl
BenefitsManagement
RiskManagement
FinanceManagement
StakeholderManagement
ResourceManagementPerspectives
The major process groupings within P3M3
The P3M3 model is 3
dimensional, it consists of the
5 levels associated with
CMMI.
It has 7 perspectives, these
are the main process groups
associated with P3M, they
exist within each of the 3
models and are the basis for
reporting. The perspectives
were added in the 2008
version.
These are complemented by
Threads, these are used to
support the diagnostic and
identify any systemic
weaknesses that is affecting
all the perspectives. There
are a minimum of 9 threads
and up to 13, depending on
the scope of an assessments
©
Slide 13
Threads – common areas we review
©
Slide 14
Thanks for your time
rod.sowden@aspireeurope.com

Mais conteúdo relacionado

Mais procurados

Cv giovanna concari_uff
Cv giovanna concari_uffCv giovanna concari_uff
Cv giovanna concari_uffviolagi
 
Etude PwC sur les fusions-acquisitions dans le secteur des Télécoms, Médias e...
Etude PwC sur les fusions-acquisitions dans le secteur des Télécoms, Médias e...Etude PwC sur les fusions-acquisitions dans le secteur des Télécoms, Médias e...
Etude PwC sur les fusions-acquisitions dans le secteur des Télécoms, Médias e...PwC France
 
Heizer om10 ch06-managing quality
Heizer om10 ch06-managing qualityHeizer om10 ch06-managing quality
Heizer om10 ch06-managing qualityRozaimi Mohd Saad
 
Cv di simone sonia con foto
Cv di simone sonia con fotoCv di simone sonia con foto
Cv di simone sonia con fotoSonia Di Simone
 
Curriculum vitae antimo_cusano
Curriculum vitae antimo_cusanoCurriculum vitae antimo_cusano
Curriculum vitae antimo_cusanoAntimo Cusano
 
Pintérné tóth klára önéletrajz
Pintérné tóth klára önéletrajzPintérné tóth klára önéletrajz
Pintérné tóth klára önéletrajzpinterklari
 
CV Template_ro_RO 2015 Aurora
CV Template_ro_RO 2015 AuroraCV Template_ro_RO 2015 Aurora
CV Template_ro_RO 2015 AuroraAurora Marculescu
 
CV_GPolonsky_RD and SMEs_general
CV_GPolonsky_RD and SMEs_generalCV_GPolonsky_RD and SMEs_general
CV_GPolonsky_RD and SMEs_generalGennady Polonsky
 
Perdite idriche: una sfida per la resilienza e lo sviluppo del Paese
Perdite idriche: una sfida per la resilienza e lo sviluppo del PaesePerdite idriche: una sfida per la resilienza e lo sviluppo del Paese
Perdite idriche: una sfida per la resilienza e lo sviluppo del PaeseServizi a rete
 
Europass cv-20140214-laciu-ro
Europass cv-20140214-laciu-roEuropass cv-20140214-laciu-ro
Europass cv-20140214-laciu-roAndreea Laciu
 

Mais procurados (16)

Cv giovanna concari_uff
Cv giovanna concari_uffCv giovanna concari_uff
Cv giovanna concari_uff
 
C.v. studio ape - arch. cristiano ferrari 13-06-2012
C.v.   studio ape - arch. cristiano ferrari 13-06-2012C.v.   studio ape - arch. cristiano ferrari 13-06-2012
C.v. studio ape - arch. cristiano ferrari 13-06-2012
 
Etude PwC sur les fusions-acquisitions dans le secteur des Télécoms, Médias e...
Etude PwC sur les fusions-acquisitions dans le secteur des Télécoms, Médias e...Etude PwC sur les fusions-acquisitions dans le secteur des Télécoms, Médias e...
Etude PwC sur les fusions-acquisitions dans le secteur des Télécoms, Médias e...
 
Overview of PPI
Overview of PPIOverview of PPI
Overview of PPI
 
Europass Curriculum vitae
Europass Curriculum vitaeEuropass Curriculum vitae
Europass Curriculum vitae
 
Heizer om10 ch06-managing quality
Heizer om10 ch06-managing qualityHeizer om10 ch06-managing quality
Heizer om10 ch06-managing quality
 
9 ano e agora
9 ano e agora9 ano e agora
9 ano e agora
 
Cv di simone sonia con foto
Cv di simone sonia con fotoCv di simone sonia con foto
Cv di simone sonia con foto
 
Guntis Stirna CV
Guntis Stirna CVGuntis Stirna CV
Guntis Stirna CV
 
Curriculum vitae antimo_cusano
Curriculum vitae antimo_cusanoCurriculum vitae antimo_cusano
Curriculum vitae antimo_cusano
 
Pintérné tóth klára önéletrajz
Pintérné tóth klára önéletrajzPintérné tóth klára önéletrajz
Pintérné tóth klára önéletrajz
 
CV Template_ro_RO 2015 Aurora
CV Template_ro_RO 2015 AuroraCV Template_ro_RO 2015 Aurora
CV Template_ro_RO 2015 Aurora
 
CV_GPolonsky_RD and SMEs_general
CV_GPolonsky_RD and SMEs_generalCV_GPolonsky_RD and SMEs_general
CV_GPolonsky_RD and SMEs_general
 
Perdite idriche: una sfida per la resilienza e lo sviluppo del Paese
Perdite idriche: una sfida per la resilienza e lo sviluppo del PaesePerdite idriche: una sfida per la resilienza e lo sviluppo del Paese
Perdite idriche: una sfida per la resilienza e lo sviluppo del Paese
 
Europass cv-20140214-laciu-ro
Europass cv-20140214-laciu-roEuropass cv-20140214-laciu-ro
Europass cv-20140214-laciu-ro
 
Cv eng 2014
Cv eng 2014Cv eng 2014
Cv eng 2014
 

Destaque

P3 M3 Services 2v0 App
P3 M3 Services 2v0 AppP3 M3 Services 2v0 App
P3 M3 Services 2v0 AppAndyMurray
 
Best Practice In A Recession Styled Ck
Best Practice In A Recession   Styled CkBest Practice In A Recession   Styled Ck
Best Practice In A Recession Styled CkAndyMurray
 
P3 m3 self_assess_project
P3 m3 self_assess_projectP3 m3 self_assess_project
P3 m3 self_assess_projectReferendo Org
 
P3 m3 intro long
P3 m3 intro longP3 m3 intro long
P3 m3 intro longKadlaa
 
Portfolio, Project and Programme Management
Portfolio, Project and Programme ManagementPortfolio, Project and Programme Management
Portfolio, Project and Programme ManagementBruce Levitan
 
Novare Consulting explain P3M3
Novare Consulting explain P3M3Novare Consulting explain P3M3
Novare Consulting explain P3M3Novare Consulting
 
Building the case for improving your project management maturity (P3M3) - PMI...
Building the case for improving your project management maturity (P3M3) - PMI...Building the case for improving your project management maturity (P3M3) - PMI...
Building the case for improving your project management maturity (P3M3) - PMI...Wired Consulting
 
Why Program Management is Essential for IT Projects
Why Program Management is Essential for IT ProjectsWhy Program Management is Essential for IT Projects
Why Program Management is Essential for IT Projectsbbigelow
 
Benefit Realisation Management
Benefit Realisation ManagementBenefit Realisation Management
Benefit Realisation ManagementBruce Levitan
 
Why program management is essential for it projects
Why program management is essential for it projectsWhy program management is essential for it projects
Why program management is essential for it projectsbbigelow
 
From KPIs to Outcomes - the Shift from Service Delivery to Strategy
From KPIs to Outcomes - the Shift from Service Delivery to StrategyFrom KPIs to Outcomes - the Shift from Service Delivery to Strategy
From KPIs to Outcomes - the Shift from Service Delivery to StrategyXenith Document Systems Ltd
 
Basic process mapping using BPMN
Basic process mapping using BPMNBasic process mapping using BPMN
Basic process mapping using BPMNBruce Levitan
 
Customer Journey Mapping overview
Customer Journey Mapping overviewCustomer Journey Mapping overview
Customer Journey Mapping overviewBruce Levitan
 
Use of Risk Maturity Model to Benchmark Project Health, 26 May 2016
Use of Risk Maturity Model to Benchmark Project Health, 26 May 2016Use of Risk Maturity Model to Benchmark Project Health, 26 May 2016
Use of Risk Maturity Model to Benchmark Project Health, 26 May 2016Association for Project Management
 

Destaque (18)

Overview of P3M3, Geof Leigh 19th Jan 2016, Bolton
Overview of P3M3, Geof Leigh 19th Jan 2016, BoltonOverview of P3M3, Geof Leigh 19th Jan 2016, Bolton
Overview of P3M3, Geof Leigh 19th Jan 2016, Bolton
 
P3 M3 Services 2v0 App
P3 M3 Services 2v0 AppP3 M3 Services 2v0 App
P3 M3 Services 2v0 App
 
Best Practice In A Recession Styled Ck
Best Practice In A Recession   Styled CkBest Practice In A Recession   Styled Ck
Best Practice In A Recession Styled Ck
 
P3 m3 self_assess_project
P3 m3 self_assess_projectP3 m3 self_assess_project
P3 m3 self_assess_project
 
P3 m3 intro long
P3 m3 intro longP3 m3 intro long
P3 m3 intro long
 
Portfolio, Project and Programme Management
Portfolio, Project and Programme ManagementPortfolio, Project and Programme Management
Portfolio, Project and Programme Management
 
Novare Consulting explain P3M3
Novare Consulting explain P3M3Novare Consulting explain P3M3
Novare Consulting explain P3M3
 
Building the case for improving your project management maturity (P3M3) - PMI...
Building the case for improving your project management maturity (P3M3) - PMI...Building the case for improving your project management maturity (P3M3) - PMI...
Building the case for improving your project management maturity (P3M3) - PMI...
 
Libre de Diabetes - Andres Di Angelo
Libre de Diabetes - Andres Di AngeloLibre de Diabetes - Andres Di Angelo
Libre de Diabetes - Andres Di Angelo
 
Why Program Management is Essential for IT Projects
Why Program Management is Essential for IT ProjectsWhy Program Management is Essential for IT Projects
Why Program Management is Essential for IT Projects
 
Foggy projects
Foggy projectsFoggy projects
Foggy projects
 
Benefit Realisation Management
Benefit Realisation ManagementBenefit Realisation Management
Benefit Realisation Management
 
Why program management is essential for it projects
Why program management is essential for it projectsWhy program management is essential for it projects
Why program management is essential for it projects
 
From KPIs to Outcomes - the Shift from Service Delivery to Strategy
From KPIs to Outcomes - the Shift from Service Delivery to StrategyFrom KPIs to Outcomes - the Shift from Service Delivery to Strategy
From KPIs to Outcomes - the Shift from Service Delivery to Strategy
 
Basic process mapping using BPMN
Basic process mapping using BPMNBasic process mapping using BPMN
Basic process mapping using BPMN
 
Customer Journey Mapping overview
Customer Journey Mapping overviewCustomer Journey Mapping overview
Customer Journey Mapping overview
 
Use of Risk Maturity Model to Benchmark Project Health, 26 May 2016
Use of Risk Maturity Model to Benchmark Project Health, 26 May 2016Use of Risk Maturity Model to Benchmark Project Health, 26 May 2016
Use of Risk Maturity Model to Benchmark Project Health, 26 May 2016
 
P3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management FrameworkP3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management Framework
 

Semelhante a Introduction to the new version of P3M3® - Rod Sowden - 18th November

Future Maturity (P3M3) or Five Generation Workplace - RSM UK, Andy Murray | F...
Future Maturity (P3M3) or Five Generation Workplace - RSM UK, Andy Murray | F...Future Maturity (P3M3) or Five Generation Workplace - RSM UK, Andy Murray | F...
Future Maturity (P3M3) or Five Generation Workplace - RSM UK, Andy Murray | F...Wellingtone
 
Innovative Business Development in a Shared Services Model through Project Po...
Innovative Business Development in a Shared Services Model through Project Po...Innovative Business Development in a Shared Services Model through Project Po...
Innovative Business Development in a Shared Services Model through Project Po...Changepoint
 
Outperform Presentation 1v3 App
Outperform Presentation 1v3 AppOutperform Presentation 1v3 App
Outperform Presentation 1v3 AppAndyMurray
 
Purchasing Office Assessment – Retail Industry
Purchasing Office Assessment – Retail IndustryPurchasing Office Assessment – Retail Industry
Purchasing Office Assessment – Retail IndustryDragon Sourcing
 
TCI2012 The Cluster Observatory Evaluation Model
TCI2012 The Cluster Observatory Evaluation ModelTCI2012 The Cluster Observatory Evaluation Model
TCI2012 The Cluster Observatory Evaluation ModelTCI Network
 
Julian Watts - The Value of Standards and why GIS and AM practitioners should...
Julian Watts - The Value of Standards and why GIS and AM practitioners should...Julian Watts - The Value of Standards and why GIS and AM practitioners should...
Julian Watts - The Value of Standards and why GIS and AM practitioners should...GeoEnable Limited
 
Breakfast with The FIRM - PWC on assessment and selection
Breakfast with The FIRM - PWC on assessment and selectionBreakfast with The FIRM - PWC on assessment and selection
Breakfast with The FIRM - PWC on assessment and selectionEmma Mirrington
 
Organisational Change Management in ERP Projects
Organisational Change Management in ERP Projects Organisational Change Management in ERP Projects
Organisational Change Management in ERP Projects Lumenia Consulting
 
P3M3 - Discovery Assessment
P3M3 - Discovery AssessmentP3M3 - Discovery Assessment
P3M3 - Discovery AssessmentProfeo
 
The Hidden Asset - Effective SRM
The Hidden Asset  - Effective SRMThe Hidden Asset  - Effective SRM
The Hidden Asset - Effective SRMBravoSolution
 

Semelhante a Introduction to the new version of P3M3® - Rod Sowden - 18th November (20)

Future Maturity (P3M3) or Five Generation Workplace - RSM UK, Andy Murray | F...
Future Maturity (P3M3) or Five Generation Workplace - RSM UK, Andy Murray | F...Future Maturity (P3M3) or Five Generation Workplace - RSM UK, Andy Murray | F...
Future Maturity (P3M3) or Five Generation Workplace - RSM UK, Andy Murray | F...
 
APM chairman Steve Wake, PGCS Symposium, 11th and 12th May 2015
APM chairman Steve Wake, PGCS Symposium, 11th and 12th May 2015APM chairman Steve Wake, PGCS Symposium, 11th and 12th May 2015
APM chairman Steve Wake, PGCS Symposium, 11th and 12th May 2015
 
Innovative Business Development in a Shared Services Model through Project Po...
Innovative Business Development in a Shared Services Model through Project Po...Innovative Business Development in a Shared Services Model through Project Po...
Innovative Business Development in a Shared Services Model through Project Po...
 
Begg
BeggBegg
Begg
 
Outperform Presentation 1v3 App
Outperform Presentation 1v3 AppOutperform Presentation 1v3 App
Outperform Presentation 1v3 App
 
Purchasing Office Assessment – Retail Industry
Purchasing Office Assessment – Retail IndustryPurchasing Office Assessment – Retail Industry
Purchasing Office Assessment – Retail Industry
 
TCI2012 The Cluster Observatory Evaluation Model
TCI2012 The Cluster Observatory Evaluation ModelTCI2012 The Cluster Observatory Evaluation Model
TCI2012 The Cluster Observatory Evaluation Model
 
APM Corporate Accreditation webinar 02.04.2014
APM Corporate Accreditation webinar 02.04.2014APM Corporate Accreditation webinar 02.04.2014
APM Corporate Accreditation webinar 02.04.2014
 
Julian Watts - The Value of Standards and why GIS and AM practitioners should...
Julian Watts - The Value of Standards and why GIS and AM practitioners should...Julian Watts - The Value of Standards and why GIS and AM practitioners should...
Julian Watts - The Value of Standards and why GIS and AM practitioners should...
 
Prince2 quick guide
Prince2 quick guidePrince2 quick guide
Prince2 quick guide
 
Prince2 quick guide
Prince2 quick guidePrince2 quick guide
Prince2 quick guide
 
Breakfast with The FIRM - PWC on assessment and selection
Breakfast with The FIRM - PWC on assessment and selectionBreakfast with The FIRM - PWC on assessment and selection
Breakfast with The FIRM - PWC on assessment and selection
 
Organisational Change Management in ERP Projects
Organisational Change Management in ERP Projects Organisational Change Management in ERP Projects
Organisational Change Management in ERP Projects
 
P3M3 - Discovery Assessment
P3M3 - Discovery AssessmentP3M3 - Discovery Assessment
P3M3 - Discovery Assessment
 
Governance of agile m samphire
Governance of agile   m samphireGovernance of agile   m samphire
Governance of agile m samphire
 
Mike Ward - Improving benefits management at Sellafield
Mike Ward - Improving benefits management at SellafieldMike Ward - Improving benefits management at Sellafield
Mike Ward - Improving benefits management at Sellafield
 
Project risk and value in supply chain management
Project risk and value in supply chain managementProject risk and value in supply chain management
Project risk and value in supply chain management
 
Cmmi 26 ago_2009_
Cmmi 26 ago_2009_Cmmi 26 ago_2009_
Cmmi 26 ago_2009_
 
Opm3 050607 hkcs
Opm3 050607 hkcsOpm3 050607 hkcs
Opm3 050607 hkcs
 
The Hidden Asset - Effective SRM
The Hidden Asset  - Effective SRMThe Hidden Asset  - Effective SRM
The Hidden Asset - Effective SRM
 

Mais de Association for Project Management

Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Association for Project Management
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...Association for Project Management
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024Association for Project Management
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...Association for Project Management
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakAssociation for Project Management
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Association for Project Management
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Association for Project Management
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Association for Project Management
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...Association for Project Management
 

Mais de Association for Project Management (20)

Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peak
 
Demystifying digital accessibility webinar
Demystifying digital accessibility webinarDemystifying digital accessibility webinar
Demystifying digital accessibility webinar
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...
 
Burnout_ Prevention Intervention Recovery.pdf
Burnout_ Prevention Intervention  Recovery.pdfBurnout_ Prevention Intervention  Recovery.pdf
Burnout_ Prevention Intervention Recovery.pdf
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...
 
Risk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threatRisk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threat
 
Time-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA LeadersTime-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA Leaders
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
 
Including mental health support in project delivery
Including mental health support in project deliveryIncluding mental health support in project delivery
Including mental health support in project delivery
 

Último

8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 

Último (20)

8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 

Introduction to the new version of P3M3® - Rod Sowden - 18th November

  • 1. © Slide 1 Overview of P3M3 V3 2015 Rod Sowden Aspire Europe Ltd
  • 2. © Slide 2 Aspire Europe Formed 2004 MSP lead author 2007 P3M3 lead author 2008 MSP lead author 2011 P3M3 jt lead author 2015 BCM Survival Guide 2014 SRO Survival Guide 2015 Programme Manager Survival Guide 2015 Easy guide to planning 2015
  • 3. © Slide 3 Maturity models – why bother? “If anything is certain, it is that change is certain. The world we are planning for today will not exist in this form” Phil Crosby
  • 4. © Slide 4 Organisational Performance Journey • Level 1 is characterised by heroic and ad-hoc behaviours • Level 2 is characterised by groups and teams setting their own ways of working or a central approach that is partially adopted • Level 3 is characterised by a consistent approach being used across the organisation. • Level 4 is characterised by continual improvement and analysis of performance • Level 5 organisations are optimised for their environment
  • 5. © Slide 5 About P3M3 2005 – P3M3 v1 2008 – P3M3 v2 2015 – P3M3 v3 • Baselining current capability (for later comparison) • Benchmarking capability against other organisations (possibly to harvest best practice from a community of organisations) • Discovering capabilities to determine which areas to concentrate on • Diagnosing systemic weaknesses to eliminate root causes and non-confirming costs • Prioritising improvement initiatives (based on any of the above) • Certifying capability through independent assessment
  • 6. © Slide 6 P3M3 maturity model People ToolsProcess Assignment The P3M3 model looks for balance between processes, tools and people, at level 3 these are normally in balance and at level 4 they are becoming optimised and efficient.
  • 7. © Slide 7 Using P3M3 to optimise £ Money Spent Degree of Process / Formality Point of Optimum Balance “Cost of Winging it!”“Cost of Prevention” £ Money Spent
  • 8. © Slide 8 What did we learn from P3M3 Version 2 People found the style endearing, but not easy to assess Assessments offered too much flexibility Designed for self delivery organisations Self assessments were misleading and needed to be improved Needed to be widened and deepened for accuracy
  • 9. © Slide 9 What did we achieve with P3M3 Version 2 Transport for London Main UK public sector Transport sector NDA and Sellafield Ltd Australian government FIFA Gatwick Airport London Olympics Queensland Government New Zealand government Measurement of Suppliers Partner We got it right !
  • 10. © Slide 10 P3M3 has provided evidence of the cost of low maturity Slow or random decision making Poor requirements Duplication and overlap Poor knowledge management Poor team performance Excessive meetings Using poor frameworks and process Hidden operational costs Excessive reporting and documentation Transport for London - £1bn saving moving from level 1 to 4 in 5 years PMI - High maturity organisations within 2% of budget, low maturity normally 30%+ UKBA saved 40% of training budget as a result of a survey Estimated 500 assessment of 200 organisations, we have done over half Mandated in Australia and New Zealand. All UK central government and the core cities
  • 11. © Slide 11 Whats new in P3M3 Version 3 2 years of design, development and testing Increased alignment with industry bodies of knowledge, notably PMI, IPMA, ISO21500 and APM More breadth – e.g. commercial management More depth – e.g. behaviours, model integration Easier to use – simple on-line self- assessment Better diagnostics – identification of common weaknesses
  • 12. © Slide 12 P3M3 Cube Threads Common assessment areas across each perspective Tools and techniques Standards and processes Information and knowledge Organisation Assurance Behaviours PlansOrganisationalGovernance ManagementControl BenefitsManagement RiskManagement FinanceManagement StakeholderManagement ResourceManagementPerspectives The major process groupings within P3M3 The P3M3 model is 3 dimensional, it consists of the 5 levels associated with CMMI. It has 7 perspectives, these are the main process groups associated with P3M, they exist within each of the 3 models and are the basis for reporting. The perspectives were added in the 2008 version. These are complemented by Threads, these are used to support the diagnostic and identify any systemic weaknesses that is affecting all the perspectives. There are a minimum of 9 threads and up to 13, depending on the scope of an assessments
  • 13. © Slide 13 Threads – common areas we review
  • 14. © Slide 14 Thanks for your time rod.sowden@aspireeurope.com