Agenda
Area Timing
Introduction 18:45-18:50
Integrated Assurance next
developments
18:50-19:00
Break out sessions 19:00-19:20
Feedback and review of the Guide to
Integrated Assurance
19:20-19:50
Next Steps 19:50-20:00
18 Oct 06
Capturing your thoughts
Take 20 minutes in your groups to look at 1 area of the Guide.
What we want to know and understand, against that area
what:
•Are your experiences of Assurance (giving & receiving)
– What went well?
– What were the difficulties?
– How was it addressed?
•What recommendations would you suggest to improve what you
experienced?
•What type of information or training would you need to support you
in your role?
18 Oct 06 3
Capturing your thoughts
The 5 Areas we want you to consider are:
•Integrated Assurance - Principles
•Integrated Assurance - for Projects
•Integrated Assurance - for Programmes & Portfolios
•Integrated Assurance - Barriers
•Integrated Assurance - Roles & Responsibilities
18 Oct 06 4
Feedback
18 Oct 06 5
Integrated Assurance - Principles
The coordination of assurance activities where there are a number of
assurance providers
Independence Assurance provides an objective view and conclusion
that cannot be influenced
Accountability Assurance given due authority with strategic
sponsorship and commitment; governance and
reporting systems; trust, transparency and visibility.
Planning &
coordination
Through an integrated assurance strategy & plan
Proportionate Reduces duplication of effort, tailored to maximise
effective use of resources
Risk based Single view agreed between the project, assurance
providers and stakeholders
Impact, follow-up
and escalation
Share findings, provide a single view of assurance,
measure effectiveness18 Oct 06 6
Integrated Assurance – Projects
• Define the enterprise model for assurance
• Agree the need for assurance
• Identify the stakeholders and their assurance requirements
• Agree the level and type of assurance required by the business
and the Project (with the Sponsor)
• Define the scope (areas) of assurance for the enterprise and the
Project
• Establish a single point for assurance for the project
• Develop the risk and assurance matrix for the project
18 Oct 06 7
Integrated Assurance – Programmes
& Projects
• Greater complexity and effort in delivering assurance
• Ensure dependencies across projects and programmes are
considered in the Integrated Assurance Strategy & Plan
• Provide resources to ensure assurance activities are co-
ordinated
• Ensure consistency of assurance activity across all projects and
programmes
• Manage the provision of non-project elements that require
assurance.
18 Oct 06 8
Integrated Assurance – Barriers
• Lack of senior understanding and sponsorship
• No ownership
• Lack of collaboration between the assurance providers
• Immature Risk Management framework
• Self interest of different assurance providers
• Skills and competency of assurance resources
18 Oct 06 9
Integrated Assurance – Roles &
Responsibilities
18 Oct 06 10
Executive/ Board Provide commitment and support; initiate and approve
Integrated Assurance Strategy & Plan.
Sponsor / SRO Ensure commitment for the Integrated Assurance
Plan; analyse assurance data
Portfolio
Manager
Coordinate delivery of Assurance Plan across the
portfolio; organise and manage the assurance plan
Project/
Programme
Manager
Engage with assurance providers to support delivery
of the plan; involved in the development of the plan.
Assurance
Manager/
provider
Advise on assurance methods and best practice;
undertake assurance activity and deliver the plan
Stakeholders Receivers of assurance output and assurance;
supporters of the plan
Next Steps
• Gather the feedback
• Review within the SIG work stream
• Develop training and further guidance
18 Oct 06 11
Additional Feedback Slides
18 Oct 06 12
Principles
• Independence
• Sponsor/Customer of “Assurance activity”
• Pro-active
• An input into continuous improvement
• Actionable
• Skills, knowledge, experience, Practitioners
• Joined up across all lines of defence
18 Oct 06 13
Projects
• What goes well
– Valued when seen as useful
– Part of Business As Usual
– Functional Buy-in & visibility
• When it is difficult
– Lack of planning for assurance
– Create more standards & documents to get through the need
– It is “done to you” not “owned by you” – link to BAU
• How to address
– Stakeholder Management & Communication Plans – “red is not dead”
– Give PMs ownership & make it part of competency profile
– Senior Management support
– PRM integration – partnership
– AQPs & Governance Management System
• (Standard assurance Workstreams for project lifecycle) – iterative
– Review is as a result of specific triggers
– C.U.R.P. – standardized set of questions
18 Oct 06 14
Programmes / Portfolio
• Difference between Programme Management &
Portfolio Assurance
– Project focus on deliverables and outputs
– Programme focus on outcomes
– Portfolio focus on Benefits & Value
• How do we assure Outcomes & Benefits?
– Clarity on the overlap between Assurance & other
functions (Audit, Risk, Benefits Mgt, etc.)
– Interdependencies between projects & Programmes
– Stakeholders understanding the different lines of
defence
18 Oct 06 15
Barriers
Difficulties / Barrier Ways of working
Senior Management buy-in Well defined business case, facts, data, persuade, influence,
justification
Lack of engagement / communications
between levels/functional areas/territorial
Explain the benefits
Incorporate engagement in PM Framework
Clear roles & responsibilities
Conflicting Business Priorities Visibility / Transparency
Aligned with business objectives
Use Priority Matrix
Aggressive Timescales Good Planning
Realistic expectations for Business
Too complicated / simple Review Governance / hierarchy
Set authority levels
Use roles & responsibilities
Doesn't fit the PM Framework Review, define & tailor the process / framework
No understanding of the dependencies Identify & manage the dependencies
Hidden Agendas Determine route cause
Explain benefits
Involve in process more
PMs driven by delivery Provide training / examples
Demonstration
Unclear roles & responsibilities
18 Oct 06 16
Roles & Responsibilities
• Head of Internal Audit
– Coordination & Accountability
• Head of Corporate Risk
– There to preempt needs in relation to assurance being met – flavour
Corporate Assurance Strategies
• Project Sponsor (Programme / Portfolio Change Initiative)
– Accountability, Benefits (dis), Assurance Strategies
• Assurance Providers
– Auditors, PM’s, Peer Review
• Assurance Recipients
– Authorities, Stakeholders, Board
• Board Level
– Setting Assurance - taking responsibility
18 Oct 06 17
This presentation was delivered
at an APM event
To find out more about
upcoming events please visit
our website
www.apm.org.uk/events

More Related Content

What's hot

AliciaKMyles Resume
AliciaKMyles ResumeAliciaKMyles Resume
AliciaKMyles Resume
Alicia Myles
 
Raising the standard for collaboration – delivering transformational collabor...
Raising the standard for collaboration – delivering transformational collabor...Raising the standard for collaboration – delivering transformational collabor...
Raising the standard for collaboration – delivering transformational collabor...
Association for Project Management
 

What's hot (20)

Investment Management Compliance Practice Leader
Investment Management Compliance Practice LeaderInvestment Management Compliance Practice Leader
Investment Management Compliance Practice Leader
 
nityaja reddy
nityaja reddynityaja reddy
nityaja reddy
 
Monica papendick lexpert casl challenges in financial institutuions
Monica papendick lexpert casl challenges in financial institutuionsMonica papendick lexpert casl challenges in financial institutuions
Monica papendick lexpert casl challenges in financial institutuions
 
AliciaKMyles Resume
AliciaKMyles ResumeAliciaKMyles Resume
AliciaKMyles Resume
 
Introducing the Portfolio Management
Introducing the Portfolio Management Introducing the Portfolio Management
Introducing the Portfolio Management
 
How to successfully deliver business change
How to successfully deliver business changeHow to successfully deliver business change
How to successfully deliver business change
 
Benefits and better business cases_Alan Brown and Stefan Sanchez
Benefits and better business cases_Alan Brown and Stefan SanchezBenefits and better business cases_Alan Brown and Stefan Sanchez
Benefits and better business cases_Alan Brown and Stefan Sanchez
 
APM Presents - Introducing Portfolio Management
APM Presents - Introducing Portfolio ManagementAPM Presents - Introducing Portfolio Management
APM Presents - Introducing Portfolio Management
 
Peter Johnson's presentation on Sponsorship or applied leadership
Peter Johnson's presentation on Sponsorship or applied leadership Peter Johnson's presentation on Sponsorship or applied leadership
Peter Johnson's presentation on Sponsorship or applied leadership
 
Lessons from the best PMOs in the world
Lessons from the best PMOs in the worldLessons from the best PMOs in the world
Lessons from the best PMOs in the world
 
Workshop F, A healthy respect for benefits by David Waller and Hugo Minney
Workshop F, A healthy respect for benefits by David Waller and Hugo MinneyWorkshop F, A healthy respect for benefits by David Waller and Hugo Minney
Workshop F, A healthy respect for benefits by David Waller and Hugo Minney
 
Raising the standard for collaboration – delivering transformational collabor...
Raising the standard for collaboration – delivering transformational collabor...Raising the standard for collaboration – delivering transformational collabor...
Raising the standard for collaboration – delivering transformational collabor...
 
Benefits-led portfolio management: maximising capital investment returns, by ...
Benefits-led portfolio management: maximising capital investment returns, by ...Benefits-led portfolio management: maximising capital investment returns, by ...
Benefits-led portfolio management: maximising capital investment returns, by ...
 
International Standard on Auditing 600 Exposure Draft Webinar - Group Audits
International Standard on Auditing 600 Exposure Draft Webinar - Group AuditsInternational Standard on Auditing 600 Exposure Draft Webinar - Group Audits
International Standard on Auditing 600 Exposure Draft Webinar - Group Audits
 
IIBA South African Chapter update
IIBA South African Chapter updateIIBA South African Chapter update
IIBA South African Chapter update
 
Realising benefits through collaboration
Realising benefits through collaborationRealising benefits through collaboration
Realising benefits through collaboration
 
Directing agile change - governance of project management
Directing agile change - governance of  project managementDirecting agile change - governance of  project management
Directing agile change - governance of project management
 
It's not Big Brother - governance in the construction industry - RICS Article
It's not Big Brother - governance in the construction industry - RICS ArticleIt's not Big Brother - governance in the construction industry - RICS Article
It's not Big Brother - governance in the construction industry - RICS Article
 
APM Benefits Summit 2017 - In scoping programmes, is using the T word a const...
APM Benefits Summit 2017 - In scoping programmes, is using the T word a const...APM Benefits Summit 2017 - In scoping programmes, is using the T word a const...
APM Benefits Summit 2017 - In scoping programmes, is using the T word a const...
 
APM Portfolio Management SIG survey 2020 results
APM Portfolio Management SIG survey 2020 resultsAPM Portfolio Management SIG survey 2020 results
APM Portfolio Management SIG survey 2020 results
 

Similar to Integrated assurance with group feedback

Making Project Assurance Work presentation.pdf
Making Project Assurance Work presentation.pdfMaking Project Assurance Work presentation.pdf
Making Project Assurance Work presentation.pdf
Association for Project Management
 
Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0
Project Management Academy
 

Similar to Integrated assurance with group feedback (20)

Delivering Assurance - Integrated assurance, Andy Tims (Phil Kemp), APM ASSUR...
Delivering Assurance - Integrated assurance, Andy Tims (Phil Kemp), APM ASSUR...Delivering Assurance - Integrated assurance, Andy Tims (Phil Kemp), APM ASSUR...
Delivering Assurance - Integrated assurance, Andy Tims (Phil Kemp), APM ASSUR...
 
Ranking portfolio initiatives, Bernard Marshall, june 2012
Ranking portfolio initiatives, Bernard Marshall, june 2012Ranking portfolio initiatives, Bernard Marshall, june 2012
Ranking portfolio initiatives, Bernard Marshall, june 2012
 
The value of assurance webinar, 28 April 2020
The value of assurance webinar, 28 April 2020The value of assurance webinar, 28 April 2020
The value of assurance webinar, 28 April 2020
 
North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"
 
Making Project Assurance Work presentation.pdf
Making Project Assurance Work presentation.pdfMaking Project Assurance Work presentation.pdf
Making Project Assurance Work presentation.pdf
 
CECL - The Relationship Between Credit and Finance
CECL - The Relationship Between Credit and FinanceCECL - The Relationship Between Credit and Finance
CECL - The Relationship Between Credit and Finance
 
How to audit for success webinar
How to audit for success webinarHow to audit for success webinar
How to audit for success webinar
 
Project Auditing
Project AuditingProject Auditing
Project Auditing
 
Delivering Assurance - Audit, Mark Reilly, APM ASSURANCE SIG conference
Delivering Assurance - Audit, Mark Reilly,  APM ASSURANCE SIG conferenceDelivering Assurance - Audit, Mark Reilly,  APM ASSURANCE SIG conference
Delivering Assurance - Audit, Mark Reilly, APM ASSURANCE SIG conference
 
Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4
 
Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0
 
Insight into Security Leader Success Part 2
Insight into Security Leader Success Part 2Insight into Security Leader Success Part 2
Insight into Security Leader Success Part 2
 
Rest assured - the role of programme and project assurance
Rest assured - the role of programme and project assuranceRest assured - the role of programme and project assurance
Rest assured - the role of programme and project assurance
 
The power of being understood by Mike Ward - Shaping your portfolio to realis...
The power of being understood by Mike Ward - Shaping your portfolio to realis...The power of being understood by Mike Ward - Shaping your portfolio to realis...
The power of being understood by Mike Ward - Shaping your portfolio to realis...
 
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
Procuring for agile: thoughts on what good looks like webinar, 23 April 2020
 
Good governance of the project portfolio
Good governance of the project portfolioGood governance of the project portfolio
Good governance of the project portfolio
 
#Managing Project Financial Auditing# By SN Panigrahi
#Managing Project Financial Auditing# By SN Panigrahi#Managing Project Financial Auditing# By SN Panigrahi
#Managing Project Financial Auditing# By SN Panigrahi
 
A Business Analyst Approach -Developing A Business Case That Delivers Value T...
A Business Analyst Approach -Developing A Business Case That Delivers Value T...A Business Analyst Approach -Developing A Business Case That Delivers Value T...
A Business Analyst Approach -Developing A Business Case That Delivers Value T...
 
A business analyst approach
A business analyst approachA business analyst approach
A business analyst approach
 
IA Watch/Assette: Advertising & Marketing Compliance Webinar on 1/26/16
IA Watch/Assette: Advertising & Marketing Compliance Webinar on 1/26/16 IA Watch/Assette: Advertising & Marketing Compliance Webinar on 1/26/16
IA Watch/Assette: Advertising & Marketing Compliance Webinar on 1/26/16
 

More from Association for Project Management

Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Association for Project Management
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
Association for Project Management
 

More from Association for Project Management (20)

Including Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdfIncluding Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...
 
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
 
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
 
The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...
 
Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...
 
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 

Recently uploaded

ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
brennadilys816
 
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Dubai Multi Commodity Centre
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
seri bangash
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
daisycvs
 
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
jual Obat Aborsi Bandung, Wa : 085180626899 Apotik jual Obat Cytotec Di Bandung
 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Pusat Herbal Resmi BPOM
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
CaitlinCummins3
 

Recently uploaded (20)

NFS- Operations Presentation - Recurrent
NFS- Operations Presentation - RecurrentNFS- Operations Presentation - Recurrent
NFS- Operations Presentation - Recurrent
 
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
 
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
 
Your Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptxYour Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptx
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
Raising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE VenturesRaising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE Ventures
 
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
Stages of Startup Funding - An Explainer
Stages of Startup Funding - An ExplainerStages of Startup Funding - An Explainer
Stages of Startup Funding - An Explainer
 
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdf
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdfDaftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdf
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdf
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
stock price prediction using machine learning
stock price prediction using machine learningstock price prediction using machine learning
stock price prediction using machine learning
 
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
 
Hyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseHyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings release
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
 
5 Brilliant Ways To Buy Verified Payoneer Accounts In 2024
5 Brilliant Ways To Buy Verified Payoneer Accounts In 20245 Brilliant Ways To Buy Verified Payoneer Accounts In 2024
5 Brilliant Ways To Buy Verified Payoneer Accounts In 2024
 

Integrated assurance with group feedback

  • 1. Integrated Assurance Presentation by Mark Reilly Project & Contract Assurance, Transport for London, and APM Specific Interest Group on Assurance
  • 2. Agenda Area Timing Introduction 18:45-18:50 Integrated Assurance next developments 18:50-19:00 Break out sessions 19:00-19:20 Feedback and review of the Guide to Integrated Assurance 19:20-19:50 Next Steps 19:50-20:00 18 Oct 06
  • 3. Capturing your thoughts Take 20 minutes in your groups to look at 1 area of the Guide. What we want to know and understand, against that area what: •Are your experiences of Assurance (giving & receiving) – What went well? – What were the difficulties? – How was it addressed? •What recommendations would you suggest to improve what you experienced? •What type of information or training would you need to support you in your role? 18 Oct 06 3
  • 4. Capturing your thoughts The 5 Areas we want you to consider are: •Integrated Assurance - Principles •Integrated Assurance - for Projects •Integrated Assurance - for Programmes & Portfolios •Integrated Assurance - Barriers •Integrated Assurance - Roles & Responsibilities 18 Oct 06 4
  • 6. Integrated Assurance - Principles The coordination of assurance activities where there are a number of assurance providers Independence Assurance provides an objective view and conclusion that cannot be influenced Accountability Assurance given due authority with strategic sponsorship and commitment; governance and reporting systems; trust, transparency and visibility. Planning & coordination Through an integrated assurance strategy & plan Proportionate Reduces duplication of effort, tailored to maximise effective use of resources Risk based Single view agreed between the project, assurance providers and stakeholders Impact, follow-up and escalation Share findings, provide a single view of assurance, measure effectiveness18 Oct 06 6
  • 7. Integrated Assurance – Projects • Define the enterprise model for assurance • Agree the need for assurance • Identify the stakeholders and their assurance requirements • Agree the level and type of assurance required by the business and the Project (with the Sponsor) • Define the scope (areas) of assurance for the enterprise and the Project • Establish a single point for assurance for the project • Develop the risk and assurance matrix for the project 18 Oct 06 7
  • 8. Integrated Assurance – Programmes & Projects • Greater complexity and effort in delivering assurance • Ensure dependencies across projects and programmes are considered in the Integrated Assurance Strategy & Plan • Provide resources to ensure assurance activities are co- ordinated • Ensure consistency of assurance activity across all projects and programmes • Manage the provision of non-project elements that require assurance. 18 Oct 06 8
  • 9. Integrated Assurance – Barriers • Lack of senior understanding and sponsorship • No ownership • Lack of collaboration between the assurance providers • Immature Risk Management framework • Self interest of different assurance providers • Skills and competency of assurance resources 18 Oct 06 9
  • 10. Integrated Assurance – Roles & Responsibilities 18 Oct 06 10 Executive/ Board Provide commitment and support; initiate and approve Integrated Assurance Strategy & Plan. Sponsor / SRO Ensure commitment for the Integrated Assurance Plan; analyse assurance data Portfolio Manager Coordinate delivery of Assurance Plan across the portfolio; organise and manage the assurance plan Project/ Programme Manager Engage with assurance providers to support delivery of the plan; involved in the development of the plan. Assurance Manager/ provider Advise on assurance methods and best practice; undertake assurance activity and deliver the plan Stakeholders Receivers of assurance output and assurance; supporters of the plan
  • 11. Next Steps • Gather the feedback • Review within the SIG work stream • Develop training and further guidance 18 Oct 06 11
  • 13. Principles • Independence • Sponsor/Customer of “Assurance activity” • Pro-active • An input into continuous improvement • Actionable • Skills, knowledge, experience, Practitioners • Joined up across all lines of defence 18 Oct 06 13
  • 14. Projects • What goes well – Valued when seen as useful – Part of Business As Usual – Functional Buy-in & visibility • When it is difficult – Lack of planning for assurance – Create more standards & documents to get through the need – It is “done to you” not “owned by you” – link to BAU • How to address – Stakeholder Management & Communication Plans – “red is not dead” – Give PMs ownership & make it part of competency profile – Senior Management support – PRM integration – partnership – AQPs & Governance Management System • (Standard assurance Workstreams for project lifecycle) – iterative – Review is as a result of specific triggers – C.U.R.P. – standardized set of questions 18 Oct 06 14
  • 15. Programmes / Portfolio • Difference between Programme Management & Portfolio Assurance – Project focus on deliverables and outputs – Programme focus on outcomes – Portfolio focus on Benefits & Value • How do we assure Outcomes & Benefits? – Clarity on the overlap between Assurance & other functions (Audit, Risk, Benefits Mgt, etc.) – Interdependencies between projects & Programmes – Stakeholders understanding the different lines of defence 18 Oct 06 15
  • 16. Barriers Difficulties / Barrier Ways of working Senior Management buy-in Well defined business case, facts, data, persuade, influence, justification Lack of engagement / communications between levels/functional areas/territorial Explain the benefits Incorporate engagement in PM Framework Clear roles & responsibilities Conflicting Business Priorities Visibility / Transparency Aligned with business objectives Use Priority Matrix Aggressive Timescales Good Planning Realistic expectations for Business Too complicated / simple Review Governance / hierarchy Set authority levels Use roles & responsibilities Doesn't fit the PM Framework Review, define & tailor the process / framework No understanding of the dependencies Identify & manage the dependencies Hidden Agendas Determine route cause Explain benefits Involve in process more PMs driven by delivery Provide training / examples Demonstration Unclear roles & responsibilities 18 Oct 06 16
  • 17. Roles & Responsibilities • Head of Internal Audit – Coordination & Accountability • Head of Corporate Risk – There to preempt needs in relation to assurance being met – flavour Corporate Assurance Strategies • Project Sponsor (Programme / Portfolio Change Initiative) – Accountability, Benefits (dis), Assurance Strategies • Assurance Providers – Auditors, PM’s, Peer Review • Assurance Recipients – Authorities, Stakeholders, Board • Board Level – Setting Assurance - taking responsibility 18 Oct 06 17
  • 18. This presentation was delivered at an APM event To find out more about upcoming events please visit our website www.apm.org.uk/events