GOVERNMENT OF ANDHRA PRADESH
                                   ABSTRACT

Clean and Green Energy – Development of Solar Power in Andhra Pradesh
– Andhra Pradesh Solar Power Policy – Order – Issued.
-----------------------------------------------------------------------------------------------------------

                             ENERGY (RES-A1) DEPARTMENT

G.O. Ms. No. 39                                                                  Dt. 26-09-2012


ORDER:-


      In order to promote generation of power from Solar Power, the State
Government hereby introduce the Andhra Pradesh Solar Policy 2012, as
mentioned below :-


                 ANDHRA PRADESH SOLAR POWER POLICY -2012



PREAMBLE
      Solar power is one of the important renewable energy sources. GoI have
recognized the importance of Solar Energy as one of the future sources of
energy and accordingly National Solar Mission was launched on 14.11.2009,
under the brand name “Solar India” with an objective to maximize generation of
power from solar energy.

       Andhra Pradesh is one of the suitable locations for installing Solar Power
Projects due to the following favorable factors:

             •    Availability of about 300 sunny days in a year with solar insolation
                  of 5.5 to 6 KWh/m².

             •    Availability of widespread electric grid network, which facilitate
                  Projects with easy connectivity.
             •    Growing energy demand in the State.

       The present situation prevailing in the State with regard to substantial gap
between the demand and supply position of power calls for taking immediate
measures to augment production of energy through non conventional sources on
fast track. Keeping in view the conducive environment present to encourage
solar power and also the fact that the production of solar power is less time
consuming, it has been decided to formulate the following policy to encourage
generation of solar power in the State.

OBJECTIVE :

Main objectives of the Solar power policy are:
1. To encourage, develop and promote solar power generation in the State with
   a view to meet the growing demand for power in an environmentally and
   economically sustainable manner.

2. To attract investment in the state for the establishment of solar power plants.

3. To promote investments for setting up manufacturing facilities in the State,
   which can generate gainful local employment.

                                                                                             Contd. P.2
:: 2 ::

4. To promote the Off-Grid Solar applications to meet the power needs on
   Stand-alone basis.

5. To contribute to overall economic development, employment generation and
   improvement in public services by provision of electrical energy for various
   needs.

6. To encourage Decentralised, Distribution Generation System in the State to
   reduce T&D losses.

1. Title

     The policy shall be known as the “Andhra Pradesh Solar Power Policy
– 2012 ”

2. Operative Period

      The policy shall come into operation with effect from the date of issuance
and shall remain applicable till 2017.


3. Eligible Developers

        All registered companies, Central and State power generation/ distribution
companies and public / private sector solar power project developers will be
eligible for setting up of Solar Power Projects, either for the purpose of captive
use and/or for selling of electricity, in accordance with the Electricity Act-2003, as
amended from time to time.

      The entity desiring to set up Solar Power Project, either for sale of power
and/ or for captive use of power within the state, shall submit a proposal to the
Nodal Agency.

4. Installed capacity

a) Utility Grid Power Projects for Captive use /direct sale to 3rd
   Party/States other than A.P. State


      The State will promote Solar Power Developers to set up Solar Power
Plants for captive use or sale of power to 3rd party/States other than Andhra
Pradesh.


b) Utility Grid Power Projects for sale through RE (Solar) Certificate
   Mechanism

       The State will promote Solar Power Developers to set up Solar Power
Plants for sale through RE (Solar) Certificate mechanism. The Solar Power
Developers will be required to apply for accreditation to the State Accreditation
Agency and thereafter to Central Agency for registration and issuance of RE
(Solar) certificate under REC mechanism as per order/regulations of appropriate
Commission issued in this regard. SLDC will give clearance for REC applications
within 15 days from the date of application. The Power generated from these
power projects shall be purchased by AP DISCOMs at Pooled Cost of Power
Purchase as determined by A.P.E.R.C. from time to time.         The Solar Power
Developers will sell RE (Solar) Certificates as per the regulations/orders of
A.P.E.R.C.
                                                                      Contd. P.3
:: 3 ::

5. Open Access for Third Party Sale

       If the Open Access is granted to any developer, they shall pay the
applicable Open Access charges and losses as approved by APERC from time
to time for sale to third party outside the State.

6. Wheeling and Transmission Loss

Producer will bear the wheeling and transmission losses as per actual.

7. Banking

Banking of 100% of energy shall be permitted from January to December of that
year. There will be no banking for energy produced being consumed on the same
day. However, banked units can not be consumed/redeemed between February
to June and also during peak hours i.e. 6.30 PM to 10.30 PM. Developer will be
required to pay 2% of the banked energy towards banking charges. The energy
unutilized by December of that year gets lapsed.

8. Incentive:

       In order to encourage the immediate production of Solar Power to reduce
the present gap in demand and supply position of power and provide industries
with a possibility to utilise the power produced through solar power, following
incentives will be extended to those solar power Developers who commission
their solar plant by June 2014. These incentives will be in force for a period of
seven years from the date of implementation.

a. Wheeling and Transmission Charges

       There will be no wheeling and transmission charges for wheeling of power
generated from the Solar Power Projects , to the desired location/s for captive
use/third party sale within the state through 33 KV system subject to industries
maintaining their demand within its contracted demand. However, wheeling and
transmission charges for wheeling of power generated from the Solar Power
Projects for sale outside the state will be as per APERC regulations

b. Cross Subsidy charges

Cross subsidy surcharge shall not be applicable for Open Access obtained for
third party sale within the state subject to the industries maintaining their demand
within its contracted demand with the DISCOMs. It is not applicable for captive
use.

c. Electricity Duty exemption

All Solar Power projects will be exempted from paying Electricity Duty for captive
consumption and third party sale within the state.

d. VAT refund

VAT for all the inputs required for solar power projects will be refunded by the
Commercial Tax Department.


e. Refund of Stamp Duty and Registration charges

Industries Department will provide incentive in terms of refund of Stamp Duty and
Registration charges for land purchased for setting up solar power project.
                                                                       Contd.P.4.
:: 4 ::

f. REC

All projects developed with the above incentives will also be eligible for REC
benefits. Deemed injection into the grid for in-house captive solar generation
plant (in the same premises) will be considered for issue of REC.


9. Grid Connectivity and Evacuation facility

      The power generated from a Solar Power Project shall be injected at an
appropriate voltage to the nearest sub-station of the AP Transco / Distribution
Licensee.

       The evacuation line from interconnection point to grid substation shall be
laid by the APTRANSCO or DISCOM at the cost of the project developer.
However, if the project developer wishes to lay evacuation line by themselves,
they can do so by paying the supervision charges to APTRANSCO/DISCOM.
APTRANSCO/DISCOMs will ensure the technical feasibility for evacuation is
granted within 21 days of applying.


10. Land

       It is the responsibility of the Project Developer to acquire the land
required for the project.


11. Restriction on use of Fossil Fuels

       No fossil fuel viz., Coal, gas, lignite, naphtha, wood etc., shall be allowed
to be used in a Solar Power Plant.


12. Reactive Power Charges

 The drawl of Reactive Power by the solar power plant shall be charged as
decided by the APERC.


13. Nodal Agency

      New and Renewable Energy Development Corporation of A.P. Ltd
(NREDCAP) shall be the State Govt. Nodal Agency for clearance, facilitation and
implementation of the proposed Solar Power Policy.

14. Project Monitoring

       A “High Level Committee” constituted with the following members will
monitor the progress of implementation of the Solar Power projects cleared
under the proposed policy:
             1. Principal Secretary, Energy Department
             2. Principal Secretary, Industries and CIP
             3. V.C.& Managing Director, NREDCAP (Member-Convener)
             4. Chairman and Managing Director, APTRANSCO
             5. Commissioner, Commercial Tax.
             6. One C&MD of DISCOMs by rotation ( One Year).
             7. Representative of Finance Department.
             8. Representative of FAPCCI and CII.
             9. One representative from Solar Power Developers
                                                                 Contd. P.5
:: 5 ::

       If any difficulty arises in giving effect to this policy, the High Level
Committee is authorized to issue clarification as well as interpretation to such
provisions, as may appear to be necessary for removing the difficultly either on
its own motion or after hearing those parties who have represented.

15. Review
       State Govt. will undertake review of this policy after a period of two years.


     (BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)


                                             MRUTUNJAY SAHOO
                                   PRINCIPAL SECRETARY TO GOVERNMENT
To
The VC & Managing Director, NREDCAP, Hyderabad.
The Chairman & Managing Director, APTRANSCO.
The Managing Director, APGENCO.
The Secretary, APERC.
All CMD of DISCOMs.
All Collectors & District Magistrates.
The Special CS to Government, EFS&T Dept., Govt. of A.P.,
The Principal Secretary to Government, Revenue Dept., Govt. of A.P.

Copy to

The Principal Secretary To Hon’ble C.M.
The P.S. to Hon’ble Minister for Finance, Planning, Small Savings &
State Lotteries.
The P.S. to Hon’ble Minister for Revenue, Relief, Rehabilitation & ULC.
The P.S. to Hon’ble Minister for Major Industries, Sugar, Commerce
& Export Promotion.
The P.S. to Hon’ble Minister for Agriculture & Agriculture Technology
Mission.
The P.S. to Hon’ble Minister for Major and Medium Irrigation, A.P. Water
Resources Development Corpn.
The P.S. to Hon’ble Minister for Housing, Weaker Section Housing
Programme, A.P. Cooperative Housing Societies Federation and AP
Housing Board.
The P.S. to Principal Secretary, Energy.
SF/SC.


                                // FORWARDED : BY ORDER//


                                                        SECTION OFFICER

More Related Content

What's hot

TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"seleven
 
Newjersey solar pres
Newjersey solar presNewjersey solar pres
Newjersey solar presmarzan
 
Jharkhand solar power policy 2013
Jharkhand solar power policy 2013Jharkhand solar power policy 2013
Jharkhand solar power policy 2013Headway Solar
 
Solar News from India for week 1 July 2021- Solar Policy change, Minister app...
Solar News from India for week 1 July 2021- Solar Policy change, Minister app...Solar News from India for week 1 July 2021- Solar Policy change, Minister app...
Solar News from India for week 1 July 2021- Solar Policy change, Minister app...Rohit Arora
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantDr Naim R Kidwai
 
20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDAHarish Sharma
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsSanman Rajput
 
New base energy news 04 may 2020 issue no. 1335 senior editor eng. khale...
New base energy news  04 may  2020   issue no. 1335  senior editor eng. khale...New base energy news  04 may  2020   issue no. 1335  senior editor eng. khale...
New base energy news 04 may 2020 issue no. 1335 senior editor eng. khale...Khaled Al Awadi
 
Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Headway Solar
 
Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Private Consultants
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Gensol Engineering Limited
 
UP Solar Power Policy 2013
UP Solar Power Policy 2013UP Solar Power Policy 2013
UP Solar Power Policy 2013Headway Solar
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010Headway Solar
 
VIETNAM – SOLAR POWER SECTOR NEW MODEL PPA FOR ROOFTOP SOLAR POWER PROJECTS
VIETNAM – SOLAR POWER SECTOR NEW MODEL PPA FOR ROOFTOP SOLAR POWER PROJECTSVIETNAM – SOLAR POWER SECTOR NEW MODEL PPA FOR ROOFTOP SOLAR POWER PROJECTS
VIETNAM – SOLAR POWER SECTOR NEW MODEL PPA FOR ROOFTOP SOLAR POWER PROJECTSDr. Oliver Massmann
 
Solar Power Project (45 MW): Bulgarian Electricity Market Study
Solar Power Project (45 MW): Bulgarian Electricity Market  Study  Solar Power Project (45 MW): Bulgarian Electricity Market  Study
Solar Power Project (45 MW): Bulgarian Electricity Market Study Simeon Arnaudov
 
Ipp process in indonesia 1995 by cockcroft and fuller
Ipp process in indonesia 1995 by cockcroft and fullerIpp process in indonesia 1995 by cockcroft and fuller
Ipp process in indonesia 1995 by cockcroft and fullerPeter Cockcroft
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanIBRAR AHMAD
 
GDF SUEZ Energy Southern Africa Co_ Ltd
GDF SUEZ Energy Southern Africa Co_ LtdGDF SUEZ Energy Southern Africa Co_ Ltd
GDF SUEZ Energy Southern Africa Co_ LtdNcedeka Stuurman
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderGensol Engineering Limited
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabHarish Sharma
 

What's hot (20)

TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
 
Newjersey solar pres
Newjersey solar presNewjersey solar pres
Newjersey solar pres
 
Jharkhand solar power policy 2013
Jharkhand solar power policy 2013Jharkhand solar power policy 2013
Jharkhand solar power policy 2013
 
Solar News from India for week 1 July 2021- Solar Policy change, Minister app...
Solar News from India for week 1 July 2021- Solar Policy change, Minister app...Solar News from India for week 1 July 2021- Solar Policy change, Minister app...
Solar News from India for week 1 July 2021- Solar Policy change, Minister app...
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plant
 
20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA20 MW Canal Top Solar RfP by PEDA
20 MW Canal Top Solar RfP by PEDA
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
New base energy news 04 may 2020 issue no. 1335 senior editor eng. khale...
New base energy news  04 may  2020   issue no. 1335  senior editor eng. khale...New base energy news  04 may  2020   issue no. 1335  senior editor eng. khale...
New base energy news 04 may 2020 issue no. 1335 senior editor eng. khale...
 
Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012
 
Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
 
UP Solar Power Policy 2013
UP Solar Power Policy 2013UP Solar Power Policy 2013
UP Solar Power Policy 2013
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010
 
VIETNAM – SOLAR POWER SECTOR NEW MODEL PPA FOR ROOFTOP SOLAR POWER PROJECTS
VIETNAM – SOLAR POWER SECTOR NEW MODEL PPA FOR ROOFTOP SOLAR POWER PROJECTSVIETNAM – SOLAR POWER SECTOR NEW MODEL PPA FOR ROOFTOP SOLAR POWER PROJECTS
VIETNAM – SOLAR POWER SECTOR NEW MODEL PPA FOR ROOFTOP SOLAR POWER PROJECTS
 
Solar Power Project (45 MW): Bulgarian Electricity Market Study
Solar Power Project (45 MW): Bulgarian Electricity Market  Study  Solar Power Project (45 MW): Bulgarian Electricity Market  Study
Solar Power Project (45 MW): Bulgarian Electricity Market Study
 
Ipp process in indonesia 1995 by cockcroft and fuller
Ipp process in indonesia 1995 by cockcroft and fullerIpp process in indonesia 1995 by cockcroft and fuller
Ipp process in indonesia 1995 by cockcroft and fuller
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistan
 
GDF SUEZ Energy Southern Africa Co_ Ltd
GDF SUEZ Energy Southern Africa Co_ LtdGDF SUEZ Energy Southern Africa Co_ Ltd
GDF SUEZ Energy Southern Africa Co_ Ltd
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
 

Viewers also liked

TUGAS FISIKA I
TUGAS FISIKA I TUGAS FISIKA I
TUGAS FISIKA I nadyavsc
 
Form pendaftaran p ps uny 2015ver 14012015
Form pendaftaran p ps uny 2015ver 14012015Form pendaftaran p ps uny 2015ver 14012015
Form pendaftaran p ps uny 2015ver 14012015Atahya
 
Irw application form 2012
Irw application form 2012Irw application form 2012
Irw application form 2012reazulislam
 
plants and animals
plants and animalsplants and animals
plants and animalspramodhhj
 
Popular struggles in nepal
Popular struggles in nepalPopular struggles in nepal
Popular struggles in nepalpramodhhj
 
Trabalho sobre a ISO/IEC 15504
Trabalho sobre a ISO/IEC 15504Trabalho sobre a ISO/IEC 15504
Trabalho sobre a ISO/IEC 15504Ricardo Zalla
 
Informal edu
Informal eduInformal edu
Informal edumu_neer
 

Viewers also liked (8)

TUGAS FISIKA I
TUGAS FISIKA I TUGAS FISIKA I
TUGAS FISIKA I
 
Form pendaftaran p ps uny 2015ver 14012015
Form pendaftaran p ps uny 2015ver 14012015Form pendaftaran p ps uny 2015ver 14012015
Form pendaftaran p ps uny 2015ver 14012015
 
Introduction to ob m1
Introduction to ob m1Introduction to ob m1
Introduction to ob m1
 
Irw application form 2012
Irw application form 2012Irw application form 2012
Irw application form 2012
 
plants and animals
plants and animalsplants and animals
plants and animals
 
Popular struggles in nepal
Popular struggles in nepalPopular struggles in nepal
Popular struggles in nepal
 
Trabalho sobre a ISO/IEC 15504
Trabalho sobre a ISO/IEC 15504Trabalho sobre a ISO/IEC 15504
Trabalho sobre a ISO/IEC 15504
 
Informal edu
Informal eduInformal edu
Informal edu
 

Similar to Ap solar policy 2012.

Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Headway Solar
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014Headway Solar
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policiesNaresh Goud
 
Solar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy CrisisSolar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy Crisissolarindia
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Spark Network
 
Kerala solar energy policy 2013
Kerala solar energy policy 2013Kerala solar energy policy 2013
Kerala solar energy policy 2013Headway Solar
 
Odisha solar policy 2013 draft
Odisha solar policy 2013 draftOdisha solar policy 2013 draft
Odisha solar policy 2013 draftHeadway Solar
 
Solar rooftop opportunities and challenges
Solar rooftop opportunities and challengesSolar rooftop opportunities and challenges
Solar rooftop opportunities and challengesJay Ranvir
 
OVERVIEW OF NET ENERGY METERING IN MALAYSIA
OVERVIEW OF  NET ENERGY METERING  IN MALAYSIAOVERVIEW OF  NET ENERGY METERING  IN MALAYSIA
OVERVIEW OF NET ENERGY METERING IN MALAYSIAZAINI ABDUL WAHAB
 
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...Syed Hashimi
 
Odisha solar-power-policy
Odisha solar-power-policyOdisha solar-power-policy
Odisha solar-power-policyJay Ranvir
 
Saudi Arabia-Solar power business plans
Saudi Arabia-Solar power business plansSaudi Arabia-Solar power business plans
Saudi Arabia-Solar power business plansSHAIK AMANULLA
 
Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8 Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8 Dr. Oliver Massmann
 
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftHeadway Solar
 

Similar to Ap solar policy 2012. (20)

Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014
 
Solar Presentation
Solar PresentationSolar Presentation
Solar Presentation
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
SOLAR MISSION
SOLAR MISSION SOLAR MISSION
SOLAR MISSION
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policies
 
Solar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy CrisisSolar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy Crisis
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
RENEWABLE POLICY
RENEWABLE POLICYRENEWABLE POLICY
RENEWABLE POLICY
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013
 
Kerala solar energy policy 2013
Kerala solar energy policy 2013Kerala solar energy policy 2013
Kerala solar energy policy 2013
 
Odisha solar policy 2013 draft
Odisha solar policy 2013 draftOdisha solar policy 2013 draft
Odisha solar policy 2013 draft
 
Solar power plant Opportunity and Costing
Solar power plant Opportunity and CostingSolar power plant Opportunity and Costing
Solar power plant Opportunity and Costing
 
Solar rooftop opportunities and challenges
Solar rooftop opportunities and challengesSolar rooftop opportunities and challenges
Solar rooftop opportunities and challenges
 
OVERVIEW OF NET ENERGY METERING IN MALAYSIA
OVERVIEW OF  NET ENERGY METERING  IN MALAYSIAOVERVIEW OF  NET ENERGY METERING  IN MALAYSIA
OVERVIEW OF NET ENERGY METERING IN MALAYSIA
 
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
 
Odisha solar-power-policy
Odisha solar-power-policyOdisha solar-power-policy
Odisha solar-power-policy
 
Grid Connected Roof Top Solar Power Generation: A Review
Grid Connected Roof Top Solar Power Generation: A ReviewGrid Connected Roof Top Solar Power Generation: A Review
Grid Connected Roof Top Solar Power Generation: A Review
 
Saudi Arabia-Solar power business plans
Saudi Arabia-Solar power business plansSaudi Arabia-Solar power business plans
Saudi Arabia-Solar power business plans
 
Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8 Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8
 
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 2 Tranche 1 Guidelines - Draft
 

Recently uploaded

9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfFrancenel Paul
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...USDAReapgrants.com
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfProbe Gold
 
Best investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discountingBest investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discountingFalcon Invoice Discounting
 

Recently uploaded (15)

9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdf
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdf
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
Best investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discountingBest investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discounting
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 

Ap solar policy 2012.

  • 1. GOVERNMENT OF ANDHRA PRADESH ABSTRACT Clean and Green Energy – Development of Solar Power in Andhra Pradesh – Andhra Pradesh Solar Power Policy – Order – Issued. ----------------------------------------------------------------------------------------------------------- ENERGY (RES-A1) DEPARTMENT G.O. Ms. No. 39 Dt. 26-09-2012 ORDER:- In order to promote generation of power from Solar Power, the State Government hereby introduce the Andhra Pradesh Solar Policy 2012, as mentioned below :- ANDHRA PRADESH SOLAR POWER POLICY -2012 PREAMBLE Solar power is one of the important renewable energy sources. GoI have recognized the importance of Solar Energy as one of the future sources of energy and accordingly National Solar Mission was launched on 14.11.2009, under the brand name “Solar India” with an objective to maximize generation of power from solar energy. Andhra Pradesh is one of the suitable locations for installing Solar Power Projects due to the following favorable factors: • Availability of about 300 sunny days in a year with solar insolation of 5.5 to 6 KWh/m². • Availability of widespread electric grid network, which facilitate Projects with easy connectivity. • Growing energy demand in the State. The present situation prevailing in the State with regard to substantial gap between the demand and supply position of power calls for taking immediate measures to augment production of energy through non conventional sources on fast track. Keeping in view the conducive environment present to encourage solar power and also the fact that the production of solar power is less time consuming, it has been decided to formulate the following policy to encourage generation of solar power in the State. OBJECTIVE : Main objectives of the Solar power policy are: 1. To encourage, develop and promote solar power generation in the State with a view to meet the growing demand for power in an environmentally and economically sustainable manner. 2. To attract investment in the state for the establishment of solar power plants. 3. To promote investments for setting up manufacturing facilities in the State, which can generate gainful local employment. Contd. P.2
  • 2. :: 2 :: 4. To promote the Off-Grid Solar applications to meet the power needs on Stand-alone basis. 5. To contribute to overall economic development, employment generation and improvement in public services by provision of electrical energy for various needs. 6. To encourage Decentralised, Distribution Generation System in the State to reduce T&D losses. 1. Title The policy shall be known as the “Andhra Pradesh Solar Power Policy – 2012 ” 2. Operative Period The policy shall come into operation with effect from the date of issuance and shall remain applicable till 2017. 3. Eligible Developers All registered companies, Central and State power generation/ distribution companies and public / private sector solar power project developers will be eligible for setting up of Solar Power Projects, either for the purpose of captive use and/or for selling of electricity, in accordance with the Electricity Act-2003, as amended from time to time. The entity desiring to set up Solar Power Project, either for sale of power and/ or for captive use of power within the state, shall submit a proposal to the Nodal Agency. 4. Installed capacity a) Utility Grid Power Projects for Captive use /direct sale to 3rd Party/States other than A.P. State The State will promote Solar Power Developers to set up Solar Power Plants for captive use or sale of power to 3rd party/States other than Andhra Pradesh. b) Utility Grid Power Projects for sale through RE (Solar) Certificate Mechanism The State will promote Solar Power Developers to set up Solar Power Plants for sale through RE (Solar) Certificate mechanism. The Solar Power Developers will be required to apply for accreditation to the State Accreditation Agency and thereafter to Central Agency for registration and issuance of RE (Solar) certificate under REC mechanism as per order/regulations of appropriate Commission issued in this regard. SLDC will give clearance for REC applications within 15 days from the date of application. The Power generated from these power projects shall be purchased by AP DISCOMs at Pooled Cost of Power Purchase as determined by A.P.E.R.C. from time to time. The Solar Power Developers will sell RE (Solar) Certificates as per the regulations/orders of A.P.E.R.C. Contd. P.3
  • 3. :: 3 :: 5. Open Access for Third Party Sale If the Open Access is granted to any developer, they shall pay the applicable Open Access charges and losses as approved by APERC from time to time for sale to third party outside the State. 6. Wheeling and Transmission Loss Producer will bear the wheeling and transmission losses as per actual. 7. Banking Banking of 100% of energy shall be permitted from January to December of that year. There will be no banking for energy produced being consumed on the same day. However, banked units can not be consumed/redeemed between February to June and also during peak hours i.e. 6.30 PM to 10.30 PM. Developer will be required to pay 2% of the banked energy towards banking charges. The energy unutilized by December of that year gets lapsed. 8. Incentive: In order to encourage the immediate production of Solar Power to reduce the present gap in demand and supply position of power and provide industries with a possibility to utilise the power produced through solar power, following incentives will be extended to those solar power Developers who commission their solar plant by June 2014. These incentives will be in force for a period of seven years from the date of implementation. a. Wheeling and Transmission Charges There will be no wheeling and transmission charges for wheeling of power generated from the Solar Power Projects , to the desired location/s for captive use/third party sale within the state through 33 KV system subject to industries maintaining their demand within its contracted demand. However, wheeling and transmission charges for wheeling of power generated from the Solar Power Projects for sale outside the state will be as per APERC regulations b. Cross Subsidy charges Cross subsidy surcharge shall not be applicable for Open Access obtained for third party sale within the state subject to the industries maintaining their demand within its contracted demand with the DISCOMs. It is not applicable for captive use. c. Electricity Duty exemption All Solar Power projects will be exempted from paying Electricity Duty for captive consumption and third party sale within the state. d. VAT refund VAT for all the inputs required for solar power projects will be refunded by the Commercial Tax Department. e. Refund of Stamp Duty and Registration charges Industries Department will provide incentive in terms of refund of Stamp Duty and Registration charges for land purchased for setting up solar power project. Contd.P.4.
  • 4. :: 4 :: f. REC All projects developed with the above incentives will also be eligible for REC benefits. Deemed injection into the grid for in-house captive solar generation plant (in the same premises) will be considered for issue of REC. 9. Grid Connectivity and Evacuation facility The power generated from a Solar Power Project shall be injected at an appropriate voltage to the nearest sub-station of the AP Transco / Distribution Licensee. The evacuation line from interconnection point to grid substation shall be laid by the APTRANSCO or DISCOM at the cost of the project developer. However, if the project developer wishes to lay evacuation line by themselves, they can do so by paying the supervision charges to APTRANSCO/DISCOM. APTRANSCO/DISCOMs will ensure the technical feasibility for evacuation is granted within 21 days of applying. 10. Land It is the responsibility of the Project Developer to acquire the land required for the project. 11. Restriction on use of Fossil Fuels No fossil fuel viz., Coal, gas, lignite, naphtha, wood etc., shall be allowed to be used in a Solar Power Plant. 12. Reactive Power Charges The drawl of Reactive Power by the solar power plant shall be charged as decided by the APERC. 13. Nodal Agency New and Renewable Energy Development Corporation of A.P. Ltd (NREDCAP) shall be the State Govt. Nodal Agency for clearance, facilitation and implementation of the proposed Solar Power Policy. 14. Project Monitoring A “High Level Committee” constituted with the following members will monitor the progress of implementation of the Solar Power projects cleared under the proposed policy: 1. Principal Secretary, Energy Department 2. Principal Secretary, Industries and CIP 3. V.C.& Managing Director, NREDCAP (Member-Convener) 4. Chairman and Managing Director, APTRANSCO 5. Commissioner, Commercial Tax. 6. One C&MD of DISCOMs by rotation ( One Year). 7. Representative of Finance Department. 8. Representative of FAPCCI and CII. 9. One representative from Solar Power Developers Contd. P.5
  • 5. :: 5 :: If any difficulty arises in giving effect to this policy, the High Level Committee is authorized to issue clarification as well as interpretation to such provisions, as may appear to be necessary for removing the difficultly either on its own motion or after hearing those parties who have represented. 15. Review State Govt. will undertake review of this policy after a period of two years. (BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH) MRUTUNJAY SAHOO PRINCIPAL SECRETARY TO GOVERNMENT To The VC & Managing Director, NREDCAP, Hyderabad. The Chairman & Managing Director, APTRANSCO. The Managing Director, APGENCO. The Secretary, APERC. All CMD of DISCOMs. All Collectors & District Magistrates. The Special CS to Government, EFS&T Dept., Govt. of A.P., The Principal Secretary to Government, Revenue Dept., Govt. of A.P. Copy to The Principal Secretary To Hon’ble C.M. The P.S. to Hon’ble Minister for Finance, Planning, Small Savings & State Lotteries. The P.S. to Hon’ble Minister for Revenue, Relief, Rehabilitation & ULC. The P.S. to Hon’ble Minister for Major Industries, Sugar, Commerce & Export Promotion. The P.S. to Hon’ble Minister for Agriculture & Agriculture Technology Mission. The P.S. to Hon’ble Minister for Major and Medium Irrigation, A.P. Water Resources Development Corpn. The P.S. to Hon’ble Minister for Housing, Weaker Section Housing Programme, A.P. Cooperative Housing Societies Federation and AP Housing Board. The P.S. to Principal Secretary, Energy. SF/SC. // FORWARDED : BY ORDER// SECTION OFFICER