BBSC 341: CONSTRUCTION:

          VISUAL DIARY PRESENTATION




                                      Ankit Surti
I chose to document the excavation and the piling process of the foundation system used in
the 1 Featherston Street Project. I also, documented the foundation system used for the
cranes which is part of the construction phase of the project and appeared to be similar to
the piling process.
12 Piles are to be casted on-site to
increase the bearing capacity.

They are casted on-site due to the
substantial size of the piles.

The pile I explored is shown on the
left, which was 26m deep and 1.5m in
diameter

Every pile varies in depth due to
uneven bearing capacity of the
reclaimed land.
Once the hole is drilled, the steel casing is
placed into the hole as a temporary formwork
and to maintain the form of the hole.

After the steel casing is placed, the reinforcing
cage is craned into place.
Shows Tremie Tube getting placed into the hole. This is used to
pour concrete in due to the substantial size of the hole. The Tremie
Tube has to be placed right down to the bottom of the hole in order
to get the concrete right down to the base of the pile. A funnel is
placed at the top of the tube in order to make the pouring process of
the concrete easier.
Shows the pouring of the concrete process. 6 trucks were used to pour the concrete for one pile.
Polymer liquid is placed into the hole to help set the
concrete and to bind the soil on the edges of the
hole.

As the concrete is poured it overflows and as a
result, drainage system has to be placed to pump the
polymer out.
Once the concrete is poured to the depth specified,
the steel casing is lifted off.

After the casing is lifted off, another reinforcing cage
is placed carefully in position. This allows for further
construction above the piles.

Image on the right shows the finished pile.
This is exactly what has been done on-site
as shown in all the images. However, the
4th process which involves feeding
bentonite was not mentioned.




 The structural engineer checks all the
 reinforcing bars and cages in order to
 ensure that they are constructed properly
 and as specified. The structural engineer
 also, checks a report on the concrete to
 ensure the crushing capacity is complied
 and as determined in the specifications.
 The geo-tech engineer ensures the right
 depth is created for the piles and the
 architects ensure that the construction
 phase is done as specified.

More Related Content

What's hot

report-on-emmar.docx13
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13
Minhal Haider
 
Concrete Pavement Rehabilitation Method
Concrete Pavement Rehabilitation MethodConcrete Pavement Rehabilitation Method
Concrete Pavement Rehabilitation Method
Denish Sonani, CMIT
 
IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006
Manuj Ray
 

What's hot (20)

report-on-emmar.docx13
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing Technique
 
Concrete Pavement Rehabilitation Method
Concrete Pavement Rehabilitation MethodConcrete Pavement Rehabilitation Method
Concrete Pavement Rehabilitation Method
 
Railway over bridge
Railway over bridgeRailway over bridge
Railway over bridge
 
Formwork
FormworkFormwork
Formwork
 
Concrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabConcrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slab
 
Dishant ppt
Dishant pptDishant ppt
Dishant ppt
 
Concrete
ConcreteConcrete
Concrete
 
04. superstructure
04. superstructure04. superstructure
04. superstructure
 
Innovative Precast Bridge System
Innovative Precast Bridge SystemInnovative Precast Bridge System
Innovative Precast Bridge System
 
Slip formwork technique
Slip formwork techniqueSlip formwork technique
Slip formwork technique
 
Svp field training report final
Svp field training report finalSvp field training report final
Svp field training report final
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Joints ppt devesh
Joints ppt deveshJoints ppt devesh
Joints ppt devesh
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Industrial training seminar PPT
Industrial training seminar PPTIndustrial training seminar PPT
Industrial training seminar PPT
 
Pre caste Concrete
Pre caste ConcretePre caste Concrete
Pre caste Concrete
 
IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006
 
Industrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERINGIndustrial project report ppt CIVIL ENGINEERING
Industrial project report ppt CIVIL ENGINEERING
 
Concrete foundations presentations
Concrete foundations presentationsConcrete foundations presentations
Concrete foundations presentations
 

Similar to Construction Presentation

Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
juwes
 
Joe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINAL
Joe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINALJoe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINAL
Joe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINAL
Joseph Kaufman
 
108 delancey street
108 delancey street108 delancey street
108 delancey street
DavidMulrich
 
LEC 15hsjsjjsjdjjdjdnnhdhdhdbdhdndd F C.ptx
LEC 15hsjsjjsjdjjdjdnnhdhdhdbdhdndd  F C.ptxLEC 15hsjsjjsjdjjdjdnnhdhdhdbdhdndd  F C.ptx
LEC 15hsjsjjsjdjjdjdnnhdhdhdbdhdndd F C.ptx
krishnarajgire71
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1
Parham Farhadpoor
 

Similar to Construction Presentation (20)

Cast in situ Pile
Cast in situ PileCast in situ Pile
Cast in situ Pile
 
IPT Training
IPT TrainingIPT Training
IPT Training
 
pile foundation and pile cap presentation
pile foundation and pile cap presentationpile foundation and pile cap presentation
pile foundation and pile cap presentation
 
Microtunel Construction / Secant Pile
Microtunel Construction / Secant PileMicrotunel Construction / Secant Pile
Microtunel Construction / Secant Pile
 
Case studies for strengthening of existing structures
Case studies for strengthening of existing structuresCase studies for strengthening of existing structures
Case studies for strengthening of existing structures
 
Jacketing (RR&S)
Jacketing (RR&S)Jacketing (RR&S)
Jacketing (RR&S)
 
mbl
mblmbl
mbl
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
 
06 bridge
06 bridge06 bridge
06 bridge
 
Joe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINAL
Joe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINALJoe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINAL
Joe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINAL
 
KUY Limeng,e20190482(I4GCI-B)_4.pdf
KUY Limeng,e20190482(I4GCI-B)_4.pdfKUY Limeng,e20190482(I4GCI-B)_4.pdf
KUY Limeng,e20190482(I4GCI-B)_4.pdf
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II Report
 
Intership in DMRC
Intership in DMRCIntership in DMRC
Intership in DMRC
 
108 delancey street
108 delancey street108 delancey street
108 delancey street
 
Site visit report
Site visit reportSite visit report
Site visit report
 
LEC 15hsjsjjsjdjjdjdnnhdhdhdbdhdndd F C.ptx
LEC 15hsjsjjsjdjjdjdnnhdhdhdbdhdndd  F C.ptxLEC 15hsjsjjsjdjjdjdnnhdhdhdbdhdndd  F C.ptx
LEC 15hsjsjjsjdjjdjdnnhdhdhdbdhdndd F C.ptx
 
civil enginnering industrial training report
civil enginnering industrial training report civil enginnering industrial training report
civil enginnering industrial training report
 
civil enginnering industrial training report
civil enginnering industrial training report civil enginnering industrial training report
civil enginnering industrial training report
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1
 
Rehabilitation of foundation
Rehabilitation of foundationRehabilitation of foundation
Rehabilitation of foundation
 

Recently uploaded

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
dlhescort
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 

Recently uploaded (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 

Construction Presentation

  • 1. BBSC 341: CONSTRUCTION: VISUAL DIARY PRESENTATION Ankit Surti
  • 2. I chose to document the excavation and the piling process of the foundation system used in the 1 Featherston Street Project. I also, documented the foundation system used for the cranes which is part of the construction phase of the project and appeared to be similar to the piling process.
  • 3. 12 Piles are to be casted on-site to increase the bearing capacity. They are casted on-site due to the substantial size of the piles. The pile I explored is shown on the left, which was 26m deep and 1.5m in diameter Every pile varies in depth due to uneven bearing capacity of the reclaimed land.
  • 4.
  • 5. Once the hole is drilled, the steel casing is placed into the hole as a temporary formwork and to maintain the form of the hole. After the steel casing is placed, the reinforcing cage is craned into place.
  • 6. Shows Tremie Tube getting placed into the hole. This is used to pour concrete in due to the substantial size of the hole. The Tremie Tube has to be placed right down to the bottom of the hole in order to get the concrete right down to the base of the pile. A funnel is placed at the top of the tube in order to make the pouring process of the concrete easier.
  • 7. Shows the pouring of the concrete process. 6 trucks were used to pour the concrete for one pile.
  • 8. Polymer liquid is placed into the hole to help set the concrete and to bind the soil on the edges of the hole. As the concrete is poured it overflows and as a result, drainage system has to be placed to pump the polymer out.
  • 9. Once the concrete is poured to the depth specified, the steel casing is lifted off. After the casing is lifted off, another reinforcing cage is placed carefully in position. This allows for further construction above the piles. Image on the right shows the finished pile.
  • 10. This is exactly what has been done on-site as shown in all the images. However, the 4th process which involves feeding bentonite was not mentioned. The structural engineer checks all the reinforcing bars and cages in order to ensure that they are constructed properly and as specified. The structural engineer also, checks a report on the concrete to ensure the crushing capacity is complied and as determined in the specifications. The geo-tech engineer ensures the right depth is created for the piles and the architects ensure that the construction phase is done as specified.