Lean Tools Select the right “Lean” tool to manage outcomes and expectations Anand Subramaniam
2 “The significant problems we face cannot be solved at the same level of thinking we were at when we created them.”  - Albert Einstein
3 Highlights Lean Tools Lean Tools - Others
Lean Tools
What is Lean? Elimination of waste Toyota Production System (TPS) Philosophy Produce only what is needed, when it is needed, with no waste Methodology Determination of value added in the process Tools Five Ss, Kaizen event, standardised work, etc 5
Problem Solving 6 ,[object Object]
Process walks
Pareto Charts
Cause & Effect
PDCA
Brainstorming
Process Mapping
Spaghetti Diagrams
Histograms
Check sheets
Flowcharts
5 W -5S-7W-VSM
Takt time
Poka-Yoka%  of Problems 6 Sigma DOE Taguchi Plan – Do  - Check – Act 7 QC Tools  Check Sheet Cause & Effect Diagram Graphs & Charts Pareto Control Chart Histogram Scatter Diagram Easy                            Medium                         Difficult 20% 20% 60% Degree of Difficulty
7 Lean - Tools 5S 8 W (Waste) Jidoka /  Andon / PokaYoke / Mistake Proofing Single minute exchange of die (SMED) Standard Operating Proced-ures Kaizen Tools Kanban Total Preventa-tiveMainten-ance Takt time Through-put time Spaghetti diagram Value Stream Mapping Kaizen blitz or event
5 S Seiri (Sort)—Separate necessary from unnecessary items, including tools, parts, materials, and paperwork, and remove the unnecessary items Seiton (Straighten)—Arrange the necessary items neatly, providing visual cues to where items should be placed Seiso (Sweep)—Clean the work area Seiketsu (Standardise)—Standardise the first three Ss so that cleanliness is maintained Shitsuke (Sustain)—Ensure that the first four Ss continue to be performed on a regular basis 8
8W - Waste (Muda) Types Transportation Inventory Motion Waiting Over-production Over-processing Defects Standards lacking 9 Tim Woods
Common Causes of Waste  Long setup time Lack of training Layout (distance) Poor maintenance Poor work methods Incapable processes Inconsistent performance measures Ineffective production planning  Lack of workplace organisation Poor supply quality / reliability  10
Jidoka and Andon Jidoka is the ability for machines to be self-dependent and error proof without any human interaction Prevents defects from passing from one step in the system to the next Enables swift detection and correction of errors Andon is a visual or audible signaling device used to indicate there is a problem in the process 11
Poka-Yoke (Mistake-Proofing An approach for mistake-proofing processes using automatic devices or methods to avoid simple human or machine error, such as forgetfulness, misunderstanding, errors in identification, lack of experience, absentmindedness, delays, or malfunctions 12
Single Minute Exchange of Die(SMED) Used to reduce changeover or setup time, which is the time needed between the completion of one procedure and the start of the next procedure Steps Separate internal activities from external activities Convert internal setup activities to external activities Streamline all setup activities 13
Standardised Work Written documentation of the way in which each step in a process should be performed Not a rigid system of compliance, but a means of communicating and codifying current best practices 14
Takt Time The speed with which customers must be served to satisfy demand for the service Cycle time is the time to accomplish a task in the system System cycle time is equal to the longest task cycle time in the system—the rate at which customers or products exit the system, or “drip time” 15
Takt Time - Calculation TAKT time is how many minutes or seconds are needed to make one part when considering the daily volumes, to be produced in that work-cell and the total time available to perform the job TAKT time is NOT the time it takes to manufacture the product.  It is based on customer demand Who is the customer The next operation Customer orders 16
TAKT Time Net Available Operating Time  (NAOT)     •  Time per shift         	- 480 minutes     •   Breaks (2 @ 10´)  	- 20 minutes     •   Clean-up               	- 20 minutes     •   Lunch		- 30 minutes      •   NAOT per shift  	- 410 minutes  Customer Requirements     •   Monthly	       	- 26,000 units/month     •   No. Working Days	- 20 days/month    •   CR/Day                 	- 1,300 units/day TAKT Time      •   410 x 60 x 3 shifts (73,800) divided by 1,300       •   57.769 seconds per part or 57 seconds 17
Throughput Time Time for an item to complete the entire process, which includes: Queue time Waiting time Transport time Actual processing time 18
Spaghetti Diagram 19

More Related Content

What's hot

Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basicssarah bridge
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean managementPramod A
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarMichael E. Parker
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturingskchawla4
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and PrinciplesAzmir Latif Beg
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 
Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingTimothy Wooi
 
Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management BasicsUpendra K
 
Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Murimanijayjay
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleAndrew Schwartz
 
Most (Maynard Operation Sequence Technique)
Most (Maynard Operation Sequence Technique)Most (Maynard Operation Sequence Technique)
Most (Maynard Operation Sequence Technique)Sohit Chauhan
 

What's hot (20)

Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
7 Wastes
7 Wastes7 Wastes
7 Wastes
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and Principles
 
Cycle time
Cycle timeCycle time
Cycle time
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in Manufacturing
 
Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management Basics
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Muri
 
Lean ppt
Lean pptLean ppt
Lean ppt
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Most (Maynard Operation Sequence Technique)
Most (Maynard Operation Sequence Technique)Most (Maynard Operation Sequence Technique)
Most (Maynard Operation Sequence Technique)
 

Viewers also liked

Viewers also liked (20)

Core Lean Tools
Core Lean ToolsCore Lean Tools
Core Lean Tools
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Solving Client Issues
Solving Client IssuesSolving Client Issues
Solving Client Issues
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Customer Service Strategy & Customer Experience
Customer Service Strategy & Customer ExperienceCustomer Service Strategy & Customer Experience
Customer Service Strategy & Customer Experience
 
Design For Six Sigma
Design For Six SigmaDesign For Six Sigma
Design For Six Sigma
 
Innovation – What, Why, How…
Innovation – What, Why, How…Innovation – What, Why, How…
Innovation – What, Why, How…
 
FMEA Analysis Cycle
FMEA Analysis CycleFMEA Analysis Cycle
FMEA Analysis Cycle
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
Content Management System
Content Management SystemContent Management System
Content Management System
 
Lesson Learned Report
Lesson Learned ReportLesson Learned Report
Lesson Learned Report
 
Lean Transformation ~ A Journey
Lean Transformation ~ A JourneyLean Transformation ~ A Journey
Lean Transformation ~ A Journey
 
Professional Services (Ps) Excellence
Professional Services (Ps) ExcellenceProfessional Services (Ps) Excellence
Professional Services (Ps) Excellence
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation Checklist
 
The 7 sorrows of mary
The 7 sorrows of maryThe 7 sorrows of mary
The 7 sorrows of mary
 
Poka Yoka Techniques
Poka Yoka TechniquesPoka Yoka Techniques
Poka Yoka Techniques
 
Optimise & Integrate WCM & SCM
Optimise & Integrate   WCM & SCMOptimise & Integrate   WCM & SCM
Optimise & Integrate WCM & SCM
 
Innovation
InnovationInnovation
Innovation
 
Cause & Effect
Cause & EffectCause & Effect
Cause & Effect
 
Software Development
Software DevelopmentSoftware Development
Software Development
 

Similar to Lean Tools

37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutionssashi prabhu
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutionssashi prabhu
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jitsree19881988
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherAlan Desrocher
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & ChecklistsAnand Subramaniam
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 
Top 32 technologies
Top 32 technologiesTop 32 technologies
Top 32 technologiesNaga Muruga
 
Lean 101 2 Hour 2011
Lean 101 2 Hour 2011Lean 101 2 Hour 2011
Lean 101 2 Hour 2011LCI1998
 
Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPSPrakash Prakash
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltRajiv Tiwari
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jitajithsrc
 

Similar to Lean Tools (20)

5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jit
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
13. lean production system pgp
13. lean production system pgp13. lean production system pgp
13. lean production system pgp
 
Top 25 lean tools
Top 25 lean toolsTop 25 lean tools
Top 25 lean tools
 
Top 32 technologies
Top 32 technologiesTop 32 technologies
Top 32 technologies
 
Lean 101 2 Hour 2011
Lean 101 2 Hour 2011Lean 101 2 Hour 2011
Lean 101 2 Hour 2011
 
Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPS
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green Belt
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
VSM – Current & Future
VSM – Current & FutureVSM – Current & Future
VSM – Current & Future
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jit
 

More from Anand Subramaniam (20)

Lean transformation
Lean transformationLean transformation
Lean transformation
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Anand dossier 2
Anand dossier 2Anand dossier 2
Anand dossier 2
 
Anand short dossier
Anand short dossierAnand short dossier
Anand short dossier
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
3 MU
3 MU3 MU
3 MU
 
Ninbennoaru Jidoka
Ninbennoaru JidokaNinbennoaru Jidoka
Ninbennoaru Jidoka
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 

Recently uploaded

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 

Recently uploaded (20)

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 

Lean Tools

  • 1. Lean Tools Select the right “Lean” tool to manage outcomes and expectations Anand Subramaniam
  • 2. 2 “The significant problems we face cannot be solved at the same level of thinking we were at when we created them.” - Albert Einstein
  • 3. 3 Highlights Lean Tools Lean Tools - Others
  • 5. What is Lean? Elimination of waste Toyota Production System (TPS) Philosophy Produce only what is needed, when it is needed, with no waste Methodology Determination of value added in the process Tools Five Ss, Kaizen event, standardised work, etc 5
  • 6.
  • 10. PDCA
  • 19. Poka-Yoka% of Problems 6 Sigma DOE Taguchi Plan – Do - Check – Act 7 QC Tools Check Sheet Cause & Effect Diagram Graphs & Charts Pareto Control Chart Histogram Scatter Diagram Easy Medium Difficult 20% 20% 60% Degree of Difficulty
  • 20. 7 Lean - Tools 5S 8 W (Waste) Jidoka / Andon / PokaYoke / Mistake Proofing Single minute exchange of die (SMED) Standard Operating Proced-ures Kaizen Tools Kanban Total Preventa-tiveMainten-ance Takt time Through-put time Spaghetti diagram Value Stream Mapping Kaizen blitz or event
  • 21. 5 S Seiri (Sort)—Separate necessary from unnecessary items, including tools, parts, materials, and paperwork, and remove the unnecessary items Seiton (Straighten)—Arrange the necessary items neatly, providing visual cues to where items should be placed Seiso (Sweep)—Clean the work area Seiketsu (Standardise)—Standardise the first three Ss so that cleanliness is maintained Shitsuke (Sustain)—Ensure that the first four Ss continue to be performed on a regular basis 8
  • 22. 8W - Waste (Muda) Types Transportation Inventory Motion Waiting Over-production Over-processing Defects Standards lacking 9 Tim Woods
  • 23. Common Causes of Waste Long setup time Lack of training Layout (distance) Poor maintenance Poor work methods Incapable processes Inconsistent performance measures Ineffective production planning Lack of workplace organisation Poor supply quality / reliability 10
  • 24. Jidoka and Andon Jidoka is the ability for machines to be self-dependent and error proof without any human interaction Prevents defects from passing from one step in the system to the next Enables swift detection and correction of errors Andon is a visual or audible signaling device used to indicate there is a problem in the process 11
  • 25. Poka-Yoke (Mistake-Proofing An approach for mistake-proofing processes using automatic devices or methods to avoid simple human or machine error, such as forgetfulness, misunderstanding, errors in identification, lack of experience, absentmindedness, delays, or malfunctions 12
  • 26. Single Minute Exchange of Die(SMED) Used to reduce changeover or setup time, which is the time needed between the completion of one procedure and the start of the next procedure Steps Separate internal activities from external activities Convert internal setup activities to external activities Streamline all setup activities 13
  • 27. Standardised Work Written documentation of the way in which each step in a process should be performed Not a rigid system of compliance, but a means of communicating and codifying current best practices 14
  • 28. Takt Time The speed with which customers must be served to satisfy demand for the service Cycle time is the time to accomplish a task in the system System cycle time is equal to the longest task cycle time in the system—the rate at which customers or products exit the system, or “drip time” 15
  • 29. Takt Time - Calculation TAKT time is how many minutes or seconds are needed to make one part when considering the daily volumes, to be produced in that work-cell and the total time available to perform the job TAKT time is NOT the time it takes to manufacture the product. It is based on customer demand Who is the customer The next operation Customer orders 16
  • 30. TAKT Time Net Available Operating Time (NAOT) • Time per shift - 480 minutes • Breaks (2 @ 10´) - 20 minutes • Clean-up - 20 minutes • Lunch - 30 minutes • NAOT per shift - 410 minutes Customer Requirements • Monthly - 26,000 units/month • No. Working Days - 20 days/month • CR/Day - 1,300 units/day TAKT Time • 410 x 60 x 3 shifts (73,800) divided by 1,300 • 57.769 seconds per part or 57 seconds 17
  • 31. Throughput Time Time for an item to complete the entire process, which includes: Queue time Waiting time Transport time Actual processing time 18
  • 33. Value Stream Mapping Process map of the value stream Includes information & transformational processing Value-added steps: “Would the customer be willing to pay for this activity?” Non-value-added steps Necessary (required for business operation) Unnecessary 20
  • 34. 21 Kaizen Blitz Determine and define the objectives Determine the current state of the process Determine the requirements of the process Create an implementation plan Continue the cycle Implement the improvements Check the effectiveness of the improvements Document and standardise the improved process
  • 35. 22 Kanban Withdrawal kanban Machine Centre Assembly Line Bin Part A Bin Part A Material Flow Card (signal) Flow Production kanban
  • 36. Total Preventative Maintenance Idle workers use their time more effectively and maintain workstations to help in the prevention of various problems that would halt production Advantages of flexible workers: - Quality inspections - Operation of several machines
  • 37. Cellular Manufacturing Work cells are central to the idea of one piece flow Ideally these work cells focus on a low range of similar products Product continually moves around the cell to each operation until complete at the end of the “U” – this optimises flow from one station to the next
  • 38. Heijunka Heijunka —“make flat and level”; eliminate variation in volume and variety of “production” Level customer demand 25
  • 39. Lean Tools - Others
  • 40. Voice of Customer (VOC) - Key Factors Customer Feedback Kaizen Process Understand Customer Experience Customer Data Analysis Customer Data Collection
  • 41. 28 Brainstorming – Ideas for Improvement Too many emergencies (“rush” projects) Lack of Communication Timeliness (Process takes too long) Lack of Streamlined process Unrealistic job expectations Brainstorm Process not followed or forms incomplete / inadequate / incorrect Mentoring / coaching / training needed Too Many Steps in Process One size does not fit all Need to educate the customer Lack of prioritisation
  • 44. 31 “Perfection is achieved, not when there is nothing more to add, but when there is nothing left to take away.“ - Antoine de Saint Exupery
  • 45. 32 Good Luck http://www.linkedin.com/in/anandsubramaniam