Technical information for high voltage disconnector
& earthing switch in enquiries, tenders and orders
Article 12(23.01.2019)
Sales engineering is one of the most important parts of every
manufacturer and supplier of electrical equipment. A sales engineer
should have a great deal of technical and business development
capabilities. In this case, I wrote another article as below:
https://www.linkedin.com/pulse/high-medium-voltage-switchgear-
sales-engineering-ali-sepehri/
In the case of the sale of AIS high voltage disconnector & earth switches,
the following technical tips should be mentioned in offers and tenders.
The information given with tenders should cover the requirements
specified as applicable, and should state compliance with and deviations
from the inquiry details. In addition, full descriptive matter and drawings
shall be provided, together with type test certificates or reports, as
requested.
Technical information to be given with offer:
➤Disconnector & earthing switch installation environment condition:
a) Tolerable earthquake acceleration;
b) Tolerable wind speed;
c) Minimum and maximum operating temperature;
d) The height of the sea level for installing;
e) Degree of environmental pollution(light, heavy, very heavy);
f) Thickness of ice layer
➤ Summary of rated values and characteristics in technical tables:
a) number of poles;
b) installation: indoor or outdoor;
c) rated voltage;
d) rated insulation level and especially rated switching impulse withstand voltage, where
applicable;
e) rated frequency(50HZ or 60HZ)
f) rated normal current (for disconnectors only);
g) rated short-time withstand current and peak current;
h) rated short-circuit making current (for earthing switches only);
i) specified type tests, on special request;
j) rated bus-transfer current switching;
k) rated induced current switching by earthing switches;
l) rated mechanical endurance of disconnectors (class M);
➤Operating mechanism of a disconnector & earthing switch and
associated equipment:
a) type of operating mechanism;
b) rated supply voltage and/or pressure of operating mechanism;
c) current required at rated supply voltage to operate the disconnector
or earthing switch,
maximum current and maximum voltage at the terminals of the
operating mechanism;
d) rated force required to operate the disconnector or earthing switch at
the rated supply pressure, as applicable;
e) number and type of auxiliary contacts;
f) design of the device or description of means for securing the position;
g) design of indicating and signaling device;
➤Disconnector switch catalogue:
The catalogue should include a brief history of the disconnector switch and the manufacturer's contact information and
disconnector photo and specifications.
➤Operating mechanism circuit diagram:
Contains: apparatus list, wiring circuit diagram, operating mechanism appearance.
Figure 1 show disconnector switch operating mechanism circuit diagram:
Figure 1:
Disconnector
switch
operating
mechanism
circuit
diagram
➤Type test certificate documents:
All type test documents must be included in technical information.
Figure 2 show type test report cover page of high voltage disconnector switch:
Figure 2:
Huayi Electric
company
type test
report cover
page
➤General manufacture routine test list:
This routine test must be according to IEC or IEEE standard. for more information about AIS high
voltage disconnector & earthing switch routine test please see this article:
https://www.linkedin.com/pulse/ac-high-voltage-air-break-disconnector-switch-routine-ali-
sepehri/
➤Constructional features & Overall dimensions and other information:
a) mass of complete disconnector or earthing switch;
b) minimum clearance in air according to dimension drawing attached:
– between poles,
– to earth,
– for isolating distance (for disconnectors only);
c) for divided support disconnectors and earthing switches, the rated contact zone;
d) corrosion protection;
e) for disconnectors having a fixed contact requiring reaction forces when closing and opening the contact,
these forces and their direction shall be stated by the manufacturer in the documentation.
The manufacturer shall give the necessary information regarding the overall dimensions of the disconnector or
earthing switch in the open and closed positions. The fixing dimensions and mass of the disconnectors and
earthing switches should also be given. The dimensions given in drawings of disconnectors and earthing
switches are subject to tolerances as standardized by ISO 2768-1 unless otherwise specified.
➤Installation manual:
This manual should include all installation tips that can help customer install the
product.
Manual must be have information about packing & maintenance & storage of
disconnector switch and spare parts.
References :
➤IEC 62271-102:High-voltage switchgear and control gear Part 102: Alternating
current disconnectors and earthing switches.
➤IEEE Std C37.30.1™-2011-IEEE Standard Requirements for AC High-Voltage Air
Switches Rated Above 1000 V
➤Siemens products website.
➤Ac high voltage air break disconnector switch routine test acc to IEC 62271-102
article.
➤22 important tips on electrical equipment sales in today market article.
➤High voltage disconnector & earthing switch tender documents.
Thank you for read this article you can see find my other article in Switchgear
Content Group:
https://www.linkedin.com/groups/12123729/
1 de 9

Recomendados

AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6... por
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...Ali Sepehri
1.2K visualizações14 slides
Vacuum Circuit Breakers Testing Methods por
Vacuum Circuit Breakers Testing MethodsVacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing MethodsAli Sepehri
2.6K visualizações9 slides
AC Circuit Breakers Routine Tests according to IEC 62271-100 por
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100Ali Sepehri
559 visualizações14 slides
Hybrid HVDC Circuit Breaker Definitions por
Hybrid HVDC Circuit Breaker  DefinitionsHybrid HVDC Circuit Breaker  Definitions
Hybrid HVDC Circuit Breaker DefinitionsAli Sepehri
347 visualizações8 slides
Out of phase current switching in High Voltage Circuit Breakers por
Out of phase current switching in High Voltage Circuit BreakersOut of phase current switching in High Voltage Circuit Breakers
Out of phase current switching in High Voltage Circuit BreakersAli Sepehri
224 visualizações11 slides
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C... por
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...Ali Sepehri
2.2K visualizações10 slides

Mais conteúdo relacionado

Mais procurados

Switchgear Installation Precomissioning Inspection.PPT por
Switchgear Installation  Precomissioning Inspection.PPTSwitchgear Installation  Precomissioning Inspection.PPT
Switchgear Installation Precomissioning Inspection.PPTAbdullah Al Dushaishi
2.5K visualizações19 slides
Relay testing procedure por
Relay testing procedure Relay testing procedure
Relay testing procedure sambit mohapatra
24.9K visualizações28 slides
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015 por
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015Gabriel Emeka Ojeah
391 visualizações33 slides
Edwin Newsletter on transformer failures on 13 October 2015 por
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Low
1.4K visualizações13 slides
2015 Arc Flash Conference MV Switchgear Standards por
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear StandardsBryan Johnson
5.1K visualizações41 slides
Iec 61439 for_low_voltage_switchgear_and por
Iec 61439 for_low_voltage_switchgear_andIec 61439 for_low_voltage_switchgear_and
Iec 61439 for_low_voltage_switchgear_andssuserfd2587
449 visualizações20 slides

Mais procurados(20)

Switchgear Installation Precomissioning Inspection.PPT por Abdullah Al Dushaishi
Switchgear Installation  Precomissioning Inspection.PPTSwitchgear Installation  Precomissioning Inspection.PPT
Switchgear Installation Precomissioning Inspection.PPT
Abdullah Al Dushaishi2.5K visualizações
Relay testing procedure por sambit mohapatra
Relay testing procedure Relay testing procedure
Relay testing procedure
sambit mohapatra24.9K visualizações
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015 por Gabriel Emeka Ojeah
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Ojeah - HV CONFERENCE POWER POINT - PERTH 2015
Gabriel Emeka Ojeah391 visualizações
Edwin Newsletter on transformer failures on 13 October 2015 por Edwin Low
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015
Edwin Low1.4K visualizações
2015 Arc Flash Conference MV Switchgear Standards por Bryan Johnson
2015 Arc Flash Conference MV Switchgear Standards2015 Arc Flash Conference MV Switchgear Standards
2015 Arc Flash Conference MV Switchgear Standards
Bryan Johnson5.1K visualizações
Iec 61439 for_low_voltage_switchgear_and por ssuserfd2587
Iec 61439 for_low_voltage_switchgear_andIec 61439 for_low_voltage_switchgear_and
Iec 61439 for_low_voltage_switchgear_and
ssuserfd2587449 visualizações
Testing of cb por SANKET AHER
Testing of cbTesting of cb
Testing of cb
SANKET AHER2K visualizações
MV MetalClad Switchgear por michaeljmack
MV MetalClad SwitchgearMV MetalClad Switchgear
MV MetalClad Switchgear
michaeljmack1.8K visualizações
End of-life factors in high voltage gas insulated switchgear with sf6 or with... por Ali Sepehri
End of-life factors in high voltage gas insulated switchgear with sf6 or with...End of-life factors in high voltage gas insulated switchgear with sf6 or with...
End of-life factors in high voltage gas insulated switchgear with sf6 or with...
Ali Sepehri297 visualizações
Switchgear presentation por Ahmed Saada, (PRMG)
Switchgear presentationSwitchgear presentation
Switchgear presentation
Ahmed Saada, (PRMG)1K visualizações
Metal-Enclosed Switchgear Load Interrupter Switches por michaeljmack
Metal-Enclosed Switchgear Load Interrupter SwitchesMetal-Enclosed Switchgear Load Interrupter Switches
Metal-Enclosed Switchgear Load Interrupter Switches
michaeljmack1.4K visualizações
TRANSFORMER TEST acceptance criteria por RajuGupta88
TRANSFORMER TEST acceptance criteriaTRANSFORMER TEST acceptance criteria
TRANSFORMER TEST acceptance criteria
RajuGupta88912 visualizações
Electrical Lessons learned por michaeljmack
Electrical Lessons learnedElectrical Lessons learned
Electrical Lessons learned
michaeljmack920 visualizações
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015 por Gabriel Emeka Ojeah
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Emeka Ojeah268 visualizações
Distribution Transformer testing, West Bengal, India por RajuMondal18
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
RajuMondal18483 visualizações
Condition monitoring part 2 por Hendry Hasbiallah
Condition monitoring part 2Condition monitoring part 2
Condition monitoring part 2
Hendry Hasbiallah543 visualizações
Testing of transformer por SMRITI KESHARWANI
Testing of transformerTesting of transformer
Testing of transformer
SMRITI KESHARWANI32.2K visualizações
Grounding pad mounted transformers por Jimmy Chaparro
Grounding   pad mounted transformersGrounding   pad mounted transformers
Grounding pad mounted transformers
Jimmy Chaparro649 visualizações

Similar a Technical information for high voltage disconnector & earthing switch in enquiries,tenders and orders

66 k v_sf6_bkr_r3_may12 por
66 k v_sf6_bkr_r3_may1266 k v_sf6_bkr_r3_may12
66 k v_sf6_bkr_r3_may12Yendapalli Chinnarao
51 visualizações26 slides
11.docx por
11.docx11.docx
11.docxGuadalupe Valladares Alvarez
16 visualizações42 slides
PT-9018-ConnProvGenSets-en por
PT-9018-ConnProvGenSets-enPT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-enMunir Kaderbhai
151 visualizações6 slides
Access control basics-9 por
Access control basics-9Access control basics-9
Access control basics-9grantlerc
436 visualizações31 slides
Dialectirc tests por
Dialectirc testsDialectirc tests
Dialectirc testsNimer Cahuas Medina
104 visualizações1 slide
BOQ _UN.pptx por
BOQ _UN.pptxBOQ _UN.pptx
BOQ _UN.pptxdessalegnd100
346 visualizações38 slides

Similar a Technical information for high voltage disconnector & earthing switch in enquiries,tenders and orders(20)

PT-9018-ConnProvGenSets-en por Munir Kaderbhai
PT-9018-ConnProvGenSets-enPT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-en
Munir Kaderbhai151 visualizações
Access control basics-9 por grantlerc
Access control basics-9Access control basics-9
Access control basics-9
grantlerc436 visualizações
BOQ _UN.pptx por dessalegnd100
BOQ _UN.pptxBOQ _UN.pptx
BOQ _UN.pptx
dessalegnd100346 visualizações
Ansi mv tech_topics43_en por ANURAG GUPTA
Ansi mv tech_topics43_enAnsi mv tech_topics43_en
Ansi mv tech_topics43_en
ANURAG GUPTA65 visualizações
Technical specification for 3.ph 4 wire stw 12 02-11 por laxman prasad
Technical specification for 3.ph 4 wire stw 12 02-11Technical specification for 3.ph 4 wire stw 12 02-11
Technical specification for 3.ph 4 wire stw 12 02-11
laxman prasad30 visualizações
Ct2000 es manual_english_version_1[1].0 por Toàn Huỳnh
Ct2000 es manual_english_version_1[1].0Ct2000 es manual_english_version_1[1].0
Ct2000 es manual_english_version_1[1].0
Toàn Huỳnh664 visualizações
2011 12-33kv tech.spec for v c b type- m2-c1-revised por Basudev patra
2011 12-33kv tech.spec for v c b type- m2-c1-revised2011 12-33kv tech.spec for v c b type- m2-c1-revised
2011 12-33kv tech.spec for v c b type- m2-c1-revised
Basudev patra554 visualizações
C2000 m en_20120201 por Toàn Huỳnh
C2000 m en_20120201C2000 m en_20120201
C2000 m en_20120201
Toàn Huỳnh1.1K visualizações
Metal clad switchgear 33k v por JoeChueng
Metal clad switchgear 33k v Metal clad switchgear 33k v
Metal clad switchgear 33k v
JoeChueng198 visualizações
Tes p-122.01-r0 (2) por Ibrahim Ali
Tes p-122.01-r0 (2)Tes p-122.01-r0 (2)
Tes p-122.01-r0 (2)
Ibrahim Ali1.7K visualizações
Mark VI ST Control Product Overview GEH 6127 por Mircea Tomescu
Mark VI ST Control Product Overview GEH 6127Mark VI ST Control Product Overview GEH 6127
Mark VI ST Control Product Overview GEH 6127
Mircea Tomescu1.3K visualizações
Kraus & naimer control switches for special application kn130 gb0816 por Dien Ha The
Kraus & naimer control switches for special application kn130 gb0816Kraus & naimer control switches for special application kn130 gb0816
Kraus & naimer control switches for special application kn130 gb0816
Dien Ha The553 visualizações
MAN0824-01 por Dana Kincaid
MAN0824-01MAN0824-01
MAN0824-01
Dana Kincaid186 visualizações
ABB Medium Voltage Indoor Fuses - ABB CEF-VT High Voltage Current Limiting Fu... por Thorne & Derrick International
ABB Medium Voltage Indoor Fuses - ABB CEF-VT High Voltage Current Limiting Fu...ABB Medium Voltage Indoor Fuses - ABB CEF-VT High Voltage Current Limiting Fu...
ABB Medium Voltage Indoor Fuses - ABB CEF-VT High Voltage Current Limiting Fu...
Thorne & Derrick International998 visualizações
Cdvr service manual renr7941-00 _ sis - caterpillar por Otorongosabroso
Cdvr   service manual   renr7941-00 _ sis - caterpillarCdvr   service manual   renr7941-00 _ sis - caterpillar
Cdvr service manual renr7941-00 _ sis - caterpillar
Otorongosabroso14.6K visualizações
PV Elite 2019 Service Pack 2 (Version 21.00.02.0000). por N.A. Tecnologia
PV Elite 2019 Service Pack 2 (Version 21.00.02.0000).PV Elite 2019 Service Pack 2 (Version 21.00.02.0000).
PV Elite 2019 Service Pack 2 (Version 21.00.02.0000).
N.A. Tecnologia1.3K visualizações
Resize bientanfuji-dienhathe.com por Dien Ha The
Resize bientanfuji-dienhathe.comResize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.com
Dien Ha The392 visualizações

Último

DESIGN OF SPRINGS-UNIT4.pptx por
DESIGN OF SPRINGS-UNIT4.pptxDESIGN OF SPRINGS-UNIT4.pptx
DESIGN OF SPRINGS-UNIT4.pptxgopinathcreddy
19 visualizações47 slides
Renewal Projects in Seismic Construction por
Renewal Projects in Seismic ConstructionRenewal Projects in Seismic Construction
Renewal Projects in Seismic ConstructionEngineering & Seismic Construction
5 visualizações8 slides
REACTJS.pdf por
REACTJS.pdfREACTJS.pdf
REACTJS.pdfArthyR3
35 visualizações16 slides
MK__Cert.pdf por
MK__Cert.pdfMK__Cert.pdf
MK__Cert.pdfHassan Khan
16 visualizações1 slide
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... por
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...csegroupvn
6 visualizações210 slides
SPICE PARK DEC2023 (6,625 SPICE Models) por
SPICE PARK DEC2023 (6,625 SPICE Models) SPICE PARK DEC2023 (6,625 SPICE Models)
SPICE PARK DEC2023 (6,625 SPICE Models) Tsuyoshi Horigome
36 visualizações218 slides

Último(20)

DESIGN OF SPRINGS-UNIT4.pptx por gopinathcreddy
DESIGN OF SPRINGS-UNIT4.pptxDESIGN OF SPRINGS-UNIT4.pptx
DESIGN OF SPRINGS-UNIT4.pptx
gopinathcreddy19 visualizações
REACTJS.pdf por ArthyR3
REACTJS.pdfREACTJS.pdf
REACTJS.pdf
ArthyR335 visualizações
MK__Cert.pdf por Hassan Khan
MK__Cert.pdfMK__Cert.pdf
MK__Cert.pdf
Hassan Khan16 visualizações
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... por csegroupvn
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
csegroupvn6 visualizações
SPICE PARK DEC2023 (6,625 SPICE Models) por Tsuyoshi Horigome
SPICE PARK DEC2023 (6,625 SPICE Models) SPICE PARK DEC2023 (6,625 SPICE Models)
SPICE PARK DEC2023 (6,625 SPICE Models)
Tsuyoshi Horigome36 visualizações
fakenews_DBDA_Mar23.pptx por deepmitra8
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptx
deepmitra816 visualizações
Proposal Presentation.pptx por keytonallamon
Proposal Presentation.pptxProposal Presentation.pptx
Proposal Presentation.pptx
keytonallamon63 visualizações
Design_Discover_Develop_Campaign.pptx por ShivanshSeth6
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptx
ShivanshSeth645 visualizações
Web Dev Session 1.pptx por VedVekhande
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptx
VedVekhande13 visualizações
MongoDB.pdf por ArthyR3
MongoDB.pdfMongoDB.pdf
MongoDB.pdf
ArthyR349 visualizações
START Newsletter 3 por Start Project
START Newsletter 3START Newsletter 3
START Newsletter 3
Start Project6 visualizações
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx por lwang78
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
lwang78165 visualizações
Searching in Data Structure por raghavbirla63
Searching in Data StructureSearching in Data Structure
Searching in Data Structure
raghavbirla6314 visualizações
Pitchbook Repowerlab.pdf por VictoriaGaleano
Pitchbook Repowerlab.pdfPitchbook Repowerlab.pdf
Pitchbook Repowerlab.pdf
VictoriaGaleano5 visualizações
Design of machine elements-UNIT 3.pptx por gopinathcreddy
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptx
gopinathcreddy34 visualizações
_MAKRIADI-FOTEINI_diploma thesis.pptx por fotinimakriadi
_MAKRIADI-FOTEINI_diploma thesis.pptx_MAKRIADI-FOTEINI_diploma thesis.pptx
_MAKRIADI-FOTEINI_diploma thesis.pptx
fotinimakriadi10 visualizações
Ansari: Practical experiences with an LLM-based Islamic Assistant por M Waleed Kadous
Ansari: Practical experiences with an LLM-based Islamic AssistantAnsari: Practical experiences with an LLM-based Islamic Assistant
Ansari: Practical experiences with an LLM-based Islamic Assistant
M Waleed Kadous7 visualizações
Update 42 models(Diode/General ) in SPICE PARK(DEC2023) por Tsuyoshi Horigome
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Tsuyoshi Horigome39 visualizações

Technical information for high voltage disconnector & earthing switch in enquiries,tenders and orders

  • 1. Technical information for high voltage disconnector & earthing switch in enquiries, tenders and orders
  • 2. Article 12(23.01.2019) Sales engineering is one of the most important parts of every manufacturer and supplier of electrical equipment. A sales engineer should have a great deal of technical and business development capabilities. In this case, I wrote another article as below: https://www.linkedin.com/pulse/high-medium-voltage-switchgear- sales-engineering-ali-sepehri/ In the case of the sale of AIS high voltage disconnector & earth switches, the following technical tips should be mentioned in offers and tenders. The information given with tenders should cover the requirements specified as applicable, and should state compliance with and deviations from the inquiry details. In addition, full descriptive matter and drawings shall be provided, together with type test certificates or reports, as requested.
  • 3. Technical information to be given with offer: ➤Disconnector & earthing switch installation environment condition: a) Tolerable earthquake acceleration; b) Tolerable wind speed; c) Minimum and maximum operating temperature; d) The height of the sea level for installing; e) Degree of environmental pollution(light, heavy, very heavy); f) Thickness of ice layer ➤ Summary of rated values and characteristics in technical tables: a) number of poles; b) installation: indoor or outdoor; c) rated voltage; d) rated insulation level and especially rated switching impulse withstand voltage, where applicable; e) rated frequency(50HZ or 60HZ) f) rated normal current (for disconnectors only); g) rated short-time withstand current and peak current; h) rated short-circuit making current (for earthing switches only); i) specified type tests, on special request; j) rated bus-transfer current switching; k) rated induced current switching by earthing switches; l) rated mechanical endurance of disconnectors (class M);
  • 4. ➤Operating mechanism of a disconnector & earthing switch and associated equipment: a) type of operating mechanism; b) rated supply voltage and/or pressure of operating mechanism; c) current required at rated supply voltage to operate the disconnector or earthing switch, maximum current and maximum voltage at the terminals of the operating mechanism; d) rated force required to operate the disconnector or earthing switch at the rated supply pressure, as applicable; e) number and type of auxiliary contacts; f) design of the device or description of means for securing the position; g) design of indicating and signaling device;
  • 5. ➤Disconnector switch catalogue: The catalogue should include a brief history of the disconnector switch and the manufacturer's contact information and disconnector photo and specifications. ➤Operating mechanism circuit diagram: Contains: apparatus list, wiring circuit diagram, operating mechanism appearance. Figure 1 show disconnector switch operating mechanism circuit diagram: Figure 1: Disconnector switch operating mechanism circuit diagram
  • 6. ➤Type test certificate documents: All type test documents must be included in technical information. Figure 2 show type test report cover page of high voltage disconnector switch: Figure 2: Huayi Electric company type test report cover page
  • 7. ➤General manufacture routine test list: This routine test must be according to IEC or IEEE standard. for more information about AIS high voltage disconnector & earthing switch routine test please see this article: https://www.linkedin.com/pulse/ac-high-voltage-air-break-disconnector-switch-routine-ali- sepehri/ ➤Constructional features & Overall dimensions and other information: a) mass of complete disconnector or earthing switch; b) minimum clearance in air according to dimension drawing attached: – between poles, – to earth, – for isolating distance (for disconnectors only); c) for divided support disconnectors and earthing switches, the rated contact zone; d) corrosion protection; e) for disconnectors having a fixed contact requiring reaction forces when closing and opening the contact, these forces and their direction shall be stated by the manufacturer in the documentation. The manufacturer shall give the necessary information regarding the overall dimensions of the disconnector or earthing switch in the open and closed positions. The fixing dimensions and mass of the disconnectors and earthing switches should also be given. The dimensions given in drawings of disconnectors and earthing switches are subject to tolerances as standardized by ISO 2768-1 unless otherwise specified.
  • 8. ➤Installation manual: This manual should include all installation tips that can help customer install the product. Manual must be have information about packing & maintenance & storage of disconnector switch and spare parts.
  • 9. References : ➤IEC 62271-102:High-voltage switchgear and control gear Part 102: Alternating current disconnectors and earthing switches. ➤IEEE Std C37.30.1™-2011-IEEE Standard Requirements for AC High-Voltage Air Switches Rated Above 1000 V ➤Siemens products website. ➤Ac high voltage air break disconnector switch routine test acc to IEC 62271-102 article. ➤22 important tips on electrical equipment sales in today market article. ➤High voltage disconnector & earthing switch tender documents. Thank you for read this article you can see find my other article in Switchgear Content Group: https://www.linkedin.com/groups/12123729/