This presenation details electrical for use in panel systems. If you have any questions about this pesentation please reach out to alibia.devente@gmail.com
7. Cetra Overview Page 20 Panel Thickness is 2 5/8” Power and Electrical run in the base.
8. Cetra Mid-Wireway Panel Page 22 Provides the ability to bring electrical and data to worksurface height. The vertical wireway is 2.6 sq.” and is located 14” from one edge of the panel. It is necessary to use mid-height connectors to continue power at a connector. A powered mid-height panel on ships with one harness. Image taken from installation instructions.
11. Cetra Ceiling Entry Panel Page 23 Ceiling Entry panel is at 68” and 80” heights widths is 30 - 48. You have the ability to go higher with stack, this option gives a cleaner look. Ceiling entry is specified separately from panel. Images taken from installation instructions.
All panels have the option of shipping powered.Jumpers only continue power.All parts are specified as needed.
Base waireways can accommodate (18) ¼” cables at 40% file and (44) 1/4” cables at 100%.
The first panel width mid-height power needs a jumper to go from base to mid-height with an additional distribution specified. Jumper cables will displace one receptacle at base and mid-height. On panels that are 24” and 30” wide jumper cables can connect to at the same or opposite end of an AED. Panels that are 36” wider must have the jumper installed on the same side.
An extruded aluminum vertical power pole ships inside of the panel and attaches to the top of the panel with a top cap that is pre-cut. Any excess height telescopes into the ceiling or can be cut to size at the installation site.