WHAT IS BENCHMARKING…?
o   Continuous, Systematic process of
    measuring one’s output and/or work process
    against the toughest competitors.
o   Organization evaluate various aspect of the
    process in relation to best practicing
    companies.
o   Dimensions measured are Quality, Time &
    Cost.
STAGES IN BENCHMARKING.
o Decide what to Benchmark.
o Gather Information.
o Analyze.
o Implement.
BENCHMARKING PROCESS
o Planning
o Collection of
  information
o Data analysis
o Implementation
o Monitoring
COSTS
 Visit
      costs
 Time costs
 Benchmarking database costs
TYPES
 Financial  benchmarking
      performing a financial analysis
      comparing the results
 Performance benchmarking
      allows the initiator firm to assess
  their    competitive position
 Product benchmarking
        process of designing new
  products or upgrades to current ones
TYPES
 Strategic   benchmarking
      involves observing how others
  compete
 Operational benchmarking
      involves staffing and productivity to
  office flow and analysis of procedures
  performed
 Best-in-class benchmarking
       involves studying the leading
  competitor
GANTT CHART
A   GANTT chart is a type of bar chart that illustrates
  a project schedule.
 It was introduced by Henry Gantt around 1910 –
  1915.
 Re-allocate resources and Re-schedule if
  necessary.
 Work breakdown structure.




                                                           8
GANTT CHART
Gantt Charts(G) are useful tools for analyzing and
  planning complex projects. It includes:-
 planning

 Scheduling

 Allocation of resources

 Help you to work out the critical path for a project
  where you must complete it by a particular date.
 Monitoring




                                                         9
GANTT CHART
   Characteristics:
      The bar in each row identifies the corresponding task
      The horizontal position of the bar identifies start and end
       times of the task
      Bar length represents the duration of the task
      Task durations can be compared easily
      Good for allocating resources and re-scheduling
      Precedence relationships can be represented using
       arrows
      Critical activities are usually highlighted
      Slack times are represented using bars with doted lines
      The bar of each activity begins at the activity earliest start
       time (ES)
      The bar of each activity ends at the activity latest finish time
       (LF).

                                                                          10
GANTT CHART
 Advantages
   Simple
   Good visual communication to others
   Task durations can be compared easily
   Good for scheduling resources


 Disadvantages
   Dependencies are more difficult to visualise
   Minor changes in data can cause major
    changes in the chart

                                                   11
CONSTRUCTING GANTT CHART

 The    steps to construct a GANTT chart are:
  1.    Schedule the critical tasks in the correct
        position.
  2.    Place the time windows in which the non-
        critical tasks can be scheduled.
  3.    Schedule the non-critical tasks according to
        their earliest starting times.
  4.    Indicate precedence relationships between
        tasks.

                                                       12
CONSTRUCTING GANTT CHART
   Example of an early GANTT chart construction:

    Step 1. Schedule critical tasks.
    Step 2. Place time windows for non-critical tasks.




                                                         13
CONSTRUCTING GANTT CHART
Step 3. Schedule non-critical tasks
Step 4. Indicate precedence relationships:




                                             14
STAFFING & RE-SCHEDULING
 Once   the project schedule, (e.g. GANTT chart),
  has been constructed, take into account
    available staff hours
    slack times and
    the project schedule
 Resource Smoothing is a technique used to re-
  allocate resources and re-schedule activities.
 In resource smoothing, non-critical tasks are re-
  scheduled within their time window.
 Staff Utilization:(duration of activity x staff required
  for each activity, all added together) / (maximum
  staff required x duration of project)
                                                             15
STAFFING & RE-SCHEDULING
Example1




                           16
STAFFING & RE-SCHEDULING
The original schedule (constructed above) for this
project is as shown below.




1. Staff utilisation =
(3x2+4x4+5x1+7x3+2x1+4x2+3x5)/(14x6) = 0.857 = 85.5%

                                                       17
STAFFING & RE-SCHEDULING
2. Work out the Staff Profile




                                18
STAFFING & RE-SCHEDULING
 Now, assume that there are 6 people available for
  working in this project but one of them returns from
  holidays at time=2.
 So re-scheduling is needed because activities A and B
  cannot be carried out in parallel until time=2.




                                                          19
CONCLUSION

 As is clearly apparent, benchmarking can add value
  to the organization's workflow and structure, by
  identifying areas for improvement and rectification.
 Gantt chart tools make project manager’s life easy.
  Therefore, Gantt chart tools are important for
  successful project execution.
Benchmarking and Gantt chart

Mais conteúdo relacionado

Mais procurados

PERT & Gantt Chart
PERT & Gantt Chart PERT & Gantt Chart
PERT & Gantt Chart Anju George
 
Programme evaluation review technique
Programme evaluation review techniqueProgramme evaluation review technique
Programme evaluation review techniquesaheli chakraborty
 
Admission of neonate in nicu
Admission of neonate in nicuAdmission of neonate in nicu
Admission of neonate in nicujaskaranChauhan3
 
The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt ChartNicola2903
 
Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)AnkitaKadam20
 
Material management
Material management Material management
Material management Harpreet Kaur
 
Collective bargaining for nursing
Collective bargaining for nursingCollective bargaining for nursing
Collective bargaining for nursingMustafa Abd
 
Program Evaluation and Review Technique
Program Evaluation and Review TechniqueProgram Evaluation and Review Technique
Program Evaluation and Review TechniqueRaymund Sanchez
 
Inventory control method in nursing management
Inventory control method in  nursing managementInventory control method in  nursing management
Inventory control method in nursing managementmannparashar
 
Organization chart and organization structure types
Organization chart and organization structure typesOrganization chart and organization structure types
Organization chart and organization structure typesR.Arun Kumar M.E (Ph.D.)
 
Neonatal transport
Neonatal transportNeonatal transport
Neonatal transportTibinponnu
 
ORGANIZATIONAL BEHAVIOR AND HUMAN RELATIONS
ORGANIZATIONAL BEHAVIOR AND HUMAN RELATIONSORGANIZATIONAL BEHAVIOR AND HUMAN RELATIONS
ORGANIZATIONAL BEHAVIOR AND HUMAN RELATIONSDR .PALLAVI PATHANIA
 
Health Aspect of 12th five year plan in India
Health Aspect of 12th five year plan in IndiaHealth Aspect of 12th five year plan in India
Health Aspect of 12th five year plan in IndiaVikash Keshri
 
INSTITUTIONAL RECORD AND REPORTS.pptx
INSTITUTIONAL RECORD AND REPORTS.pptxINSTITUTIONAL RECORD AND REPORTS.pptx
INSTITUTIONAL RECORD AND REPORTS.pptxvikaskushwaha86
 
Infection Control In NICU
Infection Control In NICUInfection Control In NICU
Infection Control In NICUHonida Juwili
 

Mais procurados (20)

PERT & Gantt Chart
PERT & Gantt Chart PERT & Gantt Chart
PERT & Gantt Chart
 
Programme evaluation review technique
Programme evaluation review techniqueProgramme evaluation review technique
Programme evaluation review technique
 
Seminar on pert
Seminar on pertSeminar on pert
Seminar on pert
 
Admission of neonate in nicu
Admission of neonate in nicuAdmission of neonate in nicu
Admission of neonate in nicu
 
PERT MBO GANTT CHART
PERT MBO GANTT CHARTPERT MBO GANTT CHART
PERT MBO GANTT CHART
 
The Gantt Chart
The Gantt ChartThe Gantt Chart
The Gantt Chart
 
Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)
 
Material management
Material management Material management
Material management
 
Cost containment
Cost containmentCost containment
Cost containment
 
Collective bargaining for nursing
Collective bargaining for nursingCollective bargaining for nursing
Collective bargaining for nursing
 
Program Evaluation and Review Technique
Program Evaluation and Review TechniqueProgram Evaluation and Review Technique
Program Evaluation and Review Technique
 
Inventory control method in nursing management
Inventory control method in  nursing managementInventory control method in  nursing management
Inventory control method in nursing management
 
Organization chart and organization structure types
Organization chart and organization structure typesOrganization chart and organization structure types
Organization chart and organization structure types
 
Neonatal transport
Neonatal transportNeonatal transport
Neonatal transport
 
ORGANIZATIONAL BEHAVIOR AND HUMAN RELATIONS
ORGANIZATIONAL BEHAVIOR AND HUMAN RELATIONSORGANIZATIONAL BEHAVIOR AND HUMAN RELATIONS
ORGANIZATIONAL BEHAVIOR AND HUMAN RELATIONS
 
In service education
In service educationIn service education
In service education
 
Health Aspect of 12th five year plan in India
Health Aspect of 12th five year plan in IndiaHealth Aspect of 12th five year plan in India
Health Aspect of 12th five year plan in India
 
INSTITUTIONAL RECORD AND REPORTS.pptx
INSTITUTIONAL RECORD AND REPORTS.pptxINSTITUTIONAL RECORD AND REPORTS.pptx
INSTITUTIONAL RECORD AND REPORTS.pptx
 
Infection Control In NICU
Infection Control In NICUInfection Control In NICU
Infection Control In NICU
 
Staffing
StaffingStaffing
Staffing
 

Destaque

Lecture5---Gantt Chart
Lecture5---Gantt ChartLecture5---Gantt Chart
Lecture5---Gantt Chartdanishrafiq
 
5S Implementation Presentation
5S Implementation Presentation 5S Implementation Presentation
5S Implementation Presentation Pranav B. Gujjar
 
203wbs Network Gantt Chart
203wbs Network Gantt Chart203wbs Network Gantt Chart
203wbs Network Gantt Chartbtecexpert
 
TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectWanBK Leo
 
Project Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert ChartProject Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert ChartVinay Prajapati
 
Guide to New Product Development (NPD)
Guide to New Product Development (NPD)Guide to New Product Development (NPD)
Guide to New Product Development (NPD)Technology Multipliers
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraintsMOHD ARISH
 
Kano Model Lightning Talk
Kano Model Lightning TalkKano Model Lightning Talk
Kano Model Lightning TalkDavid Grant
 
Action plan and Gantt chart for planning and budgeting process in the New Tim...
Action plan and Gantt chart for planning and budgeting process in the New Tim...Action plan and Gantt chart for planning and budgeting process in the New Tim...
Action plan and Gantt chart for planning and budgeting process in the New Tim...Tatiana Repkova
 
Brief and gantt chart
Brief and gantt chartBrief and gantt chart
Brief and gantt chartodalyfer
 
Mba ii pmom_unit-4.3 scheduling-gantt chart a
Mba ii pmom_unit-4.3 scheduling-gantt chart aMba ii pmom_unit-4.3 scheduling-gantt chart a
Mba ii pmom_unit-4.3 scheduling-gantt chart aRai University
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvementAdrian Oprea
 
Gantt chart cpm
Gantt chart cpmGantt chart cpm
Gantt chart cpmMimin Adam
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingHariasha
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraintsEka Darmadi
 

Destaque (20)

Lecture5---Gantt Chart
Lecture5---Gantt ChartLecture5---Gantt Chart
Lecture5---Gantt Chart
 
5S Implementation Presentation
5S Implementation Presentation 5S Implementation Presentation
5S Implementation Presentation
 
203wbs Network Gantt Chart
203wbs Network Gantt Chart203wbs Network Gantt Chart
203wbs Network Gantt Chart
 
TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft Project
 
Project Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert ChartProject Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert Chart
 
Guide to New Product Development (NPD)
Guide to New Product Development (NPD)Guide to New Product Development (NPD)
Guide to New Product Development (NPD)
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Kano model
Kano modelKano model
Kano model
 
Kano Model Lightning Talk
Kano Model Lightning TalkKano Model Lightning Talk
Kano Model Lightning Talk
 
IPDD Kano model
IPDD Kano modelIPDD Kano model
IPDD Kano model
 
Kano Analysis
Kano AnalysisKano Analysis
Kano Analysis
 
Action plan and Gantt chart for planning and budgeting process in the New Tim...
Action plan and Gantt chart for planning and budgeting process in the New Tim...Action plan and Gantt chart for planning and budgeting process in the New Tim...
Action plan and Gantt chart for planning and budgeting process in the New Tim...
 
Brief and gantt chart
Brief and gantt chartBrief and gantt chart
Brief and gantt chart
 
Mba ii pmom_unit-4.3 scheduling-gantt chart a
Mba ii pmom_unit-4.3 scheduling-gantt chart aMba ii pmom_unit-4.3 scheduling-gantt chart a
Mba ii pmom_unit-4.3 scheduling-gantt chart a
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement
 
Gantt chart cpm
Gantt chart cpmGantt chart cpm
Gantt chart cpm
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursing
 
Gantt Chart
Gantt ChartGantt Chart
Gantt Chart
 
MS project Sample gantt chart
MS project Sample  gantt chartMS project Sample  gantt chart
MS project Sample gantt chart
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 

Semelhante a Benchmarking and Gantt chart

PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
GANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursingGANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursingThangamjayarani
 
Lab 2 create a gantt chart and pert chart using ms project
Lab 2 create a gantt chart and pert chart using ms projectLab 2 create a gantt chart and pert chart using ms project
Lab 2 create a gantt chart and pert chart using ms projectFarah Ahmed
 
Project management and control
Project management and controlProject management and control
Project management and controlShruti Pendharkar
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.pptMdHelalHossain6
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and schedulingAditi Garg
 
Project Management Techniques ( WBS & Critical Path Method )
Project Management Techniques ( WBS & Critical Path Method )Project Management Techniques ( WBS & Critical Path Method )
Project Management Techniques ( WBS & Critical Path Method )Surajkumar Sonar
 
CPM/PERT and Gantt charts
CPM/PERT and Gantt chartsCPM/PERT and Gantt charts
CPM/PERT and Gantt chartsVARSHA RUSTAGI
 
Project Implementation.pdf
Project Implementation.pdfProject Implementation.pdf
Project Implementation.pdfssuserc0e4e0
 
Control techniques
Control techniquesControl techniques
Control techniquesAdnan Shakir
 
Chapter 9 Planning Tools Techniques Ppt09
Chapter 9 Planning Tools Techniques Ppt09Chapter 9 Planning Tools Techniques Ppt09
Chapter 9 Planning Tools Techniques Ppt09D
 
Project 2007 full handout
Project 2007 full handoutProject 2007 full handout
Project 2007 full handoutZenawi Mehari
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart Nicola2903
 
WBS Gantt chart and project management for Jira users
WBS Gantt chart and project management for Jira usersWBS Gantt chart and project management for Jira users
WBS Gantt chart and project management for Jira usersTam Nguyen, PMP, CSM
 

Semelhante a Benchmarking and Gantt chart (20)

PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Gantt Chart.pdf
Gantt Chart.pdfGantt Chart.pdf
Gantt Chart.pdf
 
GANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursingGANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursing
 
Lab 2 create a gantt chart and pert chart using ms project
Lab 2 create a gantt chart and pert chart using ms projectLab 2 create a gantt chart and pert chart using ms project
Lab 2 create a gantt chart and pert chart using ms project
 
Project management and control
Project management and controlProject management and control
Project management and control
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.ppt
 
Unit II.pptx
Unit II.pptxUnit II.pptx
Unit II.pptx
 
Unit 5.pdf
Unit 5.pdfUnit 5.pdf
Unit 5.pdf
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and scheduling
 
Project Management Techniques ( WBS & Critical Path Method )
Project Management Techniques ( WBS & Critical Path Method )Project Management Techniques ( WBS & Critical Path Method )
Project Management Techniques ( WBS & Critical Path Method )
 
CPM/PERT and Gantt charts
CPM/PERT and Gantt chartsCPM/PERT and Gantt charts
CPM/PERT and Gantt charts
 
Project Implementation.pdf
Project Implementation.pdfProject Implementation.pdf
Project Implementation.pdf
 
programmed evaluation and review technique,
programmed evaluation and review technique,programmed evaluation and review technique,
programmed evaluation and review technique,
 
PMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptxPMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptx
 
Control techniques
Control techniquesControl techniques
Control techniques
 
Chapter 9 Planning Tools Techniques Ppt09
Chapter 9 Planning Tools Techniques Ppt09Chapter 9 Planning Tools Techniques Ppt09
Chapter 9 Planning Tools Techniques Ppt09
 
Project 2007 full handout
Project 2007 full handoutProject 2007 full handout
Project 2007 full handout
 
GANTT CHARTS.pptx
GANTT CHARTS.pptxGANTT CHARTS.pptx
GANTT CHARTS.pptx
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart
 
WBS Gantt chart and project management for Jira users
WBS Gantt chart and project management for Jira usersWBS Gantt chart and project management for Jira users
WBS Gantt chart and project management for Jira users
 

Benchmarking and Gantt chart

  • 1. BENCHMARKING & GANTT CHART BY- ASHISH MAHAJAN ABHIJEET MALKAR ANKIT MALDE BHAGYASHREE MANKIKAR CHANDAN MANUJA KETAN LAD PANKAJ LALCHANDANI
  • 2. WHAT IS BENCHMARKING…? o Continuous, Systematic process of measuring one’s output and/or work process against the toughest competitors. o Organization evaluate various aspect of the process in relation to best practicing companies. o Dimensions measured are Quality, Time & Cost.
  • 3. STAGES IN BENCHMARKING. o Decide what to Benchmark. o Gather Information. o Analyze. o Implement.
  • 4. BENCHMARKING PROCESS o Planning o Collection of information o Data analysis o Implementation o Monitoring
  • 5. COSTS  Visit costs  Time costs  Benchmarking database costs
  • 6. TYPES  Financial benchmarking performing a financial analysis comparing the results  Performance benchmarking allows the initiator firm to assess their competitive position  Product benchmarking process of designing new products or upgrades to current ones
  • 7. TYPES  Strategic benchmarking involves observing how others compete  Operational benchmarking involves staffing and productivity to office flow and analysis of procedures performed  Best-in-class benchmarking involves studying the leading competitor
  • 8. GANTT CHART A GANTT chart is a type of bar chart that illustrates a project schedule.  It was introduced by Henry Gantt around 1910 – 1915.  Re-allocate resources and Re-schedule if necessary.  Work breakdown structure. 8
  • 9. GANTT CHART Gantt Charts(G) are useful tools for analyzing and planning complex projects. It includes:-  planning  Scheduling  Allocation of resources  Help you to work out the critical path for a project where you must complete it by a particular date.  Monitoring 9
  • 10. GANTT CHART  Characteristics:  The bar in each row identifies the corresponding task  The horizontal position of the bar identifies start and end times of the task  Bar length represents the duration of the task  Task durations can be compared easily  Good for allocating resources and re-scheduling  Precedence relationships can be represented using arrows  Critical activities are usually highlighted  Slack times are represented using bars with doted lines  The bar of each activity begins at the activity earliest start time (ES)  The bar of each activity ends at the activity latest finish time (LF). 10
  • 11. GANTT CHART  Advantages  Simple  Good visual communication to others  Task durations can be compared easily  Good for scheduling resources  Disadvantages  Dependencies are more difficult to visualise  Minor changes in data can cause major changes in the chart 11
  • 12. CONSTRUCTING GANTT CHART  The steps to construct a GANTT chart are: 1. Schedule the critical tasks in the correct position. 2. Place the time windows in which the non- critical tasks can be scheduled. 3. Schedule the non-critical tasks according to their earliest starting times. 4. Indicate precedence relationships between tasks. 12
  • 13. CONSTRUCTING GANTT CHART  Example of an early GANTT chart construction: Step 1. Schedule critical tasks. Step 2. Place time windows for non-critical tasks. 13
  • 14. CONSTRUCTING GANTT CHART Step 3. Schedule non-critical tasks Step 4. Indicate precedence relationships: 14
  • 15. STAFFING & RE-SCHEDULING  Once the project schedule, (e.g. GANTT chart), has been constructed, take into account  available staff hours  slack times and  the project schedule  Resource Smoothing is a technique used to re- allocate resources and re-schedule activities.  In resource smoothing, non-critical tasks are re- scheduled within their time window.  Staff Utilization:(duration of activity x staff required for each activity, all added together) / (maximum staff required x duration of project) 15
  • 17. STAFFING & RE-SCHEDULING The original schedule (constructed above) for this project is as shown below. 1. Staff utilisation = (3x2+4x4+5x1+7x3+2x1+4x2+3x5)/(14x6) = 0.857 = 85.5% 17
  • 18. STAFFING & RE-SCHEDULING 2. Work out the Staff Profile 18
  • 19. STAFFING & RE-SCHEDULING  Now, assume that there are 6 people available for working in this project but one of them returns from holidays at time=2.  So re-scheduling is needed because activities A and B cannot be carried out in parallel until time=2. 19
  • 20. CONCLUSION  As is clearly apparent, benchmarking can add value to the organization's workflow and structure, by identifying areas for improvement and rectification.  Gantt chart tools make project manager’s life easy. Therefore, Gantt chart tools are important for successful project execution.