SlideShare uma empresa Scribd logo
1 de 63
TABLE OF CONTENTS
Contents
Acknowledgment
Executive Summary Of Orbid Apparels
Introduction
Objectives
Methodology
Scopes
Limitations
Part- 01 Organization Part
Brief History of Orbid Apparels Ltd
Garments Merchandising
Garments Trims/Accessories
Activities of Merchandising Department
Kinds of Garments Industry
Part-02 Main Report Part
Name Of the Buyers Of Orbid Apparels Ltd
Fabric Supplier Of Orbid Apparels Ltd
Trims Supplier Of Orbid Apparels Ltd
Store Of Orbid Apparels Ltd
Job Responsibility Of Merchandiser
Essential Duties And Responsibilities
Thread,
Interlining,
Label,
Buttons,
Zippers,
Elastic
Services Of Merchandising Team To Buyers
Execution Process Of Export Order
Sampling Facilities
Quality Assurance
Quality Control And Inspection Procedures
Sourcing Services
Factory Evaluation
Capet Audit
Part-03 QUALITY
Quality Procedure
Quality Depends On Some Factors
Quality In Sewing
Types Of Quality Checkers
Quality In Washing
Checklist For Auditing Carton
Cost Of Failure
Remarks
Quality Control
Definition Of Quality
Dimension of Quality
The Great Value Of Quality
Controlling Quality
In-line Inspection
Section Supervisor
Finial Audit
Quality Procedures
Quality Drills
Points To be Checked:
Cutting Section
Spreading
Cutting
Others
Sewing Section
Finishing Section
Fabric Inspection
Grading System
4 Points
Types Of Reporting Format
Garments Defect
Classification Of Defect
Possible Garment Defects:
Fabric Cleanliness
Pressing
Stitching
Button Hole
Button Sewing
waistband
Belt Loops
Hem
Pockets
Zippers
Fly area
Labels
Final Inspection Of Garments
AQL
Garment Checking
Quality Planning
5 “S System
5 “S System Activities
5 “S System Steps
Documentation For Export:
Consular Invoice
Commercial Invoice
Certification Of origin
Shipping marks
Marks Of Origin
Compulsory Marks Of Origin
Corrective Marks Of Origin
Making method
Loading the Goods aboard Ship
Truck Transportation
Types of Tariffs
Export Transportation and Shipment
Alternative Shipping Methods
Import Quotas
Exchange Controls
Trading Blocks
Part-04 Conclusion
Reference
ACKNOWLEDGEMENT
A warm felicitation goes for me to acknowledge the people, who hold the desirability for
encouraging, praising, assisting as well as believing me on the tasks of Merchandising activities
what I have worked through my internship period. First of all I would like to take the opportunity
to thank Courses Coordinator of National Institute of Fashion Technology & my internship
supervisor for providing me guidelines, help in assisting my report. He was constantly
supporting me with his inspiring personality. I will always be always thankful for his
extraordinary reinforcement.
I would like to take the opportunity to thank Mr. Abu Soud, Senior Merchandiser, Orbid
Apparels Ltd for being my on-site supervisor & providing me time to time information,
suggestion as well as procedures to work with my topic. I also want to thank Mr. Yousof Ali,
Merchandiser of Orbid Apparels Ltd for being so cooperative in my work.
Finally I will show my gratitude to all the Management & Non-Management Staffs who have
helped me during the internship period and the entire persons who somehow have impact on me
in completing my whole report.
Executive Summary
Readymade Garments Industry is the leading foreign currency earning sectors of Bangladesh.
Now-a-days Bangladesh financial sector is very much dependent upon this sector. The annual
export income of garments sector is driven from two sources one is woven garments and
others is knit wear. Readymade Garments is a 100% export oriented garments. Readymade
garments exports various garments product in foreign market. The company makes shirts,
ladies dress, shorts, trousers, and others for U.S.A, U.K, European countries
They use high tech machineries to produce a quality garments product. They also add new
machineries to increase their production line. They have a mission and the vision is profit
maximization. The merchandising philosophy of readymade garments is to keep good relation
with their buyers.
The garments Industry maintains a good relationship with every buyer. Hard working and
commitment maintenance is their main strategy. They always try to satisfy their buyers. In
this perspective the merchandiser always try to do their merchandising activities in due time.
The merchandiser of this company is not very much skilled person. More over him has no
assistant. For this reason
Sometimes the company face problem. So, here readymade garments can recruit high skilled
people with giving high salary.
The Readymade garments should improve their product quality, packing system, internal
environment, and other merchandising activities to satisfy their foreign buyers. This report is
prepared on “Merchandising activities and buyer satisfaction of readymade garments. The OCP
report helps the reader to know about the merchandising activities, practiced in Readymade
garments And the buyer satisfaction level towards the merchandiser
Introduction
RMG (Ready Made Garment) is very important and helpful for our Bangladesh. Bangladesh has
emerged as a key player in RMG (Ready Made Garment) sector since 1978. Textiles and
clothing account for about 85% of total export earnings of Bangladesh. Out of which, 75%
comes from the apparel sector which covers the major products of knit and woven shirts,
blouses, trousers, skirts, shorts, jackets, sweaters, sports wears and many more casual and
fashion items. The sector currently employs approximately 1.5+ million workers, mostly females
from underprivileged social classes. I have completed this report on the basis of all the
department of RMG sector such as Merchandising Department, Commercial Department,
Production Department, Supply Chain Department, Human Resource Department, Compliance
Department, MIS Department, and relevant organization like BGMEA, BKMEA, Export
Promotion Buru, Yarn suppliers, Chittagong Port, Insurance Company, Shipping Company. So
by completing this report I get overall idea about RMG sector, so its carry more value than any
books.
I preferred this attachment in Orbid Apparels Ltd, which is a 100% export oriented composite
knit industry. For continuing the study of internship in the Orbid Apparels Ltd, almost worked
all the sections of this company and tried to find out the activities, planning and many other
things as well. In context, I have discussed about these things deliberately to let you know about.
Objectives:
Objective means the purpose of this report. The objectives of this report are as follows:
Its documents for future.
• To know detail about RMG sector.
• Information gathers about commercial.
• Getting idea about shipping procedure.
• Concept develops about spinning, knitting
•
• Comparison between class room learning and practical learning.
• Knowledge gather about RMG sector related other organization.
• To achieve new idea about knit garments manufacturing process.
• To know about the management and technical process of apparel industry.
• To know the management Procedure in Garments Industry.
• To mark a comment over the whole Internship Report.
• To mark out the important part of Internship Report.
• To focus on the valuable part of Internship Report.
• To have skill labor for quality product.
• To study the present market composition for the Bangladeshi garment product about
Market diversification.
• To analyze the recent labor unrest in the garment industry of Bangladesh.
• Opportunity of behavioral theory practice in our garments sector.
• Regularly behavioral theory practice in garments industry.
• Identifying the trade agreements that might affect the export growth.
• To do a merchandising practice in the factory.
• Identify the additional services that the existing companies are going to avail.
• To relate the use of groupware and collaborative systems with future trends in managers'
roles and responsibilities.
• To identify merchandising and total production system.
• To find the current scenario of backward supply chain status of Orbid Apparels Ltd.
• To find the ways of improving the backward linkage of the supply chain for Orbid
Apparels Ltd.
Methodology:
Methodology defines how we go through all the processes of research and how I have proceeded on.
Here includes the steps of conducting the report and the explanation of the sources of data.
• Factory
• Different organization.
• Books
• Discussion
• Internet
• Class lecture
• Library
• Annual report
• To collect information what I am seeing in practical in My Internship Program.
• To collect information what I did in practical what was done by me for my practical
knowledge.
• To make a comment over the project we have to understand the whole project.
Scopes:
Scope means how many uses for completing this report space. The scopes are given bellow-
 Factory
 Buying House
 Discussion
 Internet
 Some of our senior brothers can help me.
• I can collect information various books and relevant paper what related with apparel industry.
Limitations:
Limitation refers the obstacles I have to face for completing this report and what I could not cover for
this limitation.
 Time constraint
 Merchandiser doesn’t have enough time to give the information elaborately.
 Short time visit in different work stations
 Lack of organizing chain of command
 Lack of instruction book, and any change. They are following traditional business.
 I may have to suffer for lack of supply chain management.
 No other garment’s data has been compared with Bextex s data. There might be some‟
discrepancies with other factories supply chain scenario‟
 Due to high employee turnover rate and lack of good reporting practices in the factory,
problems with collecting data have been faced.
PART - 01
ORGANISATION PROFILE CONTACTS
Head Office
House No #14(Ground Floor)
Road No #09, Sector # 09, Uttara
Dhaka-1230, Bangladesh
Phone/Fax: 088 02 8931015
E-mail: orbid@orbidapparels.com
Factory Address
Plot # 186, Madha GazirChat, Ashulia
EPZ Road, Saver, Dhaka(2nd & 3rd Floor)
Phone/Fax: 088 02 7790778
E-mail: Soud.orbid@gmail.com
Knitting Factory Address
Katgora Bazar, Zirabo, Savar, Dhaka
Dying Factory Address
BEQ Fabrics Ltd.
Allianace Group.
Vajon Textile.
Sadma Fashion Ltd.
Print Factory
Plot # 10, Lane # 8, Block-A
Banarashi Palli, Section-10, Mirpur-1216, Dhaka, Bangladesh
Factory Area:
5,000 Sqf for Knitting
Ground Floor 5,000 sqf for Fabrics Store & Cutting
First Floor 5,000 sqf for Sewing
2nd
Floor 5,000 sqf for office & Finishing
3rd
Floor 5,000 sqf for Sewing, samples & Store
Knitting Section : Total 13 nos. circular knitting machine (Korea)
Gauge-24 "Dia-16" Qty-1 no-S/J & Pique
Guage-24 "Dia-17" Qty-1 no-S/J & Pique
Gauge-24 "Dia-18" Qty-1 no-S/J & Pique
Gauge-24 "Dia-19" Qty-1 no-S/J & Pique
Gauge-24 "Dia-22" Qty-1 no-S/J & Pique
Gauge-24 "Dia-24" Qty-1 no-S/J & Pique
Gauge-24 "Dia-26" Qty-1 no-S/J & Pique
Gauge-24 "Dia-30" Qty-1 no-S/J & Pique
Guage-24 "Dia-30" Qty-1 no-Rib & Int
Gauge-24 "Dia-36" Qty-1 no-Rib & Int
Guage-18 "Dia-36" Qty-1 no-Rib & Int
Guage-20 "Dia-30" qty-1 no-Terry Fleece
Guage-20 "Dia-36" Qty-1 no-Terry Fleece
Cutting, Sewing & Finishing Section
Cutting Section:
Cutting mc -04 no(Km Japan)
Cutting Table -04 nos(28' Ft.)
Fabrics Checking Table -02 no(Local)
Piping/Tape cut mc -02 nos(Adea)
Sewing Section:
Plain Machine -100 nos(Siruba)
Over Lock -74 nos(Siruba)
Flat Lock -46 nos(Siruba)
Rib Cut Machine -02 no (Yamate)
Buttons Hole -02 no (Yamata)
Button Stitch -02 no (Taking)
Feed of the Arm -02 no (Siruba)
Snap Button -03 nos
Total: -233 nos
Finishing Section:
Thread sucking Mc -01 no(Local)
Washing Machine -01 no(Samsung)
Steam Boiler (El) -01 no(Local)
Steam Boiler (Gas) -01 no(Local)
Vacuum Iron Table -13 nos(Local)
P.P.Bailing Machine 01 no
Iron -13 nos(Silver)
Generator -02 no(Japan)
Employees
For Office 25 people(No child labor)
For Sample 23 people(No child labor)
For Cutting 42 people(No child labor)
For Sewing 460 people(No child labor)
For Finishing 65 people(No child labor)
For Knitting 25 people(No child labor)
Total: 640 people
ALL TYPE OF KNIT ITEMS
T-SHIRT
POLO SHIRT
TANK TOP
SWEAT SHIRT
PAJAMA
LADIS & GIRLS DRESS
JOGGING SUITE
ALL TYPE OF FLEECE ITEMS
Production Capacity: T-SHIRT: 300000 pcs/ month
POLO SHIRT: 100000 pcs/ month
Others: 30,000 pcs/ month (As per Styles)
Our Associate Factories :
1. Orbid Fashion(Garments Printing Factory)
2. Orbid(BD) International (Accessories)
General: 1. We are able to make garments using any sorts of fabrics as desired by you such as
single jersey, interlock, pique, terry, fleece, rib, mini pique as well as different composition of fabrics in
different constructions like 88% polyester, 12% lycra, 50% cotton, 50% Modal, 100% Pima cotton, 95%
Viscose, 5% Elasthan, 100% polyester, 50% polyester, 50% coolmax, 90% Supplex, 10% Lycra etc.
2. We are able to control the shrinkage for single jersey in 3-4%, interlock 4-5%, rib 5-7%, all polyester
within 3%.
3. We are able to deliver the goods 60 days after received the L/C
GARMENTS MERCHANDISING
Orbid Apparels Ltd
The term “merchandising” is well known to the persons specially involved in garments trade. The term
merchandising has been derived from the term merchandise. Merchandise means good that are bought &
sold.
The term “merchandiser” may be defined as the person who merchandises the goods. Garments
merchandising means buying raw materials & accessories, producing required garments, maintaining
required quality level and exporting the garments within time frame.
According to Mr. Yousof Ali, Marketing can do everything but he can’t do anything directly is called
merchandiser.
From the above definition we can assume that a person involved in garments merchandising need a wide
range of knowledge & skill to perform his job successfully a merchandiser should possess the following
basic knowledge and skill. Are:-
a) Good command of English and adequate knowledge of technical terms for accurate and efficient
communication.
b) Good knowledge of yarn, fabric, and dyeing, printing, finishing, dyes color fastness garments
production, etc.
c) Clear conception of usual potential quality problems in the garments manufacturing.
d) Good knowledge of the raw materials inception systems & garments inspection systems.
When an export order is given to a merchandiser, he has to schedule the following main function to
execute the export order perfectly in time. Are:-
I. Fabric requirement calculations,
2. Accessories requirement calculations (-Thread, Button, Interlining 1abet Poly bag, Main label, Woven
label, Fit label, Cartoon etc.)
3. Source of Fabrics
4. Sources of trims.
5. Possible date of arrival of fabrics & trims in the garments factory
6. Costing.
7. Garments production planning.
8. Pre shipment inspection schedule.
9. Shipment documents.
10. Have to make proper & Action plan
1. GARMENTS Trims:
2. Garments trims means all items used in the garment except the basic is called garments trims.
There are hundreds of items used to manufacture the garments which are used as trims.
i. A list of few important trims is mentioned here.
a. Sewing thread k. Hanger
b. Interlining I. Guru tape
c. Label m. Scotch Paper
d. Button n. Tissue Paper
e. Zipper o. Plastic: clip
f. Lining n. Tag pin
g. Shoulder Fad q. Collar insert
h. Elastic r: Collar bone
i. River s. Back Board
j. Poly-bag t. Neck Board .
3. Quality of trims as well as proper selection of trims is very important; otherwise the garments
may be rejected returned by the customers.
4. Activities of Merchandising Department of Orbid Apparels Ltd:
5. Activities of Merchandising Department are as follows:
6. Communication with Buyers
a. Procure Order & Order confirmation
b. Costing
7. Consumption
a. Price Quoting
b. Sample Control & Approval
c. Potential Sourcing of Materials & Approval Fabric, Trims & Accessories
d. Lab dipping & Approval
e. Purchasing of Materials
f. Testing
g. Factory Scheduling / Planning
h. Order Follow up: all steps of production & Quality
i. Ensure On Time Delivery
j. Liaison with the customer during Design, Sourcing, Production & Shipping
k. Conduct coordination Meeting with other departments / Pre production meeting
l. Attend Buyer’s meeting
m. Ensure Customer Satisfaction
n. Product Development etc.
There are three types of garment industry in RMG sector:
• Woven Garment Industry:
The industry manufacturing garments and using woven fabric. Ex: Shirt, Trouser, Blouse & so on.
• Knit Garment Industry (cut & sews):
The Industry producing garments and using knitted fabric. Ex: T-shirt, Polo shirt, Tank top etc.
• Fully Fashion Garment Industry:
The Industry producing knitted garments and using yarn as main materials instead of fabric - Ex: Sweater,
Pullover, Cardigan etc.
Various Departments / Sections of Orbid Apparels Ltd are as follows:
1. STORE
2. SAMPLE
3. PATTERN
4. CAD/CAM/DESIGN
5. CUTTING
6. SEWING
7. FINISHING & PACKING
8. MERCHANDISING / MARKETING
9. QUALITY CONTROL / ASSURANCE
10. WORKSTUDY
11. Industrial Engineering
12. COMMERCIAL
13. ACCOUNTS
14. PERSONNEL
15. PURCHASE / PROCUREMENT
16. MAINTENANCE
17. HRD
PART- 02
Name of the Buyers of Orbid Apparels Ltd:
 ALDI (Germany & UK)
 SDV (Portugal)
 EWS (Germany & Austria)
 GINKANA (Germany)
 MOULY (Italy)
 ROY WATSON (UK)
 NORWEST (UK)
 RAGADI S. L (Spain)
 MGB METRO GROUP (Germany)
 DITO FASHION (Denmark)
 SARA CONFEZIONI SRA (Italy)
 REWE ZENT RAN AG (Germany)
 DIETER RENNER (Germany)
 WAYSNAR FAR EAST (Hongking)
 INSTYLE (Italy)
 SOMERBOND(UK)
 BBA BEYMEN BOGA ZICI(Turkey)
 SGP (France)
 KOOTENAY (Canada)
Fabric Suppliers of Orbid Apparels Ltd:
1. CALIK
2. JEMIEI TEX
3. MOU FUNG
4. NIEN HSING
5. SHANDONG
6. SHANGHAI SHELYEN
7. SUNTEX
8. TAKSANG
9. ANLE RIVER
10. ZABIR ZUBAYE
Trims Suppliers Orbid Apparels Ltd:
1. A& E
2. BRILLIANT LABEL
3. COATS
4. PAXER/ A VERYDENSISON
5. SHORE TO SHORE
6. SML
7. TOPSON
8. WANFORD
9. YK BTN/RVT
10. YKK
JOB RESPONSIBILITY FOR A GARMENTS MERCHANDISER:
The ideal candidate plays nicely with others and has a proven track record of success leading a team of
graphic artists, an understanding of screen-print and with merchandising. Specific responsibilities include
managing daily operations including providing supervision to employees as well as managing vendors,
departmental communications, stylistic direction and managing associated budgets.
ESSENTIAL DUTIES AND RESPONSIBILITIES:
• Develops and maintains a clearly defined strategy in support of company’s mission, vision and
objectives.
• Works closely with key individuals and teams to integrate strategic opportunities into the prioritized
workflow. Ensure cross-organizational support and extraordinary results for customers and partners.
• Responsible for day-to-day operations including managing employees, vendors, communications,
stylistic direction and associated budgets. This position will also provide support to customer service,
Sunrise marketing, and product development.
• Carries out supervisory responsibilities in accordance with the organization’s policies and applicable
laws.
• Manages and directs all pre-launch sampling and distribution of samples to sales & customers.
• Work with sales teams and design staff to provide cost estimates.
•Coordinates all aspects of tradeshow.
•Develops business internally by participating in Merchandising Team.
1. SEEWING THREAD:
There are various types sewing threads, which are used in the garments manufacturing industries. 100%
Cotton. 100% Polyester, Nylon, Viscose, Mono Filament, Multi Filament, Textured, and Core spun
thread especially finished thread etc.
Amount all of them spun polyester thread is used in most cases. It is vary strong and have well colorfast.
It can stand all kinds of rough washing such as stone wash, acid wash with its color unaffected. 100%
Cotton threads should not be used unless you are making the garments for garment-day, because the
cotton threads are expensive and easy to break down. Sewing threads are available in various types of
package forms. Spool, Cap, Cone, Vicone, Small vicone, Container, Cacoon, Per-wound bobbin etc.
Among the mentioned packages in most cases sewing threads are used in cone form. Within a cone length
of sewing thread varies from 1000 to 500 meters.
2. INTER LINING:
The fabric which is used between two plies of garments basic fabric with an intention to make certain
parts attractive, strong & retain those shapes for long times called interlining. Interlinings are of two
types, non-fusible and fusible interlining.
At present days non-fusible interlinings are not used commonly. Types of fusible interlinings are
available & price varies considerably.
Polyethylene coated interlining — Water wash
Polyethylene coated interlining — Water wash
Polyethylene coated interlining — Dry wash
PVC coated interlining — All types of wash, costly.
PVA coated interlining –Mild water wash
Care should also be taken during selection of interlining otherwise there may be a great problem.
(a) Shrinkage of interlining should be less than the fabric shrinkage
(b) Color of interlining should not affect the color of garments in the fused area.
3. LABEL:
Label is a common accessory, which is to use in each garments. Within each garment no of label to be
used more than one because there are various types of label to be used for various information. In the
garment label you will get some information.
Main label — name of company
Size label — Garments size
Price label Tag — Cost of garments
Composition label-fiber composition (Sometimes size in included)
Care label-Ironing & washing code, dying come (Instruction of garments care)
There sometimes also some components used outside/face side of the garment to increase the beauty or
fashion of the garments is called motif. A sometimes motif bears the symbol, trademark etc.
Labels are available with various types, Qualities, & prices. Printer labels arc cheaper while labels
manufactured in jacquard type label loom is expensive.
4. BUTTONS:
It is also common accessories used in the garments. It ‘may work as functional part as well as decorative
item, Buttons are made from Nylon Polyester, Wood Bone, Purl, Metal etc. it may have two or four holes
with shank.
Attaching of button in the garments is very important, usually it is attached by the button attach machine.
If lock stitch type button attaching machine. It looks stitch type button a size also varies. To express the
button size the term line” is used. 1 line ÷ O.638mm
• Melamine button
• Sandwich button
• Shank button
• Plastic button
• Horn button
5. ZIPPERS:
In the pant, trouser and jacket is a common component Metal or plastic-Teethes are used on narrow tapes
of polyester or Nylons & those two series of teethes locked by a slider. Sometimes two sliders are used
within a single zipper.
Usually zippers do not shrink after wash but increase of garments, which may shrink a wash then the
sipper area, may look wavy.
6 ELASTIC:
Elastics are available in many sizes, shapes, stretched. The force required to stretch the & elastic also
various depending on types of Elastic used. The elastic used in the bottom waistband of a jacket, vest or
pull over shirt etc yeas should consider using the elastic with more tractability. For pants shorts, skirts (all
buttons) the elastic should be of medium stretch ability. Elastic suppliers usually sell elastics by gross
(one gross means 144 yards) unit, but if you measure one gross length you may get 140 yds. In most
cases.
Elastic are supplied in roll form in production if you want to cut it into 20” length you should do it after
relaxation of the elastic at east far.
MERCHANDISING
Our merchandising team is committed to complete customer satisfaction. Our merchandising department
consists of highly qualified team of merchandisers whose prime aim is to provide full satisfaction to our
customer starting from the fabric procurement stage to shipment and reporting the status of the order to
the buyers regularly.
The services our merchandising team provides to our clients are:
Systematic follow-up on each stage of production and execution of order on time.
.Monitoring new trends in fabric, fashion and design.
Locating new reliable sources to meet the requirements of the customer with regard to fashion and design.
Introducing new sample to buyers to enable them to expand their business.
Educate the customer about the characteristics of variety of fabrics, dyes, dyeing and printing process,
and their positive and negative points and caution the buyers about the pitfalls involved.
Liaison between the customer and our factories and follow-up.
Guiding the supplier in preparation of the range to meet the customer's requirements with regard to
fashion and design and negotiation.
In addition, we at Decent Printing and Design keep our buyers updated at every stage of their orders. Due
to this, we prepare daily production report from the manufacturers unit. This report keeps the buyer
updated about their order at every stage of the production process.
Execution Process for a Garment
Export Order in a Factory (In Brief)
1) Order enquiry from buyer to factory: Merchandiser sits with Production Manager for ship date
planning. Enquiry on price (some times the target price is also given) Enquiry on ship date i.e. whether it
can be shipped in due date?
2) Approval of order from buyer, as par the costing given by the merchandiser: Merchandiser makes
Time and action Plan contain the details of the action be taken as per fixed date, in order to execute the
shipment on the due date as committed to buyer).
3) Buyer Bank given Master L/C to the Factory:
Master L/C is the contract given to bank, which covers the total value of the export order.)
Commercial dept. deals with the follow-up of L/C matter.
4) B/B L/C is given to the suppliers of accessories and fabric etc:
Commercial department deals with the open up of B/B, L/C
Merchandiser deals with the follow-up of the materials on time.
5) Fit sample sent to buyer for the fit approval:
Merchandiser co-ordinates with sampling section, for the fit sample, and get it approved from the buyer
for fit and measurement.
6) Pre-production sample submitted to buyer with original accessories and fabric:
P.P sample to be made from the production line.
PP. sample approval from buyer means Merchandiser takes approval on style, original fabric & original
accessories.
7) Fabric and trims to be in housed on due time as per time and action plan:
Inventory to be monitored by merchandiser so that there s no problem in quality or shortage of quantity in
fabric and accessories. If thaw is anything wrong prompt action to be taken by merchandiser.
8) Pilot production to be started as per time and action plan: Or Initial production mean consists of
100 to 200 Pcs. Production managers and quality team should check very carefully about. The style &
quality of the garment. The measurement needs to follow as per buyers spec sheet.
9) On line inspection by buyers QC certifies the quality of the garment: Buyer QC gives suggestion
where the quality defects are and how to improve on that.
10) Bulk production to be started as per the time and action plan:
Buyers Q.C monitor on the production and quality of garments. Production manager and supervisor need
to be very careful to meet. The production deadline or production target, to meet the ship date on time.)
11) In the mean time commercial section prepares the shipping documents: Contact with shipping
line for the booking of vessels. (For sea shipment).
12) Final inspection as per time and action plan: Buyer’s QC. Do random inspection during final
inspection. Only if buyer’s QC certifies the quality is satisfactory then only we can. Ship out the goods.
13) Goods are made ex-factory: Goods send to seaport (sea shipment). Goods send to airport (air
shipment)
14) Goods handed over to the shipping line:
NOTE: NOW IN ANY CASE WE FAIL TO SHIP THE GOODS ON TIME AS PER THE DATE
GIVEN ON MASTER L/C, BUYER WILL CANCEL THE GOODS OR WILL ASK FOR AIR
FREIGHT I.e. F THE ORDER WAS IN SEA SHIPMENT.
(Airfreight may come nearly 4 to 5 times of a sea freight cost.)
SAMPLING FACILITIES
Besides nearly 1,000 sorts of fabric samples, we have in house sampling department with modern
machines and equipped with state of the art technologies for the development of samples for our
customers. Our sample makers have over 10 years experience in sample development. Our sample makers
have developed the expertise of producing excellent quality of sample as per the need and requirements of
the customer.
We encourage our potential buyers to ask us for samples so that they can have an idea of the product and
its workmanship. We can provide our potential customers with samples of our own designs from our
collection.
In addition, we are very much willing to do the development of our clients' own designs and fabrics.
Our philosophy is to provide superior customer services to our valued clients in order to satisfy their
needs a step further than the market.
Quality Assurance
At Decent Printing and Design, we are committed to quality requirements of the highest standard. We do
not sacrifice on quality. We make sure quality is adhered to throughout our operation from sampling to
final shipment. We take extra efforts in ensuring the suppliers comply with strict quality control. Quality
Assurance is an inherent part of our services and we ensure that our customers do not face any problem at
any stage.
Quality Control and Inspection Procedures
We normally follow AQL Level 4.0 inspection method, but on special case we follow any inspection
method our customers require.
Our quality control and inspection procedure includes the following functions:
Our Quality Assurance department checks all the fabric/Accessories to ensure that quality/color etc
conforms to the order / style.
Our Quality Assurance and merchandising team goes to factory location to evaluate pre-production (size
set) sample, patterns, etc to approve for trial production.
Quality Assurance team evaluates trial production and then finally approves for bulk production.
As bulk production starts, our Quality Assurance team goes for inline inspection. This inline inspection
during production is performed on daily basis.
At the middle stage of production if (standard of quality) result is acceptable / good then we go for pre-
final inspection. Here we check the case pack, carton quality, shipping mark, assortment, presentation
etc.
If the pre-final result is acceptable then we go for final inspection & if it passes, we approve for the final
shipment.
To ensure quality of the highest standard, we inspect at every stage of the production process. The
following Quality & Inspection steps are being currently employed in sourcing and manufacturing:
- Accessories Inspection
- Knitted & Flannel Inspection
- Measurement Spec checking
- Accessories Inspection testing
- Accessories Color Matching checking
- Daily Cutting checking
- Fabric Inspection
- Lab dip testing
- Washing Fabric testing
SOURCING SERVICES
Proper sourcing is the key to success in Textile/garments business. Keeping this in mind, besides our own
factories, Decent Printing and Design sources products from reliable vendors with a careful assessment of
price and quality. We have built up an extensive sourcing network of dedicated Manufacturers and
Exporters from all around China. In addition, we have reliable sources of raw material such as fabric, trim
& accessories from many countries/area such as Korea, Taiwan, and Pakistan at very competitive prices.
Sourcing is our core strength, which distinguishes us from the rest of the market. We offer a complete
sourcing package from design to delivery. Our sourcing department ensures great measures to evaluate
the most suitable manufacturer and supplier for our client's requirements.
FACTORY EVALUATION
At Decent Printing and Design, we take an extra step to source the most appropriate vendor for our
customers. Before selection we thoroughly evaluate Factory on the basis of the following assessment:
. Factory design
. Financial performance
. Factory equipment & machinery
. Factory productivity
. Quota export performance
. Prevalent working procedures
. Factory past performance
. Technical competency
. Factory personnel competency
. Factory reputation
. Level of professionalism
In addition, we have formulated a Factory Evaluation Form, which is filled out for every factory and then
based on the physical, and financial assessment includes creation of a rating grade to the factory. This
rating grade can determine the quantity of Garments it can manufacture for "Decent Printing and Design"
as well as whether it has adequate production capacity. These services can be further extended in locally
reliable fabric sources, dyers and printers, which ultimately promote quality of merchandise. This is an
important process as no factory should be over booked, which causes delays in delivery and impacts
production quality negatively.
Factory assessments are an ongoing process. Decent Printing and Design is constantly investing time and
effort in finding new factories, which can meet the requirements of client in terms of fashion and price.
Shipping/Documentation
Being a supply chain service provider, we have the knowledge and expertise to provide total logistic and
transportation solutions to our customers. Our qualified personnel work in close association with leading
freight forwarders, air and shipping lines at various locations. In addition, we can provide you specific
value added services by pre advising all shipments on a regular basis with tentative arrival dates
CTPAT Audit
Documents need to be checked during factory evaluation
• Written security policies.
• Records of all movement of raw materials/ components in & out to & from storage.
• Movement record register of all packed/ finished cartons & partially filled cartons from the
packing area to the separate packed goods storage.
• Movement record register of all packed goods/ cartons in and out from the packed goods storage
• Movement record/register for dangerous goods/chemicals from storage.
• Enclosures (doors, windows, gates, fences ,etc ) checklist / checking record by security guards
per shift.
• Empty truck checking records.
• Duty roster of security Guards of last 3 months.
• Visitors log book / records.
• Log book /records for incoming/outgoing goods with both weight & quantity details.
• Report / record of shortages & overages in incoming & outgoing goods/accessories.
• In the event of staff turnover, are there procedures & documents to control the return of keys or
security access code changes?
• Previous job verification record of employees before hiring. & Security training program &
record.
PART - 03
QUALITY
Introduction:
In manufacturing, quality is the concept of making products fit for a purpose and with the fewest defects.
Many different techniques and concepts have been tried to minimize defects in products.
Quality Assurance:
"The establishment and maintenance of ALL activities and functions concerned with the attainment of
requisite quality"
Quality Control:
"The systems required for programming and co-coordinating the efforts of the various groups in an
organization to maintain the requisite quality" As such Quality Control is seen as the agent of Quality
Assurance or Total Quality Control
Specifications:
Quality Control requires the establishment of adequate specifications with proper tolerances
Objective:
To maximize the production of goods within the specified tolerances correctly the first time.
By considering such information it can be decided what requires to be monitored. Monitoring the process
is the essence of quality control
Total Quality of a garment depends on the following factors-
1) Quality of Fabrics
2) Quality of Accessories
3) Quality of Cutting
4) Quality of Machines
5) Quality of Sewing
6) Quality of Washing
7) Quality of Finishing
In each stage there are quality controlling with quality checkers or controllers. Quality manager is
responsible for total quality of a product. Quality controlling in different stages described bellow-
Quality of Fabric: There are some fabric inspectors, who check the fabric defects with fabric inspection
machine. And follow “American 4 Point System” for better quality.
Quality of Accessories: Trim inspection bay at main store inspects the trims and accessories for quantity
and quality.
Quality in Cutting: In cutting section there are 3 types of quality checkers. They are
a). Marker checking QC: Marker checking QC checks the marker used for cutting for any type of
mistake or defect. He checks for the following things-
i) Style, size, color and type of marker
ii) Any drawing defects on marker
iii) Any overlapping of parts
iv) All parts present on marker
v) Ratio of marker is correct
vi) Check with hard pattern provided by technical manager if needed
b). Table or Lay QC: Table QC checks for lay defect and correct procedure for lay. He checks for the
following things-
i) Marker length and lay length and proper allowance (1/2”+1/2”=1”) for
lay length.
ii) Any fabric defect
iii) Pile of fabric is correct
iv) Tension of fabric
v) Salvage of fabric is outside the marker.
vi) Fabric nap is correct.
c). Bundle checking QC: S/He checks for total parts are present in a bundle. S/He checks the bundle
with JC Penney 3 piece system. In this system he collects 3 pieces from the bundle and checks them for
any fabric defect, size and shape and proper cutting.
There is also an auditor and AQL section at cutting for better quality controlling.
Quality in Sewing:
Maximum quality controlling is in sewing lines as maximum defects occurred during sewing. Some
common defects are-
1) Thread tension
2) Broken stitch
3) Raw edge
4) Wrong back tack
5) Puckering
6) Open seam
7) Skip stitch
8) Joint stitch
9) Fabric defects
10) Shading
11) Stains
12) Un-even shape
13) Down stitches
14) Up-down
15) Center out
16) Gap difference
17) Poor ironing
18) Holes and damages
19) Slanted
20) Missing Bar tack
21) Marking mistake etc.
There are 3 types of quality checkers in sewing line.
They are-
a) End Post QC: Check for defects after some specific operations. They make two kinds of
report. One is “Sewing Quality Inspection Report” and another is “Repair Report”.
b) Final QC: They inspect the whole garment after sewing complete. They also use the same
report as End Post QC. Additionally they also do “Measurement Chart Fit Audit”
c) Roving QC: They audit an operator randomly using “Random Number Table” and collect
any 7 pieces of garment (JC Penney 7 piece System) from him and check for defects. If he
doesn’t find any defects than whole lot get pass. If he finds any one major defect in any
garment than he declares the whole lot fail and hang a “Red card” near the Un-cleared
operator
Also there is some Technician who concerned for better quality. AQL department in sewing lines, audit
the garments with specific AQL rating system and pass the garments only if they satisfied the
Buyer accepted DHU level for passing.
Quality in Washing:
Shading is the main quality problem in washing. There is a quality checker who matches the garments
with approval shade after each wash.
Quality in Finishing:
For better quality there are several quality posts in finishing. First step is Process wise inside checking,
then Process wise out side checking and last step is final quality Checking. And there are also two
audits in finishing.
They are-
1) Hourly Audit (Internal): They audit randomly any 7 pieces in each hour from a line. If they
find any major defect in any 1 piece than audit goes to fail and whole garments in that line have
to check again. Otherwise audit pass and garments goes to carton packing.
2) Carton Audit (External): They audit any 3 cartons from each line. They check for external
matters like Tag, size, ratio, color etc. If find any major defects in any piece of any carton, the
audit fail and all carton have to check and pack again.
Note: After passing the external audit garments are ready for shipment.
Checklist for Auditing Carton:
The followings, we have to check while auditing a carton.
1) Barcode/Shipping mark
2) Assortment
3) Size label
4) Match box
5) Sticker
6) Shade
7) Ratio
8) Also for size, presentation of garments, looseness or tightness, folding, dimension etc.
Cost of Failure:
The main costs of failure due to poor quality are-
1) Losses due to faulty and spoilt work
2) Examiners records
3) Reprocessing
a. Additional materials
b. Extra labor
c. Disruption of production
5) Administrative Costs
a. Reaching agreement with customers
b. Replacing defectives or complaint adjustments
Remarks:
1) Better quality makes the production rate better and also satisfied customer or buyer. If quality
is poor then we need much time to repair the altars, which decrease the overall production
rate.
2) Roving auditor using red card for poor quality of an operator. He also can use a green card
for better quality of an operator, which will inspire him and others for better quality.
Quality control
According to my sub objective quality is a fact to survive in a post MFA situation for competitive
market. The factory Lenny Fashion Ltd. is also concern about it, and they show interest about better
techniques of quality and its controlling system. I have just going to introduce it and presenting some core
activities those will be very much helpful to increase the product quality and its assurance system. I have
also mention here the new 5s system that will help to decrease the cost.
Definition of Quality-
Quality has been with us since the dawn of civilization; however science, after second world war it has
been used more as a competitive weapon or competitive advantage. In order to understand this we can
have a looked at Japan. In the first few years after the Second World War Japan was rebuilding from the
war, many business executives through training in quality, which conducted by dr. deeming at Japan.
These executives took the quality messes to heart and we can see the resold today, which are taken
obvious to mention. Some other countries such as South Korea, Taiwan and Singapore in Asia /pacific
followed this model and became very successful in the world arena.
Quality is a complex concept. No single definition addressee the entire dimension, areas of impact and
concerns related to quality. The term itself is used in many ways for many reasons, each use reflect a
different perspective based on philosophy, economics consumers behavior, production each. Definition
may focus a holistic perspective, the impact of quality on the organization income, the changing market
place, the nature of a product or service, the way a product or service conform to specifications or the
ability of a product or service to meet customers’ needs. And satisfy their demands. Companies and their
employees need to understand how quality affects organizations.
Eight dimensions of quality
1. Performance
2. Features
3. Reliability
4. Conformance
5. Durability
6. Serviceability
7. Aesthetics
8. Perceived quality
The great value of Quality
Many talk about the importance of quality in soft goods but not everybody recognize how important it
really is. In most cases one employee that produces bad quality can greatly affect sales for a company. A
study in the U.S. showed that an average individual will probably spend about $70,000 through his life
buying from one brand that he is comfortable with .Most sales are repeat sales so you can potentially lose
about $70,000 of business if this customer suddenly becomes unsatisfied. In the production floor it is
sometime hard to imagine that one skipped stitch can cause customer dissatisfaction please recognize that,
if something is not as specified, it is defective. Defects are a waste!
Let's see what happens to defective garments in the factory: If a defective unit is found you have two
possibilities: That it can be repaired, that it can’t. 'Seconds' are sold at a loss by the factory. Units to be
repaired are also an extra cost because extra costs are incurred in
1) Handling the unit before repair,
2) Extra labor and materials in repairing and
3) Extra handling to get it back with the first goods.
The time consumed on repairing defective goods can always be used to produce first class goods. In all
cases defective units are costs for the factory. "Do it right the first time" is the key to success.
To ensure quality we need to do a number of things:
1. Recognize who the customer is
2. Build processes that anticipate and prevent defects
3. Make a plan to achieve the desired quality level
4. Set up ways to measure our progress
5. Work as a team to achieve the goal
Receive Sewing Finishing
A good plan requires:
1. A clearly defined objective
2. Goals or expected results
3. The activities needed to achieve the desired results
4. Defined roles and responsibilities for the activities
5. Dates for the begin and completion of each activity
6. An analysis of potential problems
Measurements are a vital part of any quality improvement program. Anything that is not measure does not
improve. We need to establish these standard measures and measure the progress periodically
Teamwork is also an essential element for the success of the program. Remember, "Not ONE of us is
better than ALL of us". The whole effort needs to have a direction that a team leader will provide.
The Executive's Job Related to Quality
There are two separate areas of dealing with quality that an Executive becomes involved in:
Cutting Inspect
1. Handling repairs
Getting repairs corrected and work back into the production flow.
2. Preventing repairs
Working with operators to prevent repairs (correct at the source).
• Which one is the most important?
• Which one is the most effective way to control quality?
• Which one should be the Executive's primary aim?
• Which one takes up the majority of your time?
Answer honestly.
To Control Quality
1. Have the proper approach toward operators
• Approach operator with defective garment
• Ask operator kindly to stop her work and pay you attention
• Explain defect found and ask if she understands why garment is defective
• Make sure operator understands why it is defective
• Try to find out why the defect was created or why it was not detected at the workstation
• Restate the company's commitment to quality
• Ask operator to inspect the current bundle for more defective parts and then repair all parts
that are out of tolerance including the one found by the inspector. This Should be done
immediately Stay and observe sewing method Make sure method is being followed
2. Train operators to sew with good quality from the beginning
3. Know quality specifications and tolerances
Be sure you understand what constitutes good and poor quality.
4. Be consistent in your decisions toward quality.
5. Comment on both good and bad qualify. We all have a tendency to be silent during good times and
vocal during the bad.
6. Be sure to check each operator's work daily. The amount of defects found should govern the amount of
inspections performed. Vary inspection times and inspection sequence. Check into middle of bur-die. Do
not always look at only the top garments.
7. Use a checklist - do not rely on memory of specs.
8. Do not rely on inspectors to tell you the quality level of your operators.
9. Never give the impression that you think work is OK but inspector will not pass it. If you do have this
problem, resolve it with plant manager away from operators. Quality Control Procedures Summary
In-Line inspection:
During the production of garments the operator's finished work is audited in an in-line inspection. A
quality inspector move's from one operator to another at random inspecting a predetermined number of
parts from a finished bundle.
In-process inspector
If the in-line inspector finds a defect n a part he is inspecting he should:
1. Take defective part/parts out of the bundle
2. Take part to the operator's immediate supervisor
3. Give the part to the supervisor to examine while inspector explains the defect found.
4. Decide with the supervisor whether it is actually a defective part send if defective the supervisor should
return the part to the operator.
5. Go back to the operator and mark the bundle as rejected with a red card or cloth and fill in the
appropriate paperwork for the inspection and mark the workstation with the quality banner to signal that
follow/-up bundles have not been cleared.
6. Continue to the next operator selected randomly from the list of operators and perform the inspection
based on the approved sampling plan.
7. If an operator has a bundle rejected then all bundles coming from that operator are going to be checked
by the quality inspector until three consecutive bundles are free of defects. At this point the red quality
banner will be removed. Follow-up bundles are inspected in the same fashion (audit not 100% inspection)
8. The quality banner helps the inspector remember to inspect the follow-up bundles from that operator
and also helps the supervisor identify what operators are having quality problems.
9. Make sure that the element of surprise exists when doing an inspection. Inspections should always be
performed at random and should never follow patterns. Following a predetermined path in the line can
hint operators you are going to inspect their work next. Inspect operators at random.
10. Make sure that only the defined number of units is inspected. No more, no less.
11. The units inspected should always be taken randomly from the bundle to ensure that the sample taken
is representative from the bundle. Taking samples only from the top of the bundle is not correct and can
give skewed results.
Section supervisor:
If a quality inspector approaches the supervisor with a defective unit he or she should:
1. Greet the inspector do not ignore him/her. Inspect the part according to the quality specifications
2. If it is defective let the inspector know you understand it is a defective part and you are going
to address the part with the operator.
3. As soon as possible take the part to the operator and approach the situation appropriately:
• Approach operator with defective garment
• Ask operator kindly to stop her work and pay you attention
• Explain defect found and ask if she understands why garment is defective
• Make sure operator understands why it is defective
• Try to find out why the defect was created or why it was not detected at the workstation
• Restate the company's commitment to quality
• Ask operator to inspect the current bundle for more defective parts and then repair all parts
that are out of tolerance including the one found by the inspector. This should be done
immediately,
• Stay and observe sewing method
• Make sure method is being followed
If necessary review the operator's card with the operator to see if this was an isolated occasion or if it is a
recurring problem. Try to motivate the operator to continue working with good quality.
The supervisor leaves the operator repairing the defects the supervisor should return after
some time to make sure all work has been inspected and the defects repaired. Before the bundles continue
to the next operation the supervisor should be sure that there are no defects in them. All bundles coming
from that operator are going to be checked by the quality inspector until three consecutive bundles are
free of defects. If there are defects in the bundles following a rejection, you could say the supervisor is no;
doing a good job of ensuring quality in that operation.
100% inspection:
At the end of a section there will be an inspection made to all parts exiting the section. The inspections
should be effective in identifying all defects in a garment. To ensure all seams and quality characteristics
are inspected in a short period of time a defined inspection method should be followed.
The inspection operators should have their forms filled out correctly. A good source of information to
determine the quality performance of the section is the point of 100% inspection. The section supervisor
should check the quality level at the point of 100% inspection periodically.
From the 100% inspection forms the supervisor should analyze what are the operators /operations with
the highest defect frequency. For these operators/operations the supervisor should identify the type of
defects found most often, the cause (machine/method), and the frequency at which the type of defects
happen. With this information the supervisor should address the problems, correct the possible causes and
make plans to prevent them. The inspection form is totaled 4 times a day so a supervisor can actually see
the results of what he or she has done to stop defects,
Final Audit:
A final audit should be performed on packed items. When the boxes are ready to be shipped a certain
number of units should be inspected.
Using the MIL-STD-105D determine how many garments need to be inspected.
Randomly select a number of boxes from the lot that contain the determined amount of units to be
inspected. For example, if there are 75 boxes of 10 garments each and I need to inspect 80 units I would
open one box and inspect 5 garments, another box and inspect 7 garments, another and inspect all 10
garments, and so on until I have inspected a total of 80 garments.
After entering all the information in-to the Final Audit form, the final inspector should determine if the lot
was accepted or not. Any rejected lots should be addressed promptly to minimize the chance of having a
late order.
Quality procedures in the Cutting Area
During the cutting process the factory should ensure quality by having a Spreading Inspection, a Cutting
Inspection, and a Final Audit.
During Spreading the following is checked-.
1. The side of the spread should be aligned +/- 1/8
2. The base marker should be aligned parallel to the length of the table
3. The splice points should be identified on the base marker before spreading
4. All splices should be marked with paper that is at least longer than the overlapped fabric
5. The overlap of fabric at a splice point should exceed at least 2" on either side of the parts in the splice
6. The fabric laid should extend 1-1.5" outside of the marker
7. The fabric laid should never be less than the marker's width. The fabric width should be at least inches
wider than the marker.
8. The spread fabric should be relaxed, not stretched, and wrinkle-free before cutting.
9. No defective fabric should be laid unless there has been an official authorization.
During Cutting the following is checked'.
1. The marker lines should be followed. You can go out of the line by 1/8" max but never cut into the
part. In other words, you should always be able to see the marker lines.
2. All notches should be located correctly with a depth of %" +/- 1/16"
3. The markers should be attached to the stack of parts with approved stapes or pins
4. When cutting care should be taken not to shift the stack of parts to a since or to cut with the blade at an
angle.
In bundling and shade marking care should be taken to ensure that this numbering is correct. In other
words, no skipped numbers. The bundled parts should be grouped correctly: 3b fronts with 3b backs with
3b yokes, and so on.
For the final audit process, the quality inspector will determine how many bundles to check from every
size according to the MIL-STD-105D.
Each of these bundles will undergo the following inspection-
1. All parts from the same shade number should not have shade differences.
2. All parts have the proper shape according to the marker
3. All parts must have all notches in the correct location and with the appropriate depth.
The contact that a supervisor and the operator have during the Quality Drill is very valuable. During this
time the commitment of everyone to guarantee a job well done is strengthened. At this time the operator
should be encouraged to learn what the requirements for his operator are and he is complimented if he
knows them wholeheartedly and works to achieve them every lime.
This exercise should be performed on standard time and at least once a day. If you are having quality
problems with an operator you should increase the frequency of the exercise even to one exercise an hour.
It is necessary that the trainer and the supervisor explain the importance of the Quality Drill to the
operators stressing that its; sole purpose is to help them improve their quality. The initial resistance by the
operators is normal, but as soon as positive results from exercise are seen, the operators 'A/ill takes the
initiative to do the exercise themselves.
Quality Drills:
The production supervisor is responsible of the operator's work so it is of almost importance that he or she
has control over the quality level at which the operators produce. To prevent repairs and to ensure good
quality there is a useful tool called "Quality Drill". It is very effective in making operators quality
conscious.
During this exercise you confirm to the operator the commitment to good quality that the company has
made and motivate him/her to produce with quality.
The procedure is the following:
1. Ask the operator to stop what he is doing and stand up.
2. Give the masking tape to mark defects
3. Ask the operator to inspect, based on the Quality Specification, the bundle in which he is working on,
the bundle he has already finished, and the bundle he is going to work on next. This way the operator has
the chance to see if the work he is doing is of good quality and also make sure that the work he is
receiving from the previous operation is not defective.
4. Ask the operator to mark any part that is out of tolerance with the tape
5. Ask the operator to do it while standing up and when he or she is finished he should signal the
supervisor that he is ready to have the results evaluated.
6. The supervisor makes sure that the instructions have been understood and then leaves to continue with
the regular activities.
7. When the operator has signaled that he is finished, the supervisor returns
8. The supervisor then proceeds to inspect at random a number of parts of any bundle. If he is to find a
defective part he should separate it and ask the operator why the part was not identified. If there are no
defective parts found by the supervisor he turns to the operator and asks the operator to show him the
defective parts he found.
9. If the operator has found no defects then the supervisor should select a part and ask the operator to
explain why this part is of acceptable quality. The operator should be able to explain why based on the
points described in the quality specification.
10. If defective parts have been identified then the operator should explain v/why they are defective based
on the points described in the quality specification.
11. If the supervisor notices that the operator is not very clear of what the requirements for his operation
are or how to find out if these requirements have been met or not, then the quality specification sheet
should be reviewed point by point.
12. If the supervisor notices that the operator "overlooks" the defects then the supervisor should review
with him the importance of doing a job properly every time.
Section wise quality control:
To ensure the quality of the product, quality control personnel have to control quality in different section /
department in clothing, which are directly or indirectly involve with production.
Controlling areas are as follows: Store:
• Inventory
• Fabrics and other material inspection
• Material testing
• Cleanliness
• Swatch board making
• Reporting
Sample:
Quality control personnel must check sample before sending it to the buyer.
Important points to be checked:
Whether the samples are as per buyers specifications or not, such as style description, sketch
measurement sheet, photograph etc. and workmanship has to be checked with reference sample or related
documents provided by the buyer. Report to be submitted to the merchandiser as well as to the superior.
Cutting section:
Pattern marker: pattern and marker must be checked by the quality control personnel check points are s
follows;
• Measurement,
• Gradation,
• Allowances,
• Pattern parts missing,
• Mixed parts,
• Pattern shape,
• Direction of pattern in the marker,
• Pattern alignment with respect to the grain line,
• Poor line marking,
• Marker too wide than fabric width,
• Notches and drills marks omitted,
• Mismatch checks and strips,
• Overlapping,
• Too thick line or double line marking,
• Invisible line marking,
• Marker incorrectly positioned on the lay,
Spreading:
During spreading following should be checked:
• Fabric relaxation,
• Incorrect tension of plies,
• Wrong direction of plies,
• Unacceptable damages found,
• Mismatching of checks and strips,
• Narrow fabric,
• Shaded fabric,
• Misalignment of plies.
Cutting:
During cutting the following points should be checked:
• Inaccurate cutting,
• Notches – misplaced, too deep, angled, omitted or wrong type
• Drills –marks –wrong drill, omitted angled,
• Knife cut- garment parts damaged by careless use of knife,
• Frayed edges scorched or feud edges caused by faulty knife.
• Slits opened inaccurately or omitted.
•
•
Others:
• Bundling with bundle card,
• Numbering,
• Cut panel checking,
• Wrong size in the bundle,
• Fused parts checking,
• Cleanness,
• Proper raking/ storing.
• Proper issuing,
• prefer test cutting than bulk cutting,
• Reporting.
Sewing section:
Quality control system for sewing section:
There are some systems are in practice in the sewing floor are as follows:
• Traditional system
• JC penny system
• Traffic light system
• SPC.
In line checking criteria:
During construction of garments the processes / components must be checked in the line as follows:
• As per pre- production meeting some critical process to be checked in the sewing
line. (Randomly or 100%)
• Each and every process must be checked.
• Auditing / monitoring.
• Cleanliness (in the line and work place)
• Reporting.
End line checking criteria:
After completion of the garment in the sewing line ,it has to be checked further at the end of the line.
• Inspector will check all process of a garment. Sample may be picked randomly or
100%.
• Reporting.
Other:
• Transportation section-to-section or stat ion.
• Proper machine
• Maintenance
• Proper attachment each.
• Cleanness (floor/ line / work place)
Points to be considered:
Points to be considered during controlling quality in the sewing line are as follows:
• In line inspection should be performed at the work station.
• Inspector ratio in the line depends on the system being implemented in the line.
• As per JC penny system, one inspector for 30 operations. All operations are audited minimum
twice a day, where operator are minimum skilled.
• As per pre production meeting inspector will be provided considering the controlling system.
• Number of inspectors in the line depends on number, of operation of the style being produce and
number of machine in the line.
• Defect and measurement both should be checked in the line.
• 1/4 inch, masking tape or arrow sticker to be used to indicate the defects.
• Number of pieces, to be inspected a) randomly) 100% ,c) 7 sample per bundle( up to 180 units
per bundle) as per JC penny . N the inspector should check complete bundle/ complete process.
• The inspector must select the units at random basis from a bundle/ from the complete units.
• The inspector must inspect exactly the number of units called for the sampling plan. No more no
less or as per the system.
• The inspector must rove the s/ line as per the instruction of the superior.
• If more than one inspector rotates them so that the same inspector does not inspect the same
operator too long.
• If the inspector finds a defective unit, corrective action should be taken.
• To ensure that the problem has been corrected the inspector re- audit the corrected bundle
inspecting 7 units at random from the entire bundle/ or re- check the corrected unit or as per the
system.
• The concern production supervisor should rectify defective units with the same operator.
• For product that is not in bundle from, it is recommended that a statistical inspection based on
AQL.
Finishing section:
This final section to make the product saleable condition and the finishing processes should be controlled
to achieve the quality target. For wash garments 100% check is required after receiving the garment from
the washing plant. Defective garments should be rectified and reject pcs. Should sort out. Checking:
• Iron / press
• Folding
• Tagging /sticking
• Packing
Audit:
Audit can be performed in the sewing floor as well as in the finishing section or whatever required.
Mini- Qc:
It is a new concept, yet to be implemented in Bangladesh but its very effective quality control activity to
achieve the quality target.
Introduction to Fabric Inspection:
Fabric inspection is one of the most important quality control activities in clothing industry. This involves
the inspection of-the fabric in order to quantify the patent defects found in fabrics. During this process
other details could be collected without, any additional cost and these details can be used to minimize
waste.
After fabric is received, it should be inspected to determine its acceptability from a quality viewpoint.
Otherwise, extra cost in garment manufacturing may be incurred due to either the loss of the material or
time, to say nothing of customer returns and dissatisfaction due to poor quality.
In many small companies the same personnel do spreading and cutting and fabric is inspected as it. Is
being spread on a table for cutting. Regardless of what practice is followed, the important point is that the
fabric should be inspected before cutting, the defects marked and the patterns cut. Around the defects so
as not to include them in the finished garment.
The main raw materials Used in the manufacture of garments are fabric. About 60% or more of the value
of a garment can be attributed to fabric. In order Lo maximize profit; the fabric should be used efficiently.
Fabric inspection is usually done on fabric inspection machines. These machines are designed so that rolls
of fabric can be mounted top behind the inspection machine and the fabric will run over the inspection
table under adequate light, re-rolled as they leave the table. Defects in a fabric can be seen readily with
these machines, as the inspector has a very good view o!' the fabric. These inspection machines are either
power-driven or the inspector pulls the fabric over the inspection table. The defects are located, marked
and recorded on inspection findings or reporting format. Such machines are also equipped lo accurately
measure the length of each roll of fabric as well as monitor the width of the fabric.
Objective of Fabric Inspection:
The objective of fabric inspection is to ascertain whether the fabric received is of the expected Quality
standard or not. The main objective is, detection of fabric defects and non-conformances early as
possible, So that the time and money are riot wasted in the manufacturing process. The ultimate goal of
any quality control activity in clothing industry is to satisfy the customer.
Importance of Fabric Inspection:
As we know that fabric are the main and costly raw materials of a garment. So it is very important to use
fabric efficiently and control wastage of fabric. On the other hand fabric defects are the maximum defects
of garments, for which many-unexpected problem may occur in a clothing industry. Such as-short
shipment, discount, low price etc.
To avoid all above problems and to take preventive measures fabric inspection is very important for a
clothing industry. It is also important for the following aspects:
• Improved product quality,
• Minimize waste,
• Reduce the cost
• Avoid short shipment
• Increase productivity.
Grading Systems:
There arc-different types of standard grading systems in practice. A system is agreed or selected by
mutual acceptance between supplier and buyer.
Some of the available grading systems are given below:
• 4 point system
• 10 point system
• Graniteville '78' system
• 6 point system
• Dallas systems
4 Point System:
Penalty points are assigned according to size of defects.
Warp and Weft Directions
Length of the defect penalty points
Up to 3" 1
3"-6" 2
6"-9" 3
more than 9" 4
Maximum penalty points per yd. are 4. Defects within 1/2 of selvedge disregarded.
The system is recommended for use where smaller -defects are critical and for fabric of wider widths
and also this is very suitable for sample inspection.
Types of Reporting Format:
(1) (Sheet 1) Normal inspection - the type of sheets usually used in inspecting fabric.
(2) (Sheet 2) Special sheet to show distribution of defects within the roll.
(3) (Sheet 3) Special sheet to show location of defect within each yard.
• Defects such as colors variation, skew ness, and bowing are not considered in awarding
penalty points. The expected fabric quality should be specified and agreed with the Supplier
at the time of negotiation. By inspecting the fabric, the quality can be improved, but it could
be used to minimize waste.
Garment defect:
Product variation is a normal result of the manufacturing process. It is impossible in make each garment
exactly the same. In order 10 establish acceptable levels of variation; Tolerances should lie slated as a pan
of product specifications.
Defect:
Variations that exceed tolerances or do not meet specifications arc called detect. Garment Defect can be
defined as below: Any irregularities or deficiencies in the fabric Materials used, in (cutting, Construction
Assembling Knitting, linking , pressing or in the Finishing of a garment that adversely affects its
appearance, serviceability or sale ability or do not meet the specifications and exceed the tolerances is
garment defect.
Classification of Defects:
Generally, three main categories of defects are classified for the garment standards as per defects guide. '1
lie categories of defects are as follows:
• Critical Defect
• Major Defect
• Minor Defect
Critical Defect:
A defect that is likely to result in hazardous or unsafe conditions for an individual in consuming or using
the product, or that is contravenes any mandatory regulations.
Major Defect:
A defect that is likely to result in failure, reducing the usability or serviceability of the product. Any
obvious appearance of defect will affect the sale ability of the product. Most of the cases garments are
rejected.
Minor Defect:
A defect that does not reduces the consumption or sale of the product is nevertheless a workmanship error
beyond the quality standards.
It is recommended, at the manufacturer level that defects may be at the borderline between Major and
Minor should classified as Major, for the sake of emphasis in activating corrective action.
Factors to be considered for classification of defects:
• Location of defect
• Size of the defect
• How visible the defects from 18" distance.
• End use of the product
POSSIBLE GARMENT DEFECTS:
Materials/fabric:
1. Hole or surface Haw that could develop into hole.
2. Slues that is easily distinguishable
3. Distinctive shading
4. Dye spots misprints, or out-of-register prints.
5. Cut, tears or visible surface repairs
6. Bow or skew exceeding 1.5 percent.
7. Plaids, checks, or horizontal stripes dial are conspicuously out of match at
center front or back of a product.
Cleanliness:
1. Soil, Spots, stains or Dust
2. Attached thread clusters
Pressing:
1. Burn or scorch marks
2. Glaring shine marks
3. Press marks from camps
4. Absence of pressing when specified
5. Products packaged moist after steam pressing
6. Improper pressing
7. Seams not lined up when specified for center leg crease
8. Loops twisted after pressing
9. Pressed-increases uneven
Seams and Stitching:
1. Twisted, roped, or puckered scams
2. Open or broken stitches
3. Raw edges when covered edges are specified
4. Scams not back stitched or bar tacked when specified
5. Irregular or uneven top stitching
6. Scam grin-through
7. Any part of product caught in scam or stitches
8. Any exposed drill holes
9. Length of legs off by more than 3/8 in.
10. Stitch count not conforming to specs
11. Stitch or scam type not conforming to slices
12. Label is not correctly attached
13. Sewn on design attached at incorrect place and sewn not according to specs
14. Double needle stitch on crotch seam; t not specified
15. Use of monofilament thread, other than where specified
BUTTON HOLE:
1. Size within specs
2. Ragged edges
3. Uncut buttonhole
4. Out of 'alignment or improper spacing
5. Stitch depth too narrow or wide
Button/Button Sewing:
1. Button not securely attached
2. Butler-missing
3. Broken or damaged button
4. Out of alignment or improper spacing
5. Button not to specs
6. Lack of support materials on fragile fabric
7. Buttons that crack, chip, discolor, rust, bleed, melt or otherwise cause
consumer dissatisfaction when care label is followed
Waistband:
1. Uneven in width
2. Excessive fullness, puckering or twisting
3. Closure misaligned
4. Belt loops are crooked
Belt Loops:
1. Not fully secure
2. Extend above waistband
3. Missing tacks
4. Color shade not to specs
5. Thread shade not to specs
6. Raw edges showing
Front and back:
1. Uneven at bottom hem
2. under facing showing
3. Pockets conspicuously uneven
4. Darts uneven in length
5. Darts poorly shaped
6. Spot shirring not even right and left sides
Hems:
1. Twisted, roped, puckered, pleated, or excessively visible from exterior
2. Uneven in width
3. Uneven length of product unless specified
Pockets:
1. Not uniform in size and shape
2. Misaligned horizontally or vertically
3. Crooked
4. Missing bar tack, back tack or rivet where specified
5. Bar tack or rivet not as specified
6. Sewn-in pleats or puckers
Zippers:
1. Any malfunction in operation
2. Tape does not match color specs
3. Wavy /Zipper
4. Exposed /zipper that detracts from product's appearance
5. Irregular or uneven stitching
6. Crooked or uneven placket
7. Bar tack missing or incorrectly located at bottom or base of zipper
Gripper:
1. Misaligned
2. Missing or incorrect
3. Defective in operation
Fly area:
1. Width is not uniform
2. Bottom stop not securely clinched
3. Top of zipper not caught in band
4. Either side of fly extends past other side by excessive amount
Labels:
1. Labels are not correct
2. Located in correct location
3. Insecurely attached
DEFECTS ZONE A ZONE B
Materials
* Hole, (tear, cut, fabric run, dropped stitch MAJOR MAJOR
* Permanent crease M AJOR MAJOR
* Permanent stain MAJOR MAJOR
* Washable stain MAJOR MINOR
* Loose threads MAJOR PER SEVERITY
* Frayed edges MAJOR PER SEVERITY
Seam and Stitching
* Open Seams MAJOR MAJOR
* Under stitching (Less stitches per inch PER SEVERITY MINOR
than Spec) PER SEVERITY MINOR
* Overlap stitching PER SEVERITY PER SEN TRITV
* Double stitching
Shade and color
* Off Shade MAJOR MAJOR
* Mismatched color MAJOR MAJOR
Label
* Missing MAJOR MAJOR
* Misplaced MAJOR MAJOR
* Incomplete MAJOR MAJOR
* WRONG Label MAJOR MAJOR
* Insecurely attached MAJOR MAJOR -
* Pocket
* Not in specified location by more than 1/4 MAJOR MAJOR
* Not in specified location by less than 1/4 MINOR MINOR
* Sewn in crooked PER SEVERITY PERSEVERI IV
* Size and shade not as specified MAJOR MAJOR
Pressing
* Over pressed MAJOR PERSEVERI IV
* Distorted MAJOR PER SEVERI IV
* Wrinkles MAJOR PER SEVERI IV
* Buttons
* Missing functional buttons MAJOR MAJOR
* Missing decorative buttons MAJOR MINOR
* Misaligned buttons MAJOR MINOR
* Functional button Insecurely sewn MAJOR MAJOR
* Decorative button Insecurely sewn MAJOR MAJOR
* Size, type or color not as specified MAJOR MAJOR
* Damaged buttons MAJOR MAJOR
BUTTON HOLES MAJOR
* Missing functional button holes MAJOR MAJOR
* Missing decorative button holes MAJOR MINOR
* Extra button holes MAJOR MAJOR
* Misaligned button holes MAJOR PER SEVERITY
* Broken or skipped stitches in button MAJOR MAJOR
holes
Embroidery
* Missing embroidery MAJOR MAJOR
* Misplaced embroidery MAJOR MAJOR
Final inspection of garments:
Before shipment the final evaluation of any garments lot is called final inspection to final audit. Final
inspection consists of inspecting finished garments from the buyer’s point of view and the final inspection
occurs after garments are packed in box. If it is done after garments are packed, then proper size and style
markings on the boxes can also checked. In any case there should be a list of points to be checked in a
garments including of a finished garments. The purpose of final inspection is conduct by the buyer’s
representative. Most of the time the senior quality control personnel the buying house or from the industry
are performed the final inspection. Sometimes the buyer engages third party inspection team.
Purposes of final inspection:
• Buyers can understand about the quality standard of the merchandise being purchased.
• Last opportunity to know the quality status of the garments lot for both buyer and supplier.
• It is an important part of quality control in garment industry.
• It is an obvious condition from buyer end to conduct the final inspection.
Sequence of final inspection of garments:
• Top perform a reasonable we have to maintain a sequence of different steps of the inspection are
as follows:
• Packing list verify / compare with p.o. sheet:
Before start the final inspection we have to check the final status of the lot with p.o. sheet and packing
list. Are as follows:
• Quantity
• Color
• Size
• Packing etc.
1. Inspection preparation :
To get accurate result with must have well preparation for final inspections are as follows:
Required facilities are:
1) Sufficient space
2) Sufficient light
3) Inspection table
4) Clean, noise free environment
5) Sufficient helping hand etc.
 Required tools and equipments:
6) Packing list
7) Measuring tape
8) Arrow sticker
9) Marker pen
10) Highlight pen
11) Weight scale
12) Purchase order sheet
13) Quality specification sheet
14) Reference sample
15) Pick glass
16) Approved swatches
17) Finding and reporting format etc.
18) Metal detector
 Carton checking:
There are some important points to be checked during inspection check points are:
19) Quantity or carton
20) Quality of carton:
a) Ply of carton
b) Size of carton
c) Strength of carton
d) Color of carton etc.
21) Shipping marks
a) Main mark
b) Side mark
c) Merchandise description
22) Strapping/trapping
 Carton selection:
From the total number of number of carton, we have to select sample carton and garment sample will be
picked from those carton.
The methods of carton selection and point’s table considered are as follows:
o Methods of carton selections
o Points to be considered
 Packing and packing check:
Now we have to open carton from those selected carton and check the packing methods used for the lot
and the packing used whether it is as per specification. Check points are as follows:
23) Packing check:
a) Position of garment inside the carton
b) Inner carton
c) Protector
d) Poly bag
e) Assortment
f) Quality of garment
 Packing check:
a) Packing materials must be checked with approved sample.
b) How it is used of attaching.
• Sample selection:
For sample selection sampling plan should be followed and important points to be considered and few
related terms to be discussed are as follows:
1) Sample:
A sample consists of one or more units of a product drawn from a lot, the units of the sample being
selected at random without regard to their quality. The number of units of a product in the sample is the
sample size.
Lot or batch:
The term lot or batch shall mean “inspection lot “ or inspection batch that is a collection of units of a
product from which a sample is to be drawn and inspected to determine conformance with the
acceptability criteria.
Lot or batch size:
The lot or batch is the number of units of a product in a lot or batch.
AQL (acceptable quality level):
The AQL is the maximum percent defective that, for the purpose of sampling inspection, can be
considered satisfactory as a product average.
Sampling plan:
Sampling plan depends on types of inspection to be performed such as
a) 100% check
b) Spot checking
c) Arbitrary sampling
24) Points to be considered:
a) Color
b) Size
c) Style
Garments checking:
Selected sample must be checked 100% check points are as follows:
1. Appearance
2. Materials conformance
3. Conformity of style
4. Color shade
5. Logos
6. Workmanship
7. Finishing
8. Cleanness
9. Damages
10. Weight
11. Fitness
12. Record of defects non- conformances:
13. Measurement checking
14. Defective sample draw for reference
15. Carton fill up
16. Sticker and signature
17. Reporting.
Quality Assurance:
Quality Assurance is something that everyone in the factory dose all the time. Everyone includes such as
managers, designers, pattern makers, marker makers, cutlers, pressers, packers, machinists, and
supervisors. All of those people must know what standards are necessary, must be able to detect defects
and must know what to do to correct and prevent it happening again. The Japanese have been extremely
successful in applying the idea to Japanese industry.
Quality Assurance is about assisting people to achieve desired standards helping them to do their job!
Qualify control is as much an aspect of Quality Assurance as it is about checking whether things are
going well or not, identifying the cause of a problem and applying the correct remedy. Actually Quality
Assurance and Quality control are two sides of one coin, they cannot be separated. It does make it easier
though if we talk as if they were separate.
"Quality Assurance is a state of mind, a way of approaching the organization of production to achieve
Quality" Quality control is a process, a set of activities designed and regulate the effectiveness of
production to achieve Quality" Both of these ideas involve everyone in the company, managing director
to casual worker, design to warehouse
Definition of Quality Assurance as per BSI:
All activities and functions concerned with the attainment of quality.
Quality Assurance and management:
• Quality planning
• Quality advice and expertise
• Management of the quality system
• Training of personnel
• Analysis of customer complaints, warranty claims and product liability
A quality management system based on the fact that all functions share responsibility for quality,
provides an effective method of acquiring and maintaining the desired performance standards. The quality
department should not assume the direct responsibility for quality but should support advice and audit the
work of the other functions; in much the same way as a financial auditor performs his duty without
assuming responsibility for the profitability of the company.
The responsibility for actual control of quality during the operation of the transformation process, whether
that is the production of artifacts, delivery of a service or the passing of information internally, rests
squarely on the shoulders of the operators of the process.; this means that staff carrying out the work must
be given the tools to enable the requirements to be met. The control of quality involves the quality of
input materials, methods, equipment, processes and the appropriate instructions designed for the purpose
of preventing failure.
To enable the responsibility to be met, organizations must use every device practicable to prevent, detect
and correct errors that occur. This implies that, to achieve the control of quality, the variables which may
affect quality and which can result from the actions of human beings, the nature of materials, and the
performance of equipment, must all be controlled.
In Quality Assurance system, Quality to be builds including reliability into a product during its
development stage. Development stage starts from the planning of the new'- product. Once properly
install all these, will have well executed process control method and if necessary, inspection to be
performed as well. In other words, will have a perfect product, which never had any kind of defect during
manufacturing
QUALITY PLANNING:
• Quality Policy
• Quality Manual
QUALITY POLICY:
Establish priorities relative to
 Materials
 Processes
 Training
 Product Development
 Customer Service etc
5 s concept:
It is a Japanese method of crating high quality, a highly productive and safe working environment
What is 5s?
It is a systematic 5-step method of organizing a work place.
Objectives of 5 s:
1. To reduce wastage of labor and effort
2. To reduce wastage of item
3. To reduce wastage of money
4. To reduce accidents
5. To reduce stress
6. To improve customer service
5s standards for
It stands for systematic steps of the process. In Japanese al the steps being with the letter‘s’
1. Seiri
2. Seiton
3. Seiso
4. Seiketsu
5. Shitsuke
5s activities in garment factory:
The book on 5s techniques for improved working environment in beagle explain in detail about the
concept and implementation of 5s in general.
Following points are especially applicable to garment industry.
Seiri:
Classify all items around you; make it separate what is wanted from what is not wanted. Reduce clutter.
Cut off threads, excess of pieces of materials, broken tools etc.
Seiton:
Storage areas should be located along the operating order
Back making
process
Front
making
process
Sleeve
making
process
Collar
making
process2
3
4
5 8
7
6
1
1. shelf for front cut materials
2. shelf for back cut material
3. shelf for sleeve cut materials
4. shelf for collar cut materials
5. shelf for front, back, in process part
6. shelf for sleeve in process part
7. shelf for collar in process part
8. shelf for finished product
Seiso:
Each operator (who operates a sewing machine)
1. To be provided screwdriver, brush, dust cloth and pieces of cloth to be used for sewing test.
2. To clear dust, with the brush, of the slits on the feed dog and near surface of the throat plate.
3. To clean up the inner surface of the shuttle body with the brush and the dust cloth.
4. To check the amount of oil pan and then remove dust and thread waste from the oil plan.
5. To check the needle tip.
6. To remove thread waste from the area around motor and v- belt.
7. To inspect the relation between the needle entry and the presser foot.
8. To carry out the sewing test to adjust the thread tension.
9. To wipe and clean the whole body of the sewing machine and the top of table, using the dust
cloth.
10. To clean up the floor around the sewing machine.
In addition, the supervisor should make a study of cleaning tools to introduce better ones that provide
upgraded efficiency.
Seiketsu:
1. Contains in containers have to be visually observed from outside.
2. The supervisor attaches a label to containers to allow anybody to know what is contained inside.
3. Control limits have to be given on controls chart.
4. The supervisor introduces the color control method.
5. The supervisor standardizes the control method.
Shitsuke:
1. The supervisor to check repeatedly whether operators fully understand direction.
2. The supervisor to provide the operators with the reason why the rules have to be followed. This
will encourage the operators to observe the rules.
Developing comfortable atmosphere in which the operators frankly give suggestion among one another
essential.
5s ACTIVITY STEPS
5-S steps points to be aimed
1 Seiri • Things placed on the work batch of each operator.
• Needle thread, bobbin
• The space under the lay-up table
2 Seiton • Use of shelves
• Thread, needle, presser foot and attachment
• Specification, patterns
3 Seiso • Workshop, mess hall, locker room
• Before the start of operation of sewing machine
and after the end of work
• Lighting, fixture, air conditioner
4 Seiketsu • Laying down of rules for tidying, orderly placement
and preparation of duty roster
• Dress
• Preventive maintenance
5 Shitsuki • Report, contact, consulting, compliments
• Notice of absence, late –coming and early leave.
• Change of ones assigned work and support to
others work
Documentation for Export
Which the goods are being sent, these documents will include some or all of the following: consular
invoice, commercial invoice, certificate of origin, bill of lading, packing list, health certificate, import
license, and insurance certificate. In general, their purpose is to provide the foreign Customs authority
with a complete, detailed description of the goods so that the correct import duty can be levied.
Sometimes they are required for the administration of exchange control regulations or import quotas and
depending on the product, to safeguard public and animal health and prevent the spread of plant diseases.
Statistical information about a country's imports is also based on these documents. Failure to complete the
forms properly may lead to a fine and/or unnecessary delay in clearing the goods through foreign
Customs. If the information given is found false, heavier fines may be imposed and/or the goods
confiscated.
The preparation of such documentation is one of the tasks of an export firm's or of a shipping agent,
known as a freight forwarder, whose services may be employed for a fee. In addition to the documents
required by the foreign country, the exporter must also provide an export declaration.
Consular Invoice
This is a form, usually obtainable only from the Consulate of the importing country, on which the
exporter or its agent must enter a detailed description of the goods being shipped. Certain countries
require such a form.
On the consular invoice, there is space not only for the name of the goods but also for any marks carried,
the number of the items, their weight, the value and origin of the goods and a declaration that the
information given is correct.
There must be no erasures or "strike-over" in typing, pen-and-ink changes, or additions. In some
countries, the goods must be described in terms of the customs tariff of the importing country and the
tariff number of the items given. Most countries requiring consular invoice also insist that the document
be "legalized" that is, have its accuracy sworn to by the exporter or its agent at the consulate of the
importing country.
Commercial Invoice
Commercial Invoice is the export firm's invoice, addressed to the foreign importer describing the goods
shipped and the total price that it must pay. However, some countries require the commercial invoice to
be prepared on their own forms. Such forms are sometimes called customs invoices.
Countries that require a consular invoice also require a commercial invoice as additional proof of the
details of the export shipment. Countries that do not require a consular invoice, uses the commercial
invoice as the document upon which the import duty is based.
The exporter may also sometimes be asked, when providing an export quotation for the foreign buyer, to
supply a pro forma commercial invoice. This document shows the foreign buyer what the commercial
invoice will look like if the foreign buyer places the order. The exchange authorities in the foreign
country sometimes require it before an import license is issued.
Certificate of Origin
Certificate of Origin is a document, which indicates the country in which the goods were produced, is
required whenever preferential duties are claimed. Sometime, consular legalization of the document is
necessary. Also, certification of the document by a Chamber of commerce is required.
Shipping Marks
The purpose of these marks is to identify your goods from those of other shippers. They should be made
boldly, with waterproof and salt-proof ink, so that they can always be easily read. They should be in
black, with red or orange for dangerous cargo. The marks should be in both English and the language of
the country of destination. The final destination point should be made to stand out so that the package can
be easily identified with the corresponding shipping documents and easily located for customs clearance
and delivery.
To discourage theft, “blind marks” can be used that do not reveal the contents of the package. Product
descriptions or trademarks should not be shown. The shipping marks must be exactly the same as those
shown on the commercial invoice, bill of lading, etc. Some countries indicate exactly the shipping marks
to be used. Such specifications include the size of lettering, their position on the containers, the method
of applying the marks (brush or stencil), and the types of weights and measures to be used.
Some countries such as India require that the import permit number be marked on the packing case. In
the case of cautions for handling, exporters are encouraged to use universally recognized cautionary
marks such as a wineglass on the commercial invoice and bill of lading, etc. for "fragile", as well as
words. All cautionary marks, international handling symbols, destination should be very distinct, on three
surfaces of each crate.
Marks of Origin
The exporter, as well as marking the container, must ensure that the goods being shipped abroad have the
required marks of origin.
Compulsory Marks of Origin
Many countries require that all imported goods, and the packages in which they come, be marked in a
conspicuous place with the name of the country of origin. Exceptions are usually made for goods that
cannot be marked, those that cannot be marked without injury, and those that can only be marked at
prohibitive cost.
Corrective Marks of Origin
Other countries require that a mark of origin be placed on imported goods, if its absence would create a
false impression about the origin of such goods. This can occur if the goods show the place of
manufacture with the same name as that of place from the importing country (Toronto, Japan, compared
with Toronto, Canada). Or when the label contains only the name of the importer or import agent, rather
than that of the foreign manufacturer.
Marking Methods
Each country has regulations governing the manner in which imported goods should be marked, including
the size of the letters. Some countries require, in addition to the name of the country of origin, the words
"Made in" or" Produced in".
Sometimes, the language of the importing country must be used. As well as being legible and
conspicuous, the mark should be non-erasable.
Labeling for Export
The exporter must also comply with any labeling requirements for its product in the importing country.
These often exist for prepared goods, beverages, and pharmaceutical and toilet preparations. Usually, the
label must show the manufacturer's name and address, a list of the ingredients, the weight or volume of
the contents, and other relevant information.
Often, the required descriptions must be in the language and weights and measures system of the
importing country. In some countries, certain products must be registered with the appropriate
government department and the registration number shown on the label.
Delivery to the Dockside
One way is to use the service of a freight forwarder The shipping company's representative checks the
number of items, their condition, shipping marks, weight, and perhaps size, and then issues a "dock
receipt". The exporter keeps this dock receipt until the goods are loaded aboard the ship. After this has
been done, the shipping company issues an ocean bill of lading to replace the dock receipt.
Another way to deliver goods to the ship is by rail. Small shipments are delivered to the local railway
freight depots where they are consolidated with other shipments for the same port. Large shipments go by
carload lots and are usually loaded at the exporter's premises. At the port, the shipping line has usually
leased or has been assigned a shed in which all the box cars containing goods for the particular ship are
unloaded.
The railways assume the responsibility for unloading the boxcars, and checking and placing the goods in
the warehouse ready for loading abroad ship. The cost involved is included in the railway freight rate.
Loading the Goods aboard Ship:
When the exporter's goods have been unloaded at the dockside, it is the shipping company's
responsibility to ensure that they are properly loaded aboard the correct ship. Usually, a stevedoring firm
does this on behalf of the shipping company and the cost involved is already included in the freight rate
paid by the exporter.
With the goods safely loaded aboard the ship, the shipping agent issues a "clean" ocean bill of lading to
the exporter so long as no shortages or damaged crates, boxes, etc. have been discovered. If damage had
been noted, the exporter can still obtain a clean bill of lading by signing a letter of indemnity that
absolves the shipping line of any responsibility for the damage should insurance claim be made.
The bill of lading, in the required number of copies, is evidence of ownership and is negotiable - it is the
key document that is surrendered to the foreign importer upon payment for the goods or acceptance of a
time draft as specified in a letter of credit.
Truck Transportation
Truck transportation between Malaysia, Singapore and Thailand is quite convenient as it permits
warehouse-to-warehouse transportation and reduces the handling involved in transshipment. However, it
is more expensive than by freight train for heavy shipments.
Most exporters, if trucking suits their need, prefer to use commercial trucking companies to transport their
goods.
Rail Transportation
There are three types of railway freight rates:
1. LCL ("less than carload lot") this is the most expensive rate and applies to small shipments
based on a minimum charge for 100 lb.
2. CL ("carload" rate) this is the cheapest rate and applies to shipments 30,000 pounds or more.
3. "Pool-car rate" - this is an intermediate rate and involves the combining of shipments from
different shippers.
Rail transportation is most suitable for his shipment if:
1. The goods are heavy.
2. The distance to be traveled not economical by truck.
Internship Report on Garments Merchandising
Internship Report on Garments Merchandising
Internship Report on Garments Merchandising
Internship Report on Garments Merchandising
Internship Report on Garments Merchandising
Internship Report on Garments Merchandising
Internship Report on Garments Merchandising
Internship Report on Garments Merchandising

Mais conteúdo relacionado

Mais procurados

Introduction to indian garment industry
Introduction to indian garment industryIntroduction to indian garment industry
Introduction to indian garment industryAnkur Makhija
 
Garment Merchandising  
Garment Merchandising    Garment Merchandising   
Garment Merchandising   Azmir Latif Beg
 
Apparel Merchandiser & Merchandising
Apparel Merchandiser & MerchandisingApparel Merchandiser & Merchandising
Apparel Merchandiser & MerchandisingMd.Mehedi Hassan
 
Sampling .presentration
Sampling .presentrationSampling .presentration
Sampling .presentrationahad003
 
Fashion industry internship and training
Fashion industry internship and trainingFashion industry internship and training
Fashion industry internship and trainingRahul Hela
 
Apparel Internship Report Silver Spark Apparel Ltd Unit-2
Apparel Internship Report Silver Spark Apparel Ltd Unit-2Apparel Internship Report Silver Spark Apparel Ltd Unit-2
Apparel Internship Report Silver Spark Apparel Ltd Unit-2Nitin kumar
 
Handbook of garments manufacturing technology
Handbook of garments manufacturing technologyHandbook of garments manufacturing technology
Handbook of garments manufacturing technologyMd. Mazadul Hasan Shishir
 
Introduction to apparel industries and history
Introduction to apparel industries and historyIntroduction to apparel industries and history
Introduction to apparel industries and historyKhairul Bashar
 
Internship Report on Masco Group
Internship Report on Masco GroupInternship Report on Masco Group
Internship Report on Masco GroupAnthoney45
 
Apparel Buying and Sourcing House Presentation
Apparel Buying and Sourcing House Presentation Apparel Buying and Sourcing House Presentation
Apparel Buying and Sourcing House Presentation BuyerEase
 
Presentation Garments Merchandising
Presentation Garments MerchandisingPresentation Garments Merchandising
Presentation Garments MerchandisingKoushikKumarDash
 
Modelama Exports - Apparel Manufacturing Internship Report
Modelama Exports - Apparel Manufacturing Internship ReportModelama Exports - Apparel Manufacturing Internship Report
Modelama Exports - Apparel Manufacturing Internship ReportVinay Prajapati
 
Study on garments buying house merchandising
Study on garments buying house merchandisingStudy on garments buying house merchandising
Study on garments buying house merchandisingWINNERbd.it
 
Summer internship project, Mapping the process flowchart and documentation in...
Summer internship project, Mapping the process flowchart and documentation in...Summer internship project, Mapping the process flowchart and documentation in...
Summer internship project, Mapping the process flowchart and documentation in...Ajit gupta
 
Internship report on merchandising activities of shelltex international
Internship report on merchandising activities of shelltex internationalInternship report on merchandising activities of shelltex international
Internship report on merchandising activities of shelltex internationalWINNERbd.it
 
An Internship report on Concorde Garments Group
An Internship report on Concorde Garments GroupAn Internship report on Concorde Garments Group
An Internship report on Concorde Garments GroupMATIUR R. SHEIKH
 

Mais procurados (20)

Introduction to indian garment industry
Introduction to indian garment industryIntroduction to indian garment industry
Introduction to indian garment industry
 
Garment Merchandising  
Garment Merchandising    Garment Merchandising   
Garment Merchandising  
 
Apparel Merchandiser & Merchandising
Apparel Merchandiser & MerchandisingApparel Merchandiser & Merchandising
Apparel Merchandiser & Merchandising
 
Sampling .presentration
Sampling .presentrationSampling .presentration
Sampling .presentration
 
Fashion industry internship and training
Fashion industry internship and trainingFashion industry internship and training
Fashion industry internship and training
 
Apparel manufacturing process
Apparel manufacturing process Apparel manufacturing process
Apparel manufacturing process
 
Sewing Department
Sewing DepartmentSewing Department
Sewing Department
 
Apparel Internship Report Silver Spark Apparel Ltd Unit-2
Apparel Internship Report Silver Spark Apparel Ltd Unit-2Apparel Internship Report Silver Spark Apparel Ltd Unit-2
Apparel Internship Report Silver Spark Apparel Ltd Unit-2
 
Apparel industry sectoral analysis - ppt 1
Apparel industry   sectoral analysis - ppt 1Apparel industry   sectoral analysis - ppt 1
Apparel industry sectoral analysis - ppt 1
 
Tejas krishna_apparel_internship_report
Tejas krishna_apparel_internship_reportTejas krishna_apparel_internship_report
Tejas krishna_apparel_internship_report
 
Handbook of garments manufacturing technology
Handbook of garments manufacturing technologyHandbook of garments manufacturing technology
Handbook of garments manufacturing technology
 
Introduction to apparel industries and history
Introduction to apparel industries and historyIntroduction to apparel industries and history
Introduction to apparel industries and history
 
Internship Report on Masco Group
Internship Report on Masco GroupInternship Report on Masco Group
Internship Report on Masco Group
 
Apparel Buying and Sourcing House Presentation
Apparel Buying and Sourcing House Presentation Apparel Buying and Sourcing House Presentation
Apparel Buying and Sourcing House Presentation
 
Presentation Garments Merchandising
Presentation Garments MerchandisingPresentation Garments Merchandising
Presentation Garments Merchandising
 
Modelama Exports - Apparel Manufacturing Internship Report
Modelama Exports - Apparel Manufacturing Internship ReportModelama Exports - Apparel Manufacturing Internship Report
Modelama Exports - Apparel Manufacturing Internship Report
 
Study on garments buying house merchandising
Study on garments buying house merchandisingStudy on garments buying house merchandising
Study on garments buying house merchandising
 
Summer internship project, Mapping the process flowchart and documentation in...
Summer internship project, Mapping the process flowchart and documentation in...Summer internship project, Mapping the process flowchart and documentation in...
Summer internship project, Mapping the process flowchart and documentation in...
 
Internship report on merchandising activities of shelltex international
Internship report on merchandising activities of shelltex internationalInternship report on merchandising activities of shelltex international
Internship report on merchandising activities of shelltex international
 
An Internship report on Concorde Garments Group
An Internship report on Concorde Garments GroupAn Internship report on Concorde Garments Group
An Internship report on Concorde Garments Group
 

Destaque

Internship report on sb knitting ltd
Internship report on sb knitting ltdInternship report on sb knitting ltd
Internship report on sb knitting ltdSH Nayeem
 
My Internship Report
My Internship ReportMy Internship Report
My Internship ReportRajib Sadiq
 
Internship report presentation at square fashion ltd by md.shariful islam im...
Internship  report presentation at square fashion ltd by md.shariful islam im...Internship  report presentation at square fashion ltd by md.shariful islam im...
Internship report presentation at square fashion ltd by md.shariful islam im...MD.SHARIFUL ISLAM IMAN
 
Internship report on concepts of modern merchandising tools and techniques in...
Internship report on concepts of modern merchandising tools and techniques in...Internship report on concepts of modern merchandising tools and techniques in...
Internship report on concepts of modern merchandising tools and techniques in...Muhammad Rahat
 
Assignment on garments....
Assignment on garments....Assignment on garments....
Assignment on garments....ahad003
 
Internship Final Report
Internship Final Report Internship Final Report
Internship Final Report Nadia Nahar
 
Report on garments
Report on garmentsReport on garments
Report on garmentsahad003
 
Internship Report on Knit Dyeing
Internship Report on Knit DyeingInternship Report on Knit Dyeing
Internship Report on Knit DyeingMd. Ibrahim Hossain
 
Internship report by kamran
Internship report by kamranInternship report by kamran
Internship report by kamranstudent
 
Merchandising activities in apparel industry of bangladesh
Merchandising activities in apparel industry of bangladeshMerchandising activities in apparel industry of bangladesh
Merchandising activities in apparel industry of bangladeshSH Nayeem
 
Industrial attachment of m.s dyeing, printing & finishing ltd. by md omar...
Industrial attachment of m.s dyeing, printing & finishing ltd. by md omar...Industrial attachment of m.s dyeing, printing & finishing ltd. by md omar...
Industrial attachment of m.s dyeing, printing & finishing ltd. by md omar...Rhymeles Hredoy
 
An Internship Report On “Internal Audit & Control Practice of Garments Manufa...
An Internship Report On “Internal Audit & Control Practice of Garments Manufa...An Internship Report On “Internal Audit & Control Practice of Garments Manufa...
An Internship Report On “Internal Audit & Control Practice of Garments Manufa...Talukder Abdulla-Al-Mamun
 
Readymade garments industry of bangladesh
Readymade garments industry of bangladeshReadymade garments industry of bangladesh
Readymade garments industry of bangladeshS.m. Aminul Haque
 
Shahi Exports Pvt. Ltd
Shahi Exports Pvt. LtdShahi Exports Pvt. Ltd
Shahi Exports Pvt. Ltdsandeep kumar
 
Merchandising process in the apparel industry
Merchandising process in the apparel industryMerchandising process in the apparel industry
Merchandising process in the apparel industryMuhundhan Muhu
 

Destaque (20)

Internship report
Internship reportInternship report
Internship report
 
Apparel Internship
Apparel InternshipApparel Internship
Apparel Internship
 
Internship report on sb knitting ltd
Internship report on sb knitting ltdInternship report on sb knitting ltd
Internship report on sb knitting ltd
 
My Internship Report
My Internship ReportMy Internship Report
My Internship Report
 
Internship report presentation at square fashion ltd by md.shariful islam im...
Internship  report presentation at square fashion ltd by md.shariful islam im...Internship  report presentation at square fashion ltd by md.shariful islam im...
Internship report presentation at square fashion ltd by md.shariful islam im...
 
Internship report on concepts of modern merchandising tools and techniques in...
Internship report on concepts of modern merchandising tools and techniques in...Internship report on concepts of modern merchandising tools and techniques in...
Internship report on concepts of modern merchandising tools and techniques in...
 
Assignment on garments....
Assignment on garments....Assignment on garments....
Assignment on garments....
 
Summer project(export house) by dimpu vivek,nift/secret
Summer project(export house) by dimpu vivek,nift/secretSummer project(export house) by dimpu vivek,nift/secret
Summer project(export house) by dimpu vivek,nift/secret
 
internship report
internship reportinternship report
internship report
 
Internship Final Report
Internship Final Report Internship Final Report
Internship Final Report
 
Report on garments
Report on garmentsReport on garments
Report on garments
 
Internship Report on Knit Dyeing
Internship Report on Knit DyeingInternship Report on Knit Dyeing
Internship Report on Knit Dyeing
 
Internship report by kamran
Internship report by kamranInternship report by kamran
Internship report by kamran
 
Merchandising activities in apparel industry of bangladesh
Merchandising activities in apparel industry of bangladeshMerchandising activities in apparel industry of bangladesh
Merchandising activities in apparel industry of bangladesh
 
Industrial attachment of m.s dyeing, printing & finishing ltd. by md omar...
Industrial attachment of m.s dyeing, printing & finishing ltd. by md omar...Industrial attachment of m.s dyeing, printing & finishing ltd. by md omar...
Industrial attachment of m.s dyeing, printing & finishing ltd. by md omar...
 
An Internship Report On “Internal Audit & Control Practice of Garments Manufa...
An Internship Report On “Internal Audit & Control Practice of Garments Manufa...An Internship Report On “Internal Audit & Control Practice of Garments Manufa...
An Internship Report On “Internal Audit & Control Practice of Garments Manufa...
 
Garment defects
Garment defectsGarment defects
Garment defects
 
Readymade garments industry of bangladesh
Readymade garments industry of bangladeshReadymade garments industry of bangladesh
Readymade garments industry of bangladesh
 
Shahi Exports Pvt. Ltd
Shahi Exports Pvt. LtdShahi Exports Pvt. Ltd
Shahi Exports Pvt. Ltd
 
Merchandising process in the apparel industry
Merchandising process in the apparel industryMerchandising process in the apparel industry
Merchandising process in the apparel industry
 

Semelhante a Internship Report on Garments Merchandising

Internship report on merchandising activities of lyric garments ltd.
Internship report on merchandising activities of lyric garments ltd.Internship report on merchandising activities of lyric garments ltd.
Internship report on merchandising activities of lyric garments ltd.Farah Sultana
 
Merchandising Activities On Waymart Apparels limited.
Merchandising Activities On Waymart Apparels limited.Merchandising Activities On Waymart Apparels limited.
Merchandising Activities On Waymart Apparels limited.Rizwan Khan
 
Industrial training
Industrial trainingIndustrial training
Industrial trainingkaranlakra
 
Industrial attachment of Olio apparels ltd (envoy group)
Industrial attachment of Olio apparels ltd (envoy group)Industrial attachment of Olio apparels ltd (envoy group)
Industrial attachment of Olio apparels ltd (envoy group)Md. Mazadul Hasan Shishir
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industryTanmoy Antu
 
Internship report of ABA group (1)
Internship report of ABA group (1)Internship report of ABA group (1)
Internship report of ABA group (1)M Rahman Shuvo
 
OKTL BY SHIHAB
OKTL BY SHIHABOKTL BY SHIHAB
OKTL BY SHIHABShihab Tex
 
Group of garments
Group of garmentsGroup of garments
Group of garmentsridimarakin
 
Welcome to my presentation on Concorde Garmnets Group
Welcome to my presentation on Concorde Garmnets GroupWelcome to my presentation on Concorde Garmnets Group
Welcome to my presentation on Concorde Garmnets GroupMATIUR R. SHEIKH
 
11364012_Top
11364012_Top11364012_Top
11364012_Toppakwish
 
Group of garments
Group of garmentsGroup of garments
Group of garmentsridimarakin
 
Production process of Shirt
 Production process of Shirt Production process of Shirt
Production process of ShirtJotan Banik
 
Strategic issues in Readymade Garments Supply Chain Management: A Study on Mo...
Strategic issues in Readymade Garments Supply Chain Management: A Study on Mo...Strategic issues in Readymade Garments Supply Chain Management: A Study on Mo...
Strategic issues in Readymade Garments Supply Chain Management: A Study on Mo...Md. Adib Ibne Yousuf
 
Global country report
Global country report Global country report
Global country report Jean Shah
 
INTERNSHIP REPORT ON KEYA KNIT COMPOSITE LTD.
INTERNSHIP REPORT ON  KEYA KNIT COMPOSITE LTD. INTERNSHIP REPORT ON  KEYA KNIT COMPOSITE LTD.
INTERNSHIP REPORT ON KEYA KNIT COMPOSITE LTD. MD. ANOARUL HAQUE
 
Summer Training Project12
Summer Training Project12Summer Training Project12
Summer Training Project12timci
 
Summer training project
Summer training projectSummer training project
Summer training projecttimci
 

Semelhante a Internship Report on Garments Merchandising (20)

Internship report on merchandising activities of lyric garments ltd.
Internship report on merchandising activities of lyric garments ltd.Internship report on merchandising activities of lyric garments ltd.
Internship report on merchandising activities of lyric garments ltd.
 
Merchandising Activities On Waymart Apparels limited.
Merchandising Activities On Waymart Apparels limited.Merchandising Activities On Waymart Apparels limited.
Merchandising Activities On Waymart Apparels limited.
 
Industrial training
Industrial trainingIndustrial training
Industrial training
 
Apparel Promoters ltd. for internship report
Apparel Promoters ltd. for internship report Apparel Promoters ltd. for internship report
Apparel Promoters ltd. for internship report
 
Industrial attachment of Olio apparels ltd (envoy group)
Industrial attachment of Olio apparels ltd (envoy group)Industrial attachment of Olio apparels ltd (envoy group)
Industrial attachment of Olio apparels ltd (envoy group)
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industry
 
Internship report of ABA group (1)
Internship report of ABA group (1)Internship report of ABA group (1)
Internship report of ABA group (1)
 
OKTL BY SHIHAB
OKTL BY SHIHABOKTL BY SHIHAB
OKTL BY SHIHAB
 
Group of garments
Group of garmentsGroup of garments
Group of garments
 
MGT330 report
MGT330 reportMGT330 report
MGT330 report
 
Welcome to my presentation on Concorde Garmnets Group
Welcome to my presentation on Concorde Garmnets GroupWelcome to my presentation on Concorde Garmnets Group
Welcome to my presentation on Concorde Garmnets Group
 
11364012_Top
11364012_Top11364012_Top
11364012_Top
 
Group of garments
Group of garmentsGroup of garments
Group of garments
 
ORGANIZATION STUDY
ORGANIZATION STUDYORGANIZATION STUDY
ORGANIZATION STUDY
 
Production process of Shirt
 Production process of Shirt Production process of Shirt
Production process of Shirt
 
Strategic issues in Readymade Garments Supply Chain Management: A Study on Mo...
Strategic issues in Readymade Garments Supply Chain Management: A Study on Mo...Strategic issues in Readymade Garments Supply Chain Management: A Study on Mo...
Strategic issues in Readymade Garments Supply Chain Management: A Study on Mo...
 
Global country report
Global country report Global country report
Global country report
 
INTERNSHIP REPORT ON KEYA KNIT COMPOSITE LTD.
INTERNSHIP REPORT ON  KEYA KNIT COMPOSITE LTD. INTERNSHIP REPORT ON  KEYA KNIT COMPOSITE LTD.
INTERNSHIP REPORT ON KEYA KNIT COMPOSITE LTD.
 
Summer Training Project12
Summer Training Project12Summer Training Project12
Summer Training Project12
 
Summer training project
Summer training projectSummer training project
Summer training project
 

Último

Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsRommel Regala
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxruthvilladarez
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 

Último (20)

FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World Politics
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 

Internship Report on Garments Merchandising

  • 1. TABLE OF CONTENTS Contents Acknowledgment Executive Summary Of Orbid Apparels Introduction Objectives Methodology Scopes Limitations Part- 01 Organization Part Brief History of Orbid Apparels Ltd Garments Merchandising Garments Trims/Accessories Activities of Merchandising Department Kinds of Garments Industry Part-02 Main Report Part Name Of the Buyers Of Orbid Apparels Ltd Fabric Supplier Of Orbid Apparels Ltd Trims Supplier Of Orbid Apparels Ltd Store Of Orbid Apparels Ltd Job Responsibility Of Merchandiser Essential Duties And Responsibilities Thread,
  • 2. Interlining, Label, Buttons, Zippers, Elastic Services Of Merchandising Team To Buyers Execution Process Of Export Order Sampling Facilities Quality Assurance Quality Control And Inspection Procedures Sourcing Services Factory Evaluation Capet Audit Part-03 QUALITY Quality Procedure Quality Depends On Some Factors Quality In Sewing Types Of Quality Checkers Quality In Washing Checklist For Auditing Carton Cost Of Failure Remarks Quality Control Definition Of Quality
  • 3. Dimension of Quality The Great Value Of Quality Controlling Quality In-line Inspection Section Supervisor Finial Audit Quality Procedures Quality Drills Points To be Checked: Cutting Section Spreading Cutting Others Sewing Section Finishing Section Fabric Inspection Grading System 4 Points Types Of Reporting Format
  • 4. Garments Defect Classification Of Defect Possible Garment Defects: Fabric Cleanliness Pressing Stitching Button Hole Button Sewing waistband Belt Loops Hem Pockets Zippers Fly area Labels Final Inspection Of Garments AQL Garment Checking Quality Planning 5 “S System 5 “S System Activities 5 “S System Steps Documentation For Export:
  • 5. Consular Invoice Commercial Invoice Certification Of origin Shipping marks Marks Of Origin Compulsory Marks Of Origin Corrective Marks Of Origin Making method Loading the Goods aboard Ship Truck Transportation Types of Tariffs Export Transportation and Shipment Alternative Shipping Methods Import Quotas Exchange Controls Trading Blocks Part-04 Conclusion Reference ACKNOWLEDGEMENT A warm felicitation goes for me to acknowledge the people, who hold the desirability for encouraging, praising, assisting as well as believing me on the tasks of Merchandising activities what I have worked through my internship period. First of all I would like to take the opportunity to thank Courses Coordinator of National Institute of Fashion Technology & my internship supervisor for providing me guidelines, help in assisting my report. He was constantly
  • 6. supporting me with his inspiring personality. I will always be always thankful for his extraordinary reinforcement. I would like to take the opportunity to thank Mr. Abu Soud, Senior Merchandiser, Orbid Apparels Ltd for being my on-site supervisor & providing me time to time information, suggestion as well as procedures to work with my topic. I also want to thank Mr. Yousof Ali, Merchandiser of Orbid Apparels Ltd for being so cooperative in my work. Finally I will show my gratitude to all the Management & Non-Management Staffs who have helped me during the internship period and the entire persons who somehow have impact on me in completing my whole report. Executive Summary Readymade Garments Industry is the leading foreign currency earning sectors of Bangladesh. Now-a-days Bangladesh financial sector is very much dependent upon this sector. The annual export income of garments sector is driven from two sources one is woven garments and others is knit wear. Readymade Garments is a 100% export oriented garments. Readymade
  • 7. garments exports various garments product in foreign market. The company makes shirts, ladies dress, shorts, trousers, and others for U.S.A, U.K, European countries They use high tech machineries to produce a quality garments product. They also add new machineries to increase their production line. They have a mission and the vision is profit maximization. The merchandising philosophy of readymade garments is to keep good relation with their buyers. The garments Industry maintains a good relationship with every buyer. Hard working and commitment maintenance is their main strategy. They always try to satisfy their buyers. In this perspective the merchandiser always try to do their merchandising activities in due time. The merchandiser of this company is not very much skilled person. More over him has no assistant. For this reason Sometimes the company face problem. So, here readymade garments can recruit high skilled people with giving high salary. The Readymade garments should improve their product quality, packing system, internal environment, and other merchandising activities to satisfy their foreign buyers. This report is prepared on “Merchandising activities and buyer satisfaction of readymade garments. The OCP report helps the reader to know about the merchandising activities, practiced in Readymade garments And the buyer satisfaction level towards the merchandiser Introduction RMG (Ready Made Garment) is very important and helpful for our Bangladesh. Bangladesh has emerged as a key player in RMG (Ready Made Garment) sector since 1978. Textiles and clothing account for about 85% of total export earnings of Bangladesh. Out of which, 75% comes from the apparel sector which covers the major products of knit and woven shirts, blouses, trousers, skirts, shorts, jackets, sweaters, sports wears and many more casual and fashion items. The sector currently employs approximately 1.5+ million workers, mostly females from underprivileged social classes. I have completed this report on the basis of all the
  • 8. department of RMG sector such as Merchandising Department, Commercial Department, Production Department, Supply Chain Department, Human Resource Department, Compliance Department, MIS Department, and relevant organization like BGMEA, BKMEA, Export Promotion Buru, Yarn suppliers, Chittagong Port, Insurance Company, Shipping Company. So by completing this report I get overall idea about RMG sector, so its carry more value than any books. I preferred this attachment in Orbid Apparels Ltd, which is a 100% export oriented composite knit industry. For continuing the study of internship in the Orbid Apparels Ltd, almost worked all the sections of this company and tried to find out the activities, planning and many other things as well. In context, I have discussed about these things deliberately to let you know about. Objectives: Objective means the purpose of this report. The objectives of this report are as follows: Its documents for future. • To know detail about RMG sector. • Information gathers about commercial. • Getting idea about shipping procedure. • Concept develops about spinning, knitting • • Comparison between class room learning and practical learning. • Knowledge gather about RMG sector related other organization. • To achieve new idea about knit garments manufacturing process. • To know about the management and technical process of apparel industry. • To know the management Procedure in Garments Industry. • To mark a comment over the whole Internship Report. • To mark out the important part of Internship Report. • To focus on the valuable part of Internship Report. • To have skill labor for quality product. • To study the present market composition for the Bangladeshi garment product about Market diversification.
  • 9. • To analyze the recent labor unrest in the garment industry of Bangladesh. • Opportunity of behavioral theory practice in our garments sector. • Regularly behavioral theory practice in garments industry. • Identifying the trade agreements that might affect the export growth. • To do a merchandising practice in the factory. • Identify the additional services that the existing companies are going to avail. • To relate the use of groupware and collaborative systems with future trends in managers' roles and responsibilities. • To identify merchandising and total production system. • To find the current scenario of backward supply chain status of Orbid Apparels Ltd. • To find the ways of improving the backward linkage of the supply chain for Orbid Apparels Ltd. Methodology: Methodology defines how we go through all the processes of research and how I have proceeded on. Here includes the steps of conducting the report and the explanation of the sources of data. • Factory • Different organization. • Books • Discussion • Internet • Class lecture • Library • Annual report • To collect information what I am seeing in practical in My Internship Program. • To collect information what I did in practical what was done by me for my practical knowledge. • To make a comment over the project we have to understand the whole project.
  • 10. Scopes: Scope means how many uses for completing this report space. The scopes are given bellow-  Factory  Buying House  Discussion  Internet  Some of our senior brothers can help me. • I can collect information various books and relevant paper what related with apparel industry. Limitations: Limitation refers the obstacles I have to face for completing this report and what I could not cover for this limitation.  Time constraint  Merchandiser doesn’t have enough time to give the information elaborately.  Short time visit in different work stations  Lack of organizing chain of command  Lack of instruction book, and any change. They are following traditional business.  I may have to suffer for lack of supply chain management.  No other garment’s data has been compared with Bextex s data. There might be some‟ discrepancies with other factories supply chain scenario‟  Due to high employee turnover rate and lack of good reporting practices in the factory, problems with collecting data have been faced.
  • 11. PART - 01 ORGANISATION PROFILE CONTACTS Head Office House No #14(Ground Floor) Road No #09, Sector # 09, Uttara Dhaka-1230, Bangladesh Phone/Fax: 088 02 8931015 E-mail: orbid@orbidapparels.com Factory Address Plot # 186, Madha GazirChat, Ashulia EPZ Road, Saver, Dhaka(2nd & 3rd Floor) Phone/Fax: 088 02 7790778 E-mail: Soud.orbid@gmail.com Knitting Factory Address Katgora Bazar, Zirabo, Savar, Dhaka Dying Factory Address BEQ Fabrics Ltd. Allianace Group. Vajon Textile. Sadma Fashion Ltd. Print Factory Plot # 10, Lane # 8, Block-A Banarashi Palli, Section-10, Mirpur-1216, Dhaka, Bangladesh Factory Area: 5,000 Sqf for Knitting Ground Floor 5,000 sqf for Fabrics Store & Cutting First Floor 5,000 sqf for Sewing 2nd Floor 5,000 sqf for office & Finishing
  • 12. 3rd Floor 5,000 sqf for Sewing, samples & Store Knitting Section : Total 13 nos. circular knitting machine (Korea) Gauge-24 "Dia-16" Qty-1 no-S/J & Pique Guage-24 "Dia-17" Qty-1 no-S/J & Pique Gauge-24 "Dia-18" Qty-1 no-S/J & Pique Gauge-24 "Dia-19" Qty-1 no-S/J & Pique Gauge-24 "Dia-22" Qty-1 no-S/J & Pique Gauge-24 "Dia-24" Qty-1 no-S/J & Pique Gauge-24 "Dia-26" Qty-1 no-S/J & Pique Gauge-24 "Dia-30" Qty-1 no-S/J & Pique Guage-24 "Dia-30" Qty-1 no-Rib & Int Gauge-24 "Dia-36" Qty-1 no-Rib & Int Guage-18 "Dia-36" Qty-1 no-Rib & Int Guage-20 "Dia-30" qty-1 no-Terry Fleece Guage-20 "Dia-36" Qty-1 no-Terry Fleece Cutting, Sewing & Finishing Section Cutting Section: Cutting mc -04 no(Km Japan) Cutting Table -04 nos(28' Ft.) Fabrics Checking Table -02 no(Local) Piping/Tape cut mc -02 nos(Adea) Sewing Section: Plain Machine -100 nos(Siruba) Over Lock -74 nos(Siruba) Flat Lock -46 nos(Siruba) Rib Cut Machine -02 no (Yamate) Buttons Hole -02 no (Yamata) Button Stitch -02 no (Taking) Feed of the Arm -02 no (Siruba) Snap Button -03 nos Total: -233 nos
  • 13. Finishing Section: Thread sucking Mc -01 no(Local) Washing Machine -01 no(Samsung) Steam Boiler (El) -01 no(Local) Steam Boiler (Gas) -01 no(Local) Vacuum Iron Table -13 nos(Local) P.P.Bailing Machine 01 no Iron -13 nos(Silver) Generator -02 no(Japan) Employees For Office 25 people(No child labor) For Sample 23 people(No child labor) For Cutting 42 people(No child labor) For Sewing 460 people(No child labor) For Finishing 65 people(No child labor) For Knitting 25 people(No child labor) Total: 640 people ALL TYPE OF KNIT ITEMS T-SHIRT POLO SHIRT TANK TOP SWEAT SHIRT PAJAMA LADIS & GIRLS DRESS JOGGING SUITE ALL TYPE OF FLEECE ITEMS Production Capacity: T-SHIRT: 300000 pcs/ month POLO SHIRT: 100000 pcs/ month Others: 30,000 pcs/ month (As per Styles)
  • 14. Our Associate Factories : 1. Orbid Fashion(Garments Printing Factory) 2. Orbid(BD) International (Accessories) General: 1. We are able to make garments using any sorts of fabrics as desired by you such as single jersey, interlock, pique, terry, fleece, rib, mini pique as well as different composition of fabrics in different constructions like 88% polyester, 12% lycra, 50% cotton, 50% Modal, 100% Pima cotton, 95% Viscose, 5% Elasthan, 100% polyester, 50% polyester, 50% coolmax, 90% Supplex, 10% Lycra etc. 2. We are able to control the shrinkage for single jersey in 3-4%, interlock 4-5%, rib 5-7%, all polyester within 3%. 3. We are able to deliver the goods 60 days after received the L/C GARMENTS MERCHANDISING Orbid Apparels Ltd The term “merchandising” is well known to the persons specially involved in garments trade. The term merchandising has been derived from the term merchandise. Merchandise means good that are bought & sold. The term “merchandiser” may be defined as the person who merchandises the goods. Garments merchandising means buying raw materials & accessories, producing required garments, maintaining required quality level and exporting the garments within time frame. According to Mr. Yousof Ali, Marketing can do everything but he can’t do anything directly is called merchandiser. From the above definition we can assume that a person involved in garments merchandising need a wide range of knowledge & skill to perform his job successfully a merchandiser should possess the following basic knowledge and skill. Are:- a) Good command of English and adequate knowledge of technical terms for accurate and efficient communication. b) Good knowledge of yarn, fabric, and dyeing, printing, finishing, dyes color fastness garments production, etc.
  • 15. c) Clear conception of usual potential quality problems in the garments manufacturing. d) Good knowledge of the raw materials inception systems & garments inspection systems. When an export order is given to a merchandiser, he has to schedule the following main function to execute the export order perfectly in time. Are:- I. Fabric requirement calculations, 2. Accessories requirement calculations (-Thread, Button, Interlining 1abet Poly bag, Main label, Woven label, Fit label, Cartoon etc.) 3. Source of Fabrics 4. Sources of trims. 5. Possible date of arrival of fabrics & trims in the garments factory 6. Costing. 7. Garments production planning. 8. Pre shipment inspection schedule. 9. Shipment documents. 10. Have to make proper & Action plan 1. GARMENTS Trims: 2. Garments trims means all items used in the garment except the basic is called garments trims. There are hundreds of items used to manufacture the garments which are used as trims. i. A list of few important trims is mentioned here. a. Sewing thread k. Hanger b. Interlining I. Guru tape c. Label m. Scotch Paper d. Button n. Tissue Paper e. Zipper o. Plastic: clip f. Lining n. Tag pin g. Shoulder Fad q. Collar insert h. Elastic r: Collar bone i. River s. Back Board j. Poly-bag t. Neck Board . 3. Quality of trims as well as proper selection of trims is very important; otherwise the garments may be rejected returned by the customers. 4. Activities of Merchandising Department of Orbid Apparels Ltd: 5. Activities of Merchandising Department are as follows: 6. Communication with Buyers
  • 16. a. Procure Order & Order confirmation b. Costing 7. Consumption a. Price Quoting b. Sample Control & Approval c. Potential Sourcing of Materials & Approval Fabric, Trims & Accessories d. Lab dipping & Approval e. Purchasing of Materials f. Testing g. Factory Scheduling / Planning h. Order Follow up: all steps of production & Quality i. Ensure On Time Delivery j. Liaison with the customer during Design, Sourcing, Production & Shipping k. Conduct coordination Meeting with other departments / Pre production meeting l. Attend Buyer’s meeting m. Ensure Customer Satisfaction n. Product Development etc. There are three types of garment industry in RMG sector: • Woven Garment Industry: The industry manufacturing garments and using woven fabric. Ex: Shirt, Trouser, Blouse & so on. • Knit Garment Industry (cut & sews): The Industry producing garments and using knitted fabric. Ex: T-shirt, Polo shirt, Tank top etc. • Fully Fashion Garment Industry: The Industry producing knitted garments and using yarn as main materials instead of fabric - Ex: Sweater, Pullover, Cardigan etc. Various Departments / Sections of Orbid Apparels Ltd are as follows: 1. STORE 2. SAMPLE 3. PATTERN 4. CAD/CAM/DESIGN 5. CUTTING 6. SEWING 7. FINISHING & PACKING 8. MERCHANDISING / MARKETING 9. QUALITY CONTROL / ASSURANCE 10. WORKSTUDY 11. Industrial Engineering 12. COMMERCIAL 13. ACCOUNTS 14. PERSONNEL
  • 17. 15. PURCHASE / PROCUREMENT 16. MAINTENANCE 17. HRD PART- 02 Name of the Buyers of Orbid Apparels Ltd:  ALDI (Germany & UK)  SDV (Portugal)  EWS (Germany & Austria)  GINKANA (Germany)  MOULY (Italy)  ROY WATSON (UK)  NORWEST (UK)  RAGADI S. L (Spain)  MGB METRO GROUP (Germany)  DITO FASHION (Denmark)  SARA CONFEZIONI SRA (Italy)  REWE ZENT RAN AG (Germany)  DIETER RENNER (Germany)  WAYSNAR FAR EAST (Hongking)  INSTYLE (Italy)  SOMERBOND(UK)  BBA BEYMEN BOGA ZICI(Turkey)  SGP (France)  KOOTENAY (Canada) Fabric Suppliers of Orbid Apparels Ltd: 1. CALIK 2. JEMIEI TEX 3. MOU FUNG 4. NIEN HSING 5. SHANDONG
  • 18. 6. SHANGHAI SHELYEN 7. SUNTEX 8. TAKSANG 9. ANLE RIVER 10. ZABIR ZUBAYE Trims Suppliers Orbid Apparels Ltd: 1. A& E 2. BRILLIANT LABEL 3. COATS 4. PAXER/ A VERYDENSISON 5. SHORE TO SHORE 6. SML 7. TOPSON 8. WANFORD 9. YK BTN/RVT 10. YKK JOB RESPONSIBILITY FOR A GARMENTS MERCHANDISER: The ideal candidate plays nicely with others and has a proven track record of success leading a team of graphic artists, an understanding of screen-print and with merchandising. Specific responsibilities include managing daily operations including providing supervision to employees as well as managing vendors, departmental communications, stylistic direction and managing associated budgets. ESSENTIAL DUTIES AND RESPONSIBILITIES: • Develops and maintains a clearly defined strategy in support of company’s mission, vision and objectives. • Works closely with key individuals and teams to integrate strategic opportunities into the prioritized workflow. Ensure cross-organizational support and extraordinary results for customers and partners. • Responsible for day-to-day operations including managing employees, vendors, communications, stylistic direction and associated budgets. This position will also provide support to customer service, Sunrise marketing, and product development. • Carries out supervisory responsibilities in accordance with the organization’s policies and applicable laws. • Manages and directs all pre-launch sampling and distribution of samples to sales & customers. • Work with sales teams and design staff to provide cost estimates. •Coordinates all aspects of tradeshow. •Develops business internally by participating in Merchandising Team. 1. SEEWING THREAD: There are various types sewing threads, which are used in the garments manufacturing industries. 100% Cotton. 100% Polyester, Nylon, Viscose, Mono Filament, Multi Filament, Textured, and Core spun thread especially finished thread etc.
  • 19. Amount all of them spun polyester thread is used in most cases. It is vary strong and have well colorfast. It can stand all kinds of rough washing such as stone wash, acid wash with its color unaffected. 100% Cotton threads should not be used unless you are making the garments for garment-day, because the cotton threads are expensive and easy to break down. Sewing threads are available in various types of package forms. Spool, Cap, Cone, Vicone, Small vicone, Container, Cacoon, Per-wound bobbin etc. Among the mentioned packages in most cases sewing threads are used in cone form. Within a cone length of sewing thread varies from 1000 to 500 meters. 2. INTER LINING: The fabric which is used between two plies of garments basic fabric with an intention to make certain parts attractive, strong & retain those shapes for long times called interlining. Interlinings are of two types, non-fusible and fusible interlining. At present days non-fusible interlinings are not used commonly. Types of fusible interlinings are available & price varies considerably. Polyethylene coated interlining — Water wash Polyethylene coated interlining — Water wash Polyethylene coated interlining — Dry wash PVC coated interlining — All types of wash, costly. PVA coated interlining –Mild water wash Care should also be taken during selection of interlining otherwise there may be a great problem. (a) Shrinkage of interlining should be less than the fabric shrinkage (b) Color of interlining should not affect the color of garments in the fused area. 3. LABEL: Label is a common accessory, which is to use in each garments. Within each garment no of label to be used more than one because there are various types of label to be used for various information. In the garment label you will get some information. Main label — name of company Size label — Garments size Price label Tag — Cost of garments Composition label-fiber composition (Sometimes size in included) Care label-Ironing & washing code, dying come (Instruction of garments care) There sometimes also some components used outside/face side of the garment to increase the beauty or fashion of the garments is called motif. A sometimes motif bears the symbol, trademark etc. Labels are available with various types, Qualities, & prices. Printer labels arc cheaper while labels manufactured in jacquard type label loom is expensive. 4. BUTTONS: It is also common accessories used in the garments. It ‘may work as functional part as well as decorative item, Buttons are made from Nylon Polyester, Wood Bone, Purl, Metal etc. it may have two or four holes with shank. Attaching of button in the garments is very important, usually it is attached by the button attach machine. If lock stitch type button attaching machine. It looks stitch type button a size also varies. To express the button size the term line” is used. 1 line ÷ O.638mm • Melamine button • Sandwich button • Shank button • Plastic button
  • 20. • Horn button 5. ZIPPERS: In the pant, trouser and jacket is a common component Metal or plastic-Teethes are used on narrow tapes of polyester or Nylons & those two series of teethes locked by a slider. Sometimes two sliders are used within a single zipper. Usually zippers do not shrink after wash but increase of garments, which may shrink a wash then the sipper area, may look wavy. 6 ELASTIC: Elastics are available in many sizes, shapes, stretched. The force required to stretch the & elastic also various depending on types of Elastic used. The elastic used in the bottom waistband of a jacket, vest or pull over shirt etc yeas should consider using the elastic with more tractability. For pants shorts, skirts (all buttons) the elastic should be of medium stretch ability. Elastic suppliers usually sell elastics by gross (one gross means 144 yards) unit, but if you measure one gross length you may get 140 yds. In most cases. Elastic are supplied in roll form in production if you want to cut it into 20” length you should do it after relaxation of the elastic at east far. MERCHANDISING Our merchandising team is committed to complete customer satisfaction. Our merchandising department consists of highly qualified team of merchandisers whose prime aim is to provide full satisfaction to our customer starting from the fabric procurement stage to shipment and reporting the status of the order to the buyers regularly. The services our merchandising team provides to our clients are: Systematic follow-up on each stage of production and execution of order on time. .Monitoring new trends in fabric, fashion and design. Locating new reliable sources to meet the requirements of the customer with regard to fashion and design. Introducing new sample to buyers to enable them to expand their business. Educate the customer about the characteristics of variety of fabrics, dyes, dyeing and printing process, and their positive and negative points and caution the buyers about the pitfalls involved. Liaison between the customer and our factories and follow-up. Guiding the supplier in preparation of the range to meet the customer's requirements with regard to fashion and design and negotiation. In addition, we at Decent Printing and Design keep our buyers updated at every stage of their orders. Due to this, we prepare daily production report from the manufacturers unit. This report keeps the buyer updated about their order at every stage of the production process.
  • 21. Execution Process for a Garment Export Order in a Factory (In Brief) 1) Order enquiry from buyer to factory: Merchandiser sits with Production Manager for ship date planning. Enquiry on price (some times the target price is also given) Enquiry on ship date i.e. whether it can be shipped in due date? 2) Approval of order from buyer, as par the costing given by the merchandiser: Merchandiser makes Time and action Plan contain the details of the action be taken as per fixed date, in order to execute the shipment on the due date as committed to buyer). 3) Buyer Bank given Master L/C to the Factory: Master L/C is the contract given to bank, which covers the total value of the export order.) Commercial dept. deals with the follow-up of L/C matter. 4) B/B L/C is given to the suppliers of accessories and fabric etc: Commercial department deals with the open up of B/B, L/C Merchandiser deals with the follow-up of the materials on time. 5) Fit sample sent to buyer for the fit approval: Merchandiser co-ordinates with sampling section, for the fit sample, and get it approved from the buyer for fit and measurement. 6) Pre-production sample submitted to buyer with original accessories and fabric: P.P sample to be made from the production line. PP. sample approval from buyer means Merchandiser takes approval on style, original fabric & original accessories. 7) Fabric and trims to be in housed on due time as per time and action plan: Inventory to be monitored by merchandiser so that there s no problem in quality or shortage of quantity in fabric and accessories. If thaw is anything wrong prompt action to be taken by merchandiser. 8) Pilot production to be started as per time and action plan: Or Initial production mean consists of 100 to 200 Pcs. Production managers and quality team should check very carefully about. The style & quality of the garment. The measurement needs to follow as per buyers spec sheet. 9) On line inspection by buyers QC certifies the quality of the garment: Buyer QC gives suggestion where the quality defects are and how to improve on that. 10) Bulk production to be started as per the time and action plan: Buyers Q.C monitor on the production and quality of garments. Production manager and supervisor need to be very careful to meet. The production deadline or production target, to meet the ship date on time.)
  • 22. 11) In the mean time commercial section prepares the shipping documents: Contact with shipping line for the booking of vessels. (For sea shipment). 12) Final inspection as per time and action plan: Buyer’s QC. Do random inspection during final inspection. Only if buyer’s QC certifies the quality is satisfactory then only we can. Ship out the goods. 13) Goods are made ex-factory: Goods send to seaport (sea shipment). Goods send to airport (air shipment) 14) Goods handed over to the shipping line: NOTE: NOW IN ANY CASE WE FAIL TO SHIP THE GOODS ON TIME AS PER THE DATE GIVEN ON MASTER L/C, BUYER WILL CANCEL THE GOODS OR WILL ASK FOR AIR FREIGHT I.e. F THE ORDER WAS IN SEA SHIPMENT. (Airfreight may come nearly 4 to 5 times of a sea freight cost.) SAMPLING FACILITIES Besides nearly 1,000 sorts of fabric samples, we have in house sampling department with modern machines and equipped with state of the art technologies for the development of samples for our customers. Our sample makers have over 10 years experience in sample development. Our sample makers have developed the expertise of producing excellent quality of sample as per the need and requirements of the customer. We encourage our potential buyers to ask us for samples so that they can have an idea of the product and its workmanship. We can provide our potential customers with samples of our own designs from our collection. In addition, we are very much willing to do the development of our clients' own designs and fabrics. Our philosophy is to provide superior customer services to our valued clients in order to satisfy their needs a step further than the market. Quality Assurance At Decent Printing and Design, we are committed to quality requirements of the highest standard. We do not sacrifice on quality. We make sure quality is adhered to throughout our operation from sampling to
  • 23. final shipment. We take extra efforts in ensuring the suppliers comply with strict quality control. Quality Assurance is an inherent part of our services and we ensure that our customers do not face any problem at any stage. Quality Control and Inspection Procedures We normally follow AQL Level 4.0 inspection method, but on special case we follow any inspection method our customers require. Our quality control and inspection procedure includes the following functions: Our Quality Assurance department checks all the fabric/Accessories to ensure that quality/color etc conforms to the order / style. Our Quality Assurance and merchandising team goes to factory location to evaluate pre-production (size set) sample, patterns, etc to approve for trial production. Quality Assurance team evaluates trial production and then finally approves for bulk production. As bulk production starts, our Quality Assurance team goes for inline inspection. This inline inspection during production is performed on daily basis. At the middle stage of production if (standard of quality) result is acceptable / good then we go for pre- final inspection. Here we check the case pack, carton quality, shipping mark, assortment, presentation etc. If the pre-final result is acceptable then we go for final inspection & if it passes, we approve for the final shipment. To ensure quality of the highest standard, we inspect at every stage of the production process. The following Quality & Inspection steps are being currently employed in sourcing and manufacturing: - Accessories Inspection - Knitted & Flannel Inspection - Measurement Spec checking - Accessories Inspection testing - Accessories Color Matching checking - Daily Cutting checking - Fabric Inspection - Lab dip testing - Washing Fabric testing
  • 24. SOURCING SERVICES Proper sourcing is the key to success in Textile/garments business. Keeping this in mind, besides our own factories, Decent Printing and Design sources products from reliable vendors with a careful assessment of price and quality. We have built up an extensive sourcing network of dedicated Manufacturers and Exporters from all around China. In addition, we have reliable sources of raw material such as fabric, trim & accessories from many countries/area such as Korea, Taiwan, and Pakistan at very competitive prices. Sourcing is our core strength, which distinguishes us from the rest of the market. We offer a complete sourcing package from design to delivery. Our sourcing department ensures great measures to evaluate the most suitable manufacturer and supplier for our client's requirements. FACTORY EVALUATION At Decent Printing and Design, we take an extra step to source the most appropriate vendor for our customers. Before selection we thoroughly evaluate Factory on the basis of the following assessment: . Factory design . Financial performance . Factory equipment & machinery . Factory productivity . Quota export performance . Prevalent working procedures . Factory past performance . Technical competency . Factory personnel competency . Factory reputation . Level of professionalism In addition, we have formulated a Factory Evaluation Form, which is filled out for every factory and then based on the physical, and financial assessment includes creation of a rating grade to the factory. This rating grade can determine the quantity of Garments it can manufacture for "Decent Printing and Design" as well as whether it has adequate production capacity. These services can be further extended in locally reliable fabric sources, dyers and printers, which ultimately promote quality of merchandise. This is an important process as no factory should be over booked, which causes delays in delivery and impacts production quality negatively. Factory assessments are an ongoing process. Decent Printing and Design is constantly investing time and effort in finding new factories, which can meet the requirements of client in terms of fashion and price. Shipping/Documentation Being a supply chain service provider, we have the knowledge and expertise to provide total logistic and transportation solutions to our customers. Our qualified personnel work in close association with leading freight forwarders, air and shipping lines at various locations. In addition, we can provide you specific value added services by pre advising all shipments on a regular basis with tentative arrival dates CTPAT Audit Documents need to be checked during factory evaluation • Written security policies.
  • 25. • Records of all movement of raw materials/ components in & out to & from storage. • Movement record register of all packed/ finished cartons & partially filled cartons from the packing area to the separate packed goods storage. • Movement record register of all packed goods/ cartons in and out from the packed goods storage • Movement record/register for dangerous goods/chemicals from storage. • Enclosures (doors, windows, gates, fences ,etc ) checklist / checking record by security guards per shift. • Empty truck checking records. • Duty roster of security Guards of last 3 months. • Visitors log book / records. • Log book /records for incoming/outgoing goods with both weight & quantity details. • Report / record of shortages & overages in incoming & outgoing goods/accessories. • In the event of staff turnover, are there procedures & documents to control the return of keys or security access code changes? • Previous job verification record of employees before hiring. & Security training program & record. PART - 03 QUALITY Introduction: In manufacturing, quality is the concept of making products fit for a purpose and with the fewest defects. Many different techniques and concepts have been tried to minimize defects in products. Quality Assurance: "The establishment and maintenance of ALL activities and functions concerned with the attainment of requisite quality" Quality Control: "The systems required for programming and co-coordinating the efforts of the various groups in an organization to maintain the requisite quality" As such Quality Control is seen as the agent of Quality Assurance or Total Quality Control Specifications: Quality Control requires the establishment of adequate specifications with proper tolerances
  • 26. Objective: To maximize the production of goods within the specified tolerances correctly the first time. By considering such information it can be decided what requires to be monitored. Monitoring the process is the essence of quality control Total Quality of a garment depends on the following factors- 1) Quality of Fabrics 2) Quality of Accessories 3) Quality of Cutting 4) Quality of Machines 5) Quality of Sewing 6) Quality of Washing 7) Quality of Finishing In each stage there are quality controlling with quality checkers or controllers. Quality manager is responsible for total quality of a product. Quality controlling in different stages described bellow- Quality of Fabric: There are some fabric inspectors, who check the fabric defects with fabric inspection machine. And follow “American 4 Point System” for better quality. Quality of Accessories: Trim inspection bay at main store inspects the trims and accessories for quantity and quality. Quality in Cutting: In cutting section there are 3 types of quality checkers. They are a). Marker checking QC: Marker checking QC checks the marker used for cutting for any type of mistake or defect. He checks for the following things- i) Style, size, color and type of marker ii) Any drawing defects on marker iii) Any overlapping of parts iv) All parts present on marker v) Ratio of marker is correct vi) Check with hard pattern provided by technical manager if needed b). Table or Lay QC: Table QC checks for lay defect and correct procedure for lay. He checks for the following things- i) Marker length and lay length and proper allowance (1/2”+1/2”=1”) for lay length. ii) Any fabric defect iii) Pile of fabric is correct iv) Tension of fabric v) Salvage of fabric is outside the marker. vi) Fabric nap is correct.
  • 27. c). Bundle checking QC: S/He checks for total parts are present in a bundle. S/He checks the bundle with JC Penney 3 piece system. In this system he collects 3 pieces from the bundle and checks them for any fabric defect, size and shape and proper cutting. There is also an auditor and AQL section at cutting for better quality controlling. Quality in Sewing: Maximum quality controlling is in sewing lines as maximum defects occurred during sewing. Some common defects are- 1) Thread tension 2) Broken stitch 3) Raw edge 4) Wrong back tack 5) Puckering 6) Open seam 7) Skip stitch 8) Joint stitch 9) Fabric defects 10) Shading 11) Stains 12) Un-even shape 13) Down stitches 14) Up-down 15) Center out 16) Gap difference 17) Poor ironing 18) Holes and damages 19) Slanted 20) Missing Bar tack 21) Marking mistake etc. There are 3 types of quality checkers in sewing line. They are- a) End Post QC: Check for defects after some specific operations. They make two kinds of report. One is “Sewing Quality Inspection Report” and another is “Repair Report”. b) Final QC: They inspect the whole garment after sewing complete. They also use the same report as End Post QC. Additionally they also do “Measurement Chart Fit Audit” c) Roving QC: They audit an operator randomly using “Random Number Table” and collect any 7 pieces of garment (JC Penney 7 piece System) from him and check for defects. If he doesn’t find any defects than whole lot get pass. If he finds any one major defect in any garment than he declares the whole lot fail and hang a “Red card” near the Un-cleared operator
  • 28. Also there is some Technician who concerned for better quality. AQL department in sewing lines, audit the garments with specific AQL rating system and pass the garments only if they satisfied the Buyer accepted DHU level for passing. Quality in Washing: Shading is the main quality problem in washing. There is a quality checker who matches the garments with approval shade after each wash. Quality in Finishing: For better quality there are several quality posts in finishing. First step is Process wise inside checking, then Process wise out side checking and last step is final quality Checking. And there are also two audits in finishing. They are- 1) Hourly Audit (Internal): They audit randomly any 7 pieces in each hour from a line. If they find any major defect in any 1 piece than audit goes to fail and whole garments in that line have to check again. Otherwise audit pass and garments goes to carton packing. 2) Carton Audit (External): They audit any 3 cartons from each line. They check for external matters like Tag, size, ratio, color etc. If find any major defects in any piece of any carton, the audit fail and all carton have to check and pack again. Note: After passing the external audit garments are ready for shipment. Checklist for Auditing Carton: The followings, we have to check while auditing a carton. 1) Barcode/Shipping mark 2) Assortment 3) Size label 4) Match box 5) Sticker 6) Shade 7) Ratio 8) Also for size, presentation of garments, looseness or tightness, folding, dimension etc. Cost of Failure: The main costs of failure due to poor quality are- 1) Losses due to faulty and spoilt work 2) Examiners records 3) Reprocessing a. Additional materials b. Extra labor c. Disruption of production 5) Administrative Costs a. Reaching agreement with customers b. Replacing defectives or complaint adjustments
  • 29. Remarks: 1) Better quality makes the production rate better and also satisfied customer or buyer. If quality is poor then we need much time to repair the altars, which decrease the overall production rate. 2) Roving auditor using red card for poor quality of an operator. He also can use a green card for better quality of an operator, which will inspire him and others for better quality. Quality control According to my sub objective quality is a fact to survive in a post MFA situation for competitive market. The factory Lenny Fashion Ltd. is also concern about it, and they show interest about better techniques of quality and its controlling system. I have just going to introduce it and presenting some core activities those will be very much helpful to increase the product quality and its assurance system. I have also mention here the new 5s system that will help to decrease the cost. Definition of Quality- Quality has been with us since the dawn of civilization; however science, after second world war it has been used more as a competitive weapon or competitive advantage. In order to understand this we can have a looked at Japan. In the first few years after the Second World War Japan was rebuilding from the war, many business executives through training in quality, which conducted by dr. deeming at Japan. These executives took the quality messes to heart and we can see the resold today, which are taken obvious to mention. Some other countries such as South Korea, Taiwan and Singapore in Asia /pacific followed this model and became very successful in the world arena. Quality is a complex concept. No single definition addressee the entire dimension, areas of impact and concerns related to quality. The term itself is used in many ways for many reasons, each use reflect a different perspective based on philosophy, economics consumers behavior, production each. Definition may focus a holistic perspective, the impact of quality on the organization income, the changing market place, the nature of a product or service, the way a product or service conform to specifications or the ability of a product or service to meet customers’ needs. And satisfy their demands. Companies and their employees need to understand how quality affects organizations. Eight dimensions of quality 1. Performance 2. Features 3. Reliability 4. Conformance 5. Durability 6. Serviceability 7. Aesthetics 8. Perceived quality The great value of Quality Many talk about the importance of quality in soft goods but not everybody recognize how important it really is. In most cases one employee that produces bad quality can greatly affect sales for a company. A study in the U.S. showed that an average individual will probably spend about $70,000 through his life buying from one brand that he is comfortable with .Most sales are repeat sales so you can potentially lose about $70,000 of business if this customer suddenly becomes unsatisfied. In the production floor it is
  • 30. sometime hard to imagine that one skipped stitch can cause customer dissatisfaction please recognize that, if something is not as specified, it is defective. Defects are a waste! Let's see what happens to defective garments in the factory: If a defective unit is found you have two possibilities: That it can be repaired, that it can’t. 'Seconds' are sold at a loss by the factory. Units to be repaired are also an extra cost because extra costs are incurred in 1) Handling the unit before repair, 2) Extra labor and materials in repairing and 3) Extra handling to get it back with the first goods. The time consumed on repairing defective goods can always be used to produce first class goods. In all cases defective units are costs for the factory. "Do it right the first time" is the key to success. To ensure quality we need to do a number of things: 1. Recognize who the customer is 2. Build processes that anticipate and prevent defects 3. Make a plan to achieve the desired quality level 4. Set up ways to measure our progress 5. Work as a team to achieve the goal Receive Sewing Finishing A good plan requires: 1. A clearly defined objective 2. Goals or expected results 3. The activities needed to achieve the desired results 4. Defined roles and responsibilities for the activities 5. Dates for the begin and completion of each activity 6. An analysis of potential problems Measurements are a vital part of any quality improvement program. Anything that is not measure does not improve. We need to establish these standard measures and measure the progress periodically Teamwork is also an essential element for the success of the program. Remember, "Not ONE of us is better than ALL of us". The whole effort needs to have a direction that a team leader will provide. The Executive's Job Related to Quality There are two separate areas of dealing with quality that an Executive becomes involved in: Cutting Inspect
  • 31. 1. Handling repairs Getting repairs corrected and work back into the production flow. 2. Preventing repairs Working with operators to prevent repairs (correct at the source). • Which one is the most important? • Which one is the most effective way to control quality? • Which one should be the Executive's primary aim? • Which one takes up the majority of your time? Answer honestly. To Control Quality 1. Have the proper approach toward operators • Approach operator with defective garment • Ask operator kindly to stop her work and pay you attention • Explain defect found and ask if she understands why garment is defective • Make sure operator understands why it is defective • Try to find out why the defect was created or why it was not detected at the workstation • Restate the company's commitment to quality • Ask operator to inspect the current bundle for more defective parts and then repair all parts that are out of tolerance including the one found by the inspector. This Should be done immediately Stay and observe sewing method Make sure method is being followed 2. Train operators to sew with good quality from the beginning 3. Know quality specifications and tolerances Be sure you understand what constitutes good and poor quality. 4. Be consistent in your decisions toward quality. 5. Comment on both good and bad qualify. We all have a tendency to be silent during good times and vocal during the bad. 6. Be sure to check each operator's work daily. The amount of defects found should govern the amount of inspections performed. Vary inspection times and inspection sequence. Check into middle of bur-die. Do not always look at only the top garments. 7. Use a checklist - do not rely on memory of specs. 8. Do not rely on inspectors to tell you the quality level of your operators. 9. Never give the impression that you think work is OK but inspector will not pass it. If you do have this problem, resolve it with plant manager away from operators. Quality Control Procedures Summary In-Line inspection: During the production of garments the operator's finished work is audited in an in-line inspection. A quality inspector move's from one operator to another at random inspecting a predetermined number of parts from a finished bundle. In-process inspector
  • 32. If the in-line inspector finds a defect n a part he is inspecting he should: 1. Take defective part/parts out of the bundle 2. Take part to the operator's immediate supervisor 3. Give the part to the supervisor to examine while inspector explains the defect found. 4. Decide with the supervisor whether it is actually a defective part send if defective the supervisor should return the part to the operator. 5. Go back to the operator and mark the bundle as rejected with a red card or cloth and fill in the appropriate paperwork for the inspection and mark the workstation with the quality banner to signal that follow/-up bundles have not been cleared. 6. Continue to the next operator selected randomly from the list of operators and perform the inspection based on the approved sampling plan. 7. If an operator has a bundle rejected then all bundles coming from that operator are going to be checked by the quality inspector until three consecutive bundles are free of defects. At this point the red quality banner will be removed. Follow-up bundles are inspected in the same fashion (audit not 100% inspection) 8. The quality banner helps the inspector remember to inspect the follow-up bundles from that operator and also helps the supervisor identify what operators are having quality problems. 9. Make sure that the element of surprise exists when doing an inspection. Inspections should always be performed at random and should never follow patterns. Following a predetermined path in the line can hint operators you are going to inspect their work next. Inspect operators at random. 10. Make sure that only the defined number of units is inspected. No more, no less. 11. The units inspected should always be taken randomly from the bundle to ensure that the sample taken is representative from the bundle. Taking samples only from the top of the bundle is not correct and can give skewed results. Section supervisor: If a quality inspector approaches the supervisor with a defective unit he or she should: 1. Greet the inspector do not ignore him/her. Inspect the part according to the quality specifications 2. If it is defective let the inspector know you understand it is a defective part and you are going to address the part with the operator. 3. As soon as possible take the part to the operator and approach the situation appropriately: • Approach operator with defective garment • Ask operator kindly to stop her work and pay you attention • Explain defect found and ask if she understands why garment is defective • Make sure operator understands why it is defective • Try to find out why the defect was created or why it was not detected at the workstation • Restate the company's commitment to quality • Ask operator to inspect the current bundle for more defective parts and then repair all parts that are out of tolerance including the one found by the inspector. This should be done immediately, • Stay and observe sewing method • Make sure method is being followed If necessary review the operator's card with the operator to see if this was an isolated occasion or if it is a recurring problem. Try to motivate the operator to continue working with good quality.
  • 33. The supervisor leaves the operator repairing the defects the supervisor should return after some time to make sure all work has been inspected and the defects repaired. Before the bundles continue to the next operation the supervisor should be sure that there are no defects in them. All bundles coming from that operator are going to be checked by the quality inspector until three consecutive bundles are free of defects. If there are defects in the bundles following a rejection, you could say the supervisor is no; doing a good job of ensuring quality in that operation. 100% inspection: At the end of a section there will be an inspection made to all parts exiting the section. The inspections should be effective in identifying all defects in a garment. To ensure all seams and quality characteristics are inspected in a short period of time a defined inspection method should be followed. The inspection operators should have their forms filled out correctly. A good source of information to determine the quality performance of the section is the point of 100% inspection. The section supervisor should check the quality level at the point of 100% inspection periodically. From the 100% inspection forms the supervisor should analyze what are the operators /operations with the highest defect frequency. For these operators/operations the supervisor should identify the type of defects found most often, the cause (machine/method), and the frequency at which the type of defects happen. With this information the supervisor should address the problems, correct the possible causes and make plans to prevent them. The inspection form is totaled 4 times a day so a supervisor can actually see the results of what he or she has done to stop defects, Final Audit: A final audit should be performed on packed items. When the boxes are ready to be shipped a certain number of units should be inspected. Using the MIL-STD-105D determine how many garments need to be inspected. Randomly select a number of boxes from the lot that contain the determined amount of units to be inspected. For example, if there are 75 boxes of 10 garments each and I need to inspect 80 units I would open one box and inspect 5 garments, another box and inspect 7 garments, another and inspect all 10 garments, and so on until I have inspected a total of 80 garments. After entering all the information in-to the Final Audit form, the final inspector should determine if the lot was accepted or not. Any rejected lots should be addressed promptly to minimize the chance of having a late order. Quality procedures in the Cutting Area During the cutting process the factory should ensure quality by having a Spreading Inspection, a Cutting Inspection, and a Final Audit. During Spreading the following is checked-.
  • 34. 1. The side of the spread should be aligned +/- 1/8 2. The base marker should be aligned parallel to the length of the table 3. The splice points should be identified on the base marker before spreading 4. All splices should be marked with paper that is at least longer than the overlapped fabric 5. The overlap of fabric at a splice point should exceed at least 2" on either side of the parts in the splice 6. The fabric laid should extend 1-1.5" outside of the marker 7. The fabric laid should never be less than the marker's width. The fabric width should be at least inches wider than the marker. 8. The spread fabric should be relaxed, not stretched, and wrinkle-free before cutting. 9. No defective fabric should be laid unless there has been an official authorization. During Cutting the following is checked'. 1. The marker lines should be followed. You can go out of the line by 1/8" max but never cut into the part. In other words, you should always be able to see the marker lines. 2. All notches should be located correctly with a depth of %" +/- 1/16" 3. The markers should be attached to the stack of parts with approved stapes or pins 4. When cutting care should be taken not to shift the stack of parts to a since or to cut with the blade at an angle. In bundling and shade marking care should be taken to ensure that this numbering is correct. In other words, no skipped numbers. The bundled parts should be grouped correctly: 3b fronts with 3b backs with 3b yokes, and so on. For the final audit process, the quality inspector will determine how many bundles to check from every size according to the MIL-STD-105D. Each of these bundles will undergo the following inspection- 1. All parts from the same shade number should not have shade differences. 2. All parts have the proper shape according to the marker 3. All parts must have all notches in the correct location and with the appropriate depth. The contact that a supervisor and the operator have during the Quality Drill is very valuable. During this time the commitment of everyone to guarantee a job well done is strengthened. At this time the operator should be encouraged to learn what the requirements for his operator are and he is complimented if he knows them wholeheartedly and works to achieve them every lime. This exercise should be performed on standard time and at least once a day. If you are having quality problems with an operator you should increase the frequency of the exercise even to one exercise an hour. It is necessary that the trainer and the supervisor explain the importance of the Quality Drill to the operators stressing that its; sole purpose is to help them improve their quality. The initial resistance by the
  • 35. operators is normal, but as soon as positive results from exercise are seen, the operators 'A/ill takes the initiative to do the exercise themselves. Quality Drills: The production supervisor is responsible of the operator's work so it is of almost importance that he or she has control over the quality level at which the operators produce. To prevent repairs and to ensure good quality there is a useful tool called "Quality Drill". It is very effective in making operators quality conscious. During this exercise you confirm to the operator the commitment to good quality that the company has made and motivate him/her to produce with quality. The procedure is the following: 1. Ask the operator to stop what he is doing and stand up. 2. Give the masking tape to mark defects 3. Ask the operator to inspect, based on the Quality Specification, the bundle in which he is working on, the bundle he has already finished, and the bundle he is going to work on next. This way the operator has the chance to see if the work he is doing is of good quality and also make sure that the work he is receiving from the previous operation is not defective. 4. Ask the operator to mark any part that is out of tolerance with the tape 5. Ask the operator to do it while standing up and when he or she is finished he should signal the supervisor that he is ready to have the results evaluated. 6. The supervisor makes sure that the instructions have been understood and then leaves to continue with the regular activities. 7. When the operator has signaled that he is finished, the supervisor returns 8. The supervisor then proceeds to inspect at random a number of parts of any bundle. If he is to find a defective part he should separate it and ask the operator why the part was not identified. If there are no defective parts found by the supervisor he turns to the operator and asks the operator to show him the defective parts he found. 9. If the operator has found no defects then the supervisor should select a part and ask the operator to explain why this part is of acceptable quality. The operator should be able to explain why based on the points described in the quality specification. 10. If defective parts have been identified then the operator should explain v/why they are defective based on the points described in the quality specification. 11. If the supervisor notices that the operator is not very clear of what the requirements for his operation are or how to find out if these requirements have been met or not, then the quality specification sheet should be reviewed point by point. 12. If the supervisor notices that the operator "overlooks" the defects then the supervisor should review with him the importance of doing a job properly every time. Section wise quality control: To ensure the quality of the product, quality control personnel have to control quality in different section / department in clothing, which are directly or indirectly involve with production.
  • 36. Controlling areas are as follows: Store: • Inventory • Fabrics and other material inspection • Material testing • Cleanliness • Swatch board making • Reporting Sample: Quality control personnel must check sample before sending it to the buyer. Important points to be checked: Whether the samples are as per buyers specifications or not, such as style description, sketch measurement sheet, photograph etc. and workmanship has to be checked with reference sample or related documents provided by the buyer. Report to be submitted to the merchandiser as well as to the superior. Cutting section: Pattern marker: pattern and marker must be checked by the quality control personnel check points are s follows; • Measurement, • Gradation, • Allowances, • Pattern parts missing, • Mixed parts, • Pattern shape, • Direction of pattern in the marker, • Pattern alignment with respect to the grain line, • Poor line marking, • Marker too wide than fabric width, • Notches and drills marks omitted, • Mismatch checks and strips, • Overlapping, • Too thick line or double line marking, • Invisible line marking, • Marker incorrectly positioned on the lay, Spreading: During spreading following should be checked: • Fabric relaxation, • Incorrect tension of plies, • Wrong direction of plies, • Unacceptable damages found, • Mismatching of checks and strips, • Narrow fabric, • Shaded fabric, • Misalignment of plies. Cutting:
  • 37. During cutting the following points should be checked: • Inaccurate cutting, • Notches – misplaced, too deep, angled, omitted or wrong type • Drills –marks –wrong drill, omitted angled, • Knife cut- garment parts damaged by careless use of knife, • Frayed edges scorched or feud edges caused by faulty knife. • Slits opened inaccurately or omitted. • • Others: • Bundling with bundle card, • Numbering, • Cut panel checking, • Wrong size in the bundle, • Fused parts checking, • Cleanness, • Proper raking/ storing. • Proper issuing, • prefer test cutting than bulk cutting, • Reporting. Sewing section: Quality control system for sewing section: There are some systems are in practice in the sewing floor are as follows: • Traditional system • JC penny system • Traffic light system • SPC. In line checking criteria: During construction of garments the processes / components must be checked in the line as follows: • As per pre- production meeting some critical process to be checked in the sewing line. (Randomly or 100%) • Each and every process must be checked. • Auditing / monitoring. • Cleanliness (in the line and work place) • Reporting. End line checking criteria: After completion of the garment in the sewing line ,it has to be checked further at the end of the line. • Inspector will check all process of a garment. Sample may be picked randomly or 100%. • Reporting. Other: • Transportation section-to-section or stat ion. • Proper machine
  • 38. • Maintenance • Proper attachment each. • Cleanness (floor/ line / work place) Points to be considered: Points to be considered during controlling quality in the sewing line are as follows: • In line inspection should be performed at the work station. • Inspector ratio in the line depends on the system being implemented in the line. • As per JC penny system, one inspector for 30 operations. All operations are audited minimum twice a day, where operator are minimum skilled. • As per pre production meeting inspector will be provided considering the controlling system. • Number of inspectors in the line depends on number, of operation of the style being produce and number of machine in the line. • Defect and measurement both should be checked in the line. • 1/4 inch, masking tape or arrow sticker to be used to indicate the defects. • Number of pieces, to be inspected a) randomly) 100% ,c) 7 sample per bundle( up to 180 units per bundle) as per JC penny . N the inspector should check complete bundle/ complete process. • The inspector must select the units at random basis from a bundle/ from the complete units. • The inspector must inspect exactly the number of units called for the sampling plan. No more no less or as per the system. • The inspector must rove the s/ line as per the instruction of the superior. • If more than one inspector rotates them so that the same inspector does not inspect the same operator too long. • If the inspector finds a defective unit, corrective action should be taken. • To ensure that the problem has been corrected the inspector re- audit the corrected bundle inspecting 7 units at random from the entire bundle/ or re- check the corrected unit or as per the system. • The concern production supervisor should rectify defective units with the same operator. • For product that is not in bundle from, it is recommended that a statistical inspection based on AQL. Finishing section: This final section to make the product saleable condition and the finishing processes should be controlled to achieve the quality target. For wash garments 100% check is required after receiving the garment from the washing plant. Defective garments should be rectified and reject pcs. Should sort out. Checking: • Iron / press • Folding • Tagging /sticking • Packing Audit: Audit can be performed in the sewing floor as well as in the finishing section or whatever required. Mini- Qc: It is a new concept, yet to be implemented in Bangladesh but its very effective quality control activity to achieve the quality target. Introduction to Fabric Inspection:
  • 39. Fabric inspection is one of the most important quality control activities in clothing industry. This involves the inspection of-the fabric in order to quantify the patent defects found in fabrics. During this process other details could be collected without, any additional cost and these details can be used to minimize waste. After fabric is received, it should be inspected to determine its acceptability from a quality viewpoint. Otherwise, extra cost in garment manufacturing may be incurred due to either the loss of the material or time, to say nothing of customer returns and dissatisfaction due to poor quality. In many small companies the same personnel do spreading and cutting and fabric is inspected as it. Is being spread on a table for cutting. Regardless of what practice is followed, the important point is that the fabric should be inspected before cutting, the defects marked and the patterns cut. Around the defects so as not to include them in the finished garment. The main raw materials Used in the manufacture of garments are fabric. About 60% or more of the value of a garment can be attributed to fabric. In order Lo maximize profit; the fabric should be used efficiently. Fabric inspection is usually done on fabric inspection machines. These machines are designed so that rolls of fabric can be mounted top behind the inspection machine and the fabric will run over the inspection table under adequate light, re-rolled as they leave the table. Defects in a fabric can be seen readily with these machines, as the inspector has a very good view o!' the fabric. These inspection machines are either power-driven or the inspector pulls the fabric over the inspection table. The defects are located, marked and recorded on inspection findings or reporting format. Such machines are also equipped lo accurately measure the length of each roll of fabric as well as monitor the width of the fabric. Objective of Fabric Inspection: The objective of fabric inspection is to ascertain whether the fabric received is of the expected Quality standard or not. The main objective is, detection of fabric defects and non-conformances early as possible, So that the time and money are riot wasted in the manufacturing process. The ultimate goal of any quality control activity in clothing industry is to satisfy the customer. Importance of Fabric Inspection: As we know that fabric are the main and costly raw materials of a garment. So it is very important to use fabric efficiently and control wastage of fabric. On the other hand fabric defects are the maximum defects of garments, for which many-unexpected problem may occur in a clothing industry. Such as-short shipment, discount, low price etc. To avoid all above problems and to take preventive measures fabric inspection is very important for a clothing industry. It is also important for the following aspects: • Improved product quality, • Minimize waste, • Reduce the cost • Avoid short shipment • Increase productivity. Grading Systems: There arc-different types of standard grading systems in practice. A system is agreed or selected by mutual acceptance between supplier and buyer.
  • 40. Some of the available grading systems are given below: • 4 point system • 10 point system • Graniteville '78' system • 6 point system • Dallas systems 4 Point System: Penalty points are assigned according to size of defects. Warp and Weft Directions Length of the defect penalty points Up to 3" 1 3"-6" 2 6"-9" 3 more than 9" 4 Maximum penalty points per yd. are 4. Defects within 1/2 of selvedge disregarded. The system is recommended for use where smaller -defects are critical and for fabric of wider widths and also this is very suitable for sample inspection. Types of Reporting Format: (1) (Sheet 1) Normal inspection - the type of sheets usually used in inspecting fabric. (2) (Sheet 2) Special sheet to show distribution of defects within the roll. (3) (Sheet 3) Special sheet to show location of defect within each yard. • Defects such as colors variation, skew ness, and bowing are not considered in awarding penalty points. The expected fabric quality should be specified and agreed with the Supplier at the time of negotiation. By inspecting the fabric, the quality can be improved, but it could be used to minimize waste. Garment defect: Product variation is a normal result of the manufacturing process. It is impossible in make each garment exactly the same. In order 10 establish acceptable levels of variation; Tolerances should lie slated as a pan of product specifications. Defect: Variations that exceed tolerances or do not meet specifications arc called detect. Garment Defect can be defined as below: Any irregularities or deficiencies in the fabric Materials used, in (cutting, Construction Assembling Knitting, linking , pressing or in the Finishing of a garment that adversely affects its appearance, serviceability or sale ability or do not meet the specifications and exceed the tolerances is
  • 41. garment defect. Classification of Defects: Generally, three main categories of defects are classified for the garment standards as per defects guide. '1 lie categories of defects are as follows: • Critical Defect • Major Defect • Minor Defect Critical Defect: A defect that is likely to result in hazardous or unsafe conditions for an individual in consuming or using the product, or that is contravenes any mandatory regulations. Major Defect: A defect that is likely to result in failure, reducing the usability or serviceability of the product. Any obvious appearance of defect will affect the sale ability of the product. Most of the cases garments are rejected. Minor Defect: A defect that does not reduces the consumption or sale of the product is nevertheless a workmanship error beyond the quality standards. It is recommended, at the manufacturer level that defects may be at the borderline between Major and Minor should classified as Major, for the sake of emphasis in activating corrective action. Factors to be considered for classification of defects: • Location of defect • Size of the defect • How visible the defects from 18" distance. • End use of the product POSSIBLE GARMENT DEFECTS: Materials/fabric: 1. Hole or surface Haw that could develop into hole. 2. Slues that is easily distinguishable 3. Distinctive shading 4. Dye spots misprints, or out-of-register prints. 5. Cut, tears or visible surface repairs 6. Bow or skew exceeding 1.5 percent. 7. Plaids, checks, or horizontal stripes dial are conspicuously out of match at center front or back of a product. Cleanliness: 1. Soil, Spots, stains or Dust 2. Attached thread clusters Pressing:
  • 42. 1. Burn or scorch marks 2. Glaring shine marks 3. Press marks from camps 4. Absence of pressing when specified 5. Products packaged moist after steam pressing 6. Improper pressing 7. Seams not lined up when specified for center leg crease 8. Loops twisted after pressing 9. Pressed-increases uneven Seams and Stitching: 1. Twisted, roped, or puckered scams 2. Open or broken stitches 3. Raw edges when covered edges are specified 4. Scams not back stitched or bar tacked when specified 5. Irregular or uneven top stitching 6. Scam grin-through 7. Any part of product caught in scam or stitches 8. Any exposed drill holes 9. Length of legs off by more than 3/8 in. 10. Stitch count not conforming to specs 11. Stitch or scam type not conforming to slices 12. Label is not correctly attached 13. Sewn on design attached at incorrect place and sewn not according to specs 14. Double needle stitch on crotch seam; t not specified 15. Use of monofilament thread, other than where specified BUTTON HOLE: 1. Size within specs 2. Ragged edges 3. Uncut buttonhole 4. Out of 'alignment or improper spacing 5. Stitch depth too narrow or wide Button/Button Sewing: 1. Button not securely attached 2. Butler-missing 3. Broken or damaged button 4. Out of alignment or improper spacing 5. Button not to specs 6. Lack of support materials on fragile fabric 7. Buttons that crack, chip, discolor, rust, bleed, melt or otherwise cause consumer dissatisfaction when care label is followed
  • 43. Waistband: 1. Uneven in width 2. Excessive fullness, puckering or twisting 3. Closure misaligned 4. Belt loops are crooked Belt Loops: 1. Not fully secure 2. Extend above waistband 3. Missing tacks 4. Color shade not to specs 5. Thread shade not to specs 6. Raw edges showing Front and back: 1. Uneven at bottom hem 2. under facing showing 3. Pockets conspicuously uneven 4. Darts uneven in length 5. Darts poorly shaped 6. Spot shirring not even right and left sides Hems: 1. Twisted, roped, puckered, pleated, or excessively visible from exterior 2. Uneven in width 3. Uneven length of product unless specified Pockets: 1. Not uniform in size and shape 2. Misaligned horizontally or vertically 3. Crooked 4. Missing bar tack, back tack or rivet where specified 5. Bar tack or rivet not as specified 6. Sewn-in pleats or puckers Zippers: 1. Any malfunction in operation 2. Tape does not match color specs 3. Wavy /Zipper 4. Exposed /zipper that detracts from product's appearance 5. Irregular or uneven stitching 6. Crooked or uneven placket 7. Bar tack missing or incorrectly located at bottom or base of zipper
  • 44. Gripper: 1. Misaligned 2. Missing or incorrect 3. Defective in operation Fly area: 1. Width is not uniform 2. Bottom stop not securely clinched 3. Top of zipper not caught in band 4. Either side of fly extends past other side by excessive amount Labels: 1. Labels are not correct 2. Located in correct location 3. Insecurely attached
  • 45. DEFECTS ZONE A ZONE B Materials * Hole, (tear, cut, fabric run, dropped stitch MAJOR MAJOR * Permanent crease M AJOR MAJOR * Permanent stain MAJOR MAJOR * Washable stain MAJOR MINOR * Loose threads MAJOR PER SEVERITY * Frayed edges MAJOR PER SEVERITY Seam and Stitching * Open Seams MAJOR MAJOR * Under stitching (Less stitches per inch PER SEVERITY MINOR than Spec) PER SEVERITY MINOR * Overlap stitching PER SEVERITY PER SEN TRITV * Double stitching Shade and color * Off Shade MAJOR MAJOR * Mismatched color MAJOR MAJOR Label * Missing MAJOR MAJOR * Misplaced MAJOR MAJOR * Incomplete MAJOR MAJOR * WRONG Label MAJOR MAJOR * Insecurely attached MAJOR MAJOR - * Pocket * Not in specified location by more than 1/4 MAJOR MAJOR * Not in specified location by less than 1/4 MINOR MINOR * Sewn in crooked PER SEVERITY PERSEVERI IV * Size and shade not as specified MAJOR MAJOR Pressing * Over pressed MAJOR PERSEVERI IV * Distorted MAJOR PER SEVERI IV * Wrinkles MAJOR PER SEVERI IV * Buttons * Missing functional buttons MAJOR MAJOR * Missing decorative buttons MAJOR MINOR * Misaligned buttons MAJOR MINOR * Functional button Insecurely sewn MAJOR MAJOR * Decorative button Insecurely sewn MAJOR MAJOR * Size, type or color not as specified MAJOR MAJOR * Damaged buttons MAJOR MAJOR BUTTON HOLES MAJOR * Missing functional button holes MAJOR MAJOR * Missing decorative button holes MAJOR MINOR * Extra button holes MAJOR MAJOR * Misaligned button holes MAJOR PER SEVERITY * Broken or skipped stitches in button MAJOR MAJOR holes Embroidery * Missing embroidery MAJOR MAJOR * Misplaced embroidery MAJOR MAJOR
  • 46. Final inspection of garments: Before shipment the final evaluation of any garments lot is called final inspection to final audit. Final inspection consists of inspecting finished garments from the buyer’s point of view and the final inspection occurs after garments are packed in box. If it is done after garments are packed, then proper size and style markings on the boxes can also checked. In any case there should be a list of points to be checked in a garments including of a finished garments. The purpose of final inspection is conduct by the buyer’s representative. Most of the time the senior quality control personnel the buying house or from the industry are performed the final inspection. Sometimes the buyer engages third party inspection team. Purposes of final inspection: • Buyers can understand about the quality standard of the merchandise being purchased. • Last opportunity to know the quality status of the garments lot for both buyer and supplier. • It is an important part of quality control in garment industry. • It is an obvious condition from buyer end to conduct the final inspection. Sequence of final inspection of garments: • Top perform a reasonable we have to maintain a sequence of different steps of the inspection are as follows: • Packing list verify / compare with p.o. sheet: Before start the final inspection we have to check the final status of the lot with p.o. sheet and packing list. Are as follows: • Quantity • Color • Size • Packing etc. 1. Inspection preparation : To get accurate result with must have well preparation for final inspections are as follows: Required facilities are: 1) Sufficient space 2) Sufficient light 3) Inspection table 4) Clean, noise free environment 5) Sufficient helping hand etc.  Required tools and equipments: 6) Packing list 7) Measuring tape 8) Arrow sticker 9) Marker pen 10) Highlight pen 11) Weight scale 12) Purchase order sheet 13) Quality specification sheet 14) Reference sample 15) Pick glass 16) Approved swatches 17) Finding and reporting format etc.
  • 47. 18) Metal detector  Carton checking: There are some important points to be checked during inspection check points are: 19) Quantity or carton 20) Quality of carton: a) Ply of carton b) Size of carton c) Strength of carton d) Color of carton etc. 21) Shipping marks a) Main mark b) Side mark c) Merchandise description 22) Strapping/trapping  Carton selection: From the total number of number of carton, we have to select sample carton and garment sample will be picked from those carton. The methods of carton selection and point’s table considered are as follows: o Methods of carton selections o Points to be considered  Packing and packing check: Now we have to open carton from those selected carton and check the packing methods used for the lot and the packing used whether it is as per specification. Check points are as follows: 23) Packing check: a) Position of garment inside the carton b) Inner carton c) Protector d) Poly bag e) Assortment f) Quality of garment  Packing check: a) Packing materials must be checked with approved sample. b) How it is used of attaching. • Sample selection: For sample selection sampling plan should be followed and important points to be considered and few related terms to be discussed are as follows: 1) Sample: A sample consists of one or more units of a product drawn from a lot, the units of the sample being selected at random without regard to their quality. The number of units of a product in the sample is the sample size. Lot or batch: The term lot or batch shall mean “inspection lot “ or inspection batch that is a collection of units of a product from which a sample is to be drawn and inspected to determine conformance with the acceptability criteria.
  • 48. Lot or batch size: The lot or batch is the number of units of a product in a lot or batch. AQL (acceptable quality level): The AQL is the maximum percent defective that, for the purpose of sampling inspection, can be considered satisfactory as a product average. Sampling plan: Sampling plan depends on types of inspection to be performed such as a) 100% check b) Spot checking c) Arbitrary sampling 24) Points to be considered: a) Color b) Size c) Style Garments checking: Selected sample must be checked 100% check points are as follows: 1. Appearance 2. Materials conformance 3. Conformity of style 4. Color shade 5. Logos 6. Workmanship 7. Finishing 8. Cleanness 9. Damages 10. Weight 11. Fitness 12. Record of defects non- conformances: 13. Measurement checking 14. Defective sample draw for reference 15. Carton fill up 16. Sticker and signature 17. Reporting. Quality Assurance: Quality Assurance is something that everyone in the factory dose all the time. Everyone includes such as managers, designers, pattern makers, marker makers, cutlers, pressers, packers, machinists, and supervisors. All of those people must know what standards are necessary, must be able to detect defects and must know what to do to correct and prevent it happening again. The Japanese have been extremely successful in applying the idea to Japanese industry. Quality Assurance is about assisting people to achieve desired standards helping them to do their job! Qualify control is as much an aspect of Quality Assurance as it is about checking whether things are going well or not, identifying the cause of a problem and applying the correct remedy. Actually Quality Assurance and Quality control are two sides of one coin, they cannot be separated. It does make it easier though if we talk as if they were separate. "Quality Assurance is a state of mind, a way of approaching the organization of production to achieve Quality" Quality control is a process, a set of activities designed and regulate the effectiveness of
  • 49. production to achieve Quality" Both of these ideas involve everyone in the company, managing director to casual worker, design to warehouse Definition of Quality Assurance as per BSI: All activities and functions concerned with the attainment of quality. Quality Assurance and management: • Quality planning • Quality advice and expertise • Management of the quality system • Training of personnel • Analysis of customer complaints, warranty claims and product liability A quality management system based on the fact that all functions share responsibility for quality, provides an effective method of acquiring and maintaining the desired performance standards. The quality department should not assume the direct responsibility for quality but should support advice and audit the work of the other functions; in much the same way as a financial auditor performs his duty without assuming responsibility for the profitability of the company. The responsibility for actual control of quality during the operation of the transformation process, whether that is the production of artifacts, delivery of a service or the passing of information internally, rests squarely on the shoulders of the operators of the process.; this means that staff carrying out the work must be given the tools to enable the requirements to be met. The control of quality involves the quality of input materials, methods, equipment, processes and the appropriate instructions designed for the purpose of preventing failure. To enable the responsibility to be met, organizations must use every device practicable to prevent, detect and correct errors that occur. This implies that, to achieve the control of quality, the variables which may affect quality and which can result from the actions of human beings, the nature of materials, and the performance of equipment, must all be controlled. In Quality Assurance system, Quality to be builds including reliability into a product during its development stage. Development stage starts from the planning of the new'- product. Once properly install all these, will have well executed process control method and if necessary, inspection to be performed as well. In other words, will have a perfect product, which never had any kind of defect during manufacturing QUALITY PLANNING: • Quality Policy • Quality Manual
  • 50. QUALITY POLICY: Establish priorities relative to  Materials  Processes  Training  Product Development  Customer Service etc 5 s concept: It is a Japanese method of crating high quality, a highly productive and safe working environment What is 5s? It is a systematic 5-step method of organizing a work place. Objectives of 5 s: 1. To reduce wastage of labor and effort 2. To reduce wastage of item 3. To reduce wastage of money 4. To reduce accidents 5. To reduce stress 6. To improve customer service 5s standards for It stands for systematic steps of the process. In Japanese al the steps being with the letter‘s’ 1. Seiri 2. Seiton 3. Seiso 4. Seiketsu 5. Shitsuke 5s activities in garment factory: The book on 5s techniques for improved working environment in beagle explain in detail about the concept and implementation of 5s in general. Following points are especially applicable to garment industry. Seiri: Classify all items around you; make it separate what is wanted from what is not wanted. Reduce clutter. Cut off threads, excess of pieces of materials, broken tools etc. Seiton: Storage areas should be located along the operating order Back making process Front making process Sleeve making process Collar making process2 3 4 5 8 7 6 1
  • 51. 1. shelf for front cut materials 2. shelf for back cut material 3. shelf for sleeve cut materials 4. shelf for collar cut materials 5. shelf for front, back, in process part 6. shelf for sleeve in process part 7. shelf for collar in process part 8. shelf for finished product Seiso: Each operator (who operates a sewing machine) 1. To be provided screwdriver, brush, dust cloth and pieces of cloth to be used for sewing test. 2. To clear dust, with the brush, of the slits on the feed dog and near surface of the throat plate. 3. To clean up the inner surface of the shuttle body with the brush and the dust cloth. 4. To check the amount of oil pan and then remove dust and thread waste from the oil plan. 5. To check the needle tip. 6. To remove thread waste from the area around motor and v- belt. 7. To inspect the relation between the needle entry and the presser foot. 8. To carry out the sewing test to adjust the thread tension. 9. To wipe and clean the whole body of the sewing machine and the top of table, using the dust cloth. 10. To clean up the floor around the sewing machine. In addition, the supervisor should make a study of cleaning tools to introduce better ones that provide upgraded efficiency. Seiketsu: 1. Contains in containers have to be visually observed from outside. 2. The supervisor attaches a label to containers to allow anybody to know what is contained inside. 3. Control limits have to be given on controls chart. 4. The supervisor introduces the color control method. 5. The supervisor standardizes the control method. Shitsuke: 1. The supervisor to check repeatedly whether operators fully understand direction. 2. The supervisor to provide the operators with the reason why the rules have to be followed. This will encourage the operators to observe the rules. Developing comfortable atmosphere in which the operators frankly give suggestion among one another essential.
  • 52. 5s ACTIVITY STEPS 5-S steps points to be aimed 1 Seiri • Things placed on the work batch of each operator. • Needle thread, bobbin • The space under the lay-up table 2 Seiton • Use of shelves • Thread, needle, presser foot and attachment • Specification, patterns 3 Seiso • Workshop, mess hall, locker room • Before the start of operation of sewing machine and after the end of work • Lighting, fixture, air conditioner 4 Seiketsu • Laying down of rules for tidying, orderly placement and preparation of duty roster • Dress • Preventive maintenance 5 Shitsuki • Report, contact, consulting, compliments • Notice of absence, late –coming and early leave. • Change of ones assigned work and support to others work
  • 53. Documentation for Export Which the goods are being sent, these documents will include some or all of the following: consular invoice, commercial invoice, certificate of origin, bill of lading, packing list, health certificate, import license, and insurance certificate. In general, their purpose is to provide the foreign Customs authority with a complete, detailed description of the goods so that the correct import duty can be levied. Sometimes they are required for the administration of exchange control regulations or import quotas and depending on the product, to safeguard public and animal health and prevent the spread of plant diseases. Statistical information about a country's imports is also based on these documents. Failure to complete the forms properly may lead to a fine and/or unnecessary delay in clearing the goods through foreign Customs. If the information given is found false, heavier fines may be imposed and/or the goods confiscated. The preparation of such documentation is one of the tasks of an export firm's or of a shipping agent, known as a freight forwarder, whose services may be employed for a fee. In addition to the documents required by the foreign country, the exporter must also provide an export declaration. Consular Invoice This is a form, usually obtainable only from the Consulate of the importing country, on which the exporter or its agent must enter a detailed description of the goods being shipped. Certain countries require such a form. On the consular invoice, there is space not only for the name of the goods but also for any marks carried, the number of the items, their weight, the value and origin of the goods and a declaration that the information given is correct. There must be no erasures or "strike-over" in typing, pen-and-ink changes, or additions. In some countries, the goods must be described in terms of the customs tariff of the importing country and the tariff number of the items given. Most countries requiring consular invoice also insist that the document be "legalized" that is, have its accuracy sworn to by the exporter or its agent at the consulate of the importing country. Commercial Invoice Commercial Invoice is the export firm's invoice, addressed to the foreign importer describing the goods shipped and the total price that it must pay. However, some countries require the commercial invoice to be prepared on their own forms. Such forms are sometimes called customs invoices. Countries that require a consular invoice also require a commercial invoice as additional proof of the details of the export shipment. Countries that do not require a consular invoice, uses the commercial invoice as the document upon which the import duty is based. The exporter may also sometimes be asked, when providing an export quotation for the foreign buyer, to supply a pro forma commercial invoice. This document shows the foreign buyer what the commercial invoice will look like if the foreign buyer places the order. The exchange authorities in the foreign country sometimes require it before an import license is issued.
  • 54. Certificate of Origin Certificate of Origin is a document, which indicates the country in which the goods were produced, is required whenever preferential duties are claimed. Sometime, consular legalization of the document is necessary. Also, certification of the document by a Chamber of commerce is required. Shipping Marks The purpose of these marks is to identify your goods from those of other shippers. They should be made boldly, with waterproof and salt-proof ink, so that they can always be easily read. They should be in black, with red or orange for dangerous cargo. The marks should be in both English and the language of the country of destination. The final destination point should be made to stand out so that the package can be easily identified with the corresponding shipping documents and easily located for customs clearance and delivery. To discourage theft, “blind marks” can be used that do not reveal the contents of the package. Product descriptions or trademarks should not be shown. The shipping marks must be exactly the same as those shown on the commercial invoice, bill of lading, etc. Some countries indicate exactly the shipping marks to be used. Such specifications include the size of lettering, their position on the containers, the method of applying the marks (brush or stencil), and the types of weights and measures to be used. Some countries such as India require that the import permit number be marked on the packing case. In the case of cautions for handling, exporters are encouraged to use universally recognized cautionary marks such as a wineglass on the commercial invoice and bill of lading, etc. for "fragile", as well as words. All cautionary marks, international handling symbols, destination should be very distinct, on three surfaces of each crate. Marks of Origin The exporter, as well as marking the container, must ensure that the goods being shipped abroad have the required marks of origin. Compulsory Marks of Origin Many countries require that all imported goods, and the packages in which they come, be marked in a conspicuous place with the name of the country of origin. Exceptions are usually made for goods that cannot be marked, those that cannot be marked without injury, and those that can only be marked at prohibitive cost. Corrective Marks of Origin Other countries require that a mark of origin be placed on imported goods, if its absence would create a false impression about the origin of such goods. This can occur if the goods show the place of manufacture with the same name as that of place from the importing country (Toronto, Japan, compared with Toronto, Canada). Or when the label contains only the name of the importer or import agent, rather than that of the foreign manufacturer. Marking Methods Each country has regulations governing the manner in which imported goods should be marked, including the size of the letters. Some countries require, in addition to the name of the country of origin, the words "Made in" or" Produced in". Sometimes, the language of the importing country must be used. As well as being legible and conspicuous, the mark should be non-erasable. Labeling for Export The exporter must also comply with any labeling requirements for its product in the importing country. These often exist for prepared goods, beverages, and pharmaceutical and toilet preparations. Usually, the
  • 55. label must show the manufacturer's name and address, a list of the ingredients, the weight or volume of the contents, and other relevant information. Often, the required descriptions must be in the language and weights and measures system of the importing country. In some countries, certain products must be registered with the appropriate government department and the registration number shown on the label. Delivery to the Dockside One way is to use the service of a freight forwarder The shipping company's representative checks the number of items, their condition, shipping marks, weight, and perhaps size, and then issues a "dock receipt". The exporter keeps this dock receipt until the goods are loaded aboard the ship. After this has been done, the shipping company issues an ocean bill of lading to replace the dock receipt. Another way to deliver goods to the ship is by rail. Small shipments are delivered to the local railway freight depots where they are consolidated with other shipments for the same port. Large shipments go by carload lots and are usually loaded at the exporter's premises. At the port, the shipping line has usually leased or has been assigned a shed in which all the box cars containing goods for the particular ship are unloaded. The railways assume the responsibility for unloading the boxcars, and checking and placing the goods in the warehouse ready for loading abroad ship. The cost involved is included in the railway freight rate. Loading the Goods aboard Ship: When the exporter's goods have been unloaded at the dockside, it is the shipping company's responsibility to ensure that they are properly loaded aboard the correct ship. Usually, a stevedoring firm does this on behalf of the shipping company and the cost involved is already included in the freight rate paid by the exporter. With the goods safely loaded aboard the ship, the shipping agent issues a "clean" ocean bill of lading to the exporter so long as no shortages or damaged crates, boxes, etc. have been discovered. If damage had been noted, the exporter can still obtain a clean bill of lading by signing a letter of indemnity that absolves the shipping line of any responsibility for the damage should insurance claim be made. The bill of lading, in the required number of copies, is evidence of ownership and is negotiable - it is the key document that is surrendered to the foreign importer upon payment for the goods or acceptance of a time draft as specified in a letter of credit. Truck Transportation Truck transportation between Malaysia, Singapore and Thailand is quite convenient as it permits warehouse-to-warehouse transportation and reduces the handling involved in transshipment. However, it is more expensive than by freight train for heavy shipments. Most exporters, if trucking suits their need, prefer to use commercial trucking companies to transport their goods. Rail Transportation There are three types of railway freight rates: 1. LCL ("less than carload lot") this is the most expensive rate and applies to small shipments based on a minimum charge for 100 lb. 2. CL ("carload" rate) this is the cheapest rate and applies to shipments 30,000 pounds or more. 3. "Pool-car rate" - this is an intermediate rate and involves the combining of shipments from different shippers. Rail transportation is most suitable for his shipment if: 1. The goods are heavy. 2. The distance to be traveled not economical by truck.