INDL PPT 1.pptx

DELHI SKILL AND ENTREPRENEURSHIP UNIVERSITY
(Aryabhatt DSEU Ashok Vihar Campus)
Hospital Building Construction
Under Guidance of
PWD Engineer
Department of Civil Engineering
Smt. Riniyo Nani
(Senior lecturer)
Mr. Vagish kumar
H.O.D (Civil Engg)
CERTIFICATE
This is certify that the practical training work entitled “
Construction of Hospital Building” BY “Swadeshi Civil
Infrastructure Pvt Ltd” (SCIPL) which is being submitted by Sourav
(10521417), Vivek kumar (10521476), Yash (10521417), Vivek
kumar(10521477), in partial fulfillments of the requirements for
the award of Diploma in Civil Engineering at Aryabhatt DSEU
Ashok Vihar Campus, GT karnal road, Delhi-110033 is a record
of the student’s own work carried out in this form under my
supervision and guidance.
Mr. Vagish kumar
H.O.D (Civil Engg)
Smt. Riniyo Nani
(Senior lecturer)
We are immensely grateful to Sh. Vagish Kumar, Smt Riniyo
Nani, for their meticulous guidance and Constance
encouragement at all stages of practical training work.
We grateful indebted to Mr. Amarjeet ( Assistant Executive
Engineer PWD) and Mr. Ankit (third party Quality Engineer) who
helped us.
We are thankful to our parents and our friends for the support
they extended us during entire duration of practical Industrial
Training.
Sourav (10521417
Vivek kumar (10621476)
Yash (10521416
Vivek kumar (10521477)
Contents
About the Hospital Building
D-wall
Foundations
Composite structure
Fire paint
Bolted Connection
Parts of Bolted connection
Scaffolding
Masonry work
AAC block
C&D Block
Our Proposed site is located at Lok nayak
hospital near Delhi gate metro station Delhi-
110054.
The total area of Building spanning is about
84,840 sq metres.
The building has two tower which have target
of total floor is 22, in on each tower.
This building is proposed to have total
number of Beds to be available is 1500.
This building is composite structure of Mild
Steel and RCC (Reinforced Cement Concrete).
D-wall is known as Diaphragm wall, it is designed to retain soils
during the construction of underground structure.
It helps to control the movement of ground during construction.
It is intended to take up high vertical loads from above ground
structures.
It is play important role in Active earth pressure as well as in passive
earth pressure.
The lower and very important part of any structure is foundations.
And after doing soil testing depend upon bearing capacity of soil
Engineer decide to construct Raft foundation.
Raft foundations also known as Mat foundations, it is a type of
combined footing that covers the entire area and supports all the
wall and columns.
This foundations is use because soil on that location is found to be
sandy , clay, silt and hard stone.
This structure is made up with RCC
(Reinforced Cement concrete) and
Mild Steel. Thatswhy also known
composite structure.
RCC is good in taking Compressive
as well as Tensile Stress But also in
Shear Stress thatswhy it is built
End to end of building, and middle
structure is of MS.
Engineer decides this to built
building as soon as possible. And
reduce time of delay, Because Mild
steel structure can be early as
compare to RCC structure.
Mild steel cannot be come into contact of moisture, water, and fire.
 To prevent corrosion and fire damaged, a layer is provide on beam
and column of mild steel, fire resistance material is used.
This material is very costly and become hard after drying. It is apply
like a paint with the help of compressor machine. Which is apply this
paint with high pressure.
Column and beam is connected by bolted joint. This joint are many
advantage such as :-
•They can easy to install, inspect, and maintain.
•They also allow for flexibility and adjustability in design and erection.
•Skill labourer not mandatory.
•Grade of this Nutt and bolt is 10.9s
•Due to high grade of bolt, this connection is strong, durable etc.
Parts of Bolted connection
A bolt is a metal rod for fastenings objects together it consist of :-
•Thread of outer side
•Head on its top
•Nut
•Washer
This complete nut bolt connection called HDFG (High Strength
Friction Grip).
Inner dia of nutt is known as Nominal dia
Where Bolt dia is known as Crest dia.
Scaffolding, also called scaffold or stagging, use for to do masonry work,
Brick work, Plastering etc.
There are different type of scaffolding depend upon material which type of
work such as Aluminium scaffolding, Bamboo scaffolding, Trestle scaffolding
etc.
Aluminium Scaffolding were used at out site project.
Vertical rod of scaffolding known as PROP.
Whereas horizontal is known as LEDGER
Prop and ledger is tied using a clip.
MASONRY WORK
For partition work three type of brick use such as :-
First class brick
AAC block
CND block
First Class Brick
This brick is used in this project for HALF BRICK wall
And for ONE BRICK wall.
We know that two type of bond use such as English bond
and Flemish bond.
But mostly English bond were used.
AAC BLOCK
AAC stand for Autoclaved Aerated concrete.
This is widely use in this building due to following
advantages:-
•Lightweight
•Precast
•Foam concrete
•No need to curing
C&D waste Block
•C&D waste (construction and Demolition waste) block is made up
of wood ,steel, concrete, gypsum, plaster, metal etc.
•This block is used to reduce construction waste to safe our
environment.
•Their size is large than Brick. So more volume is cover in width and
heght.
…….To be continued.
1 de 16

Recomendados

report-on-emmar.docx13 por
report-on-emmar.docx13report-on-emmar.docx13
report-on-emmar.docx13Minhal Haider
212 visualizações16 slides
Site visit report 2017 por
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
5.6K visualizações14 slides
Ct 1 report por
Ct 1 reportCt 1 report
Ct 1 reportAh Lai
1.5K visualizações25 slides
Ct report por
Ct reportCt report
Ct reportTee Joanne
820 visualizações25 slides
Ct report por
Ct reportCt report
Ct reportBoon Xiong Yong
398 visualizações25 slides
Site Report por
Site Report Site Report
Site Report Sow Wei Henn
306 visualizações16 slides

Mais conteúdo relacionado

Similar a INDL PPT 1.pptx

Speedy construction presentation por
Speedy construction presentationSpeedy construction presentation
Speedy construction presentationsomitra bhardwaj
916 visualizações48 slides
Wall materials por
Wall materialsWall materials
Wall materialsSaloniHosmani
59 visualizações27 slides
Ishfaq Rashid.pptx por
Ishfaq Rashid.pptxIshfaq Rashid.pptx
Ishfaq Rashid.pptxlovish34
6 visualizações51 slides
Site visit report por
Site visit reportSite visit report
Site visit reportDoreen Yeo
2.4K visualizações16 slides
PRE-CAST-CONSTRUCTION.pptx por
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxLokeswarSaha1
83 visualizações55 slides
Shinchan presentation.pptx por
Shinchan presentation.pptxShinchan presentation.pptx
Shinchan presentation.pptxRAKESHPANDEY754083
155 visualizações28 slides

Similar a INDL PPT 1.pptx(20)

Speedy construction presentation por somitra bhardwaj
Speedy construction presentationSpeedy construction presentation
Speedy construction presentation
somitra bhardwaj916 visualizações
Wall materials por SaloniHosmani
Wall materialsWall materials
Wall materials
SaloniHosmani59 visualizações
Ishfaq Rashid.pptx por lovish34
Ishfaq Rashid.pptxIshfaq Rashid.pptx
Ishfaq Rashid.pptx
lovish346 visualizações
Site visit report por Doreen Yeo
Site visit reportSite visit report
Site visit report
Doreen Yeo2.4K visualizações
PRE-CAST-CONSTRUCTION.pptx por LokeswarSaha1
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
LokeswarSaha183 visualizações
Shinchan presentation.pptx por RAKESHPANDEY754083
Shinchan presentation.pptxShinchan presentation.pptx
Shinchan presentation.pptx
RAKESHPANDEY754083155 visualizações
Ct report por Tee Joanne
Ct reportCt report
Ct report
Tee Joanne338 visualizações
Ct report por Gan Jet Foong
Ct reportCt report
Ct report
Gan Jet Foong700 visualizações
Ct report por Chern Lim
Ct reportCt report
Ct report
Chern Lim834 visualizações
Speedy construction- FORMS AND MATERIALS por SOUMYA KHANDELWAL
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
SOUMYA KHANDELWAL4.8K visualizações
Ctw site report(pg 1 to 8, 14) por Chin Tze Wei
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
Chin Tze Wei707 visualizações
PRE-CAST-CONSTRUCTION.pptx por Vinayak247538
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
Vinayak24753813 visualizações
Case Study: High Rise Buildings por Prasad Thanthratey
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
Prasad Thanthratey7.8K visualizações
Suraj presentation.pptx por RAKESHPANDEY754083
Suraj presentation.pptxSuraj presentation.pptx
Suraj presentation.pptx
RAKESHPANDEY75408317 visualizações
REPORT ON ANALYSIS OF CONSTRUCTION SEQUENCES por Saleh Ahmed
REPORT ON 	ANALYSIS OF CONSTRUCTION SEQUENCES REPORT ON 	ANALYSIS OF CONSTRUCTION SEQUENCES
REPORT ON ANALYSIS OF CONSTRUCTION SEQUENCES
Saleh Ahmed510 visualizações
Shear Wall por Rutvik Sabhaya
Shear WallShear Wall
Shear Wall
Rutvik Sabhaya1.1K visualizações
Prestressing ppt por Sudhan Sathe
Prestressing pptPrestressing ppt
Prestressing ppt
Sudhan Sathe542 visualizações
Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res... por IJERA Editor
Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...
Study of Strength of RC Shear Wall at Different Location on Multi-Storied Res...
IJERA Editor1K visualizações
Design of Retaining Wall por Ananthakumar75
Design of Retaining WallDesign of Retaining Wall
Design of Retaining Wall
Ananthakumar7541 visualizações

Último

Endangered-Species (1).ppt por
Endangered-Species (1).pptEndangered-Species (1).ppt
Endangered-Species (1).pptEmilyRStraderYesterd
21 visualizações18 slides
Smart Cities por
Smart CitiesSmart Cities
Smart CitiesDr. Salem Baidas
9 visualizações40 slides
Arkan. İngilis dili sərbəst iş.pptx por
Arkan. İngilis dili sərbəst iş.pptxArkan. İngilis dili sərbəst iş.pptx
Arkan. İngilis dili sərbəst iş.pptxArkanAdisli
5 visualizações28 slides
Business X Design - Digital for People, Product, and Planet - an Intersection... por
Business X Design - Digital for People, Product, and Planet - an Intersection...Business X Design - Digital for People, Product, and Planet - an Intersection...
Business X Design - Digital for People, Product, and Planet - an Intersection...Matt Gibson
29 visualizações42 slides
Plantation Festival - Photo Journey.pdf por
Plantation Festival - Photo Journey.pdfPlantation Festival - Photo Journey.pdf
Plantation Festival - Photo Journey.pdfAnil G
6 visualizações29 slides
Smart Farming por
Smart FarmingSmart Farming
Smart FarmingDr. Salem Baidas
24 visualizações25 slides

Último(20)

Arkan. İngilis dili sərbəst iş.pptx por ArkanAdisli
Arkan. İngilis dili sərbəst iş.pptxArkan. İngilis dili sərbəst iş.pptx
Arkan. İngilis dili sərbəst iş.pptx
ArkanAdisli5 visualizações
Business X Design - Digital for People, Product, and Planet - an Intersection... por Matt Gibson
Business X Design - Digital for People, Product, and Planet - an Intersection...Business X Design - Digital for People, Product, and Planet - an Intersection...
Business X Design - Digital for People, Product, and Planet - an Intersection...
Matt Gibson29 visualizações
Plantation Festival - Photo Journey.pdf por Anil G
Plantation Festival - Photo Journey.pdfPlantation Festival - Photo Journey.pdf
Plantation Festival - Photo Journey.pdf
Anil G6 visualizações
Smart Farming por Dr. Salem Baidas
Smart FarmingSmart Farming
Smart Farming
Dr. Salem Baidas24 visualizações
Oral Presentation.pdf por salamaalmehrzi14
Oral Presentation.pdfOral Presentation.pdf
Oral Presentation.pdf
salamaalmehrzi145 visualizações
Green Technology.pdf por rishithakre12
Green Technology.pdfGreen Technology.pdf
Green Technology.pdf
rishithakre1215 visualizações
ijospin77.pdf por HaseebBashir5
ijospin77.pdfijospin77.pdf
ijospin77.pdf
HaseebBashir55 visualizações
Towards a just and regenerative aquaculture system por Martin Koehring
Towards a just and regenerative aquaculture systemTowards a just and regenerative aquaculture system
Towards a just and regenerative aquaculture system
Martin Koehring13 visualizações
ORAL_PRESENTATION.pdf por ahmadalfalasim
ORAL_PRESENTATION.pdfORAL_PRESENTATION.pdf
ORAL_PRESENTATION.pdf
ahmadalfalasim10 visualizações
ESG -in construction.pptx por theparnikakadam
ESG -in construction.pptxESG -in construction.pptx
ESG -in construction.pptx
theparnikakadam6 visualizações
Healthcare Waste Management por Dr. Salem Baidas
Healthcare Waste ManagementHealthcare Waste Management
Healthcare Waste Management
Dr. Salem Baidas17 visualizações
Sustainable Tourism por Dr. Salem Baidas
Sustainable TourismSustainable Tourism
Sustainable Tourism
Dr. Salem Baidas8 visualizações
Citizen science of the Great Barrier Reef and Coral Sea Expedition por Dr Adam Smith
Citizen science of the Great Barrier Reef and Coral Sea ExpeditionCitizen science of the Great Barrier Reef and Coral Sea Expedition
Citizen science of the Great Barrier Reef and Coral Sea Expedition
Dr Adam Smith44 visualizações
climate and the world por Basel Ahmed
climate and the worldclimate and the world
climate and the world
Basel Ahmed34 visualizações
Impact of Climate Change on Groundwater Resources por C. P. Kumar
Impact of Climate Change on Groundwater ResourcesImpact of Climate Change on Groundwater Resources
Impact of Climate Change on Groundwater Resources
C. P. Kumar19 visualizações

INDL PPT 1.pptx

  • 1. DELHI SKILL AND ENTREPRENEURSHIP UNIVERSITY (Aryabhatt DSEU Ashok Vihar Campus) Hospital Building Construction Under Guidance of PWD Engineer Department of Civil Engineering Smt. Riniyo Nani (Senior lecturer) Mr. Vagish kumar H.O.D (Civil Engg)
  • 2. CERTIFICATE This is certify that the practical training work entitled “ Construction of Hospital Building” BY “Swadeshi Civil Infrastructure Pvt Ltd” (SCIPL) which is being submitted by Sourav (10521417), Vivek kumar (10521476), Yash (10521417), Vivek kumar(10521477), in partial fulfillments of the requirements for the award of Diploma in Civil Engineering at Aryabhatt DSEU Ashok Vihar Campus, GT karnal road, Delhi-110033 is a record of the student’s own work carried out in this form under my supervision and guidance. Mr. Vagish kumar H.O.D (Civil Engg) Smt. Riniyo Nani (Senior lecturer)
  • 3. We are immensely grateful to Sh. Vagish Kumar, Smt Riniyo Nani, for their meticulous guidance and Constance encouragement at all stages of practical training work. We grateful indebted to Mr. Amarjeet ( Assistant Executive Engineer PWD) and Mr. Ankit (third party Quality Engineer) who helped us. We are thankful to our parents and our friends for the support they extended us during entire duration of practical Industrial Training. Sourav (10521417 Vivek kumar (10621476) Yash (10521416 Vivek kumar (10521477)
  • 4. Contents About the Hospital Building D-wall Foundations Composite structure Fire paint Bolted Connection Parts of Bolted connection Scaffolding Masonry work AAC block C&D Block
  • 5. Our Proposed site is located at Lok nayak hospital near Delhi gate metro station Delhi- 110054. The total area of Building spanning is about 84,840 sq metres. The building has two tower which have target of total floor is 22, in on each tower. This building is proposed to have total number of Beds to be available is 1500. This building is composite structure of Mild Steel and RCC (Reinforced Cement Concrete).
  • 6. D-wall is known as Diaphragm wall, it is designed to retain soils during the construction of underground structure. It helps to control the movement of ground during construction. It is intended to take up high vertical loads from above ground structures. It is play important role in Active earth pressure as well as in passive earth pressure.
  • 7. The lower and very important part of any structure is foundations. And after doing soil testing depend upon bearing capacity of soil Engineer decide to construct Raft foundation. Raft foundations also known as Mat foundations, it is a type of combined footing that covers the entire area and supports all the wall and columns. This foundations is use because soil on that location is found to be sandy , clay, silt and hard stone.
  • 8. This structure is made up with RCC (Reinforced Cement concrete) and Mild Steel. Thatswhy also known composite structure. RCC is good in taking Compressive as well as Tensile Stress But also in Shear Stress thatswhy it is built End to end of building, and middle structure is of MS. Engineer decides this to built building as soon as possible. And reduce time of delay, Because Mild steel structure can be early as compare to RCC structure.
  • 9. Mild steel cannot be come into contact of moisture, water, and fire.  To prevent corrosion and fire damaged, a layer is provide on beam and column of mild steel, fire resistance material is used. This material is very costly and become hard after drying. It is apply like a paint with the help of compressor machine. Which is apply this paint with high pressure.
  • 10. Column and beam is connected by bolted joint. This joint are many advantage such as :- •They can easy to install, inspect, and maintain. •They also allow for flexibility and adjustability in design and erection. •Skill labourer not mandatory. •Grade of this Nutt and bolt is 10.9s •Due to high grade of bolt, this connection is strong, durable etc.
  • 11. Parts of Bolted connection A bolt is a metal rod for fastenings objects together it consist of :- •Thread of outer side •Head on its top •Nut •Washer This complete nut bolt connection called HDFG (High Strength Friction Grip). Inner dia of nutt is known as Nominal dia Where Bolt dia is known as Crest dia.
  • 12. Scaffolding, also called scaffold or stagging, use for to do masonry work, Brick work, Plastering etc. There are different type of scaffolding depend upon material which type of work such as Aluminium scaffolding, Bamboo scaffolding, Trestle scaffolding etc. Aluminium Scaffolding were used at out site project. Vertical rod of scaffolding known as PROP. Whereas horizontal is known as LEDGER Prop and ledger is tied using a clip.
  • 13. MASONRY WORK For partition work three type of brick use such as :- First class brick AAC block CND block First Class Brick This brick is used in this project for HALF BRICK wall And for ONE BRICK wall. We know that two type of bond use such as English bond and Flemish bond. But mostly English bond were used.
  • 14. AAC BLOCK AAC stand for Autoclaved Aerated concrete. This is widely use in this building due to following advantages:- •Lightweight •Precast •Foam concrete •No need to curing
  • 15. C&D waste Block •C&D waste (construction and Demolition waste) block is made up of wood ,steel, concrete, gypsum, plaster, metal etc. •This block is used to reduce construction waste to safe our environment. •Their size is large than Brick. So more volume is cover in width and heght.