Pre-engineered buildings are factory-built steel structures that are shipped to sites in pieces and bolted together for quick assembly. They are rectangular structures enclosed in corrugated metal sheeting. PEB construction is fast because foundations are poured while factory fabrication occurs. PEBs have primary and secondary structural elements, roof/wall panels, and accessories. They provide benefits like reduced construction time, lower costs, flexibility for expansion, large clear spans, quality control, and energy efficiency. However, they also have disadvantages like corrosion sensitivity, added insulation costs, and limited design customization. PEBs are commonly used for warehouses, factories, workshops, and other industrial and commercial buildings.
2. What is a PEB?
• Pre- Engineered Buildings are factory-built buildings of
steel that are shipped go site and bolted together.
• Suited to construct industrial buildings and warehouses.
• It is cheap, very fast to erect, and can also be dismantled
and moved to another site.
• These structures are sometimes called ‘metal boxes’ or
‘tin sheds’.
• They are essentially rectangular boxes enclosed in a skin
of corrugated metal sheeting.
• Great speed is achieved because while the foundations
and floor slab are being constructed, the beams and
column- the structural system- are being fabricated in the
factories.
3. COMPONENTS OF A PEB
• Primary Frame: Primary framing of a PEB is
an assembly of built-up I-section members
& that framing consist trusses or
castellated beams etc.
• Secondary Structural Elements: It is
actually Cold Formed Members, which can
be in diff. shapes like “Z”, “C” etc. In general
known as “Purlins”.
• Roof & Wall Panels : Tin shades & Curtain
Wall made of Glass & Roll-formed steel
sheets usually comes in this category.
• Sandwich Panels: Sandwich Panel is made
of three layers , in which a non-Aluminium
Core is inserted b/w two aluminium sheet.
• Other Accessories: Mezzanine floors, Bolts,
Insulation, etc.construction time
6. ADVANTAGES
Reduced construction time
• Buildings are typically delivered in just a few weeks after
approval of drawings.
• Foundation and anchor bolts are cast parallel with finished,
ready for the site bolting.
• PEB will reduces total construction time of the project by at
least 50%.
• This also allows faster occupancy and earlier realization of
revenue.
Lower cost
• Due to the systems approach, there is a significant saving in
design, manufacturing and on site erection cost.
• The secondary members and cladding nest together
reducing transportation cost.
• Steel buildings that are properly insulated save natural
resources, energy and money.
7. ADVANTAGES
Flexibility of expansion
• Buildings can be easily expanded in length by adding
additional bays.
• Also expansion in width and height is possible by pre
designing for future expansion.
Large clear spans
• Buildings can be supplied to around 80M clear spans.
Quality control
• As buildings are manufactured completely in the factory
under controlled conditions the quality is assured.
Low maintenance
• Buildings are supplied with high quality paint systems for
cladding and steel to suit ambient conditions at the site,
which results in long durability and low maintenance coats.
Energy efficient roofing and wall system
• Buildings can be supplied with polyurethane insulated panels
or fiberglass blankets insulation to achieve required ―U‖
values.
8. Architectural versatility
• Building can be supplied with various types of fascia's,
canopies, and curved eaves and are designed to receive pre
cast concrete wall panels, curtain walls, block walls and other
wall systems.
• All the components are available in different colors also.
Single source responsibility
• As the complete building package is supplied by a single
vendor, compatibility of all the building components and
accessories is assured.
• This is one of the major benefits of the pre engineered building
systems.
Sustainability
• Steel is 100% recyclable and is the most recycled material in the
world.
• Thus, each ton of recycled steel saves 2,500 pounds of iron ore
and approximately 1,000 pounds of coa
ADVANTAGES
9. DISADVANTAGES
• Rusting / Corrosion Sensitive, as if the quality
of steel used or paint used for coating of steel
members is not of good quality , than it can
damage the structure and thus reduces the life
of structure.
• Insulation Cost : as insulating the building to an
agreeable benchmark will furthermore add to
your construction costs.
• Appearance : Steel Sections can be unattractive
when left exposed
• Marginal design, material and construction
10. • May not include all construction/fit-up
needed for the building to serve the
intended purpose.
• No secondary roof membrane
• Usually no internal finished walls
• Note: Because of the above disadvantages,
pre-engineered buildings are generally not
recommended for school buildings except
for non-instructional purposes such as
storage, maintenance facility and etc.
DISADVANTAGES
11. DESIGN METHODOLOGY
• Method Used : Stiffness Matrix Method
• Standard Code used :
• AISC
• ASCE
• IS : 800
• Software used : Stad.Pro v8i, ETABS, RAM Steel
• Load Considerations & their Calculations : Loads considered in the PEB design are same as for
general building structure. These are as follows ,
• Dead load Calculations : It includes Self Wt. of Purlins , Roof & Wall Sheeting , insulation material &
other structural component.
• Live / Imposed Load Calculations : It should be Considered as per given in IS 875 (Part 2 ) for diff.
type of
• Wind Load Calculations : Consider the Basic wind Speed as per Area of that particular structure.
Design wind Pressure is calculated as per IS 875 (Part 3) . Wind Load on Roof can be UDL &
calculation for this can be done as per IS875(Part 3)
• Seismic Load Calculations : Earthquake Loads affect the design of structure in areas of great seismic
activity. The seismic load can be calculated as per IS 1893-2002(Part 1).
• Other Moving Loads : It can be Moving EOT Crane load or Mono Rail etc.
12. • Primary system: This system
involves tapered or parallel
columns or tapered beams
which are called rafters. Base
of column is either fixed or
pinned based on the load
requirements.
Systems used in PEB
13. • Secondary system :
It consists of purlins, grits which
are the side claddings and eave
struts stiffened by sag rods. This
system also includes the flange
stiffeners which joins the untied
flanges of the PEB primary system
to the secondary system.
14. • Accessories: This part includes the Turbo
ventilator, ridge vents, Flashings, gutters,
down pipes, ladders etc.
• Skylights
• Ventilators
• Pre Engineered Building Connections
15. • Factories
• Warehouses
• Workshops
• Offices
• Gas stations
• Showrooms
• Aircraft hangers
• Metro stations
• Vehicle parking sheds
• Schools
• Indoor stadium roofs
• Bridges
• Railway platform shelters
• Outdoor stadium canopies
• PEB are more advantageous than the conventional structures in economy, speed of construction and
simple erection.
Applications