Resume Wynn R Pettitt

Wynn R. Pettitt
Telecommunications Project Manager / Construction Manager
Wynn.Pettitt@gmail.com 404-368-3059
Summary:
Over 16 years of telecommunications experience with a focus in project management, construction
management, and engineering. Has lead several multi-million dollar projects which were completed either
ahead of schedule or on-time. Deep understanding of cell site construction, including new site builds,
transport, DAS/iDAS, and small cell technologies. Also possesses familiarity with RF design standards
and principles. Project management skills include working within strict deadlines, effective
communication and working with cross functional teams, and excellent problem solving skills
EXPERIENCE:
12/2012-12/2014 AT&T/Matrix Resources Atlanta, GA.
ETTCS / LTE / Ethernet Over Microwave Project Manager
Managed the builds of both Ethernet over Microwave and Ethernet To The Cell Site projects for
all of Alabama and Mississippi for AT&T. Worked with upper management to determine project scope.
Oversaw the day-to-day operations of vendors, tower crews, construction crews, and technicians for the
installation of line and antennas, civil work, equipment installation, routers, transport testing, and integration.
Involved in all phases of the project lifecycle.
• Finished all projects under budget and ahead of monthly, quarterly, and yearly schedules
• Required to track, update, and meet all KPIs and maintain CASPR milestones
• Launched the largest number of Ethernet over Microwave sites in AT&T history
• Helped develop national MW process for AT&T
• Handled all budgetary items including equipment ordering, purchase orders, OOMs, and true-ups
• Wrote all MOPs and SMOPs and acted as technical liason between intergration team and engineering
• Worked closely with site acquisition team to acquire leases, NTPs, 1As, and CDs
• Oversaw the installation and programming of Cisco SiADs and Ericsson FX11 cards
• Required to verify all sites were FCC and FAA compliant and quality standards were met
03/2010-12/2012 AT&T/Skyline Telecommunications Atlanta, GA.
New Site Build Transport Project Manager
Managed the installation, design, provisioning, testing, and all construction related to the delivery of fiber,
copper, and microwave transport for new site builds, growth, DAS, and LTE projects in the Alabama,
Mississippi, and Lousiana AT&T markets. Oversaw the day-to-day operations of vendors, tower crews,
construction crews, and technicians for the installation of microwave, civil work, equipment installation,
transport testing, and integration. Involved in all phases of the project lifecycle and orked with upper
management to determine project scope.
• Finished all projects under budget and ahead of schedule
• Required to track, update, and meet all KPIs and maintened milestones in CASPR
• Wrote all MOPs and SMOPs and acted as technical liason between intergration team and engineering
• Interfaced with LECs and provisioning groups to ensure timely delivery of circuits
• Verified all designs and engineering documents were correct
• Acted as technical lead for all field and switch technicians, and worked with Ericsson in the installation
and integration of 3106s, 3206s, and 6601s and installation and provisioning of ET-MFX and FX11 cards
• Worked with Operations group to ensure all installations and construction met quality standards
• Worked closely with site acquisition team to acquire leases, NTPs, 1As, and CDs
03/2008-03/2010 Time Warner Cable / EMC Herndon, VA.
Granite Subject Matter Expert/Admin
Worked as part of the team that rolled out Granite for Time-Warner Cable at the market, regional, and national
level and helped develop company-wide procedures.
• Modeled over 400 equipment templates based on vendor specifications and network elements
• Added new User-Defined Attributes and UDA groups as a Granite Admin
• Add, delete, and modify categories, types, bandwidths and other parameters in Granite Admin
• Performed queries in Granite backend using SQL in Oracle
• Lead committee calls with client for Circuit Inventory Managament team to determine object and path
types, categories, and statuses
• Updated equipment templates and logical ports using Telcordia OPI portal to reconcile instances
08/2007-03/2008 Cingular / Matrix Resources Atlanta, GA.
Circuit Design Engineer/Provisioner
Responsible for designing circuits (T1, DS3, & OC-n) needed to meet the Interconnect and Transport plans for
market and regional projects
• Responsible for creating the circuit paths amd segments in the Granite database and submitting ASR
requests to the LEC for processing
• Issued orders for Telco T1s, (install, disconnects, changes, moves)
• Performed and coordinated end-to-end network engineering and provisioning of DS0s, DS1s, DS3s, end-
to-end circuits, and interconnect trunks
• Coordinated with operations and vendors to remote test using Centest with Alcatel DACS and Tellabs
5500 and 532L DACS
• Created and resolved LEC trouble-tickets for faulty circuits and verified circuits working properly
11/2004-07/2007 Bechtel Corporation Atlanta, GA.
New Site Build Construction Manager
Managed the construction for new cell sites including new towers, lines and antennas, setting shelters, civil
work, utilities, and transport. Oversaw the day-to-day operations of vendors, tower crews, construction
crews, and technicians for the installation and construction for new cell sites. Also over saw all transport for
AT&T 3G in Georgia, Florda, and Louisiana including managing three switches and 15 field technicians for
test and turn up of DS3s and T1s for UMTS and Node integration. Involved in all phases of the project
lifecycle.
• Wrote daily schedule, prepared invoice documentation, and maintained progress tracker and reports
• Responsible for ordering materials and supervising GCs in building sites according to engineering and
construction drawings and RFDSs.
• Lead all pre-construction and utility site walks with GCs, utility providers, and telco
• Required to track, update, and meet all KPIs present to client and maintain CASPR miletsones
• Responsible for all financial and budgetary aspects of projects
• Worked with site acquisition group to acquire 1As, CDs, leases, and NTPs
• Lead weekly safety meetings with all construction and tower crews
• Reviewed, approved, and uploaded all final hand-offs in Siterra and FileNet
• Worked with Operations group to ensure all installations and construction met quality standards
• Completed all projects ahead of or on schedule and under budget
7/2002-11/2004 Wireless Facilities, Inc. Atlanta, GA.
Project Manager / Lead DS3/T1/e911 Technician
Served as both Project Manager and lead technician for rollout of Cingular 2G network and e911. Worked with
upper management to determine project scope. Oversaw the day-to-day operations of civil crews, field technicians,
and switch technicians for the installation, test, and turn-up of DS3 and T1 circuits for cell site backhaul. Involved
in all phases of the project lifecycle.
• Writing daily schedule, preparing invoice documentation, and maintaining progress tracker
• Required to track, update, and meet all KPIs
• Providing support for vendors to ensure end-to-end connectivity of equipment, including True Position
LMU’s, Ericsson and Nokia BTS
• Installation and maintenance trainer for WFI and Cingular Engineers and Technicians
• Responsible for ordering all materials and invoicing client for billable hours
• Oversaw circuit design and provisioning and held daily calls with LECs to ensure timely delivery of
circuits
2/2001 – 6/2002 Jump Start Communications Phoenix, AZ., Portland, OR., Atlanta,
GA., Orlando / Tampa, FL., Kansas City, MS.
Transport Lead
·
Worked as the transport lead in several AT&T Wireless switches that required using various test equipment to stress
test DS3s and T1s. Oversaw the day-to-day operations of civil crews, field technicians, and switch technicians for
the installation, test, and turn-up of DS3 and T1 circuits for cell site backhaul.
• .Writing daily schedule, preparing invoice documentation, and maintaining progress tracker
• Providing support for vendors to ensure end-to-end connectivity of equipment, including Ericsson and
Nokia BTS
• Responsible for ordering all materials and invoicing client for billable hours
• Oversaw circuit design and provisioning and held daily calls with LECs to ensure timely delivery of
circuits
7/2000 - 2/2001 Teksytems Fresno, Bakersfield, and Sacramento, CA.
Project Manager
Responsible for the daily operations of the Nortel DMS 250 Switch installation, circuit acceptance, and integration
from the Ericsson switch to the new Nortel switch. Managed all vendors, contractors, and staff required for the
installaion and integration.
• Manage work-load and multi-task to comply with established critical dates and exceed company
requirements to ensure the timely establishment of high-quality networks and work requests
• Required to track, update, and meet all KPIs
• Coordinate work efforts by interfacing with multiple work groups and customers
• Analyze, plan, and design interoffice facilities to include rack layout, equipment layout, cable routing,
and determine DSX assignments
• Responsible for testing, turn up, and maintenance of high-capacity circuits including DS1's and DS3's

Recomendados

HGHancock Resume 042716 por
HGHancock Resume 042716HGHancock Resume 042716
HGHancock Resume 042716Gray Hancock
263 visualizações5 slides
Pierce, Kevin_Resume_05.13.2016 por
Pierce, Kevin_Resume_05.13.2016Pierce, Kevin_Resume_05.13.2016
Pierce, Kevin_Resume_05.13.2016Kevin Pierce
151 visualizações4 slides
James Nimmo CV -2015-E&I- por
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-Stevie Nimmo
707 visualizações8 slides
cv 2016 por
cv 2016cv 2016
cv 2016Rey Arnold Macalalad
241 visualizações6 slides
James Bullen CV por
James Bullen CVJames Bullen CV
James Bullen CVJames Bullen
262 visualizações5 slides
Bill Rogers CV 19-01-15 por
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers
739 visualizações10 slides

Mais conteúdo relacionado

Mais procurados

Jen Tong Resume por
Jen Tong ResumeJen Tong Resume
Jen Tong ResumeJen Tong
481 visualizações3 slides
Todd Dickey_ resume June 2016 gov por
Todd Dickey_ resume June 2016 govTodd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 govTodd Dickey
381 visualizações6 slides
Rocky Nash Resume A por
Rocky Nash Resume ARocky Nash Resume A
Rocky Nash Resume ARocky Nash
543 visualizações4 slides
DeStephen Derek RESUME por
DeStephen Derek RESUMEDeStephen Derek RESUME
DeStephen Derek RESUMEDerek DeStephen
159 visualizações4 slides
K KELLAR RESUME por
K KELLAR RESUMEK KELLAR RESUME
K KELLAR RESUMEKen Kellar
304 visualizações3 slides
Carlos A. Gonzalez CV English por
Carlos A. Gonzalez CV English Carlos A. Gonzalez CV English
Carlos A. Gonzalez CV English Carlos A Gonzalez
178 visualizações2 slides

Mais procurados(16)

Jen Tong Resume por Jen Tong
Jen Tong ResumeJen Tong Resume
Jen Tong Resume
Jen Tong481 visualizações
Todd Dickey_ resume June 2016 gov por Todd Dickey
Todd Dickey_ resume June 2016 govTodd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 gov
Todd Dickey381 visualizações
Rocky Nash Resume A por Rocky Nash
Rocky Nash Resume ARocky Nash Resume A
Rocky Nash Resume A
Rocky Nash543 visualizações
DeStephen Derek RESUME por Derek DeStephen
DeStephen Derek RESUMEDeStephen Derek RESUME
DeStephen Derek RESUME
Derek DeStephen159 visualizações
K KELLAR RESUME por Ken Kellar
K KELLAR RESUMEK KELLAR RESUME
K KELLAR RESUME
Ken Kellar304 visualizações
Carlos A. Gonzalez CV English por Carlos A Gonzalez
Carlos A. Gonzalez CV English Carlos A. Gonzalez CV English
Carlos A. Gonzalez CV English
Carlos A Gonzalez178 visualizações
DeStephen Derek Resume por Derek DeStephen
DeStephen Derek ResumeDeStephen Derek Resume
DeStephen Derek Resume
Derek DeStephen161 visualizações
Ariel Pantaleon - CV por Ariel Pantaleon
Ariel Pantaleon - CVAriel Pantaleon - CV
Ariel Pantaleon - CV
Ariel Pantaleon152 visualizações
TAIWAN BARBER Resume por Taiwan Barber
TAIWAN BARBER ResumeTAIWAN BARBER Resume
TAIWAN BARBER Resume
Taiwan Barber145 visualizações
saif.resume dxb por md saif ali khan
saif.resume dxbsaif.resume dxb
saif.resume dxb
md saif ali khan152 visualizações
2.annexure mep projects executed por Arun Das
2.annexure mep projects executed2.annexure mep projects executed
2.annexure mep projects executed
Arun Das481 visualizações
Karl j gabel resume por KarlGabel
Karl j gabel resumeKarl j gabel resume
Karl j gabel resume
KarlGabel39 visualizações
RESUME WilliamCrowley Sept 2016-1 por William Crowley
RESUME WilliamCrowley Sept 2016-1RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1
William Crowley240 visualizações
MMeadowsRSM922016 por Marcus Meadows
MMeadowsRSM922016MMeadowsRSM922016
MMeadowsRSM922016
Marcus Meadows74 visualizações

Similar a Resume Wynn R Pettitt

Resume por
ResumeResume
ResumeDrew Culpepper
136 visualizações2 slides
SK Project Management Resume por
SK Project Management ResumeSK Project Management Resume
SK Project Management ResumeStephen Kramer
233 visualizações4 slides
Sample Resume - Telecom por
Sample Resume - TelecomSample Resume - Telecom
Sample Resume - TelecomPatrice Green
757 visualizações2 slides
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju... por
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...Belva Thomas
43 visualizações2 slides
Joel Sedeski-Resume por
Joel Sedeski-ResumeJoel Sedeski-Resume
Joel Sedeski-ResumeJoel Sedeski
218 visualizações3 slides
Resume - John Altieri Ver 20 por
Resume - John Altieri Ver 20Resume - John Altieri Ver 20
Resume - John Altieri Ver 20John Altieri
100 visualizações1 slide

Similar a Resume Wynn R Pettitt(20)

Resume por Drew Culpepper
ResumeResume
Resume
Drew Culpepper136 visualizações
SK Project Management Resume por Stephen Kramer
SK Project Management ResumeSK Project Management Resume
SK Project Management Resume
Stephen Kramer233 visualizações
Sample Resume - Telecom por Patrice Green
Sample Resume - TelecomSample Resume - Telecom
Sample Resume - Telecom
Patrice Green757 visualizações
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju... por Belva Thomas
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
Belva Thomas43 visualizações
Joel Sedeski-Resume por Joel Sedeski
Joel Sedeski-ResumeJoel Sedeski-Resume
Joel Sedeski-Resume
Joel Sedeski218 visualizações
Resume - John Altieri Ver 20 por John Altieri
Resume - John Altieri Ver 20Resume - John Altieri Ver 20
Resume - John Altieri Ver 20
John Altieri100 visualizações
Ramin A Massoudi Resume.2.17.2016 por Ramin Massoudi
Ramin A  Massoudi Resume.2.17.2016Ramin A  Massoudi Resume.2.17.2016
Ramin A Massoudi Resume.2.17.2016
Ramin Massoudi150 visualizações
Jacob Louwaert - Resume - 08.04.15 por Jacob Louwaert
Jacob Louwaert - Resume - 08.04.15Jacob Louwaert - Resume - 08.04.15
Jacob Louwaert - Resume - 08.04.15
Jacob Louwaert231 visualizações
Callahan_Allen_Resume por Al Callahan
Callahan_Allen_ResumeCallahan_Allen_Resume
Callahan_Allen_Resume
Al Callahan241 visualizações
Ananda Rao Resume 14.02.2016 por Anand Rao
Ananda Rao Resume 14.02.2016Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016
Anand Rao244 visualizações
Stephen kramer resume updated 2 por Stephen Kramer
Stephen kramer resume updated 2Stephen kramer resume updated 2
Stephen kramer resume updated 2
Stephen Kramer226 visualizações
Gross, Alex por alexzg
Gross, AlexGross, Alex
Gross, Alex
alexzg408 visualizações
Jeff_Pierson_resume_current 12_21_2016 por Jeffery Pierson
Jeff_Pierson_resume_current 12_21_2016Jeff_Pierson_resume_current 12_21_2016
Jeff_Pierson_resume_current 12_21_2016
Jeffery Pierson47 visualizações
Herndon's por Henry Herndon
Herndon'sHerndon's
Herndon's
Henry Herndon149 visualizações
Presentation_Resume.p178148.f1728558 7_28_2016 por DARRYL SPROWAL
Presentation_Resume.p178148.f1728558 7_28_2016Presentation_Resume.p178148.f1728558 7_28_2016
Presentation_Resume.p178148.f1728558 7_28_2016
DARRYL SPROWAL84 visualizações
Emilio Hoyos RESUME 2 2015 por Emilio Hoyos
Emilio Hoyos RESUME 2 2015Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015
Emilio Hoyos340 visualizações
Resume por Jim Choi
ResumeResume
Resume
Jim Choi160 visualizações
John Z Farhat Cv Sept 30th 2010 A por JzF
John Z Farhat Cv  Sept 30th 2010 AJohn Z Farhat Cv  Sept 30th 2010 A
John Z Farhat Cv Sept 30th 2010 A
JzF638 visualizações

Resume Wynn R Pettitt

  • 1. Wynn R. Pettitt Telecommunications Project Manager / Construction Manager Wynn.Pettitt@gmail.com 404-368-3059 Summary: Over 16 years of telecommunications experience with a focus in project management, construction management, and engineering. Has lead several multi-million dollar projects which were completed either ahead of schedule or on-time. Deep understanding of cell site construction, including new site builds, transport, DAS/iDAS, and small cell technologies. Also possesses familiarity with RF design standards and principles. Project management skills include working within strict deadlines, effective communication and working with cross functional teams, and excellent problem solving skills EXPERIENCE: 12/2012-12/2014 AT&T/Matrix Resources Atlanta, GA. ETTCS / LTE / Ethernet Over Microwave Project Manager Managed the builds of both Ethernet over Microwave and Ethernet To The Cell Site projects for all of Alabama and Mississippi for AT&T. Worked with upper management to determine project scope. Oversaw the day-to-day operations of vendors, tower crews, construction crews, and technicians for the installation of line and antennas, civil work, equipment installation, routers, transport testing, and integration. Involved in all phases of the project lifecycle. • Finished all projects under budget and ahead of monthly, quarterly, and yearly schedules • Required to track, update, and meet all KPIs and maintain CASPR milestones • Launched the largest number of Ethernet over Microwave sites in AT&T history • Helped develop national MW process for AT&T • Handled all budgetary items including equipment ordering, purchase orders, OOMs, and true-ups • Wrote all MOPs and SMOPs and acted as technical liason between intergration team and engineering • Worked closely with site acquisition team to acquire leases, NTPs, 1As, and CDs • Oversaw the installation and programming of Cisco SiADs and Ericsson FX11 cards • Required to verify all sites were FCC and FAA compliant and quality standards were met 03/2010-12/2012 AT&T/Skyline Telecommunications Atlanta, GA. New Site Build Transport Project Manager Managed the installation, design, provisioning, testing, and all construction related to the delivery of fiber, copper, and microwave transport for new site builds, growth, DAS, and LTE projects in the Alabama, Mississippi, and Lousiana AT&T markets. Oversaw the day-to-day operations of vendors, tower crews, construction crews, and technicians for the installation of microwave, civil work, equipment installation, transport testing, and integration. Involved in all phases of the project lifecycle and orked with upper management to determine project scope. • Finished all projects under budget and ahead of schedule • Required to track, update, and meet all KPIs and maintened milestones in CASPR • Wrote all MOPs and SMOPs and acted as technical liason between intergration team and engineering • Interfaced with LECs and provisioning groups to ensure timely delivery of circuits • Verified all designs and engineering documents were correct • Acted as technical lead for all field and switch technicians, and worked with Ericsson in the installation and integration of 3106s, 3206s, and 6601s and installation and provisioning of ET-MFX and FX11 cards • Worked with Operations group to ensure all installations and construction met quality standards • Worked closely with site acquisition team to acquire leases, NTPs, 1As, and CDs 03/2008-03/2010 Time Warner Cable / EMC Herndon, VA.
  • 2. Granite Subject Matter Expert/Admin Worked as part of the team that rolled out Granite for Time-Warner Cable at the market, regional, and national level and helped develop company-wide procedures. • Modeled over 400 equipment templates based on vendor specifications and network elements • Added new User-Defined Attributes and UDA groups as a Granite Admin • Add, delete, and modify categories, types, bandwidths and other parameters in Granite Admin • Performed queries in Granite backend using SQL in Oracle • Lead committee calls with client for Circuit Inventory Managament team to determine object and path types, categories, and statuses • Updated equipment templates and logical ports using Telcordia OPI portal to reconcile instances 08/2007-03/2008 Cingular / Matrix Resources Atlanta, GA. Circuit Design Engineer/Provisioner Responsible for designing circuits (T1, DS3, & OC-n) needed to meet the Interconnect and Transport plans for market and regional projects • Responsible for creating the circuit paths amd segments in the Granite database and submitting ASR requests to the LEC for processing • Issued orders for Telco T1s, (install, disconnects, changes, moves) • Performed and coordinated end-to-end network engineering and provisioning of DS0s, DS1s, DS3s, end- to-end circuits, and interconnect trunks • Coordinated with operations and vendors to remote test using Centest with Alcatel DACS and Tellabs 5500 and 532L DACS • Created and resolved LEC trouble-tickets for faulty circuits and verified circuits working properly 11/2004-07/2007 Bechtel Corporation Atlanta, GA. New Site Build Construction Manager Managed the construction for new cell sites including new towers, lines and antennas, setting shelters, civil work, utilities, and transport. Oversaw the day-to-day operations of vendors, tower crews, construction crews, and technicians for the installation and construction for new cell sites. Also over saw all transport for AT&T 3G in Georgia, Florda, and Louisiana including managing three switches and 15 field technicians for test and turn up of DS3s and T1s for UMTS and Node integration. Involved in all phases of the project lifecycle. • Wrote daily schedule, prepared invoice documentation, and maintained progress tracker and reports • Responsible for ordering materials and supervising GCs in building sites according to engineering and construction drawings and RFDSs. • Lead all pre-construction and utility site walks with GCs, utility providers, and telco • Required to track, update, and meet all KPIs present to client and maintain CASPR miletsones • Responsible for all financial and budgetary aspects of projects • Worked with site acquisition group to acquire 1As, CDs, leases, and NTPs • Lead weekly safety meetings with all construction and tower crews • Reviewed, approved, and uploaded all final hand-offs in Siterra and FileNet • Worked with Operations group to ensure all installations and construction met quality standards • Completed all projects ahead of or on schedule and under budget 7/2002-11/2004 Wireless Facilities, Inc. Atlanta, GA. Project Manager / Lead DS3/T1/e911 Technician
  • 3. Served as both Project Manager and lead technician for rollout of Cingular 2G network and e911. Worked with upper management to determine project scope. Oversaw the day-to-day operations of civil crews, field technicians, and switch technicians for the installation, test, and turn-up of DS3 and T1 circuits for cell site backhaul. Involved in all phases of the project lifecycle. • Writing daily schedule, preparing invoice documentation, and maintaining progress tracker • Required to track, update, and meet all KPIs • Providing support for vendors to ensure end-to-end connectivity of equipment, including True Position LMU’s, Ericsson and Nokia BTS • Installation and maintenance trainer for WFI and Cingular Engineers and Technicians • Responsible for ordering all materials and invoicing client for billable hours • Oversaw circuit design and provisioning and held daily calls with LECs to ensure timely delivery of circuits 2/2001 – 6/2002 Jump Start Communications Phoenix, AZ., Portland, OR., Atlanta, GA., Orlando / Tampa, FL., Kansas City, MS. Transport Lead · Worked as the transport lead in several AT&T Wireless switches that required using various test equipment to stress test DS3s and T1s. Oversaw the day-to-day operations of civil crews, field technicians, and switch technicians for the installation, test, and turn-up of DS3 and T1 circuits for cell site backhaul. • .Writing daily schedule, preparing invoice documentation, and maintaining progress tracker • Providing support for vendors to ensure end-to-end connectivity of equipment, including Ericsson and Nokia BTS • Responsible for ordering all materials and invoicing client for billable hours • Oversaw circuit design and provisioning and held daily calls with LECs to ensure timely delivery of circuits 7/2000 - 2/2001 Teksytems Fresno, Bakersfield, and Sacramento, CA. Project Manager Responsible for the daily operations of the Nortel DMS 250 Switch installation, circuit acceptance, and integration from the Ericsson switch to the new Nortel switch. Managed all vendors, contractors, and staff required for the installaion and integration. • Manage work-load and multi-task to comply with established critical dates and exceed company requirements to ensure the timely establishment of high-quality networks and work requests • Required to track, update, and meet all KPIs • Coordinate work efforts by interfacing with multiple work groups and customers • Analyze, plan, and design interoffice facilities to include rack layout, equipment layout, cable routing, and determine DSX assignments • Responsible for testing, turn up, and maintenance of high-capacity circuits including DS1's and DS3's