SlideShare a Scribd company logo
1 of 4
Walid Zaza
356 Lake Road, Takapuna,
Auckland 0622, New Zealand
Telephone: +64 211 062 416
Email: wzaza.nz@gmail.com
Professional Profile
A dedicated, driven and conscientious professional with a wealth of skills and expertise acquired
during career to date, in project management and engineering. Demonstrates exceptional
technical expertise, including the use of complex machinery and equipment, ensuring all activities
are carried out in compliance of all internal and external procedures and guidelines. Possesses a
methodical and analytical approach to tasks which enables astute project management and team
leadership, planning effectively and allocating resources and duties to meet defined targets and
objectives, within budget. Naturally proactive, and motivated, with a passion to complete projects
to the highest quality standards, would prove an asset to any business.
Objective
Currently looking for a new and challenging role within the field of project management and
engineering, one that will make best use of skills and expertise, while supporting ongoing personal
and professional development.
Career Summary
November 2014 –
July 2015
Project Engineer (Civil), Hawkins PNG, Papua New Guinea
l Managing the Civil Works contract and Electrical Works contract of the project.
Overseeing subcontractors with over 150+ staff and 20+ plants. Supervising, organising
and coordinating daily works, programme planning, methodology planning and ensuring
health and safety implemented. Ensuring each aspect is completed on time, preparing
accurate documentation, project reporting and involved in commercial relevant activates.
l Supported fellow engineers in managing other contracts of the project, notably the
Asphalt and Signage and Road Marking contracts.
l Developing, managing and enforcing a health and safety regiment which cultivated in a
success of Zero LTI’s in sections I was responsible for. Also as part of Zero LTI’s for the
entire project-over 750,000 man hrs. The majority of the workforce was low-skilled labour
and due to conditions from the client, the entire work site was open to the public; which
only demonstrates the gravity of our success.
l Preparing As-built information and managing the Quality Assurance, Quality Control
process.
Page 1
Projects:
l Kumel (Kookaburra) Flyover Project ($161 million Kina contract)
Aug 2014 –Nov Civil Engineer, McConnell Dowell, NZ
l Methodology planning, Programme planning, Labour scheduling, Equipment scheduling,
Pricing and Health and Safety planning
l Effectively planning works, liaising with contractors and managing subcontractors to
ensure technical specifications of tender met.
l Preparing built information and managing the Quality Assurance, Quality Control process
Projects:
l Wigram Bridge, Christchurch
l Vanuatu Wharf Development
March 2014 – June
2014
Site/Project Engineer, FUEL INSTALLATIONS AK LTD, NZ
l Leading a team of five permanent staff and eight subcontractors, with responsibility for
supervising, organising and coordinating daily works, ensuring health and safety
requirements are fulfilled
l Effectively planning works, liaising with contractors and managing subcontractors to
ensure each project is completed on time, preparing accurate documentation and reports
including progress reports
l Preparing built information and managing the Quality Assurance, Quality Control process
Projects:
l Undertaking duties on a number of projects for Chevron New Zealand
l Participating in the project to demolish and rebuild a Caltex petrol station, including fuel
tank removal and upgrade. $2.4 million contract
Nov 2012 – Feb
2014
Site Engineer, Civil and OLE, HILOR, NZ
l Accountable for managing quality control and health and safety of all staff on site,
supervising and coordinating daily works and planning future works to ensure timely
project completion
l Collaborating closely with contractors to manage subcontractors effectively, preparing
Page 2
accurate documentation and reports to project data on progress of each project,
highlighting any issues
Projects:
l Managing a team up to 40 people on a project with a projected spend of AUS$150m,
supervising all construction and engineering requirements for three tunnels in the
Auckland region
l The project incorporated an Overhead Conductor Rail System, the first time this system
has been utilised in New Zealand
2012 Site Engineer, STOCKMAN GENERAL CONTRACTORS, NZ
l Managing a team of five, planning, coordinating and leading daily operations for the
construction of a tunnel within a power substation, to ensure the achievement of project
deliverables
l Documenting progress, identifying any existing or potential issues, and putting in place
remedial actions to avoid any potential risks to project delivery
2010 – 2012 Site Engineer, SPIRAL DRILLERS CIVIL LTD, NZ
l Supervising daily works to ensure the maintenance of quality control and compliance of
health and safety requirements for onsite staff
l Planning, coordinating and documenting on each project, identifying and mitigating issues
as they arise, managing a team of five
2008 – 2010 Sales Assistant, COUNTRY ROAD
2006 – 2008 Surveyor, BECA INFRASTRUCTURE LTD
2006 – 2007 Property Maintenance/Construction, HANDS ON PROPERTY LTD
Education and Qualifications
Bachelors: Civil Engineering Technology, Unitec Institute of Technology (2011)
NCEA: Level 3
Technical & Operational Skills
l Piles Driven & Cast Foundations, Bulk Earthworks, Retaining Walls, Concreting, Tunnelling,
High Voltage Cabling, Low Voltage Cabling, Overhead Line Systems, Removal and
Installation of Fuel Tanks & Lines, Drainage Services, Storm water Services Electrical
Services, General Constructions, Pavement and Asphalting, Street lighting,
Key I.T. Skills
l Microsoft Office (Excel, Word, Project)
l AutoCad
Page 3
Personal Details
Languages: English (Mother Tongue)
Interests and Activities
Currently include: Volleyball, Football and Outdoor Pursuits.
REFERENCES ARE AVAILABLE ON REQUEST
Page 4

More Related Content

What's hot

emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction ManagerEdwardo Figuracion
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)Joedon Cunanan
 
Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Khalid Tamur , PMP®
 
Troy Hebert 2016
Troy Hebert 2016Troy Hebert 2016
Troy Hebert 2016Troy Hebert
 
Updated CV as of May 6, 2016
Updated CV as of May 6, 2016Updated CV as of May 6, 2016
Updated CV as of May 6, 2016Donn Jozwel Laroa
 
Q.C Civil Ispector
Q.C Civil IspectorQ.C Civil Ispector
Q.C Civil IspectorImran Alam
 
QA/QC Civil Engineer
QA/QC Civil EngineerQA/QC Civil Engineer
QA/QC Civil EngineerRavi chandran
 
1.INTRODUCTION TO KMAC
1.INTRODUCTION TO KMAC1.INTRODUCTION TO KMAC
1.INTRODUCTION TO KMACKMAC ADMIN
 
CV Kjartan Tobiassen_English
CV Kjartan Tobiassen_EnglishCV Kjartan Tobiassen_English
CV Kjartan Tobiassen_EnglishKjartan Tobiassen
 
Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2Chetan Pandharinath Padme
 
Kristalia Interiors pre qualification 22 05 15
Kristalia Interiors  pre qualification 22  05 15Kristalia Interiors  pre qualification 22  05 15
Kristalia Interiors pre qualification 22 05 15Kristalia Interiors L.L.C
 
ANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANANANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANANVeera Narayanan
 
Application and CV 2016 Latest 8-23-2016
Application and CV  2016 Latest 8-23-2016Application and CV  2016 Latest 8-23-2016
Application and CV 2016 Latest 8-23-2016Victor Miguel Pinat
 

What's hot (20)

Project Manager CV
Project Manager CVProject Manager CV
Project Manager CV
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
 
Andrew Quilaneta CV
Andrew Quilaneta CVAndrew Quilaneta CV
Andrew Quilaneta CV
 
Devin Lockhart Resume
Devin Lockhart ResumeDevin Lockhart Resume
Devin Lockhart Resume
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)
 
Glenn updated cv
Glenn updated cvGlenn updated cv
Glenn updated cv
 
Troy Hebert 2016
Troy Hebert 2016Troy Hebert 2016
Troy Hebert 2016
 
Harley's CV1
Harley's  CV1Harley's  CV1
Harley's CV1
 
Updated CV as of May 6, 2016
Updated CV as of May 6, 2016Updated CV as of May 6, 2016
Updated CV as of May 6, 2016
 
Q.C Civil Ispector
Q.C Civil IspectorQ.C Civil Ispector
Q.C Civil Ispector
 
QA/QC Civil Engineer
QA/QC Civil EngineerQA/QC Civil Engineer
QA/QC Civil Engineer
 
1.INTRODUCTION TO KMAC
1.INTRODUCTION TO KMAC1.INTRODUCTION TO KMAC
1.INTRODUCTION TO KMAC
 
HSE Mahmoud Farag
HSE Mahmoud FaragHSE Mahmoud Farag
HSE Mahmoud Farag
 
CV Kjartan Tobiassen_English
CV Kjartan Tobiassen_EnglishCV Kjartan Tobiassen_English
CV Kjartan Tobiassen_English
 
Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2Project Management Planning & Control Assignment 2
Project Management Planning & Control Assignment 2
 
Reda Amin1
Reda Amin1Reda Amin1
Reda Amin1
 
Kristalia Interiors pre qualification 22 05 15
Kristalia Interiors  pre qualification 22  05 15Kristalia Interiors  pre qualification 22  05 15
Kristalia Interiors pre qualification 22 05 15
 
ANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANANANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANAN
 
Application and CV 2016 Latest 8-23-2016
Application and CV  2016 Latest 8-23-2016Application and CV  2016 Latest 8-23-2016
Application and CV 2016 Latest 8-23-2016
 

Similar to Walid Zaza CV

Gary Clancy CV - November 2016
Gary Clancy CV - November 2016Gary Clancy CV - November 2016
Gary Clancy CV - November 2016Gary Clancy
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CVShane Elcoate
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CVShane Elcoate
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013psmuga9
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013psmuga9
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013psmuga9
 
EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015Obinna Ezeifedi
 
Andrew Carige_Resume_Detailed Version 25-02-16
Andrew Carige_Resume_Detailed Version 25-02-16Andrew Carige_Resume_Detailed Version 25-02-16
Andrew Carige_Resume_Detailed Version 25-02-16Carige Andrew
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDFsaddam abas
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)murali perianan
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)murali perianan
 
Resume_-_K_M_Nazmul_Ahasan
Resume_-_K_M_Nazmul_AhasanResume_-_K_M_Nazmul_Ahasan
Resume_-_K_M_Nazmul_AhasanNazmul Ahasan
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016belal alrwadieh
 

Similar to Walid Zaza CV (20)

Gary Clancy CV - November 2016
Gary Clancy CV - November 2016Gary Clancy CV - November 2016
Gary Clancy CV - November 2016
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015
 
CV PM-KJH
CV PM-KJHCV PM-KJH
CV PM-KJH
 
Andrew Carige_Resume_Detailed Version 25-02-16
Andrew Carige_Resume_Detailed Version 25-02-16Andrew Carige_Resume_Detailed Version 25-02-16
Andrew Carige_Resume_Detailed Version 25-02-16
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDF
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
 
Kleynhans Claudius - Senior Project Manager R
Kleynhans Claudius - Senior Project Manager RKleynhans Claudius - Senior Project Manager R
Kleynhans Claudius - Senior Project Manager R
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)
 
Resume_-_K_M_Nazmul_Ahasan
Resume_-_K_M_Nazmul_AhasanResume_-_K_M_Nazmul_Ahasan
Resume_-_K_M_Nazmul_Ahasan
 
Resume RVM 2015
Resume RVM 2015Resume RVM 2015
Resume RVM 2015
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
 
CV~PW~02-02-16 Opus
CV~PW~02-02-16 OpusCV~PW~02-02-16 Opus
CV~PW~02-02-16 Opus
 
Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)
 

Walid Zaza CV

  • 1. Walid Zaza 356 Lake Road, Takapuna, Auckland 0622, New Zealand Telephone: +64 211 062 416 Email: wzaza.nz@gmail.com Professional Profile A dedicated, driven and conscientious professional with a wealth of skills and expertise acquired during career to date, in project management and engineering. Demonstrates exceptional technical expertise, including the use of complex machinery and equipment, ensuring all activities are carried out in compliance of all internal and external procedures and guidelines. Possesses a methodical and analytical approach to tasks which enables astute project management and team leadership, planning effectively and allocating resources and duties to meet defined targets and objectives, within budget. Naturally proactive, and motivated, with a passion to complete projects to the highest quality standards, would prove an asset to any business. Objective Currently looking for a new and challenging role within the field of project management and engineering, one that will make best use of skills and expertise, while supporting ongoing personal and professional development. Career Summary November 2014 – July 2015 Project Engineer (Civil), Hawkins PNG, Papua New Guinea l Managing the Civil Works contract and Electrical Works contract of the project. Overseeing subcontractors with over 150+ staff and 20+ plants. Supervising, organising and coordinating daily works, programme planning, methodology planning and ensuring health and safety implemented. Ensuring each aspect is completed on time, preparing accurate documentation, project reporting and involved in commercial relevant activates. l Supported fellow engineers in managing other contracts of the project, notably the Asphalt and Signage and Road Marking contracts. l Developing, managing and enforcing a health and safety regiment which cultivated in a success of Zero LTI’s in sections I was responsible for. Also as part of Zero LTI’s for the entire project-over 750,000 man hrs. The majority of the workforce was low-skilled labour and due to conditions from the client, the entire work site was open to the public; which only demonstrates the gravity of our success. l Preparing As-built information and managing the Quality Assurance, Quality Control process. Page 1
  • 2. Projects: l Kumel (Kookaburra) Flyover Project ($161 million Kina contract) Aug 2014 –Nov Civil Engineer, McConnell Dowell, NZ l Methodology planning, Programme planning, Labour scheduling, Equipment scheduling, Pricing and Health and Safety planning l Effectively planning works, liaising with contractors and managing subcontractors to ensure technical specifications of tender met. l Preparing built information and managing the Quality Assurance, Quality Control process Projects: l Wigram Bridge, Christchurch l Vanuatu Wharf Development March 2014 – June 2014 Site/Project Engineer, FUEL INSTALLATIONS AK LTD, NZ l Leading a team of five permanent staff and eight subcontractors, with responsibility for supervising, organising and coordinating daily works, ensuring health and safety requirements are fulfilled l Effectively planning works, liaising with contractors and managing subcontractors to ensure each project is completed on time, preparing accurate documentation and reports including progress reports l Preparing built information and managing the Quality Assurance, Quality Control process Projects: l Undertaking duties on a number of projects for Chevron New Zealand l Participating in the project to demolish and rebuild a Caltex petrol station, including fuel tank removal and upgrade. $2.4 million contract Nov 2012 – Feb 2014 Site Engineer, Civil and OLE, HILOR, NZ l Accountable for managing quality control and health and safety of all staff on site, supervising and coordinating daily works and planning future works to ensure timely project completion l Collaborating closely with contractors to manage subcontractors effectively, preparing Page 2
  • 3. accurate documentation and reports to project data on progress of each project, highlighting any issues Projects: l Managing a team up to 40 people on a project with a projected spend of AUS$150m, supervising all construction and engineering requirements for three tunnels in the Auckland region l The project incorporated an Overhead Conductor Rail System, the first time this system has been utilised in New Zealand 2012 Site Engineer, STOCKMAN GENERAL CONTRACTORS, NZ l Managing a team of five, planning, coordinating and leading daily operations for the construction of a tunnel within a power substation, to ensure the achievement of project deliverables l Documenting progress, identifying any existing or potential issues, and putting in place remedial actions to avoid any potential risks to project delivery 2010 – 2012 Site Engineer, SPIRAL DRILLERS CIVIL LTD, NZ l Supervising daily works to ensure the maintenance of quality control and compliance of health and safety requirements for onsite staff l Planning, coordinating and documenting on each project, identifying and mitigating issues as they arise, managing a team of five 2008 – 2010 Sales Assistant, COUNTRY ROAD 2006 – 2008 Surveyor, BECA INFRASTRUCTURE LTD 2006 – 2007 Property Maintenance/Construction, HANDS ON PROPERTY LTD Education and Qualifications Bachelors: Civil Engineering Technology, Unitec Institute of Technology (2011) NCEA: Level 3 Technical & Operational Skills l Piles Driven & Cast Foundations, Bulk Earthworks, Retaining Walls, Concreting, Tunnelling, High Voltage Cabling, Low Voltage Cabling, Overhead Line Systems, Removal and Installation of Fuel Tanks & Lines, Drainage Services, Storm water Services Electrical Services, General Constructions, Pavement and Asphalting, Street lighting, Key I.T. Skills l Microsoft Office (Excel, Word, Project) l AutoCad Page 3
  • 4. Personal Details Languages: English (Mother Tongue) Interests and Activities Currently include: Volleyball, Football and Outdoor Pursuits. REFERENCES ARE AVAILABLE ON REQUEST Page 4