◦ WHAT IS AN ATTRIBUTE?
◦ CONTROL CHARTS FOR ATTRIBUTE DATA
◦ TYPES & SELECTION OF CONTROL CHART
◦ WHAT IS p CHART , np CHART , c CHART , u CHART.
◦ CALCULATE THE PARAMETERS OF THE CONTROL
CHARTS
◦ ADVANTAGES OF ATTRIBUTE CONTROL CHARTS
Objectives :-
3
4
The term Attribute refers to those quality characteristics
that conform to specifications or do not conform to
specifications. This data may be expressed as ok/not ok,
go/no go, yes/no, or presence/absence of a defect.
Attribute are used:
1. Where measurements are not possible.
2. Where measurements can be made but are not made
because of time, cost, or need.
◦What is an Attribute?
5
CONTROLCHARTS FOR ATTRIBUTE DATA:
1. Nonconforming Units (based on the Binomial
distribution): p chart, np chart.
2. Nonconformities (based on the Poisson
distribution): c chart, u chart.
6
7
TYPES & SELECTION OF CONTROLCHART:
What type of
data do I have?
Variable Attribute
Counting defects
or defectives?
X-bar & S
Chart
I & MR
Chart
X-bar & R
Chart
n > 10 1 < n < 10 n = 1
Defectives Defects
What subgroup
size is available?
Constant
Sample Size?
Constant
Opportunity?
yes yesNo no
np Chart u Chartp Chart c Chart
8
The p chart is for the fraction of defective items in a
sample/lot. This chart shows the fraction of nonconforming
or defective product produced by a manufacturing process.
The fraction defective is the number of defective items in a
sample divided by the total number of items in a sample.
The fraction defective chart is used when the sample size
varies.
What is p Chart:
9
Calculatethe parametersof the p Control Chart
with thefollowing:
Where:
p: Average proportion defective (0.0 – 1.0)
ni: Average Number inspected in subgroups
LCLp: Lower Control Limit on p Chart
UCLp: Upper Control Limit on p Chart
Total number of defective items
Total number of items inspected
n
p
p(1 p)
UCL  p 3
Center Line Control Limits
in
p
i
p(1 p)
LCL  p 3
p =
10
EXAMPLE
Sub-
group
Number
Number
Inspected
Defective
Items
1 250 12
2 189 3
3 410 9
4 210 4
5 315 0
6 310 6
7 240 6
8 295 1
19 300 16
25 310 2
Total 7500 138
Average number inspected:
7500 = 300
25
0.018
138
7500
p
300
0.018)0.018(1
LCL 0.018 3
0.005 0.0
0.041
300
0.018)0.018(1
UCL 0.018 3
11
0.053
p-bar
LCL
UCL
p
5 10 15 20
Subgroup
25
0
0.01
0.02
0.03
0.04
Control Chart:
12
What is np Chart:
When each data point is based on the same sample
size, a special version of the p chart can be used.
The np chart is for the number of defective items in
a sample.
This chart shows the number of nonconforming.
The number of defective, np, chart shows the number
of defective items in samples rather than the fraction
of defective items. It requires that the sample size
remains constant.
13
Calculatethe parametersof the np Control Chartwith
the following:
Center Line Control Limits
Where:
N : Constant Sample Size
p : Average proportion defective (0.0 – 1.0)
LCLnp: Lower Control Limit on nP chart
UCLnp: Upper Control Limit on nP chart
N p
Total number of items inspected
p =
Total number of defective items UCL  N p + 3
np
N p (1 p)
LCL  N p 3
np
N p (1 p)
14
What is c Chart:
The c chart is similar to the np chart, in that it requires
equal (constant) sample sizes for each data point.
This shows the number of defects or nonconformities
produced by a manufacturing process.
The number of defects (c chart) is based on the Poisson
distribution.
15
Calculatethe parametersof the c ControlChart with the
following:
2
Center Line Control Limits
Total number of subgroups
Total number of defects
c 
UCLc  c 3 c
LCLc  c 3 c
Where:
C :
LCLc:
UCLc:
Total number of defects divided by the total number of
subgroups. Lower Control Limit on C Chart.
Upper Control Limit on C Chart.
16
Sample
No.
No. of
Defects
Sample
No.
No. of
Defects
Sample
No.
No. of
Defects
Sample
No.
No. of
Defects
1 5 6 4 11 6 16 5
2 4 7 5 12 5 17 4
3 5 8 6 13 4 18 6
4 6 9 8 14 7 19 6
5 4 10 7 15 6 20 6
CL =
EXAMPLE
17
c chart
LCL
UCL
C bar
18
What is u Chart:
The u chart is a more general version of the c chart for use
when the data points do not come from equal-sized
samples.
The symbol u is used to represent defects per unit.
The u chart is used in cases where the samples are of
different size.
This chart shows the nonconformities per unit produced by a
manufacturing process.
19
Calculate the parameters of the u Control Chart with the
following:
30
Center Line Control Limits
u 
Total number of defects Identified
Total number of Units Inspected
u
ni
UCLu  u 3
i
u
nuLCL  u 3
Where:
u: Total number of defects divided by the total number of units inspected.
ni : Average Number inspected in subgroup
LCLu: Lower Control Limit on U Chart.
UCLu: Upper Control Limit on U Chart.
20
Advantages of attribute control charts:
Allowing for quick summaries, that is, the engineer
may simply classify products as acceptable or
unacceptable, based on various quality criteria.
Thus, attribute charts sometimes bypass the need for
expensive, precise devices and time-consuming
measurement procedures.
Easily understood by managers unfamiliar with
quality control procedures.
Thank you very much for your attention!
21

Mais conteúdo relacionado

Mais procurados

X bar and R control charts
X bar and R control chartsX bar and R control charts
X bar and R control chartsDhruv Shah
 
Process capability
Process capabilityProcess capability
Process capabilitypadam nagar
 
Attributes Control Charts
Attributes Control ChartsAttributes Control Charts
Attributes Control Chartsahmad bassiouny
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality controlAnubhav Grover
 
Statistical quality control presentation
Statistical quality control presentationStatistical quality control presentation
Statistical quality control presentationSuchitra Sahu
 
Quality Control Chart
 Quality Control Chart Quality Control Chart
Quality Control ChartAshish Gupta
 
Single and double sampling
Single and double samplingSingle and double sampling
Single and double samplingShivani Garg
 
Ppt On S.Q.C.
Ppt On S.Q.C.Ppt On S.Q.C.
Ppt On S.Q.C.dvietians
 
Statistical process control (spc)
Statistical process control (spc)Statistical process control (spc)
Statistical process control (spc)Ashish Chaudhari
 
SPC WithAdrian Adrian Beale
SPC WithAdrian Adrian BealeSPC WithAdrian Adrian Beale
SPC WithAdrian Adrian BealeAdrian Beale
 
Statistical process control (spc)
Statistical process control (spc)Statistical process control (spc)
Statistical process control (spc)Ashish Chaudhari
 
Lot-by-Lot Acceptance Sampling for Attributes
Lot-by-Lot Acceptance Sampling for AttributesLot-by-Lot Acceptance Sampling for Attributes
Lot-by-Lot Acceptance Sampling for AttributesParth Desani
 

Mais procurados (20)

X bar and R control charts
X bar and R control chartsX bar and R control charts
X bar and R control charts
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 
Process capability
Process capabilityProcess capability
Process capability
 
Attributes Control Charts
Attributes Control ChartsAttributes Control Charts
Attributes Control Charts
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 
Statistical quality control presentation
Statistical quality control presentationStatistical quality control presentation
Statistical quality control presentation
 
Quality Control Chart
 Quality Control Chart Quality Control Chart
Quality Control Chart
 
Single and double sampling
Single and double samplingSingle and double sampling
Single and double sampling
 
Ppt On S.Q.C.
Ppt On S.Q.C.Ppt On S.Q.C.
Ppt On S.Q.C.
 
Statistical process control (spc)
Statistical process control (spc)Statistical process control (spc)
Statistical process control (spc)
 
Control charts
Control chartsControl charts
Control charts
 
X‾ and r charts
X‾ and r chartsX‾ and r charts
X‾ and r charts
 
SPC WithAdrian Adrian Beale
SPC WithAdrian Adrian BealeSPC WithAdrian Adrian Beale
SPC WithAdrian Adrian Beale
 
Method study
Method studyMethod study
Method study
 
Spc
SpcSpc
Spc
 
Spc training
Spc training Spc training
Spc training
 
CONTROL CHARTS
CONTROL CHARTSCONTROL CHARTS
CONTROL CHARTS
 
Statistical process control (spc)
Statistical process control (spc)Statistical process control (spc)
Statistical process control (spc)
 
Lot-by-Lot Acceptance Sampling for Attributes
Lot-by-Lot Acceptance Sampling for AttributesLot-by-Lot Acceptance Sampling for Attributes
Lot-by-Lot Acceptance Sampling for Attributes
 
Control chart ppt
Control chart pptControl chart ppt
Control chart ppt
 

Semelhante a Control charts (p np c u)

Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]Hariharan Ponnusamy
 
control Chart u np c p
control Chart u np c pcontrol Chart u np c p
control Chart u np c pblactigger401
 
control charts to enhance your problem solving abilities
control charts to enhance your problem solving abilitiescontrol charts to enhance your problem solving abilities
control charts to enhance your problem solving abilitiesINSTITUTE OF ENGINEERING /BKC
 
statistical quality control
statistical quality controlstatistical quality control
statistical quality controlVicky Raj
 
JF608: Quality Control - Unit 4
JF608: Quality Control - Unit 4JF608: Quality Control - Unit 4
JF608: Quality Control - Unit 4Asraf Malik
 
Statistical Process Control (SPC) - QMS.pptx
Statistical Process Control (SPC) - QMS.pptxStatistical Process Control (SPC) - QMS.pptx
Statistical Process Control (SPC) - QMS.pptxARUN KUMAR
 
CHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptxCHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptxhinal10
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrolceutics1315
 
C chart class material
C chart class materialC chart class material
C chart class materialBestha Chakri
 
Statistical process control ppt @ doms
Statistical process control ppt @ doms Statistical process control ppt @ doms
Statistical process control ppt @ doms Babasab Patil
 
Hızlı Ozet - Istatistiksel Proses Kontrol
Hızlı Ozet - Istatistiksel Proses KontrolHızlı Ozet - Istatistiksel Proses Kontrol
Hızlı Ozet - Istatistiksel Proses Kontrolmetallicaslayer
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process ControlNAVEENBANSHIWAL
 

Semelhante a Control charts (p np c u) (20)

Attribute Chart.pptx
Attribute Chart.pptxAttribute Chart.pptx
Attribute Chart.pptx
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]
 
Chapter9[1]
Chapter9[1]Chapter9[1]
Chapter9[1]
 
C chart
C chartC chart
C chart
 
control Chart u np c p
control Chart u np c pcontrol Chart u np c p
control Chart u np c p
 
control charts to enhance your problem solving abilities
control charts to enhance your problem solving abilitiescontrol charts to enhance your problem solving abilities
control charts to enhance your problem solving abilities
 
Facility Location
Facility Location Facility Location
Facility Location
 
statistical quality control
statistical quality controlstatistical quality control
statistical quality control
 
JF608: Quality Control - Unit 4
JF608: Quality Control - Unit 4JF608: Quality Control - Unit 4
JF608: Quality Control - Unit 4
 
Statistical Process Control (SPC) - QMS.pptx
Statistical Process Control (SPC) - QMS.pptxStatistical Process Control (SPC) - QMS.pptx
Statistical Process Control (SPC) - QMS.pptx
 
CHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptxCHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptx
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrol
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrol
 
C chart class material
C chart class materialC chart class material
C chart class material
 
Statistical process control ppt @ doms
Statistical process control ppt @ doms Statistical process control ppt @ doms
Statistical process control ppt @ doms
 
Hızlı Ozet - Istatistiksel Proses Kontrol
Hızlı Ozet - Istatistiksel Proses KontrolHızlı Ozet - Istatistiksel Proses Kontrol
Hızlı Ozet - Istatistiksel Proses Kontrol
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
Ch04
Ch04Ch04
Ch04
 

Último

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 

Último (20)

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 

Control charts (p np c u)

  • 1. 1
  • 3. ◦ WHAT IS AN ATTRIBUTE? ◦ CONTROL CHARTS FOR ATTRIBUTE DATA ◦ TYPES & SELECTION OF CONTROL CHART ◦ WHAT IS p CHART , np CHART , c CHART , u CHART. ◦ CALCULATE THE PARAMETERS OF THE CONTROL CHARTS ◦ ADVANTAGES OF ATTRIBUTE CONTROL CHARTS Objectives :- 3
  • 4. 4 The term Attribute refers to those quality characteristics that conform to specifications or do not conform to specifications. This data may be expressed as ok/not ok, go/no go, yes/no, or presence/absence of a defect. Attribute are used: 1. Where measurements are not possible. 2. Where measurements can be made but are not made because of time, cost, or need. ◦What is an Attribute?
  • 5. 5 CONTROLCHARTS FOR ATTRIBUTE DATA: 1. Nonconforming Units (based on the Binomial distribution): p chart, np chart. 2. Nonconformities (based on the Poisson distribution): c chart, u chart.
  • 6. 6
  • 7. 7 TYPES & SELECTION OF CONTROLCHART: What type of data do I have? Variable Attribute Counting defects or defectives? X-bar & S Chart I & MR Chart X-bar & R Chart n > 10 1 < n < 10 n = 1 Defectives Defects What subgroup size is available? Constant Sample Size? Constant Opportunity? yes yesNo no np Chart u Chartp Chart c Chart
  • 8. 8 The p chart is for the fraction of defective items in a sample/lot. This chart shows the fraction of nonconforming or defective product produced by a manufacturing process. The fraction defective is the number of defective items in a sample divided by the total number of items in a sample. The fraction defective chart is used when the sample size varies. What is p Chart:
  • 9. 9 Calculatethe parametersof the p Control Chart with thefollowing: Where: p: Average proportion defective (0.0 – 1.0) ni: Average Number inspected in subgroups LCLp: Lower Control Limit on p Chart UCLp: Upper Control Limit on p Chart Total number of defective items Total number of items inspected n p p(1 p) UCL  p 3 Center Line Control Limits in p i p(1 p) LCL  p 3 p =
  • 10. 10 EXAMPLE Sub- group Number Number Inspected Defective Items 1 250 12 2 189 3 3 410 9 4 210 4 5 315 0 6 310 6 7 240 6 8 295 1 19 300 16 25 310 2 Total 7500 138 Average number inspected: 7500 = 300 25 0.018 138 7500 p 300 0.018)0.018(1 LCL 0.018 3 0.005 0.0 0.041 300 0.018)0.018(1 UCL 0.018 3
  • 11. 11 0.053 p-bar LCL UCL p 5 10 15 20 Subgroup 25 0 0.01 0.02 0.03 0.04 Control Chart:
  • 12. 12 What is np Chart: When each data point is based on the same sample size, a special version of the p chart can be used. The np chart is for the number of defective items in a sample. This chart shows the number of nonconforming. The number of defective, np, chart shows the number of defective items in samples rather than the fraction of defective items. It requires that the sample size remains constant.
  • 13. 13 Calculatethe parametersof the np Control Chartwith the following: Center Line Control Limits Where: N : Constant Sample Size p : Average proportion defective (0.0 – 1.0) LCLnp: Lower Control Limit on nP chart UCLnp: Upper Control Limit on nP chart N p Total number of items inspected p = Total number of defective items UCL  N p + 3 np N p (1 p) LCL  N p 3 np N p (1 p)
  • 14. 14 What is c Chart: The c chart is similar to the np chart, in that it requires equal (constant) sample sizes for each data point. This shows the number of defects or nonconformities produced by a manufacturing process. The number of defects (c chart) is based on the Poisson distribution.
  • 15. 15 Calculatethe parametersof the c ControlChart with the following: 2 Center Line Control Limits Total number of subgroups Total number of defects c  UCLc  c 3 c LCLc  c 3 c Where: C : LCLc: UCLc: Total number of defects divided by the total number of subgroups. Lower Control Limit on C Chart. Upper Control Limit on C Chart.
  • 16. 16 Sample No. No. of Defects Sample No. No. of Defects Sample No. No. of Defects Sample No. No. of Defects 1 5 6 4 11 6 16 5 2 4 7 5 12 5 17 4 3 5 8 6 13 4 18 6 4 6 9 8 14 7 19 6 5 4 10 7 15 6 20 6 CL = EXAMPLE
  • 18. 18 What is u Chart: The u chart is a more general version of the c chart for use when the data points do not come from equal-sized samples. The symbol u is used to represent defects per unit. The u chart is used in cases where the samples are of different size. This chart shows the nonconformities per unit produced by a manufacturing process.
  • 19. 19 Calculate the parameters of the u Control Chart with the following: 30 Center Line Control Limits u  Total number of defects Identified Total number of Units Inspected u ni UCLu  u 3 i u nuLCL  u 3 Where: u: Total number of defects divided by the total number of units inspected. ni : Average Number inspected in subgroup LCLu: Lower Control Limit on U Chart. UCLu: Upper Control Limit on U Chart.
  • 20. 20 Advantages of attribute control charts: Allowing for quick summaries, that is, the engineer may simply classify products as acceptable or unacceptable, based on various quality criteria. Thus, attribute charts sometimes bypass the need for expensive, precise devices and time-consuming measurement procedures. Easily understood by managers unfamiliar with quality control procedures.