SlideShare uma empresa Scribd logo
1 de 6
R.S.Venkateshwaran
Mob: +965-60974385
E-mail: aaryesvee@gmail.com
CAREER OBJECTIVE
My main objective is to obtain a professional career with a reputed firm, where I believe
the challenging assignments there would definitely require a high level of skills and
professionalism, which I have built through several years of working and studying.
PROFESSIONAL EXPERIENCE
With Dodsal Engineering and Construction Pte Ltd., United Arab
Emirates, as Senior Planning Engineer.
A well-known EPC contractor in Middle east Performing Oil and Gas projects.
Project : New Gathering Center- GC 31, Kuwait
PMC/FEED : AMEC Foster Wheeler
Client : Kuwait Oil Company (KOC)
Duration : Jan’ 2015 to till date
Scope of work: The Scope of Work includes detailed Engineering, Procurement,
Construction, Commissioning, Training and Assistance to Company for Performance test.
With Exterran Belleli Energy Srl., United Arab Emirates, as Planning
Engineer.
Scope of work: Construction includes Storage tanks, pressure vessels etc. for Oil &
gas industries, Refineries, Power Plants, Desalination Plants etc.
Project : Fujairah Power Project (56m dia and 20 feet high tanks – 3 nos)
Contractor: Acciona Agua
Client : Sembcorp Power Company
Duration : Apr’ 2014 to Jan’2015
With Aveon Offshore Ltd., Nigeria as Project Planning and Scheduling
Engineer.
Scope of Work: Leading manufacturers of Subsea Manifolds, X-mas trees, Tubing head
frames and subsea controls (HDM&EDM), Suction Piles, Jackets, Spider decks and Heli
decks.
Project # 1: Shell Bonga North-West project (Subsea Manifolds, X-Trees, Tubing Head,
Etc.)
Contractor: FMC Technologies
Client: Shell Nigeria (SNEPCO)
Duration: Feb 2012 to Aug 2013
Project # 2: ERHA North Phase 2 project (Subsea Manifolds, X-Trees, Suction Piles,
Etc.)
Contractor: Cameroon Offshore Systems Nigeria Ltd.
Client: Esso Exploration and Production Nigeria Ltd.
Duration: Dec 2012 to Jan 2014
R.S.Venkateshwaran
Mob: +965-60974385
E-mail: aaryesvee@gmail.com
Project # 3: EGINA Subsea Production System(Subsea Manifolds, X-Trees, Suction
Piles,Etc.)
Contractor: FMC Technologies
Client: TOTAL Nigeria Ltd.
Duration: Dec 2013 to Mar 2014
With M/s Zamil Steel Industries Ltd., Saudi Arabia, as Planning Engineer.
Scope of work: Steel fabrication includes structural, pressure vessels etc. for Oil &
gas industries, refineries, power plants etc.
Clients: Technip Ltd, Saipem Ltd, Saudi Oger Ltd, Samsung Engg, Hyundai Heavy
Industries.
Period: Dec’ 2010 to Dec’ 2011
With M/s V3 Power Petro Fabricators Pvt Ltd., India, as Planning
Engineer
Scope of work: Fabrication of Storage Tanks, Pipe racks, Pressure vessels, Pipe line
works, etc.,
Clients: Nagarjuna Oil Corporation Ltd, Thermo systems Ltd, BGR energy systems Ltd.
Period: May 2006 to Nov’ 2010
CORE STRENGTH – PLANNING & COST CONTROL
Planning:
 In charge of setting up:
- Project Calendar
- Planning Procedures
- Progress Measurement procedures
- Reporting procedures
- Work Breakdown Structure (WBS)
- OBS
 In charge of creating the 2 key schedules per project phase:
- Procurement Schedule: From Material Requisition till PO Placement.
R.S.Venkateshwaran
Mob: +965-60974385
E-mail: aaryesvee@gmail.com
- Manufacturing Schedule: From Purchase Order Placement till Material
receipt.
 Discusses the outcome of the above planning in terms of schedules and
procedures with the Project Manager and / or Lead Discipline Engineers in order
to achieve a final project plan.
 Regularly reviews the manpower plan to check compliance with Contract Terms &
Conditions;
 Incorporates team comments and issues final schedule to Client for approval;
Holds discussions with Client representatives over the schedule and incorporates
comments into the schedule; Issues the final Implementation Plan.
 Participates in the negotiations on project control aspects with Vendors and
Contractors; Reviews and comment on Contractors' and Vendors' schedules;
Issues revised schedules including corrective actions.
 Prepares progress measurement procedures for all phases of the project including
determination of weight factors.
 Collects and compiles back-up data for project statistics and ratio calculations.
 Undertakes project follow-up of progress monitoring, working to update the
project schedule with actual input and activity progress; Issues the updated
schedule status along with the trend analysis schedule showing forecast dates for
group information purposes.
 Provides assistance to the Project Manager on project delays, reasons and
corrective action suggestions
 Sets up and issues the Document Register; Prepares Level 3 List and Document
Register using MS Access.
 Prepares Planning attachments for Weekly Progress Reports; Issues feedback to
Project Managers for onward transmission to client;
 Prepares and issues Planning attachments for Monthly Progress Reports. These
include:
- Updated Project schedule
- Updated Document register
- Progress Statistics
- Progress S - curves covering all phases of the project
- Manpower Histograms
- Milestones Status Report
R.S.Venkateshwaran
Mob: +965-60974385
E-mail: aaryesvee@gmail.com
- Exceptional reports such as “Activity behind Schedule" or the "Activity Due
Plan" for the following week or month.
 Prepares a detailed network using project management software (such as
Primavera-P6); Ensures the update and maintenance of Planning software
applications
 Reviews and comments on vendor schedules, as well as progress reports for
various purchase orders; Monitors timely execution of such orders closely;
Informs the Project Manager in case of delay and suggests corrective actions.
 When assigned as a Lead Planning Engineer position, takes charge of preparing
the Engineering Document Register and the Procurement Document Register
inclusive of all basic overall schedules (Levels 0, 1 and 2) as well as Detailed
Schedules (Level 3).
 Reviews Construction contractors' schedules and Progress Reports, provides
comments and suggests corrective action.
Cost Control:
 Responsible to control and monitor project total expenditure including verifying
and checking of invoices and claims from suppliers, vendors and subcontractors
to ensure that all project expenditures are captured and properly recorded.
 Provide planning and cost controlling support for the projects which includes
variation reporting, monitoring of milestone progress to the preparation of
customer billing processes, etc
 Perform technical and commercial review of EPC long time tenders
(subcontractor’s quotations) for the preparation of Service agreements
 Ensure effective project implementation and utilize productive reports from the
creation of WBS with the use of project management system to monitor the
status of all purchases, invoicing and delivery up to the closure of the project.
 Attend project meetings and discussions with the PMT and external clients
 Perform project costing related reporting to the team and management’s review
on a monthly basis to ensure that expenditures are kept within the project
budget.
 Provide cost control and planning advice to the internal PMT team as and when
required.
R.S.Venkateshwaran
Mob: +965-60974385
E-mail: aaryesvee@gmail.com
EDUCATIONAL QUALIFICATION
B.E – Mechanical Engineering on 2006
Anna University,
Tamilnadu, INDIA.
SOFTWARE EXPOSURE
Operating System : MS Windows Xp , Windows 7 & 8.
Packages : MS Office (Word, Excel, Power Point, Access)
Application Software’s: MS-Project, Primavera P6 & P3, Oracle & AutoCAD
DEVELOPEMENTAL PROGRAMMES ATTENDED
 Workshop on communication skills
 Workshop on personality development and customer focus
 Team-building workshop
 Program on ISO systems and procedures
PERSONAL DETAILS
Date of Birth : 22nd January 1985
Passport No : G 7552907
Marital Status : Single
Languages Known : English, Tamil and Telugu
Permanent Address : OA/1, Kanakkan Street, Mannargudi,
Tamilnadu, India.
R.S.Venkateshwaran
Mob: +965-60974385
E-mail: aaryesvee@gmail.com
EDUCATIONAL QUALIFICATION
B.E – Mechanical Engineering on 2006
Anna University,
Tamilnadu, INDIA.
SOFTWARE EXPOSURE
Operating System : MS Windows Xp , Windows 7 & 8.
Packages : MS Office (Word, Excel, Power Point, Access)
Application Software’s: MS-Project, Primavera P6 & P3, Oracle & AutoCAD
DEVELOPEMENTAL PROGRAMMES ATTENDED
 Workshop on communication skills
 Workshop on personality development and customer focus
 Team-building workshop
 Program on ISO systems and procedures
PERSONAL DETAILS
Date of Birth : 22nd January 1985
Passport No : G 7552907
Marital Status : Single
Languages Known : English, Tamil and Telugu
Permanent Address : OA/1, Kanakkan Street, Mannargudi,
Tamilnadu, India.

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Roshanak Jalili CV
Roshanak Jalili CVRoshanak Jalili CV
Roshanak Jalili CV
 
Robert W Self Resume 2009
Robert W Self Resume 2009Robert W Self Resume 2009
Robert W Self Resume 2009
 
Resume
ResumeResume
Resume
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
 
satheesh Resume
satheesh Resumesatheesh Resume
satheesh Resume
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
balaji cv
balaji cvbalaji cv
balaji cv
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project Manager
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
 
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 

Destaque

Event Sourcing and Functional Programming
Event Sourcing and Functional ProgrammingEvent Sourcing and Functional Programming
Event Sourcing and Functional ProgrammingGlobalLogic Ukraine
 
Ficha de inscripción Danzas en el Hall
Ficha de inscripción Danzas en el HallFicha de inscripción Danzas en el Hall
Ficha de inscripción Danzas en el HallPia D' Lucca
 
Business analytics and data mining
Business analytics and data miningBusiness analytics and data mining
Business analytics and data miningHoang Nguyen
 
Geminis
GeminisGeminis
GeminisGineNC
 
Sailesh CV-Planning Engineer
Sailesh CV-Planning EngineerSailesh CV-Planning Engineer
Sailesh CV-Planning Engineersailesh konduru
 
Quantum Computation and the Stabilizer Formalism for Error Correction
Quantum Computation and the Stabilizer Formalism for Error CorrectionQuantum Computation and the Stabilizer Formalism for Error Correction
Quantum Computation and the Stabilizer Formalism for Error CorrectionDaniel Bulhosa Solórzano
 

Destaque (15)

DISTC Events Ref
DISTC Events RefDISTC Events Ref
DISTC Events Ref
 
Salmos e hinos 107
Salmos e hinos 107Salmos e hinos 107
Salmos e hinos 107
 
Event Sourcing and Functional Programming
Event Sourcing and Functional ProgrammingEvent Sourcing and Functional Programming
Event Sourcing and Functional Programming
 
Circular 8
Circular 8Circular 8
Circular 8
 
Research Lab Trainings
Research Lab TrainingsResearch Lab Trainings
Research Lab Trainings
 
Salmos e hinos 012
Salmos e hinos 012Salmos e hinos 012
Salmos e hinos 012
 
Tauro
Tauro Tauro
Tauro
 
Tecnología Educativa IGY
Tecnología Educativa IGYTecnología Educativa IGY
Tecnología Educativa IGY
 
Polo tierra
Polo tierraPolo tierra
Polo tierra
 
Blessed
BlessedBlessed
Blessed
 
Ficha de inscripción Danzas en el Hall
Ficha de inscripción Danzas en el HallFicha de inscripción Danzas en el Hall
Ficha de inscripción Danzas en el Hall
 
Business analytics and data mining
Business analytics and data miningBusiness analytics and data mining
Business analytics and data mining
 
Geminis
GeminisGeminis
Geminis
 
Sailesh CV-Planning Engineer
Sailesh CV-Planning EngineerSailesh CV-Planning Engineer
Sailesh CV-Planning Engineer
 
Quantum Computation and the Stabilizer Formalism for Error Correction
Quantum Computation and the Stabilizer Formalism for Error CorrectionQuantum Computation and the Stabilizer Formalism for Error Correction
Quantum Computation and the Stabilizer Formalism for Error Correction
 

Semelhante a Venkatesh- planning CV

Venkatesh planning cv
Venkatesh  planning cv Venkatesh  planning cv
Venkatesh planning cv Venkatesh -
 
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...satish kumar
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015Ismail Shaikh
 
Ashwin_Planning Engineer-new
Ashwin_Planning Engineer-newAshwin_Planning Engineer-new
Ashwin_Planning Engineer-newASHWIN VISHAL
 
Planning Engineer Resume-mech
Planning Engineer Resume-mechPlanning Engineer Resume-mech
Planning Engineer Resume-mechMohammed Maqsood
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerSankar Sundaram PMP
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CVkiran kumar Reddy
 
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operationrias ahamed
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 

Semelhante a Venkatesh- planning CV (20)

Venkatesh planning cv
Venkatesh  planning cv Venkatesh  planning cv
Venkatesh planning cv
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Henry CV
Henry CVHenry CV
Henry CV
 
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
Satish Kumar CV- AL FARA'A Group(UAE, SAUDI ARABIA, QATAR, INDIA) (CIVIL Engi...
 
Project Planning & Control Engineer
Project Planning & Control EngineerProject Planning & Control Engineer
Project Planning & Control Engineer
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Ashwin_Planning Engineer-new
Ashwin_Planning Engineer-newAshwin_Planning Engineer-new
Ashwin_Planning Engineer-new
 
Planning Engineer Resume-mech
Planning Engineer Resume-mechPlanning Engineer Resume-mech
Planning Engineer Resume-mech
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
 
my resume sankar 3
my resume sankar 3my resume sankar 3
my resume sankar 3
 
Project Planning Engineer
Project Planning EngineerProject Planning Engineer
Project Planning Engineer
 
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operation
 
C.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._DattaC.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._Datta
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Resume Narenth Natarajan
Resume Narenth NatarajanResume Narenth Natarajan
Resume Narenth Natarajan
 
Mohamed Fazil CV
Mohamed Fazil CVMohamed Fazil CV
Mohamed Fazil CV
 

Venkatesh- planning CV

  • 1. R.S.Venkateshwaran Mob: +965-60974385 E-mail: aaryesvee@gmail.com CAREER OBJECTIVE My main objective is to obtain a professional career with a reputed firm, where I believe the challenging assignments there would definitely require a high level of skills and professionalism, which I have built through several years of working and studying. PROFESSIONAL EXPERIENCE With Dodsal Engineering and Construction Pte Ltd., United Arab Emirates, as Senior Planning Engineer. A well-known EPC contractor in Middle east Performing Oil and Gas projects. Project : New Gathering Center- GC 31, Kuwait PMC/FEED : AMEC Foster Wheeler Client : Kuwait Oil Company (KOC) Duration : Jan’ 2015 to till date Scope of work: The Scope of Work includes detailed Engineering, Procurement, Construction, Commissioning, Training and Assistance to Company for Performance test. With Exterran Belleli Energy Srl., United Arab Emirates, as Planning Engineer. Scope of work: Construction includes Storage tanks, pressure vessels etc. for Oil & gas industries, Refineries, Power Plants, Desalination Plants etc. Project : Fujairah Power Project (56m dia and 20 feet high tanks – 3 nos) Contractor: Acciona Agua Client : Sembcorp Power Company Duration : Apr’ 2014 to Jan’2015 With Aveon Offshore Ltd., Nigeria as Project Planning and Scheduling Engineer. Scope of Work: Leading manufacturers of Subsea Manifolds, X-mas trees, Tubing head frames and subsea controls (HDM&EDM), Suction Piles, Jackets, Spider decks and Heli decks. Project # 1: Shell Bonga North-West project (Subsea Manifolds, X-Trees, Tubing Head, Etc.) Contractor: FMC Technologies Client: Shell Nigeria (SNEPCO) Duration: Feb 2012 to Aug 2013 Project # 2: ERHA North Phase 2 project (Subsea Manifolds, X-Trees, Suction Piles, Etc.) Contractor: Cameroon Offshore Systems Nigeria Ltd. Client: Esso Exploration and Production Nigeria Ltd. Duration: Dec 2012 to Jan 2014
  • 2. R.S.Venkateshwaran Mob: +965-60974385 E-mail: aaryesvee@gmail.com Project # 3: EGINA Subsea Production System(Subsea Manifolds, X-Trees, Suction Piles,Etc.) Contractor: FMC Technologies Client: TOTAL Nigeria Ltd. Duration: Dec 2013 to Mar 2014 With M/s Zamil Steel Industries Ltd., Saudi Arabia, as Planning Engineer. Scope of work: Steel fabrication includes structural, pressure vessels etc. for Oil & gas industries, refineries, power plants etc. Clients: Technip Ltd, Saipem Ltd, Saudi Oger Ltd, Samsung Engg, Hyundai Heavy Industries. Period: Dec’ 2010 to Dec’ 2011 With M/s V3 Power Petro Fabricators Pvt Ltd., India, as Planning Engineer Scope of work: Fabrication of Storage Tanks, Pipe racks, Pressure vessels, Pipe line works, etc., Clients: Nagarjuna Oil Corporation Ltd, Thermo systems Ltd, BGR energy systems Ltd. Period: May 2006 to Nov’ 2010 CORE STRENGTH – PLANNING & COST CONTROL Planning:  In charge of setting up: - Project Calendar - Planning Procedures - Progress Measurement procedures - Reporting procedures - Work Breakdown Structure (WBS) - OBS  In charge of creating the 2 key schedules per project phase: - Procurement Schedule: From Material Requisition till PO Placement.
  • 3. R.S.Venkateshwaran Mob: +965-60974385 E-mail: aaryesvee@gmail.com - Manufacturing Schedule: From Purchase Order Placement till Material receipt.  Discusses the outcome of the above planning in terms of schedules and procedures with the Project Manager and / or Lead Discipline Engineers in order to achieve a final project plan.  Regularly reviews the manpower plan to check compliance with Contract Terms & Conditions;  Incorporates team comments and issues final schedule to Client for approval; Holds discussions with Client representatives over the schedule and incorporates comments into the schedule; Issues the final Implementation Plan.  Participates in the negotiations on project control aspects with Vendors and Contractors; Reviews and comment on Contractors' and Vendors' schedules; Issues revised schedules including corrective actions.  Prepares progress measurement procedures for all phases of the project including determination of weight factors.  Collects and compiles back-up data for project statistics and ratio calculations.  Undertakes project follow-up of progress monitoring, working to update the project schedule with actual input and activity progress; Issues the updated schedule status along with the trend analysis schedule showing forecast dates for group information purposes.  Provides assistance to the Project Manager on project delays, reasons and corrective action suggestions  Sets up and issues the Document Register; Prepares Level 3 List and Document Register using MS Access.  Prepares Planning attachments for Weekly Progress Reports; Issues feedback to Project Managers for onward transmission to client;  Prepares and issues Planning attachments for Monthly Progress Reports. These include: - Updated Project schedule - Updated Document register - Progress Statistics - Progress S - curves covering all phases of the project - Manpower Histograms - Milestones Status Report
  • 4. R.S.Venkateshwaran Mob: +965-60974385 E-mail: aaryesvee@gmail.com - Exceptional reports such as “Activity behind Schedule" or the "Activity Due Plan" for the following week or month.  Prepares a detailed network using project management software (such as Primavera-P6); Ensures the update and maintenance of Planning software applications  Reviews and comments on vendor schedules, as well as progress reports for various purchase orders; Monitors timely execution of such orders closely; Informs the Project Manager in case of delay and suggests corrective actions.  When assigned as a Lead Planning Engineer position, takes charge of preparing the Engineering Document Register and the Procurement Document Register inclusive of all basic overall schedules (Levels 0, 1 and 2) as well as Detailed Schedules (Level 3).  Reviews Construction contractors' schedules and Progress Reports, provides comments and suggests corrective action. Cost Control:  Responsible to control and monitor project total expenditure including verifying and checking of invoices and claims from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly recorded.  Provide planning and cost controlling support for the projects which includes variation reporting, monitoring of milestone progress to the preparation of customer billing processes, etc  Perform technical and commercial review of EPC long time tenders (subcontractor’s quotations) for the preparation of Service agreements  Ensure effective project implementation and utilize productive reports from the creation of WBS with the use of project management system to monitor the status of all purchases, invoicing and delivery up to the closure of the project.  Attend project meetings and discussions with the PMT and external clients  Perform project costing related reporting to the team and management’s review on a monthly basis to ensure that expenditures are kept within the project budget.  Provide cost control and planning advice to the internal PMT team as and when required.
  • 5. R.S.Venkateshwaran Mob: +965-60974385 E-mail: aaryesvee@gmail.com EDUCATIONAL QUALIFICATION B.E – Mechanical Engineering on 2006 Anna University, Tamilnadu, INDIA. SOFTWARE EXPOSURE Operating System : MS Windows Xp , Windows 7 & 8. Packages : MS Office (Word, Excel, Power Point, Access) Application Software’s: MS-Project, Primavera P6 & P3, Oracle & AutoCAD DEVELOPEMENTAL PROGRAMMES ATTENDED  Workshop on communication skills  Workshop on personality development and customer focus  Team-building workshop  Program on ISO systems and procedures PERSONAL DETAILS Date of Birth : 22nd January 1985 Passport No : G 7552907 Marital Status : Single Languages Known : English, Tamil and Telugu Permanent Address : OA/1, Kanakkan Street, Mannargudi, Tamilnadu, India.
  • 6. R.S.Venkateshwaran Mob: +965-60974385 E-mail: aaryesvee@gmail.com EDUCATIONAL QUALIFICATION B.E – Mechanical Engineering on 2006 Anna University, Tamilnadu, INDIA. SOFTWARE EXPOSURE Operating System : MS Windows Xp , Windows 7 & 8. Packages : MS Office (Word, Excel, Power Point, Access) Application Software’s: MS-Project, Primavera P6 & P3, Oracle & AutoCAD DEVELOPEMENTAL PROGRAMMES ATTENDED  Workshop on communication skills  Workshop on personality development and customer focus  Team-building workshop  Program on ISO systems and procedures PERSONAL DETAILS Date of Birth : 22nd January 1985 Passport No : G 7552907 Marital Status : Single Languages Known : English, Tamil and Telugu Permanent Address : OA/1, Kanakkan Street, Mannargudi, Tamilnadu, India.