SlideShare a Scribd company logo
1 of 3
Download to read offline
CURRICULAM VITAE
VIKAS JHANWAR
Mobile No: +91-9530232921
Residence: +91-9950809384
Email: ctovikas@gmail.com
Career Objective:
Seeking a position to utilize my skills and abilities in maintenances & Utility department that
offer professionals growth while being resourceful, innovative and flexible for effective
plant maintenances.
Academic Qualification:
 B.Tech (Mechanical) from Rajasthan Technical University, Kota in 2014 with Honours.
 Sen. Secondary from Rajasthan board of secondary Education, Ajmer in 2008 first division.
Work Experiences:
 Current Industry : RSWM Limited (Ringas).
 Current Functional Area: Plant Maintenances/Equipments repairs/utility.
 Current Designation : Mechanical Engineer.
 I currently working as (Mechanical Engineer) RSWM LIMITED, Ringas is LNJ Bhilwara group
established in Nov 2014 New Plastic Industry Erection Plant.
 Responsible for breakdown and preventive maintenances of mechanical rotating and static
equipments which are as follows-
 Single and double air compressor.
 Blower and cooling Tower.
 Storage tanks for various chemicals and pressure vessels and dryers, all Gear box, Bearing.
 Inspection of new equipments for project related job as per for plant modification.
 Generating preventive, breakdown material usage of individual plant report regularly and
submission to head.
 Responsible for cheeking measurement and keeping billing record in ms excel format for
respective organization.
 Responsible for carrying out predictive maintenances of rotating machines such as pump
motor, blowers, fans and gear, Chillers, AHU, compressors and dryer, Receiver tank.
 Performed routine maintenances inspection of equipments to identify and respond to
problem in a timely manner, thus preventive breakdown.
Key skills:
 Performed routine maintenances inspection of equipments to identify and respond to
problem in a timely manner.
 Exceptional problem solving and analytical abilities.
 Directed storage of equipments and assured safety measurements were followed.
Worked as Project engineer:
 Generation of optimised layout options for various engine configurations for the projects,
including the information regarding the area required and quantity of utilities & equipments .
 Reviewing PFDs (Process Flow Diagram), P&IDs (Piping & Instrumentation Diagram) and
Isometrics.
 Involved in the CAPEX (capital expenditure) estimation with various configurations of Aux
Boilers and other Balance of plant equipments.
 Prepared various project documents PEP (Project Execution Plan), RFP (Request for Proposal)
for the DEC work, and TBE (Technical Bid Evaluation) reports of vendors.
 Worked on ERP for the creation of MR (Material Requisition) of the major equipments of
cogeneration power plant & Service entry for the material required in projects.
 Reviewing the DBRs (Design Basis Reports) submitted by the DEC (Detailed Engineering
Consultants) and preparation of Equipment numbering as per project engineering Procedures.
 Prepared Technical BID evaluation report for the RSWM ltd Ringas.
 Erection of various Equipments like Heat Exchanger, Vessel, and Column.
 Knowledge of GA Drawing and Data Sheet of Equipments.
 Knowledge of P&ID.
 Supporting & Alignment of spools.
 Alignment of high rating Flanges.
 Hydro and Pneumatic testing of pipe lines.
 Involved in piping activities from Erection, ISO clearance, Mechanical clearance, and Hydro /
Pneumatic test to Box Up alignment tolerance activities.
Software proficiency:
 Mechanical cad Design Auto Cad, Proe’s Engineering Certified by CADD CENTER, AJMER.
 Microsoft office suite skills.
Strength:
 Flexible, industrious, patience and dedicated person.
 Experiences of working in a team (New Erection Plant project Rswm Limited).
 Self motivated, energetic and good talking skills.
 Responsible in troubleshooting problem for machine.
Personal interest:
 Surfing on internet.
 Watching video for latest technology.
Personal Profile:
Name : Vikas Jhanwar
Date of Birth : 22/09/1991
Language Known : English, Hindi
Father Name : Mr. Subhash Jhanwar
Permanent Add : Khatiyo ka Mohlla
Village –Kanpura, Via-Shrinagar
Distt- Ajmer (Rajasthan)
Pin-305025.
Declaration:
I hereby declare that all the details furnished here are true to the best of my knowledge.
VIKAS JHANWAR

More Related Content

What's hot (20)

Tech.Eng PE CV 2015
Tech.Eng PE CV 2015Tech.Eng PE CV 2015
Tech.Eng PE CV 2015
 
Karthick mm
Karthick  mmKarthick  mm
Karthick mm
 
tausif alam resume
tausif alam resumetausif alam resume
tausif alam resume
 
Ali Raza CV(Final)
Ali Raza CV(Final)Ali Raza CV(Final)
Ali Raza CV(Final)
 
RAVI CV
RAVI CVRAVI CV
RAVI CV
 
Resume with cover latter pdf
Resume with cover latter pdfResume with cover latter pdf
Resume with cover latter pdf
 
CV of Planning Engineer-15
CV of Planning Engineer-15CV of Planning Engineer-15
CV of Planning Engineer-15
 
Umesh_BE_mechanical with experience in metal industry project,operation & mai...
Umesh_BE_mechanical with experience in metal industry project,operation & mai...Umesh_BE_mechanical with experience in metal industry project,operation & mai...
Umesh_BE_mechanical with experience in metal industry project,operation & mai...
 
jeff hayner resume[1]
jeff hayner resume[1]jeff hayner resume[1]
jeff hayner resume[1]
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
MANISH KUMAR- UPDATE RESUME (1) (1)
MANISH KUMAR- UPDATE RESUME (1) (1)MANISH KUMAR- UPDATE RESUME (1) (1)
MANISH KUMAR- UPDATE RESUME (1) (1)
 
updated habeeb cv
updated habeeb cvupdated habeeb cv
updated habeeb cv
 
E jacques cosp resume
E jacques cosp resumeE jacques cosp resume
E jacques cosp resume
 
MAINTENANCE MANAGER
MAINTENANCE MANAGERMAINTENANCE MANAGER
MAINTENANCE MANAGER
 
Dale_Savoy Resume 2014
Dale_Savoy Resume 2014Dale_Savoy Resume 2014
Dale_Savoy Resume 2014
 
Arturo Final Resume
Arturo Final ResumeArturo Final Resume
Arturo Final Resume
 
gk-cv
gk-cvgk-cv
gk-cv
 
Resume
ResumeResume
Resume
 
andreh cv new1
andreh cv new1andreh cv new1
andreh cv new1
 
Curriculum Vitae, Ashraf Gharieb to ahmed omar
Curriculum Vitae, Ashraf Gharieb to ahmed omarCurriculum Vitae, Ashraf Gharieb to ahmed omar
Curriculum Vitae, Ashraf Gharieb to ahmed omar
 

Viewers also liked

R. Panton- Child Welfare (June 2015)
R. Panton- Child Welfare (June 2015)R. Panton- Child Welfare (June 2015)
R. Panton- Child Welfare (June 2015)Rebecca Panton
 
Surviving the Regulatory HR Minefield
Surviving the Regulatory HR MinefieldSurviving the Regulatory HR Minefield
Surviving the Regulatory HR MinefieldG&A Partners
 
Diseño de bienes y servivios
Diseño de bienes y serviviosDiseño de bienes y servivios
Diseño de bienes y serviviostefita vega
 
News - TWU News - Texas Woman's for Women in Business - Inaugural Class MS
News - TWU News - Texas Woman's for Women in Business - Inaugural Class MSNews - TWU News - Texas Woman's for Women in Business - Inaugural Class MS
News - TWU News - Texas Woman's for Women in Business - Inaugural Class MSNancy J. Hong nancy.hong@unt.edu
 
Articolo Manifesto Ala di riserva
Articolo Manifesto Ala di riservaArticolo Manifesto Ala di riserva
Articolo Manifesto Ala di riservaMichele Lobaccaro
 
스마트한 수업
스마트한 수업스마트한 수업
스마트한 수업yaromyarom
 
Brochure retail certificate training - Retail Certificate training
Brochure retail certificate training - Retail Certificate trainingBrochure retail certificate training - Retail Certificate training
Brochure retail certificate training - Retail Certificate trainingMagne Consulting
 
Trends and forecasting
Trends and forecastingTrends and forecasting
Trends and forecastingAnjali Savla
 
How to win by Mirza Yawar Baig
How to win by Mirza Yawar BaigHow to win by Mirza Yawar Baig
How to win by Mirza Yawar BaigMirza Yawar Baig
 
Marks & Spencer - Research & Guidelines
Marks & Spencer - Research & GuidelinesMarks & Spencer - Research & Guidelines
Marks & Spencer - Research & GuidelinesGeert
 
Challenges of decision making by Mirza Yawar Baig
Challenges of decision making by Mirza Yawar BaigChallenges of decision making by Mirza Yawar Baig
Challenges of decision making by Mirza Yawar BaigMirza Yawar Baig
 
Marks and spencers
Marks and spencersMarks and spencers
Marks and spencersRajan Mithra
 
Demand Management of Knitwear Industry in Changing World
Demand Management of Knitwear Industry in Changing WorldDemand Management of Knitwear Industry in Changing World
Demand Management of Knitwear Industry in Changing WorldSutanu Kundu
 
Marks & spencers retail
Marks & spencers retailMarks & spencers retail
Marks & spencers retailMVIT
 

Viewers also liked (19)

R. Panton- Child Welfare (June 2015)
R. Panton- Child Welfare (June 2015)R. Panton- Child Welfare (June 2015)
R. Panton- Child Welfare (June 2015)
 
IV Jornadas mesa de prostitución y trata
IV Jornadas mesa de prostitución y trata IV Jornadas mesa de prostitución y trata
IV Jornadas mesa de prostitución y trata
 
Surviving the Regulatory HR Minefield
Surviving the Regulatory HR MinefieldSurviving the Regulatory HR Minefield
Surviving the Regulatory HR Minefield
 
Diseño de bienes y servivios
Diseño de bienes y serviviosDiseño de bienes y servivios
Diseño de bienes y servivios
 
Comparative david g.pptx
Comparative david g.pptxComparative david g.pptx
Comparative david g.pptx
 
News - TWU News - Texas Woman's for Women in Business - Inaugural Class MS
News - TWU News - Texas Woman's for Women in Business - Inaugural Class MSNews - TWU News - Texas Woman's for Women in Business - Inaugural Class MS
News - TWU News - Texas Woman's for Women in Business - Inaugural Class MS
 
Articolo Manifesto Ala di riserva
Articolo Manifesto Ala di riservaArticolo Manifesto Ala di riserva
Articolo Manifesto Ala di riserva
 
스마트한 수업
스마트한 수업스마트한 수업
스마트한 수업
 
Convenio automocion2013-14-malaga
Convenio automocion2013-14-malagaConvenio automocion2013-14-malaga
Convenio automocion2013-14-malaga
 
Brochure retail certificate training - Retail Certificate training
Brochure retail certificate training - Retail Certificate trainingBrochure retail certificate training - Retail Certificate training
Brochure retail certificate training - Retail Certificate training
 
Trends and forecasting
Trends and forecastingTrends and forecasting
Trends and forecasting
 
5 6
5 65 6
5 6
 
How to win by Mirza Yawar Baig
How to win by Mirza Yawar BaigHow to win by Mirza Yawar Baig
How to win by Mirza Yawar Baig
 
Marks & Spencer - Research & Guidelines
Marks & Spencer - Research & GuidelinesMarks & Spencer - Research & Guidelines
Marks & Spencer - Research & Guidelines
 
Challenges of decision making by Mirza Yawar Baig
Challenges of decision making by Mirza Yawar BaigChallenges of decision making by Mirza Yawar Baig
Challenges of decision making by Mirza Yawar Baig
 
Marks and spencers
Marks and spencersMarks and spencers
Marks and spencers
 
Trend Forecasting
Trend ForecastingTrend Forecasting
Trend Forecasting
 
Demand Management of Knitwear Industry in Changing World
Demand Management of Knitwear Industry in Changing WorldDemand Management of Knitwear Industry in Changing World
Demand Management of Knitwear Industry in Changing World
 
Marks & spencers retail
Marks & spencers retailMarks & spencers retail
Marks & spencers retail
 

Similar to CURRICULAM_VITAE (1)

Similar to CURRICULAM_VITAE (1) (20)

Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
Abhishek
AbhishekAbhishek
Abhishek
 
javed
javedjaved
javed
 
RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA
 
Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.
 
MS Suresh -Jun-16
MS Suresh -Jun-16MS Suresh -Jun-16
MS Suresh -Jun-16
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
0 b a levine mfg qc eng resume
0 b a levine mfg   qc eng resume0 b a levine mfg   qc eng resume
0 b a levine mfg qc eng resume
 
Rotating Equipment Engineer
Rotating Equipment  EngineerRotating Equipment  Engineer
Rotating Equipment Engineer
 
Hedayatullah CV
Hedayatullah CVHedayatullah CV
Hedayatullah CV
 
Omar mohamed 's cv
Omar mohamed 's cvOmar mohamed 's cv
Omar mohamed 's cv
 
Abubacker Maheen
Abubacker MaheenAbubacker Maheen
Abubacker Maheen
 
Giri Rao CV-Mech Design engineer
Giri Rao CV-Mech Design engineerGiri Rao CV-Mech Design engineer
Giri Rao CV-Mech Design engineer
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CV
 
Sr. Estimation engineer
Sr. Estimation engineerSr. Estimation engineer
Sr. Estimation engineer
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
Vijayendra CV
Vijayendra CVVijayendra CV
Vijayendra CV
 
Jeffrey Selorm Dzata_Mechanical Engineer
Jeffrey Selorm Dzata_Mechanical Engineer Jeffrey Selorm Dzata_Mechanical Engineer
Jeffrey Selorm Dzata_Mechanical Engineer
 
Resume
Resume Resume
Resume
 

CURRICULAM_VITAE (1)

  • 1. CURRICULAM VITAE VIKAS JHANWAR Mobile No: +91-9530232921 Residence: +91-9950809384 Email: ctovikas@gmail.com Career Objective: Seeking a position to utilize my skills and abilities in maintenances & Utility department that offer professionals growth while being resourceful, innovative and flexible for effective plant maintenances. Academic Qualification:  B.Tech (Mechanical) from Rajasthan Technical University, Kota in 2014 with Honours.  Sen. Secondary from Rajasthan board of secondary Education, Ajmer in 2008 first division. Work Experiences:  Current Industry : RSWM Limited (Ringas).  Current Functional Area: Plant Maintenances/Equipments repairs/utility.  Current Designation : Mechanical Engineer.  I currently working as (Mechanical Engineer) RSWM LIMITED, Ringas is LNJ Bhilwara group established in Nov 2014 New Plastic Industry Erection Plant.  Responsible for breakdown and preventive maintenances of mechanical rotating and static equipments which are as follows-  Single and double air compressor.  Blower and cooling Tower.  Storage tanks for various chemicals and pressure vessels and dryers, all Gear box, Bearing.  Inspection of new equipments for project related job as per for plant modification.  Generating preventive, breakdown material usage of individual plant report regularly and submission to head.  Responsible for cheeking measurement and keeping billing record in ms excel format for respective organization.  Responsible for carrying out predictive maintenances of rotating machines such as pump motor, blowers, fans and gear, Chillers, AHU, compressors and dryer, Receiver tank.  Performed routine maintenances inspection of equipments to identify and respond to problem in a timely manner, thus preventive breakdown.
  • 2. Key skills:  Performed routine maintenances inspection of equipments to identify and respond to problem in a timely manner.  Exceptional problem solving and analytical abilities.  Directed storage of equipments and assured safety measurements were followed. Worked as Project engineer:  Generation of optimised layout options for various engine configurations for the projects, including the information regarding the area required and quantity of utilities & equipments .  Reviewing PFDs (Process Flow Diagram), P&IDs (Piping & Instrumentation Diagram) and Isometrics.  Involved in the CAPEX (capital expenditure) estimation with various configurations of Aux Boilers and other Balance of plant equipments.  Prepared various project documents PEP (Project Execution Plan), RFP (Request for Proposal) for the DEC work, and TBE (Technical Bid Evaluation) reports of vendors.  Worked on ERP for the creation of MR (Material Requisition) of the major equipments of cogeneration power plant & Service entry for the material required in projects.  Reviewing the DBRs (Design Basis Reports) submitted by the DEC (Detailed Engineering Consultants) and preparation of Equipment numbering as per project engineering Procedures.  Prepared Technical BID evaluation report for the RSWM ltd Ringas.  Erection of various Equipments like Heat Exchanger, Vessel, and Column.  Knowledge of GA Drawing and Data Sheet of Equipments.  Knowledge of P&ID.  Supporting & Alignment of spools.  Alignment of high rating Flanges.  Hydro and Pneumatic testing of pipe lines.  Involved in piping activities from Erection, ISO clearance, Mechanical clearance, and Hydro / Pneumatic test to Box Up alignment tolerance activities. Software proficiency:  Mechanical cad Design Auto Cad, Proe’s Engineering Certified by CADD CENTER, AJMER.  Microsoft office suite skills.
  • 3. Strength:  Flexible, industrious, patience and dedicated person.  Experiences of working in a team (New Erection Plant project Rswm Limited).  Self motivated, energetic and good talking skills.  Responsible in troubleshooting problem for machine. Personal interest:  Surfing on internet.  Watching video for latest technology. Personal Profile: Name : Vikas Jhanwar Date of Birth : 22/09/1991 Language Known : English, Hindi Father Name : Mr. Subhash Jhanwar Permanent Add : Khatiyo ka Mohlla Village –Kanpura, Via-Shrinagar Distt- Ajmer (Rajasthan) Pin-305025. Declaration: I hereby declare that all the details furnished here are true to the best of my knowledge. VIKAS JHANWAR