Company
 Name: Extrusa de
Colombia S.A.
 Locations: Via Mamonal,
Km 11. Cartagena,
Colombia.
 Industry: Plastic films
 ERP System: Oracle
PeopleSoft
 Database: SQL Server
 Website: www.ajover.com
CASE STUDY - At a glance
Objectives
 Minimise trim waste through trim
optimisation.
 Extrusa de Colombia S.A. primary goal
was to achieve an average waste of 15
%.
 Reduce orders programming time.
 Automate trim process.
 Standardise processes.
 Improve order combination
management.
Key Challenges
 The machines parameters in X-Trim
should match the reality of the plant.
 The machine operators must be able to
understand the trim solution in a
simple way.
Implemented Solutions
 X-Trim (Base Module + Rewinding
Algorithm).
 X-Trim was configured to consider the
machines from the plant, ensuring that
the generated solution corresponds to
the actual production process by
stages.
 Planners were trained to be able to
easily change parameters (default and
by run) depending on the current
reality of the plant (new technologies
development, purchase of new
machines, etc.).
 A report was designed to match the
format of production plans that are
handled in the shop-floor. This brings
the possibility to have a simple to
understand output for the machine
operators .
Specialists in optimised production planning & scheduling
“The implemented solu-
tion has allowed, in
short-time, that pro-
gramming engineers
have the necessary tool
to ensure the best possi-
ble solution. The results
speak for themselves in
terms of saving time in
scheduling process and
reducing scrap.”
Javier Julio
Planning Manager
Key Benefits
 Scrap reduction:
Using X-Trim Extrusa de Colombia S.A.
was able to reduce scrap from 23% to an
average of 13%, improving the quantity
of finished product.
 More efficient machines:
Operator productivity due to the
reduction of knife changes:
approximately 50%. As a consequence,
Extrusa de Colombia S.A. had the
opportunity to increase their production
throughput, without changing the
machines.
 Less programming time:
X-Trim iteration allows the planners to
get many alternative solutions in just
seconds.
 Stock improvements:
The possibility to manage standard sizes
for their side reels, instead of producing
any additional width is a plus in the
process and allows Extrusa de
Colombia S.A. to align their stock with
the market.
Payback
The solution was implemented in 1.5
month. After its go-live, the ROI
(Return on Investment) was of two
months.
Copyright 2002-2009 Greycon Ltd. Registered in England No. 1861647. Registered office at 7 Calico House, Plantation Wharf, York Road, Battersea, London
SW11 3TN. VAT Registration No. 422 3242 00.
Last Update 14 August 2012www.greycon.com
“The services provided by
Greycon were complete,
since they begin to ex-
plain how X-Trim works
until it started to run
completely in the plant.
We are very grateful for
having always the sup-
port required, especially
in the complex cases
that were found in the
initial settings.”
Javier Julio
Planning Manager

More Related Content

Viewers also liked

Viewers also liked (16)

студия ручеек
студия ручеекстудия ручеек
студия ручеек
 
4.1 slideshare 2
4.1 slideshare 24.1 slideshare 2
4.1 slideshare 2
 
Presentación1
Presentación1Presentación1
Presentación1
 
Bruno & marta
Bruno & martaBruno & marta
Bruno & marta
 
Maria i guim
Maria  i guimMaria  i guim
Maria i guim
 
Trabajo practico n3
Trabajo practico n3Trabajo practico n3
Trabajo practico n3
 
Caverna Do Dragão Último Capítulo
Caverna Do  Dragão Último  CapítuloCaverna Do  Dragão Último  Capítulo
Caverna Do Dragão Último Capítulo
 
Presentación n°1
Presentación n°1Presentación n°1
Presentación n°1
 
Pasandola rico mayo 9 de 2012
Pasandola rico mayo 9 de 2012Pasandola rico mayo 9 de 2012
Pasandola rico mayo 9 de 2012
 
Como Ganar Almas 2007
Como Ganar Almas  2007Como Ganar Almas  2007
Como Ganar Almas 2007
 
Special resolution proposed by member
Special resolution proposed by member Special resolution proposed by member
Special resolution proposed by member
 
Stefnan sett á samfélagsmiðla
Stefnan sett á samfélagsmiðlaStefnan sett á samfélagsmiðla
Stefnan sett á samfélagsmiðla
 
OpenERP for Hologram Industry
OpenERP for Hologram IndustryOpenERP for Hologram Industry
OpenERP for Hologram Industry
 
Prueba corta 2
Prueba corta 2Prueba corta 2
Prueba corta 2
 
Creating the Ultimate Experience: UX + CX + CRM
Creating the Ultimate Experience: UX + CX + CRMCreating the Ultimate Experience: UX + CX + CRM
Creating the Ultimate Experience: UX + CX + CRM
 
Dahiana grisales
Dahiana grisalesDahiana grisales
Dahiana grisales
 

Similar to Greycon Case Study - AJOVER X-Trim

Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)pratik negi
 
GregorySusa-Portfolio
GregorySusa-PortfolioGregorySusa-Portfolio
GregorySusa-PortfolioGregory Susa
 
Danone-a practitioner approach to packaging line productivity by Mathieu Lora...
Danone-a practitioner approach to packaging line productivity by Mathieu Lora...Danone-a practitioner approach to packaging line productivity by Mathieu Lora...
Danone-a practitioner approach to packaging line productivity by Mathieu Lora...Monique Watkins
 
Business Optimizer Introduction
Business Optimizer IntroductionBusiness Optimizer Introduction
Business Optimizer IntroductionDonato Marrazzo
 
Lesson 9 use of technology
Lesson 9   use of technologyLesson 9   use of technology
Lesson 9 use of technologycoburgpsych
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)Ashima Kandari
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS Julian Kalac P.Eng
 
KingGregory_ExpandedResume 20160808
KingGregory_ExpandedResume 20160808KingGregory_ExpandedResume 20160808
KingGregory_ExpandedResume 20160808Gregory King II
 
License plate: The Ultimate Strategy For Beginners And Intermediates
License plate: The Ultimate Strategy For Beginners And IntermediatesLicense plate: The Ultimate Strategy For Beginners And Intermediates
License plate: The Ultimate Strategy For Beginners And Intermediatesfuwong
 
License Plate The Ultimate Strategy For Beginners And Intermediates
License Plate The Ultimate Strategy For Beginners And IntermediatesLicense Plate The Ultimate Strategy For Beginners And Intermediates
License Plate The Ultimate Strategy For Beginners And IntermediatesJenny Fu
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and BoeingMutunga David
 
TOYOTA PRODUCTION SYSTEM
TOYOTA PRODUCTION SYSTEMTOYOTA PRODUCTION SYSTEM
TOYOTA PRODUCTION SYSTEMEnamul Khan
 

Similar to Greycon Case Study - AJOVER X-Trim (20)

Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)
 
GregorySusa-Portfolio
GregorySusa-PortfolioGregorySusa-Portfolio
GregorySusa-Portfolio
 
Danone-a practitioner approach to packaging line productivity by Mathieu Lora...
Danone-a practitioner approach to packaging line productivity by Mathieu Lora...Danone-a practitioner approach to packaging line productivity by Mathieu Lora...
Danone-a practitioner approach to packaging line productivity by Mathieu Lora...
 
Business Optimizer Introduction
Business Optimizer IntroductionBusiness Optimizer Introduction
Business Optimizer Introduction
 
Creative Engineering
Creative EngineeringCreative Engineering
Creative Engineering
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
EXALEAD OnePart Reuse Booklet
EXALEAD OnePart Reuse BookletEXALEAD OnePart Reuse Booklet
EXALEAD OnePart Reuse Booklet
 
Caso de Sucesso da Magna Steyr
Caso de Sucesso da Magna Steyr Caso de Sucesso da Magna Steyr
Caso de Sucesso da Magna Steyr
 
Lesson 9 use of technology
Lesson 9   use of technologyLesson 9   use of technology
Lesson 9 use of technology
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
KingGregory_ExpandedResume 20160808
KingGregory_ExpandedResume 20160808KingGregory_ExpandedResume 20160808
KingGregory_ExpandedResume 20160808
 
License plate: The Ultimate Strategy For Beginners And Intermediates
License plate: The Ultimate Strategy For Beginners And IntermediatesLicense plate: The Ultimate Strategy For Beginners And Intermediates
License plate: The Ultimate Strategy For Beginners And Intermediates
 
License Plate The Ultimate Strategy For Beginners And Intermediates
License Plate The Ultimate Strategy For Beginners And IntermediatesLicense Plate The Ultimate Strategy For Beginners And Intermediates
License Plate The Ultimate Strategy For Beginners And Intermediates
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and Boeing
 
TOYOTA PRODUCTION SYSTEM
TOYOTA PRODUCTION SYSTEMTOYOTA PRODUCTION SYSTEM
TOYOTA PRODUCTION SYSTEM
 
JIT Brochure Pages
JIT Brochure PagesJIT Brochure Pages
JIT Brochure Pages
 
Lean production toyota production system
Lean production toyota production systemLean production toyota production system
Lean production toyota production system
 
12. jit in toyota production system pgp
12. jit in toyota production system pgp12. jit in toyota production system pgp
12. jit in toyota production system pgp
 
Thango at Iceb 3rd Oct 2011
Thango at Iceb 3rd Oct 2011Thango at Iceb 3rd Oct 2011
Thango at Iceb 3rd Oct 2011
 

Greycon Case Study - AJOVER X-Trim

  • 1. Company  Name: Extrusa de Colombia S.A.  Locations: Via Mamonal, Km 11. Cartagena, Colombia.  Industry: Plastic films  ERP System: Oracle PeopleSoft  Database: SQL Server  Website: www.ajover.com CASE STUDY - At a glance Objectives  Minimise trim waste through trim optimisation.  Extrusa de Colombia S.A. primary goal was to achieve an average waste of 15 %.  Reduce orders programming time.  Automate trim process.  Standardise processes.  Improve order combination management. Key Challenges  The machines parameters in X-Trim should match the reality of the plant.  The machine operators must be able to understand the trim solution in a simple way. Implemented Solutions  X-Trim (Base Module + Rewinding Algorithm).  X-Trim was configured to consider the machines from the plant, ensuring that the generated solution corresponds to the actual production process by stages.  Planners were trained to be able to easily change parameters (default and by run) depending on the current reality of the plant (new technologies development, purchase of new machines, etc.).  A report was designed to match the format of production plans that are handled in the shop-floor. This brings the possibility to have a simple to understand output for the machine operators . Specialists in optimised production planning & scheduling “The implemented solu- tion has allowed, in short-time, that pro- gramming engineers have the necessary tool to ensure the best possi- ble solution. The results speak for themselves in terms of saving time in scheduling process and reducing scrap.” Javier Julio Planning Manager
  • 2. Key Benefits  Scrap reduction: Using X-Trim Extrusa de Colombia S.A. was able to reduce scrap from 23% to an average of 13%, improving the quantity of finished product.  More efficient machines: Operator productivity due to the reduction of knife changes: approximately 50%. As a consequence, Extrusa de Colombia S.A. had the opportunity to increase their production throughput, without changing the machines.  Less programming time: X-Trim iteration allows the planners to get many alternative solutions in just seconds.  Stock improvements: The possibility to manage standard sizes for their side reels, instead of producing any additional width is a plus in the process and allows Extrusa de Colombia S.A. to align their stock with the market. Payback The solution was implemented in 1.5 month. After its go-live, the ROI (Return on Investment) was of two months. Copyright 2002-2009 Greycon Ltd. Registered in England No. 1861647. Registered office at 7 Calico House, Plantation Wharf, York Road, Battersea, London SW11 3TN. VAT Registration No. 422 3242 00. Last Update 14 August 2012www.greycon.com “The services provided by Greycon were complete, since they begin to ex- plain how X-Trim works until it started to run completely in the plant. We are very grateful for having always the sup- port required, especially in the complex cases that were found in the initial settings.” Javier Julio Planning Manager