Island of Eigg
Green Island in Miniature
Lynda Mitchell, ALIenergy

Scotland has about 90 inhabited islands, mostly to the west and to the north of the
mainland. Oban, where I live on the west coast of the mainland, serves as the ferry
port for transport to many of the western islands.
All the Scottish islands have their own unique character. Island communities are
often isolated and are therefore have a strong sense of identity, and are naturally
inclined to self-sufficiency. Many of the islands have abundant natural resources for
renewable energy generation and there are plenty of examples of community
owned projects, particularly wind turbines.
Eigg is a small island of about 3000 hectares (12 square km), with a resident
population of about 100 people which doubles in summer due to visitors.
The landscape is very rural: scattered houses with a number of community buildings
and small businesses.
This island is now owned by the residents: after decades of problems with absent
landlords, the island was bought out in 1997 by the newly formed Isle of Eigg
Heritage Trust, a partnership between the residents of Eigg, the Highland Council,
and the Scottish Wildlife Trust.
This was achieved largely due to the generosity of around ten thousand members of
the general public who believed in the issue of land ownership reform in Scotland.
Gaining control of the islandā€™s assets through its successful campaign for community
ownership was the first step for Eigg.
One of the next main challenges for the community was that this island does not
have a connection to the mainland electricity grid - and there was no prospect of
ever being given one from the privatised utility companies.
Instead, individual homes mostly relied on diesel generators for domestic electricity.
This situation acted as a huge incentive to look at better alternatives.
It took a few years for the islanders to go through the process of comparing the cost
of connecting their island to the UK national electricity grid and the cost of setting
up their own renewable electricity mini grid.
It would have cost Ā£5 million for a 12 mile undersea grid connection to the mainland,
so the islanders began to consider an innovative standalone Ā£1.6 million system
which combined wind, sun and hydro power to make the island self-sufficient in
energy.
So, the next major project of the Heritage Trust was to enable the provision of
a miniature mains electricity grid, powered from renewable sources, to develop an
electricity supply that would be environmentally and economically sustainable.
After the year 2000, with the development of the renewable energy sector and an
improved funding landscape both at home in Scotland and in the EU, the choice was
obvious: Eigg had to go for the renewable option!
The Isle of Eigg Heritage Trust formed a subsidiary trading company, Eigg Electric
Ltd, to organise and operate the new network.
The project was designed and built by contractors Scottish Hydro Contracting with
subcontractors E-Connect Ventures Ltd, Wind and Sun Ltd, Energy Renewed Ltd,
G.G. MacKenzie Contractors Ltd, project managers Synergie Scotland Ltd and the
voluntary contributions of many islanders.
Eigg Electric is in charge of maintaining, servicing and repairing the grid and
administering the prepayment scheme via card meters.
The new renewable energy network consists mainly of hydro power (112kW) plus
some wind power (24kW) and solar PV (initially 10kW; and a further 20kW later
added and more planned).
There is also a bank of rechargeable batteries equivalent to 24hrs of electricity
demand, and also two back up diesel generators (each 80kW), however these are
rarely required.
The system was switched on with much celebration on 1st Feb 2008 - a world leader
in the integration of multiple renewable energy resources into a high voltage grid
system (with 11km of buried cable) to supply an isolated and scattered small island
community.
This project has been conceived and driven by the enthusiasm of the whole
community and is the culmination of 10 years of action and achievement since the
purchase of the island.
The islanders are generally very careful with their electricity use, and achieve an
average domestic electricity use of just half the national average. Each building is
equipped with an electricity monitor to show consumption.
Eigg Electric generates a finite amount of energy and so Eigg residents agreed from
the outset to cap electricity use at 5 kW at any one time for households, with up to
10 kW available for businesses.
Residents paid towards installation, Ā£500 per 5kW connection or Ā£1,000 per 10kW
connection. If these limits are ever exceeded (which happens very rarely) the
electricity will cut off and there is a Ā£20 reconnection charge.
If renewable resources are low, for example in summer when there is less rain and
wind, but more people on the island, an innovative ā€œtraffic lightā€ system asks
residents to keep their usage to a minimum. A ā€˜green lightā€™ means all is normal. A
ā€˜red lightā€™ alerts people to be extra careful at times of shortage and can reduce
demand by up to 20% and this ensures that there is nearly always enough
renewable energy for everyone.
At times when renewable resources are very high, when there is lots of sun, wind
and rain, the batteries are full and thereā€™s excess electricity, then excess power is
diverted to heaters in the community buildings such as the community hall and
church. A pilot projects is underway involving trial of electric vehicles, which can also
act as electric storage batteries.
In 2010, Eigg was announced as one of three joint winners in a national competition,
NESTA's Big Green Challenge, winning a prize of Ā£300,000. This money is helping to
enable further improvements on the island.
Insulation, solar hot water panels, more PV to meet summer demand, transport
(bikes, car sharing and pilot electric car) and local food production are all being
addressed.
The prize money has allowed a 50% grant for a range of domestic carbon reduction
measures and has of course, created a great feeling of pride in achievement. Island
population is rising, as are local businesses and the numbers of summer visitors ecotourists.
Future work will include developing better management of wood fuel resources for
heating; and the islanders are hoping for a pilot tidal generator project to be
developed with an academic partner.
Overall the island has already achieved almost 100% renewable electricity (and is
expected to achieve 100% with the installation of the next phase of PV) and has cut
carbon emissions by about half so far.
The islanders will continue to work towards a 100% renewable energy and carbon
neutral future.
Further information:
http://www.isleofeigg.net
http://www.ashden.org/files/reports/Isle%20of%20Eigg%20case%20study.pdf
http://www.youtube.com/watch?v=T7HggVRrE58
http://www.youtube.com/watch?v=HMCgSf-QSKo
http://www.ashden.org/winners/Eigg10

This project was funded by: European Regional Development Fund, Big Lottery, Highlands & Islands Enterprise, HIE
Lochaber, Highlands and Islands Community Energy Company, Scottish Community Household Renewables Initiative,
Energy Saving Trust, Highland Council, Isle of Eigg Heritage Trust & the Residents of the Isle of Eigg.

More Related Content

More from UNDPhr

UNDP_Energy Audits_2015
UNDP_Energy Audits_2015UNDP_Energy Audits_2015
UNDP_Energy Audits_2015UNDPhr
Ā 
Energetski plan Nacionalnog parka Plitvička jezera_REGEA
Energetski plan Nacionalnog parka Plitvička jezera_REGEAEnergetski plan Nacionalnog parka Plitvička jezera_REGEA
Energetski plan Nacionalnog parka Plitvička jezera_REGEAUNDPhr
Ā 
Nacionalno koordinacijsko tijelo za energetsku učinkovitost
Nacionalno koordinacijsko tijelo za energetsku učinkovitostNacionalno koordinacijsko tijelo za energetsku učinkovitost
Nacionalno koordinacijsko tijelo za energetsku učinkovitostUNDPhr
Ā 
HEP - Current status and perspectives of ESCO projects in Croatia
HEP - Current status and   perspectives of ESCO projects in CroatiaHEP - Current status and   perspectives of ESCO projects in Croatia
HEP - Current status and perspectives of ESCO projects in CroatiaUNDPhr
Ā 
ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND
ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUNDENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND
ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUNDUNDPhr
Ā 
Energy Insitute Hrvoje Pozar
Energy Insitute Hrvoje PozarEnergy Insitute Hrvoje Pozar
Energy Insitute Hrvoje PozarUNDPhr
Ā 
APN_EMIS_Funcionalities_07_2015
APN_EMIS_Funcionalities_07_2015APN_EMIS_Funcionalities_07_2015
APN_EMIS_Funcionalities_07_2015UNDPhr
Ā 
Projektni paket - Ličko-senjska županija
Projektni paket - Ličko-senjska županijaProjektni paket - Ličko-senjska županija
Projektni paket - Ličko-senjska županijaUNDPhr
Ā 
Projektni paket - Sisačko-moslavačka županija
Projektni paket - Sisačko-moslavačka županijaProjektni paket - Sisačko-moslavačka županija
Projektni paket - Sisačko-moslavačka županijaUNDPhr
Ā 
Projektni paket - Karlovačka zupanija
Projektni paket  - Karlovačka zupanijaProjektni paket  - Karlovačka zupanija
Projektni paket - Karlovačka zupanijaUNDPhr
Ā 
StrateŔke smjernice - Sisačko-moslavačka županija
StrateŔke smjernice - Sisačko-moslavačka županijaStrateŔke smjernice - Sisačko-moslavačka županija
StrateŔke smjernice - Sisačko-moslavačka županijaUNDPhr
Ā 
StrateŔke smjernice - Ličko-senjska županija
StrateŔke smjernice - Ličko-senjska županijaStrateŔke smjernice - Ličko-senjska županija
StrateŔke smjernice - Ličko-senjska županijaUNDPhr
Ā 
StrateŔke smjernice - Karlovačka županija
StrateŔke smjernice - Karlovačka županijaStrateŔke smjernice - Karlovačka županija
StrateŔke smjernice - Karlovačka županijaUNDPhr
Ā 
Sustainable energy solutions in the Western Balkans
Sustainable energy solutions in the Western BalkansSustainable energy solutions in the Western Balkans
Sustainable energy solutions in the Western BalkansUNDPhr
Ā 
Cooperation EU and the Western Balkans
Cooperation EU and the Western BalkansCooperation EU and the Western Balkans
Cooperation EU and the Western BalkansUNDPhr
Ā 
Sustainable Energy - Martin Krause
Sustainable Energy - Martin KrauseSustainable Energy - Martin Krause
Sustainable Energy - Martin KrauseUNDPhr
Ā 
Better project - Introduction
Better project - IntroductionBetter project - Introduction
Better project - IntroductionUNDPhr
Ā 
EU project pipeline_FINAL_15122014
EU project pipeline_FINAL_15122014EU project pipeline_FINAL_15122014
EU project pipeline_FINAL_15122014UNDPhr
Ā 
Prezentacija VIN_15-12-2014
Prezentacija VIN_15-12-2014Prezentacija VIN_15-12-2014
Prezentacija VIN_15-12-2014UNDPhr
Ā 
POCACITO - Intro
POCACITO - IntroPOCACITO - Intro
POCACITO - IntroUNDPhr
Ā 

More from UNDPhr (20)

UNDP_Energy Audits_2015
UNDP_Energy Audits_2015UNDP_Energy Audits_2015
UNDP_Energy Audits_2015
Ā 
Energetski plan Nacionalnog parka Plitvička jezera_REGEA
Energetski plan Nacionalnog parka Plitvička jezera_REGEAEnergetski plan Nacionalnog parka Plitvička jezera_REGEA
Energetski plan Nacionalnog parka Plitvička jezera_REGEA
Ā 
Nacionalno koordinacijsko tijelo za energetsku učinkovitost
Nacionalno koordinacijsko tijelo za energetsku učinkovitostNacionalno koordinacijsko tijelo za energetsku učinkovitost
Nacionalno koordinacijsko tijelo za energetsku učinkovitost
Ā 
HEP - Current status and perspectives of ESCO projects in Croatia
HEP - Current status and   perspectives of ESCO projects in CroatiaHEP - Current status and   perspectives of ESCO projects in Croatia
HEP - Current status and perspectives of ESCO projects in Croatia
Ā 
ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND
ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUNDENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND
ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY FUND
Ā 
Energy Insitute Hrvoje Pozar
Energy Insitute Hrvoje PozarEnergy Insitute Hrvoje Pozar
Energy Insitute Hrvoje Pozar
Ā 
APN_EMIS_Funcionalities_07_2015
APN_EMIS_Funcionalities_07_2015APN_EMIS_Funcionalities_07_2015
APN_EMIS_Funcionalities_07_2015
Ā 
Projektni paket - Ličko-senjska županija
Projektni paket - Ličko-senjska županijaProjektni paket - Ličko-senjska županija
Projektni paket - Ličko-senjska županija
Ā 
Projektni paket - Sisačko-moslavačka županija
Projektni paket - Sisačko-moslavačka županijaProjektni paket - Sisačko-moslavačka županija
Projektni paket - Sisačko-moslavačka županija
Ā 
Projektni paket - Karlovačka zupanija
Projektni paket  - Karlovačka zupanijaProjektni paket  - Karlovačka zupanija
Projektni paket - Karlovačka zupanija
Ā 
StrateŔke smjernice - Sisačko-moslavačka županija
StrateŔke smjernice - Sisačko-moslavačka županijaStrateŔke smjernice - Sisačko-moslavačka županija
StrateŔke smjernice - Sisačko-moslavačka županija
Ā 
StrateŔke smjernice - Ličko-senjska županija
StrateŔke smjernice - Ličko-senjska županijaStrateŔke smjernice - Ličko-senjska županija
StrateŔke smjernice - Ličko-senjska županija
Ā 
StrateŔke smjernice - Karlovačka županija
StrateŔke smjernice - Karlovačka županijaStrateŔke smjernice - Karlovačka županija
StrateŔke smjernice - Karlovačka županija
Ā 
Sustainable energy solutions in the Western Balkans
Sustainable energy solutions in the Western BalkansSustainable energy solutions in the Western Balkans
Sustainable energy solutions in the Western Balkans
Ā 
Cooperation EU and the Western Balkans
Cooperation EU and the Western BalkansCooperation EU and the Western Balkans
Cooperation EU and the Western Balkans
Ā 
Sustainable Energy - Martin Krause
Sustainable Energy - Martin KrauseSustainable Energy - Martin Krause
Sustainable Energy - Martin Krause
Ā 
Better project - Introduction
Better project - IntroductionBetter project - Introduction
Better project - Introduction
Ā 
EU project pipeline_FINAL_15122014
EU project pipeline_FINAL_15122014EU project pipeline_FINAL_15122014
EU project pipeline_FINAL_15122014
Ā 
Prezentacija VIN_15-12-2014
Prezentacija VIN_15-12-2014Prezentacija VIN_15-12-2014
Prezentacija VIN_15-12-2014
Ā 
POCACITO - Intro
POCACITO - IntroPOCACITO - Intro
POCACITO - Intro
Ā 

Recently uploaded

PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARPEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARdoktercalysta
Ā 
How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?Alejandro Cremades
Ā 
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxNetapsFoundationAdmi
Ā 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxSaksham Gupta
Ā 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...srcw2322l101
Ā 
Navigating Tax Season with Confidence Streamlines CPA Firms
Navigating Tax Season with Confidence Streamlines CPA FirmsNavigating Tax Season with Confidence Streamlines CPA Firms
Navigating Tax Season with Confidence Streamlines CPA FirmsYourLegal Accounting
Ā 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312LR1709MUSIC
Ā 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsRajesh Gupta
Ā 
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportDubai Multi Commodity Centre
Ā 
1Q24_EN hyundai capital 1q performance
1Q24_EN   hyundai capital 1q performance1Q24_EN   hyundai capital 1q performance
1Q24_EN hyundai capital 1q performanceirhcs
Ā 
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionAlejandro Cremades
Ā 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra
Ā 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckHajeJanKamps
Ā 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Associationseri bangash
Ā 
Hyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseHyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseirhcs
Ā 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsStefan Wolpers
Ā 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingYourLegal Accounting
Ā 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerPusat Herbal Resmi BPOM
Ā 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.daisycvs
Ā 

Recently uploaded (20)

PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARPEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
Ā 
How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?
Ā 
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Ā 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Ā 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
Ā 
Navigating Tax Season with Confidence Streamlines CPA Firms
Navigating Tax Season with Confidence Streamlines CPA FirmsNavigating Tax Season with Confidence Streamlines CPA Firms
Navigating Tax Season with Confidence Streamlines CPA Firms
Ā 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
Ā 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
Ā 
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Ā 
1Q24_EN hyundai capital 1q performance
1Q24_EN   hyundai capital 1q performance1Q24_EN   hyundai capital 1q performance
1Q24_EN hyundai capital 1q performance
Ā 
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Ā 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Ā 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Ā 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
Ā 
Hyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseHyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings release
Ā 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
Ā 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic Accounting
Ā 
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Ā 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Ā 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Ā 

Island of Eigg - Green island in miniature (EN)

  • 1. Island of Eigg Green Island in Miniature Lynda Mitchell, ALIenergy Scotland has about 90 inhabited islands, mostly to the west and to the north of the mainland. Oban, where I live on the west coast of the mainland, serves as the ferry port for transport to many of the western islands. All the Scottish islands have their own unique character. Island communities are often isolated and are therefore have a strong sense of identity, and are naturally inclined to self-sufficiency. Many of the islands have abundant natural resources for renewable energy generation and there are plenty of examples of community owned projects, particularly wind turbines. Eigg is a small island of about 3000 hectares (12 square km), with a resident population of about 100 people which doubles in summer due to visitors. The landscape is very rural: scattered houses with a number of community buildings and small businesses. This island is now owned by the residents: after decades of problems with absent landlords, the island was bought out in 1997 by the newly formed Isle of Eigg Heritage Trust, a partnership between the residents of Eigg, the Highland Council, and the Scottish Wildlife Trust. This was achieved largely due to the generosity of around ten thousand members of the general public who believed in the issue of land ownership reform in Scotland. Gaining control of the islandā€™s assets through its successful campaign for community ownership was the first step for Eigg.
  • 2. One of the next main challenges for the community was that this island does not have a connection to the mainland electricity grid - and there was no prospect of ever being given one from the privatised utility companies. Instead, individual homes mostly relied on diesel generators for domestic electricity. This situation acted as a huge incentive to look at better alternatives. It took a few years for the islanders to go through the process of comparing the cost of connecting their island to the UK national electricity grid and the cost of setting up their own renewable electricity mini grid. It would have cost Ā£5 million for a 12 mile undersea grid connection to the mainland, so the islanders began to consider an innovative standalone Ā£1.6 million system which combined wind, sun and hydro power to make the island self-sufficient in energy. So, the next major project of the Heritage Trust was to enable the provision of a miniature mains electricity grid, powered from renewable sources, to develop an electricity supply that would be environmentally and economically sustainable. After the year 2000, with the development of the renewable energy sector and an improved funding landscape both at home in Scotland and in the EU, the choice was obvious: Eigg had to go for the renewable option! The Isle of Eigg Heritage Trust formed a subsidiary trading company, Eigg Electric Ltd, to organise and operate the new network. The project was designed and built by contractors Scottish Hydro Contracting with subcontractors E-Connect Ventures Ltd, Wind and Sun Ltd, Energy Renewed Ltd, G.G. MacKenzie Contractors Ltd, project managers Synergie Scotland Ltd and the voluntary contributions of many islanders. Eigg Electric is in charge of maintaining, servicing and repairing the grid and administering the prepayment scheme via card meters.
  • 3. The new renewable energy network consists mainly of hydro power (112kW) plus some wind power (24kW) and solar PV (initially 10kW; and a further 20kW later added and more planned). There is also a bank of rechargeable batteries equivalent to 24hrs of electricity demand, and also two back up diesel generators (each 80kW), however these are rarely required. The system was switched on with much celebration on 1st Feb 2008 - a world leader in the integration of multiple renewable energy resources into a high voltage grid system (with 11km of buried cable) to supply an isolated and scattered small island community. This project has been conceived and driven by the enthusiasm of the whole community and is the culmination of 10 years of action and achievement since the purchase of the island. The islanders are generally very careful with their electricity use, and achieve an average domestic electricity use of just half the national average. Each building is equipped with an electricity monitor to show consumption. Eigg Electric generates a finite amount of energy and so Eigg residents agreed from the outset to cap electricity use at 5 kW at any one time for households, with up to 10 kW available for businesses. Residents paid towards installation, Ā£500 per 5kW connection or Ā£1,000 per 10kW connection. If these limits are ever exceeded (which happens very rarely) the electricity will cut off and there is a Ā£20 reconnection charge. If renewable resources are low, for example in summer when there is less rain and wind, but more people on the island, an innovative ā€œtraffic lightā€ system asks residents to keep their usage to a minimum. A ā€˜green lightā€™ means all is normal. A ā€˜red lightā€™ alerts people to be extra careful at times of shortage and can reduce demand by up to 20% and this ensures that there is nearly always enough renewable energy for everyone. At times when renewable resources are very high, when there is lots of sun, wind and rain, the batteries are full and thereā€™s excess electricity, then excess power is
  • 4. diverted to heaters in the community buildings such as the community hall and church. A pilot projects is underway involving trial of electric vehicles, which can also act as electric storage batteries. In 2010, Eigg was announced as one of three joint winners in a national competition, NESTA's Big Green Challenge, winning a prize of Ā£300,000. This money is helping to enable further improvements on the island. Insulation, solar hot water panels, more PV to meet summer demand, transport (bikes, car sharing and pilot electric car) and local food production are all being addressed. The prize money has allowed a 50% grant for a range of domestic carbon reduction measures and has of course, created a great feeling of pride in achievement. Island population is rising, as are local businesses and the numbers of summer visitors ecotourists. Future work will include developing better management of wood fuel resources for heating; and the islanders are hoping for a pilot tidal generator project to be developed with an academic partner. Overall the island has already achieved almost 100% renewable electricity (and is expected to achieve 100% with the installation of the next phase of PV) and has cut carbon emissions by about half so far. The islanders will continue to work towards a 100% renewable energy and carbon neutral future. Further information: http://www.isleofeigg.net http://www.ashden.org/files/reports/Isle%20of%20Eigg%20case%20study.pdf http://www.youtube.com/watch?v=T7HggVRrE58 http://www.youtube.com/watch?v=HMCgSf-QSKo http://www.ashden.org/winners/Eigg10 This project was funded by: European Regional Development Fund, Big Lottery, Highlands & Islands Enterprise, HIE Lochaber, Highlands and Islands Community Energy Company, Scottish Community Household Renewables Initiative, Energy Saving Trust, Highland Council, Isle of Eigg Heritage Trust & the Residents of the Isle of Eigg.