SlideShare a Scribd company logo
1 of 9
Post-combustion CO2 capture from natural gas combined cycles by solvent supported membranes 
Alberto Volenoa, Matteo C. Romanoa, Davide M. Turia, Paolo Chiesaa, 
Minh T. Hob, Dianne E. Wileyb 
a Politecnico di Milano, Department of Energy, Milan, Italy 
b CO2CRC, University of New South Wales, Sydney, Australia 
GHGT-12, Austin, TX, USA – 6-9th October 2014
2 
Integration in NG combined cycles 
NGCC flue gas: 
• 
CO2 concentration ~ 4% 
• 
N2/CO2 ~ 19  large surface and low CO2 purity with a simple post- combustion capture configuration 
NGCC with flue gas recycle: 
• 
CO2 concentration ~ 8-10% 
• 
N2/CO2 ~ 10  smaller surface, but still low CO2 purity (purification step required)
3 
Integration in NG combined cycles 
Alternative configuration with selective CO2 flue gas recycle 
Merkel TC, Lin H, Wei X, Baker R. J Membr Sci 2010;359:126-139. 
e.me.mCO2CO2Flue gas ventedair / flue gasfuelCO2water/steam~ Gas turbineSteam turbineHRSG~ HPevaIPevaLPecoIPrhHP sh IPecoHPecoIPshHPecoLPevaLPshmemb. 2memb. 1CO2to storageNatural gasFlue gas coolere.m 
At memb.1 inlet: 
• 
CO2 concentration ~ 33-35% 
• 
N2/CO2 ~ 1.7
4 
Results 
Sensitivity analysis on membrane feed pressure: 
Ref. NGCC Membrane cases Membrane feed pressure, bar 1.52 2.03 3.04 4.05 Power balance, MW: Gas turbine net power 272.1 249.8 249.4 249.2 249.0 Steam turbine gross power 147.1 167.3 167.6 167.7 168.0 Steam cycle pumps -1.79 -2.13 -2.14 -2.14 -2.15 Aux. for cond. heat rejection -1.86 -2.05 -2.05 -2.05 -2.05 Aux. for heat reject. other than cond. -0.77 -0.82 -0.90 -0.98 Fresh air fan -2.08 -2.05 -2.03 -2.01 Flue gas compressor -25.55 -45.44 -76.60 -100.8 Flue gas expander 11.65 21.25 36.46 48.03 CO2 compression -19.20 -19.02 -18.89 -18.59 Gross Power, MW 419.2 417.1 417.0 417.0 416.9 Net Power, MW 415.6 376.9 366.7 350.8 338.4 Heat input, MW, LHV 711.3 711.3 711.3 711.3 711.3 Net efficiency, %LHV 58.4 53.0 51.6 49.3 47.6 CO2 capture efficiency, % 90.0 90.0 90.0 90.0 Specific emission, kg/MWh 353.7 40.3 41.5 43.3 44.9 CO2 avoided, % 88.6 88.3 87.8 87.3 SPECCA, MJ/kg 2.01 2.63 3.66 4.55 CO2 purity, %mol dry 95.2 96.0 96.5 96.7
5 
Economic analysis - Results 
Cost of CO2 avoided 
020406080100120p_f=1.5barp_f=2barp_f=3barp_f=4barCost of CO2avoided, US$/t Other OpexEnergy OpexCapex - otherCapex - CO2 compr. andtreatm. Capex - flue gas compr./exp. Capex - membranes 
73.5 $/t 
DOE-NETL MEA baseline: 96 $/t DOE/NETL, 2012. Updated Costs (June 2011 Basis) for Selected Bituminous Baseline Cases.
6 
Conclusions 
 
Economic analysis is needed to define the optimal operating parameters of CO2 membrane systems 
 
Optimal operating parameters will depend on the membrane properties (permeability, selectivity) and cost 
 
Techno-economic analysis is a fundamental tool to correctly tailoring the properties of solvent supported membranes to specific applications 
 
Low efficiency penalties (-5.4% pts.) and competitive cost of CO2 avoided (73 $/t) have been obtained for this specific application, with membrane performance and cost in line with state-of-the-art polymeric membranes. 
 
It is likely that existing GT turbines cannot operate with CO2-enrichment as high as obtained with this configuration  The development of tailored GTs is challenging in absence of a sufficient market  limited retrofitability in existing NGCC. 
 
Easier integration and retrofitability in PC plants and other industrial sources (e.g. cement and iron & steel plants) is foreseen for CO2 membranes.
7 
MCFC as post-combustion CO2 separation systems
8 
MCFC technology can be utilized in cement plant for CO2 separation from fue gases at the preheating tower outlet, and for power production. 
 
Anode side fed with natural gas (direct and indirect internal reforming); 
 
Cathode side fed with fuel gases (@33-34% CO2) and additional air, providing O2. 
MCFC in cement plant 
CO2 from cement plant 
CO2 from NG 
CO2 to storage 
CO2 to asmosphere 
CH4+4CO32-2H2O+5CO2+2e- 
2O2+4CO2+8e- 4CO32- 
CO32-
9 
Q LHV, in [MWLHV] 
178.4 
MCFC LHV efficiency 
52.8 
Air utilization factor [UO2,%] 
39.3 
CO2 Utilization factor [UCO2,%] 
70 
Fuel cell power [MWE] 
106.1 
ORC Power [MWE] 
8.31 
Auxiliares [MWE] 
-19.86 
Overall net power [MWE] 
94.58 
Net electric LHV efficiency 
53.0 
Cement plant flue gas CO2 capture efficiency [%] 
73.2 
Equivalent CO2 emissions from NG conversion [g/kWh] 
-1061 
MCFC in cement plant - performance 
• 
Clinker production = 3600 tpd 
• 
MCFC voltage = 0.8 V

More Related Content

What's hot

Carbon Capture And Storage
Carbon Capture And StorageCarbon Capture And Storage
Carbon Capture And StorageHector Rodriguez
 
Chemical Looping Combustion
Chemical Looping CombustionChemical Looping Combustion
Chemical Looping CombustionRajan Lanjekar
 
Reducing greenhouse gas emissions in the transport sector –Successful nationa...
Reducing greenhouse gas emissions in the transport sector –Successful nationa...Reducing greenhouse gas emissions in the transport sector –Successful nationa...
Reducing greenhouse gas emissions in the transport sector –Successful nationa...Leonardo ENERGY
 
Carbon-di-oxide into fuel
Carbon-di-oxide into fuelCarbon-di-oxide into fuel
Carbon-di-oxide into fuelNithyamadhavan
 
CO2 to fuels and chemicals course material final version
CO2 to fuels and chemicals course material final versionCO2 to fuels and chemicals course material final version
CO2 to fuels and chemicals course material final versionHariprasad Narayanan
 
Excess property determination
Excess property determinationExcess property determination
Excess property determinationDhavaleRucha
 
Carbon Footprints and Carbon Credit
Carbon Footprints and Carbon CreditCarbon Footprints and Carbon Credit
Carbon Footprints and Carbon Creditkanhaiya kumawat
 
Introduction to Carbon Footprint Calculation and the Importance
Introduction to Carbon Footprint Calculation and the Importance Introduction to Carbon Footprint Calculation and the Importance
Introduction to Carbon Footprint Calculation and the Importance Janathakshan Gte Ltd
 
Practical-guide-calculating-GHG-emissions_OCCC.pdf
Practical-guide-calculating-GHG-emissions_OCCC.pdfPractical-guide-calculating-GHG-emissions_OCCC.pdf
Practical-guide-calculating-GHG-emissions_OCCC.pdfyiTing28
 
Energy Balance (1).ppt
Energy Balance (1).pptEnergy Balance (1).ppt
Energy Balance (1).pptmudassar60
 
Selective Catalytic Reduction of NOx
Selective Catalytic Reduction of NOxSelective Catalytic Reduction of NOx
Selective Catalytic Reduction of NOxbadcrackcherry
 
Electrochemical reduction of Carbon Dioxide
Electrochemical reduction of Carbon DioxideElectrochemical reduction of Carbon Dioxide
Electrochemical reduction of Carbon DioxideSaurav Ch. Sarma
 
Material Balance of Adipic Acid Plant
Material Balance of Adipic Acid PlantMaterial Balance of Adipic Acid Plant
Material Balance of Adipic Acid PlantIshaneeSharma
 

What's hot (20)

Capture of CO2
Capture of CO2Capture of CO2
Capture of CO2
 
Carbon Capture And Storage
Carbon Capture And StorageCarbon Capture And Storage
Carbon Capture And Storage
 
Chemical Looping Combustion
Chemical Looping CombustionChemical Looping Combustion
Chemical Looping Combustion
 
carbon capture and storage
carbon capture and storagecarbon capture and storage
carbon capture and storage
 
Reducing greenhouse gas emissions in the transport sector –Successful nationa...
Reducing greenhouse gas emissions in the transport sector –Successful nationa...Reducing greenhouse gas emissions in the transport sector –Successful nationa...
Reducing greenhouse gas emissions in the transport sector –Successful nationa...
 
Carbon-di-oxide into fuel
Carbon-di-oxide into fuelCarbon-di-oxide into fuel
Carbon-di-oxide into fuel
 
CO2 to fuels and chemicals course material final version
CO2 to fuels and chemicals course material final versionCO2 to fuels and chemicals course material final version
CO2 to fuels and chemicals course material final version
 
Excess property determination
Excess property determinationExcess property determination
Excess property determination
 
Carbon Footprints and Carbon Credit
Carbon Footprints and Carbon CreditCarbon Footprints and Carbon Credit
Carbon Footprints and Carbon Credit
 
Tandem catalyst for CO2 reduction.pptx
Tandem catalyst for CO2 reduction.pptxTandem catalyst for CO2 reduction.pptx
Tandem catalyst for CO2 reduction.pptx
 
CO2 Capture - Jon Gibbins, UKCCSRC, at the UKCCSRC ECR Winter School 2015
CO2 Capture - Jon Gibbins, UKCCSRC, at the UKCCSRC ECR Winter School 2015CO2 Capture - Jon Gibbins, UKCCSRC, at the UKCCSRC ECR Winter School 2015
CO2 Capture - Jon Gibbins, UKCCSRC, at the UKCCSRC ECR Winter School 2015
 
Introduction to Carbon Footprint Calculation and the Importance
Introduction to Carbon Footprint Calculation and the Importance Introduction to Carbon Footprint Calculation and the Importance
Introduction to Carbon Footprint Calculation and the Importance
 
Practical-guide-calculating-GHG-emissions_OCCC.pdf
Practical-guide-calculating-GHG-emissions_OCCC.pdfPractical-guide-calculating-GHG-emissions_OCCC.pdf
Practical-guide-calculating-GHG-emissions_OCCC.pdf
 
Adsorption Materials and Processes for Carbon Capture from Gas-Fired Power Pl...
Adsorption Materials and Processes for Carbon Capture from Gas-Fired Power Pl...Adsorption Materials and Processes for Carbon Capture from Gas-Fired Power Pl...
Adsorption Materials and Processes for Carbon Capture from Gas-Fired Power Pl...
 
Carbon footprint
Carbon footprintCarbon footprint
Carbon footprint
 
Unit process
Unit processUnit process
Unit process
 
Energy Balance (1).ppt
Energy Balance (1).pptEnergy Balance (1).ppt
Energy Balance (1).ppt
 
Selective Catalytic Reduction of NOx
Selective Catalytic Reduction of NOxSelective Catalytic Reduction of NOx
Selective Catalytic Reduction of NOx
 
Electrochemical reduction of Carbon Dioxide
Electrochemical reduction of Carbon DioxideElectrochemical reduction of Carbon Dioxide
Electrochemical reduction of Carbon Dioxide
 
Material Balance of Adipic Acid Plant
Material Balance of Adipic Acid PlantMaterial Balance of Adipic Acid Plant
Material Balance of Adipic Acid Plant
 

Viewers also liked

Carbon Capture & Storage
Carbon Capture & StorageCarbon Capture & Storage
Carbon Capture & Storagesinghramanand
 
SBC Energy Institute - Factbook: Bringing CCS to Market - webinar 30 Jan
SBC Energy Institute - Factbook: Bringing CCS to Market - webinar 30 JanSBC Energy Institute - Factbook: Bringing CCS to Market - webinar 30 Jan
SBC Energy Institute - Factbook: Bringing CCS to Market - webinar 30 JanGlobal CCS Institute
 
Co2 sequestration using ionic liquids.
Co2 sequestration using ionic liquids.Co2 sequestration using ionic liquids.
Co2 sequestration using ionic liquids.Aakruti Makode
 
Gestión y calidad de la educación.
Gestión y calidad de la educación.Gestión y calidad de la educación.
Gestión y calidad de la educación.Edi
 
Glier_Defense_Online_Publication
Glier_Defense_Online_PublicationGlier_Defense_Online_Publication
Glier_Defense_Online_PublicationJustin Glier
 
Different Techniques for Carbon Dioxide Capture from Air
Different Techniques for Carbon Dioxide Capture from AirDifferent Techniques for Carbon Dioxide Capture from Air
Different Techniques for Carbon Dioxide Capture from AirMadhura Chincholi
 
Modeling of co2 capture via chemical absorption processes an extensiveliterat...
Modeling of co2 capture via chemical absorption processes an extensiveliterat...Modeling of co2 capture via chemical absorption processes an extensiveliterat...
Modeling of co2 capture via chemical absorption processes an extensiveliterat...RENE QUISPE
 
Current Status of Amine-based CO2 Capture Technology in KEPCO
Current Status of Amine-based CO2 Capture Technology in KEPCOCurrent Status of Amine-based CO2 Capture Technology in KEPCO
Current Status of Amine-based CO2 Capture Technology in KEPCOcanaleenergia
 
CO2 absorption in power plants_f3
CO2 absorption in power plants_f3CO2 absorption in power plants_f3
CO2 absorption in power plants_f3Athina Kouneli
 
Solvent development for biogas scrubbers for CO2 removal - Marco Linders
Solvent development for biogas scrubbers for CO2 removal - Marco LindersSolvent development for biogas scrubbers for CO2 removal - Marco Linders
Solvent development for biogas scrubbers for CO2 removal - Marco LindersEBAconference
 
Power Generation Facility with Amine Based Carbon Capture
Power Generation Facility with Amine Based Carbon CapturePower Generation Facility with Amine Based Carbon Capture
Power Generation Facility with Amine Based Carbon CapturePeter Zhou
 
Presntation co2 and mea
Presntation co2 and meaPresntation co2 and mea
Presntation co2 and meaHASSAN SALEM
 
Amine Gas Treating Unit - Best Practices - Troubleshooting Guide
Amine Gas Treating Unit  - Best Practices - Troubleshooting Guide Amine Gas Treating Unit  - Best Practices - Troubleshooting Guide
Amine Gas Treating Unit - Best Practices - Troubleshooting Guide Gerard B. Hawkins
 

Viewers also liked (20)

Progressing CCS - Engineers Without Borders
Progressing CCS - Engineers Without BordersProgressing CCS - Engineers Without Borders
Progressing CCS - Engineers Without Borders
 
Carbon Capture & Storage
Carbon Capture & StorageCarbon Capture & Storage
Carbon Capture & Storage
 
Studies of Hydrotalcite Clays for CO2 Adsorption - Professor Joe Wood at the ...
Studies of Hydrotalcite Clays for CO2 Adsorption - Professor Joe Wood at the ...Studies of Hydrotalcite Clays for CO2 Adsorption - Professor Joe Wood at the ...
Studies of Hydrotalcite Clays for CO2 Adsorption - Professor Joe Wood at the ...
 
SBC Energy Institute - Factbook: Bringing CCS to Market - webinar 30 Jan
SBC Energy Institute - Factbook: Bringing CCS to Market - webinar 30 JanSBC Energy Institute - Factbook: Bringing CCS to Market - webinar 30 Jan
SBC Energy Institute - Factbook: Bringing CCS to Market - webinar 30 Jan
 
Co2 sequestration using ionic liquids.
Co2 sequestration using ionic liquids.Co2 sequestration using ionic liquids.
Co2 sequestration using ionic liquids.
 
Gestión y calidad de la educación.
Gestión y calidad de la educación.Gestión y calidad de la educación.
Gestión y calidad de la educación.
 
Glier_Defense_Online_Publication
Glier_Defense_Online_PublicationGlier_Defense_Online_Publication
Glier_Defense_Online_Publication
 
Jiafei Zhang (Imperial College London) - Influence of Amine Molecular Structu...
Jiafei Zhang (Imperial College London) - Influence of Amine Molecular Structu...Jiafei Zhang (Imperial College London) - Influence of Amine Molecular Structu...
Jiafei Zhang (Imperial College London) - Influence of Amine Molecular Structu...
 
Different Techniques for Carbon Dioxide Capture from Air
Different Techniques for Carbon Dioxide Capture from AirDifferent Techniques for Carbon Dioxide Capture from Air
Different Techniques for Carbon Dioxide Capture from Air
 
Modeling of co2 capture via chemical absorption processes an extensiveliterat...
Modeling of co2 capture via chemical absorption processes an extensiveliterat...Modeling of co2 capture via chemical absorption processes an extensiveliterat...
Modeling of co2 capture via chemical absorption processes an extensiveliterat...
 
Selection of amine solvents for CO2 capture from natural gas power plant - pr...
Selection of amine solvents for CO2 capture from natural gas power plant - pr...Selection of amine solvents for CO2 capture from natural gas power plant - pr...
Selection of amine solvents for CO2 capture from natural gas power plant - pr...
 
Current Status of Amine-based CO2 Capture Technology in KEPCO
Current Status of Amine-based CO2 Capture Technology in KEPCOCurrent Status of Amine-based CO2 Capture Technology in KEPCO
Current Status of Amine-based CO2 Capture Technology in KEPCO
 
CO2 absorption in power plants_f3
CO2 absorption in power plants_f3CO2 absorption in power plants_f3
CO2 absorption in power plants_f3
 
Solvent development for biogas scrubbers for CO2 removal - Marco Linders
Solvent development for biogas scrubbers for CO2 removal - Marco LindersSolvent development for biogas scrubbers for CO2 removal - Marco Linders
Solvent development for biogas scrubbers for CO2 removal - Marco Linders
 
Power Generation Facility with Amine Based Carbon Capture
Power Generation Facility with Amine Based Carbon CapturePower Generation Facility with Amine Based Carbon Capture
Power Generation Facility with Amine Based Carbon Capture
 
Selection of amine solvents for CO2 capture from natural gas power plant
Selection of amine solvents for CO2 capture from natural gas power plantSelection of amine solvents for CO2 capture from natural gas power plant
Selection of amine solvents for CO2 capture from natural gas power plant
 
Presntation co2 and mea
Presntation co2 and meaPresntation co2 and mea
Presntation co2 and mea
 
Carbon Capture & Storage
Carbon Capture & StorageCarbon Capture & Storage
Carbon Capture & Storage
 
CO2 Separation - A Proposal
CO2 Separation - A Proposal CO2 Separation - A Proposal
CO2 Separation - A Proposal
 
Amine Gas Treating Unit - Best Practices - Troubleshooting Guide
Amine Gas Treating Unit  - Best Practices - Troubleshooting Guide Amine Gas Treating Unit  - Best Practices - Troubleshooting Guide
Amine Gas Treating Unit - Best Practices - Troubleshooting Guide
 

Similar to Post-combustion CO2 capture from natural gas combined cycles by solvent supported membranes

Pawan CO2 REDUCTION PPT
Pawan CO2 REDUCTION PPTPawan CO2 REDUCTION PPT
Pawan CO2 REDUCTION PPTPawan Kumar
 
2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINALSandra Broekema
 
Process design of Ca-L process for CO2 capture from NGCC
Process design of Ca-L process for CO2 capture from NGCCProcess design of Ca-L process for CO2 capture from NGCC
Process design of Ca-L process for CO2 capture from NGCCRahulA
 
Carbon Dioxide Capture and Storage (CSS) System
Carbon Dioxide Capture and Storage (CSS) SystemCarbon Dioxide Capture and Storage (CSS) System
Carbon Dioxide Capture and Storage (CSS) SystemTamer Koksalan, PhD
 
Technologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil RefineriesTechnologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil Refineriescanaleenergia
 
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008rhysemo
 
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008rhysemo
 
Apec workshop 2 presentation 5 e apec workshop mexico capture technologies ...
Apec workshop 2 presentation 5 e apec workshop mexico   capture technologies ...Apec workshop 2 presentation 5 e apec workshop mexico   capture technologies ...
Apec workshop 2 presentation 5 e apec workshop mexico capture technologies ...Global CCS Institute
 
Apec workshop 2 presentation 5 e apec workshop mexico capture technologies ...
Apec workshop 2 presentation 5 e apec workshop mexico   capture technologies ...Apec workshop 2 presentation 5 e apec workshop mexico   capture technologies ...
Apec workshop 2 presentation 5 e apec workshop mexico capture technologies ...Global CCS Institute
 
DISCUSSION ON ALTERNATIVE METHODS OF POINT-SOURCE CARBON CAPTURE
DISCUSSION ON ALTERNATIVE METHODS OF POINT-SOURCE CARBON CAPTUREDISCUSSION ON ALTERNATIVE METHODS OF POINT-SOURCE CARBON CAPTURE
DISCUSSION ON ALTERNATIVE METHODS OF POINT-SOURCE CARBON CAPTUREiQHub
 
CO2 Capture - CCS-R WB - 29102014(0)
CO2 Capture - CCS-R WB - 29102014(0)CO2 Capture - CCS-R WB - 29102014(0)
CO2 Capture - CCS-R WB - 29102014(0)Lugas Raka Adrianto
 
Clean Coal Technologies
Clean Coal TechnologiesClean Coal Technologies
Clean Coal TechnologiesArnab Mitra
 
Condition Monitoring of electrical machine
Condition Monitoring of electrical machine Condition Monitoring of electrical machine
Condition Monitoring of electrical machine Molla Morshad
 

Similar to Post-combustion CO2 capture from natural gas combined cycles by solvent supported membranes (20)

Pawan CO2 REDUCTION PPT
Pawan CO2 REDUCTION PPTPawan CO2 REDUCTION PPT
Pawan CO2 REDUCTION PPT
 
Catalyst materials for solar refineries, synthetic fuels and procedures for a...
Catalyst materials for solar refineries, synthetic fuels and procedures for a...Catalyst materials for solar refineries, synthetic fuels and procedures for a...
Catalyst materials for solar refineries, synthetic fuels and procedures for a...
 
2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL
 
Process design of Ca-L process for CO2 capture from NGCC
Process design of Ca-L process for CO2 capture from NGCCProcess design of Ca-L process for CO2 capture from NGCC
Process design of Ca-L process for CO2 capture from NGCC
 
312 r.j.basavaraj
312 r.j.basavaraj312 r.j.basavaraj
312 r.j.basavaraj
 
Carbon Dioxide Capture and Storage (CSS) System
Carbon Dioxide Capture and Storage (CSS) SystemCarbon Dioxide Capture and Storage (CSS) System
Carbon Dioxide Capture and Storage (CSS) System
 
On the integration of sequential supplementary firing in natural gas combined...
On the integration of sequential supplementary firing in natural gas combined...On the integration of sequential supplementary firing in natural gas combined...
On the integration of sequential supplementary firing in natural gas combined...
 
Technologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil RefineriesTechnologies for Carbon Capture in Oil Refineries
Technologies for Carbon Capture in Oil Refineries
 
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
 
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
Airah Natural Refrigerants Special Interest Group Sydney 30 October 2008
 
Capturing CO2 from air: Research at the University of Edinburgh - Dr Maria Ch...
Capturing CO2 from air: Research at the University of Edinburgh - Dr Maria Ch...Capturing CO2 from air: Research at the University of Edinburgh - Dr Maria Ch...
Capturing CO2 from air: Research at the University of Edinburgh - Dr Maria Ch...
 
Apec workshop 2 presentation 5 e apec workshop mexico capture technologies ...
Apec workshop 2 presentation 5 e apec workshop mexico   capture technologies ...Apec workshop 2 presentation 5 e apec workshop mexico   capture technologies ...
Apec workshop 2 presentation 5 e apec workshop mexico capture technologies ...
 
Apec workshop 2 presentation 5 e apec workshop mexico capture technologies ...
Apec workshop 2 presentation 5 e apec workshop mexico   capture technologies ...Apec workshop 2 presentation 5 e apec workshop mexico   capture technologies ...
Apec workshop 2 presentation 5 e apec workshop mexico capture technologies ...
 
DISCUSSION ON ALTERNATIVE METHODS OF POINT-SOURCE CARBON CAPTURE
DISCUSSION ON ALTERNATIVE METHODS OF POINT-SOURCE CARBON CAPTUREDISCUSSION ON ALTERNATIVE METHODS OF POINT-SOURCE CARBON CAPTURE
DISCUSSION ON ALTERNATIVE METHODS OF POINT-SOURCE CARBON CAPTURE
 
Capstone Final
Capstone FinalCapstone Final
Capstone Final
 
CO2 Capture - CCS-R WB - 29102014(0)
CO2 Capture - CCS-R WB - 29102014(0)CO2 Capture - CCS-R WB - 29102014(0)
CO2 Capture - CCS-R WB - 29102014(0)
 
Clean Coal Technologies
Clean Coal TechnologiesClean Coal Technologies
Clean Coal Technologies
 
COAL FIRED BOILER -PRINCIPALS.pdf
COAL FIRED BOILER -PRINCIPALS.pdfCOAL FIRED BOILER -PRINCIPALS.pdf
COAL FIRED BOILER -PRINCIPALS.pdf
 
Condition Monitoring of electrical machine
Condition Monitoring of electrical machine Condition Monitoring of electrical machine
Condition Monitoring of electrical machine
 
A perspective on transition engineering options from capture-readiness to ful...
A perspective on transition engineering options from capture-readiness to ful...A perspective on transition engineering options from capture-readiness to ful...
A perspective on transition engineering options from capture-readiness to ful...
 

More from UK Carbon Capture and Storage Research Centre

More from UK Carbon Capture and Storage Research Centre (20)

CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
CCUS Roadmap for Mexico - presentation by M. Vita Peralta Martínez (IIE - Ele...
 
Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...
Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...
Advances in Rock Physics Modelling and Improved Estimation of CO2 Saturation,...
 
Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...
Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...
Numerical Modelling of Fracture Growth and Caprock Integrity During CO2 Injec...
 
Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...
Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...
Assessing Uncertainty of Time Lapse Seismic Response Due to Geomechanical Def...
 
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
 
Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...
Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...
Modelling Fault Reactivation, Induced Seismicity, and Leakage During Undergro...
 
Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...
Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...
Pore scale dynamics and the interpretation of flow processes - Martin Blunt, ...
 
Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...
Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...
Passive seismic monitoring for CO2 storage sites - Anna Stork, University of ...
 
Multiphase flow modelling of calcite dissolution patterns from core scale to ...
Multiphase flow modelling of calcite dissolution patterns from core scale to ...Multiphase flow modelling of calcite dissolution patterns from core scale to ...
Multiphase flow modelling of calcite dissolution patterns from core scale to ...
 
Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...
Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...
Long term safety of geological co2 storage: lessons from Bravo Dome Natural C...
 
Challenges in the chemical industry, jay brookes (boc) industry ccs worksho...
Challenges in the chemical industry, jay brookes (boc)   industry ccs worksho...Challenges in the chemical industry, jay brookes (boc)   industry ccs worksho...
Challenges in the chemical industry, jay brookes (boc) industry ccs worksho...
 
Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...
Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...
Overall Network Issues, Tim Dumenil (Pale Blue Dot) - Industry CCS Workshop, ...
 
Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...
Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...
Challenges in the Steel Industry and the Network, James Watt (Amec) - Industr...
 
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
Horizon 2020 Update, Jon Gibbins, University of Edinburgh - UKCCSRC Strathcly...
 
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
Guangdong Offshore CCUS Project (GOCCUS) - Xi Liang, University of Edinburgh ...
 
Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...
Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...
Changes in the Dutch CCS Landscape - Jan Brouwer, CATO - UKCCSRC Strathclyde ...
 
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
 
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
Carbon Capture and Storage in Australia - Tania Constable, CO2CRC - UKCCSRC S...
 
Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...
Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...
Computational Modelling and Optimisation of Carbon Capture Reactors, Daniel S...
 
Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...
Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...
Effective Adsorbents for Establishing Solids Looping as a Next Generation NG ...
 

Recently uploaded

UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 

Recently uploaded (20)

UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 

Post-combustion CO2 capture from natural gas combined cycles by solvent supported membranes

  • 1. Post-combustion CO2 capture from natural gas combined cycles by solvent supported membranes Alberto Volenoa, Matteo C. Romanoa, Davide M. Turia, Paolo Chiesaa, Minh T. Hob, Dianne E. Wileyb a Politecnico di Milano, Department of Energy, Milan, Italy b CO2CRC, University of New South Wales, Sydney, Australia GHGT-12, Austin, TX, USA – 6-9th October 2014
  • 2. 2 Integration in NG combined cycles NGCC flue gas: • CO2 concentration ~ 4% • N2/CO2 ~ 19  large surface and low CO2 purity with a simple post- combustion capture configuration NGCC with flue gas recycle: • CO2 concentration ~ 8-10% • N2/CO2 ~ 10  smaller surface, but still low CO2 purity (purification step required)
  • 3. 3 Integration in NG combined cycles Alternative configuration with selective CO2 flue gas recycle Merkel TC, Lin H, Wei X, Baker R. J Membr Sci 2010;359:126-139. e.me.mCO2CO2Flue gas ventedair / flue gasfuelCO2water/steam~ Gas turbineSteam turbineHRSG~ HPevaIPevaLPecoIPrhHP sh IPecoHPecoIPshHPecoLPevaLPshmemb. 2memb. 1CO2to storageNatural gasFlue gas coolere.m At memb.1 inlet: • CO2 concentration ~ 33-35% • N2/CO2 ~ 1.7
  • 4. 4 Results Sensitivity analysis on membrane feed pressure: Ref. NGCC Membrane cases Membrane feed pressure, bar 1.52 2.03 3.04 4.05 Power balance, MW: Gas turbine net power 272.1 249.8 249.4 249.2 249.0 Steam turbine gross power 147.1 167.3 167.6 167.7 168.0 Steam cycle pumps -1.79 -2.13 -2.14 -2.14 -2.15 Aux. for cond. heat rejection -1.86 -2.05 -2.05 -2.05 -2.05 Aux. for heat reject. other than cond. -0.77 -0.82 -0.90 -0.98 Fresh air fan -2.08 -2.05 -2.03 -2.01 Flue gas compressor -25.55 -45.44 -76.60 -100.8 Flue gas expander 11.65 21.25 36.46 48.03 CO2 compression -19.20 -19.02 -18.89 -18.59 Gross Power, MW 419.2 417.1 417.0 417.0 416.9 Net Power, MW 415.6 376.9 366.7 350.8 338.4 Heat input, MW, LHV 711.3 711.3 711.3 711.3 711.3 Net efficiency, %LHV 58.4 53.0 51.6 49.3 47.6 CO2 capture efficiency, % 90.0 90.0 90.0 90.0 Specific emission, kg/MWh 353.7 40.3 41.5 43.3 44.9 CO2 avoided, % 88.6 88.3 87.8 87.3 SPECCA, MJ/kg 2.01 2.63 3.66 4.55 CO2 purity, %mol dry 95.2 96.0 96.5 96.7
  • 5. 5 Economic analysis - Results Cost of CO2 avoided 020406080100120p_f=1.5barp_f=2barp_f=3barp_f=4barCost of CO2avoided, US$/t Other OpexEnergy OpexCapex - otherCapex - CO2 compr. andtreatm. Capex - flue gas compr./exp. Capex - membranes 73.5 $/t DOE-NETL MEA baseline: 96 $/t DOE/NETL, 2012. Updated Costs (June 2011 Basis) for Selected Bituminous Baseline Cases.
  • 6. 6 Conclusions  Economic analysis is needed to define the optimal operating parameters of CO2 membrane systems  Optimal operating parameters will depend on the membrane properties (permeability, selectivity) and cost  Techno-economic analysis is a fundamental tool to correctly tailoring the properties of solvent supported membranes to specific applications  Low efficiency penalties (-5.4% pts.) and competitive cost of CO2 avoided (73 $/t) have been obtained for this specific application, with membrane performance and cost in line with state-of-the-art polymeric membranes.  It is likely that existing GT turbines cannot operate with CO2-enrichment as high as obtained with this configuration  The development of tailored GTs is challenging in absence of a sufficient market  limited retrofitability in existing NGCC.  Easier integration and retrofitability in PC plants and other industrial sources (e.g. cement and iron & steel plants) is foreseen for CO2 membranes.
  • 7. 7 MCFC as post-combustion CO2 separation systems
  • 8. 8 MCFC technology can be utilized in cement plant for CO2 separation from fue gases at the preheating tower outlet, and for power production.  Anode side fed with natural gas (direct and indirect internal reforming);  Cathode side fed with fuel gases (@33-34% CO2) and additional air, providing O2. MCFC in cement plant CO2 from cement plant CO2 from NG CO2 to storage CO2 to asmosphere CH4+4CO32-2H2O+5CO2+2e- 2O2+4CO2+8e- 4CO32- CO32-
  • 9. 9 Q LHV, in [MWLHV] 178.4 MCFC LHV efficiency 52.8 Air utilization factor [UO2,%] 39.3 CO2 Utilization factor [UCO2,%] 70 Fuel cell power [MWE] 106.1 ORC Power [MWE] 8.31 Auxiliares [MWE] -19.86 Overall net power [MWE] 94.58 Net electric LHV efficiency 53.0 Cement plant flue gas CO2 capture efficiency [%] 73.2 Equivalent CO2 emissions from NG conversion [g/kWh] -1061 MCFC in cement plant - performance • Clinker production = 3600 tpd • MCFC voltage = 0.8 V