Lean Management
Lean Maturity Matrix
Agenda
Overview
Assessment Process
Assessment Criteria
Lean Maturity Levels
Overview
• Need for maturity matrix is to determine the extent of transformation to adopt Lean
• Lean principles
• Minimize or eliminate waste
• Lean transformation is moving from an old way of thinking to Lean thinking
Assessment Process
• Assessment process
• Assessment steps
1. Decide scope of assessment
2. Appoint a facilitator
3. Appoint representatives
4. Initial kickoff meeting
5. Self-assessment
6. Collates results
7. Build consensus
8. Collate scores
Assessment Criteria
1. Strategic use of Lean
Indicates the degree of Lean incorporation in organization
2. Lean leadership
Indicates to what degree leaders encourage Lean
3. Delivery of value
Indicate evaluation and management of organization's key value streams
4. Standard work
Indicates the degree of process standardization for continuous improvement
5. Process flow
Indicates the degree of process design encourage flow and balance resources
6. Process control
Indicate the degree of process control to reduce rework
Lean Maturity Levels
Level 0
No Lean principles
followed
Level 1
Lean is recognized and
initial efforts is in place
Level 2
Well defined process to
follow Lean principles
Level 3
Infrastructure in place for
consistent Lean usage Level 4
People at level believe in
Lean, follow and
optimize
Lean Maturity Matrix
Wt P1 P2 P3 P4 P5 Assessed
Score
Moderated
Score
Min Max
Strategic Use of
Lean
Lean leadership
Delivery of Value
Standard Work
Process Flow
Process Control
Wt: Weightage for each of the criteria. Total should add up to 100%
P1 to P5: Person doing self-assessment
Key Takeaways
Need for assessment
Assessment approach
Assessment criteria
Lean maturity model
Lean maturity matrix
Knowledge Check
Knowledge
Check
A.
B.
C.
D.
1
At what Lean maturity level can you expect well defined process to follow Lean
principles?
Level 3
Level 0
Level 2
Level 1
Knowledge
Check
The correct answer is
A.
B.
C.
D.
1
At what Lean maturity level can you expect well defined process to follow Lean
principles?
Well defined process to follow Lean principles is usually in Lean maturity level 3. People can still start following this in
earlier levels like 0, 1, or 2. But to fully qualify for level 3 and move ahead to level 4 this is a requirement.
A
Level 3
Level 0
Level 2
Level 1

Mais conteúdo relacionado

Semelhante a Lesson 9 - Lean Maturity Matrix

QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008Engr. Syed Noor Mustafa Shah
 
Three Ways to Transition From “Fire Fighting” Mode to Boost Gains
Three Ways to Transition From “Fire Fighting” Mode to Boost GainsThree Ways to Transition From “Fire Fighting” Mode to Boost Gains
Three Ways to Transition From “Fire Fighting” Mode to Boost GainsSafetyChain Software
 
30-9(ISO9001-2015).pptx
30-9(ISO9001-2015).pptx30-9(ISO9001-2015).pptx
30-9(ISO9001-2015).pptxibr1722011
 
Capability Maturity Model Integartion
Capability Maturity Model IntegartionCapability Maturity Model Integartion
Capability Maturity Model IntegartionSaqib Raza
 
continuous improvement in school management (4) .pdf
continuous improvement in school management (4) .pdfcontinuous improvement in school management (4) .pdf
continuous improvement in school management (4) .pdflynnmdasuki1
 
Training and Development
Training and DevelopmentTraining and Development
Training and DevelopmentPadmasinh Patil
 
Service Management Success Story March 2015
Service Management Success Story March 2015Service Management Success Story March 2015
Service Management Success Story March 2015Rachel Murphy
 
Performace evaluation
Performace evaluationPerformace evaluation
Performace evaluationQamar Wajid
 
Process capability
Process capabilityProcess capability
Process capabilityEman Ahmed
 
Understanding and implementing quality management system in medical laboratories
Understanding and implementing quality management system in medical laboratoriesUnderstanding and implementing quality management system in medical laboratories
Understanding and implementing quality management system in medical laboratoriesPathKind Labs
 
Preparing for your Food Safety Audit
Preparing for your Food Safety AuditPreparing for your Food Safety Audit
Preparing for your Food Safety AuditPECB
 
ISO 9001:2015 Reshaping the role of the auditor - updated version
ISO 9001:2015 Reshaping the role of the auditor - updated versionISO 9001:2015 Reshaping the role of the auditor - updated version
ISO 9001:2015 Reshaping the role of the auditor - updated versionBywater Training
 

Semelhante a Lesson 9 - Lean Maturity Matrix (20)

Total Quality Process (TQP)
Total Quality Process (TQP)Total Quality Process (TQP)
Total Quality Process (TQP)
 
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
 
Layered process audit
Layered process audit Layered process audit
Layered process audit
 
Three Ways to Transition From “Fire Fighting” Mode to Boost Gains
Three Ways to Transition From “Fire Fighting” Mode to Boost GainsThree Ways to Transition From “Fire Fighting” Mode to Boost Gains
Three Ways to Transition From “Fire Fighting” Mode to Boost Gains
 
30-9(ISO9001-2015).pptx
30-9(ISO9001-2015).pptx30-9(ISO9001-2015).pptx
30-9(ISO9001-2015).pptx
 
Capability Maturity Model Integartion
Capability Maturity Model IntegartionCapability Maturity Model Integartion
Capability Maturity Model Integartion
 
continuous improvement in school management (4) .pdf
continuous improvement in school management (4) .pdfcontinuous improvement in school management (4) .pdf
continuous improvement in school management (4) .pdf
 
Software process maturity+ framework
Software process maturity+ frameworkSoftware process maturity+ framework
Software process maturity+ framework
 
Achieve cmmi level 5 maturity
Achieve cmmi level 5 maturityAchieve cmmi level 5 maturity
Achieve cmmi level 5 maturity
 
Qms iso 9000
Qms iso 9000Qms iso 9000
Qms iso 9000
 
Lean transformation
Lean transformationLean transformation
Lean transformation
 
Training and Development
Training and DevelopmentTraining and Development
Training and Development
 
Service Management Success Story March 2015
Service Management Success Story March 2015Service Management Success Story March 2015
Service Management Success Story March 2015
 
ISO 9001:2015 Requirements.pptx
ISO 9001:2015 Requirements.pptxISO 9001:2015 Requirements.pptx
ISO 9001:2015 Requirements.pptx
 
Performace evaluation
Performace evaluationPerformace evaluation
Performace evaluation
 
Process capability
Process capabilityProcess capability
Process capability
 
Understanding and implementing quality management system in medical laboratories
Understanding and implementing quality management system in medical laboratoriesUnderstanding and implementing quality management system in medical laboratories
Understanding and implementing quality management system in medical laboratories
 
MBA TQM 5s.pdf
MBA TQM 5s.pdfMBA TQM 5s.pdf
MBA TQM 5s.pdf
 
Preparing for your Food Safety Audit
Preparing for your Food Safety AuditPreparing for your Food Safety Audit
Preparing for your Food Safety Audit
 
ISO 9001:2015 Reshaping the role of the auditor - updated version
ISO 9001:2015 Reshaping the role of the auditor - updated versionISO 9001:2015 Reshaping the role of the auditor - updated version
ISO 9001:2015 Reshaping the role of the auditor - updated version
 

Mais de TunAnhTrnh9

Lesson 2 - Types of Waste
Lesson 2 - Types of WasteLesson 2 - Types of Waste
Lesson 2 - Types of WasteTunAnhTrnh9
 
Lesson 6 - Lean in Office
Lesson 6 - Lean in OfficeLesson 6 - Lean in Office
Lesson 6 - Lean in OfficeTunAnhTrnh9
 
Lesson 7 - Lean Metrics
Lesson 7 - Lean MetricsLesson 7 - Lean Metrics
Lesson 7 - Lean MetricsTunAnhTrnh9
 
Lesson 10 - Value stream mapping
Lesson 10 - Value stream mappingLesson 10 - Value stream mapping
Lesson 10 - Value stream mappingTunAnhTrnh9
 
Lesson 8 - Other Methodologies That Complement Lean
Lesson 8 - Other Methodologies That Complement LeanLesson 8 - Other Methodologies That Complement Lean
Lesson 8 - Other Methodologies That Complement LeanTunAnhTrnh9
 
Lesson 4 - Lean in Manufacturing
Lesson 4 - Lean in ManufacturingLesson 4 - Lean in Manufacturing
Lesson 4 - Lean in ManufacturingTunAnhTrnh9
 
Lesson 5 - Lean in Service
Lesson 5 - Lean in ServiceLesson 5 - Lean in Service
Lesson 5 - Lean in ServiceTunAnhTrnh9
 
Lesson 3 - Tools
Lesson 3 - ToolsLesson 3 - Tools
Lesson 3 - ToolsTunAnhTrnh9
 
Lesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANLesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANTunAnhTrnh9
 

Mais de TunAnhTrnh9 (9)

Lesson 2 - Types of Waste
Lesson 2 - Types of WasteLesson 2 - Types of Waste
Lesson 2 - Types of Waste
 
Lesson 6 - Lean in Office
Lesson 6 - Lean in OfficeLesson 6 - Lean in Office
Lesson 6 - Lean in Office
 
Lesson 7 - Lean Metrics
Lesson 7 - Lean MetricsLesson 7 - Lean Metrics
Lesson 7 - Lean Metrics
 
Lesson 10 - Value stream mapping
Lesson 10 - Value stream mappingLesson 10 - Value stream mapping
Lesson 10 - Value stream mapping
 
Lesson 8 - Other Methodologies That Complement Lean
Lesson 8 - Other Methodologies That Complement LeanLesson 8 - Other Methodologies That Complement Lean
Lesson 8 - Other Methodologies That Complement Lean
 
Lesson 4 - Lean in Manufacturing
Lesson 4 - Lean in ManufacturingLesson 4 - Lean in Manufacturing
Lesson 4 - Lean in Manufacturing
 
Lesson 5 - Lean in Service
Lesson 5 - Lean in ServiceLesson 5 - Lean in Service
Lesson 5 - Lean in Service
 
Lesson 3 - Tools
Lesson 3 - ToolsLesson 3 - Tools
Lesson 3 - Tools
 
Lesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANLesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEAN
 

Último

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 

Último (20)

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 

Lesson 9 - Lean Maturity Matrix

  • 4. Overview • Need for maturity matrix is to determine the extent of transformation to adopt Lean • Lean principles • Minimize or eliminate waste • Lean transformation is moving from an old way of thinking to Lean thinking
  • 5. Assessment Process • Assessment process • Assessment steps 1. Decide scope of assessment 2. Appoint a facilitator 3. Appoint representatives 4. Initial kickoff meeting 5. Self-assessment 6. Collates results 7. Build consensus 8. Collate scores
  • 6. Assessment Criteria 1. Strategic use of Lean Indicates the degree of Lean incorporation in organization 2. Lean leadership Indicates to what degree leaders encourage Lean 3. Delivery of value Indicate evaluation and management of organization's key value streams 4. Standard work Indicates the degree of process standardization for continuous improvement 5. Process flow Indicates the degree of process design encourage flow and balance resources 6. Process control Indicate the degree of process control to reduce rework
  • 7. Lean Maturity Levels Level 0 No Lean principles followed Level 1 Lean is recognized and initial efforts is in place Level 2 Well defined process to follow Lean principles Level 3 Infrastructure in place for consistent Lean usage Level 4 People at level believe in Lean, follow and optimize
  • 8. Lean Maturity Matrix Wt P1 P2 P3 P4 P5 Assessed Score Moderated Score Min Max Strategic Use of Lean Lean leadership Delivery of Value Standard Work Process Flow Process Control Wt: Weightage for each of the criteria. Total should add up to 100% P1 to P5: Person doing self-assessment
  • 9. Key Takeaways Need for assessment Assessment approach Assessment criteria Lean maturity model Lean maturity matrix
  • 11. Knowledge Check A. B. C. D. 1 At what Lean maturity level can you expect well defined process to follow Lean principles? Level 3 Level 0 Level 2 Level 1
  • 12. Knowledge Check The correct answer is A. B. C. D. 1 At what Lean maturity level can you expect well defined process to follow Lean principles? Well defined process to follow Lean principles is usually in Lean maturity level 3. People can still start following this in earlier levels like 0, 1, or 2. But to fully qualify for level 3 and move ahead to level 4 this is a requirement. A Level 3 Level 0 Level 2 Level 1