1
ETOBICOKE CREEK
NORTH TRAIL PROJECTMay 18, 2017 at Michael Power High School
105 Eringate Drive, Etobicoke ON M9C 3Z7
Purpose of Open House
• We invite you to discuss your questions or concerns with City staff at this meeting
• We also invite you to fill out a comment form, so we may consider your input
• The purpose of today’s open house is to present the design and proposed
construction timeline of a new multi-use trail along Etobicoke Creek south of
Eglinton Avenue West
We Want Your Input
2
Multi-Use Trails
• The City of Toronto has over 300 km of major multi-use
trails
• Together with on-street bicycle facilities, multi-use trails
provide a network of active transportation and recreation
choices for Toronto’s residents and visitors
• Improved access to trails can encourage people to
participate in healthy activities and make our city a better
place to live
• This trail is one of a number of trail projects that are being
considered around Toronto to help improve cycling
connectivity and make green spaces more accessible to
residents
• For more information on multi-use trails please visit
www.toronto.ca/cycling
Waterfront Trail at Marie Curtis Park
Finch Hydro Corridor Trail looking West
from Sentinel Road
3
Existing and Proposed Multi-Use Trails in Toronto
4
Etobicoke Creek
North Trail
5
Etobicoke Creek North Trail
Etobicoke Creek North Trail
Multi-Use Trail Benefits
• Creates pedestrian-cyclist links between neighbourhoods
separated from motor vehicle traffic
• Connects existing amenities and services in the area such as
Centennial Park
• Connects green spaces for use by local residents
• Fills a significant gap in the trail system along Etobicoke Creek to
connect the Toronto Waterfront to Caledon
• Connects to the planned Eglinton West Trail
6
7
Background Information
Ontario Stream Assessment Protocol (OSAP) Archaeological Assessment Geotechnical Investigation
Hydrovac of Utility Pipelines
8
Background Information
Studies
The following studies were conducted in order to gather background information on the site:
Study Description
Ontario Stream Assessment Protocol (OSAP) Evaluated water quality, physical habitat, fish and benthos communities
within the creek
Flora (plant) and fauna (animal) assessments Confirmed the absence of Species at Risk (SAR) (site walk-throughs
conducted by field biologists)
Stage 2 Archeological Assessment Confirmed the absence of cultural material within the project limits
Geotechnical investigation Assessed the general subsurface soil and shallow groundwater
conditions along the proposed trail through the advancement of 4
boreholes, 44 augering test pits and the installation of 2 groundwater
monitoring wells
Hydrovac Located the depth of 8 utility pipelines that traverse a section of the trail
within the hydro corridor
Arborist report Inventoried all trees and determined the amount of tree removals
required to facilitate construction
9
Background Information
Permits and Approvals
Approving Authority Approval Description
Toronto and Region Conservation Authority (TRCA) TRCA planning, water resources, ecology, archeology and
geotechnical staff review and provide approval of project and
proposed scope of work
Department of Fisheries and Oceans (DFO) DFO reviews and provides approval of project and proposed
scope of work to ensure there will be no negative impacts to fish
or fish habitat
Ministry of Natural Resources and Forestry (MNRF) MNRF staff conduct screening of the project area to confirm the
absence Species at Risk (SAR)
Pipeline Utility Companies (Enbridge Petroleum, Enbridge
Distribution, Imperial Oil, Sun-Canadian and Trans Northern
Pipelines Inc.)
Each pipeline utility company reviews the scope of work and
grants a pipeline crossing agreement/permit to allow the trail to
be built across the pipelines
City of Toronto, Urban Forestry Urban Forestry staff at the City review the proposed tree
removals/injuries and grant a Ravine and Natural Feature Permit
to conduct the work
Infrastructure Ontario/ Hydro One Easement agreements
10
Pooling after rainfall
Severe trail erosion near Eglinton Ave EErosion compromising the adjacent trail
Existing Conditions (Before)
Etobicoke Creek North Trail
Design Overview
In general, the proposed trail will be:
• paved asphalt surface;
• approximately 1.1 kilometres long;
• 3.5 m wide; and,
• typically 5% maximum trail grade.
The proposed scope of work also involves the installation of:
• bank stabilization works at one site located approximately half-way through the project limits
to protect the new trail infrastructure from erosion;
• post-and-paddle fencing along some sections of the trail to provide safety for trail users;
and,
• a drainage swale along a portion of the east side of the trail.
*Please see roll plan for details*
11
Roll Plan (on table)
12
Trail Overview
Roll Plan (on table)
13
Eglinton Access and Extension Drawing
Roll Plan (on table)
14
Scour Site 2 Buttress and Trail Realignment
Roll Plan (on table)
15
Scour Site 3 Trail Realignment
16
Vegetated Rock Buttress
17
Typical Trail Cross-Section
Design Considerations for the Natural
Environment
18
• Minimize aquatic habitat
disturbance by reducing amount of
in-stream work
o Monitoring stations deployed
to assess future creek
migration rates at Scour Sites
1 and 3
• Minimize tree removals with
expertise from certified arborist
o Proposed trail to follow
existing alignment except for
two sections that will be
realigned
o Realigned sections of trail to
be reduced from 3.5 m to 3.0
m wide and shoulders to be
reduced from 0.6 m to 0.35 m
wide
Phase 1: Site Setup & Tree Removals
Duration: ~ 50 days
19
Fast Fence
Staging/StockpilingCofferdam
Silt Sock
Staging/Stockpiling
Sediment Filtration Bag
20
Site Setup Aspects Description
Fast Fence Temporary fencing will be erected along the access route
and trail during construction to provide site security and
ensure public safety
Erosion and Sediment Control (ESC) Silt socks and sediment fencing will be placed along access
routes and staging/stockpiling areas to prevent sediment
from infiltrating the watercourse during construction
Cofferdams A cofferdam consisting of pea-gravel meter bags will be
placed in the creek to isolate the work area and prevent
sediment from infiltration the watercourse
Sediment Filtration Bag Water will be pumped from the isolated work area and
filtered through a filtration bag that is surrounded by
erosion and sediment control measures prior to re-entering
the watercourse
Staging & Stockpiling Areas Pre-determined areas where construction materials will be
stored (surrounded by appropriate ESC measures)
Site Setup
21
Phase 2: Vegetated Rock Buttress Construction
Duration: ~ 50 days
Erosion Scour: Vegetated Buttress Location (Before)
Excavation Installation
Vegetated Buttress Location (After)
22
Phase 3: Trail Construction
Duration: ~100 days
Excavation with tree protection Gravel/Stone Placement with ESC Final Asphalt Paving/Site Restoration
Tree Protection Measures and Site
Restoration
• Qualified arborist to conduct regular site inspections to
ensure all tree protection measures are in proper working
order and negative impacts to trees are kept to a
minimum
• Drainage swale to be field-fitted and hand dug around
large tree roots (where possible)
• Approximately 60 trees, including 14 non-native Manitoba
Maple, and 4 invasive Buckthorn trees to be removed to
facilitate construction of the proposed trail
• TRCA’s typical compensation ratio of 3:1 (3 trees planted
for each tree removed) to be exceeded with 267 native
trees and 500 native shrubs proposed to be planted
• All disturbed areas to be restored to existing conditions or
better using topsoil and native seed mix
23
Tree protection measures (fast fence)
Restoration Plan
24
• Discuss your questions or concerns with City staff at this meeting
• Fill out a comment form, so we may consider your input. Comment forms may be dropped off with a staff person as you leave
• If you would like to submit your comment form at a later date, you may do so by email or mail. Please submit your comment form
by June 1, 2017
• Construction of the trail is expected to start in June 2017, pending approvals, and a separate notice will be sent out prior to
construction
• Construction and final site restoration are expected to be finalized by spring 2018, as weather conditions permit
• The public can stay informed by requesting to be added to the project mailing list and through the project webpage,
www.toronto.ca/etobicokecreeknorth
Next Steps
For more information about this project please contact:
Paul Martin
Public Consultation Unit
City of Toronto, Metro Hall, 19th Floor
55 John Street, Toronto, ON M5V 3C6
Email: paul.martin@toronto.ca
Phone: 416-392-6681
25

More Related Content

What's hot

Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Toronto Public Consultation Unit
 
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
Steeles Bridge  EA PIC#2 powerpoint 04_01_2017Steeles Bridge  EA PIC#2 powerpoint 04_01_2017
Steeles Bridge EA PIC#2 powerpoint 04_01_2017Paul B. Martin
 
Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)knelischer
 
Jan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public MeetingJan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public Meetingknelischer
 
Reimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsReimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsknelischer
 
John Street Open House Display Boards
John Street Open House Display BoardsJohn Street Open House Display Boards
John Street Open House Display Boardsknelischer
 
Re imagining yonge street mcea study - pic 2 display panels low res
Re imagining yonge street mcea study - pic 2 display panels low resRe imagining yonge street mcea study - pic 2 display panels low res
Re imagining yonge street mcea study - pic 2 display panels low resknelischer
 
Presentation for public information centres
Presentation for public information centresPresentation for public information centres
Presentation for public information centresknelischer
 
Simmons us 82 fm 989 txk 060909
Simmons   us 82 fm 989 txk 060909Simmons   us 82 fm 989 txk 060909
Simmons us 82 fm 989 txk 060909Brian Bochner
 
Construction of the highline
Construction of the highlineConstruction of the highline
Construction of the highlineturnitover
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]knelischer
 
Chorley Park Trail Connection Accessibility - January 21, 2015
Chorley Park Trail Connection Accessibility - January 21, 2015Chorley Park Trail Connection Accessibility - January 21, 2015
Chorley Park Trail Connection Accessibility - January 21, 2015Toronto Public Consultation Unit
 
Design Review Panel Presentation - December 2014
Design Review Panel Presentation - December 2014Design Review Panel Presentation - December 2014
Design Review Panel Presentation - December 2014knelischer
 

What's hot (20)

Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
 
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
Steeles Bridge  EA PIC#2 powerpoint 04_01_2017Steeles Bridge  EA PIC#2 powerpoint 04_01_2017
Steeles Bridge EA PIC#2 powerpoint 04_01_2017
 
Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)
 
Jan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public MeetingJan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public Meeting
 
Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1Steeles Avenue East Bridge Study PIC 1
Steeles Avenue East Bridge Study PIC 1
 
Reimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsReimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panels
 
John Street Open House Display Boards
John Street Open House Display BoardsJohn Street Open House Display Boards
John Street Open House Display Boards
 
Chorley Park Trail Connecton - Working Group Meeting #3
Chorley Park Trail Connecton - Working Group Meeting #3Chorley Park Trail Connecton - Working Group Meeting #3
Chorley Park Trail Connecton - Working Group Meeting #3
 
Re imagining yonge street mcea study - pic 2 display panels low res
Re imagining yonge street mcea study - pic 2 display panels low resRe imagining yonge street mcea study - pic 2 display panels low res
Re imagining yonge street mcea study - pic 2 display panels low res
 
Presentation for public information centres
Presentation for public information centresPresentation for public information centres
Presentation for public information centres
 
Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)
 
Simmons us 82 fm 989 txk 060909
Simmons   us 82 fm 989 txk 060909Simmons   us 82 fm 989 txk 060909
Simmons us 82 fm 989 txk 060909
 
The Highline
 The Highline The Highline
The Highline
 
Construction of the highline
Construction of the highlineConstruction of the highline
Construction of the highline
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
 
Chorley Park Trail Connection Accessibility - January 21, 2015
Chorley Park Trail Connection Accessibility - January 21, 2015Chorley Park Trail Connection Accessibility - January 21, 2015
Chorley Park Trail Connection Accessibility - January 21, 2015
 
Design Review Panel Presentation - December 2014
Design Review Panel Presentation - December 2014Design Review Panel Presentation - December 2014
Design Review Panel Presentation - December 2014
 
Buey Oil Well Permit
Buey Oil Well PermitBuey Oil Well Permit
Buey Oil Well Permit
 
Eglinton Park
Eglinton ParkEglinton Park
Eglinton Park
 
Oakwood Avenue Bump-outs (slides)
Oakwood Avenue Bump-outs (slides)Oakwood Avenue Bump-outs (slides)
Oakwood Avenue Bump-outs (slides)
 

Similar to 2017 05-18 Etobicoke Creek Nort Trail panels final

Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Fairfax County
 
Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Fairfax County
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_knelischer
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Crosstown TO
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Crosstown TO
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_knelischer
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Crosstown TO
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor WideCrosstown TO
 
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept PlanDead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept PlanFairfax County
 
EIA Presentation.pptx
EIA Presentation.pptxEIA Presentation.pptx
EIA Presentation.pptxEmranKhandker
 
Boston Engineering and Design Poster
Boston Engineering and Design PosterBoston Engineering and Design Poster
Boston Engineering and Design PosterThomas Bryce
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...Crosstown TO
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Crosstown TO
 
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.pptEIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.pptRaghuGhu1
 

Similar to 2017 05-18 Etobicoke Creek Nort Trail panels final (20)

Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
 
Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
 
Lawrence Park PIC 3 slides
Lawrence Park PIC 3 slidesLawrence Park PIC 3 slides
Lawrence Park PIC 3 slides
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
Display boards
Display boardsDisplay boards
Display boards
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor Wide
 
Area 38 pic 1 final presentation
Area 38 pic 1   final presentationArea 38 pic 1   final presentation
Area 38 pic 1 final presentation
 
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept PlanDead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
 
EIA Presentation.pptx
EIA Presentation.pptxEIA Presentation.pptx
EIA Presentation.pptx
 
Boston Engineering and Design Poster
Boston Engineering and Design PosterBoston Engineering and Design Poster
Boston Engineering and Design Poster
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
GrassedWateWays.pptx
GrassedWateWays.pptxGrassedWateWays.pptx
GrassedWateWays.pptx
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017
 
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.pptEIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
 

More from Toronto Public Consultation Unit

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Toronto Public Consultation Unit
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Toronto Public Consultation Unit
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 

More from Toronto Public Consultation Unit (20)

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
 
General information
General informationGeneral information
General information
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Downsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study BoardsDownsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study Boards
 
Downsview Water Service Improvement Study Maps
Downsview Water Service Improvement Study MapsDownsview Water Service Improvement Study Maps
Downsview Water Service Improvement Study Maps
 

Recently uploaded

Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxScottMeyers35
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processNAP Global Network
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCNAP Global Network
 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberSareena Khatun
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptxpiyushsinghrajput913
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...HyderabadDolls
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehousesubs7
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s educationSERUDS INDIA
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)NAP Global Network
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30JSchaus & Associates
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlEdouardHusson
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...kajalverma014
 
Make a difference in a girl's life by donating to her education!
Make a difference in a girl's life by donating to her education!Make a difference in a girl's life by donating to her education!
Make a difference in a girl's life by donating to her education!SERUDS INDIA
 
31st World Press Freedom Day - A Press for the Planet: Journalism in the face...
31st World Press Freedom Day - A Press for the Planet: Journalism in the face...31st World Press Freedom Day - A Press for the Planet: Journalism in the face...
31st World Press Freedom Day - A Press for the Planet: Journalism in the face...Christina Parmionova
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
unang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionunang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionGLADYSNUEVO1
 
31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.Christina Parmionova
 

Recently uploaded (20)

Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
 
Make a difference in a girl's life by donating to her education!
Make a difference in a girl's life by donating to her education!Make a difference in a girl's life by donating to her education!
Make a difference in a girl's life by donating to her education!
 
31st World Press Freedom Day - A Press for the Planet: Journalism in the face...
31st World Press Freedom Day - A Press for the Planet: Journalism in the face...31st World Press Freedom Day - A Press for the Planet: Journalism in the face...
31st World Press Freedom Day - A Press for the Planet: Journalism in the face...
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
 
unang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionunang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog version
 
31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.31st World Press Freedom Day Conference in Santiago.
31st World Press Freedom Day Conference in Santiago.
 

2017 05-18 Etobicoke Creek Nort Trail panels final

  • 1. 1 ETOBICOKE CREEK NORTH TRAIL PROJECTMay 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7
  • 2. Purpose of Open House • We invite you to discuss your questions or concerns with City staff at this meeting • We also invite you to fill out a comment form, so we may consider your input • The purpose of today’s open house is to present the design and proposed construction timeline of a new multi-use trail along Etobicoke Creek south of Eglinton Avenue West We Want Your Input 2
  • 3. Multi-Use Trails • The City of Toronto has over 300 km of major multi-use trails • Together with on-street bicycle facilities, multi-use trails provide a network of active transportation and recreation choices for Toronto’s residents and visitors • Improved access to trails can encourage people to participate in healthy activities and make our city a better place to live • This trail is one of a number of trail projects that are being considered around Toronto to help improve cycling connectivity and make green spaces more accessible to residents • For more information on multi-use trails please visit www.toronto.ca/cycling Waterfront Trail at Marie Curtis Park Finch Hydro Corridor Trail looking West from Sentinel Road 3
  • 4. Existing and Proposed Multi-Use Trails in Toronto 4 Etobicoke Creek North Trail
  • 6. Etobicoke Creek North Trail Multi-Use Trail Benefits • Creates pedestrian-cyclist links between neighbourhoods separated from motor vehicle traffic • Connects existing amenities and services in the area such as Centennial Park • Connects green spaces for use by local residents • Fills a significant gap in the trail system along Etobicoke Creek to connect the Toronto Waterfront to Caledon • Connects to the planned Eglinton West Trail 6
  • 7. 7 Background Information Ontario Stream Assessment Protocol (OSAP) Archaeological Assessment Geotechnical Investigation Hydrovac of Utility Pipelines
  • 8. 8 Background Information Studies The following studies were conducted in order to gather background information on the site: Study Description Ontario Stream Assessment Protocol (OSAP) Evaluated water quality, physical habitat, fish and benthos communities within the creek Flora (plant) and fauna (animal) assessments Confirmed the absence of Species at Risk (SAR) (site walk-throughs conducted by field biologists) Stage 2 Archeological Assessment Confirmed the absence of cultural material within the project limits Geotechnical investigation Assessed the general subsurface soil and shallow groundwater conditions along the proposed trail through the advancement of 4 boreholes, 44 augering test pits and the installation of 2 groundwater monitoring wells Hydrovac Located the depth of 8 utility pipelines that traverse a section of the trail within the hydro corridor Arborist report Inventoried all trees and determined the amount of tree removals required to facilitate construction
  • 9. 9 Background Information Permits and Approvals Approving Authority Approval Description Toronto and Region Conservation Authority (TRCA) TRCA planning, water resources, ecology, archeology and geotechnical staff review and provide approval of project and proposed scope of work Department of Fisheries and Oceans (DFO) DFO reviews and provides approval of project and proposed scope of work to ensure there will be no negative impacts to fish or fish habitat Ministry of Natural Resources and Forestry (MNRF) MNRF staff conduct screening of the project area to confirm the absence Species at Risk (SAR) Pipeline Utility Companies (Enbridge Petroleum, Enbridge Distribution, Imperial Oil, Sun-Canadian and Trans Northern Pipelines Inc.) Each pipeline utility company reviews the scope of work and grants a pipeline crossing agreement/permit to allow the trail to be built across the pipelines City of Toronto, Urban Forestry Urban Forestry staff at the City review the proposed tree removals/injuries and grant a Ravine and Natural Feature Permit to conduct the work Infrastructure Ontario/ Hydro One Easement agreements
  • 10. 10 Pooling after rainfall Severe trail erosion near Eglinton Ave EErosion compromising the adjacent trail Existing Conditions (Before)
  • 11. Etobicoke Creek North Trail Design Overview In general, the proposed trail will be: • paved asphalt surface; • approximately 1.1 kilometres long; • 3.5 m wide; and, • typically 5% maximum trail grade. The proposed scope of work also involves the installation of: • bank stabilization works at one site located approximately half-way through the project limits to protect the new trail infrastructure from erosion; • post-and-paddle fencing along some sections of the trail to provide safety for trail users; and, • a drainage swale along a portion of the east side of the trail. *Please see roll plan for details* 11
  • 12. Roll Plan (on table) 12 Trail Overview
  • 13. Roll Plan (on table) 13 Eglinton Access and Extension Drawing
  • 14. Roll Plan (on table) 14 Scour Site 2 Buttress and Trail Realignment
  • 15. Roll Plan (on table) 15 Scour Site 3 Trail Realignment
  • 18. Design Considerations for the Natural Environment 18 • Minimize aquatic habitat disturbance by reducing amount of in-stream work o Monitoring stations deployed to assess future creek migration rates at Scour Sites 1 and 3 • Minimize tree removals with expertise from certified arborist o Proposed trail to follow existing alignment except for two sections that will be realigned o Realigned sections of trail to be reduced from 3.5 m to 3.0 m wide and shoulders to be reduced from 0.6 m to 0.35 m wide
  • 19. Phase 1: Site Setup & Tree Removals Duration: ~ 50 days 19 Fast Fence Staging/StockpilingCofferdam Silt Sock Staging/Stockpiling Sediment Filtration Bag
  • 20. 20 Site Setup Aspects Description Fast Fence Temporary fencing will be erected along the access route and trail during construction to provide site security and ensure public safety Erosion and Sediment Control (ESC) Silt socks and sediment fencing will be placed along access routes and staging/stockpiling areas to prevent sediment from infiltrating the watercourse during construction Cofferdams A cofferdam consisting of pea-gravel meter bags will be placed in the creek to isolate the work area and prevent sediment from infiltration the watercourse Sediment Filtration Bag Water will be pumped from the isolated work area and filtered through a filtration bag that is surrounded by erosion and sediment control measures prior to re-entering the watercourse Staging & Stockpiling Areas Pre-determined areas where construction materials will be stored (surrounded by appropriate ESC measures) Site Setup
  • 21. 21 Phase 2: Vegetated Rock Buttress Construction Duration: ~ 50 days Erosion Scour: Vegetated Buttress Location (Before) Excavation Installation Vegetated Buttress Location (After)
  • 22. 22 Phase 3: Trail Construction Duration: ~100 days Excavation with tree protection Gravel/Stone Placement with ESC Final Asphalt Paving/Site Restoration
  • 23. Tree Protection Measures and Site Restoration • Qualified arborist to conduct regular site inspections to ensure all tree protection measures are in proper working order and negative impacts to trees are kept to a minimum • Drainage swale to be field-fitted and hand dug around large tree roots (where possible) • Approximately 60 trees, including 14 non-native Manitoba Maple, and 4 invasive Buckthorn trees to be removed to facilitate construction of the proposed trail • TRCA’s typical compensation ratio of 3:1 (3 trees planted for each tree removed) to be exceeded with 267 native trees and 500 native shrubs proposed to be planted • All disturbed areas to be restored to existing conditions or better using topsoil and native seed mix 23 Tree protection measures (fast fence)
  • 25. • Discuss your questions or concerns with City staff at this meeting • Fill out a comment form, so we may consider your input. Comment forms may be dropped off with a staff person as you leave • If you would like to submit your comment form at a later date, you may do so by email or mail. Please submit your comment form by June 1, 2017 • Construction of the trail is expected to start in June 2017, pending approvals, and a separate notice will be sent out prior to construction • Construction and final site restoration are expected to be finalized by spring 2018, as weather conditions permit • The public can stay informed by requesting to be added to the project mailing list and through the project webpage, www.toronto.ca/etobicokecreeknorth Next Steps For more information about this project please contact: Paul Martin Public Consultation Unit City of Toronto, Metro Hall, 19th Floor 55 John Street, Toronto, ON M5V 3C6 Email: paul.martin@toronto.ca Phone: 416-392-6681 25