Improving On-Time Delivery
Customer ABC Classifications
and Standard Lead Times
Presented to Western Mass. APICS Chapter #19
By Thomas G. Cantin, CPIM
Copyright 2010 All rights reserved
ABC Classifications
• Inventory ABC Classifications
A - 20% of items represent 80% of $
B - 30% of items represent 15% of $
C - 50% of items represent 5% of $
• Customer ABC Classification
Based upon total sales revenue
Use yearly totals to avoid seasonality
Rankings may be modified
ABC Customer Classification
QUANTITY RUNNING REVENUE RUNNING
Units Total Percentage Dollars Total Percentage
A WORLWIDE EMPORIUM 207,771 207,771 28.2% $548,530.92 $548,530.92 15.8%
A ROCK SOLID 73,921 281,692 38.2% $412,269.68 $960,800.60 27.6%
A BELLA VILLA 70,840 352,532 47.8% $456,253.76 $1,417,054.36 40.7%
A CAPITAL COMPANY 66,504 419,036 56.9% $189,368.40 $1,606,422.76 46.1%
A DANUBE INC. 54,209 473,245 64.2% $312,204.23 $1,918,626.99 55.1%
A RED ZINGER 52,756 526,001 71.4% $214,862.36 $2,133,489.35 61.3%
A WINE & BRINE 32,634 558,635 75.8% $249,767.78 $2,383,257.13 68.5%
A BROWN & COMPANY 31,884 590,519 80.1% $163,352.48 $2,546,609.61 73.1%
A FRENCH CONNECTION 24,057 614,576 83.4% $183,439.47 $2,730,049.08 78.4%
A CAMERA WEAR 20,299 634,875 86.1% $188,737.60 $2,918,786.68 83.8%
B CTS WEATHERPROOF 17,184 652,059 88.5% $73,240.45 $2,992,027.13 85.9%
B SNOW WHITE 16,386 668,445 90.7% $57,694.38 $3,049,721.51 87.6%
Lead Times
• Planning Horizons
• Demand Rates
• Manufacturing or Service Environment
– Mass Customization
– Flow
– Cellular
– Job Shop
– Engineer to Order
– Project Management
Lead Time Calendar
FEBRUARY
S M T W T F S
21 22 23 24 25 26 27
28 1 2 3 4 5 6
MARCH
S M T W T F S
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3
Lead Time Calendar
FEBRUARY
S M T W T F S
21 22 23 24 25 26 27
28 1 2 3 4 5 6
MARCH
S M T W T F S
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3
Lead Time Calendar
FEBRUARY
S M T W T F S
21 22 23 24 25 26 27
28 1 2 3 4 5 6
MARCH
S M T W T F S
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3
Improving On-Time Delivery
• Where are you now?
• Where do you want to be?
• SMART Goal format
– Specific (by business segment or Customer)
– Measurable (is data readily available?)
– Attainable (do you have the resources?)
– Realistic (not just a hope or a dream)
– Tangible (time-based)
Starting Point
2006-2008 Actual
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
OEM
SS
OEM 90.0% 88.0% 87.9% 87.2% 74.5% 82.0%
SS 88.0% 84.0% 89.3% 87.8% 72.4% 76.8%
YE YE Q1 Q2 Q3 Q4
2006 2007 2008 2008 2008 2008
Using a Decision Map
• On-Time Delivery is one of the most
important high-level, strategic objectives.
• Must get key stakeholders involved.
• S&OP meeting is a good starting point
– Materials/Capacity
– Operations
– Sales & Customer Service
– Shipping/Logistics
Completed Decision Map
Assumptions:
A1: Material is available at each
operation as planned and scheduled.
A2: Associates are available at agreed
staffing levels with the correct skill sets.
A3: Actual customer orders and
forecasts are received far enough in
advance to allow for proper planning and
fulfillment.
A4: Product is automatically allocated by
the system.
Success Factors:
S1: Achieve On-Time delivery of:
OEM SS
January 89% 87%
February 90% 88%
March 91% 89%
Q1 90% 88%
S2: Achieve 95% (units) fill rate and
90% (item) fill rate against stocking
levels by the end of the first quarter.
Decision Objective:
What is the best way to
improve our on-time
delivery performance?
Other Objectives:
1. Institute a cycle-counting program.
2. Reduce overall inventory levels.
Option 1:
Re-allocate resources to match
production capabilities to actual
mix & volume demanded.
Option 3:
Perform value-stream mapping
in order to identify key product
families.
Option 4:
Utilize available capacity
within each product line to
support stocking levels.
Option 2:
Increase set-up reduction
efforts to provide greater
scheduling flexibility.
Constraint 4:
Provided that we can rely on
forecasts and stocking levels to
be relatively accurate.
Constraint 3:
Provided that we can minimize
the impact of non-conforming
materials.
Constraint 2:
Provided that we can avoid
overtime expenses in excess of
target (budgeted) amounts.
Constraint 1:
Provided that we understand
what the actual production rates
are for each department.
Relevant Concerns:
1. There may be (cultural) resistance
to change policies and procedures .
2. (Short) lead time expectations from
several customers.
Measuring On-Time Delivery
• Promise Dates given to Customers
• Customer Request Dates
• Customer Measurements
– By Entire Order
– By Line Item
– By Number of Units
• CAUTION: On-Time Delivery should not
be based upon revenue dollars shipped
The Seven Key Dates
• Order receipt date
• Order entry date
• Customer request date
• Promise date
• Completion date
• Allocation date
• Ship date
Backlog Profile in Trouble
Backlog Profile Thursday, 06/26/08
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Week Ending Dates
Quantity
Capacity
Promised
Capacity 0 0 0 0 0 0 0 0 0 0 0 1,200 0 0 4,800 4,800 4,800
Promised 6 0 37 84 0 0 60 72 60 497 919 5,593 6,650 4,302 3,827 3,475 3,300
4/12/2008 4/19/2008 4/26/2008 5/3/2008 5/10/2008 5/17/2008 5/24/2008 5/31/2008 6/7/2008 6/14/2008 6/21/2008 6/28/2008 7/5/2008 7/12/2008 7/19/2008 7/26/2008 8/2/2008
Order Promising Mistakes
• Variable lead times given to Customers
– Earlier when slow; later when busy
– Erratic lead times from supply partners
• Improper planning parameters
– Throughput rates are not known
– Old data is being used
• Inconsistent processes
– Within planning and scheduling, customer
service, production, etc.
Stop Making Bad Promises
• Institute a formal order promising process.
• Communicate changes to Customers.
• Focus on the Detailed Scheduling and
Planning required to keep the promises
you are making.
• Ensure that there is feedback within a
closed-loop planning system.
• Improve the processes and systems.
Expedite with Extreme Caution
• Expediting impedes normal product flows
and gives rise to informal management
systems (hot sheets, special lists, etc.).
• Do we understand why there was a
request or need to expedite?
• When people are in a rush, they often get
the (important) details wrong.
• Remember that when everything is a
priority, then nothing is a priority.
Senior Management
• Outline problems identified from work that
has already been done.
• Use data and specific examples to relate
problems to resource allocation, as well as
internal results and impact on Customers.
• Prioritize proposed solutions and try to
provide multiple options instead of simple
“Yes” or “No” decisions.
OEM Data December 2008
Early On-Time 1 - 7 8 - 14 15 - 30 GT 30 Totals Early On Time Late
A Total 195,965 67,027 14,934 12,094 11,236 4,583 305,839 62.1% 24.3% 13.6%
B Total 61,656 44,672 8,398 8,748 4,342 2,090 129,906 47.5% 34.4% 18.2%
C Total 17,305 4,745 2,574 4,158 10,971 732 40,485 42.7% 11.7% 45.5%
Resource Allocation
• Focus on Real Bottlenecks.
• Dispel Myths of Artificial Bottlenecks or
Man-made constraints.
• Challenge or Confirm basic assumptions
inherent to the process.
• Be mindful of other objectives.
• Speak about what success will look like
and the benefits to be realized.
Scheduling & Loading
Two basic strategies:
1. Forward-scheduling, infinite capacity
• Earliest completion date
• Focus on material availability
• “Load-and-go” mentality
• Expedite incoming materials; chase orders
2. Backward-scheduling, finite capacity
• Latest start date
• Planned and scheduled around constraint
Order Policies & Lot Sizes
• Customer order minimums
– How do you incorporate your forecasts?
– What is your target service level?
• Production lot sizing (min./max.)
– Lot-for-lot
– Fixed order quantity
• Set-ups and change-overs
– Are they accounted for in planning?
Forecasts and Service Levels
Service Stocking Levels
60,000
70,000
80,000
90,000
100,000
110,000
120,000
Units
Net On-Hand Units 61,557 77,440 76,582 83,892 84,738 97,676 91,027 86,943 89,811 86,128 71,106 85,629 93,631
Target Stocking Level 117,497 117,497 117,497 110,607 110,607 110,607 110,607 110,607 110,607 110,607 110,607 110,607 110,607
Fill Rate 52.4% 65.9% 65.2% 75.8% 76.6% 88.3% 82.3% 78.6% 81.2% 77.9% 64.3% 77.4% 84.7%
2/24/2009 3/3/2009 3/10/2009 3/17/2009 3/24/2009 3/31/2009 4/7/2009 4/14/2009 4/21/2009 4/28/2009 5/5/2009 5/12/2009 5/19/2009
A Systematic Solution
1. Ability to review new orders against current
backlog profile and lead times
2. Formal order promising policies/guidelines
3. Visibility of orders within MRP/DSP tools
4. Controlled order release
5. Ability to monitor progress of order
6. Capability of in-process corrective action
7. Meaningful metrics tracked and published
8. Continuous improvement of processes
Actual Results
2009 On-Time Delivery
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
Month
On-TimeDelivery%
OEM
SS
OEM 89.1% 96.1% 96.3% 96.9% 97.1% 98.1% 98.3% 98.8% 94.5% 97.7% 98.6% 98.7%
SS 77.8% 92.7% 92.0% 99.8% 99.5% 99.7% 100.0% 99.6% 99.7% 99.8% 99.8% 99.9%
January February March April May June July August September October November December
Business Consulting
Education & Training
Professional Services
cantinmanagementgroup.com
(413)427-6536

More Related Content

What's hot

Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectSumit K Jha
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mappingmahawar1987
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with examplebhanutomar
 
Value Stream Mapping -The Concept
Value Stream Mapping -The ConceptValue Stream Mapping -The Concept
Value Stream Mapping -The ConceptSubhrajyoti Parida
 
MRP (Material requirements planning)
MRP (Material requirements planning)MRP (Material requirements planning)
MRP (Material requirements planning)Abdulrahman El-Sayed
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...Niranjana B
 
Value stream mapping (1)
Value stream mapping (1)Value stream mapping (1)
Value stream mapping (1)jmachado33
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt ProjectAndrey Lygin
 
SAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalSAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalAndrew Si
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mappingShaunak Kale
 
Green Belt Project Storyboard Template Example
Green Belt Project Storyboard Template Example Green Belt Project Storyboard Template Example
Green Belt Project Storyboard Template Example GoLeanSixSigma.com
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSMSedhuSiddarth
 

What's hot (20)

Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt project
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
 
Value Stream Mapping -The Concept
Value Stream Mapping -The ConceptValue Stream Mapping -The Concept
Value Stream Mapping -The Concept
 
Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07
 
MRP (Material requirements planning)
MRP (Material requirements planning)MRP (Material requirements planning)
MRP (Material requirements planning)
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
 
Lean 6sigma and DMAIC
Lean 6sigma and DMAICLean 6sigma and DMAIC
Lean 6sigma and DMAIC
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Value stream mapping (1)
Value stream mapping (1)Value stream mapping (1)
Value stream mapping (1)
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Six Sigma Black Belt Project
Six Sigma Black Belt ProjectSix Sigma Black Belt Project
Six Sigma Black Belt Project
 
LEAN SIX SIGMA PROJECT - FINAL
LEAN SIX SIGMA PROJECT - FINALLEAN SIX SIGMA PROJECT - FINAL
LEAN SIX SIGMA PROJECT - FINAL
 
S&OP Process
S&OP ProcessS&OP Process
S&OP Process
 
SAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalSAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-External
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
S&OP Implementation Roadmap
S&OP Implementation RoadmapS&OP Implementation Roadmap
S&OP Implementation Roadmap
 
Green Belt Project Storyboard Template Example
Green Belt Project Storyboard Template Example Green Belt Project Storyboard Template Example
Green Belt Project Storyboard Template Example
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 

Viewers also liked

5. effective, on time delivery
5. effective, on time delivery5. effective, on time delivery
5. effective, on time deliveryhfonfe
 
Six Sigma Project on Distribution Efficiency
Six Sigma Project on Distribution EfficiencySix Sigma Project on Distribution Efficiency
Six Sigma Project on Distribution Efficiencymrt77
 
Performance delivery
Performance deliveryPerformance delivery
Performance deliveryMichael Mckay
 
2012 10 25_sbo presentatie sap event
2012 10 25_sbo presentatie sap event2012 10 25_sbo presentatie sap event
2012 10 25_sbo presentatie sap eventDesk Solutions NV
 
Keynote blended learning NHL
Keynote blended learning NHLKeynote blended learning NHL
Keynote blended learning NHLWilfredRubens.com
 
On time delivery_SCM 4Q Presentation
On time delivery_SCM 4Q PresentationOn time delivery_SCM 4Q Presentation
On time delivery_SCM 4Q PresentationTorben Skat Rasmussen
 
Six-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleSix-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleDheerendra S Negi
 
Presentation for Six Sigma certification
Presentation for Six Sigma certificationPresentation for Six Sigma certification
Presentation for Six Sigma certificationElena Titova
 
Using Six Sigma to reduce ATF pipeline transfer losses
Using Six Sigma to reduce ATF pipeline transfer lossesUsing Six Sigma to reduce ATF pipeline transfer losses
Using Six Sigma to reduce ATF pipeline transfer lossesNeelesh Bhagwat
 
Average Handle Time: How to reduce yours and improve customer satisfaction!
Average Handle Time: How to reduce yours and improve customer satisfaction!Average Handle Time: How to reduce yours and improve customer satisfaction!
Average Handle Time: How to reduce yours and improve customer satisfaction!eakoehler
 
How Should Suppliers be Penalized for Late Deliveries or Poor Quality
How Should Suppliers be Penalized for Late Deliveries or Poor QualityHow Should Suppliers be Penalized for Late Deliveries or Poor Quality
How Should Suppliers be Penalized for Late Deliveries or Poor QualityBill Kohnen
 

Viewers also liked (14)

5. effective, on time delivery
5. effective, on time delivery5. effective, on time delivery
5. effective, on time delivery
 
Six Sigma Project on Distribution Efficiency
Six Sigma Project on Distribution EfficiencySix Sigma Project on Distribution Efficiency
Six Sigma Project on Distribution Efficiency
 
Performance delivery
Performance deliveryPerformance delivery
Performance delivery
 
2012 10 25_sbo presentatie sap event
2012 10 25_sbo presentatie sap event2012 10 25_sbo presentatie sap event
2012 10 25_sbo presentatie sap event
 
Keynote blended learning NHL
Keynote blended learning NHLKeynote blended learning NHL
Keynote blended learning NHL
 
On time delivery_SCM 4Q Presentation
On time delivery_SCM 4Q PresentationOn time delivery_SCM 4Q Presentation
On time delivery_SCM 4Q Presentation
 
Lean Six Sigma Black Belt Project Storyboard - The Retension Process
Lean Six Sigma Black Belt Project Storyboard - The Retension ProcessLean Six Sigma Black Belt Project Storyboard - The Retension Process
Lean Six Sigma Black Belt Project Storyboard - The Retension Process
 
Six-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleSix-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sample
 
Ui Mockup
Ui MockupUi Mockup
Ui Mockup
 
Presentation for Six Sigma certification
Presentation for Six Sigma certificationPresentation for Six Sigma certification
Presentation for Six Sigma certification
 
2 Powerful Purchasing Cost Reduction Strategies
2 Powerful Purchasing Cost Reduction Strategies2 Powerful Purchasing Cost Reduction Strategies
2 Powerful Purchasing Cost Reduction Strategies
 
Using Six Sigma to reduce ATF pipeline transfer losses
Using Six Sigma to reduce ATF pipeline transfer lossesUsing Six Sigma to reduce ATF pipeline transfer losses
Using Six Sigma to reduce ATF pipeline transfer losses
 
Average Handle Time: How to reduce yours and improve customer satisfaction!
Average Handle Time: How to reduce yours and improve customer satisfaction!Average Handle Time: How to reduce yours and improve customer satisfaction!
Average Handle Time: How to reduce yours and improve customer satisfaction!
 
How Should Suppliers be Penalized for Late Deliveries or Poor Quality
How Should Suppliers be Penalized for Late Deliveries or Poor QualityHow Should Suppliers be Penalized for Late Deliveries or Poor Quality
How Should Suppliers be Penalized for Late Deliveries or Poor Quality
 

Similar to Improving On Time Delivery

Supply Chain Management Workshop
Supply Chain Management WorkshopSupply Chain Management Workshop
Supply Chain Management WorkshopTom Sauder, P.Eng.
 
CSCMP 2014: Using S&OP to Improve Enterprise Resiliency
CSCMP 2014: Using S&OP to Improve Enterprise ResiliencyCSCMP 2014: Using S&OP to Improve Enterprise Resiliency
CSCMP 2014: Using S&OP to Improve Enterprise ResiliencyAlyssaVallie
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
Joel Marusiak, Neovia Logistics presenatation at Spare Parts 2013
Joel Marusiak, Neovia Logistics presenatation at Spare Parts 2013Joel Marusiak, Neovia Logistics presenatation at Spare Parts 2013
Joel Marusiak, Neovia Logistics presenatation at Spare Parts 2013Copperberg
 
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...Lora Cecere
 
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC Julian Kalac P.Eng
 
Logistics Case Study
Logistics Case StudyLogistics Case Study
Logistics Case StudyDonald Cross
 
Joachim_Sculte_Hungary_Appsday_Demantra_081007.ppt
Joachim_Sculte_Hungary_Appsday_Demantra_081007.pptJoachim_Sculte_Hungary_Appsday_Demantra_081007.ppt
Joachim_Sculte_Hungary_Appsday_Demantra_081007.pptbhagatsingh9
 
Enhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaEnhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaWillie Carter
 
Enhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaEnhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaWillie Carter
 
The Benefits of Applying Lean Sigma for Service
The Benefits of Applying Lean Sigma for ServiceThe Benefits of Applying Lean Sigma for Service
The Benefits of Applying Lean Sigma for ServiceWillie Carter
 
MGMT 6103 - Control Phase- CMCC
MGMT 6103 - Control Phase- CMCCMGMT 6103 - Control Phase- CMCC
MGMT 6103 - Control Phase- CMCCLeonard Burch
 
Business Performance Management - Process Approach
Business Performance Management - Process ApproachBusiness Performance Management - Process Approach
Business Performance Management - Process ApproachAjay Koul
 
Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Kaustav Lahiri
 
Complete Guide To Input Output Business Process Model PowerPoint Presentatio...
Complete Guide To Input Output Business Process Model  PowerPoint Presentatio...Complete Guide To Input Output Business Process Model  PowerPoint Presentatio...
Complete Guide To Input Output Business Process Model PowerPoint Presentatio...SlideTeam
 
Jared Amato - Six Sigma Green Belt Reporting
Jared Amato - Six Sigma Green Belt ReportingJared Amato - Six Sigma Green Belt Reporting
Jared Amato - Six Sigma Green Belt ReportingJared Amato
 
How gilt implemented a successful labor management system ops summit 2013
How gilt implemented a successful labor management system ops summit 2013How gilt implemented a successful labor management system ops summit 2013
How gilt implemented a successful labor management system ops summit 2013Steve Johnson
 
Webinar_DemandPlanning_Forecasting.pdf
Webinar_DemandPlanning_Forecasting.pdfWebinar_DemandPlanning_Forecasting.pdf
Webinar_DemandPlanning_Forecasting.pdfssuser252a1f
 

Similar to Improving On Time Delivery (20)

Supply Chain Workshop Demo
Supply Chain Workshop DemoSupply Chain Workshop Demo
Supply Chain Workshop Demo
 
Supply Chain Management Workshop
Supply Chain Management WorkshopSupply Chain Management Workshop
Supply Chain Management Workshop
 
CSCMP 2014: Using S&OP to Improve Enterprise Resiliency
CSCMP 2014: Using S&OP to Improve Enterprise ResiliencyCSCMP 2014: Using S&OP to Improve Enterprise Resiliency
CSCMP 2014: Using S&OP to Improve Enterprise Resiliency
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
Joel Marusiak, Neovia Logistics presenatation at Spare Parts 2013
Joel Marusiak, Neovia Logistics presenatation at Spare Parts 2013Joel Marusiak, Neovia Logistics presenatation at Spare Parts 2013
Joel Marusiak, Neovia Logistics presenatation at Spare Parts 2013
 
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
Presentation with Jim Prescott of Sonoco Products on S&OP at CSCMP in San Ant...
 
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
 
Logistics Case Study
Logistics Case StudyLogistics Case Study
Logistics Case Study
 
Lean vs six sigma -jk
Lean vs six sigma  -jkLean vs six sigma  -jk
Lean vs six sigma -jk
 
Joachim_Sculte_Hungary_Appsday_Demantra_081007.ppt
Joachim_Sculte_Hungary_Appsday_Demantra_081007.pptJoachim_Sculte_Hungary_Appsday_Demantra_081007.ppt
Joachim_Sculte_Hungary_Appsday_Demantra_081007.ppt
 
Enhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaEnhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean Sigma
 
Enhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean SigmaEnhancing Service Quality: Implementing Lean Sigma
Enhancing Service Quality: Implementing Lean Sigma
 
The Benefits of Applying Lean Sigma for Service
The Benefits of Applying Lean Sigma for ServiceThe Benefits of Applying Lean Sigma for Service
The Benefits of Applying Lean Sigma for Service
 
MGMT 6103 - Control Phase- CMCC
MGMT 6103 - Control Phase- CMCCMGMT 6103 - Control Phase- CMCC
MGMT 6103 - Control Phase- CMCC
 
Business Performance Management - Process Approach
Business Performance Management - Process ApproachBusiness Performance Management - Process Approach
Business Performance Management - Process Approach
 
Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.
 
Complete Guide To Input Output Business Process Model PowerPoint Presentatio...
Complete Guide To Input Output Business Process Model  PowerPoint Presentatio...Complete Guide To Input Output Business Process Model  PowerPoint Presentatio...
Complete Guide To Input Output Business Process Model PowerPoint Presentatio...
 
Jared Amato - Six Sigma Green Belt Reporting
Jared Amato - Six Sigma Green Belt ReportingJared Amato - Six Sigma Green Belt Reporting
Jared Amato - Six Sigma Green Belt Reporting
 
How gilt implemented a successful labor management system ops summit 2013
How gilt implemented a successful labor management system ops summit 2013How gilt implemented a successful labor management system ops summit 2013
How gilt implemented a successful labor management system ops summit 2013
 
Webinar_DemandPlanning_Forecasting.pdf
Webinar_DemandPlanning_Forecasting.pdfWebinar_DemandPlanning_Forecasting.pdf
Webinar_DemandPlanning_Forecasting.pdf
 

Improving On Time Delivery

  • 1. Improving On-Time Delivery Customer ABC Classifications and Standard Lead Times Presented to Western Mass. APICS Chapter #19 By Thomas G. Cantin, CPIM Copyright 2010 All rights reserved
  • 2. ABC Classifications • Inventory ABC Classifications A - 20% of items represent 80% of $ B - 30% of items represent 15% of $ C - 50% of items represent 5% of $ • Customer ABC Classification Based upon total sales revenue Use yearly totals to avoid seasonality Rankings may be modified
  • 3. ABC Customer Classification QUANTITY RUNNING REVENUE RUNNING Units Total Percentage Dollars Total Percentage A WORLWIDE EMPORIUM 207,771 207,771 28.2% $548,530.92 $548,530.92 15.8% A ROCK SOLID 73,921 281,692 38.2% $412,269.68 $960,800.60 27.6% A BELLA VILLA 70,840 352,532 47.8% $456,253.76 $1,417,054.36 40.7% A CAPITAL COMPANY 66,504 419,036 56.9% $189,368.40 $1,606,422.76 46.1% A DANUBE INC. 54,209 473,245 64.2% $312,204.23 $1,918,626.99 55.1% A RED ZINGER 52,756 526,001 71.4% $214,862.36 $2,133,489.35 61.3% A WINE & BRINE 32,634 558,635 75.8% $249,767.78 $2,383,257.13 68.5% A BROWN & COMPANY 31,884 590,519 80.1% $163,352.48 $2,546,609.61 73.1% A FRENCH CONNECTION 24,057 614,576 83.4% $183,439.47 $2,730,049.08 78.4% A CAMERA WEAR 20,299 634,875 86.1% $188,737.60 $2,918,786.68 83.8% B CTS WEATHERPROOF 17,184 652,059 88.5% $73,240.45 $2,992,027.13 85.9% B SNOW WHITE 16,386 668,445 90.7% $57,694.38 $3,049,721.51 87.6%
  • 4. Lead Times • Planning Horizons • Demand Rates • Manufacturing or Service Environment – Mass Customization – Flow – Cellular – Job Shop – Engineer to Order – Project Management
  • 5. Lead Time Calendar FEBRUARY S M T W T F S 21 22 23 24 25 26 27 28 1 2 3 4 5 6 MARCH S M T W T F S 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
  • 6. Lead Time Calendar FEBRUARY S M T W T F S 21 22 23 24 25 26 27 28 1 2 3 4 5 6 MARCH S M T W T F S 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
  • 7. Lead Time Calendar FEBRUARY S M T W T F S 21 22 23 24 25 26 27 28 1 2 3 4 5 6 MARCH S M T W T F S 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
  • 8. Improving On-Time Delivery • Where are you now? • Where do you want to be? • SMART Goal format – Specific (by business segment or Customer) – Measurable (is data readily available?) – Attainable (do you have the resources?) – Realistic (not just a hope or a dream) – Tangible (time-based)
  • 9. Starting Point 2006-2008 Actual 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0% OEM SS OEM 90.0% 88.0% 87.9% 87.2% 74.5% 82.0% SS 88.0% 84.0% 89.3% 87.8% 72.4% 76.8% YE YE Q1 Q2 Q3 Q4 2006 2007 2008 2008 2008 2008
  • 10. Using a Decision Map • On-Time Delivery is one of the most important high-level, strategic objectives. • Must get key stakeholders involved. • S&OP meeting is a good starting point – Materials/Capacity – Operations – Sales & Customer Service – Shipping/Logistics
  • 11. Completed Decision Map Assumptions: A1: Material is available at each operation as planned and scheduled. A2: Associates are available at agreed staffing levels with the correct skill sets. A3: Actual customer orders and forecasts are received far enough in advance to allow for proper planning and fulfillment. A4: Product is automatically allocated by the system. Success Factors: S1: Achieve On-Time delivery of: OEM SS January 89% 87% February 90% 88% March 91% 89% Q1 90% 88% S2: Achieve 95% (units) fill rate and 90% (item) fill rate against stocking levels by the end of the first quarter. Decision Objective: What is the best way to improve our on-time delivery performance? Other Objectives: 1. Institute a cycle-counting program. 2. Reduce overall inventory levels. Option 1: Re-allocate resources to match production capabilities to actual mix & volume demanded. Option 3: Perform value-stream mapping in order to identify key product families. Option 4: Utilize available capacity within each product line to support stocking levels. Option 2: Increase set-up reduction efforts to provide greater scheduling flexibility. Constraint 4: Provided that we can rely on forecasts and stocking levels to be relatively accurate. Constraint 3: Provided that we can minimize the impact of non-conforming materials. Constraint 2: Provided that we can avoid overtime expenses in excess of target (budgeted) amounts. Constraint 1: Provided that we understand what the actual production rates are for each department. Relevant Concerns: 1. There may be (cultural) resistance to change policies and procedures . 2. (Short) lead time expectations from several customers.
  • 12. Measuring On-Time Delivery • Promise Dates given to Customers • Customer Request Dates • Customer Measurements – By Entire Order – By Line Item – By Number of Units • CAUTION: On-Time Delivery should not be based upon revenue dollars shipped
  • 13. The Seven Key Dates • Order receipt date • Order entry date • Customer request date • Promise date • Completion date • Allocation date • Ship date
  • 14. Backlog Profile in Trouble Backlog Profile Thursday, 06/26/08 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Week Ending Dates Quantity Capacity Promised Capacity 0 0 0 0 0 0 0 0 0 0 0 1,200 0 0 4,800 4,800 4,800 Promised 6 0 37 84 0 0 60 72 60 497 919 5,593 6,650 4,302 3,827 3,475 3,300 4/12/2008 4/19/2008 4/26/2008 5/3/2008 5/10/2008 5/17/2008 5/24/2008 5/31/2008 6/7/2008 6/14/2008 6/21/2008 6/28/2008 7/5/2008 7/12/2008 7/19/2008 7/26/2008 8/2/2008
  • 15. Order Promising Mistakes • Variable lead times given to Customers – Earlier when slow; later when busy – Erratic lead times from supply partners • Improper planning parameters – Throughput rates are not known – Old data is being used • Inconsistent processes – Within planning and scheduling, customer service, production, etc.
  • 16. Stop Making Bad Promises • Institute a formal order promising process. • Communicate changes to Customers. • Focus on the Detailed Scheduling and Planning required to keep the promises you are making. • Ensure that there is feedback within a closed-loop planning system. • Improve the processes and systems.
  • 17. Expedite with Extreme Caution • Expediting impedes normal product flows and gives rise to informal management systems (hot sheets, special lists, etc.). • Do we understand why there was a request or need to expedite? • When people are in a rush, they often get the (important) details wrong. • Remember that when everything is a priority, then nothing is a priority.
  • 18. Senior Management • Outline problems identified from work that has already been done. • Use data and specific examples to relate problems to resource allocation, as well as internal results and impact on Customers. • Prioritize proposed solutions and try to provide multiple options instead of simple “Yes” or “No” decisions.
  • 19. OEM Data December 2008 Early On-Time 1 - 7 8 - 14 15 - 30 GT 30 Totals Early On Time Late A Total 195,965 67,027 14,934 12,094 11,236 4,583 305,839 62.1% 24.3% 13.6% B Total 61,656 44,672 8,398 8,748 4,342 2,090 129,906 47.5% 34.4% 18.2% C Total 17,305 4,745 2,574 4,158 10,971 732 40,485 42.7% 11.7% 45.5%
  • 20. Resource Allocation • Focus on Real Bottlenecks. • Dispel Myths of Artificial Bottlenecks or Man-made constraints. • Challenge or Confirm basic assumptions inherent to the process. • Be mindful of other objectives. • Speak about what success will look like and the benefits to be realized.
  • 21. Scheduling & Loading Two basic strategies: 1. Forward-scheduling, infinite capacity • Earliest completion date • Focus on material availability • “Load-and-go” mentality • Expedite incoming materials; chase orders 2. Backward-scheduling, finite capacity • Latest start date • Planned and scheduled around constraint
  • 22. Order Policies & Lot Sizes • Customer order minimums – How do you incorporate your forecasts? – What is your target service level? • Production lot sizing (min./max.) – Lot-for-lot – Fixed order quantity • Set-ups and change-overs – Are they accounted for in planning?
  • 23. Forecasts and Service Levels Service Stocking Levels 60,000 70,000 80,000 90,000 100,000 110,000 120,000 Units Net On-Hand Units 61,557 77,440 76,582 83,892 84,738 97,676 91,027 86,943 89,811 86,128 71,106 85,629 93,631 Target Stocking Level 117,497 117,497 117,497 110,607 110,607 110,607 110,607 110,607 110,607 110,607 110,607 110,607 110,607 Fill Rate 52.4% 65.9% 65.2% 75.8% 76.6% 88.3% 82.3% 78.6% 81.2% 77.9% 64.3% 77.4% 84.7% 2/24/2009 3/3/2009 3/10/2009 3/17/2009 3/24/2009 3/31/2009 4/7/2009 4/14/2009 4/21/2009 4/28/2009 5/5/2009 5/12/2009 5/19/2009
  • 24. A Systematic Solution 1. Ability to review new orders against current backlog profile and lead times 2. Formal order promising policies/guidelines 3. Visibility of orders within MRP/DSP tools 4. Controlled order release 5. Ability to monitor progress of order 6. Capability of in-process corrective action 7. Meaningful metrics tracked and published 8. Continuous improvement of processes
  • 25. Actual Results 2009 On-Time Delivery 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0% Month On-TimeDelivery% OEM SS OEM 89.1% 96.1% 96.3% 96.9% 97.1% 98.1% 98.3% 98.8% 94.5% 97.7% 98.6% 98.7% SS 77.8% 92.7% 92.0% 99.8% 99.5% 99.7% 100.0% 99.6% 99.7% 99.8% 99.8% 99.9% January February March April May June July August September October November December
  • 26. Business Consulting Education & Training Professional Services cantinmanagementgroup.com (413)427-6536