MEP design
Process
MEP Design, Tero Järvinen
Granlund Oy
Consultancy
• MEP Design
• Facilities Management
• Energy and Sustainability
Software
• Manager– Facilities Ma...
MEP Design, Tero Järvinen
TRIPLA
Total floor area: 350,000 brm2
Estimated Completion: 2018-2021
Cost estimation: 1.000 M€
...
Integrated Enviroment
Requirement Management–
Comfort simulation–
Energy simulation –
Cost analysis–
Life cycle–
CFD –
Mai...
Design
MEP Design, Tero Järvinen
MEP Design, Tero Järvinen
Contract
Philosophy Process
Alliance
IPD
Partnering
BIMLean
Construction
Requirements
Concept
De...
MEP Design, Tero Järvinen
Origin: DPR Construction inc.
Need for modeling?
• There has to be need for models from
client
• If you order a ”BIM”, it just confuse the
designers.
Di...
Modeling = Designing
• BIM modeling is not just for geeks or CAD-
personell
• BIM modelling is a different way to make des...
Modeling requires:
• Professionality from every participants
• Common vision, where to aim in project
• Wider collaboratio...
Process
MEP Design, Tero Järvinen
”Normal” project for designers:
Design – Bid –Build –contract
1. Design tender from building owner (made by external proje...
”Sophisticated” project for designers:
”Design–Bid–Build” or ”Somekind of partering” -contract
1. Design tender from build...
MEP Design, Tero Järvinen
Granlund participation to COBIM
Download at: http://www.buildingsmart.fi
MEP Design, Tero Järvinen
MEP BIM design
• Creating requirementsRequirements
• Alternative solutionsSchematic
• Modelling chosen alternativeDesign
•...
Phases of MEP design
• Two major phases:
1. Schematic design
- Gathering requirements from customer
- Simulations and visu...
• Requirements -> Targets (Excel / BIM)
• Service area charts (CAD / BIM)
• Technical spaces (discussion with architect)
•...
Requirements management
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
1. Targets for spacetypes
2. ...
Spacetypes and Requirements
SQL
MEP Design, Tero Järvinen
For starting of MEP design, requirementsfor Indoor Quality are n...
Service area charts
MEP Design, Tero Järvinen
Spaces with requirements are linked to service area charts
(for exampleAir h...
Energy and Comfort simulations
MEP Design, Tero Järvinen
Dynamic simulation of energy and comfort is made according to the...
•2D-section drawings (CAD)
•Network modeling (CAD + combied models)
•Auditing (combied models)
•Visualizations (combied mo...
BIM in Design Development -phase
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Alterantivesolutions...
BIM in Detail Design -phase
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
CombiedModels Model Audit...
BIM in Construction -phase
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Installations are mabe acc...
BIM in Commissioning
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Information export from
models
I...
BIM in Facility Management
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Use of Models in
Facility ...
MEP design, phases
Proper
Schematic design
Checking of
2D-section drawings
Modelling
Auditing Calculations (balancing
of n...
MEP modeling
MEP Design, Tero Järvinen
• Easiest thing in MEP modeling is the normal use of
MagiCAD in network modeling
• ...
MEP Design, Tero Järvinen
How to make proper Models
Modellers should have proper technical equipmens.
Modelling starts aft...
Utilizing 2D and 3D models with
AutoCAD -based softwares
MEP Design, Tero Järvinen
In MagiCAD system, architect 2D drawing...
MEP Design, Tero Järvinen
Combied Models
Combied models 1/2
MEP Design, Tero Järvinen
With using coordinated approach in combied models you can be sure your networ...
Combied models 2/2
MEP Design, Tero Järvinen
• With combied model you can see all installation details you need for making...
MEP Design, Tero Järvinen
MEP BIM usage in Site
Mainly usage of combied models – in very rare cases usage of MagiCAD model...
MEP Design, Tero Järvinen
BIM in construction site
Contractors really look after models and do installations
according to ...
MEP Design, Tero Järvinen
MEP model in site
BIM models are in use in site office, and 3D-views are printed to
paper for us...
MEP Design, Tero Järvinen
MEP model in site
Insulation installation of highest pipes are impossible ->
pipes were lowered ...
MEP Design, Tero Järvinen
MEP model in site
Year 2008
MEP model made without structural
model
No information of beamheight...
Technical Facility
Management
MEP Design, Tero Järvinen
MEP Design, Tero Järvinen
BIM Management Process during building life cycle
Back to Maintenance
Equipments
MEP Design, Tero Järvinen
FM system
SQL
For Facility Management point of view, network models are not really im...
Building Performance
MEP Design, Tero Järvinen
BAS system
SQL
Connected to BAS system and offering ”one value of building ...
Building Performance
MEP Design, Tero Järvinen
BAS system
SQL
• Information pops up on a large lobby screen or on your com...
Granlund software
MEP Design, Tero Järvinen
Design Maintenance
MEP Design, Tero Järvinen
MEP Design, Tero Järvinen
Information storage
BIM2FM,3D-view
Bim software
Equipment Database
BIM2FM: Intelligent 2D IFC-sp...
MEP Design, Tero Järvinen
Browser based MEP PLM software
MEP PLM -System
Schematic design Detailed Design Construction FM
...
Energy
MEP Design, Tero Järvinen
Energy analysis in different phases
Requirements management in phase of Design Brief
MEP Design, Tero Järvinen
IFC
Requirements
Concept
Detail
Construction
Co...
Using spatial model (from bim)
• Normally, architectal model do not have windows in early phases
• Windows and walls can b...
Decisions need different metrics…
By team working and using
of BIM and efficient simulation
it was possible to analyze
15....
… and result evaluation even more
F. Flager, J. Basbagill, M. Lepech & M. Fischer.
Multi-objective building envelope optim...
Parametric
Energy
Simulation
Demo
MEP Design, Tero Järvinen
Meilahden potilastorni, 1.kerros
MEP Design, Tero Järvinen
Thanks, questions?
Próximos SlideShares
Carregando em…5
×

MEP BIM design

MEP Design slides from a seminar. Granlund Oy, Finland

  • Seja o primeiro a comentar

MEP BIM design

  1. 1. MEP design Process MEP Design, Tero Järvinen
  2. 2. Granlund Oy Consultancy • MEP Design • Facilities Management • Energy and Sustainability Software • Manager– Facilities Management • Designer – MEP Design • RIUSKA – Energy Analysis • BSPro – IFC middleware Numbers • ~515 person, 43 MEUR (2013) • T&K 3,5 MEUR / 41 personyears MEP Design, Tero Järvinen
  3. 3. MEP Design, Tero Järvinen TRIPLA Total floor area: 350,000 brm2 Estimated Completion: 2018-2021 Cost estimation: 1.000 M€ -Shoppingcentre -Housing -Headquarters-level offices -Business Park -Hotel and City Suites -Multi-purpose arena -Public tranport terminal Jobs for 15.000 people A life cycle coordinator will be responsible for the realization of the ecological criteria in all of the project phases. MEP Design Energy / Enviroment Consultancy / City District analysis New projects
  4. 4. Integrated Enviroment Requirement Management– Comfort simulation– Energy simulation – Cost analysis– Life cycle– CFD – Maintenance- Roomex Riuska Riuska Lifest BSLCA Ansys Manager Equipment data– MEP modeling– Model Auditing– Combiedmodels– LightingSimulations- Designer MagiCAD Solibri Navisworks 3ds Max MEP Design, Tero Järvinen Technical Analysis ManagementConsultancy Special Calculations Carbon Footprint Datacenters Enviroment CMMS Software Due Diligence Energy Efficiency Facility Management Management and Supervision
  5. 5. Design MEP Design, Tero Järvinen
  6. 6. MEP Design, Tero Järvinen Contract Philosophy Process Alliance IPD Partnering BIMLean Construction Requirements Concept Detail Construction Commissioning Maintenance Cornerstones of construction project
  7. 7. MEP Design, Tero Järvinen Origin: DPR Construction inc.
  8. 8. Need for modeling? • There has to be need for models from client • If you order a ”BIM”, it just confuse the designers. Different companies has different opinions what modeling is • Common language is missing without ”BIM execution plan” MEP Design, Tero Järvinen
  9. 9. Modeling = Designing • BIM modeling is not just for geeks or CAD- personell • BIM modelling is a different way to make design BIM is something else than producing paper drawings • Buildings will rise also without BIM • If you need only paper drawings, you should’t use BIM • BIM is tool for designers, contractors and building owners MEP Design, Tero Järvinen
  10. 10. Modeling requires: • Professionality from every participants • Common vision, where to aim in project • Wider collaboration comparing to ”normal” project • Understanding what other participants are doing • Mental Change MEP Design, Tero Järvinen
  11. 11. Process MEP Design, Tero Järvinen
  12. 12. ”Normal” project for designers: Design – Bid –Build –contract 1. Design tender from building owner (made by external project management consultant) 2. Design Offer -> Quality 40%, Cost 60% (or something else) 3. Light Preliminary Design (Diagrams, Serviceareas, 2D-main routes, no products selected, work specification) No coordination 4. Detail Design (Equipment database, diagrams, MagiCAD modelling) No coordination 5. Construction (nothing to do with BIM) 6. Facility Management (nothing to do with BIM) MEP Design, Tero Järvinen
  13. 13. ”Sophisticated” project for designers: ”Design–Bid–Build” or ”Somekind of partering” -contract 1. Design tender from building owner (made by external project management consultant) 2. Design Offer -> Quality ~70%, Cost 30% 3. Preliminary Design (Diagrams, Serviceareas, 3D-main routes, Equipment database, work specification, other documents) Coordinated process, no products selected 4. Detail Design (MagiCAD modelling) Heavily Coordinated process 5. Construction (Combied model in use) 6. Facility Management (not so much to do with BIM) MEP Design, Tero Järvinen
  14. 14. MEP Design, Tero Järvinen
  15. 15. Granlund participation to COBIM Download at: http://www.buildingsmart.fi MEP Design, Tero Järvinen
  16. 16. MEP BIM design • Creating requirementsRequirements • Alternative solutionsSchematic • Modelling chosen alternativeDesign • Building according the ModelsConstruction • Utilization of ModelsCommissioning • BIM in FMMaintenance Target consumption Indoor air quality Spatial Provisions Energy Efficiency Network Modelling Network calculations Combied Models Information content Device Validation Information content Service Area Charts Device Database MEP Design, Tero Järvinen
  17. 17. Phases of MEP design • Two major phases: 1. Schematic design - Gathering requirements from customer - Simulations and visual information for decississions makers 2. Detail Design - Modelling of building according the decissions made in Schematic design phase MEP Design, Tero Järvinen
  18. 18. • Requirements -> Targets (Excel / BIM) • Service area charts (CAD / BIM) • Technical spaces (discussion with architect) • 2D-section drawings (CAD) • 3D-mock-up rooms / -spaces (CAD + combied models) • Main network routes (CAD + combied models) MEP Design, Tero Järvinen • TasksSchematic design
  19. 19. Requirements management Requirements Schematic Design Construction Commissioning Maintenance 1. Targets for spacetypes 2. Building Model 3. Linking requirements to spaces 5. Energy and Comfort simulation 4. Service Area Zones 6. Comparisation of alternativesolutions 7. Chosen calculation to basis of CAD- system calculations SQL IFC MEP Design, Tero Järvinen
  20. 20. Spacetypes and Requirements SQL MEP Design, Tero Järvinen For starting of MEP design, requirementsfor Indoor Quality are needed • With colloboration of customer, maximum temperatures etc. has to be decided • With these requirementsMEP designer makes comfort and energy simulations for fullfilling the requirements. End result is a target value for each space, which MEP designer has to fulfill. (for example: Requirement: max. 26oC -> simulation -> target value 1.2kW cooling Requirements Concept Detail Construction Commissioning Maintenance
  21. 21. Service area charts MEP Design, Tero Järvinen Spaces with requirements are linked to service area charts (for exampleAir handling unit service areas) • Linking is made using ifcSpaces (IfcZones are created with external software to IFC file • Visualization: Solibri… or some other software (?) which understandIfcZones. IFC SQL Requirements Concept Detail Construction Commissioning Maintenance
  22. 22. Energy and Comfort simulations MEP Design, Tero Järvinen Dynamic simulation of energy and comfort is made according to the requirements, building model and service area charts. • Every space is simulated • Alternative simulations and comparisations for different envelopes, windows etc. -> beginning of LCC calculations IFC SQL Requirements Concept Detail Construction Commissioning Maintenance
  23. 23. •2D-section drawings (CAD) •Network modeling (CAD + combied models) •Auditing (combied models) •Visualizations (combied models) MEP Design, Tero Järvinen • TasksDetail Design
  24. 24. BIM in Design Development -phase Requirements Schematic Design Construction Commissioning Maintenance Alterantivesolutions Diagrams and equipment databases Spatial provisions and service area zones Energy- and comfort simulatations Life Cycle CFD-simulations 3D-mockups Technical Visualizations LightingSimulations SQL IFC Design Development –phase specifys the investment costs, energy consumption and indoor air quality levels MEP Design, Tero Järvinen Sustainability
  25. 25. BIM in Detail Design -phase Requirements Schematic Design Construction Commissioning Maintenance CombiedModels Model AuditingModellingof MEP-networks BIM based Provision of Voids Equipment database RouteDesigning SQL IFC Common BIM Requirements Information export from models Detail Design is made according to the Design Develompment MEP Design, Tero Järvinen
  26. 26. BIM in Construction -phase Requirements Schematic Design Construction Commissioning Maintenance Installations are mabe according the Detailed Design Model CombiedModels Information export from models IFC SQL Revisionhandling of Models, Documents and Equipment data Model based assembly inspection Equipment Validation Tero Järvinen / BIM models
  27. 27. BIM in Commissioning Requirements Schematic Design Construction Commissioning Maintenance Information export from models Information of BIM is used in Commissioning As-Bildt Model Target values of energy consumption for Facility ManagementSQL IFC Assembly Inspections Tero Järvinen / BIM models
  28. 28. BIM in Facility Management Requirements Schematic Design Construction Commissioning Maintenance Use of Models in Facility Management Monitoring Energy Efficiency BIM Management Process during building life cycle MEP Design, Tero Järvinen BIM is helping Facility Management Service area zones Equipment database
  29. 29. MEP design, phases Proper Schematic design Checking of 2D-section drawings Modelling Auditing Calculations (balancing of networks pressure etc.) Combied models to construction yard MEP Design, Tero Järvinen
  30. 30. MEP modeling MEP Design, Tero Järvinen • Easiest thing in MEP modeling is the normal use of MagiCAD in network modeling • Hardest thing in MEP modeling is the iterative process, revision management • MEP designer is last disicpline in process. Changes in Architect or Structural models affects to MEP models • There are quite a lot tasks in MEP design, which is not seen in other disicplines (simulation, diagrams, system design, equipment databases… etc.) • Designing is made first, modeling after that
  31. 31. MEP Design, Tero Järvinen How to make proper Models Modellers should have proper technical equipmens. Modelling starts after schematic design Continuous learning, stimulating enviroment Passion. Be proud of your models Courage to have challanges, need to take steps forward without knowing what will happen Understanding your on place in big picture, other participants are also doing same building – collaborative approach
  32. 32. Utilizing 2D and 3D models with AutoCAD -based softwares MEP Design, Tero Järvinen In MagiCAD system, architect 2D drawing is in use - same drawing what is in use when plotting MEP design to paper. Combiedmodels are in use with Navisworks. Two screens, Magicad in other, and Naviswork in other. From Magicad (Autocad), seperate navis-cachefile is saved to be viewed in combied model (nwc -> nwf) For efficient design, two screens is mandotory When making models according to COBIM 2012 requirements, just using MagiCAD is not enough.AutoCAD is not for collaborative 3D design, it is lacking useful 3D features, speed and teamwork capabilities.
  33. 33. MEP Design, Tero Järvinen Combied Models
  34. 34. Combied models 1/2 MEP Design, Tero Järvinen With using coordinated approach in combied models you can be sure your networks are in correct places • Combied models is mandotory when modeling networks in Detail Design phase. • With combied model, other disicplines have better understanding of networks (for example need of space etc. Software: Navisworks Tekla BIMSight Solibri IFC Arch, Struct, MEP- IFC files Requirements Concept Detail Construction Commissioning Maintenance
  35. 35. Combied models 2/2 MEP Design, Tero Järvinen • With combied model you can see all installation details you need for making networks installation possible according the design. • When installations are made according the design, you have first step for network model usage in Facility Management • Good Practice: before assembly in certain areas is started, you should present combied model of that area to MEP contractors. This is where you can make planning of assembly schedules and contractors can see the amount of networks belonging to other contractors. Software: Navisworks Tekla BIMSight Solibri IFC Requirements Concept Detail Construction Commissioning Maintenance
  36. 36. MEP Design, Tero Järvinen MEP BIM usage in Site Mainly usage of combied models – in very rare cases usage of MagiCAD models Contractor is not interested about calculations (pressure, flows etc.) First question from contractor: “What is the installation height of pipe/duct/cabletray?” In general, attitude to usage of combied models is positive
  37. 37. MEP Design, Tero Järvinen BIM in construction site Contractors really look after models and do installations according to model...
  38. 38. MEP Design, Tero Järvinen MEP model in site BIM models are in use in site office, and 3D-views are printed to paper for use inside building
  39. 39. MEP Design, Tero Järvinen MEP model in site Insulation installation of highest pipes are impossible -> pipes were lowered to gain more installation space (Slide: Jyrki Maalahti / SRV Oy)
  40. 40. MEP Design, Tero Järvinen MEP model in site Year 2008 MEP model made without structural model No information of beamheights inside the combied model. Only architectural model was in use when making MEP design Year 2009 With structural model MEP design change can be done
  41. 41. Technical Facility Management MEP Design, Tero Järvinen
  42. 42. MEP Design, Tero Järvinen BIM Management Process during building life cycle Back to Maintenance
  43. 43. Equipments MEP Design, Tero Järvinen FM system SQL For Facility Management point of view, network models are not really important Allmost all information for technicalFM is inside device database (and diagrams) IFC model do not have enough information for the need of FM Requirements Concept Detail Construction Commissioning Maintenance
  44. 44. Building Performance MEP Design, Tero Järvinen BAS system SQL Connected to BAS system and offering ”one value of building Performance” • Offering interface for Facility managementpersons, who are not capable to use BAS system • Offering interface for Building Managementto analyze building performance daily basis Requirements Concept Detail Construction Commissioning Maintenance
  45. 45. Building Performance MEP Design, Tero Järvinen BAS system SQL • Information pops up on a large lobby screen or on your computer screen alongside newsletters providing information on your building's energy consumption, energy class and maintenance performance. Requirements Concept Detail Construction Commissioning Maintenance
  46. 46. Granlund software MEP Design, Tero Järvinen
  47. 47. Design Maintenance MEP Design, Tero Järvinen
  48. 48. MEP Design, Tero Järvinen Information storage BIM2FM,3D-view Bim software Equipment Database BIM2FM: Intelligent 2D IFC-spaceview Above information also linked To IFC-spaces Daily updated Information is not in Graphical BIM software but in shared databases
  49. 49. MEP Design, Tero Järvinen Browser based MEP PLM software MEP PLM -System Schematic design Detailed Design Construction FM Spaces / Design Equipment Network Modeling Equipment approval Requirements BIM in FM Supervision Diagrams Service areas Simulations SQL IFC Performance Metrix Network Balancing AsBuilt info PLM = Product Lifecycle Management FLM = Facility Lifecycle Management FLM BAS info
  50. 50. Energy MEP Design, Tero Järvinen
  51. 51. Energy analysis in different phases
  52. 52. Requirements management in phase of Design Brief MEP Design, Tero Järvinen IFC Requirements Concept Detail Construction Commissioning Maintenance Software: - Cost estimation - energysimulation - IFC-space objects
  53. 53. Using spatial model (from bim) • Normally, architectal model do not have windows in early phases • Windows and walls can be created in energysimulation softaware to have multiple variations for example different procents (%) on windows in envelope (or window types, shadings etc. MEP Design, Tero Järvinen
  54. 54. Decisions need different metrics… By team working and using of BIM and efficient simulation it was possible to analyze 15..20 design solutions (renovation and new building) during 2 days workshop (School/daycare building in Syväniemi, Kuopio, Finland) E-value Carbon footprint Energy costs Indoor conditions PRE Model NovaMEP Design, Tero Järvinen
  55. 55. … and result evaluation even more F. Flager, J. Basbagill, M. Lepech & M. Fischer. Multi-objective building envelope optimization for life-cycle cost and global warming potential. eWork and eBusiness in Architecture, Engineering and Construction. 2012 London, ISBN 978-0-415-62128-1. 21,360 different design configurations MEP Design, Tero Järvinen
  56. 56. Parametric Energy Simulation Demo MEP Design, Tero Järvinen
  57. 57. Meilahden potilastorni, 1.kerros MEP Design, Tero Järvinen Thanks, questions?

×