SlideShare uma empresa Scribd logo
1 de 33
Responsible Supply Chain
  Creating the smarter, leaner, & greener workplace of the future




Stephen Thompson
Vice President, Enterprise Applications & Alliances
April 29, 2010
Agenda


• Johnson Controls overview


• Operational challenges in the current facility environment


• Shortcomings of the existing facility build – operate – retrofit process


• An emerging better way – focus on the building life cycle from the start


• Case Study – JCI Corporate HQ




2   Johnson Controls
Three global businesses focused on sustainability
across the supply chain
     140,000 Employees            Fortune 100             Multi-Industry Company




Building Efficiency           Power Solutions                   Automotive Experience
 Creating quality indoor       Providing the highest quality,   Delivering world-class
 environments that are         lowest cost automotive           technologies that differentiate
 comfortable, safe, energy     batteries to power vehicles      vehicle interiors and increase
 efficient, and sustainable    of today and tomorrow            consumer demand

                               200 million vehicles
                               12 million homes
                               1 million commercial buildings
 3   Johnson Controls
JCI’s suite of offerings help customers achieve sustainability goals
  across the real estate portfolio

PRODUCTS &                                                                                ENERGY
TECHNOLOGY                      ENERGY EFFICIENT       ENERGY EFFICIENCY                 SOLUTIONS
                                   EQUIPMENT              RETROFITS
                      BUILDING                                           ON-SITE
                     AUTOMATION                                        RENEWABLE
                      SYSTEMS                                            ENERGY
                                    People who design, build, own
                BUILDING            and operate buildings need to:            DISTRIBUTED
                SYSTEMS                                                      HEAT & POWER
              INTEGRATION                                                     GENERATION
                                    Manage energy & lifecycle costs
                                     Reduce environmental impact
                ENERGY &                                                        FACILITY
                                        Increase building value              MANAGEMENT
                EMISSIONS
               MANAGEMENT            Enhance image and reputation            & OPERATIONS

                     WORKSPACE &                                            EQUIPMENT
                      PORTFOLIO                                            MAINTENANCE
                     OPTIMIZATION                                            & REPAIR
                                 GREEN BUILDING          BUILDING SYSTEM
                              DESIGN & CERTIFICATION   RETRO-COMMISSIONING
 ADVISORY                                                                             TECHNICAL
 SERVICES                                                                              SERVICES

  4   Johnson Controls
We provide a mix of these services to over 1 million
 customers in 150+ countries across the globe




  Apartment units            Lodging            Schools        Colleges & Universities           Hospitals           High Technology




       Homes                  Retail         Shopping Malls         Government                 Life Sciences             Airports




High-rise Apartments      Medical Clinics   Small Commercial     Large Commercial        Arenas/Convention Centers   Industrial Plants

   Residential                                            Mid Market                                                   Complex
   5   Johnson Controls
Sustainable supply chain principles guide Johnson Controls
$26B in annual 3rd party spend
     ENVIRONMENTAL                             SOCIAL                                    ECONOMIC
      STEWARDSHIP                           RESPONSIBILITY                              PROSPERITY
 • Achieve competitive         • Increase minority business development &         • Ensure the ongoing
   edge from                     supplier diversity                                 financial viability of the
   environmentally                                                                  business through
                               • Strive to attain a high performance work
   responsible products &                                                           strategic investments
                                 environment free of workplace diseases
   services                                                                         and management of risk
                                 and that is physically and emotionally safe

World Environment Center                     JCI has a long history of commitment to a diverse supply chain
Gold Medal for International
Corporate Achievement in                      Johnson Controls spends $1.7 billion annually with ~340 diverse suppliers
Sustainable Development
                                              One of only 13 companies in the Billion-Dollar Roundtable

                                              Member of Dow Jones Sustainability World Index




 6   Johnson Controls
Agenda


• Johnson Controls overview


• Operational challenges in the current facility environment


• Shortcomings of the existing facility build – operate – retrofit process


• An emerging better way – focus on the building life cycle from the start


• Case Study – JCI Corporate HQ




7   Johnson Controls
Commercial buildings have a major energy & environmental
impact consuming nearly 50% of the electricity in the U.S.

       Buildings use 40%                             • Building sector represents 40% of the
                                                       world’s energy consumption
     of U.S. primary energy
                                                     • 1/3rd of energy-related global GHG
                                                       emissions (~8 gigatons/year)
                           Residential
       Industrial           Buildings                • Buildings responsible for 30% of raw
                              22%                      materials use, 25% of solid waste, 25%
         32%
                                                       water use, and 12% of land use.
                                Commercial
                                 Buildings           • Commercial buildings provide much more
                                    18%                concentrated targets for energy and
          Transportation
                                                       sustainability programs
               28%




    Sources: International Energy Agency; U.S. Energy Information Administration (2009) Annual
8   Energy Review; U.S. Dept of Energy (2009) Building Energy Data Book; World Resources Institute;
    United Nationa Environment Program –Sustainable Buildings & Climate Initiative
Global changes in energy and climate legislation / regulation
increasing scope and immediacy of the challenge




    Passed                               Passed                           Passed
    - Stimulus funds                     - Energy Performance in          - National energy goals
    - EE retrofit tax deduction            Buildings Directive recast     - Local/regional carbon
    - RE tax credits                     - Emissions trading system         trading (Australia, Tokyo)
    - Greenhouse gas reporting rule      - UK Climate reduction           - Japan revised Energy
    Proposed                               commitment (CRC): 32%            Conservation Law requires
    - Prescriptive rebates (Jobs Bill)     reduction by 2020                company-wide energy
    - EE/RE resource Standard            - HCFC Phase-out                   mgmt
    - PACE loan guarantees               Proposed                         - Energy codes (JP, CN, IN)
    - Utility decoupling                 - Binding 30% energy reduction   - Stimulus funds / Tax
    - Dynamic utility rates                targets (from voluntary 20%      incentives
    - CFC Chiller replacement              goal)                          Proposed
      incentives                         - Building retrofit Initiative   - Energy savings certificate
    - 30-50% more stringent building     - Energy services legislation      trading (Australia, India)
      energy efficiency codes            - Mandatory energy audits        - India ESCO risk guarantee
    - Mandatory building energy          - GWP Refrigerant phase down       facility
      labeling                           - Energy Tax revisions           - Singapore Government
    - Carbon cap and trade system                                           Bldg Green Mark 2030 Goal


9
Productive response to rising global demand for energy &
sustainability requires rethinking approaches to buildings


          What is your company's top strategy going forward to meet
                         its carbon reduction goal?
                                                            0%           10%   20%   30%   40%    50%

                           Onsite renewable energy                         12%
                     Renewable power purchases                            10%
                 Energy efficiency in buildings                                                  45%
              Energy efficiency in transportation                        6%
          Use of alternative transportation fuels                1%
              Carbon emission offset purchases                           7%
             No prioritization amongst strategies                              14%
                                      Other/Don't know                   7%

                  Building efficiency is largest and most cost effective
                   strategy for reducing greenhouse gas emissions
10
     Source: Johnson Controls/ IFMA (2009) Energy Efficiency Indicator
Agenda


• Johnson Controls overview


• Operational challenges in the current facility environment


• Shortcomings of the existing facility build – operate – retrofit process


• An emerging better way – focus on the building life cycle from the start


• Case Study – JCI Corporate HQ




11   Johnson Controls
Gaps in motivations, tools, and goals leads to high levels of
 disconnect across the existing building lifecycle

                                                            Building Lifecycle




                     Plan /                      Acquire or                                                      Operate /
                                                                              Construct
                    Assess                        Design                                                         Maintain

Lead          Owner facilities team        Architects / Designers         General Contractors            Facility Manager,
                                                                                                         Occupant groups

Focus         Balancing capital            Create a memorable             First cost; risk mitigation;   Facility as a tool to support
              availability with time-      building; Design delivery;     Deliver on time on budget      their efforts to deliver core
              line and growth plans        Manage safety risk                                            mission of enterprise

Process      Incomplete                    Limited insight into details   Minimal concern about          Minimal engagement prior
Gaps         knowledge of                  of intended use leads to       operating cost.                to occupancy = poor life-
             intended use /                capacity for peak demand                                      cycle performance
             operation

  12    Johnson Controls                Minimal interaction across lifecycle
Plan /   Acquire                Operate /
                                                                           Construct
                                                      Assess    & Design               Maintain
Design team focused on conceptual
performance with insufficient regard for the actual use of the facilities

            Challenges                                       Impact
• Difficult to translate conceptual design    • Designs generally built to deliver
  to actual performance requirements            capacity for peaks
                                              • Each sub-component designed to cover
• Challenged to tie together disparate
                                                unknowns in other systems
  components to create a unified system
                                              • Life-cycle cost, performance, and
• Analytic / design tools focused on            safety factors excluded
  component initial performance
                                              • Real estate portfolio doesn’t optimize
                                                support core missions of individual
• Insufficient insight from cross – section
                                                department and overall organization
  of end users
                                              • Construction process takes longer and
• Poor hand-off to construct phase              costs more for same delivered value
  (general contractor)



   13
Plan /        Acquire                      Operate /
                                                                                                                                                                        Construct
                                                                                                                                          Assess         & Design                     Maintain

       Traditional construction model amplifies disconnects
       between key constituents across the building life-cycle
                       Traditional Contracting Model                                                                                 Traditional Model - Disconnected
                                                                                     Architect /
                                                       Owner
                                                                                     Engineer                                                                                     End
                                                                                                                                        Building
                                                                                                                                                                                  User
                                                       General                                                                          Systems
                                                      Contractor                                                                                                                Systems
                     Mechanical                                                       Electrical
                     Contractor                                                       Contractor

                                                                      Electrical                      High Voltage
  Water Systems                         Piping
                                                                     Equipment                        Distribution
                                                                                                                                               Access               Voicemail
                                                                                                                                                                                      Internet
                                                                                                                              HVAC             Control
   Air Systems
                                      Building                  Emergency Power                      Medium Voltage                                                                   Access
                                     Automation                   Generation                          Distribution

   Technology
                                    Fire Protection             Fire Alarm System
                                                                                                     Lighting Control                        Fire/Life
   Installation                                                                                          System                              Safety                       Patient
                                                                                                                                                                         Monitoring
   Mechanical                     Special Mechanical                 Integrated                                                                          Business
                                                                                                       IT Network
   Equipment                           Systems                     Security System                                                                       Systems
                                                                                                                           Facilities                                                 Support
Special Technology                                             Power Management
                                                                                                   Specialty Healthcare   Department
     Systems                                                     & Assurance                                                                                                          Services
                                                                 Other Specialty
                                                               Technology Systems                                                                                    Time &
                                                                                                                                                                     Attendance
 Traditional Contracting Limitations
                                                                                                                                                   POS
 • Silo mentality with limited integration between subsystems;
   creating operating inefficiencies                                                                                                                                Finance
 • Fragmented subsystem approach that creates cost
   inefficiencies (labor & materials), and increases project risk                                                             IT Department
 • Difficult to determine contractor accountability



       14
Plan /   Acquire                                    Operate /
                                                                                                             Construct
                                                                    Assess    & Design                                   Maintain

Current process ignores / sub-optimizes operational
performance leading to significant decline in performance over time
                                                                                           Intended
                                Traditional Construction Process                           Performance
                                                                                           (Opportunity)
                  Auto
               Commission                                                                   Optimum “As Built”
                                                                                            Peak Performance
                      First Occupancy




                                                                                     Design Service Live
 Performance




                            Existing Practices



                                                                                                           Minimum Acceptable
                                                                                                           Performance

                                                        Actual Service Live


                                                 Time

15
Agenda


• Johnson Controls overview


• Operational challenges in the current facility environment


• Shortcomings of the existing facility build – operate – retrofit process


• An emerging better way – focus on the building life cycle from the start


• Case Study – JCI Corporate HQ




16   Johnson Controls
An emerging facility approach brings together constituents to build /
remodel more efficient and productive real estate investments

                                            Building Lifecycle




                 Plan /               Acquire &        Construct            Operate /
                Assess                 Design                               Maintain


                         Key Action                                Impact
      • Involve all key constituents as              • Improved project quality with reduced
        early as possible in process                   cost and schedule variability

      • Decisions based on total life-               • Projects deliver facilities that are
        cycle cost                                     optimized to perform, impacting 100%
                                                       of life-cycle cost rather than the 25%
                                                       that is first cost

 17   Johnson Controls
Building life-cycle focus enables business objectives by driving
 efficiencies across the entire real estate budget …
                Fortune 1000
     Typical Corporate Real Estate Spend
                                                                    Enterprise Challenges (illustrative)
                           Example:
                        Pharmaceuticals                             • Capital constraints
                                   Houskeeping
                                       6%

                                                                    • Uncertain / declining real estate
                                                 Maintenance
                                                     18%              markets

                                                                    • Accelerated shift to global v multi-
               Fixed Asset -                                          national
                   Rent,
               Depreciation,
                    etc.
                   53%                                  Utilities
                                                                    • Volatile utility prices
                                                         11%


                                                                    • Increasing regulatory / government
                                             Security
                                               6%
                                                                      investment in sustainability
                                     Other
                                      6%



 … impacting all elements including rent / depreciation (>50% of total spend)

18   Johnson Controls
Plan /   Acquire                Operate /
                                                                                                        Construct
                                                                                   Assess    & Design               Maintain

Using sensing technology to evaluate / improve workplace
utilization while maintaining worker safety, comfort, and productivity
Green & Agile @ BBC, Media Village W12
      18% reduction in workstations – release of Woodlands
      Average utilisation improved from 46.8% to 62.2%
      Move to a more agile and sustainable way of working – churned over 2500 people
      Average share ratio of 1.2:1 (equates to 12 people sharing 10 desks)




         19                     A Discussion on Corporate Environmental Sustainability
Plan /     Acquire                Operate /
                                                                               Construct
                                                        Assess      & Design               Maintain
Major construction consumers showing
increased preference for the benefits of the design – build process

                          Growth trajectory                       Key accelerators
 60%
                                                       • Increased collaboration
                  54%
                               50%               50%     between owner and
 50%                                     45%             contractor
                                                           • Single-point of contact
 40%                                                          throughout process
                              40%                40%
                  35%
 30%
                                                       • Realization of operational
                                                         vision
 20%
                                                       • Reduced schedule variability
                                                         and increased cost visibility
 10%             Trad Design Bid Build
                 Design Build                          • Flexibility in construct process
  0%                                                     to adapt design
            2000            2005     2010      2015



 20    Johnson Controls
Plan /      Acquire                    Operate /
                                                                                                                                             Construct
                                                                                                                   Assess       & Design                   Maintain

   Intelligent buildings require new construction model to deliver highly
   integrated projects … engages operators early
                    Technology Contracting Model                                                                   Integrated Model – Converged Systems
                                                                             Architect /
                                                  Owner
                                                                             Engineer
                                                                                                                             Building           End User
                                                  General                                                                    Systems            Systems
                                                 Contractor

                Mechanical                      Low Voltage
                                                Technology                         Electrical
                Contractor                       Contractor
                                                Contractor                         Contractor
                                                                                                                         Facilities                Support
                                                              Special Mechanical                  High Voltage
Water Systems                Fire Protection
                                                                   Systems                        Distribution         Department                  Services
                                Building                  Special Technology                    Medium Voltage
   Piping
                               Automation                      Systems                           Distribution

                               Technology                                                          Electrical
 Air Systems                                                  Fire Alarm System
                               Installation                                                       Equipment

 Mechanical                  Lighting Control                    Integrated                     Emergency Power
 Equipment                       System                        Security System                    Generation
                                                                                                                                  IT Department
                                                          Specialty Healthcare
                               IT Network
                                                                Systems
                                                                                                                                        Business
                         Power Management                   Other Specialty                                                             Systems
                           & Assurance                    Technology Systems


Technology Contracting Advantages
• Holistic approach that enhances technology convergence;
                                                                                                                     Engage operations teams during
• Eliminates waste from system and infrastructure duplication. Balances
  first and lifecycle costs and reduces risk                                                                      construction process to ensure design /
• Owner / GC has a single source of accountability; minimizing delays in                                          build to optimize life cycle performance
  construction schedule


   21
                Tech contracting is the logical evolution of the design – build
            Johnson Controls
                process … increased focus on engaging system users in design
Plan /   Acquire                   Operate /
                                                                                          Construct
                                                                    Assess    & Design                  Maintain

 Emerging construction models focus on building life-cycle cost
 … improving facility performance while mitigating risk and cost
  Key drivers of waste in       Estimated waste
  the traditional model         Percent of total technology spend                    Common cabling and wiring
                                                                                     for all low voltage systems,
                                                                                     reducing amount of material
 Redundant materials                        3-4
                                                                                     Integrated project
                                                                                     management and minimized
 Duplicate labor                                     2-3                             integration efforts after
                                                                                     implementation reducing labor
 Potential delays in
                                                                                     Upfront integration and issue
 building completion due                                   TBD                       resolution, prior to
 to integration errors                                                               implementation reduces
                                                                                     sources of errors and change
 Change orders to integrate                                                          orders
                                                              2-3
 disparate systems
                                                                                     Leveraging JCI volume and
 Loss of procurement benefits                                       1-2              competitive bid process helps
                                                                                     procure these systems for
                                                                                     lower prices

 Total Waste in process                                             8 - 13




     22   Johnson Controls
SOURCE: JCI Internal analysis
Plan /   Acquire                                    Operate /
                                                                                                                   Construct
                                                                          Assess    & Design                                   Maintain

    Facility owners / operators can optimize / maintain their capital
    investment through real time data analysis and improvement projects
                                                                                                 Intended
                                      Integrated Design, Build, Operate                          Performance
                                                                                                 (Opportunity)
                        Auto
                     Commission                                                                   Optimum “As Built”
                                                                                                  Peak Performance
                            First Occupancy
                                                                  Perpetual




                                                                                           Design Service Live
                                                                Commissioning
       Performance




                                  Existing Practices



                                                                                                                 Minimum Acceptable
                                                                                                                 Performance

                                                              Actual Service Live


                                                       Time
     23
SOURCE: NIST 2004; JCI analysis
Plan /       Acquire                      Operate /
                                                                                                                      Construct
                                                                                         Assess        & Design                     Maintain
  The new, smarter buildings utilize technology to drive performance
  improvement across the building life-cycle

                                                                                Info technology platform that integrates disparate real
                          Sustainability Command Center
                                                                                estate and building management systems into a single
                                                                                portal for improved real-time management
                                                                                Case Study: State of Missouri
                                                                                Issues
                                                                                   • Spends $300M annually to operate/maintain 1,000
                                                                                     buildings
                                                                                   • Launched plan to reduce statewide energy consumption
                                                                                     by 15% by 2010
                                                                                   • State had little visibility of building performance
                                                                                JCI Offering
                                                                                   • $24M performance contract to integrate individual
Energy     Square      Building   Equipment     General Scheduling    Capital        systems and buildings to common user interface
 Use        Feet      Conditions, Condition &   Ledger   Systems     Planning
            Data       Controls Maintenance                            Data        • Created dashboard that provides real-time information on
                                                                                     utility usage, maintenance spending, and capital
                                                                                     investments
                                                                                Outcome
         Sequentra®
                                                                                   • $35M annual savings from reduced energy usage
                                                                                   • State can calculate its carbon footprint, and better
                                                                                     control energy, maintenance, and real estate costs


                                 We are continuing to develop this offering as more
                                      customers request this kind of solution.
                                                                                                                                                24
Plan /    Acquire                   Operate /
                                                                                         Construct
                                                                Assess     & Design                  Maintain

Future buildings must be prepared to
deal with multiple elements of the smart grid

  Benefits to Owner/Tenant
  • Lower real estate spend (energy, O&M, capital)
  • Smaller GHG footprint
  • Improved energy security                                                          Today’s challenge…
  • Enhanced comfort and productivity
  • Green recognition

                                                                                               Traditional
  Benefits to Utilities/ISO                                                                    supply-side
  • Flattened load profile                                                                     solutions to
  • Reduced peak                                                                               energy
    demand
                                                                                               problems
  • Cleaner energy profile
  • Compliance with
                                                                                               cannot meet
    RPS/EERS                                          Smart                                    net-zero
  • Least cost ancillary                              Buildings                                energy goals
    services                                                                                   alone


  Benefits to Society
  • Reduce climate risk
  • More reliable and secure electric system
  • Lower energy costs



                   Without smarter building operations on the customer side of the meter,
 25   Confidential         the full potential of the smart grid cannot be unlocked
Plan /   Acquire                Operate /
                                                                         Construct
                                                    Assess    & Design               Maintain

Agenda



• Johnson Controls overview


• Operational challenges in the current facility environment


• Shortcomings of the existing facility build – operate – retrofit process


• An emerging better way – focus on the building life cycle from the start


• Case Study – JCI Corporate HQ




26   Johnson Controls
Johnson Controls has used this approach to redesign its global HQ,
creating a high performing, more comfortable, and sustainable campus




                        34 acre site, 500,000 sf total building footprint


                               4 LEED-NC v2.2 Platinum buildings
                               1 LEED-EBOM v2.0 Platinum building
                               >90th percentile EnergyStar ratings


27   Johnson Controls
Johnson Controls had several goals for its corporate
campus expansion
Construction Goals                          Operational Goals
• Safety–our primary concern                • High performance workplace
• Five secondary (equally weighted)
  project goals                             • Sustainability from a community
                                              perspective
     • Budget: Bid / Buy / Deliver /
       Respond to Changes
                                            • Energy and resource conservation
     • Quality: Attention to detail
       (Create a world class facility)
                                            • LEED Platinum
     • Schedule: Completion date is
       predictable – make necessary
       adjustments
     • Platinum LEED Submission:
       Campus submission to create all
       high performance buildings
     • Diverse Supplier Goal: 20% Minimum

28   Johnson Controls
Johnson Controls Corporate Headquarters combines the best of the
new practices in a significant retrofit / new build

                                         Targeting highest concentration
Solar Thermal              Geothermal
                                          of LEED Platinum certified
                                          buildings (4 NC, 1 EB) in world

                                         >90th %tile Energy Star ratings
Gray Water
Recycling                                272 wells for ground-source heat
                                          pumps reduce energy by 29%

                                         Extensive daylight harvesting and
                                          shade control

                                         385 kW combined ground and
                                          roof mounted photovoltaic arrays
                                          (Wisconsin’s largest PV system)

                                         1,330 sf solar thermal collectors
                                          used to heat hot water in building

     Solar Photovoltaics                 BMS integration to IT monitoring
                                          system in data center
29   Johnson Controls
Design / construction process utilized advanced HVAC /
controls to deliver energy and asset performance targets

 Under floor air distribution system
  that can be easily reconfigured

 Daylight harvesting and shade
  controls

 Personal environment modules

 Semi-automated demand response                Bi-Directional

                                               Communications



 BMS ↔ IT asset mgmt system
  integration in data center

 BMS ↔ Work order management
  system

30 Johnson Controls
Actual performance significantly better than comparable JCI facilities
Total Electrical Demand
  (Watts /square foot)




                                                York, PA Campus
                                                Building Efficiency HQ
                          31 Johnson Controls
                                                Milwaukee Building B1
                                                Corporate HQ
Construction process incorporated LEED checklist as part of
achieving LEED platinum certification for new and existing buildings




Sustainable design in the LEED process – specific local content requirements
Future Vision
 Example: Strategic Alliance with IBM
Press Release 22 Feb.
IBM and Johnson Controls Join Forces to Make
Buildings Smarter
Combined Offering to Enhance Energy and Operational
Efficiencies



• IBM’s Maximo is the core of Connect MX
• IBM’s Lotus Mash-up tools will deliver
  client dashboard’s
• Integrating our building technlogies and
  enterprise applications brings a richness
  of information that enables dynamic
  operation of buildings ……FM 2.0




FM 2.0 will deliver significant competitive advantage and enhanced client retention

• Energy Savings through continous commissioning - 10% to 20%
• Operating cost savings through reduction of labor and and auto despatch of technicians – 10% to 20%
• Space optimization through building occupancy tracking …..



33

Mais conteúdo relacionado

Mais procurados

Architectural acoustics
Architectural acousticsArchitectural acoustics
Architectural acousticsRUSHIT PATEL
 
Building automation - Cisco Headquarters
Building automation - Cisco HeadquartersBuilding automation - Cisco Headquarters
Building automation - Cisco HeadquartersPrashanth Dommeti
 
case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.Milan Jain
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structuresFAIZAL MUHAMMED
 
Urban Sustainability in Cascadia Region
 Urban Sustainability in Cascadia Region Urban Sustainability in Cascadia Region
Urban Sustainability in Cascadia RegionAkanksha Chopra
 
Intelligent Building Management Systems
Intelligent Building Management SystemsIntelligent Building Management Systems
Intelligent Building Management SystemsKhaled Ali
 
Case study college of architecture
Case study college of architecture Case study college of architecture
Case study college of architecture Abhijeet Roy
 
Teri university case study
Teri university case studyTeri university case study
Teri university case studyDeepika Verma
 
Prestige tech park III
Prestige tech park IIIPrestige tech park III
Prestige tech park IIIMadhu Sagar
 
CRESCENT UNIVERSITY
CRESCENT UNIVERSITYCRESCENT UNIVERSITY
CRESCENT UNIVERSITYDanish Ryan
 
(5) bs-ii-electricity-unit-v-2012-five
(5) bs-ii-electricity-unit-v-2012-five(5) bs-ii-electricity-unit-v-2012-five
(5) bs-ii-electricity-unit-v-2012-fiveBattula Choudary
 
The Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyThe Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyShailja km
 
Building services & Standards For Institutional Building
Building services & Standards For Institutional BuildingBuilding services & Standards For Institutional Building
Building services & Standards For Institutional BuildingKashish Duggal
 
Service core
Service coreService core
Service coreaduiti
 
Building services -
Building services -Building services -
Building services -Rami Reddy
 
electric plan distribution design for large campus building
electric plan distribution design for large campus building electric plan distribution design for large campus building
electric plan distribution design for large campus building Somesh Siddharth
 

Mais procurados (20)

Architectural acoustics
Architectural acousticsArchitectural acoustics
Architectural acoustics
 
Building automation - Cisco Headquarters
Building automation - Cisco HeadquartersBuilding automation - Cisco Headquarters
Building automation - Cisco Headquarters
 
Bms system
Bms  systemBms  system
Bms system
 
case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Urban Sustainability in Cascadia Region
 Urban Sustainability in Cascadia Region Urban Sustainability in Cascadia Region
Urban Sustainability in Cascadia Region
 
Intelligent Building Management Systems
Intelligent Building Management SystemsIntelligent Building Management Systems
Intelligent Building Management Systems
 
Case study college of architecture
Case study college of architecture Case study college of architecture
Case study college of architecture
 
Teri university case study
Teri university case studyTeri university case study
Teri university case study
 
Prestige tech park III
Prestige tech park IIIPrestige tech park III
Prestige tech park III
 
CRESCENT UNIVERSITY
CRESCENT UNIVERSITYCRESCENT UNIVERSITY
CRESCENT UNIVERSITY
 
(5) bs-ii-electricity-unit-v-2012-five
(5) bs-ii-electricity-unit-v-2012-five(5) bs-ii-electricity-unit-v-2012-five
(5) bs-ii-electricity-unit-v-2012-five
 
LEED Presentation
LEED PresentationLEED Presentation
LEED Presentation
 
Hassan fathy
Hassan fathyHassan fathy
Hassan fathy
 
The Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case studyThe Institute of Rural Research And Development (IRRAD)-Architecture case study
The Institute of Rural Research And Development (IRRAD)-Architecture case study
 
Building services & Standards For Institutional Building
Building services & Standards For Institutional BuildingBuilding services & Standards For Institutional Building
Building services & Standards For Institutional Building
 
Service core
Service coreService core
Service core
 
Building services -
Building services -Building services -
Building services -
 
electric plan distribution design for large campus building
electric plan distribution design for large campus building electric plan distribution design for large campus building
electric plan distribution design for large campus building
 
Leed
Leed Leed
Leed
 

Semelhante a Creating the Smarter, Leaner & Greener Workplace of the Future

Unlocking the benefits of Energy Efficiency
Unlocking the benefits of Energy EfficiencyUnlocking the benefits of Energy Efficiency
Unlocking the benefits of Energy EfficiencyQs. Nahinga David
 
Telkonet nov2012presentation
Telkonet nov2012presentationTelkonet nov2012presentation
Telkonet nov2012presentationnabarnes
 
Telkonet nov2012presentation
Telkonet nov2012presentationTelkonet nov2012presentation
Telkonet nov2012presentationCompany Spotlight
 
SPB Infrastructure Presentation
SPB Infrastructure PresentationSPB Infrastructure Presentation
SPB Infrastructure Presentationjsmitley
 
Building Simulations | Understanding Your Building's Energy Profile
Building Simulations | Understanding Your Building's Energy ProfileBuilding Simulations | Understanding Your Building's Energy Profile
Building Simulations | Understanding Your Building's Energy ProfileEnergy Advantage
 
Building Simulations | Understanding Your Energy Profile
Building Simulations | Understanding Your Energy ProfileBuilding Simulations | Understanding Your Energy Profile
Building Simulations | Understanding Your Energy ProfileEnergy Advantage
 
On the path to high-performance buildings and beyond
On the path to high-performance buildings and beyondOn the path to high-performance buildings and beyond
On the path to high-performance buildings and beyondSchneider Electric
 
Explore the Value of LEED Green Building in the Market Today
Explore the Value of LEED Green Building in the Market TodayExplore the Value of LEED Green Building in the Market Today
Explore the Value of LEED Green Building in the Market TodayTorkBetterBusiness
 
Building a More Sustainable Future - Solar Decathlon
Building a More Sustainable Future - Solar DecathlonBuilding a More Sustainable Future - Solar Decathlon
Building a More Sustainable Future - Solar DecathlonSaulo Rozendo
 
New Energy Conference-Firas Obeido from SatchNet
New Energy Conference-Firas Obeido from SatchNet New Energy Conference-Firas Obeido from SatchNet
New Energy Conference-Firas Obeido from SatchNet EDAMA
 
NREL, Shanti Pless
NREL, Shanti PlessNREL, Shanti Pless
NREL, Shanti Plessshobart
 
High Performance Buidlings for Brazil
High Performance Buidlings for BrazilHigh Performance Buidlings for Brazil
High Performance Buidlings for Brazilsekkelww
 
[Vihreä Foorumi 29.3.] Laura Varpasuo, Nokia
[Vihreä Foorumi 29.3.] Laura Varpasuo, Nokia[Vihreä Foorumi 29.3.] Laura Varpasuo, Nokia
[Vihreä Foorumi 29.3.] Laura Varpasuo, NokiaGBC Finland
 
Presentation On Sustainability April 2009 Final
Presentation On Sustainability April 2009 FinalPresentation On Sustainability April 2009 Final
Presentation On Sustainability April 2009 FinalAndy Rayner
 
BOMA 2012 Show - Axcess Intro
BOMA 2012 Show - Axcess IntroBOMA 2012 Show - Axcess Intro
BOMA 2012 Show - Axcess IntroMike Putich
 
NESHEP Planet Positive Presentation
NESHEP Planet Positive PresentationNESHEP Planet Positive Presentation
NESHEP Planet Positive PresentationBianca Kemp
 

Semelhante a Creating the Smarter, Leaner & Greener Workplace of the Future (20)

Unlocking the benefits of Energy Efficiency
Unlocking the benefits of Energy EfficiencyUnlocking the benefits of Energy Efficiency
Unlocking the benefits of Energy Efficiency
 
Telkonet nov2012presentation
Telkonet nov2012presentationTelkonet nov2012presentation
Telkonet nov2012presentation
 
Telkonet nov2012presentation
Telkonet nov2012presentationTelkonet nov2012presentation
Telkonet nov2012presentation
 
SPB Infrastructure Presentation
SPB Infrastructure PresentationSPB Infrastructure Presentation
SPB Infrastructure Presentation
 
ECS_AboutECS
ECS_AboutECSECS_AboutECS
ECS_AboutECS
 
Building Simulations | Understanding Your Building's Energy Profile
Building Simulations | Understanding Your Building's Energy ProfileBuilding Simulations | Understanding Your Building's Energy Profile
Building Simulations | Understanding Your Building's Energy Profile
 
Building Simulations | Understanding Your Energy Profile
Building Simulations | Understanding Your Energy ProfileBuilding Simulations | Understanding Your Energy Profile
Building Simulations | Understanding Your Energy Profile
 
On the path to high-performance buildings and beyond
On the path to high-performance buildings and beyondOn the path to high-performance buildings and beyond
On the path to high-performance buildings and beyond
 
Hugh Jones. Carbon Footprinting Competitive Advantage?
Hugh Jones. Carbon Footprinting Competitive Advantage?Hugh Jones. Carbon Footprinting Competitive Advantage?
Hugh Jones. Carbon Footprinting Competitive Advantage?
 
Explore the Value of LEED Green Building in the Market Today
Explore the Value of LEED Green Building in the Market TodayExplore the Value of LEED Green Building in the Market Today
Explore the Value of LEED Green Building in the Market Today
 
Eecs Cert Report
Eecs Cert ReportEecs Cert Report
Eecs Cert Report
 
Building a More Sustainable Future - Solar Decathlon
Building a More Sustainable Future - Solar DecathlonBuilding a More Sustainable Future - Solar Decathlon
Building a More Sustainable Future - Solar Decathlon
 
1. introduction
1. introduction1. introduction
1. introduction
 
New Energy Conference-Firas Obeido from SatchNet
New Energy Conference-Firas Obeido from SatchNet New Energy Conference-Firas Obeido from SatchNet
New Energy Conference-Firas Obeido from SatchNet
 
NREL, Shanti Pless
NREL, Shanti PlessNREL, Shanti Pless
NREL, Shanti Pless
 
High Performance Buidlings for Brazil
High Performance Buidlings for BrazilHigh Performance Buidlings for Brazil
High Performance Buidlings for Brazil
 
[Vihreä Foorumi 29.3.] Laura Varpasuo, Nokia
[Vihreä Foorumi 29.3.] Laura Varpasuo, Nokia[Vihreä Foorumi 29.3.] Laura Varpasuo, Nokia
[Vihreä Foorumi 29.3.] Laura Varpasuo, Nokia
 
Presentation On Sustainability April 2009 Final
Presentation On Sustainability April 2009 FinalPresentation On Sustainability April 2009 Final
Presentation On Sustainability April 2009 Final
 
BOMA 2012 Show - Axcess Intro
BOMA 2012 Show - Axcess IntroBOMA 2012 Show - Axcess Intro
BOMA 2012 Show - Axcess Intro
 
NESHEP Planet Positive Presentation
NESHEP Planet Positive PresentationNESHEP Planet Positive Presentation
NESHEP Planet Positive Presentation
 

Mais de Stanford Graduate School of Business

Executive Compensation in the Say-On-Pay Era: Winning the Shareholder Value
Executive Compensation in the Say-On-Pay Era: Winning the Shareholder ValueExecutive Compensation in the Say-On-Pay Era: Winning the Shareholder Value
Executive Compensation in the Say-On-Pay Era: Winning the Shareholder ValueStanford Graduate School of Business
 

Mais de Stanford Graduate School of Business (17)

Blockchain for Social Impact: Moving Beyond the Hype
Blockchain for Social Impact: Moving Beyond the HypeBlockchain for Social Impact: Moving Beyond the Hype
Blockchain for Social Impact: Moving Beyond the Hype
 
8 Key Life and Leadership Lessons
8 Key Life and Leadership Lessons8 Key Life and Leadership Lessons
8 Key Life and Leadership Lessons
 
Key Corporate Governance Insights
Key Corporate Governance InsightsKey Corporate Governance Insights
Key Corporate Governance Insights
 
How to Manage Your Anxiety When Presenting
How to Manage Your Anxiety When PresentingHow to Manage Your Anxiety When Presenting
How to Manage Your Anxiety When Presenting
 
7 Lessons for Aspiring Leaders
7 Lessons for Aspiring Leaders7 Lessons for Aspiring Leaders
7 Lessons for Aspiring Leaders
 
How Much Does Venture Capital Drive the U.S. Economy?
How Much Does Venture Capital Drive the U.S. Economy?How Much Does Venture Capital Drive the U.S. Economy?
How Much Does Venture Capital Drive the U.S. Economy?
 
Words of Wisdom for the Class of 2015
Words of Wisdom for the Class of 2015Words of Wisdom for the Class of 2015
Words of Wisdom for the Class of 2015
 
2014 Year in Review | Stanford Graduate School of Business
2014 Year in Review | Stanford Graduate School of Business2014 Year in Review | Stanford Graduate School of Business
2014 Year in Review | Stanford Graduate School of Business
 
Robert Siegel: HR Issues in a Startup
Robert Siegel: HR Issues in a Startup Robert Siegel: HR Issues in a Startup
Robert Siegel: HR Issues in a Startup
 
Alibaba Founder Jack Ma: Ideas & Technology Can Change the World
Alibaba Founder Jack Ma: Ideas & Technology Can Change the World Alibaba Founder Jack Ma: Ideas & Technology Can Change the World
Alibaba Founder Jack Ma: Ideas & Technology Can Change the World
 
The Power of Storytelling: Making Brands Come to Life
The Power of Storytelling: Making Brands Come to LifeThe Power of Storytelling: Making Brands Come to Life
The Power of Storytelling: Making Brands Come to Life
 
How To Make Innovation a Reality at Work
How To Make Innovation a Reality at WorkHow To Make Innovation a Reality at Work
How To Make Innovation a Reality at Work
 
Using Neuroscience to Influence Behavior
Using Neuroscience to Influence BehaviorUsing Neuroscience to Influence Behavior
Using Neuroscience to Influence Behavior
 
Business as Art by Stanford Business Professor Michael Ray
Business as Art by Stanford Business Professor Michael RayBusiness as Art by Stanford Business Professor Michael Ray
Business as Art by Stanford Business Professor Michael Ray
 
Natura: The Challenges in Building a Sustainable Supply Chain
Natura: The Challenges in Building a Sustainable Supply ChainNatura: The Challenges in Building a Sustainable Supply Chain
Natura: The Challenges in Building a Sustainable Supply Chain
 
Entrepreneurship Roadmap
Entrepreneurship RoadmapEntrepreneurship Roadmap
Entrepreneurship Roadmap
 
Executive Compensation in the Say-On-Pay Era: Winning the Shareholder Value
Executive Compensation in the Say-On-Pay Era: Winning the Shareholder ValueExecutive Compensation in the Say-On-Pay Era: Winning the Shareholder Value
Executive Compensation in the Say-On-Pay Era: Winning the Shareholder Value
 

Último

How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseCeline George
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptxmary850239
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 

Último (20)

How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 

Creating the Smarter, Leaner & Greener Workplace of the Future

  • 1. Responsible Supply Chain Creating the smarter, leaner, & greener workplace of the future Stephen Thompson Vice President, Enterprise Applications & Alliances April 29, 2010
  • 2. Agenda • Johnson Controls overview • Operational challenges in the current facility environment • Shortcomings of the existing facility build – operate – retrofit process • An emerging better way – focus on the building life cycle from the start • Case Study – JCI Corporate HQ 2 Johnson Controls
  • 3. Three global businesses focused on sustainability across the supply chain 140,000 Employees Fortune 100 Multi-Industry Company Building Efficiency Power Solutions Automotive Experience Creating quality indoor Providing the highest quality, Delivering world-class environments that are lowest cost automotive technologies that differentiate comfortable, safe, energy batteries to power vehicles vehicle interiors and increase efficient, and sustainable of today and tomorrow consumer demand  200 million vehicles  12 million homes  1 million commercial buildings 3 Johnson Controls
  • 4. JCI’s suite of offerings help customers achieve sustainability goals across the real estate portfolio PRODUCTS & ENERGY TECHNOLOGY ENERGY EFFICIENT ENERGY EFFICIENCY SOLUTIONS EQUIPMENT RETROFITS BUILDING ON-SITE AUTOMATION RENEWABLE SYSTEMS ENERGY People who design, build, own BUILDING and operate buildings need to: DISTRIBUTED SYSTEMS HEAT & POWER INTEGRATION GENERATION Manage energy & lifecycle costs Reduce environmental impact ENERGY & FACILITY Increase building value MANAGEMENT EMISSIONS MANAGEMENT Enhance image and reputation & OPERATIONS WORKSPACE & EQUIPMENT PORTFOLIO MAINTENANCE OPTIMIZATION & REPAIR GREEN BUILDING BUILDING SYSTEM DESIGN & CERTIFICATION RETRO-COMMISSIONING ADVISORY TECHNICAL SERVICES SERVICES 4 Johnson Controls
  • 5. We provide a mix of these services to over 1 million customers in 150+ countries across the globe Apartment units Lodging Schools Colleges & Universities Hospitals High Technology Homes Retail Shopping Malls Government Life Sciences Airports High-rise Apartments Medical Clinics Small Commercial Large Commercial Arenas/Convention Centers Industrial Plants Residential Mid Market Complex 5 Johnson Controls
  • 6. Sustainable supply chain principles guide Johnson Controls $26B in annual 3rd party spend ENVIRONMENTAL SOCIAL ECONOMIC STEWARDSHIP RESPONSIBILITY PROSPERITY • Achieve competitive • Increase minority business development & • Ensure the ongoing edge from supplier diversity financial viability of the environmentally business through • Strive to attain a high performance work responsible products & strategic investments environment free of workplace diseases services and management of risk and that is physically and emotionally safe World Environment Center JCI has a long history of commitment to a diverse supply chain Gold Medal for International Corporate Achievement in  Johnson Controls spends $1.7 billion annually with ~340 diverse suppliers Sustainable Development  One of only 13 companies in the Billion-Dollar Roundtable  Member of Dow Jones Sustainability World Index 6 Johnson Controls
  • 7. Agenda • Johnson Controls overview • Operational challenges in the current facility environment • Shortcomings of the existing facility build – operate – retrofit process • An emerging better way – focus on the building life cycle from the start • Case Study – JCI Corporate HQ 7 Johnson Controls
  • 8. Commercial buildings have a major energy & environmental impact consuming nearly 50% of the electricity in the U.S. Buildings use 40% • Building sector represents 40% of the world’s energy consumption of U.S. primary energy • 1/3rd of energy-related global GHG emissions (~8 gigatons/year) Residential Industrial Buildings • Buildings responsible for 30% of raw 22% materials use, 25% of solid waste, 25% 32% water use, and 12% of land use. Commercial Buildings • Commercial buildings provide much more 18% concentrated targets for energy and Transportation sustainability programs 28% Sources: International Energy Agency; U.S. Energy Information Administration (2009) Annual 8 Energy Review; U.S. Dept of Energy (2009) Building Energy Data Book; World Resources Institute; United Nationa Environment Program –Sustainable Buildings & Climate Initiative
  • 9. Global changes in energy and climate legislation / regulation increasing scope and immediacy of the challenge Passed Passed Passed - Stimulus funds - Energy Performance in - National energy goals - EE retrofit tax deduction Buildings Directive recast - Local/regional carbon - RE tax credits - Emissions trading system trading (Australia, Tokyo) - Greenhouse gas reporting rule - UK Climate reduction - Japan revised Energy Proposed commitment (CRC): 32% Conservation Law requires - Prescriptive rebates (Jobs Bill) reduction by 2020 company-wide energy - EE/RE resource Standard - HCFC Phase-out mgmt - PACE loan guarantees Proposed - Energy codes (JP, CN, IN) - Utility decoupling - Binding 30% energy reduction - Stimulus funds / Tax - Dynamic utility rates targets (from voluntary 20% incentives - CFC Chiller replacement goal) Proposed incentives - Building retrofit Initiative - Energy savings certificate - 30-50% more stringent building - Energy services legislation trading (Australia, India) energy efficiency codes - Mandatory energy audits - India ESCO risk guarantee - Mandatory building energy - GWP Refrigerant phase down facility labeling - Energy Tax revisions - Singapore Government - Carbon cap and trade system Bldg Green Mark 2030 Goal 9
  • 10. Productive response to rising global demand for energy & sustainability requires rethinking approaches to buildings What is your company's top strategy going forward to meet its carbon reduction goal? 0% 10% 20% 30% 40% 50% Onsite renewable energy 12% Renewable power purchases 10% Energy efficiency in buildings 45% Energy efficiency in transportation 6% Use of alternative transportation fuels 1% Carbon emission offset purchases 7% No prioritization amongst strategies 14% Other/Don't know 7% Building efficiency is largest and most cost effective strategy for reducing greenhouse gas emissions 10 Source: Johnson Controls/ IFMA (2009) Energy Efficiency Indicator
  • 11. Agenda • Johnson Controls overview • Operational challenges in the current facility environment • Shortcomings of the existing facility build – operate – retrofit process • An emerging better way – focus on the building life cycle from the start • Case Study – JCI Corporate HQ 11 Johnson Controls
  • 12. Gaps in motivations, tools, and goals leads to high levels of disconnect across the existing building lifecycle Building Lifecycle Plan / Acquire or Operate / Construct Assess Design Maintain Lead Owner facilities team Architects / Designers General Contractors Facility Manager, Occupant groups Focus Balancing capital Create a memorable First cost; risk mitigation; Facility as a tool to support availability with time- building; Design delivery; Deliver on time on budget their efforts to deliver core line and growth plans Manage safety risk mission of enterprise Process Incomplete Limited insight into details Minimal concern about Minimal engagement prior Gaps knowledge of of intended use leads to operating cost. to occupancy = poor life- intended use / capacity for peak demand cycle performance operation 12 Johnson Controls Minimal interaction across lifecycle
  • 13. Plan / Acquire Operate / Construct Assess & Design Maintain Design team focused on conceptual performance with insufficient regard for the actual use of the facilities Challenges Impact • Difficult to translate conceptual design • Designs generally built to deliver to actual performance requirements capacity for peaks • Each sub-component designed to cover • Challenged to tie together disparate unknowns in other systems components to create a unified system • Life-cycle cost, performance, and • Analytic / design tools focused on safety factors excluded component initial performance • Real estate portfolio doesn’t optimize support core missions of individual • Insufficient insight from cross – section department and overall organization of end users • Construction process takes longer and • Poor hand-off to construct phase costs more for same delivered value (general contractor) 13
  • 14. Plan / Acquire Operate / Construct Assess & Design Maintain Traditional construction model amplifies disconnects between key constituents across the building life-cycle Traditional Contracting Model Traditional Model - Disconnected Architect / Owner Engineer End Building User General Systems Contractor Systems Mechanical Electrical Contractor Contractor Electrical High Voltage Water Systems Piping Equipment Distribution Access Voicemail Internet HVAC Control Air Systems Building Emergency Power Medium Voltage Access Automation Generation Distribution Technology Fire Protection Fire Alarm System Lighting Control Fire/Life Installation System Safety Patient Monitoring Mechanical Special Mechanical Integrated Business IT Network Equipment Systems Security System Systems Facilities Support Special Technology Power Management Specialty Healthcare Department Systems & Assurance Services Other Specialty Technology Systems Time & Attendance Traditional Contracting Limitations POS • Silo mentality with limited integration between subsystems; creating operating inefficiencies Finance • Fragmented subsystem approach that creates cost inefficiencies (labor & materials), and increases project risk IT Department • Difficult to determine contractor accountability 14
  • 15. Plan / Acquire Operate / Construct Assess & Design Maintain Current process ignores / sub-optimizes operational performance leading to significant decline in performance over time Intended Traditional Construction Process Performance (Opportunity) Auto Commission Optimum “As Built” Peak Performance First Occupancy Design Service Live Performance Existing Practices Minimum Acceptable Performance Actual Service Live Time 15
  • 16. Agenda • Johnson Controls overview • Operational challenges in the current facility environment • Shortcomings of the existing facility build – operate – retrofit process • An emerging better way – focus on the building life cycle from the start • Case Study – JCI Corporate HQ 16 Johnson Controls
  • 17. An emerging facility approach brings together constituents to build / remodel more efficient and productive real estate investments Building Lifecycle Plan / Acquire & Construct Operate / Assess Design Maintain Key Action Impact • Involve all key constituents as • Improved project quality with reduced early as possible in process cost and schedule variability • Decisions based on total life- • Projects deliver facilities that are cycle cost optimized to perform, impacting 100% of life-cycle cost rather than the 25% that is first cost 17 Johnson Controls
  • 18. Building life-cycle focus enables business objectives by driving efficiencies across the entire real estate budget … Fortune 1000 Typical Corporate Real Estate Spend Enterprise Challenges (illustrative) Example: Pharmaceuticals • Capital constraints Houskeeping 6% • Uncertain / declining real estate Maintenance 18% markets • Accelerated shift to global v multi- Fixed Asset - national Rent, Depreciation, etc. 53% Utilities • Volatile utility prices 11% • Increasing regulatory / government Security 6% investment in sustainability Other 6% … impacting all elements including rent / depreciation (>50% of total spend) 18 Johnson Controls
  • 19. Plan / Acquire Operate / Construct Assess & Design Maintain Using sensing technology to evaluate / improve workplace utilization while maintaining worker safety, comfort, and productivity Green & Agile @ BBC, Media Village W12  18% reduction in workstations – release of Woodlands  Average utilisation improved from 46.8% to 62.2%  Move to a more agile and sustainable way of working – churned over 2500 people  Average share ratio of 1.2:1 (equates to 12 people sharing 10 desks) 19 A Discussion on Corporate Environmental Sustainability
  • 20. Plan / Acquire Operate / Construct Assess & Design Maintain Major construction consumers showing increased preference for the benefits of the design – build process Growth trajectory Key accelerators 60% • Increased collaboration 54% 50% 50% between owner and 50% 45% contractor • Single-point of contact 40% throughout process 40% 40% 35% 30% • Realization of operational vision 20% • Reduced schedule variability and increased cost visibility 10% Trad Design Bid Build Design Build • Flexibility in construct process 0% to adapt design 2000 2005 2010 2015 20 Johnson Controls
  • 21. Plan / Acquire Operate / Construct Assess & Design Maintain Intelligent buildings require new construction model to deliver highly integrated projects … engages operators early Technology Contracting Model Integrated Model – Converged Systems Architect / Owner Engineer Building End User General Systems Systems Contractor Mechanical Low Voltage Technology Electrical Contractor Contractor Contractor Contractor Facilities Support Special Mechanical High Voltage Water Systems Fire Protection Systems Distribution Department Services Building Special Technology Medium Voltage Piping Automation Systems Distribution Technology Electrical Air Systems Fire Alarm System Installation Equipment Mechanical Lighting Control Integrated Emergency Power Equipment System Security System Generation IT Department Specialty Healthcare IT Network Systems Business Power Management Other Specialty Systems & Assurance Technology Systems Technology Contracting Advantages • Holistic approach that enhances technology convergence; Engage operations teams during • Eliminates waste from system and infrastructure duplication. Balances first and lifecycle costs and reduces risk construction process to ensure design / • Owner / GC has a single source of accountability; minimizing delays in build to optimize life cycle performance construction schedule 21 Tech contracting is the logical evolution of the design – build Johnson Controls process … increased focus on engaging system users in design
  • 22. Plan / Acquire Operate / Construct Assess & Design Maintain Emerging construction models focus on building life-cycle cost … improving facility performance while mitigating risk and cost Key drivers of waste in Estimated waste the traditional model Percent of total technology spend Common cabling and wiring for all low voltage systems, reducing amount of material Redundant materials 3-4 Integrated project management and minimized Duplicate labor 2-3 integration efforts after implementation reducing labor Potential delays in Upfront integration and issue building completion due TBD resolution, prior to to integration errors implementation reduces sources of errors and change Change orders to integrate orders 2-3 disparate systems Leveraging JCI volume and Loss of procurement benefits 1-2 competitive bid process helps procure these systems for lower prices Total Waste in process 8 - 13 22 Johnson Controls SOURCE: JCI Internal analysis
  • 23. Plan / Acquire Operate / Construct Assess & Design Maintain Facility owners / operators can optimize / maintain their capital investment through real time data analysis and improvement projects Intended Integrated Design, Build, Operate Performance (Opportunity) Auto Commission Optimum “As Built” Peak Performance First Occupancy Perpetual Design Service Live Commissioning Performance Existing Practices Minimum Acceptable Performance Actual Service Live Time 23 SOURCE: NIST 2004; JCI analysis
  • 24. Plan / Acquire Operate / Construct Assess & Design Maintain The new, smarter buildings utilize technology to drive performance improvement across the building life-cycle Info technology platform that integrates disparate real Sustainability Command Center estate and building management systems into a single portal for improved real-time management Case Study: State of Missouri Issues • Spends $300M annually to operate/maintain 1,000 buildings • Launched plan to reduce statewide energy consumption by 15% by 2010 • State had little visibility of building performance JCI Offering • $24M performance contract to integrate individual Energy Square Building Equipment General Scheduling Capital systems and buildings to common user interface Use Feet Conditions, Condition & Ledger Systems Planning Data Controls Maintenance Data • Created dashboard that provides real-time information on utility usage, maintenance spending, and capital investments Outcome Sequentra® • $35M annual savings from reduced energy usage • State can calculate its carbon footprint, and better control energy, maintenance, and real estate costs We are continuing to develop this offering as more customers request this kind of solution. 24
  • 25. Plan / Acquire Operate / Construct Assess & Design Maintain Future buildings must be prepared to deal with multiple elements of the smart grid Benefits to Owner/Tenant • Lower real estate spend (energy, O&M, capital) • Smaller GHG footprint • Improved energy security Today’s challenge… • Enhanced comfort and productivity • Green recognition Traditional Benefits to Utilities/ISO supply-side • Flattened load profile solutions to • Reduced peak energy demand problems • Cleaner energy profile • Compliance with cannot meet RPS/EERS Smart net-zero • Least cost ancillary Buildings energy goals services alone Benefits to Society • Reduce climate risk • More reliable and secure electric system • Lower energy costs Without smarter building operations on the customer side of the meter, 25 Confidential the full potential of the smart grid cannot be unlocked
  • 26. Plan / Acquire Operate / Construct Assess & Design Maintain Agenda • Johnson Controls overview • Operational challenges in the current facility environment • Shortcomings of the existing facility build – operate – retrofit process • An emerging better way – focus on the building life cycle from the start • Case Study – JCI Corporate HQ 26 Johnson Controls
  • 27. Johnson Controls has used this approach to redesign its global HQ, creating a high performing, more comfortable, and sustainable campus 34 acre site, 500,000 sf total building footprint  4 LEED-NC v2.2 Platinum buildings  1 LEED-EBOM v2.0 Platinum building  >90th percentile EnergyStar ratings 27 Johnson Controls
  • 28. Johnson Controls had several goals for its corporate campus expansion Construction Goals Operational Goals • Safety–our primary concern • High performance workplace • Five secondary (equally weighted) project goals • Sustainability from a community perspective • Budget: Bid / Buy / Deliver / Respond to Changes • Energy and resource conservation • Quality: Attention to detail (Create a world class facility) • LEED Platinum • Schedule: Completion date is predictable – make necessary adjustments • Platinum LEED Submission: Campus submission to create all high performance buildings • Diverse Supplier Goal: 20% Minimum 28 Johnson Controls
  • 29. Johnson Controls Corporate Headquarters combines the best of the new practices in a significant retrofit / new build  Targeting highest concentration Solar Thermal Geothermal of LEED Platinum certified buildings (4 NC, 1 EB) in world  >90th %tile Energy Star ratings Gray Water Recycling  272 wells for ground-source heat pumps reduce energy by 29%  Extensive daylight harvesting and shade control  385 kW combined ground and roof mounted photovoltaic arrays (Wisconsin’s largest PV system)  1,330 sf solar thermal collectors used to heat hot water in building Solar Photovoltaics  BMS integration to IT monitoring system in data center 29 Johnson Controls
  • 30. Design / construction process utilized advanced HVAC / controls to deliver energy and asset performance targets  Under floor air distribution system that can be easily reconfigured  Daylight harvesting and shade controls  Personal environment modules  Semi-automated demand response Bi-Directional Communications  BMS ↔ IT asset mgmt system integration in data center  BMS ↔ Work order management system 30 Johnson Controls
  • 31. Actual performance significantly better than comparable JCI facilities Total Electrical Demand (Watts /square foot) York, PA Campus Building Efficiency HQ 31 Johnson Controls Milwaukee Building B1 Corporate HQ
  • 32. Construction process incorporated LEED checklist as part of achieving LEED platinum certification for new and existing buildings Sustainable design in the LEED process – specific local content requirements
  • 33. Future Vision Example: Strategic Alliance with IBM Press Release 22 Feb. IBM and Johnson Controls Join Forces to Make Buildings Smarter Combined Offering to Enhance Energy and Operational Efficiencies • IBM’s Maximo is the core of Connect MX • IBM’s Lotus Mash-up tools will deliver client dashboard’s • Integrating our building technlogies and enterprise applications brings a richness of information that enables dynamic operation of buildings ……FM 2.0 FM 2.0 will deliver significant competitive advantage and enhanced client retention • Energy Savings through continous commissioning - 10% to 20% • Operating cost savings through reduction of labor and and auto despatch of technicians – 10% to 20% • Space optimization through building occupancy tracking ….. 33