SPECIALDECISION SITUATIONS
OUTLINE
• Choice between mutually exclusive projects of unequal life
• Optimal timing decision
• Determination of economic life
• Interrelationship between investment and financing aspects
• Inflation and capital budgeting
• International capital budgeting
• Investment in capabilities
Choice between Mutually Exclusive Projects
of Unequal Life
For a proper comparison of the two alternatives, that have different lives,
we have to convert the present value of costs into a uniform annual
equivalent (UAE) figure – this is also called an equivalent annual cost
(EAC) figure. The UAE is a function of the present value of cost, the life
of the asset, and the discount rate. The UAE is simply:
PV Cost
PVIFAr,n
Uniform Annual Equivalent
12,000 12,000 12,000
PV of costs of machineA:
12,000 12,000
75,000 + + + + + = 118,260
(1.12) (1.12)2 (1.12)3 (1.12)4 (1.12)5
PV costs of machine B :
15,000 15,000 15,000
50,000 + + + = 86,030
MachineA:
(1.12) (1.12)2
UAE = 118,260
(1.12)3
118,260
PVIFA12%,5
Machine B: UAE = 86,030
PVIFA12%,3
3.605
86,030
2.402
= 32,804
= 35,816
=
=
Optimal Timing
In real life, an investment is rarely a “now or never” proposition.
Typically, it can be undertaken now or at some point of time in future.
Given this option, the issue of optimal timing assumes significance.
Under conditions of certainty, the optimal timing may be
determined by using the following procedure.
1. Examine alternative dates (t) when the investment can be made.
2. Estimate the net future value as of each alternative date and
convert the same to its current value.
3. Choose the timing that has the highest current value
Determination of Economic Life
The economic life of an asset is conceptually defined as the period
after which the asset should be replaced to minimise the sum of
operating and maintenance costs and capital costs expressed on an
annual basis. Put differently, it is the replacement cycle that
minimises the uniform annual equivalent total cost, UAE (TC) of
operating and owning the asset. The UAE (TC) is simply the sum of
the uniform annual equivalent operating and maintenance cost, UAE
(OM), and the uniform annual equivalent capital cost, UAE (CC).
That is,
UAE (TC) = UAE (OM) + UAE (CC) (13.1)
S
UAE (CC)
Replacement
Period (in years)
Annualised Cost
Costs over the Life of a Machine
Interrelationship between the Investment and
Financing Aspects
• WACC is the right discount rate for a project that is a carbon copy
of the firm’s existing business.
• A project may have financing effects that differ from those of the
existing investments of the firm. It may have a different debt
capacity or be entitled to certain subsidies or have some special
financial features. In such cases the recommended method is to
calculate the adjusted NPV (orAPV for short).
Adjusted Present Value (APV)
APV is calculated by first estimating the base-case NPV and then
adjusting it to reflect the financing side effects of the project.
The base-case NPV is the NPV of the project under the following
assumptions:
•
• The project is financed entirely by equity.
There is no financing side effect like issue cost or subsidy
The present value of financing side effects is equal to:
• Present value of positive financing side effects like tax shield on
debt and availability of subsidies.
• Present value of negative financing side effects like issue costs and
financial distress costs associated with excessive leverage.
Illustration
Investment
Net cash inflow
Opportunity cost of capital
Issue cost of equity
Debt available
Repayment of debt
Tax rate
: Rs. 5 million
: Rs.1 million per year for 8
years
: 15 percent
: 5 percent
: Rs.2.4 million at 14 percent
: 8 equal annual instalments.
First instalment will be paid at
the end of first year
: 40 percent
Illustration
= -512,700
Base – case NPV:
8 1,000,000
-5,000,000 + 
t=1 (1.15)t
The base-case NPV has to be adjusted for two factors: (i) issue cost, and
(ii) tax-shield associated with debt.
Illustration
Out of the total financing requirement of the project Rs.2,600,000
will come from the equity sources and Rs.2,400,000 will come in
the form of debt finance. As the net equity finance required by the
project is Rs.2,600,000 and the issue costs would absorb 5 per cent
of the gross proceeds of the issue, the firm will have to issue
Rs.2,736,842 (Rs.2,600,000 / 0.95) of equity stock in order to
realise a net amount of Rs.2,600,000. The difference of Rs.136,842
is the cost of underwriting, brokerage, printing, and other issue
related expenses. TheAPV after adjustment for issue cost is :
APV = Base-case NPV – Issue cost
= -Rs.512,700 – Rs.136,842
= -Rs.649,542
Illustration
Now we consider the adjustment for the tax shield associated with debt
finance. The present value of tax shield associated with Rs.2,400,000 of
debt finance is calculated. From this we find that the debt finance
associated with the project brings a stream of tax shields which has a
present value of Rs.403,385. If we make adjustment for this also, we get
:
APV = Base case NPV – Issue cost + Present
value of tax shield
= -Rs.512,700 – Rs.136,842 + Rs.403,385
= -Rs.246,157
Y
ear Interest Tax shield
Debt outstanding
at the beginning
Present value of
tax shield
(at 14% discount rate)
1 2,400,000 336,000 134,400 117,869
2 2,100,000 294,000 117,600 90,552
3 1,800,000 252,000 100,800 68,040
4 1,500,000 210,000 84,000 49,728
5 1,200,000 168,000 67,200 34,877
6 900,000 126,000 50,400 22,982
7 600,000 84,000 33,600 13,440
8 300,000 42,000 16,800 5,897
Total Rs.403,385
Calculation of the Present Value of Tax Shield
Merits of APV
The principle underlying APV is to divide and conquer. APV does not
reflect the side effects of financing in a single calculation. Instead, it
captures them in a series of calculations. This makes it more
illuminating. You not only know what the APV is but also where it is
coming from. This is helpful in reformulating the project.
APV makes more sense for projects that have a capital structure
that is different from the rest of the firm or which have a capital structure
that changes significantly over time or which enjoy special concessions,
incentives, and subsidies. For example, APV is eminently suitable for
leveraged buyouts(LBOs) or infrastructure projects.
Adjusted Cost of Capital
E
V V
D c
r (1- T )
D + rE (13.4)
Though conceptually sound, APV is not very popular because (i) it
requires some sophistication to assess the financing side effects, and (ii)
it involves a series of adjustments which may be cumbersome.
That is why WACC, which is the cost of capital adjusted for
financing effects, is more commonly used in practice. Recall that WACC
is:
There are some other formulae also of adjusted cost of capital.
Two of them are :
Modigliani and Miller formula : r* = r (1-TL) (13.5)
Miles and Ezzell formula : r* = r – L rD T
1+r
(13.6)
1+ rD
where r* = adjusted cost of capital
r = opportunity cost of capital assuming 100 per cent
equity financing
T = tax rate applicable to the firm
L = marginal contribution of the project to the firm’s
debt capacity
rD = cost of debt
Adjusted Cost of Capital
Adjusted Cost of Capital
Example 1 A firm is considering a project for setting up a captive power
plant for which the following information has been gathered.
Investment outlay :
Annual post-tax savings :
Life of the project :
Debt capacity of the project :
Interest rate of debt :
Nature of debt :
Tax rate of the firm :
Opportunity cost of capital :
Rs. 50 million
Rs. 5 million
Perpetual
Rs. 25 million
10 percent
Perpetual
40 percent
12 percent
The adjusted cost of capital as per Modigliani-Miller formula is :
r* = r (1-TL) = 0.12 (1- 0.4 x 0.5 ) = 0.096 or 9.6%
The adjusted cost of capital as per Miles and Ezzell formula is :
1+r 1.12
r* = r – L rD T = 0.12 –0.5 x 0.10 x 0.4 x = 0.100 or 10.0%
1+ rD 1.10
Inflation and Capital Budgeting
Inflation has been a persistent feature of the Indian economy. Hence, it
should be properly considered in capital investment appraisal. Since the
cost of capital, the discount rate, is typically expressed in nominal terms,
all the cash flows should also be expressed in nominal terms. This means
that (a) projected revenues and costs must reflect the inflation rates
expected in future and (b) salvage values, too, must be expressed in
future nominal amounts.
International Capital Budgeting
There are two equivalent ways of calculating the NPV of a foreign
project.
Home CurrencyApproach
• Convert all the foreign currency cash flows into rupees (use fore-
casted exchange rates)
• Calculate the NPV in rupees ( use the rupee discount rate)
Foreign CurrencyApproach
• Calculate the NPV in foreign currency (use the foreign currency
discount rate)
• Convert the foreign currency NPV into rupees (use the spot ex-
change rate)
Investment in Capabilities
Empirical evidence suggests that companies that perform well have
organisational capabilities that enable them to exploit opportunities.
What are these organisational capabilities? As Baldwin and Clark say: “
Organisational capabilities are combinations of human skills,
organisational procedures and routines, physical assets, and the systems
of information and incentives that improve performance along particular
dimensions. Such capabilities are indeed organisational assets.”
Capabilities
Baldwin and Clark mention five specific capabilities:
External Integration Capability The ability of the firm to link its
understanding of customers with engineering design to develop improved
products.
Internal Integration Capability Internal integration makes a company faster
and more efficient in performing various functions like new product
development, prototyping, facilities engineering, and capacity expansion
Flexibility The ability of a firm to do a variety of things and to respond
quickly to changes.
Capacity to Experiment The capacity to experiment depends on the
investments a firm makes in developing knowledge, disseminating
knowledge, and adopting the same in practice
Capacity to Cannibalise Cannibalisation involves introducing a new
product that cuts into the sales of the existing products.
Characteristics of Capabilities – Building
Investments
Investments required to build capabilities have certain special
characteristics. These are:
 Many of the outlays required are on things like common language
and communication, human training and skill development, and
support services. These are not ordinarily regarded as capital
expenditure in many firms.
 Investments required to build a capability range widely in scale
and scope.
 While costs of building capabilities are visible and appear on
someone’s budget, the benefits are derived by the company as a
whole and occur only after a time lag.
Allocating Resources to Build Capabilities
The challenge for a company lies in developing a capital allocation
system that accommodates investment in capabilities without sacrificing
the benefits of a formal financial analysis. Towards this end, the
following actions are required.
• Identify the capabilities that the firm should develop and ensure that
there is a firm organisational commitment to them.
• Develop a capital budget for capabilities and a proper system of
authorisation and accounting for expenditures relating to
capabilities.
• Translate the desired capabilities into appropriate goals and rewards
that are clearly understood and used by people throughout the
organisation.
• Link compensation of managers to improvements in speed, quality,
and flexibility, which are the outcomes of capabilities.
SUMMARY
 For a proper comparison of two mutually exclusive alternatives, that have
different lives, we have to convert the present value of costs into a uniform
annual equivalent (UAE) figure.
The UAE is simply:
PV (Cost)/PVIFA r,n
 In real life, an investment can typically be undertaken now or at some point of
time in future. The timing that has the highest current value represents the
optimal timing.
 The economic life of an asset is conceptually defined as the period after which
the asset should be replaced to minimise the sum of operating and
maintenance costs and capital costs expressed on an annual basis.
 Strictly speaking, WACC is the right discount rate for a project that is a carbon
copy of the firm’s existing business.
 A project may have financing effects that differ from those of the existing
investments of the firm. It may have different debt capacity or be entitled to
certain subsidies or have some special financial features. In such cases the
recommended method is to calculate the adjusted NPV (orAPV for short).
 APV is calculated by first estimating the base-case NPV and then adjusting it
to reflect the financing impact of the project.
APV = Base-case NPV + Present value of the financing side effects of the
project
 The base-case NPV is the NPV of the project under the following assumptions
: (a) The project is financed entirely by equity. (b) There is no financing effect
like issue cost or subsidy.
 The present value of financing side effects is equal to : Present value of
positive financing side effects like tax subsidies – Present value of negative
financing side effects like issue costs.
 Though conceptually sound, APV is not very popular because (i) it requires
some sophistication to assess the financing side effects, and (ii) it involves a
series of adjustments which may be cumbersome. That is why WACC, which
is the cost of capital adjusted for financing effects, is more commonly used in
practice.
 WACC is equal to :
D E
rD (1- Tc) + rE
V V
 There are some other formulae also for calculating the adjusted cost of capital.
Two of them are:
Modigliani and Miller formula : r* = r (1-TL)
1+r
Miles and Ezzell formula : r* = r – L rD T
1+ rD
 The adjustment for inflation should be done properly in practice.
 There are two ways of evaluating an international capital budgeting proposal:
the home currency approach and the foreign currency approach. Correctly
applied both the approaches yield the same result.
 Empirical evidence suggest that companies that perform well have
organisational capabilities that enable them to exploit opportunities.
1 de 27

Recomendados

Chapter13 specialdecisionsituations por
Chapter13 specialdecisionsituationsChapter13 specialdecisionsituations
Chapter13 specialdecisionsituationsAKSHAYA0000
408 visualizações27 slides
Ch14sol cash flow estimation por
Ch14sol cash flow estimationCh14sol cash flow estimation
Ch14sol cash flow estimationHassan Zada
266 visualizações20 slides
Project Valuation Lecture por
Project Valuation LectureProject Valuation Lecture
Project Valuation Lecturebradhapa
4.3K visualizações20 slides
Brad Simon - Finance Lecture - Project Valuation por
Brad Simon - Finance Lecture - Project ValuationBrad Simon - Finance Lecture - Project Valuation
Brad Simon - Finance Lecture - Project Valuationbradhapa
2.5K visualizações20 slides
Capital Budgeting por
Capital BudgetingCapital Budgeting
Capital Budgetingyashpal01
3.1K visualizações26 slides
Adl 13-financial-management por
Adl 13-financial-managementAdl 13-financial-management
Adl 13-financial-managementHimanshu Jindal
8.3K visualizações28 slides

Mais conteúdo relacionado

Similar a PPAM-AK PPT.pptx

Lecture cash flow evaluation new por
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation newBsgr Planmin
533 visualizações47 slides
Lecture cash flow evaluation new por
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation newBsgr Planmin
1K visualizações47 slides
FN6033-CORP FIN-LECTURE 5A.ppt por
FN6033-CORP FIN-LECTURE 5A.pptFN6033-CORP FIN-LECTURE 5A.ppt
FN6033-CORP FIN-LECTURE 5A.ppthass6
3 visualizações28 slides
present worth analysis.ppt por
present worth analysis.pptpresent worth analysis.ppt
present worth analysis.pptashwinigupta38
34 visualizações65 slides
Chapter10 thecostofcapital por
Chapter10 thecostofcapitalChapter10 thecostofcapital
Chapter10 thecostofcapitalAKSHAYA0000
660 visualizações35 slides
Chapter 8Cost of CapitalAssociated PressLearning O.docx por
Chapter 8Cost of CapitalAssociated PressLearning O.docxChapter 8Cost of CapitalAssociated PressLearning O.docx
Chapter 8Cost of CapitalAssociated PressLearning O.docxmccormicknadine86
3 visualizações101 slides

Similar a PPAM-AK PPT.pptx(20)

Lecture cash flow evaluation new por Bsgr Planmin
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
Bsgr Planmin533 visualizações
Lecture cash flow evaluation new por Bsgr Planmin
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
Bsgr Planmin1K visualizações
FN6033-CORP FIN-LECTURE 5A.ppt por hass6
FN6033-CORP FIN-LECTURE 5A.pptFN6033-CORP FIN-LECTURE 5A.ppt
FN6033-CORP FIN-LECTURE 5A.ppt
hass63 visualizações
present worth analysis.ppt por ashwinigupta38
present worth analysis.pptpresent worth analysis.ppt
present worth analysis.ppt
ashwinigupta3834 visualizações
Chapter10 thecostofcapital por AKSHAYA0000
Chapter10 thecostofcapitalChapter10 thecostofcapital
Chapter10 thecostofcapital
AKSHAYA0000660 visualizações
Chapter 8Cost of CapitalAssociated PressLearning O.docx por mccormicknadine86
Chapter 8Cost of CapitalAssociated PressLearning O.docxChapter 8Cost of CapitalAssociated PressLearning O.docx
Chapter 8Cost of CapitalAssociated PressLearning O.docx
mccormicknadine863 visualizações
Cf%20 Capital%20 Budgeting%206 por rajeevgupta
Cf%20 Capital%20 Budgeting%206Cf%20 Capital%20 Budgeting%206
Cf%20 Capital%20 Budgeting%206
rajeevgupta643 visualizações
Cf Capital Budgeting 6 por rajeevgupta
Cf Capital Budgeting 6Cf Capital Budgeting 6
Cf Capital Budgeting 6
rajeevgupta419 visualizações
Cf Capital Budgeting 6 por rajeevgupta
Cf Capital Budgeting 6Cf Capital Budgeting 6
Cf Capital Budgeting 6
rajeevgupta806 visualizações
Capital budgeting por bindu sreevatsava
Capital budgetingCapital budgeting
Capital budgeting
bindu sreevatsava75 visualizações
Introducing financial analysis por venkataramanan Thiru
Introducing financial analysisIntroducing financial analysis
Introducing financial analysis
venkataramanan Thiru735 visualizações
The Discounted Cash Flow Valuation.pptx por asde13
The Discounted Cash Flow Valuation.pptxThe Discounted Cash Flow Valuation.pptx
The Discounted Cash Flow Valuation.pptx
asde131.1K visualizações
VBM, KPI Feb 2016 por Olegas Kasatkinas
VBM, KPI Feb 2016VBM, KPI Feb 2016
VBM, KPI Feb 2016
Olegas Kasatkinas985 visualizações
Cap budget [autosaved] por Kinnar Majithia
Cap budget [autosaved]Cap budget [autosaved]
Cap budget [autosaved]
Kinnar Majithia926 visualizações
THE COST OF CAPITAL por PANKAJ PANDEY
THE COST OF CAPITALTHE COST OF CAPITAL
THE COST OF CAPITAL
PANKAJ PANDEY2.2K visualizações
Net Present Value And Washington State University por Marie Stars
Net Present Value And Washington State UniversityNet Present Value And Washington State University
Net Present Value And Washington State University
Marie Stars4 visualizações
Chapter8 investmentcriteria por AKSHAYA0000
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteria
AKSHAYA00002.2K visualizações

Último

Ch. 8 Political Party and Party System.pptx por
Ch. 8 Political Party and Party System.pptxCh. 8 Political Party and Party System.pptx
Ch. 8 Political Party and Party System.pptxRommel Regala
53 visualizações11 slides
MercerJesse2.1Doc.pdf por
MercerJesse2.1Doc.pdfMercerJesse2.1Doc.pdf
MercerJesse2.1Doc.pdfjessemercerail
237 visualizações5 slides
MIXING OF PHARMACEUTICALS.pptx por
MIXING OF PHARMACEUTICALS.pptxMIXING OF PHARMACEUTICALS.pptx
MIXING OF PHARMACEUTICALS.pptxAnupkumar Sharma
82 visualizações35 slides
unidad 3.pdf por
unidad 3.pdfunidad 3.pdf
unidad 3.pdfMarcosRodriguezUcedo
106 visualizações38 slides
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively por
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks EffectivelyISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks EffectivelyPECB
598 visualizações18 slides
Pharmaceutical Inorganic chemistry UNIT-V Radiopharmaceutical.pptx por
Pharmaceutical Inorganic chemistry UNIT-V Radiopharmaceutical.pptxPharmaceutical Inorganic chemistry UNIT-V Radiopharmaceutical.pptx
Pharmaceutical Inorganic chemistry UNIT-V Radiopharmaceutical.pptxMs. Pooja Bhandare
93 visualizações51 slides

Último(20)

Ch. 8 Political Party and Party System.pptx por Rommel Regala
Ch. 8 Political Party and Party System.pptxCh. 8 Political Party and Party System.pptx
Ch. 8 Political Party and Party System.pptx
Rommel Regala53 visualizações
MercerJesse2.1Doc.pdf por jessemercerail
MercerJesse2.1Doc.pdfMercerJesse2.1Doc.pdf
MercerJesse2.1Doc.pdf
jessemercerail237 visualizações
MIXING OF PHARMACEUTICALS.pptx por Anupkumar Sharma
MIXING OF PHARMACEUTICALS.pptxMIXING OF PHARMACEUTICALS.pptx
MIXING OF PHARMACEUTICALS.pptx
Anupkumar Sharma82 visualizações
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively por PECB
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks EffectivelyISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively
PECB 598 visualizações
Pharmaceutical Inorganic chemistry UNIT-V Radiopharmaceutical.pptx por Ms. Pooja Bhandare
Pharmaceutical Inorganic chemistry UNIT-V Radiopharmaceutical.pptxPharmaceutical Inorganic chemistry UNIT-V Radiopharmaceutical.pptx
Pharmaceutical Inorganic chemistry UNIT-V Radiopharmaceutical.pptx
Ms. Pooja Bhandare93 visualizações
The Accursed House by Émile Gaboriau por DivyaSheta
The Accursed House  by Émile GaboriauThe Accursed House  by Émile Gaboriau
The Accursed House by Émile Gaboriau
DivyaSheta212 visualizações
Education and Diversity.pptx por DrHafizKosar
Education and Diversity.pptxEducation and Diversity.pptx
Education and Diversity.pptx
DrHafizKosar177 visualizações
Monthly Information Session for MV Asterix (November) por Esquimalt MFRC
Monthly Information Session for MV Asterix (November)Monthly Information Session for MV Asterix (November)
Monthly Information Session for MV Asterix (November)
Esquimalt MFRC58 visualizações
Pharmaceutical Inorganic Chemistry Unit IVMiscellaneous compounds Expectorant... por Ms. Pooja Bhandare
Pharmaceutical Inorganic Chemistry Unit IVMiscellaneous compounds Expectorant...Pharmaceutical Inorganic Chemistry Unit IVMiscellaneous compounds Expectorant...
Pharmaceutical Inorganic Chemistry Unit IVMiscellaneous compounds Expectorant...
Ms. Pooja Bhandare109 visualizações
Use of Probiotics in Aquaculture.pptx por AKSHAY MANDAL
Use of Probiotics in Aquaculture.pptxUse of Probiotics in Aquaculture.pptx
Use of Probiotics in Aquaculture.pptx
AKSHAY MANDAL104 visualizações
Narration lesson plan por TARIQ KHAN
Narration lesson planNarration lesson plan
Narration lesson plan
TARIQ KHAN59 visualizações
11.30.23 Poverty and Inequality in America.pptx por mary850239
11.30.23 Poverty and Inequality in America.pptx11.30.23 Poverty and Inequality in America.pptx
11.30.23 Poverty and Inequality in America.pptx
mary850239167 visualizações
ICS3211_lecture 09_2023.pdf por Vanessa Camilleri
ICS3211_lecture 09_2023.pdfICS3211_lecture 09_2023.pdf
ICS3211_lecture 09_2023.pdf
Vanessa Camilleri73 visualizações
CUNY IT Picciano.pptx por apicciano
CUNY IT Picciano.pptxCUNY IT Picciano.pptx
CUNY IT Picciano.pptx
apicciano54 visualizações
Structure and Functions of Cell.pdf por Nithya Murugan
Structure and Functions of Cell.pdfStructure and Functions of Cell.pdf
Structure and Functions of Cell.pdf
Nithya Murugan701 visualizações
Classification of crude drugs.pptx por GayatriPatra14
Classification of crude drugs.pptxClassification of crude drugs.pptx
Classification of crude drugs.pptx
GayatriPatra1492 visualizações
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB... por Nguyen Thanh Tu Collection
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
BÀI TẬP BỔ TRỢ TIẾNG ANH 11 THEO ĐƠN VỊ BÀI HỌC - CẢ NĂM - CÓ FILE NGHE (GLOB...
Nguyen Thanh Tu Collection73 visualizações
Class 9 lesson plans por TARIQ KHAN
Class 9 lesson plansClass 9 lesson plans
Class 9 lesson plans
TARIQ KHAN47 visualizações

PPAM-AK PPT.pptx

  • 2. OUTLINE • Choice between mutually exclusive projects of unequal life • Optimal timing decision • Determination of economic life • Interrelationship between investment and financing aspects • Inflation and capital budgeting • International capital budgeting • Investment in capabilities
  • 3. Choice between Mutually Exclusive Projects of Unequal Life For a proper comparison of the two alternatives, that have different lives, we have to convert the present value of costs into a uniform annual equivalent (UAE) figure – this is also called an equivalent annual cost (EAC) figure. The UAE is a function of the present value of cost, the life of the asset, and the discount rate. The UAE is simply: PV Cost PVIFAr,n
  • 4. Uniform Annual Equivalent 12,000 12,000 12,000 PV of costs of machineA: 12,000 12,000 75,000 + + + + + = 118,260 (1.12) (1.12)2 (1.12)3 (1.12)4 (1.12)5 PV costs of machine B : 15,000 15,000 15,000 50,000 + + + = 86,030 MachineA: (1.12) (1.12)2 UAE = 118,260 (1.12)3 118,260 PVIFA12%,5 Machine B: UAE = 86,030 PVIFA12%,3 3.605 86,030 2.402 = 32,804 = 35,816 = =
  • 5. Optimal Timing In real life, an investment is rarely a “now or never” proposition. Typically, it can be undertaken now or at some point of time in future. Given this option, the issue of optimal timing assumes significance. Under conditions of certainty, the optimal timing may be determined by using the following procedure. 1. Examine alternative dates (t) when the investment can be made. 2. Estimate the net future value as of each alternative date and convert the same to its current value. 3. Choose the timing that has the highest current value
  • 6. Determination of Economic Life The economic life of an asset is conceptually defined as the period after which the asset should be replaced to minimise the sum of operating and maintenance costs and capital costs expressed on an annual basis. Put differently, it is the replacement cycle that minimises the uniform annual equivalent total cost, UAE (TC) of operating and owning the asset. The UAE (TC) is simply the sum of the uniform annual equivalent operating and maintenance cost, UAE (OM), and the uniform annual equivalent capital cost, UAE (CC). That is, UAE (TC) = UAE (OM) + UAE (CC) (13.1)
  • 7. S UAE (CC) Replacement Period (in years) Annualised Cost Costs over the Life of a Machine
  • 8. Interrelationship between the Investment and Financing Aspects • WACC is the right discount rate for a project that is a carbon copy of the firm’s existing business. • A project may have financing effects that differ from those of the existing investments of the firm. It may have a different debt capacity or be entitled to certain subsidies or have some special financial features. In such cases the recommended method is to calculate the adjusted NPV (orAPV for short).
  • 9. Adjusted Present Value (APV) APV is calculated by first estimating the base-case NPV and then adjusting it to reflect the financing side effects of the project. The base-case NPV is the NPV of the project under the following assumptions: • • The project is financed entirely by equity. There is no financing side effect like issue cost or subsidy The present value of financing side effects is equal to: • Present value of positive financing side effects like tax shield on debt and availability of subsidies. • Present value of negative financing side effects like issue costs and financial distress costs associated with excessive leverage.
  • 10. Illustration Investment Net cash inflow Opportunity cost of capital Issue cost of equity Debt available Repayment of debt Tax rate : Rs. 5 million : Rs.1 million per year for 8 years : 15 percent : 5 percent : Rs.2.4 million at 14 percent : 8 equal annual instalments. First instalment will be paid at the end of first year : 40 percent
  • 11. Illustration = -512,700 Base – case NPV: 8 1,000,000 -5,000,000 +  t=1 (1.15)t The base-case NPV has to be adjusted for two factors: (i) issue cost, and (ii) tax-shield associated with debt.
  • 12. Illustration Out of the total financing requirement of the project Rs.2,600,000 will come from the equity sources and Rs.2,400,000 will come in the form of debt finance. As the net equity finance required by the project is Rs.2,600,000 and the issue costs would absorb 5 per cent of the gross proceeds of the issue, the firm will have to issue Rs.2,736,842 (Rs.2,600,000 / 0.95) of equity stock in order to realise a net amount of Rs.2,600,000. The difference of Rs.136,842 is the cost of underwriting, brokerage, printing, and other issue related expenses. TheAPV after adjustment for issue cost is : APV = Base-case NPV – Issue cost = -Rs.512,700 – Rs.136,842 = -Rs.649,542
  • 13. Illustration Now we consider the adjustment for the tax shield associated with debt finance. The present value of tax shield associated with Rs.2,400,000 of debt finance is calculated. From this we find that the debt finance associated with the project brings a stream of tax shields which has a present value of Rs.403,385. If we make adjustment for this also, we get : APV = Base case NPV – Issue cost + Present value of tax shield = -Rs.512,700 – Rs.136,842 + Rs.403,385 = -Rs.246,157
  • 14. Y ear Interest Tax shield Debt outstanding at the beginning Present value of tax shield (at 14% discount rate) 1 2,400,000 336,000 134,400 117,869 2 2,100,000 294,000 117,600 90,552 3 1,800,000 252,000 100,800 68,040 4 1,500,000 210,000 84,000 49,728 5 1,200,000 168,000 67,200 34,877 6 900,000 126,000 50,400 22,982 7 600,000 84,000 33,600 13,440 8 300,000 42,000 16,800 5,897 Total Rs.403,385 Calculation of the Present Value of Tax Shield
  • 15. Merits of APV The principle underlying APV is to divide and conquer. APV does not reflect the side effects of financing in a single calculation. Instead, it captures them in a series of calculations. This makes it more illuminating. You not only know what the APV is but also where it is coming from. This is helpful in reformulating the project. APV makes more sense for projects that have a capital structure that is different from the rest of the firm or which have a capital structure that changes significantly over time or which enjoy special concessions, incentives, and subsidies. For example, APV is eminently suitable for leveraged buyouts(LBOs) or infrastructure projects.
  • 16. Adjusted Cost of Capital E V V D c r (1- T ) D + rE (13.4) Though conceptually sound, APV is not very popular because (i) it requires some sophistication to assess the financing side effects, and (ii) it involves a series of adjustments which may be cumbersome. That is why WACC, which is the cost of capital adjusted for financing effects, is more commonly used in practice. Recall that WACC is:
  • 17. There are some other formulae also of adjusted cost of capital. Two of them are : Modigliani and Miller formula : r* = r (1-TL) (13.5) Miles and Ezzell formula : r* = r – L rD T 1+r (13.6) 1+ rD where r* = adjusted cost of capital r = opportunity cost of capital assuming 100 per cent equity financing T = tax rate applicable to the firm L = marginal contribution of the project to the firm’s debt capacity rD = cost of debt Adjusted Cost of Capital
  • 18. Adjusted Cost of Capital Example 1 A firm is considering a project for setting up a captive power plant for which the following information has been gathered. Investment outlay : Annual post-tax savings : Life of the project : Debt capacity of the project : Interest rate of debt : Nature of debt : Tax rate of the firm : Opportunity cost of capital : Rs. 50 million Rs. 5 million Perpetual Rs. 25 million 10 percent Perpetual 40 percent 12 percent The adjusted cost of capital as per Modigliani-Miller formula is : r* = r (1-TL) = 0.12 (1- 0.4 x 0.5 ) = 0.096 or 9.6% The adjusted cost of capital as per Miles and Ezzell formula is : 1+r 1.12 r* = r – L rD T = 0.12 –0.5 x 0.10 x 0.4 x = 0.100 or 10.0% 1+ rD 1.10
  • 19. Inflation and Capital Budgeting Inflation has been a persistent feature of the Indian economy. Hence, it should be properly considered in capital investment appraisal. Since the cost of capital, the discount rate, is typically expressed in nominal terms, all the cash flows should also be expressed in nominal terms. This means that (a) projected revenues and costs must reflect the inflation rates expected in future and (b) salvage values, too, must be expressed in future nominal amounts.
  • 20. International Capital Budgeting There are two equivalent ways of calculating the NPV of a foreign project. Home CurrencyApproach • Convert all the foreign currency cash flows into rupees (use fore- casted exchange rates) • Calculate the NPV in rupees ( use the rupee discount rate) Foreign CurrencyApproach • Calculate the NPV in foreign currency (use the foreign currency discount rate) • Convert the foreign currency NPV into rupees (use the spot ex- change rate)
  • 21. Investment in Capabilities Empirical evidence suggests that companies that perform well have organisational capabilities that enable them to exploit opportunities. What are these organisational capabilities? As Baldwin and Clark say: “ Organisational capabilities are combinations of human skills, organisational procedures and routines, physical assets, and the systems of information and incentives that improve performance along particular dimensions. Such capabilities are indeed organisational assets.”
  • 22. Capabilities Baldwin and Clark mention five specific capabilities: External Integration Capability The ability of the firm to link its understanding of customers with engineering design to develop improved products. Internal Integration Capability Internal integration makes a company faster and more efficient in performing various functions like new product development, prototyping, facilities engineering, and capacity expansion Flexibility The ability of a firm to do a variety of things and to respond quickly to changes. Capacity to Experiment The capacity to experiment depends on the investments a firm makes in developing knowledge, disseminating knowledge, and adopting the same in practice Capacity to Cannibalise Cannibalisation involves introducing a new product that cuts into the sales of the existing products.
  • 23. Characteristics of Capabilities – Building Investments Investments required to build capabilities have certain special characteristics. These are:  Many of the outlays required are on things like common language and communication, human training and skill development, and support services. These are not ordinarily regarded as capital expenditure in many firms.  Investments required to build a capability range widely in scale and scope.  While costs of building capabilities are visible and appear on someone’s budget, the benefits are derived by the company as a whole and occur only after a time lag.
  • 24. Allocating Resources to Build Capabilities The challenge for a company lies in developing a capital allocation system that accommodates investment in capabilities without sacrificing the benefits of a formal financial analysis. Towards this end, the following actions are required. • Identify the capabilities that the firm should develop and ensure that there is a firm organisational commitment to them. • Develop a capital budget for capabilities and a proper system of authorisation and accounting for expenditures relating to capabilities. • Translate the desired capabilities into appropriate goals and rewards that are clearly understood and used by people throughout the organisation. • Link compensation of managers to improvements in speed, quality, and flexibility, which are the outcomes of capabilities.
  • 25. SUMMARY  For a proper comparison of two mutually exclusive alternatives, that have different lives, we have to convert the present value of costs into a uniform annual equivalent (UAE) figure. The UAE is simply: PV (Cost)/PVIFA r,n  In real life, an investment can typically be undertaken now or at some point of time in future. The timing that has the highest current value represents the optimal timing.  The economic life of an asset is conceptually defined as the period after which the asset should be replaced to minimise the sum of operating and maintenance costs and capital costs expressed on an annual basis.  Strictly speaking, WACC is the right discount rate for a project that is a carbon copy of the firm’s existing business.  A project may have financing effects that differ from those of the existing investments of the firm. It may have different debt capacity or be entitled to certain subsidies or have some special financial features. In such cases the recommended method is to calculate the adjusted NPV (orAPV for short).
  • 26.  APV is calculated by first estimating the base-case NPV and then adjusting it to reflect the financing impact of the project. APV = Base-case NPV + Present value of the financing side effects of the project  The base-case NPV is the NPV of the project under the following assumptions : (a) The project is financed entirely by equity. (b) There is no financing effect like issue cost or subsidy.  The present value of financing side effects is equal to : Present value of positive financing side effects like tax subsidies – Present value of negative financing side effects like issue costs.  Though conceptually sound, APV is not very popular because (i) it requires some sophistication to assess the financing side effects, and (ii) it involves a series of adjustments which may be cumbersome. That is why WACC, which is the cost of capital adjusted for financing effects, is more commonly used in practice.  WACC is equal to : D E rD (1- Tc) + rE V V
  • 27.  There are some other formulae also for calculating the adjusted cost of capital. Two of them are: Modigliani and Miller formula : r* = r (1-TL) 1+r Miles and Ezzell formula : r* = r – L rD T 1+ rD  The adjustment for inflation should be done properly in practice.  There are two ways of evaluating an international capital budgeting proposal: the home currency approach and the foreign currency approach. Correctly applied both the approaches yield the same result.  Empirical evidence suggest that companies that perform well have organisational capabilities that enable them to exploit opportunities.