THE TERMITES OF PRODUCTION –
CHRONIC LOSSES
 Chronic Losses – caused by gradual
machine deterioration, but not potent
enough to critically damage machine
in a single occurrence
 Machines are run at slower pace –
avoid breakdown – continual under-
performance
 Becomes the “Cost of doing Business”
– part of the status quo
 Japanese TPM texts – Chronic losses
always account for higher percent
than sporadic losses
Image retrieved from : https://leanmanufacturing.online/losses-costs-
efficiency/
Combination
of factors :
Chronic
Losses
Cause
Cause
Cause
Cause
P-M ANALYSIS : INTRODUCTION
 Developed by Kunio Shiroshe of Japan Institute of Plant Maintenance
 Physically analyses chronic losses according to inherent principles and
natural laws that govern them
 Clarifies the mechanics of their occurrence, and conditions that must be
controlled to prevent them
 Refined variation of Fishbone diagram
 Sequence : Physically analyse chronic problems, Define conditions
underlying abnormal phenomena, Identify factors contributing to
phenomena
Phenomena –
Deviations from
normal to
abnormal state
Physical –
Analysis to
understand the
principles
behind an
abnormal event
P Understand
mechanics of the
problem of abnormal
phenomena – How
they are produced;
Understand the
mechanism of the
equipmentsUnderstand the
relations between
the abnormal
event & the 4
production inputs
(4 M’s) – Machine,
Man, Material,
Method
M
WHEN TO USE P-M ANALYSIS ?
Root Cause Analysis
5-Why Analysis
Singl
e
Caus
e
Multiple
Cause
s
Chronic
Losses
Complex combination
of causes
Bar chart retrieved from : https://leanmanufacturing.online/p-m-analysis-basic/
PM Analysis Vs. Conventional Approach
Approach Conventional
Approach
P-M Analysis
Objective Reduce defects to ½ or
1/3 of their present level
Reduce defects to zero
or get as close as
possible
Concepts • Priority based
• Focus on factor having
greatest impact
• Carry out measures
only
on selected factors.
• Not priority-based
• Think logically; list all
possible factors behind
defects
• Investigate all factors
• Correct all
abnormalities
Methodology Cause-and-effect-
diagram
PM Analysis
Application • Use where defect rate • Use where defect rate
P-M Analysis Steps
1. Clarify the phenomenon
2. Conduct a physical analysis
3. Define the phenomenon’s constituent conditions
4. Study production input correlations (4Ms)
5. Set optimal conditions (standard values)
6. Survey casual factors for abnormalities
7. Determining abnormalities to be addressed
8. Propose and make improvements
1. Clarify the phenomenon
 ‘Phenomenon’ means an occurrence or fact that
can be observed.
 In P-M analysis “clarifying the phenomenon”
means using our observation skills to grasp facts
and illuminate underlying concepts.
 Carefully define and categorize the abnormal
occurrence.
 Without this, P-M analysis may end up missing
the mark.
2. Conduct a physical analysis
 Physical analysis is a logical investigation of
phenomena such as defects or breakdowns that
explains how the phenomena occur in terms
physical principles and quantities.
 Physical analysis explains properly stratified
phenomena from a physical point of view.
 Determines the phenomenon in physical term,
e.g., how the parts or process conditions change
in relation to each other to produce the defect or
failure.
3. Identify constituent conditions
 Identify all the conditions that will consistently produce the
phenomenon.
 It is to review all the conditions that consistently give rise to
the problem.
 These are constituent conditions either necessary or
sufficient for the physical phenomenon analyzed in the
previous step to occur.
 Any constituent condition fall into one of the four categories of
production inputs:
(1) Machine
(2) Man
(3) Material
(4) Methods
4. Study 4Ms for causal factors
 Look for potential cause-and-effect relations between the
constituent conditions and equipment, materials, work
methods, and human factors.
 The constituent condition becomes the “effect,” and review
4M elements for potential “cause”.
 4Ms are further divided into primary 4Ms and secondary
4Ms.
Phenomenon Constituent
Conditions
Primary 4Ms Secondary 4Ms
1. A car engine will not
start.
1. Gasoline is not
supplied to the
engine.
1-1. the fuel system is
without gasoline.
1-1-1. The gasket
between the gas tank
and the fuel line is
worn.
1-1-2. The gas tank is
empty.
2. Electrical power is
not supplied to the
engine.
2-1. The battery is
without power.
2-1-1. A battery cable
is loose.
2-1-2. the battery is
dead
5. Establish optimal conditions(standard
values)
 Review the equipment’s current precision
levels to determine where new or revised
standards are deficient.
 Seek out and identify all abnormalities within
the factors.
6. Survey causal factors and
abnormalities
 Determine the most reliable, efficient ways to measure
the gap between the condition of causal factors
identified in step 3 and 4 and their ideas value
confirmed in step 5.
 Determine the most efficient way to physical survey all
the factors at the machine location.
 Conduct the survey, measuring targeted values and
comparing them to optimal standards to determine
which factors contain abnormalities and thus are
actual causes of defect phenomenon.
7. Determine abnormalities to be
addressed
 Review survey results and list all abnormalities to
be addressed.
 Key to identifying abnormalities:
1. Thoroughly investigate all factors.
2. Compare normal conditions against current
standards.
3. Think in term of optimal conditions, not just
necessary conditions.
4. Understand the causal factors behind each
condition classified as abnormal.
8. Propose and make
improvements
 Final P-M analysis step.
 Team propose and make any corrections and
improvements required for each abnormality,
then plan and institute appropriate preventive
measures.
 Preventive maintenance procedures to
maintain optimal condition.
P-M analysis is unsuccessful
when…
 Some factors are overlooked.
 Abnormalities are not thoroughly identified.
 Accepted standard values are incorrect or
inappropriate.
 Measurement methods are incorrect or
inappropriate.
 The counter measures themselves contain
errors.
P-M ANALYSIS : SUMMARY
Step 1 Classification of the
phenomenon
Perform sufficient
stratified
Step 2 Physical analysis of
phenomenon
Analysis the view point of
physical for phenomena
Step 3 Conditions to reproduce
phenomenon
Study the condition under
which phenomenon can
be reproduced
Step 4 Relevant equipment,
tooling, materials,
methods
Study relevant equipment,
tooling, material, way
Step 5 Study on research
methods
Study the range of
research, methods of
research and
measurement methods
Step 6 Extraction of the problem Creating standard and
measurement
Step 7 Planning of measure Measures for each
problem
EXAMPLE 1 :
ANALYSIS OF COMPONENTS TO ASSESS CAUSES OF THE
FAILURE
Phenomen
a
Point of view Condition as
method
Relation to
the 4M
Relation to the 4M
secondary
Air does not
come until
the needle
• Low air pressure
• Air hose is long
• Broken air hose
Leaking air
in the
cylinder
• Scratches of the
piston rod, wear
Resistance
between the
cover and
piston rod
• Deformation of the
piston rod, scratches
rust
• Deformation of the rod
cover
• Lack of lubrication
Resistance
between the
piston rod
and cylinder
• Deformation of the
cylinder tube,
scratches rust
• Lack of lubrication
Stopinthemiddleof
pistonrodoftheair
cylinder
Resistanceforcereceived
bytherodthantherodis
greateradvance
Driving
force of
the rod is
less
Resistance
experience
d by a
large rod
EXAMPLE 2 : P-M ANALYSIS TABLE
Turbine shaft Occurrence and
frequency
By theory and by
drawing to analyse
the phenomena
Machine No. Failure occurs and
sometimes non-
standard for large
ellipse in the
process
Changing the
distance b/w the
centre of the
grinding wheel and
the work piece
NC cylindrical
grinder
Established
conditions
Relevance of the
methods and
materials, equipment
and tooling
Secon
d
investi
gation
Item
(drawing)
Second
item
(part
Position
changes
the
centre of
the
Loose
measure
ment
during
clampin
N
G
N
G
-1 wear
n/d clamp
1-1-2 wear
cam
….
….
1-1-5
NG
NG
NG
NG
OK
Exchang
e
Exchang
e
Exchang
e
Exchang
e
Ok
Ok
Ok
Ok
Measur
es
Sectio
nResult
Thefirstsurvey
items
Toleranc
e
Less0.002
mmImpac
t
Hig
h
Measured0.001mm
Survey
results
Looseness
ofthe
clamp
Judgeme
nt
Judgeme
nt
REFERENCES
 Terry Wireman Blog Series. Chronic vs. Sporadic Failure. Retrieved
from : SAP Partner - VestaPartners.com
 Kunio S., Kaneda M. & Kimura Y. P-M Analysis : An Advanced Step
In TPM Implementation. What is P-M Analysis? Page 18. CRC
Press. Retrieved from : Google Books
 Willmott P. & McCarthy D. TPM : A Route to World Class
Manufacturing. P-M Analysis. Page 104. Newnes Publishers.
Retrieved from : Google Books
 P-M Analysis Basics. Retrieved from : LeanManufacturing.online
 Arai K. TPM for the Lean Factory. Phenomenon, Mechanisms &
Causes. Page 3-33. Routledge Publishers. Retrieved from : Google
Books
 Monma H. PM Analysis. 4 March, 2015. Retrieved from : Japanese
Gemba Kaizen Web
Thank You!

More Related Content

What's hot

20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction
Henrik Gantzel
 
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEETO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
Mohamed Fayas
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
Operational Excellence Consulting
 

What's hot (20)

Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
OEE
OEEOEE
OEE
 
Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)
 
Tpm
TpmTpm
Tpm
 
Ppap training ppt
Ppap training   ppt Ppap training   ppt
Ppap training ppt
 
My machine camp
My machine campMy machine camp
My machine camp
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
 
20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction
 
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEETO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
 
Tpmjishu
TpmjishuTpmjishu
Tpmjishu
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Ch 7 qm
Ch 7 qmCh 7 qm
Ch 7 qm
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
 

Similar to Phenomenon & Mechanism Analysis

Similar to Phenomenon & Mechanism Analysis (20)

FMEA Presentation V1.1
FMEA Presentation V1.1FMEA Presentation V1.1
FMEA Presentation V1.1
 
Method for accident and incident analysis
Method for accident and incident analysisMethod for accident and incident analysis
Method for accident and incident analysis
 
3620720.ppt
3620720.ppt3620720.ppt
3620720.ppt
 
5 why criteria matrix
5 why criteria matrix5 why criteria matrix
5 why criteria matrix
 
K04555558
K04555558K04555558
K04555558
 
Risk analysis
Risk analysis  Risk analysis
Risk analysis
 
Failure analysis of polymer and rubber materials
Failure analysis of polymer and rubber materialsFailure analysis of polymer and rubber materials
Failure analysis of polymer and rubber materials
 
Failure Analysis of Polymer and Rubber Components
Failure Analysis of Polymer and Rubber ComponentsFailure Analysis of Polymer and Rubber Components
Failure Analysis of Polymer and Rubber Components
 
International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES) International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)
 
Case Template BPKK.pptx
Case Template BPKK.pptxCase Template BPKK.pptx
Case Template BPKK.pptx
 
Cause & Effect
Cause & EffectCause & Effect
Cause & Effect
 
1675091151425_Process Management Risk.pptx
1675091151425_Process Management Risk.pptx1675091151425_Process Management Risk.pptx
1675091151425_Process Management Risk.pptx
 
Preventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.pptPreventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.ppt
 
Accident Investigation & RCA
Accident Investigation & RCAAccident Investigation & RCA
Accident Investigation & RCA
 
Nebosh oil-and-gas-certificate-e book
Nebosh oil-and-gas-certificate-e bookNebosh oil-and-gas-certificate-e book
Nebosh oil-and-gas-certificate-e book
 
Incident accident analysis
Incident accident analysisIncident accident analysis
Incident accident analysis
 
topic7.ppt
topic7.ppttopic7.ppt
topic7.ppt
 
Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety Analysis
 
2015 Trinity Dublin - Task risk management - hf in process safety
2015 Trinity Dublin - Task risk management - hf in process safety2015 Trinity Dublin - Task risk management - hf in process safety
2015 Trinity Dublin - Task risk management - hf in process safety
 
Troubleshooting.pdf
Troubleshooting.pdfTroubleshooting.pdf
Troubleshooting.pdf
 

More from Shubham Singh

More from Shubham Singh (20)

Research Methodology
Research MethodologyResearch Methodology
Research Methodology
 
Traffic Light System
Traffic Light SystemTraffic Light System
Traffic Light System
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Ergonomics in apparel manufacturing
Ergonomics in apparel manufacturingErgonomics in apparel manufacturing
Ergonomics in apparel manufacturing
 
Ergonomics
ErgonomicsErgonomics
Ergonomics
 
Training & Development of Supervisors
Training & Development of SupervisorsTraining & Development of Supervisors
Training & Development of Supervisors
 
Sustainability in apparel sector
Sustainability in apparel sectorSustainability in apparel sector
Sustainability in apparel sector
 
Sustainable Production
Sustainable ProductionSustainable Production
Sustainable Production
 
Joint Venture
Joint VentureJoint Venture
Joint Venture
 
Business Plan
Business PlanBusiness Plan
Business Plan
 
Entrepreneurship Management
Entrepreneurship ManagementEntrepreneurship Management
Entrepreneurship Management
 
Ergonomics principles used in cutting tools in the RMG industry
Ergonomics principles used in cutting tools in the RMG industryErgonomics principles used in cutting tools in the RMG industry
Ergonomics principles used in cutting tools in the RMG industry
 
Henry Ford
Henry FordHenry Ford
Henry Ford
 
Amdavad Haat
Amdavad Haat Amdavad Haat
Amdavad Haat
 
Twitter
TwitterTwitter
Twitter
 
E-Commerce Business Model
E-Commerce Business ModelE-Commerce Business Model
E-Commerce Business Model
 
E-Commerce Business Model
E-Commerce Business ModelE-Commerce Business Model
E-Commerce Business Model
 
Benchmarking : An essential Quality tool
Benchmarking : An essential Quality toolBenchmarking : An essential Quality tool
Benchmarking : An essential Quality tool
 
Corporate Restructuring through Quality Initiatives
Corporate Restructuring through Quality InitiativesCorporate Restructuring through Quality Initiatives
Corporate Restructuring through Quality Initiatives
 
CNC fabric cutting machines
CNC fabric cutting machinesCNC fabric cutting machines
CNC fabric cutting machines
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

Phenomenon & Mechanism Analysis

  • 1. Maintenance Management Phenomenon & Mechanism Analysis Presented to : Mr. Amit Phogat By : Bittu Singh Asst. Professor Radhe Kumar NIFT-Gandhinagar Shubham Singh
  • 2. THE TERMITES OF PRODUCTION – CHRONIC LOSSES  Chronic Losses – caused by gradual machine deterioration, but not potent enough to critically damage machine in a single occurrence  Machines are run at slower pace – avoid breakdown – continual under- performance  Becomes the “Cost of doing Business” – part of the status quo  Japanese TPM texts – Chronic losses always account for higher percent than sporadic losses Image retrieved from : https://leanmanufacturing.online/losses-costs- efficiency/ Combination of factors : Chronic Losses Cause Cause Cause Cause
  • 3. P-M ANALYSIS : INTRODUCTION  Developed by Kunio Shiroshe of Japan Institute of Plant Maintenance  Physically analyses chronic losses according to inherent principles and natural laws that govern them  Clarifies the mechanics of their occurrence, and conditions that must be controlled to prevent them  Refined variation of Fishbone diagram  Sequence : Physically analyse chronic problems, Define conditions underlying abnormal phenomena, Identify factors contributing to phenomena Phenomena – Deviations from normal to abnormal state Physical – Analysis to understand the principles behind an abnormal event P Understand mechanics of the problem of abnormal phenomena – How they are produced; Understand the mechanism of the equipmentsUnderstand the relations between the abnormal event & the 4 production inputs (4 M’s) – Machine, Man, Material, Method M
  • 4. WHEN TO USE P-M ANALYSIS ? Root Cause Analysis 5-Why Analysis Singl e Caus e Multiple Cause s Chronic Losses Complex combination of causes Bar chart retrieved from : https://leanmanufacturing.online/p-m-analysis-basic/
  • 5. PM Analysis Vs. Conventional Approach Approach Conventional Approach P-M Analysis Objective Reduce defects to ½ or 1/3 of their present level Reduce defects to zero or get as close as possible Concepts • Priority based • Focus on factor having greatest impact • Carry out measures only on selected factors. • Not priority-based • Think logically; list all possible factors behind defects • Investigate all factors • Correct all abnormalities Methodology Cause-and-effect- diagram PM Analysis Application • Use where defect rate • Use where defect rate
  • 6. P-M Analysis Steps 1. Clarify the phenomenon 2. Conduct a physical analysis 3. Define the phenomenon’s constituent conditions 4. Study production input correlations (4Ms) 5. Set optimal conditions (standard values) 6. Survey casual factors for abnormalities 7. Determining abnormalities to be addressed 8. Propose and make improvements
  • 7. 1. Clarify the phenomenon  ‘Phenomenon’ means an occurrence or fact that can be observed.  In P-M analysis “clarifying the phenomenon” means using our observation skills to grasp facts and illuminate underlying concepts.  Carefully define and categorize the abnormal occurrence.  Without this, P-M analysis may end up missing the mark.
  • 8. 2. Conduct a physical analysis  Physical analysis is a logical investigation of phenomena such as defects or breakdowns that explains how the phenomena occur in terms physical principles and quantities.  Physical analysis explains properly stratified phenomena from a physical point of view.  Determines the phenomenon in physical term, e.g., how the parts or process conditions change in relation to each other to produce the defect or failure.
  • 9. 3. Identify constituent conditions  Identify all the conditions that will consistently produce the phenomenon.  It is to review all the conditions that consistently give rise to the problem.  These are constituent conditions either necessary or sufficient for the physical phenomenon analyzed in the previous step to occur.  Any constituent condition fall into one of the four categories of production inputs: (1) Machine (2) Man (3) Material (4) Methods
  • 10. 4. Study 4Ms for causal factors  Look for potential cause-and-effect relations between the constituent conditions and equipment, materials, work methods, and human factors.  The constituent condition becomes the “effect,” and review 4M elements for potential “cause”.  4Ms are further divided into primary 4Ms and secondary 4Ms. Phenomenon Constituent Conditions Primary 4Ms Secondary 4Ms 1. A car engine will not start. 1. Gasoline is not supplied to the engine. 1-1. the fuel system is without gasoline. 1-1-1. The gasket between the gas tank and the fuel line is worn. 1-1-2. The gas tank is empty. 2. Electrical power is not supplied to the engine. 2-1. The battery is without power. 2-1-1. A battery cable is loose. 2-1-2. the battery is dead
  • 11. 5. Establish optimal conditions(standard values)  Review the equipment’s current precision levels to determine where new or revised standards are deficient.  Seek out and identify all abnormalities within the factors.
  • 12. 6. Survey causal factors and abnormalities  Determine the most reliable, efficient ways to measure the gap between the condition of causal factors identified in step 3 and 4 and their ideas value confirmed in step 5.  Determine the most efficient way to physical survey all the factors at the machine location.  Conduct the survey, measuring targeted values and comparing them to optimal standards to determine which factors contain abnormalities and thus are actual causes of defect phenomenon.
  • 13. 7. Determine abnormalities to be addressed  Review survey results and list all abnormalities to be addressed.  Key to identifying abnormalities: 1. Thoroughly investigate all factors. 2. Compare normal conditions against current standards. 3. Think in term of optimal conditions, not just necessary conditions. 4. Understand the causal factors behind each condition classified as abnormal.
  • 14. 8. Propose and make improvements  Final P-M analysis step.  Team propose and make any corrections and improvements required for each abnormality, then plan and institute appropriate preventive measures.  Preventive maintenance procedures to maintain optimal condition.
  • 15. P-M analysis is unsuccessful when…  Some factors are overlooked.  Abnormalities are not thoroughly identified.  Accepted standard values are incorrect or inappropriate.  Measurement methods are incorrect or inappropriate.  The counter measures themselves contain errors.
  • 16. P-M ANALYSIS : SUMMARY Step 1 Classification of the phenomenon Perform sufficient stratified Step 2 Physical analysis of phenomenon Analysis the view point of physical for phenomena Step 3 Conditions to reproduce phenomenon Study the condition under which phenomenon can be reproduced Step 4 Relevant equipment, tooling, materials, methods Study relevant equipment, tooling, material, way Step 5 Study on research methods Study the range of research, methods of research and measurement methods Step 6 Extraction of the problem Creating standard and measurement Step 7 Planning of measure Measures for each problem
  • 17. EXAMPLE 1 : ANALYSIS OF COMPONENTS TO ASSESS CAUSES OF THE FAILURE Phenomen a Point of view Condition as method Relation to the 4M Relation to the 4M secondary Air does not come until the needle • Low air pressure • Air hose is long • Broken air hose Leaking air in the cylinder • Scratches of the piston rod, wear Resistance between the cover and piston rod • Deformation of the piston rod, scratches rust • Deformation of the rod cover • Lack of lubrication Resistance between the piston rod and cylinder • Deformation of the cylinder tube, scratches rust • Lack of lubrication Stopinthemiddleof pistonrodoftheair cylinder Resistanceforcereceived bytherodthantherodis greateradvance Driving force of the rod is less Resistance experience d by a large rod
  • 18. EXAMPLE 2 : P-M ANALYSIS TABLE Turbine shaft Occurrence and frequency By theory and by drawing to analyse the phenomena Machine No. Failure occurs and sometimes non- standard for large ellipse in the process Changing the distance b/w the centre of the grinding wheel and the work piece NC cylindrical grinder Established conditions Relevance of the methods and materials, equipment and tooling Secon d investi gation Item (drawing) Second item (part Position changes the centre of the Loose measure ment during clampin N G N G -1 wear n/d clamp 1-1-2 wear cam …. …. 1-1-5 NG NG NG NG OK Exchang e Exchang e Exchang e Exchang e Ok Ok Ok Ok Measur es Sectio nResult Thefirstsurvey items Toleranc e Less0.002 mmImpac t Hig h Measured0.001mm Survey results Looseness ofthe clamp Judgeme nt Judgeme nt
  • 19. REFERENCES  Terry Wireman Blog Series. Chronic vs. Sporadic Failure. Retrieved from : SAP Partner - VestaPartners.com  Kunio S., Kaneda M. & Kimura Y. P-M Analysis : An Advanced Step In TPM Implementation. What is P-M Analysis? Page 18. CRC Press. Retrieved from : Google Books  Willmott P. & McCarthy D. TPM : A Route to World Class Manufacturing. P-M Analysis. Page 104. Newnes Publishers. Retrieved from : Google Books  P-M Analysis Basics. Retrieved from : LeanManufacturing.online  Arai K. TPM for the Lean Factory. Phenomenon, Mechanisms & Causes. Page 3-33. Routledge Publishers. Retrieved from : Google Books  Monma H. PM Analysis. 4 March, 2015. Retrieved from : Japanese Gemba Kaizen Web